1 Requests for Information pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 2, 2018 RFI 01 Is the RFP due at 4pm or pm on May 16th? An Addendum will change to due date to May 17th at 4pm RFI 02 Do you have an anticipated start date for this project? Assume July 01, 2018 RFI 03 There is a Bid Form issued with the RFP labeled Sprouts Bid Form April This bid form has (3) break-outs (Sprouts T.I. Build-Out / Shell Build-Outs / Civil). The RFP and Sample Contract reference (2) proposals & SOV s. There is also a separate Sprouts Bid Form in each of the Project Manuals provided in the Bid Documents. RFP / Section 2 / Item 2.1-A lists Bid Proposal Forms Complete, Exhibit A. There are no documents labeled Exhibit A in the RFP which was issued. Please clarify specifically what Bid Forms are to be submitted by the GC. An Addendum is being issued that will remove the bid form from the Project Manual(s). A bid form will be formally included with the Addendum. An advanced copy has been added to the Share folder within the Addendum Folder. RFI 04 The improvements indicated on the Civil Exhibit for Bid document provided in the Bid Documents are not shown on the Civil Drawings provided in the Bid Set. There is insufficient information on the Civil Exhibit for Bid document which will be required in order to provide a hard bid for this scope. Please provide revised Civil Drawings which include the proposed improvements along with relevant specific details if this scope is to be included in the GC base bid.

2 Ignore the Civil Exhibit for Bid document. A new document Sprouts Retail Exhibit has been added to the Sharefolder within the Addendum folder. Provide a budgetary dollar value. The exhibit will be formally issued in the Addendum. RFI 0 There are no Site Demo drawings in the bid set detailing the existing improvements to be removed or what the thickness is of the existing asphalt & concrete. Please provide Site Demo drawings, details and additional information. Sprouts_Civil_Demo_Plans_Add1 has been added to the Sharefolder within the Addendum folder. The demo drawings will be formally included in the Addendum. RFI 06 Can the RFP due date be changed to May 17th at 4pm. Yes. The date change will be included in the Addendum. RFI 07 The Responsibility List on Sheet T1.0 of the Sprouts TI Bid Set (See Below) lists several items which are to be supplied and/or supplied and installed by the Developer (D).

3 Please confirm & verify that all of the items shown as supplied and/or supplied and installed by Developer on the Responsibility List will be the sole responsibility of the Developer and are not part of the GC bid scope and should not be included in the Bid. The bid form has been revised to have an add/alt for the GC to provide and install all Owner/Developer scope. The revised bid form will be added to the Sharefolder, and will be formally be included in the Addendum. RFI 08 Sheet A1.0 / Keynote 11 references pilasters provided by others under separate permit. These (4) pilasters are shown with hashed lines. These pilasters are not shown on the exterior elevations but they are shown on the Sprouts TI bid set on sheet A1.0. Please clarify the scope of work involving these pilasters and what portion, if any is to be included in the GC bid. The whole "tower" element is going to be provided by others. Allan Industries will be doing this work. Allan Industries will also be completing the canopies on the Sprouts façade. Our shell documents show the canopies along the 3 adjacent tenants, which the GC will be responsible for providing. RFI 09 Sheet A4.0 / Detail 1 shows a tower by others & (7) canopies by others. These items are shown with hashed lines. Detail 3 shows (2) canopy locations which are shown with standard solid lines. Please verify that the items identified as by others are not to be included in the GC base bid and that only the canopies detailed with standard solid lines are to be included. The whole "tower" element is going to be provided by others. Allan Industries will be doing this work. Allan Industries will also be completing the canopies on the Sprouts façade. Our shell documents show the canopies along the 3 adjacent tenants, which the GC will be responsible for providing. RFI 10 There are two specification manuals included with the bid documents totaling over 100 pages. One is 814 pages (RI Project Manual ) and the other is 74 pages (TI Project Manual ). Please clarify which specification manual is to be used for the bid? Both spec manuals will be used. The TI manual for the TI project and the RI manual for the RI project.

4 RFI 11 Document (CIVIL-EXHIBIT-FOR-BID ) What is the intent of this document? If this document is meant to be used in bidding, we will need civil plans with pavement sections for the various different asphalt conditions as well as there appears to be a new water line going diagonally thru the Home Depot Garden center, and the new water lines in the public street (Cline St). This exhibit is no longer valid and should be removed from the bid package. There is a new exhibit which provides a schematic layout of proposed waterline improvements, which are in addition to the civil plans provided in the RFP. Contractors should provide a budget for this waterline work as a hard bid is not expected since we do not have construction documents for this work, at this time. RFI 12 In Brixton Retail Improvements page D1.1 keynote 2 calls for interior slab to be removed but it also calls for keynote 8 to remove only the flooring down to slab. The area for keynote 2 does not have the hatching to indicate slab removal. Please clarify the limit of slab removal at the retail improvement area. The slab inside the Sprouts space will need to be removed flush with the proposed demising wall. In the adjacent retail tenants the existing floor material will need to be removed down to top of floor slab. RFI 13 In Brixton Retail Improvements page A4.0 states tower and canopies by others. There are no exterior elevations in the Sprouts plan set. Please clarify the responsibility for the scope of work for exterior elevations. The tower and canopies on the Sprouts will be provided by others. All other work will be the responsibility of the GC. RFI 14 In Brixton Retail Improvements page3.0 keynote 2 states match existing roofing. What is the existing roofing specification to be matched? The GC will be responsible to match the existing/adjacent roofing assembly in its entirety. RFI 1 In Brixton Retail Improvements page A.2 & A.3 exterior wall sections call for dens glass over fire treated plywood over metal studs. Is this required? Either of these materials (dens glass & fire treated plywood) are suitable for EIFS substrate, the manufacturer does not require both? Yes. It is required. The places where we have plywood is where signage will be placed.

5 RFI 16 In Brixton Retail Improvements architectural demo plans call for the existing slab in the future Sprouts space to be removed and replaced, but the structural plans call for it to be existing to remain. Please clarify the scope of work for the Sprouts slab on grade. This is a coordination issue. The slab will be removed and replaced in the Sprouts space. RFI 17 In the Sprouts Farmers Market plans page T1.0 on the responsibility schedule for BTS, all the items on this list are either provided by Sprouts or the Developer. Is this correct, the GC will not be responsible for providing any materials or equipment on this list? The T1.0 responsibility list is correct. This matches the prototype drawings. Please proceed with the responsibility stated on there for each item. See response to RFI 07. RFI 18 In the Sprouts Farmers Market plans page T1.0 on the responsibility schedule for BTS and Page F1.1 & F1.2 provide conflicting information for a few items. Please clarify which page will have precedence for the supply of conflicting material and equipment responsibilities. The T1.0 schedule trumps that F1.1 and F1.2. Please use the T1.0 for reference. RFI 19 In the Sprouts Farmers Market specification manual section 343 states Sprouts CM to provide name of concrete polishing subcontractor prior to bid. Please provide concrete polishing subcontractor name and contact information. National Concrete Polishing & Grinding, Inc. will be the concrete polishing sub. The contact is: Brian Cribbs (bcribbs@nationalpolishing.com) 14 Brecksville Road, Suite 101, Richfield, OH RFI 20 Will a piping diagram and branch/loop piping sizes be issued for this store? Additionally, there are several circuits on the refrigeration schedule that list multiple CDS valves. Can you clarify what the correct valves are? With Architect for response.

Requests for Information pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 2018

Requests for Information pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 2018 Requests for Information - 05.0.1 5pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 201 RFI 01 Is the RFP due at 4pm or 5pm on May 16th? Response: RFI 02 Do you have an anticipated

More information

Port KC RFP NORTHLAND PARK BUILDING V

Port KC RFP NORTHLAND PARK BUILDING V Port KC RFP NORTHLAND PARK BUILDING V 1. The RFP refers to landscaping plans. However, it does not appear that the landscaping plans were issued with the rest of the RFP. Will these be issued with an addendum?

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 PROJECT: 300 Seneca New Academic Campus DATE: September 23, 2013 300 Seneca Ave., S.F.,

More information

ADDENDUM #4 FOR THE WEST VALLEY FACILITIES INCREMENT 2 REPLACEMENT PROJECT WEST VALLEY COLLEGE

ADDENDUM #4 FOR THE WEST VALLEY FACILITIES INCREMENT 2 REPLACEMENT PROJECT WEST VALLEY COLLEGE ADDENDUM #4 FOR THE WEST VALLEY FACILITIES INCREMENT 2 REPLACEMENT PROJECT AT WEST VALLEY COLLEGE Owner West Valley-Mission Community College District Saratoga, California Bid #01-1516 12-22-15 WEST VALLEY-MISSION

More information

Questions and Answers Construction of New Amenities At Folly Beach County Park

Questions and Answers Construction of New Amenities At Folly Beach County Park Questions and Answers Construction of New Amenities At Folly Beach County Park 2019-003 1. A410, Keynotes 11.34 Responsibility Chart -stainless steel table does not indicate if it is provided by the owner

More information

SOLICITATION ADDENDUM

SOLICITATION ADDENDUM CITY OF PALM BEACH GARDENS PURCHASING DEPARTMENT SOLICITATION ADDENDUM Addendum No. 1 DATE: January 30, 2018 TO: SOLICITATION NO.: TITLE: OPENING DATE: All Potential Bidders ITB2018-097GF Prefabricated

More information

ADDENDUM #2 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR. The University of Texas Health Science Center at San Antonio

ADDENDUM #2 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR. The University of Texas Health Science Center at San Antonio ADDENDUM #2 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR The University of Texas Health Science Center at San Antonio Renovate Floor 1 and Floor 2 of the PARC Bldg. RFP No.: 745-16-9935

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 3: Roofs 1 & 3 DATE: December 29, 2017 1235 Mission

More information

SECTION ADDENDUM NUMBER ONE

SECTION ADDENDUM NUMBER ONE Softball Field Repairs and Upgrades 03 February 2012 University of South Carolina Upstate State Project Number: H34-I350 DP3 Architects Project Number: 11124 GENERAL INFORMATION SECTION 00 09 10 ADDENDUM

More information

Reason for Change Identifiers: OR= Owner Request; FC= Field Condition; AJ= Requirement of Local Authority CL= Clarification (No Scope Change)

Reason for Change Identifiers: OR= Owner Request; FC= Field Condition; AJ= Requirement of Local Authority CL= Clarification (No Scope Change) Page 1 of 6 ADCI Bulletin No. 01 Date: March 30, 2015 Project: @580 Renovation for New Apartment Units Address: 580 Walnut Street Cincinnati, OH 45202 Commission: Prepared For: Prepared By: PDT P266 Cincinnati

More information

BID ADDENDUM #1 September 24, 2010

BID ADDENDUM #1 September 24, 2010 BID ADDENDUM #1 September 24, 2010 To: Prospective Bidders/Planholders For: Science 1 Seismic Retrofit & Renovation California State University Stanislaus One University Circle, Turlock, CA 95382 Bid /

More information

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT 06045-0191 138 MCKEE STREET MANCHESTER, CT BID NO. 16/17-5 ADDENDUM NO. 1 1. The bid opening has been

More information

This Addendum forms a part of the Contract Documents and modifies the Drawings and Project Manual as hereinafter indicated.

This Addendum forms a part of the Contract Documents and modifies the Drawings and Project Manual as hereinafter indicated. BIDDER RESPONSES RIARNG P-6 ADDITION TO ALL BIDDERS OF RECORD: This Addendum forms a part of the Contract Documents and modifies the Drawings and Project Manual as hereinafter indicated. ADDENDUM 001 2/14/2019

More information

Q&A: The Block/Parsons Alley Construction RFP

Q&A: The Block/Parsons Alley Construction RFP Q&A: The Block/Parsons Alley Construction RFP 1. Is there a Geotechnical Report available? 2. Would it be possible to extend the bid date to a day other than a Monday? 3. Is it possible to extend the date

More information

ELEVATION GENERAL NOTES: 1. ALL PAINT / FINISH SYMBOL DEFINITIONS FOUND ON A8.1. 2. ALL NEW GLAZING WITHIN 18" OF GROUND OR ADJACENT TO DOOR(S) TO BE TEMPERED. 3. REMOVE ALL EXISTING METLA COPING CAPS

More information

Solicitation Number: FA B-A001 Project Numbers: RKMF Demo Base Gymnasium & RKMF Demo Pool Facilities.

Solicitation Number: FA B-A001 Project Numbers: RKMF Demo Base Gymnasium & RKMF Demo Pool Facilities. Solicitation Number: FA4861-14-B-A001 Project Numbers: RKMF 13-0134 Demo Base Gymnasium & RKMF 130135 Demo Pool Facilities Responses to RFIs 1. Does all the building material get hauled off base? Response:

More information

APPENDICES DESIGN REQUIREMENTS. Appendix A. Performance Criteria for Design Projects

APPENDICES DESIGN REQUIREMENTS. Appendix A. Performance Criteria for Design Projects PROVINCE OF NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE RENEWAL DTIR Document DC350 APPENDICES DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed

More information

University of Akron. Addendum No. 2. For. Zook Hall Renovation Phase 2A Abatement & Demolition Project #: UAK120015

University of Akron. Addendum No. 2. For. Zook Hall Renovation Phase 2A Abatement & Demolition Project #: UAK120015 University of Akron Addendum No. 2 For Zook Hall Renovation Phase 2A Abatement & Demolition Project #: UAK120015 University of Akron Capital Planning & Facilities Management Lincoln Building Akron, Ohio

More information

1.0 ABOUT THE NU GUIDELINES

1.0 ABOUT THE NU GUIDELINES Construction Policies & Procedures Northeastern University Guidelines for Capital Project Design & Implementation.0 ABOUT THE NU GUIDELINES This document is intended to describe in a comprehensive manner

More information

RFI s Blake s Lotaburger #91

RFI s Blake s Lotaburger #91 Wells Fargo Plaza 221 North Kansas Street, Suite 820 El Paso, Texas 79901 (915) 613-4576 phone (915) 532-8839 fax www.pwarch.com RFI s Blake s Lotaburger #91 RFI No 1. Are we to supply a cost for asbestos

More information

THE PLAZA AT PPL CENTER ALLENTOWN, PA

THE PLAZA AT PPL CENTER ALLENTOWN, PA Building Function and Primary Use The owner of the new Plaza at PPL Center is Liberty Property Trust, but the primary tenant is PPL, which will use the building as the headquarters for its new subsidiaries

More information

RESPONSES TO QUESTIONS. March 1, 2018

RESPONSES TO QUESTIONS. March 1, 2018 MPA CONTRACT NO. H275-C1 HANSCOM AIRCRAFT RESCUE FIRE FIGHTING / UNITED STATES CUSTOMS AND BORDER PROTECTION FACILITY L.G. HANSCOM FIELD, BEDFORD, MASSACHUSETTS RESPONSES TO QUESTIONS March 1, 2018 The

More information

#2 Daniel Drive O Fallon, Missouri BaalmanArchitects.com

#2 Daniel Drive O Fallon, Missouri BaalmanArchitects.com Addendum No. 3 To: All Contractors Date: April 16, 2018 Re: WB Industries Renovations for a Professional Office 1270 West Terra Lane O Fallon, Missouri 63366 The following Drawing and/or Specification

More information

INVITATION TO TENDER ITT NO. PS CONSTRUCTION SERVICES FOR INTERIOR OFFICE RENOVATIONS AT 236 E CORDOVA STREET QUESTIONS AND ANSWERS NO.

INVITATION TO TENDER ITT NO. PS CONSTRUCTION SERVICES FOR INTERIOR OFFICE RENOVATIONS AT 236 E CORDOVA STREET QUESTIONS AND ANSWERS NO. FINANCE, RISK, & SUPPLY CHAIN MANAGEMENT Supply Chain Management INVITATION TO TENDER ITT NO. PS20170908 CONSTRUCTION SERVICES FOR INTERIOR OFFICE RENOVATIONS AT 236 E CORDOVA STREET QUESTIONS AND ANSWERS

More information

C o u n t y o f F a i r f a x, V i r g i n i a

C o u n t y o f F a i r f a x, V i r g i n i a 001961 Page 2 C o u n t y o f F a i r f a x, V i r g i n i a A D D E N D U M DATE: August 2, 2016 ADDENDUM NO. 4 TO: REFERENCE: FOR: DUE DATE/TIME: ALL PROSPECTIVE BIDDERS Government Center Generator System

More information

ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. 1. September 9, to the BIDDING DOCUMENTS for

ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. 1. September 9, to the BIDDING DOCUMENTS for AUSTIN ARCHITEXAS DALLAS ARCHITECTURE, PLANNING AND HISTORIC PRESERVATION, INC. ADDENDUM NO. 1 September 9, 2014 to the BIDDING DOCUMENTS for ELLIS COUNTY COMPLEX Records Storage Building Waxahachie, Texas

More information

RFP /ME - ADDENDUM 2

RFP /ME - ADDENDUM 2 RFP 201013/ME - ADDENDUM 2 RFP Closing: February 5, 2015 at 2:00 PM (Local Time) Page 1 of 33 RFP Number: 201013/ME Date: January 28, 2015 RETURN PROPOSALS AS SHOWN BELOW Copies of proposal required: Eight

More information

4615 E. State Street Suite 206 Rockford Illinois /

4615 E. State Street Suite 206 Rockford Illinois / ADDENDUM NO. 2 Date: April 29th 2015 4615 E. State Street Suite 206 Rockford Illinois 61108 815 / 397-3330 Project: Whiteside County Health Department New Facility and Interior Renovation Project Number:

More information

Revised Drawings A, E, and M dated 11/13/18 (that include additional specifications)

Revised Drawings A, E, and M dated 11/13/18 (that include additional specifications) Addendum No. 1 To: All Prospective Bidders Description: Holocaust Resource Center Expansion Stockton University Galloway, New Jersey 08205 Bid Number: B190003 Date: November 19, 2018 Pursuant to N.J.S.A.

More information

DATE: July 27, 2018 TO: All Bidders FROM: Jo Nell Miller, Purchasing Specialist SUBJECT: Addendum 2 Bid 550 Moorpark College Gymnasium Renovation

DATE: July 27, 2018 TO: All Bidders FROM: Jo Nell Miller, Purchasing Specialist SUBJECT: Addendum 2 Bid 550 Moorpark College Gymnasium Renovation DATE: July 27, 2018 TO: All Bidders FROM: Jo Nell Miller, Purchasing Specialist SUBJECT: Addendum 2 Bid 550 Moorpark College Gymnasium Renovation This addendum is hereby made part of the Contract Documents

More information

SOLICITATION ADDENDUM

SOLICITATION ADDENDUM CITY OF PALM BEACH GARDENS PURCHASING DEPARTMENT SOLICITATION ADDENDUM Addendum No. 7 DATE: August 22, 2018 TO: SOLICITATION NO.: TITLE: OPENING DATE: All Potential Bidders ITB2018-095RC Construction of

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 2: Roof 2 DATE: December 29, 2017 1235 Mission Street San Francisco, California SFUSD Project

More information

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment & Convention Authority

More information

Addendum #2 Bid Opportunity RFP to Replace the Township of Wellesley s Fire Station #2. Closing Date: Friday, January 25, :00 hrs.

Addendum #2 Bid Opportunity RFP to Replace the Township of Wellesley s Fire Station #2. Closing Date: Friday, January 25, :00 hrs. Addendum #2 Bid Opportunity 2018-08 RFP to Replace the Township of Wellesley s Fire Station #2 Closing Date: Friday, January 25, 2019 09:00 hrs. Question 1: How close to the property line can the septic

More information

BID PACKAGES 3-21, Addendum No. 03

BID PACKAGES 3-21, Addendum No. 03 WEBER MURPHY FOX Addendum Date: January 23, 2018 Bid Due Date: January 26, 2018 BID PACKAGES 3-21, Addendum No. 03 to the Plans and Specifications for Cuyahoga Community College West Science and IT Labs

More information

A1.01 SITE PLAN 394 W OLENTANGY ST POWELL, OH BUILDING TO BE RENOVATED SITE PLAN. P F www. archa ll.

A1.01 SITE PLAN 394 W OLENTANGY ST POWELL, OH BUILDING TO BE RENOVATED SITE PLAN. P F www. archa ll. N O R T H F I F T H S T R E E T C O L U M B U S O H I O P.. 00 F.. 000 www. archa ll. com W OLENTANGY ST POWELL, OH 0 DRAWING SET 0 0 0 preliminary check bid permit construction REVISIONS BUILDING TO BE

More information

Addendum No. 3: EAST HIGH SCHOOL AUDITORIUM RENOVATIONS

Addendum No. 3: EAST HIGH SCHOOL AUDITORIUM RENOVATIONS Rockford Board of Education 501 Seventh Street Rockford, IL 61104 May 30, 2014 Addendum No. 3: 14-70 EAST HIGH SCHOOL To All Bidders: Attached are modification, clarifications and/or corrections for the

More information

ADDENDUM 3 TO INVITATION FOR BID 5300-FG. Interior Renovations for UNLV Quality Assurance Lab (QAL) and UNLV Monitoring Systems Lab (MSL)

ADDENDUM 3 TO INVITATION FOR BID 5300-FG. Interior Renovations for UNLV Quality Assurance Lab (QAL) and UNLV Monitoring Systems Lab (MSL) ADDENDUM 3 TO INVITATION FOR BID 5300-FG Interior Renovations for UNLV Quality Assurance Lab (QAL) and UNLV Monitoring Systems Lab (MSL) University of Nevada, Las Vegas Purchasing Department 4505 Maryland

More information

Via Internet Posting 14 pages

Via Internet Posting 14 pages Michael Pacholok Director Purchasing and Materials Management Division City Hall, 18 th Floor, West Tower 100 Queen Street West Toronto, Ontario M5H 2N2 Joanne Kehoe Manager Construction Services March

More information

REBECCA LG BOSTICK, ARCHITECTS, INC

REBECCA LG BOSTICK, ARCHITECTS, INC REBECCA LG BOSTICK, ARCHITECTS, INC 703-768-2250 ADDENDUM NO. 3 Page 1 of 4 (plus attachments -2 pages) SILVERBROOK ELEMENTARY SCHOOL RENOVATION Fairfax County Public Schools 9350 Crosspointe Drive, Fairfax

More information

1292 WESTMINSTER ST PROVIDENCE CITY PLANNING COMMISSION FRIDAY AUGUST 11, 2017

1292 WESTMINSTER ST PROVIDENCE CITY PLANNING COMMISSION FRIDAY AUGUST 11, 2017 PROVIDENCE CITY PLANNING COMMISSION FRIDAY AUGUST 11, 2017 AERIAL VIEW EXISTING CONDITIONS WESTMINSTER STREET MASONRY, AND WOOD STRUCTURE TO BE DEMOLISHED IN ITS ENTIRETY MASONRY, CONCRETE, AND STEEL STRUCTURE

More information

ALL BIDDERS OF RECORD, CONSULTANTS, OWNER:

ALL BIDDERS OF RECORD, CONSULTANTS, OWNER: ADDENDUM NUMBER ONE for Project No.: U-787-14-1 State Permanent Improvement Project No.: H27-Z167 COLUMBIA, SOUTH CAROLINA PREPARED BY: The Boudreaux Group 1330 Lady Street, Columbia, SC 29201 DATE OF

More information

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen:

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen: March 6, 2018 Subject: Addendum No. 2 Toyota Park Transit Center Phase II Ladies and Gentlemen: This Addendum No. 2 is being issued to provide responses to questions submitted by potential bidders and

More information

Lindenwood. Business Park Olathe, Kansas. Property Features. Development Overview. 6,300 to 25,200 SF Flex/Industrial Space

Lindenwood. Business Park Olathe, Kansas. Property Features. Development Overview. 6,300 to 25,200 SF Flex/Industrial Space Property Features State-of-the-art light-industrial flex buildings Outdoor storage available +1- Acres Attractive exterior and landscaping -high and drive-in loading options Interior finish can be custom

More information

Dick s Sporting Goods Demolition Package

Dick s Sporting Goods Demolition Package REQUEST FOR PROPOSAL FOR COMPETITIVE SEALED PROPOSALS TO PROVIDE: Dick s Sporting Goods Demolition Package at Salt Lake City, UT 2425 E. Camelback Rd. Suite 750 Phoenix AZ 85016 Notice of Extended Payment

More information

Insulation manufacturer to submit dew point analysis free of charge for typical wall section. Analysis by:

Insulation manufacturer to submit dew point analysis free of charge for typical wall section. Analysis by: PACE REPRESENTATIVES INC. 50 Redfield Street Boston MA 02122 www.pacerepresentatives.com 617-342-7072 PRE JOB AIR BARRIER/EXTERIOR WALL INSULATION MEETING CHECK LIST 1.01 Date: Insulation manufacturer

More information

RFP 30-18, Lassiter HS Gym Replacement Questions and Answers

RFP 30-18, Lassiter HS Gym Replacement Questions and Answers 1. Jim Cooper Cooper & Co. What is the approximate cost range of this project? The construction budget is approx. $10.8 million. 2. David Keener Bowen & Watson There may be some typos in the insurance

More information

62 POTOMAC STREET WEST ROXBURY, MA 02132

62 POTOMAC STREET WEST ROXBURY, MA 02132 62 POTOMAC STREET SET P R O J E C T T E A M COVER 1. ALL WORK SHALL BE IN COMPLIANCE WITH ALL APPLICABLE LOCALS BUILDING CODES AND REGULATIONS. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR S REQUIRED FOR CONSTRUCTION

More information

ARTICLE 1 Section 1.1 TITLE

ARTICLE 1 Section 1.1 TITLE MEMO To: City of Spring Hill From: Camiros, Ltd. Date: April 25, 2018 Re: Integrating the City of Spring Hill Design Review Guidelines The Planning Commission has been asked to consider integrating the

More information

Erie County Medical Center Corporation. Addendum Number 1 to RFP # 21728

Erie County Medical Center Corporation. Addendum Number 1 to RFP # 21728 Erie County Medical Center Corporation RFP # 21728 Addendum Number 1 Erie County Medical Center Corporation Addendum Number 1 to RFP # 21728 ARCHITECTURAL / ENGINEERING SERVICES FOR: MEP SYSTEMS / ELEVATOR

More information

REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA

REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA GENERAL INFORMATION Greenwood School District 50 is

More information

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

Florida Army National Guard Construction Facilities Management Office. Scope of Work: Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines September 2011 Scope of Work: To provide complete design for the renovation/alterations

More information

301 Walnut Street Windsor, Colorado phone fax

301 Walnut Street Windsor, Colorado phone fax 301 Walnut Street Windsor, Colorado 80550 phone 970-674-2400 fax 970-674-2456 www.windsorgov.com Table of Contents... 2 SECTION 1 Questions & Requests for Clarification... 3 1.1 Question Deadline... 3

More information

Richmond Hill Primary Renovation SECTION SELECTIVE DEMOLITION

Richmond Hill Primary Renovation SECTION SELECTIVE DEMOLITION SECTION 024119 SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

FOR IFB #PC436 Exterior Improvements at Colton Public Housing Complex

FOR IFB #PC436 Exterior Improvements at Colton Public Housing Complex HOUSING AUTHORITY OF THE COUNTY OF SAN BERNARDINO PROCUREMENT AND CONTRACTS DEPARTMENT 715 E. BRIER DRIVE, SAN BERNARDINO, CA 92408 (909) 890-0644 FAX (909) 890-2349 http://www.hacsb.com/procurement.htm

More information

Parish of Ascension Project Management ADDENDUM #1 NOTICE TO BIDDERS/ QUOTE

Parish of Ascension Project Management ADDENDUM #1 NOTICE TO BIDDERS/ QUOTE Parish of Ascension Project Management ADDENDUM #1 NOTICE TO BIDDERS/ QUOTE PROJECT #/ ENG-16-085 PROJECT NAME: FRANK SOTILE PAVILION ADDITION CODE: DATE: Wednesday, June 14, 2017 OWNER: ASCENSION PARISH

More information

Addendum No. 5 Tender Call No Closing: 12:00 NOON (LOCAL TIME), February 17, 2017

Addendum No. 5 Tender Call No Closing: 12:00 NOON (LOCAL TIME), February 17, 2017 Michael Pacholok, Chief Purchasing Official and Director Purchasing and Materials Management Division City Hall, 18th Floor, West 100 Queen Street West Toronto, Ontario M5H 2N2 Joanne Kehoe Manager Construction

More information

See attached answers to questions and requests for clarification received.

See attached answers to questions and requests for clarification received. Office of the Vice President 971 Elmore Drive and Chief Financial Officer PO Box 115250 Procurement Services Gainesville, FL 32611-5250 http://procurement.ufl.edu/ (352) 392-1331 Fax 352-392-8837 June

More information

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES. For the renovation of existing apartment buildings. August 15, 2016

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES. For the renovation of existing apartment buildings. August 15, 2016 REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES For the renovation of existing apartment buildings August 15, 2016 INVITATION Bath Housing Development Corporation is soliciting proposals for

More information

APPENDIX 1 PROJECT REQUIREMENTS

APPENDIX 1 PROJECT REQUIREMENTS APPENDIX 1 PROJECT REQUIREMENTS I) Scope of Work This section contains a general summary of the work the Contractor shall perform under this contract. If any conflict exists between the work described

More information

NMHU STUDENT UNION BUILDING STUDIO SW PROJECT NO 0918

NMHU STUDENT UNION BUILDING STUDIO SW PROJECT NO 0918 NMHU STUDENT UNION BUILDING STUDIO SW PROJECT NO 0918 MAY 03, 2010 ADDENDUM 4 Project: NMHU Student Union Building Architect's Project Number: 0918 IFB # 905 From: Studio Southwest Architects To: Prospective

More information

Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form. McKee and Associates Architecture and Interior Design Addendum No. TWO Date: 2.12.19 Project: Addition to Doctor s Clinic For The Washington County Hospital and Nursing Home Chatom, Alabama McKee Project

More information

Project :RFQ165_ Macau International Airport- Construction Works for New Hangar Date :31 May 2013 Subject :Tender Clarification No.

Project :RFQ165_ Macau International Airport- Construction Works for New Hangar Date :31 May 2013 Subject :Tender Clarification No. Project :RFQ165_ Macau International Airport- Construction Works for New Hangar Date :31 May 2013 Subject :Tender Clarification 1 01 Allow any alternative design for composite beam and slab for the structural

More information

ProjNet: Logged In User

ProjNet: Logged In User Page 1 of 8 Public / SBU / FOUO Bid Inquiry Contractor Report All Inquiries Project: DDJC Tracy, CA - DLA FY-14 GPW-59 (General Purpose Warehouse) P2# 373676 Review: RFP W91238-14-R-0001 (Ph II due 4-13

More information

CLARION UNIVERSITY OF PENNSYLVANIA STATE SYSTEM OF HIGHER EDUCATION ISSUE DATE: September 4, 2014

CLARION UNIVERSITY OF PENNSYLVANIA STATE SYSTEM OF HIGHER EDUCATION ISSUE DATE: September 4, 2014 CLARION UNIVERSITY OF PENNSYLVANIA STATE SYSTEM OF HIGHER EDUCATION ISSUE DATE: September 4, 2014 PROJECT NO: PROJECT NAME: BIDS DUE: 2:00 P.M., EST., September 24, 2014 ADDENDUM NO. 3 TO: Prospective

More information

ADDENDUM NO. 3 REQUEST FOR PROPOSALS HANGAR 1610/1612 FIRE SUPPRESSION RETROFIT PROJECT

ADDENDUM NO. 3 REQUEST FOR PROPOSALS HANGAR 1610/1612 FIRE SUPPRESSION RETROFIT PROJECT ADDENDUM NO. 3 REQUEST FOR PROPOSALS HANGAR 1610/1612 FIRE SUPPRESSION RETROFIT PROJECT Effective September 6, 2018, Addendum No. 3 (THREE), {Pages 1-7 and the applicable attachment(s)}, is associated

More information

ADDENDUM NO. 5. Except as hereinafter specified, the work shall be in accordance with the drawings and specifications.

ADDENDUM NO. 5. Except as hereinafter specified, the work shall be in accordance with the drawings and specifications. ADDENDUM NO. 5 ITB-CD-CME-16-10 Southern Well Field Expansion: Equip 5 Wells and New Raw Water Main Phase 2 ISSUE DATE: August 22, 2016 DUE DATE: August 25, 2016 @ 2:00 p.m. SUBJECT: Addendum No. 5 INTENT:

More information

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality

Show how a KM database impacts: cost, time, and quality. Demonstrate how Parametric Design could be used to save time, money, and improve quality Executive Summary: Thesis Proposal Final Draft The following pages contain a final draft of the thesis proposal for the South Baltimore District Court House. The basic layout consists of focusing on Knowledge

More information

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

Florida Army National Guard Construction Facilities Management Office. Scope of Work: Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines October 2008 Scope of Work: To provide complete design for the renovation/alterations

More information

NOTTAWASEPPI HURON BAND of the POTAWATOMI

NOTTAWASEPPI HURON BAND of the POTAWATOMI NOTTAWASEPPI HURON BAND of the POTAWATOMI Widoktadwen New Government Center Bid Pkg #2 Pre Bid Meeting October 4, 2012 The SKILLMAN Corporation Project Administration Construction Management Nottawaseppi

More information

LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA Phone (916) FAX (916) Purchasing Department

LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA Phone (916) FAX (916) Purchasing Department LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA 95825 Phone (916) 568-3071 FAX (916) 568-3145 Purchasing Department Sacramento City College American River College Cosumnes River College

More information

Business Services Procurement University of North Texas University of North Texas Health Science Center University of North Texas at Dallas

Business Services Procurement University of North Texas University of North Texas Health Science Center University of North Texas at Dallas DATE: September 25, 2018 TO: FROM: SUBJECT: Potential Proposers Denise Harpool Senior Buyer Addendum 1Answers to Questions RFP763-19-133521DH CMAR-UNTHSC East Parking Garage Renovation Clarification to

More information

ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO. PS 061 SEVEN SPRINGS WASTEWATER TREATMENT FACILITY IMPROVEMENTS PASCO COUNTY,

More information

ALBUQUERQUE PUBLIC SCHOOLS for MONTESSORI OF THE RIO GRANDE CHARTER SCHOOL

ALBUQUERQUE PUBLIC SCHOOLS for MONTESSORI OF THE RIO GRANDE CHARTER SCHOOL ADDENDUM NO. 2 To all holders of Contract Documents for the construction of: ALBUQUERQUE PUBLIC SCHOOLS for MONTESSORI OF THE RIO GRANDE CHARTER SCHOOL Please note this Addendum forms a part of the Contract

More information

CITY OF PORTSMOUTH, NEW HAMPSHIRE GREENLAND WELL PUMP STATION REPLACEMENT ADDENDUM NO. 1

CITY OF PORTSMOUTH, NEW HAMPSHIRE GREENLAND WELL PUMP STATION REPLACEMENT ADDENDUM NO. 1 Addendum No. 1 September 26, 2016 Page 1 of 8 CITY OF PORTSMOUTH, NEW HAMPSHIRE GREENLAND WELL PUMP STATION REPLACEMENT ADDENDUM NO. 1 This Addendum forms part of the original contract drawings and specifications

More information

RFI REPLY. Project: Palm Coast Readiness Center Date: 07/22/16 Flagler County, Florida Comm. No.: 09005

RFI REPLY. Project: Palm Coast Readiness Center Date: 07/22/16 Flagler County, Florida Comm. No.: 09005 Project: Palm Coast Readiness Center Date: 07/22/16 Flagler County, Florida Comm. No.: 09005 To: All Bidding General Contractors Fax Email U.S. Mail Attn. Messenger We are sending the following: Quick

More information

Addendum #02 New County Office Building Responses to RFP Questions

Addendum #02 New County Office Building Responses to RFP Questions Sam Lin Manager Project Development Unit 1402 Maple Street Redwood City, CA 94063 650-369-4766 September 22, 2017 slin@smcgov.org Addendum #02 New County Office Building Responses to RFP Questions To All

More information

DALLAS-FORT WORTH INTERNATIONAL AIRPORT

DALLAS-FORT WORTH INTERNATIONAL AIRPORT DALLAS-FORT WORTH INTERNATIONAL AIRPORT ADDENDUM NO. 2 TO THE REQUEST FOR BIDS Contract No. 9500445 Restroom Rehabilitation at Terminal B (Phase 3 & 4) December 20, 2010 THE REQUEST FOR BIDS (RFB) FOR

More information

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL

More information

SPITZER CONFERENCE CENTER BRIEFING SUITE REFRESH Addendum #2 02/22/2018 LCCC POJECT NO. SPBSR-17 BPA PROJECT NO

SPITZER CONFERENCE CENTER BRIEFING SUITE REFRESH Addendum #2 02/22/2018 LCCC POJECT NO. SPBSR-17 BPA PROJECT NO SPITZER CONFERENCE CENTER BRIEFING SUITE REFRESH Addendum #2 02/22/2018 LCCC POJECT NO. SPBSR-17 BPA PROJECT NO. 16-32 ADDENDUM NO. 2 SPITZER CONFERENCE CENTER BRIEFING SUITE REFRESH LORAIN COUNTY COMMUNITY

More information

ADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP # February 1, 2018

ADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP # February 1, 2018 ADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP #2018-09-01 NOTICE TO PROSPECTIVE BIDDERS February 1, 2018 Prospective bidders are hereby informed of the following corrections, additions,

More information

Bid Addendum B Issued: 04/27/16

Bid Addendum B Issued: 04/27/16 ARMET DAVIS NEWLOVE AIA ARCHITECTS 1330 OLYMPIC BOULEVARD SANTA MONICA, CA 90404-3726 TEL: (310) 452-5533 FAX: (310) 450-4742 EL POLLO LOCO #6155 4292 Blue Diamond Rd. Las Vegas, NV 89139 Bid Addendum

More information

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows: ADDENDUM NO. 1 TO THE DRAWINGS AND SPECIFICATIONS FOR THE New Dishman-McGinnis Elementary School Bowling Green Independent Schools Bowling Green, Kentucky BG 12-256 RTA 1209 March 11, 2013 To All Plan

More information

ADDENDUM #1 AUGUST 25, INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF

ADDENDUM #1 AUGUST 25, INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF ADDENDUM #1 AUGUST 25, 2016 INTERSECTION IMPROVEMENTS AT SR 434 AND TUSCORA DRIVE Bid # ITB-06/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project

More information

SARASOTA COUNTY GOVERNMENT PROCUREMENT 1660 Ringling Blvd., 3 rd Floor Sarasota, Florida Telephone Fax

SARASOTA COUNTY GOVERNMENT PROCUREMENT 1660 Ringling Blvd., 3 rd Floor Sarasota, Florida Telephone Fax SARASOTA COUNTY GOVERNMENT PROCUREMENT 1660 Ringling Blvd., 3 rd Floor Sarasota, Florida 34236 Telephone 941-861-5266 Fax 941-861-5129 ADDENDUM NO.1 BID # : #153025CS CCSWDC Leachate Lift Station Rehabilitation

More information

ADDENDUM # 1 To: File RFP for: New Affordable Home Construction Services

ADDENDUM # 1 To: File RFP for: New Affordable Home Construction Services Procurement Department ADDENDUM # 1 To: File 1605-909-23-4532 RFP for: New Affordable Home Construction Services Please note the following change: Change #1 RFP closing date and time is changed to July

More information

PLEASE NOTE: Questions are presented below in italics, with answers from the Trust in bold. Similar questions are answered only once.

PLEASE NOTE: Questions are presented below in italics, with answers from the Trust in bold. Similar questions are answered only once. Design and Consultant Services for Façade Restoration Project at Pier 40 Request for Proposal (RFP) Project/Contract #A5029 Questions & Answers December 19, 2018 PLEASE NOTE: Questions are presented below

More information

RPQ ADDENDUM. Project Manager Frank Ramirez

RPQ ADDENDUM. Project Manager Frank Ramirez Port of Miami Contracts, Procurement & Materials Management 1007 N. America Way, Suite 311 Miami Fl 33132 MIAMI-DADE COUNTY, FLORIDA REQUEST FOR PRICE QUOTATION (RPQ) Contract No: MCC 7360 Plan - CICC

More information

Technical Report #1. Matthew R Peyton

Technical Report #1. Matthew R Peyton Technical Report #1 This Document is Technical Report #1 for 5th year senior thesis in the Architectural Engineering Departments at The Pennsylvania State University. This Report will include structural

More information

The following shall be incorporated into the Contract Documents dated 12 MARCH 2018.

The following shall be incorporated into the Contract Documents dated 12 MARCH 2018. ADDENDUM NO. 1 DATE: March 28, 2018 PROJECT: OWNER: BID DATE: L Anse Area Schools Concession Building L Anse Area Schools Monday, April 9, 2018 at 2:00 PM The following shall be incorporated into the Contract

More information

3.0 Architectural Design Principles

3.0 Architectural Design Principles 3.0 Architectural Design Principles 3.1 Building Character 1166 West Pender will house 31 floors of office space, blending high design, ecological responsibility, and civic enhancement. The building brings

More information

1. Meeting minutes from the pre-bid conference are attached for inclusion in the Bid Documents.

1. Meeting minutes from the pre-bid conference are attached for inclusion in the Bid Documents. PROJECT NO. 13-130.03 Splash Pad at Lakeside Park ADDENDUM #4 `` Splash Pad at Lakeside Park Pell City, AL WBA No. 13-130.03 OWNER: City of Pell City 1905 First Ave. North Pell City, AL 35125 ph. (205)338-2244

More information

June 12, 2017 Addendum #6 RFP # Modular Relocation & Site Development

June 12, 2017 Addendum #6 RFP # Modular Relocation & Site Development June 12, 2017 Addendum #6 RFP #2017-003 Modular Relocation & Site Development Questions & Answers 1) To better facilitate a functional and qualified design build budget, please provide details, drawings,

More information

ADDENDUM NO. ONE TO THE CONSTRUCTION DOCUMENTS September 19, 2017

ADDENDUM NO. ONE TO THE CONSTRUCTION DOCUMENTS September 19, 2017 General: ADDENDUM NO. ONE TO THE CONSTRUCTION DOCUMENTS September 19, 2017 The following changes, additions, or deletions shall be made to the following documents; all other conditions shall remain the

More information

Fair Oaks Water District

Fair Oaks Water District Fair Oaks Water District Request for Proposal To develop a set of construction drawings, construction specifications and bid documents for a Skyway Well in Fair Oaks. (FOWD Job #C19WTSTSTHD) Prepared by:

More information

TOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS

TOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS TOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS The Town of East Haddam is seeking bids from qualified contractors who will

More information

Request for Proposal

Request for Proposal Request for Proposal Architectural/Engineering Services Restaurant Improvements to Greyhound Intercity Bus Terminal 205 S. Lamar Dallas, TX 75201 This project is partially funded by a transportation improvement

More information

Addendum No. 3 Borough of Manhattan Community College Roof Replacement Project No: MC

Addendum No. 3 Borough of Manhattan Community College Roof Replacement Project No: MC Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 11 th Floor New York, New York 10019 CUNY.Builds@mail.cuny.edu July 19 th, 2012

More information

Mark Staaf. David Nardozzi Architectural Job Captain

Mark Staaf. David Nardozzi Architectural Job Captain Mark Staaf From: Mark Schilling Sent: Thursday, April 5, 2018 5:05 PM To: Mark Staaf Subject: Fwd: Fairview Medical Office Building - Addendum 2 Attachments: 16073.06_2018-04-05 FAIRVIEW MOB_Addendum-2_Combined.pdf

More information

EMBASSY SUITES PARK EAST DRIVE BEACHWOOD, OH INTERIOR AND EXTERIOR RENOVATION Owner NF II Beachwood, LLC

EMBASSY SUITES PARK EAST DRIVE BEACHWOOD, OH INTERIOR AND EXTERIOR RENOVATION Owner NF II Beachwood, LLC EMBASSY SUITES 3775 PARK EAST DRIVE BEACHWOOD, OH 44122 INTERIOR AND EXTERIOR RENOVATION Owner NF II Beachwood, LLC 1100 Monarch Tower 3424 Peachtree Rd. NE Atlanta, GA 30326 Tel: 404.262.9660 Developer

More information