1 Executive Summary of Bistan Lift IrrigationProject INTRODUCTION:- 1.1 (i) AIM(S) OF THE PROJECT WORK : The main objective of Bistan Lift Irrigation Scheme is to provide irrigation facilities to the water-scare areas in left side of Narmada basin where the level of irrigation is very much less as compare to national irrigation percentage. The Bistan Lift Irrigation Scheme has been conceived to cater irrigation water to about 22,000 ha. of CCA Khargone districts of Nimar region along with water for drinking and Irrigation purposes. Total 8 villages of Khargone Tehsil, 47 villages of Gogawa Tehsil, 37 villages of Bhagwanpura Tehsil of Khargone district will be benefited by this scheme. Bistan lift canal takes off at R.D. 101 km. of ISP main canal which has designed to carry a discharge of 8.0 cumecs.at intake well point of Bistan lift scheme,the discharge of ISP Main canal is 72 cumecs. 1.2 Location of Project : The project area is spreaded in Khargone Distt. of M.P. The supply source i.e. Indira Sagar Project reservoir, lifting point, pump houses and rising main lie in Khargone District of Nimar region and the water lifted from Indira Sagar Main Canal at km.101 near village mohammadpur in Gogawa Tehsil of dist. Khargone while Distribution chamber is situated near village Merghatti and Devalgaon in Bhagwanpura tehsil of dist. Khargone total command area of project lies between command area of Khargone lift canal and forest boundary north to south & Kunda river to upper beda command west to east. 2.0 Present Proposal: SALIENT FEATURES 1. Name of the Project. : Bistan Lift Irrigation Project 2. Type of Project ( Irrigation or Multipurpose) : : Irrigation Project 3. Location : ii) Supply Source : In Khargone District Indira Sagar Reservoir i) Lifting Point ; : In Khargone District, Near Mohammadpur Page 1

2 village ISP Main Canal at RD 101 km. iii) Feeder Reservoir : Indira Sagar Reservoir iv) Command In Khargone District 3.1 River Basin a) Name i) Lifting ii) Command : Narmada Basin Lower Narmada Sub Basin (3b). b) Located in : Madhya Pradesh 3.2 River / Tributaries : Narmada River 3.3 State(s) / District(s) or Tehsils in which following are located. State District Tehsil (a) Reservoir (Supply Source) : M.P Khandwa Punasa (b) Lifting Point / Rising Main M.P Khargone Gogawan (c) Command Area : Khargone District Teshil (i) Khargone (ii) Gogawa (iii) Bhagwanpura 3.4 Name of Village near the Head-works Lifting Point : ISP Main Canal Khargone Mohammadpur 3.5 Location of Head-Works : 1) Lifting Point : ISP Main Canal RD 101 km (a) Longitude : (b) Latitude : (c) List in Earthquake Zone No. : Zone-III (Moderate Seismic) 2) Delivery Point : Mehar GHatti &Devalgaon Page 2

3 c) List in Earthquake Zone : Zone-III (Moderate Seismic) 3.6 Project area reference to : as detailed below a) Toposheet : Indira Sagar Project Reservoir Lifting Point Rising Main Pump House Canal & Command Area Topo sheet No. 55 B b) Index Plan : Attached 3.7. Access to the Project. a) Nearest Airport : i) Devi Ahilya Airport Indore (M.P.) 130 km. from Mohammadpur village b) Nearest Rail Head : ii) 60 km from Sanawad 4. Interstate aspects of the project (a) Catchment area of the basin. : It is a lift scheme hence no independent catchment is being harnessed. (b)state-wise / Country-wise details : Not applicable of Catchment area. (c)submergence due to project (d)water allocation for the state (if any) : No submergence due to project, as it is a lift scheme : The Quantum of water being lifted for this project is included in the water share of M.P. as per NWDT award. Page 3

4 (e) Water allocation for other state : Not applicable (f) committed utilisation Upstream Projects (i) Project Completed (ii)project under construction As stated above it is as per committed utilization of share of Narmada Waters (iii)feature projects (vi)any other Downstream Projects (i) Project Completed As stated above it is as per committed utilization of Narmada Waters (ii)project under construction (iii) Future projects (vi) Any other (g) Proposed annual utilization by the project Irrigation (82.94 Mcum) : 8.00 cumecs. 5. Estimated life of the project (years) : 50 Year 6. Irrigation (ha.) (a) Gross command area (GCA) (b) Culturable command area (CCA) : 34,500 Hectare :22,000.Hectare 7. Project Performance (a) Irrigation : 22,000.Hectare 8. Head Regulator(s) : Intake well at Lifting point,&outlet regulators at D C and Main pipe line. Page 4

5 9. Canal System 9.1 Main Canal (Piped) : Piped network as per Design 9.1.1Purpose of Canal : Irrigation Type : Rising Main Pipe Canal (M.S. /DI Pipe) (a)flow/ : Piped system (b) Lined/unlined : Not applicable (c) Discharge capacity of the : Not applicable (Piped Canal) channel above which lining is proposed (d) Type of lining : Not applicable Design data All the component such as jack well, Rising mains and Entire disnet system.designed by turnkey contract basis Distribution system - :Distributaries i/c Minors & sub-minors (piped) (only upto 2.50 hectares) 10.Cropping Pattern : Percentage area Existing Proposed 100% 129% 10.1 Name of crop (season-wise) Rabi (a) Wheat local (b) Wheat hyd (c) Vegetables (d) Gram ( (e) Berseam Page 5

6 (f) Moong 11 Cost Cost of the project (Rs.Crore) total Crore 12. B.C. Ratio Tender has been received on turnkey basis and the agreement has been done with HCC & Laxmi Civil Engineering Services Pvt. Ltd (JV) on It is proposed to provide irrigation water up to 2.50 ha. Sub chak by Drip Irrigation/ sprikler System, so as to have optimum utilization of value added water. Lifting system is adopted to pump the required water up to highest elevated areas and the same is distributed to agricultural lands through pipelines by constructing a Delivery chambers as per the technical standards. The detailed survey has completed, planning work is completed. 3.0 Climatic condition:- The command area of this scheme falls in Nimar Zone under Vindhayachal range which is having mostly dry season. Maximum part of rain fall occur in the month of July & August. The average rain fall varies from 750 mm to 800 mm and distribution of rain fall is erotic. The temperature of the area varies from 35 deg. to 45 deg in the month of May. The May & December hottest and coldest respectively. 4.0 Land Topography, Phsycography & Geology : - The command area of Khargone Lift Irrigation scheme is situated in Tehsil Khargone, Bhagwanpura and Gogawan of district Khargone in Madhya Pradesh. Command area is located between to latitude and to longitude. The area served can be located in top sheet no. /9, /10 under Indira Sagar project. The command of Bistan lift Scheme is surrounded by catchment of Kunda and Beda River. These are the main drainage channel in the command. The area comes under Agro-climatic zone No.11 Nimar Valley Zone No River Narmada is situated in northern side of district Khargone. The topography of district and command area is undulated as well as plains. Some of undulating lands are surrounded by hillocks forest. The variation of slopes in undulating area is from 3% to 10%. 5.0 Necessity of Scheme :- Page 6

7 Since there is no major scheme either constructed or under proposal to irrigate such topographically rich command having scarcity of water, hence, this interbasin scheme is being proposed.total water available in Indira Sagar Project Main Canal at R.D. 101 km. is about 72 cumecs, & 8.00 cumecs of water will be lifted from intake well for providing irrigation in Bistan Lift Irrigation scheme. There is no major scheme constructed or under proposal to irrigate such command having scarcity of water hence this scheme is being proposed. It is proposed to lift 8.0 cumecs of water through three stages pumping and MS rising mains feeding water to Delivery Chambers proposed to be constructed near village Mehar Ghatti and Devalgaon. The irrigation water will be distributed in command area through MS,DI and HDPE pipe line system for a command of hect. of culturalable command area. This scheme is also proposed for serving raw drinking water to above mention command area villages. In the present proposal the main canal and disnet system is completely designed as piped canal. The main objective of Bistan Lift Irrigation Scheme is to provide irrigation facilities to the water-short areas in upper reaches of Khargone, where the level of irrigation is very less as compared to available culturable area. The Bistan Lift Irrigation Scheme is conceived to cater irrigation water to about ha. of CCA in 92 village. 6.0 COST ESTIMATE: The detail Estimate amounting Rs crore has been prepared on the rate MP WRD USR effective from FINANCIAL RESOURCES : The Project will be funded by GOMP and aids from AIBP/NABARD. 8.0 REVENUE:- The revenue for irrigation will be collected as per state Government policy. 9.0 BENEFIT COST RATIO, FINANCIAL RETURN & INTERNAL RATE OF RETURN:- The Benefit Cost Ratio works out to be 2.97 as detailed below and is very enthusiastic being within permissible limits. The detailed calculation of B.C. Ratio is attached as annexure 3(a) & 3(b) Total Annual Benefits Total Annual Cost (Expenditure) Lakh Lakh Benefit Cost Ratio = Annual Benefits Annual costs = FUTURE UTILIZATION OF FACILITIES CREATED (BUILDINGS) Page 7

8 The buildings will be constructed at location of 3 nos. pump houses and also at certain important location in the command area. The estimated life of the project is 50 years and these buildings will be utilized in future during operation and maintenance of the scheme. 7.0 Cost per Ha.:- The cost per ha. of this schemes works out to be Rs Lacs/ ha. on C.C.A and it is well within the norms prescribed by the WRD (M.P.) 8.0 Water Rates:- Water rates will be as per M.P. water resources department Construction Program:- It is proposed to complete entire work of the scheme up to June RECOMMENDATION :- The Study of Socio economic status of Nimar region reveals that the region is suffering acute scarcity of water for Drinking & Agriculture field. Because of that, the overall development of the region has worst affected. Further it is observed that day by day the ground water table is depleting and there is a possibility that in future the water may not be available even for drinking purpose also. The study also reveals that the percentage of irrigation in Khargone district by Government Sources i.e. tanks & Canals is very much less as compared to national irrigation percentage. To fulfill the requirement of Nimar region the Narmada Water is the only alternate. As described earlier, sufficient water i.e. 8.0 cumecs is available in the Main Canal of Indira Sagar Project which can be lifted for flurishment of Nimar region and the utilization of Narmada water is being made as per NWDT award. Considering above facts & necessity of water in the draught prone Nimar area, the scheme Bistan Lift Irrigation is proposed. The most attractive feature of the project is that without displacing a single person, Irrigation will be provided to 22,000 ha. of land as neither any new dam is being constructed & nor any submergence is being created. The Benefit Cost Ratio is 2.97, which is well within norms of acceptance & thus the present proposal is submitted & recommended for approval.. Executive Engineer N.D.Division No.18 Khargone Page 8

The Chairman welcomed all the members of the Committee and thereafter agenda items were taken up for deliberations.

The Chairman welcomed all the members of the Committee and thereafter agenda items were taken up for deliberations. The 292 nd meeting of the State Expert Appraisal Committee (SEAC) was held on 16 th June, 2017 under the Chairmanship of Dr. R.B. Lal for the projects / issues received from SEIAA. The following members

More information

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT TEM MEDIUM IRRIGATION PROJECT EXECUTIVE SUMMARY 2016 CHIEF ENGINEER CHAMBAL BETWA BASIN WATER RESOURCES DEPARTMENT BHOPAL (M.P) TEM MEDIUM IRRIGATION

More information

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT SUTHALIYA PROJECT PRE FEASIBILITY REPORT ( PFR ) 2018 CHIEF ENGINEER CHAMBAL BETWA BASIN WATER RESOURCES DEPARTMENT BHOPAL (M.P) SUTHALIYA PROJECT

More information

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT

GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT PARBATI(RINSI)MAJOR IRRIGATION PROJECT PROJECT FEASIBILITY REPORT (PFR) 2017 CHIEF ENGINEER CHAMBAL BETWA BASIN WATER RESOURCES DEPARTMENT BHOPAL

More information

MAJHGAON MEDIUM PROJECT

MAJHGAON MEDIUM PROJECT GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT MAJHGAON MEDIUM PROJECT C.C.A 9900 Ha ESTIMATED COST 358.99 Crores BLOCK:- AJAIGARH DISTRICT:- PANNA CHIEF ENGINEER DHASAN KEN BASIN WATER RESOURCES

More information

Head N E Ha

Head N E Ha Sr. No. PARTICULARS DETAILS A PREAMBLE 1. Project Name Ajansara Barrage Project 2. Project Proponent M/s. Vidharbha Irrigation Development Corporation 3. Screening Category Item 1 (C) in EIA Notification,

More information

BERKHEDA MEDIUM IRRIGATION PROJECT. Techno-Economic Feasibility Report

BERKHEDA MEDIUM IRRIGATION PROJECT. Techno-Economic Feasibility Report GOVERNMENT OF MADHYA PRADESH NARMADA VALLEY DEVELOPMENT AUTHORITY CHIEF ENGINEER Indira Sagar Project (Canals) Sanawad District West Nimar, Madhya Pradesh BALANCE MEDIUM AND MINOR PROJECTS IN NARMADA BASIN

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

DETAIL PROJECT REPORT

DETAIL PROJECT REPORT GOVERNMENT OF MADHYA PRADESH DHIMARKHEDA MICRO IRRIGATION PROJECT DETAIL PROJECT REPORT VOLUME - I REPORT Chief Engineer Upper Narmada Zone Bargi Hills, Jabalpur DHIMARKHEDA MICRO IRRIGATION PROJECT DETAILED

More information

Fig: Alignment of a ridge or watershed canal (Head reach of a main canal in plains)

Fig: Alignment of a ridge or watershed canal (Head reach of a main canal in plains) SYSTEM OF IRRIGATION CANAL CHAPTER 6 Alluvial Soil and Non-Alluvial Soil The soil which is formed by transportation and deposition of silt through the agency of water, over a course of time, is called

More information

A Balance Sheet of Performance of Large dams in India The case of irrigation and flood control

A Balance Sheet of Performance of Large dams in India The case of irrigation and flood control 1 A Balance Sheet of Performance of Large dams in India The case of irrigation and flood control Over the last 51 years of water resources development in Independent India, the nation has spent over Rs.

More information

A VISIT REPORT ON SARDAR SAROVAR DAM. CIVIL 4 th SEM PREPARED BY: MISS. D.A.DAVE MR. H.A.MAULVI CIVIL ENGINEERING DEPARTMENT

A VISIT REPORT ON SARDAR SAROVAR DAM. CIVIL 4 th SEM PREPARED BY: MISS. D.A.DAVE MR. H.A.MAULVI CIVIL ENGINEERING DEPARTMENT A VISIT REPORT ON SARDAR SAROVAR DAM CIVIL 4 th SEM PREPARED BY: MISS. D.A.DAVE MR. H.A.MAULVI CIVIL ENGINEERING DEPARTMENT A.Y.DADABHAI TECHNICAL INSTITUTE-KOSAMBA 1 The Narmada River Narmada means ever-delightful,

More information

THERE IS NO CASE FOR INCREASE IN HEIGHT OF THE SARDAR SAROVAR DAM

THERE IS NO CASE FOR INCREASE IN HEIGHT OF THE SARDAR SAROVAR DAM THERE IS NO CASE FOR INCREASE IN HEIGHT OF THE SARDAR SAROVAR DAM Signal from the System: Laws do not matter The events of last five weeks around Sardar Sarovar Project have given a clear message to the

More information

State. 2. Location: Madhya Pradesh. Total period for which the forest land is proposed to be diverted (in year). 3. Detail of user agency

State. 2. Location: Madhya Pradesh. Total period for which the forest land is proposed to be diverted (in year). 3. Detail of user agency F. No. 8-39/2018-FC Sub: Proposal for diversion of 55.3 ha. of forest land for construction of Parna Minor Irrigation Project, in favour of Water Resources Department, Damoh District Madhya Pradesh State.-regarding.

More information

Impact of Bundelkhand Special Package for Drought Mitigation. National Rainfed Area Authority, Planning Commission, Government of India, New Delhi

Impact of Bundelkhand Special Package for Drought Mitigation. National Rainfed Area Authority, Planning Commission, Government of India, New Delhi Impact of Bundelkhand Special Package for Drought Mitigation National Rainfed Area Authority, Planning Commission, Government of India, New Delhi 1 Background of the Package The Package was initiated by

More information

Convergence of NREGS with Water Resource Department in the State of M.P. Date

Convergence of NREGS with Water Resource Department in the State of M.P. Date Convergence of NREGS with Water Resource Department in the State of M.P. Date 22.04.2009 OVER VIEW OF N.R.E.G.S. in MP State 1. Total District Notified 50 2. Total Janpad Panchayat 313 3. Total Gram Panchayats

More information

Bishunpur Small Hydro Power Project

Bishunpur Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

R.T.Thokal Head, Dept. of Irrigation and Drainage Engineering College of Agril Engg. And Tech., Dr.BSKKV, Dapoli Maharashtra State, INDIA

R.T.Thokal Head, Dept. of Irrigation and Drainage Engineering College of Agril Engg. And Tech., Dr.BSKKV, Dapoli Maharashtra State, INDIA Application of GIS-based SWAT framework for water management of irrigation project under rotational water supply S.D. Gorantiwar Head, Dept. of Irrigation and Drainage Engineering Dr. A. S. College of

More information

SITE VISITED AT SARDAR SAROVAR DAM AT 24/08/2017 (3 RD, 5 TH AND 7 TH SEMESTER)

SITE VISITED AT SARDAR SAROVAR DAM AT 24/08/2017 (3 RD, 5 TH AND 7 TH SEMESTER) SITE VISITED AT SARDAR SAROVAR DAM AT 24/08/2017 (3 RD, 5 TH AND 7 TH SEMESTER) PREPARED BY: ASSISTANT PROFESSOR NILESH PRAJAPATI CIVIL ENGG. DEPARTMENT DJMIT MOGAR River Bed Power House (RBPH) RIVER BED

More information

Thethaitangar Small Hydro Power Project

Thethaitangar Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation

More information

Model Lift Irrigation Scheme

Model Lift Irrigation Scheme Model Lift Irrigation Scheme (Lecture notes by Dr.S.S.Rao) Contents 1. Introduction... 2 2. Guideline lines for small lift irrigation schemes.... 3 2.1. Lift irrigation on surface water... 3 2.1.1 Size

More information

Madhya Pradesh State Water Policy, 2003

Madhya Pradesh State Water Policy, 2003 Madhya Pradesh State Water Policy, 2003 This document is available at ielrc.org/content/e0307.pdf For further information, visit www.ielrc.org Note: This document is put online by the International Environmental

More information

Sugabandh Small Hydro Power Project

Sugabandh Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

Torpa Small Hydro Power Project

Torpa Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

The term rotation of crops is somewhat self explanatory. It implies that nature of the crop sown in a particular field is changed year after year.

The term rotation of crops is somewhat self explanatory. It implies that nature of the crop sown in a particular field is changed year after year. CROP ROTATION The term rotation of crops is somewhat self explanatory. It implies that nature of the crop sown in a particular field is changed year after year. Necessity for rotation The necessity for

More information

Enhancement of System performance through Benchmarking: Case Study of Samrat Ashok Sagar Irrigation Project, MP, India

Enhancement of System performance through Benchmarking: Case Study of Samrat Ashok Sagar Irrigation Project, MP, India Volume 1, No 2, 21 Copyright 21 All rights reserved Integrated Publishing services Research article ISSN 976 4399 Enhancement of System performance through Benchmarking: Case Study of Samrat Ashok Sagar

More information

DPR GUIDELINES FOR ERM OF IRRIGATION PROJECTS

DPR GUIDELINES FOR ERM OF IRRIGATION PROJECTS DPR GUIDELINES FOR ERM OF IRRIGATION PROJECTS 1.0 INTRODUCTION RAJEEV SINGHAL Director NWA, CWC, Pune Modernisation of Irrigation Project includes extension, renovation & modernisation components of existing

More information

International Journal of Engineering and Techniques - Volume 4 Issue 1, Jan Feb 2018

International Journal of Engineering and Techniques - Volume 4 Issue 1, Jan Feb 2018 RESEARCH ARTICLE OPEN ACCESS STUDY ON SUSTAINABLE PLANNING, DESIGN AND MANAGEMENT OF MICRO-WATERSHED FOR BASAVANA BAGEWADI TALUKA OF VIJAYAPUR DISTRICT Nagraj S. Patil 1, Basavaraj B. Hosamani 2, Nataraja

More information

Command Area Management Study of Karjan Dam Gujarat, India using Remote Sensing and GIS

Command Area Management Study of Karjan Dam Gujarat, India using Remote Sensing and GIS IJSTE - International Journal of Science Technology & Engineering Volume 1 Issue 11 May 2015 ISSN (online): 2349-784X Command Area Management Study of Karjan Dam Gujarat, India using Remote Sensing and

More information

A Report on Industrial Visit at

A Report on Industrial Visit at Department of Civil Engineering A Report on Industrial Visit at Sardar Sarovar Dam Site & Dhanki Pumping Station (Dt.13-10-2015 & 14-10-2015) Prepared by: Jignesh Shah Details of Visit: Date: 13/10/2015

More information

ARHAM VEERAYATAN INSTITUTE OF ENGINEERING, TECHNOLOGY & RESEARCH Haripar (Mota Asambia), Bhuj Mandvi road, Mandvi Tal.

ARHAM VEERAYATAN INSTITUTE OF ENGINEERING, TECHNOLOGY & RESEARCH Haripar (Mota Asambia), Bhuj Mandvi road, Mandvi Tal. ARHAM VEERAYATAN INSTITUTE OF ENGINEERING, TECHNOLOGY & RESEARCH Haripar (Mota Asambia), Bhuj Mandvi road, Mandvi Tal. Kutch (Gujarat) Date: 19/10/2016, Wednesday Duration: 1 Day A FEEDBACK REPORT ON VISIT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT BANDOL CRUSHER STONE QUARRY OF SHRI TULSIRAM SAHU AT Khasra No. 15/2,23/2 Village Bandol Tehsil District State Madhya Pradesh Production Capacity 45030 M3/Year Area 3.150 Hectare

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

Feasibility of Pipe Distribution Network (PDN) over Canal Distribution Network (CDN) For Irrigation

Feasibility of Pipe Distribution Network (PDN) over Canal Distribution Network (CDN) For Irrigation Feasibility of Pipe Distribution Network (PDN) over Canal Distribution Network (CDN) For Irrigation Sandesh B. Kulavmode 1, Dr. S. S.Valunjkar 2 1,2 Department of Civil Engineering, Government College

More information

Impact of Jamda medium irrigation project on irrigeted land cover in its command area in Jalgaon district

Impact of Jamda medium irrigation project on irrigeted land cover in its command area in Jalgaon district 2017; 3(11): 304-308 ISSN Print: 2394-7500 ISSN Online: 2394-5869 Impact Factor: 5.2 IJAR 2017; 3(11): 304-308 www.allresearchjournal.com Received: 19-09-2017 Accepted: 20-10-2017 Assistant Professor,

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Incidentally, here it should be noted that in response to RTI application, the dates of original commissioning. SSP: Mounting Costs, Minimal Benefits

Incidentally, here it should be noted that in response to RTI application, the dates of original commissioning. SSP: Mounting Costs, Minimal Benefits SSP: Mounting Costs, Minimal Benefits 1 Mounting Financial Costs According to the working group report on Water Resources for the 11 th Five Year Plan, the total cost of the Sardar Sarovar Project (SSP)

More information

1.1 Name of the Project : 1.2 Proposed Installed Capacity of the Project : MW

1.1 Name of the Project : 1.2 Proposed Installed Capacity of the Project : MW 1.0 GENERAL FORM NO.APP/P/PTB-2/1 PART B SECTOR SPECIFIC INFORMATION SMALL HYDRO POWER PROJECT 1.1 Name of the Project _ 1.2 Proposed Installed Capacity of the Project MW 1.3 Proposed location of the Project

More information

GOVERNMENT OF ANDHRA PRADESH WATER RESOURES DEPARTMENT CHINTHALAPUDI LIFT IRRIGATION SCHEME FEASIBILITY REPORT

GOVERNMENT OF ANDHRA PRADESH WATER RESOURES DEPARTMENT CHINTHALAPUDI LIFT IRRIGATION SCHEME FEASIBILITY REPORT GOVERNMENT OF ANDHRA PRADESH WATER RESOURES DEPARTMENT CHINTHALAPUDI LIFT IRRIGATION SCHEME FEASIBILITY REPORT SUBMITTED TO EXECUTIVE ENGINEER Indira Sagar Project, JANGAREDDYGUDEM West Godavari District.

More information

HYDRAULIC DESIGN OF PIPE DISTRIBUTION NETWORK FOR IRRIGATION PROJECT

HYDRAULIC DESIGN OF PIPE DISTRIBUTION NETWORK FOR IRRIGATION PROJECT International Journal of Civil Engineering and Technology (IJCIET) Volume 9, Issue 7, July 2018, pp. 1109 1116, Article ID: IJCIET_09_07_116 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=9&itype=7

More information

Crop Water Requirement Estimation by using CROPWAT Model: A Case Study of Halali Dam Command Area, Vidisha District, Madhya Pradesh, India

Crop Water Requirement Estimation by using CROPWAT Model: A Case Study of Halali Dam Command Area, Vidisha District, Madhya Pradesh, India Volume-5, Issue-3, June-2015 International Journal of Engineering and Management Research Page Number: 553-557 Crop Water Requirement Estimation by using CROPWAT Model: A Case Study of Halali Dam Command

More information

POWER POTENTIAL STUDIES A CASE STUDY OF KULSI MUTLTIPURPOSE PROJECT

POWER POTENTIAL STUDIES A CASE STUDY OF KULSI MUTLTIPURPOSE PROJECT POWER POTENTIAL STUDIES A CASE STUDY OF KULSI MUTLTIPURPOSE PROJECT G.k.Hazarika B.E (civil) Asstt Executive Engineer Brahmaputra Board Dilip Goswami B.E (civil) Executive Engineer Brahmaputra Board The

More information

LAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES

LAW OF THE REPUBLIC OF INDONESIA NUMBER 7 OF 2004 REGARDING WATER RESOURCES LAW OF NUMBER 7 OF 2004 REGARDING WATER RESOURCES BY THE GRACE OF THE ALMIGHTY GOD, THE PRESIDENT OF Considering : a. that water resources is the gift of the Almighty God which gives benefits for the realization

More information

Maximizing the benefit by revival, mordenisation and rejuvenation of water harvesting sturcture (check Dam) in Dahod District of Gujarat

Maximizing the benefit by revival, mordenisation and rejuvenation of water harvesting sturcture (check Dam) in Dahod District of Gujarat Maximizing the benefit by revival, mordenisation and rejuvenation of water harvesting sturcture (check Dam) in Dahod District of Gujarat Lukhawada Check dam across River hadaf, Taluka : Limkheda Funded

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

Sl.No DETAILS HULICAL FOREBAY DAM A. GENERAL:

Sl.No DETAILS HULICAL FOREBAY DAM A. GENERAL: KARNATAKA POWER CORPORATION LIMITED VARAHI HYDRO ELECTRIC PROJECT INFORMATION FOR ENGINEERING DATA Sl.No DETAILS HULICAL FOREBAY DAM A. GENERAL: 1. Name of the dam/project. 2. Location. Hulical fore bay

More information

A REPORT ON ACADEMIC VISIT TO UKAI DAM (Date: 27 th February 2017)

A REPORT ON ACADEMIC VISIT TO UKAI DAM (Date: 27 th February 2017) A REPORT ON ACADEMIC VISIT TO UKAI DAM (Date: 27 th February 2017) CONCERNED FACULTY : Dr. JIGAR SEVALIYA Prof. HIMANSHU PADHYA Prof. MEHALI MEHTA Prof. MITALI SHAH Dr. MINAKSHI VAGHANI Prof.PAYAL ZAVERI

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR

More information

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION 1.1 General The Lower Erkhuwa hydropower Project is located in Kulung and Chauki Danda VDCs of Bhojpur District, in East Nepal. It is located

More information

D.A.DEGREE.ENGINEERING & TECHNOLOGY MAHEMADABAD

D.A.DEGREE.ENGINEERING & TECHNOLOGY MAHEMADABAD D.A.DEGREE.ENGINEERING & TECHNOLOGY MAHEMADABAD INDUSTRIAL VISIT REPORT 1 Name of the industry Sardar Sarovar Dam 2 Location Kevadiya Colony Bharuch, Gujarat 3 Date 18-7-2017 4 Time 11:00AM 5 Semester

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

6) Penstocks 3.25m dia and 965m long to lead a design discharge of cumecs

6) Penstocks 3.25m dia and 965m long to lead a design discharge of cumecs Project: Sorang Hydro Electric Project - 100 MW Overview: M/s.Himachal Sorang Pvt.Ltd., Hyderabad, is developing the Run of the River Sorang Hydro Electric Project (100MW) in Kinnaur District of Himachal

More information

Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web: Ph:

Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web:     Ph: Serial : SK1_CE_U+I_Irrigation_091018 CLASS TEST Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web: E-mail: info@madeeasy.in Ph: 011-451461 CLASS TEST 018-19 CIVIL ENGINEERING

More information

Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web: Ph:

Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web:     Ph: Serial : 01. SK_J+B_CE_Irrigation_090918 CLASS TEST (GATE) Delhi Noida Bhopal Hyderabad Jaipur Lucknow Indore Pune Bhubaneswar Kolkata Patna Web: E-mail: info@madeeasy.in Ph: 011-451461 CLASS TEST 018-19

More information

DETAILED PROJECT REPORT OF IWMP-II (NICHAR-WATERSHED) DEVELOPMENT BLOCK NICHAR DISTRICT KINNAUR (Himachal Pradesh) VOLUME-I

DETAILED PROJECT REPORT OF IWMP-II (NICHAR-WATERSHED) DEVELOPMENT BLOCK NICHAR DISTRICT KINNAUR (Himachal Pradesh) VOLUME-I DETAILED PROJECT REPORT OF IWMPII (NICHARWATERSHED) DEVELOPMENT BLOCK NICHAR DISTRICT KINNAUR (Himachal Pradesh) VOLUMEI DEPARTMENT OF RURAL DEVELOPMENT Shimla171009, Himachal Pradesh 200910 DETAILED PROJECT

More information

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

TD 603. Water Resources Milind Sohoni sohoni/ Analysis Framework for the 2009 Maharashtra MWRRA Tarrif Document

TD 603. Water Resources Milind Sohoni  sohoni/ Analysis Framework for the 2009 Maharashtra MWRRA Tarrif Document TD 603 Water Resources Milind Sohoni www.cse.iitb.ac.in/ sohoni/ Analysis Framework for the 2009 Maharashtra MWRRA Tarrif Document () February 16, 2010 1 / 16 Vol I: The Chapters 1 Preface: Terms of Reference,

More information

UTILIZATION OF AVAILABLE WATER RESOURCES IN UTTARANCHAL: AN APPRAISAL OF CURRENT STATUS AT THE DISTRICT SCALE INTRODUCTION

UTILIZATION OF AVAILABLE WATER RESOURCES IN UTTARANCHAL: AN APPRAISAL OF CURRENT STATUS AT THE DISTRICT SCALE INTRODUCTION UTILIZATION OF AVAILABLE WATER RESOURCES IN UTTARANCHAL: AN APPRAISAL OF CURRENT STATUS AT THE DISTRICT SCALE V. N. Sharda and P.R. Ojasvi* INTRODUCTION The study on water as a natural resource is inclusive

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

Climate Change The International Journal

Climate Change The International Journal Climate Change The International Journal ISSN 2394-8558 EISSN 2394-8566 2016 Discovery Publication. All Rights Reserved Water resources management in Gujarat Publication History Received: 3 July 2016 Accepted:

More information

CE 2031 WATER RESOURCES ENGINEERING L T P C

CE 2031 WATER RESOURCES ENGINEERING L T P C CE 2031 WATER RESOURCES ENGINEERING L T P C 3 0 0 3 QUESTION BANK PART - A UNIT I GENERAL 1. Write short notes on Water Resources Survey. 2. How do you calculate Average Annual Runoff depth? 3. Write short

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

GOVERNMENT OF KARNATAKA

GOVERNMENT OF KARNATAKA GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT STATE WATER POLICY 00 GOVERNMENT OF KARNATAKA (Water Resources Department) STATE WATER POLICY Introduction :- The State is endowed with limited water

More information

Strategy and Methodology for Improved IWRM

Strategy and Methodology for Improved IWRM Strategy and Methodology for Improved IWRM A Case Study of Tungabhadra River Basin in India S. Puttaswamaiah H. L. Shashidhara K. V. Raju Centre for Ecological Economics and Natural Resources Institute

More information

A Geographical Study of Irrigation Water Storage in Jalgaon District

A Geographical Study of Irrigation Water Storage in Jalgaon District 10 A Geographical Study of Irrigation Water Storage in Jalgaon District Mr. Prasanna Suresh Deshmukh Department of Geography JDMVS CO-OP SAMAJ Arts, Science & Commerce College, Varangaon, Dist Jalgaon

More information

Proposed Water Pipeline Route

Proposed Water Pipeline Route A Detail on Proposed Water Pipeline Route of 1600 (2 x 800) MW GODDA THERMAL POWER PROJECT GODDA, JHARKHAND ADANI POWER (JHARKHAND) LTD. Village - Motia, Tehsil Godda, District Godda, Jharkhand 1 Contents

More information

Alpha College of Engineering. Fifth Semester B.E. Question Bank. Hydrology and irrigation engineering

Alpha College of Engineering. Fifth Semester B.E. Question Bank. Hydrology and irrigation engineering Alpha College of Engineering Fifth Semester B.E. Question Bank Hydrology and irrigation engineering UNIT 1: INTRODUCTION & PRECIPITATION 1.Explain in brief the different types of precipitation. 2.How do

More information

Flood Control by Reservoir Operation for Ukai Reservoir

Flood Control by Reservoir Operation for Ukai Reservoir GRD Journals Global Research and Development Journal for Engineering Recent Advances in Civil Engineering for Global Sustainability March 2016 e-issn: 2455-5703 Flood Control by Reservoir Operation for

More information

GOVERNMENT OF KARNATAKA

GOVERNMENT OF KARNATAKA GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT STATE WATER POLICY 2002 This document is available at www.ielrc.org/content/e0205.pdf 1 GOVERNMENT OF KARNATAKA (Water Resources Department) STATE WATER

More information

ANNUAL REPORT ON CSRACTIVITIES FOR FY

ANNUAL REPORT ON CSRACTIVITIES FOR FY M in1liii JlHPRil Annexure "C" ANNUAL REPORT ON CSRACTIVITIES FOR FY 1. A brief outline of the company's CSR policy, including overview of the projects or programs proposed to be undertaken and a reference

More information

RIVER BASIN TAPI [ INDIA

RIVER BASIN TAPI [ INDIA RIVER BASIN TAPI [ INDIA ] SCHEDULE A ASSESSMENT OF RIVER BASINS (RBs) IN SOUTH ASIA Sr. No. Details 1 Physical Features - General Information 1.1 Name of River basin (also indicate regional names); Tapi,

More information

Intra and Inter Basin Linking of Rivers in Water Resources Management

Intra and Inter Basin Linking of Rivers in Water Resources Management Journal of Scientific & Industrial Research Vol. 75, March 2016, pp. 150-155 Intra and Inter Basin Linking of Rivers in Water Resources Management A Verdhen Dronacharya College of Engineering, Gurgaon-

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Krishna Construction Company AT Khasra No.1046 Vill.-Pipalya Hamir, Tehsil-Barod, District-Agar Malwa (M.P.) Production Capacity: 40000 Cu.mt Crusher Stone for 18 Months

More information

Module 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur

Module 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur Module 3 Irrigation Engineering Principles Lesson 4 Types of Irrigation Schemes and Methods of Field Water Application Instructional objectives On completion of this lesson, the students come to know of

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

DRINKING WATER FROM SARDAR SAROVAR PROJECT NARMADA CONTROL AUTHORITY

DRINKING WATER FROM SARDAR SAROVAR PROJECT NARMADA CONTROL AUTHORITY International Environmental Law Research Centre DRINKING WATER FROM SARDAR SAROVAR PROJECT NARMADA CONTROL AUTHORITY NCA Publication No. 3/91, 1991 This paper can be downloaded in PDF format from IELRC

More information

Sinnar Taluka Overview and preparation for field trip. Pooja Prasad (Ph D scholar) 22/8/2017

Sinnar Taluka Overview and preparation for field trip. Pooja Prasad (Ph D scholar) 22/8/2017 Sinnar Taluka Overview and preparation for field trip Pooja Prasad (Ph D scholar) 22/8/2017 1 Topics Overview of Sinnar taluka Geo-morphology, cropping patterns Diversion based irrigation (DBI) system

More information

REMOTE SENSING AND GIS FOR INTEGRATED LAND MANAGEMENT: CASE OF INDIA

REMOTE SENSING AND GIS FOR INTEGRATED LAND MANAGEMENT: CASE OF INDIA REMOTE SENSING AND GIS FOR INTEGRATED LAND MANAGEMENT: CASE OF INDIA R.B.Singh and Dilip Kumar Department of Geography Delhi School of Economics University of Delhi Delhi-110007, India E-mail:rbsgeo@hotmail.com

More information

THE NARMADA BACHAO ANDOLAN

THE NARMADA BACHAO ANDOLAN DAMS AND DISPLACEMENT THE NARMADA BACHAO ANDOLAN JMPCOC/EVS-II/DS/15-16 1 Narmada means ever delightful one of the holiest rivers in the country of India they say that even the site of the river will cleanse

More information

ALEO HYDRO ELECTRIC PROJECT ALEO, MANALI (H.P.) (2X1500KW) A.K. Goel Manging Director M/s. Small Hydro Engineering Consultant Pvt. Ltd.

ALEO HYDRO ELECTRIC PROJECT ALEO, MANALI (H.P.) (2X1500KW) A.K. Goel Manging Director M/s. Small Hydro Engineering Consultant Pvt. Ltd. Himalayan Small Hydropower Summit (October 12-13, 2006), Dehradun ALEO HYDRO ELECTRIC PROJECT ALEO, MANALI (H.P.) (2X1500KW) A.K. Goel Manging Director M/s. Small Hydro Engineering Consultant Pvt. Ltd.

More information

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE APPENDIX VIII Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (I) Basic Information S.No. Particulates Details 1. Name of the Mining Lease site

More information

Medium and Minor Irrigation Works

Medium and Minor Irrigation Works Medium and Minor Irrigation Works Abstract: Sandela Haripriya, M.Tech Assistant Professor, Department of Civil Engineering, Balaji Institute of Technology & Sciences, Narsampet, Warangal, Telangana. As

More information

ABSTRACT. 150 microwatersheds.

ABSTRACT. 150 microwatersheds. Inventory of Rapid Reconnaissance Soil Survey for Prioritization of Micro-watersheds of 4D1B1 and 4D1B2 Watersheds of 4D1B Subcatchment (Non RVP) of 4D1(Lower most Krishna below Nagarjunsagar dam), Krishna

More information

Irrigation Market in India

Irrigation Market in India Now Available Irrigation Market in India Programmes and Projects: Opportunities for Construction and Equipment Report (PDF) Data-set (Excel) India Infrastructure Research Irrigation Market in India Table

More information

State at a Glance: Arunachal Pradesh, Vol. 1(2), Water

State at a Glance: Arunachal Pradesh, Vol. 1(2), Water Water 6.1: Details of Inland Fishery Water Resources of Various Types in Arunachal Pradesh (A.P.) 6.2: Installation of off-grid/decentralized Renewable Energy Systems/Devices 6.3: Source wise Installed

More information

Flood Control by Reservoir Operation for Ukai Reservoir Kalariya Kishankumar B. 1 Dr.R.B.Khasiya 2 Mr.B.J.Batliwala 3 Dr.J.N.

Flood Control by Reservoir Operation for Ukai Reservoir Kalariya Kishankumar B. 1 Dr.R.B.Khasiya 2 Mr.B.J.Batliwala 3 Dr.J.N. IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 02, 2015 ISSN (online): 2321-0613 Flood Control by Reservoir Operation for Ukai Reservoir Kalariya Kishankumar B. 1 Dr.R.B.Khasiya

More information

-

- PROPOSAL FOR ENVIRONMENTAL CLEARANCE FOR Masonarystone Mine (Minor Mineral, Category B2) Near Village- Baramsar, Tehsil Jaisalmer District Jaisalmer (Raj.) M.L. No. 344/10 Area 1.0 Hect. Proposed Production

More information

Sustainable Groundwater Management

Sustainable Groundwater Management Sustainable Groundwater Management Developing and promoting a more accurate understanding of the socio-ecological value of groundwater, and the nature and scale of the consequences of its unsustainable

More information

WAPCOS LIMITED (A Government of India Undertaking) 76 C, Sector 18, Gurgaon , Haryana, INDIA

WAPCOS LIMITED (A Government of India Undertaking) 76 C, Sector 18, Gurgaon , Haryana, INDIA WATER RESOURCES DEPARTMENT GOVERNMENT OF MADHYA PRADESH EIA STUDY FOR BINA COMPLEX MULTIPURPOSE IRRIGATION PROJECT Volume-I : Final EIA Report WAPCOS LIMITED (A Government of India Undertaking) 76 C, Sector

More information

PLANNING FOR OPTIMUM USE OF WATER RESOURCES OF MRP COMPLEX USING MIKE BASIN

PLANNING FOR OPTIMUM USE OF WATER RESOURCES OF MRP COMPLEX USING MIKE BASIN J. Indian Water Resour. Journal Soc., of Vol. Indian 33 Water No. 1, Resources January, Society, 2013 Vol 33, No. 1, January, 2013 PLANNING FR PTIMUM USE F WATER RESURCES F MRP CMPLEX USING MIKE BASIN

More information

NEED FOR GROUNDWATER UTILIZATION AND MANAGEMENT IN AURANGABAD CITY, MAHARASHTRA ABSTRACT

NEED FOR GROUNDWATER UTILIZATION AND MANAGEMENT IN AURANGABAD CITY, MAHARASHTRA ABSTRACT NEED FOR GROUNDWATER UTILIZATION AND MANAGEMENT IN AURANGABAD CITY, MAHARASHTRA S.M.Deshpande Junior Geologist, Groundwater Surveys and Development Agency, Shivajinagar, Pune 411 005 ABSTRACT Aurangabad

More information

Guidelines for Construction of Pipe Distribution Network (PDN) for Irrigation

Guidelines for Construction of Pipe Distribution Network (PDN) for Irrigation Guidelines for Construction of Pipe Distribution Network (PDN) for Irrigation Mr. Sandesh B. Kulavmode 1, Dr.S.S.Valunjkar 2 1P.G. Student, Dept. of Civil Engineering, Government College of Engineering,

More information

Nation looks to Bihar for rise in production of food grains! And Bihar is devastated by floods almost every year

Nation looks to Bihar for rise in production of food grains! And Bihar is devastated by floods almost every year Nation looks to Bihar for rise in production of food grains! And Bihar is devastated by floods almost every year AGRICULTURE-FLOOD Third highest Volatile State Reason- Frequent flood FLOOD PRONE AREA OF

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Pathari Basouda : Basouda : Vidisha (M.P.) : 2.00 Hectare : Stone KHASRA No : 177/1/2 PRODUCTION CAP : 10000 Cu.mt/year Stone APPLICANT

More information

Civil Engineering Department. 2 Marks Question and Answer. CE:2301:Irrigation Engineering

Civil Engineering Department. 2 Marks Question and Answer. CE:2301:Irrigation Engineering Civil Engineering Department 2 Marks Question and Answer CE:2301:Irrigation Engineering 1 UNIT 1 INTRODUCTION 1) Define irrigation? Irrigation is defined as the science of artificial application of water

More information

Slow Sand Filtration Project

Slow Sand Filtration Project Slow Sand Filtration Project MEETING OF REPRESENTATIVES OF SSF-PROJECT COUNTRIES NAGPUR.INDIA-SEPTEMBER 15-19,1980 International Reference Centre for Community Water Supply and Sanitation P.O. Box 5500

More information