1 ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to the mining project. The EMP has been designed within the framework of various legislative and regulatory requirements on environmental and socio-economic aspects. M/s. Srinivasa Infrastructure Pvt. Ltd. proposes to conduct semi mechanized opencast method quarrying for Road metal extraction of m 3 /annum in an area of Ha at Survey No. 240/10, Vankayalapadu Village, Edlapadu Mandal, Guntur District, Andhra Pradesh. Quarry lease deed executed work orders issued by Assistant Director of Mines and Geology, Guntur, Government of Andhra Pradesh vide letter no. 3904/Q/2011 dated for a period upto Mining Plan was approved by the Deputy Director of Mine and Geology, Guntur vide letter no. 4818/MP/RM/GNT/2017 dated Capital cost of the proposed quarrying activity is Rs. 35 Lakhs. M/s. Srinivasa Infrastructure Pvt. Ltd. is conscious of his environmental responsibility towards the society in minimizing the pollution load due to this project and accordingly decided to prepare. The objective of preparing environment management plan is to delineate effective measures to control and to mitigate the environmental pollution. This report presents the environment management plan, detailing the environmentally sound technology and the measures needed to contain and mitigate the anticipated environmental impacts due to the project. 1.1 Mine Location The proposed Quarry lease area of ha at Survey No. 240/10, Vankayalapadu Village, Edlapadu Mandal, Guntur District, Andhra Pradesh. The quarry lease area falls in the Survey of India topo sheet no. 65 D/4 with the co-ordinates of Latitude 16 11'53.68"N and Longitude 80 14'46.09"E with an elevation of 67 m. The nearest village is Vankayalapadu located at a distance of 1.2 km from the QL area in SE direction. The major road access is Guntur to Vijayawada National Highway road is passing at a distance of 1.0 km from the QL area in South direction. Cart road is available from main road to lease area. Nearest town and Railway Station is Phirangipuram located at a distance of 11 km from the QL area in Northeast direction. Kondavidu RF located at 1.4 km in NE direction. Pedda Nandipadu 1-1

2 Branch canal is passing at a distance of 2.0 km in W direction. There are no sensitive areas like national parks, wildlife sanctuaries, state/national boundaries observed in 10km radius from the quarry lease area. Quarry lease location map is presented in figure 1.1. Details of the quarry lease area are presented in table 1.1. Table 1.1 Details of the Quarry Lease area Area in Ownership and State & District Mandal Village Survey No hectares status of occupancy Andhra Pradesh Edlapadu Vankayalapadu 240/ Govt. land Guntur 1.2 Land use pattern of the lease area The Quarry lease is a slightly hilly in nature with dip towards north. The land use pattern of the lease area is presented in table 1.2. Table 1.2 Land Use Pattern of Lease Area S. No. Purpose Extent (Ha) 1 Area under quarrying Green belt Vacant Total

3 Fig 1.1 Quarry Lease Location Map of M/s. Srinivasa Infrastructure Pvt. Ltd. 1-3

4 Fig 1.2 Quarry Lease area of M/s. Srinivasa Infrastructure Pvt. Ltd. 1-4

5 2.0 Topography The Quarry lease is a slightly hilly in nature with dip towards north. The lowest contour is 45 m and highest contour is 60 m in topo plan. 3.0 Regional Geology The Eastern Ghat Mobile Belt (EGMB) in Andhra Pradesh occupying large parts of Coastal District, Prakasam, Guntur, Krishna, East & West Godavari, Visakhapatnam, Vizianagaram and Srikakulam Districts for more than 600 Km in length with maximum width of 100 Km in Northern District and tapers it to 20 Km in Southern District. It is NNE - SSW trending in Southern part and charge to NE -SW, West of Eluru. Stratigraphy & Lithology Eastern Ghat Mobile Belt in Andhra Pradesh is divided into 3 longitudinal zones based on the lithological characteristics. 1) Western Charnockite Zone (WCZ) 2) Central Khondalite Zone (CKZ) 3) Eastern Migmatite Zone The Southern half of the coastal belt is mainly represented by Western Charnockite zone with minor patches of Central Khondalite Zone like near Mangalagiri, where as in the Northern District of Andhra Pradesh, Central Khondalite Zone predominant with bands of Charnockite Rock. 3.1 Details of prospecting carried out No prospecting operations were conducted. After the grant of quarry lease, the lessee will start the quarry operations based on the results of existing road metal quarries in the neighboring area. 4.0 Reserves Estimation The deposit is found to be irregular in shape. Hence cross sectional method adopted for Estimation of Geological Reserves. 3 Sections A-A1 to C-C1 were drawn at equal distance perpendicular to the strike direction of the formation to estimate the reserves. The cross sections were drawn perpendicular to the trend direction, the cross sectional area of the individual sections are calculated to arrive at sectional area, the area thus arrived is multiplied by the sectional influence of 45 m and 30m (average) to arrive the volume of Road Metal. 1-5

6 Table 1.3 Geological Reserves Section Category Section Area Sectional Volume in in m² Influence (m) m³ (AxB) A-A B-B1 Proved C-C Grand Total Reserves Blocked under buffer zone Section Category Section Area Sectional Volume in in m² Influence (m) m³ (AxB) A-A B-B1 Proved C-C Grand Total Reserves Blocked under safety slopes Section Category Section Area Sectional Volume in in m² Influence (m) m³ (AxB) A-A B-B1 Proved C-C Grand Total Mineable reserves and life of quarry Proved Reserves = m³ Reserves Blocked under buffer zone = m³ Reserves Blocked under safety slopes = m³ Total reserves blocked = m³ Reserves already excavated = m³ Reserves available for mining = m³ Extraction of market grade recovery = m³ Life of the mine = /12000 = 16.7 Years or 17 years 5.0 MINING METHOD The road metal in the quarry lease area is exposed on the surface with sheet. Hence, it is proposed to quarry the sheet by opencast and semi mechanized method by developing m height with 3 m bench width with drilling and blasting. The development of benches in the sheet rock will be O safety slopes. 1-6

7 5.1 Year wise development and production It is proposed to produce m 3 of material from an area of m 2 of the lease area during the five years of proposed plan period. The average annual production is m 3. Year wise production and waste generation details are presented in table LIST OF MACHINERY Table 1.5 Year wise Production and Waste generation 1. Excavator : 2 No 2. Drilling Machines : 1 No. 3. Tractor with trailers : 2 No s 4. Rock breakers : 1 No s 5. Tippers : 4 No s 6. Water Tanker : 1 No s Year Volume in Production m 3 (100%) m 3 I Year II Year III Year IV Year V Year Total DRILLING & BLASTING Drilling is accomplished either with wagon drills of 4.5 size or with jackhammer drills depending on the strata and the production requirement. The blasts holes will be placed with spacing and burden of 3 m X 3 m in staggered pattern. The drill machines of 115 mm hammer drilling will be employed for blasting in staggered pattern with 3 X 3 spacing burden with depth of 5 meters each. Each blast hole will yield 45 m Transportation of the blocks from quarry to yard and to the destination The rock will be loaded by excavators into the tractors and hauled to the stock yard for dispatch. The lessee will deploy two tractors at his mine to transport the waste unfinished and finished rock from yard to dispatch point. 1-7

8 8.0 Solid Wastes Generation and Management Plan In this quarry there is no wastage is anticipated. 9.0 Employment Potential The following employees are required for the proposed mining operations Table 1.6 Employment Potential S. No Description Quantity 1 Mine Manager 1 2 Supervisor 1 3 Tipper operators 4 4 Excavator operators 4 5 Semi Skilled Workers 10 6 Drill operators 2 7 Water tanker operator 1 Total SITE SERIVCES Regarding site services, a mine office shall be established at the mine and other statutory constructions like rest shelter, drinking water supply, and first aid facility shall be provided Water requirement Water requirement is mainly for drinking purpose, domestic purpose, green belt maintaining and for sprinkling on Mine haulage roads the water shall be drawn from nearby village. The domestic waste water shall be sent to septic tank followed by soak pit. Rainwater storage tank of 5 KL capacity will be provided to collect the storm water for reuse and also water from nearby village. This will ensure that the rainwater is effectively used and minimizes the drawl of ground water resources. The water requirement is presented in table 1.7. Table 1.7 Water Requirement S. No Water Usage Quantity KLD 1 Wet drilling operation (On production 100 Ltr/1 m 3 ) Water sprinkling on haul roads Ltr/Head (23 No s) Green 0.2 KL 2 times a day 0.4 Total Environmental protection is an issue that no organization can neglect and hope to survive. The products of civilization are being dumped upon the environment to a degree that the 1-8

9 environment finds difficult to assimilate. The key to the success of the integrated approach to pollution prevention and control is the management and operation of the organization. Effective committed management delivers a successful operation. As total commitment to the environment, not just for compliance with legal or regulatory compliance will be the essence of environment management. Many companies have recognized the benefits of implementing an effective environmental management system. Environmental management plan can be effectively implemented to mitigate the pollution levels by observing the following: a. Pollution will be prevented or reduced at the source b. Pollution that cannot be prevented will be recycled in an environmentally safe manner. c. Pollution that cannot be prevented or recycled will be treated in environmentally safe manner and d. Disposal and other releases into the environment will be used only as a last resort and will be conducted in an environmentally safe manner. The proposed project is stone quarrying. The mine owners are aware of the adverse impacts due to the mining activity and propose to initiate a number of measures for the environment protection within the mine area and in the surrounding areas. The company has a stated environmental policy of ensuring regulatory compliance with respect to the statutory laws and regulations and those periodically issued by the Ministry of Environment, GOI, New Delhi, CPCB, New Delhi and State Pollution Control Board Sources of Pollution and Control Measures The sources of pollution are air and noise from the proposed activity mainly from Mining, drilling, Blasting and transportation of mineral Air Pollution and its Control The stone quarrying does not involve much dust formation. The dust would be generated during drilling, blasting, quarrying and also during handling and transportation of the material. The dust anticipated at drilling place will be suppressed by putting cloth around the hole. Use of sharp drill pits for drilling holes and drills with water flushing systems (wet drilling) to reduce dust generation. Water spraying to be adopted at Faces/sites before and after blasting, Faces/sites while loading. Over charging of blast holes should be avoided. Personal protective equipments like nose mask and goggles etc will be provided to the 1-9

10 workers. Regular water spraying on haul roads during transportation of mineral and waste by water sprinklers. Over loading of transport equipments should be avoided to prevent spillage. Also, measures such as covering tarpaulin over the loaded material will prevent spreading of dust particles from the trucks. Speed controls on vehicle movements to limited speed. Wind reduction control by plantation. Over burden dump has reached the optimum size, it will covered with top soil and water will spread on top soil and grass will be developed on the dump. Limiting the height and slope of the stockpiles can also reduce wind speed. Regular checking and maintenance of vehicles should be conducted and pollution under control certificate be obtained. Periodical monitoring of ambient air quality will helps to take steps to control the pollutants Noise pollution and its control The major source of noise pollution is due to drilling of drill holes, machinery, Blasting and vehicular movement. Blasting operations will be carried out only during daytime so as to avoid high noise intensity in night time. Noise barriers in the form of trees are provided to attenuate the noise levels and green belt of 3m width shall be developed to mitigate propagation of noise. Protective equipment to reduce the noise levels like ear muffs and other protective devices will be provided to the staff working near noise generating sources like drill machine operators and dumper drivers. Training would be imparted to mine personnel to generate awareness about the damaging effects of noise. The transport activity shall be restricted to day time to reduce impact on habitation. The engines of the tractors shall be switched off during loading operation, and shall be periodically maintained to ensure low noise levels. Proper maintenance of the equipment will also reduce the noise Occupational Safety and Health Health and safety aspects of the mine will be taken care off as per the World Bank (WB) guidelines on open pit mining. The guidelines provide the detailed information on the aspects that are required to be taken into account for maintaining proper health and safety issues. The workers continuously exposed to dust will be provided with protective devices like dust mask to prevent respiratory disorders. The workers continuously exposed to a high noise will be provided with ear muffs/ earplugs. Green belt in and around the mining area will be developed to attenuate noise and dust impact. The blasting carried out in the mine area will be carefully planned and executed under the supervision of a responsible officer, to avoid any 1-10

11 accidents. Provisions of rest shelter for mine workers with facility of drinking water supply for the employees will be provided by the project authority. The standard of the drinking water will be per WHO guidelines. Periodical training programme to inform the employees about their task, associated risk, and safe working practices will be undertaken. Conduct of mock drill, Safe storage & handling of explosives. Training will also include information on accident prevention, proper control and maintenance of equipment and safe material handling practices. Awareness on safety and ensure using of personal protective equipments (PPE) by workers. Regular maintenance and testing of equipments will be done. A regular monitoring of the Occupational Health and Safety will reduce the chances of accidents in the mine. Records of job related accidents and illness should be maintained. This information will be reviewed and evaluated to improve the effectiveness of Environmental Health and Safety programme. Occupational Safety and Health to Control Dust Inhalation Very little dust is expected to be generated during mining and does not affect the environment. However while drilling to avoid dust dispersion, wet drilling will be practiced. It is a small scale mining activity with few truck trips as production capacity is low. All the above precautions would be adopted to prevent dust generation at site and to be dispersed in the outside environment. However, for the safety of workers at site, engaged at the strategic locations/dust generation points like drills, loading and unloading points dust masks would be provided. Dust masks would prevent inhalation of RSPM thereby reducing the risk of lung diseases and other respiratory disorders. Regular health monitoring of workers will be carried out Occupational Safety and Health to Control Exposure to Noise Blasting will be done using non delay detonators to reduce vibrations, and the amount of explosive used will also be less at a time. There will not be heavy earth moving machinery which may create some noise pollution. Thus the vibration and noise will be well controlled within permissible limits. To protect the workers from exposure to high levels of noise, following measures would be adopted: Provision of protective devices like ear muffs/ear plugs to workers who cannot be isolated from the source of high intensity noise, e.g. blasting; Reducing the exposure time of workers to the higher noise levels by shift management. 1-11

12 Smooth blasting techniques, special explosives and silent non-explosive demolishing agent will be used. Muffed blasting and use of Milli-second detonators will help in reducing the noise pollution Control of Ground Vibration & Fly Rock generation In this area the applicant proposes to deploy blasting with less quantity of non-explosives. There will not be any impact on surroundings, as there are less blasting and intended to use low power explosives in this mine. It is a small scale mine and only limited No. of holes are blasted. Ground vibrations due to blasting and its impact on various mine structures, should be studied in details when the mine becomes operational, especially the charge per delay factor. General measures to reduce ground vibration & fly rocks resulting from blasting are given below: Blasting should be carried out in the daytime, as during the night time the sound intensity becomes higher; Blasting should not be carried out when strong winds are blowing towards the inhabited areas; Maximum permissible charge per delay should be decided on the basis of the distance of structure to be protected from the blasting. The number of rows in a blast should not be more than four so that fly rock generation and ground vibration is reduced. Peak particle velocity or ground vibration for safety of nearby structures and residential buildings is 21 mm/sec (Standard 100 mm/sec); To contain fly rocks, stemming column should not be less than the burden of the hole, and the blasting area should be muffled; Each blast should be carefully planned, checked, and executed under the supervision of a responsible officer. Blasting data/observations should be recorded; and As per the mining plan, in order to ensure slope stabilization, controlled production blasting shall be adopted to avoid tension cracks and back breaks. Such cracks may get filled with water, which reduces the stability of excavated slopes and the angle of slopes Peak Particle Velocity The vibrations are measured as per the assessment criteria given under Bureau of Indian Standard, IS: (Reaffirmed 2003) - Criteria for Safety and Design of Structures 1-12

13 Subject to Underground Blasts. Per the assessment criteria, the value of ground particle velocity may be computed from the following expression: Where V = K1 [Q 2/3 /R] 1.25 V = Particle velocity in mm/sec K1 = Constant which may be normally taken as 880 for soil, weathered or soft rock and 1400 for hard rock. Q = Charge per delay (kg), and R = Distance (m) from blast point Based on the above equation, the ground particle velocities at different distances (3 m, 5 m, 10 m, 20 m, 50 m, 70 m, 100 m, 150 m and 200 m) are calculated considering K1 as 880 for soft rocks and 1400 for hard rocks. As per the Standard, for safety of structures from threshold damage, the ground particle velocity should not exceed the following: Soil, Weathered or Soft rock 70 mm/sec Hard Rock 100 mm/sec The results are presented in the Table 1.7 below for the maximum charge Table 1.7 Peak Particle Velocity (V) S. No Constant Peak Particle Velocity (V) mm/second Charge Distance from the Blasting (R in meters) (K1) Per Delay Q= 0.2Kg Q= 0.2Kg It is clear that with Q = 0.2 kg charge per delay shall result in particle velocity of 1.14 mm/sec in soft rock within a distance of 70m, while in the hard rock the particle velocity is 1.16 mm/sec shall be within 100m. There shall not be any structure with in 70m of the quarry area, and it may be, concluded that the ground vibrations generated by blasting during the mining operations will not likely to effect the structures proposed in the vicinity of > 70 m from the point of blast. Concrete structures like office, store etc should not be proposed within the core mine area. These structures otherwise will be affected by the ground vibrations Water Quality Management There is no chemical discharge either from the quarry or from the processing quarry, there will not be water pollution. The proposed quarry workings will not touch the ground water 1-13

14 aquifer. Quarrying Operations will be carried out on the slope of the Rocky terrain. The ground water level in this area is 20 m BGL and the quarrying will be done on above the surface level. Maximum depth of the quarry will be 25 m from top of the hill which is about 15 m height from ground level, flooding by ground water is not anticipated. Hence neither ground water table nor the general surface drainage pattern is affected Hence there will not be water pollution. There will be no change in quality of water. However during rainy months, there is a possibility of wet conditions developing in the working pit this will be minimized, if not altogether eliminated, by adopting simple techniques like digging trenches all round to drain off rainwater and preventing surface run off from entering and flooding working pit. The water from the pits will be pumped by deploying suitable pumps, if and when required, the mine drainage can be effectively managed and the pit kept dry to keep up the production schedule Water Resources In this area water table is at greater depth of 20 m BGL and the workings are carried out on top of the hill which is at 15 m height. There are no wells or springs in the area. Hence there will not be adverse effect on ground water due to quarrying. The daily water requirement for the quarry operations would be approximately 5.7 KLD. Water sprinkling on mine haulage roads etc shall consume 0.3 KLD. Wet drilling operations consume about 4.0 KLD. For green belt development water consumption is about 0.4 KLD. Domestic water requirement is about 1.0 KLD. The required water is sourced from nearby village through tankers. The generation of wastewater from domestic sources is expected to be approximately 0.8 KLD, which will be sent to septic tank followed by soak pit Water Management Following measures will be adopted to mitigate the impact on the water resources: The blasting activities will have to take care on the sinkholes, cracks and fissures in the site activities. During excavation and drilling activities effort must be taken to avoid face collapse at these cracks and fissures. To prevent surface water contamination by oil/grease, leak proof containers shall be used for storage and transportation of oil/grease. The floors of oil/grease handling area will be kept effectively impervious. 1-14

15 To prevent degradation and maintain the water quality during rainy season, adequate control measures should be adopted to check the mine run-off into the natural streams. Garland drain and siltation pond need to be constructed of appropriate size to arrest silt and sediment flows from soil and mineral dumps. The water so collected will be utilised for watering the mine area, roads, green belt development etc. The drain should be regularly desilted and maintained. The garland drain (size, gradient and length) and sump capacity will be designed keeping 50% safety margin over and above the peak sudden rainfall and maximum discharge in the area adjoining the mine site. Sump capacity should also provide adequate retention period to provide proper settling of silt material. The surface water around the mine, and infrastructure will be regularly tested and appropriate control measures adopted in case of any pollutant is detected above the prescribed limits Waste Management plan During the plan period a total volume of m 3 will be excavated out of which m 3 of road metal will be produced and there is no waste is anticipated in this mine area Dump Area No waste will be generated in this quarry. Step dumping will be resorted by forming 5m terraces. This material can be utilized to fill the pits and also used as water storage tanks after quarry operations are over Land Management Land degradation is one of the major adverse impacts of opencast mining in the form of excavated voids. Land reclamation plan must, therefore, be implemented simultaneously with the mining activities. Reclamation of the affected land during quarrying will be reclaimed by backfilling with mine waste Soil Conservation Measures The applied area is hill in the wavy and irregular. Therefore, the growth of trees and plants is uncertain and not satisfactory. Hence, in this area few small plants and thorny trees are grown here and there. Except this, no big trees are seen in this area. Top soil, if any will be properly stacked at earmarked dump site with adequate measures and the same will be used for reclamation and rehabilitation of the mined out areas. To prevent soil erosion and washoff of dump-fines from freshly excavated benches and dumps following measures shall be adopted: 1-15

16 Garland drains will be provided around the mine wherever required to arrest any soil from the mine area being carried away by the rain water; Toe drains with suitable baffles will be provided all along the toe of the soil dumps to arrest any soil from the dump slopes being carried away by the rain water; Loose material slopes will be covered by mineation by making contour trenches at 3-5 m interval to check soil erosion both due to wind and rain; Retaining walls (concrete or local stone) will be pr ovided, around the stockpile or wherever required, to support the benches or any loose material as well as to arrest sliding of loose debris House Keeping Proper housekeeping and cleanliness will be maintained in the infrastructure facilities. Wet mopping will be adopted to conserve water. Sign boards will be provided in the work area, along the road and building highlighting the safety and occupational aspects Transport Systems The major road access is Guntur to Vijayawada National Highway road is passing at a distance of 1.0 km from the QL area in South direction. Cart road is available from main road to lease area. Nearest town and Railway Station is Phirangipuram located at a distance of 11 km from the QL area in Northeast direction. The finished product and waste material is transported by road using trucks of 17 Tons capacity. The number of trips will be approximately 2 per day for transportation of mineral and the trucks are covered with tarpaulin. The lessee will deploy two tractors to transport the finished product, waste blocks, unfinished and finished blocks from quarry site to yard and trucks to transport mineral from yard to destination.. The materials while transporting do not pose any hazard. Sufficient parking facilities will be provided for vehicles loading and unloading of material. Safety signs will be displayed inside and outside the mine to avoid road accidents Environmental Greening Program Environmental greening program is an important component of the Environment Management Plan and is an imperative requirement for sink of air pollutants including noise as per the guidelines issued by the Ministry of Environment and forests, Govt. of India. Conceptualization, design and implementation of the proposed activity, taking into account the specific requirement of the proposed mining activity and the site conditions are 1-16

17 presented. Green cover in mining area not only help in reducing pollution level, but also improves the ecological conditions and prevent soil erosion to great extent. It further improves the aesthetics and beneficially influences the microclimate of the surrounding. In every year buffer zone will be planted along the boundary on lease area. Saplings consisting of Neem, Teak, Raavi and etc will be planted per year over an area of 150 m 2 at 3m grid interval. Around the office buildings and along the side of connecting roads green belt will be developed to reduce the dust emission. The environmental greening program as designed comprises the location and development of a shelterbelt and Afforestation in about 0.06 Hectares. The shelterbelt will contain species, which act as windbreakers so that the environment within the mine is contained; the planting of different species in rows is envisaged in general in the greenbelt. A dedicated cell in the mine should be established for post plantation care, which include, regular watering, manuring, protective measures etc. Diseased and dead plants should be uprooted and replaced by fresh saplings. Regular monitoring on survival rate and remedial action should be done in an organized and planned manner Socio-economic Environment The project provides an opportunity for the local people to get employment directly or indirectly and helps in the upliftment of the socioeconomic status of the area. The proposed project would generate an employment of 23. The local inhabitants of the area live in the villages surrounding the mine area and their main occupation is Agriculture. In a small way they rear cattle and sheep for sustenance. The mining activity in this belt will benefit the locals both directly and indirectly. The direct beneficiaries will be those who get employed in the mines as skilled and un-skilled workers. The indirect beneficiaries will be those who open small business to sell goods required by the residents whose Per Capita income will be enhanced by the mining activity, and thereby their purchasing power. In the long run a lot of social good is expected in the comparatively backward area when the inhabitants will be able to send their children to school. The change, though slow, is bound to be perceptible. The management will involve in social activities of stakeholders/surrounding community by planning the betterment of neighboring social conditions through awareness and welfare programs to ensure an improved relation, useful in the long run. Many of the beneficiaries of such programs will include own employees as well. The goodwill of the local populace can 1-17

18 never be ignored. It is proposed to supply drinking water and medical facilities to the villagers. The management will also support for vocational training and assistance in utilizing government programs. The channels employed may vary either through direct contact or by means of local organizations. Another important facet of social environment identified by the project proponents is a green appearance; hence the management will develop a green belt towards aesthetic beautification as the same is necessary to be considered as a responsible, social neighbour Disaster Planning The following natural/ quarrying hazards may occur during normal operation Slope failure at the mine faces; Accident due to explosives; Accident due to heavy equipment/machinery; Sabotage in case of magazine; and Accidents due to fly rocks and boulders. In order to take care of above hazards/disasters, the following control shall be adopted: All safety precautions are strictly followed during all mining operations; Checking and regular maintenance of garland drains and earthen bunds to avoid any inflow of surface water into mining area; Entry of unauthorized persons shall be prohibited; Fire fighting and first aid provisions in the mines office and mining Area; Provision of all the safety appliances such as safety boots, helmets, dust masks, ear mufflers, goggles etc. would be made available to the employees and regular check to ensure the use; Training and refresher courses for all the employees working in the hazardous premises; Working of mine as per approved plan, related amendments and other regulatory provisions; Cleaning of mine faces shall be done regularly; Handling of explosives, charging and blasting shall be carried out by competent persons only; Provision of magazine at safe place with fencing and necessary security arrangement; Suppression of dust on the haulage roads by providing water sprinkling. 1-18

19 23.0 Environment Management Cell A Cell for Environmental Management within Mine lease area at the project level, will take the overall responsibility for co-ordination of the actions required for environmental management and mitigation, and for monitoring the progress of the proposed management plans and actions to be taken for the project. The Cell will be under the overall supervision of the Mine Manager, and responsible for monitoring of the implementation of the various actions which are to be executed by the agencies specified in the EMP. The Cell will be headed by Mine Manager and the other members of the cell that will include a Horticulturist. The EMC will prepare a formal report on environmental management and mitigation for the Environmental issues at the Mine, at six-monthly intervals. Reports on any urgent or significant issues may be prepared at shorter intervals. Apart from responsibilities listed above, the EMC will have the responsibility of the following: Collection of water and air samples within and outside the work zone; Analyzing the water and air samples; Implementation of the control and protective measures; Land reclamation and vegetation; Co-ordination of the environment related activities; Collection of the statistics of health of workers; Green belt development; Awareness and implementing safety programmes; and Monitor the progress of implementation of EMP Post Project Monitoring The survey of post project monitoring comprises of the following monitoring aspects; a. Ambient air quality survey b. Noise Level Monitoring c. Water quality monitoring Ambient air quality and noise level Monitoring will be carried out at minimum four stations, two stations within mine site and two stations nearby residential areas outside the mine. Parameters like particulate matter, sulphur dioxide, oxides of nitrogen carbon monoxide and lead will be monitored in case of ambient air quality. Water quality monitoring will be carried out in the mine working area, sump and nearby village. The frequency of monitoring is 1-19

20 preferably once in three months on 24 hour basis. The samples will be collected in accordance with the procedures given by CPCB Other Management Aspects Records will be maintained for the analysis of ambient air quality, noise levels and water quality. These records are not only required for the perusal of the Pollution Control Board authorities to take preventive action against the environmental pollution. The management will maintain the records as per the hazardous waste regulations and EPA regulations and apply for the annual consents for air and water, and renewal of authorization for the storage of hazardous waste as per the Hazardous Waste (Handling & Management) Rules, The records of hazardous waste manifest will be maintained. The mine will obtain the consent for establishment (CFE) and consent for operation (CFO) from State Pollution Control Board as required under section 25/26 of the Water act, 1974 and under section 21/22 of Air Act, 1981, before commissioning and production as directed by the Hon ble Supreme Court of India. The CFO will be renewed each year by the management in consultation with SPCB. The mine will submit environmental statement every year before September 30. The management ensures that it will comply with all the directions and regulations issued by the Ministry of Environment Forests and Climate Change (MoEF&CC), New Delhi, State and Central Pollution Control Boards. The Consent for Establishment, Consent for Operation will be displayed in a conspicuous location for the information of the inspecting authorities of different departments Cost proposed for Environmental Protection Measures The cost estimate of environment management is presented in table Table 1.10 Environment Management - Cost Estimate S. No. Description Item 1 Air pollution Nose masks 23 No's Capital cost (Rs.) Recurring cost (Rs.) Remarks Once a week. Replaceable, and cost may increase with time Cloth for drillers 20 no- 1m each Issued quarterly Gunny bags for covering the As and when needed, Lump sum surface of jackhammer holes Road 1 Ltr/10 Sq. m. and waste dump settling (1/4 of wetting)-5000 Ltrs tank Water tanker one tankers per day for 300 days Plantation on road side - 3m interval and buffer zone - 3m Re-plant the non-surviving plants, watering and protection 1-20

21 2 Water pollution interval plus maintenance from animals Sub Total Construction of garland drains Once only for the lease period/life of mine De-silting operations Yearly and manual operations Construction of check dams Once in year, cost incurred is to buy sand bags and filling sand Construction of retaining wall Cost of construction of wall for waste dump in slope side around the dip side of the dump. Sub Total Included in main cost suitably - Rs. 4000/ 3 months PPE's like Ear muffs - Rs. 15 each Once in six months Sub Total First aid kits - 2 No's Once in year, replace by Fire extinguishers - 2 No's conducting periodical checkup 3 Noise pollution Maintenance of machinery 4 Occupational Safety and Health 5 Environmental monitoring PPE's to all employees (hand Rs. 30, safety Rs and helmet@ Rs. 100) Training and awareness programs on risk factors during emergencies by the experts Periodical medical checkup and supply of medicines - Rs per head Sub Total Ambient air quality studies - Once in six months locations Water quality studies - Once a year - 2 Locations Noise studies - Once in six months - 2 Locations Vibration studies - Once in year - 1 locations Sub Total Grand Total Safety shoe twice in a year, helmets once in three years and hand gloves thrice in a year Once in six months and create sign boards about the risk and safety precautions regularly Once in a year and supply of medicines for every three months Will be done through MoEF&CC/NABL recognised laboratories 1-21

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to the mining

More information

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village,

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Palakurthy Mandal, Peddapally District, Telangana State Applicant Sri

More information

Environmental Management Plan. For Mining of. Building Stone & Road Metal

Environmental Management Plan. For Mining of. Building Stone & Road Metal Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 5.65 Ha at Survey No. 427,428 & 429 Alladurg Village, Alladurg Mandal, Medak District, Telangana State Lessee M/s

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to the mining

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

Environmental Management Plan. For Mining of. Rough Stone & Road Metal

Environmental Management Plan. For Mining of. Rough Stone & Road Metal Environmental Management Plan For Mining of Rough Stone & Road Metal Over an extent of 6.53 Ha at Survey No.312/1 of Ramalingampalli (V), Bommalaramaram (M), Yadadri Bhuvangairi (D), Telangana State. Lessee

More information

Team Labs and Consultants 1-1

Team Labs and Consultants 1-1 ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVESUMMARY 1.1 Introduction Road Metal of M/s. Venkata Ramana Stone Crusher covering an extent of 0.89 Ac is located at Sy.No.379/1 of Perecherla Village, Medikonduru Mandal, Guntur District,

More information

Environment Management Plan

Environment Management Plan Environment Management Plan Environmental Impact Assessment Statement describing the impact of mining and beneficiation on environment on the following: i) Land area indicating the area likely to be degraded

More information

GRAVEL & ROUGH STONE QUARRY

GRAVEL & ROUGH STONE QUARRY ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL & ROUGH STONE QUARRY Sy. No. 211 (Carved out of Sy.No.1) Tarluwada Village & Anandapuram Mandal, Visakhapatnam District, Andhra Pradesh. AREA OF MINING LEASE 23.760

More information

M/s. Sai Vikas Stone Crushing Industries, (Rough Stone and Road Metal Quarry) ENVIRONMENTAL MANAGEMETN PLAN

M/s. Sai Vikas Stone Crushing Industries, (Rough Stone and Road Metal Quarry) ENVIRONMENTAL MANAGEMETN PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to the mining project. The EMP has been designed

More information

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE ENVIRONMENTAL MANAGEMENT REPORT Of COLOUR GRANITE MINE Sy. No.Old: 52/2B1 (New 52/2B1) of Peddavelagatur Village, Peddapanjani Mandal,Chittor District, Andhra Pradesh AREA OF MINING LEASE 5.70 Ha. For

More information

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R. WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

Period of Compliance Report : April, 2017 to September, 2017

Period of Compliance Report : April, 2017 to September, 2017 Name of the Project Project Code Clearance Letter No. with date : OSTAPAL CHROMITE MINES, M/S. FACOR LTD. : Mining (Non-Coal) : No. J-11015/183/2007-IA-II (M) dt.13-05-09 Period of Compliance Report :

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Parsen : Gwalior : Gwalior (M.P.) : 3.345 Hectare : Stone KHASRA No : 4154 PRODUCTION CAP : 50,000 Cu.mt/year (avg.) Stone APPLICANT

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

Team Labs and Consultants

Team Labs and Consultants ENVIRONMENT MANAGEMENT PLAN 1.0 Introduction This report discusses the management plan for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN BANKUCHIA STONE DEPOSIT VILLAGE POLICE STATION DISTRICT STATE AREA PRODUCTION RATE BANKUCHIA PATAMDA EAST SINGHBHUM JHARKHAND 29.00 ACRES (11.74 HA) 854755 TPA PROJECT PROPONENT

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Pathari Basouda : Basouda : Vidisha (M.P.) : 2.00 Hectare : Stone KHASRA No : 177/1/2 PRODUCTION CAP : 10000 Cu.mt/year Stone APPLICANT

More information

Risk Assessment Nagla

Risk Assessment Nagla Risk and Hazards HAZARD Major Risks involved in River Bed Mining are following: 1. River Bed Inundation 2. Soil Erosion 3. Disturbance of Ground water Level 4. Damage of River bank due to access of Ramps

More information

VENKATESWARA STONE CRUSHER SURVEY NO. 293/1, 292/B, 292/B/A & 292/B/AA, PONUGODU VILLAGE, GUDURU MANDAL, MAHABUBAD DISTRICT, TELANGANA STATE

VENKATESWARA STONE CRUSHER SURVEY NO. 293/1, 292/B, 292/B/A & 292/B/AA, PONUGODU VILLAGE, GUDURU MANDAL, MAHABUBAD DISTRICT, TELANGANA STATE VENKATESWARA STONE CRUSHER SURVEY NO. 293/1, 292/B, 292/B/A & 292/B/AA, PONUGODU VILLAGE, GUDURU MANDAL, MAHABUBAD DISTRICT, TELANGANA STATE ENVIRONMENT MANAGEMENT PLAN (SEMI MECHANISED OPENCAST BUILDING

More information

M/s. Bharat Clays Private Limited Pre-Feasibility Report

M/s. Bharat Clays Private Limited Pre-Feasibility Report 1. EXECUTIVE SUMMARY 1.1 Introduction is a private partnership firm. They applied for a mining lease for China Clay over an extent of 2.023 Hectares in Sy. No: 102/3 & 102/4P of Jaggampeta Village, Jaggampeta

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION An Environmental Management Plan (EMP) is a site-specific plan developed to ensure that all necessary measures are identified and implemented in order to protect

More information

DHANWADA CRUSHER STONE QUARRY

DHANWADA CRUSHER STONE QUARRY ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-

More information

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH

More information

SGS MINERALS PRIVATE LIMITED SURVEY NO. 666/P, 1082/P & 1083/P, APPASAMUDRAM VILLAGE, UDAYAGIRI MANDAL, SPSR NELLORE DISTRICT, ANDHRA PRADESH

SGS MINERALS PRIVATE LIMITED SURVEY NO. 666/P, 1082/P & 1083/P, APPASAMUDRAM VILLAGE, UDAYAGIRI MANDAL, SPSR NELLORE DISTRICT, ANDHRA PRADESH SGS MINERALS PRIVATE LIMITED SURVEY NO. 666/P, 1082/P & 1083/P, APPASAMUDRAM VILLAGE, UDAYAGIRI MANDAL, SPSR NELLORE DISTRICT, ANDHRA PRADESH ENVIRONMENT MANAGEMENT PLAN SUBMITTED BY M/s. SGS Minerals

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Krishna Construction Company AT Khasra No.1046 Vill.-Pipalya Hamir, Tehsil-Barod, District-Agar Malwa (M.P.) Production Capacity: 40000 Cu.mt Crusher Stone for 18 Months

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

ENVIRONMENTAL MANAGEMENT

ENVIRONMENTAL MANAGEMENT ENVIRONMENTAL MANAGEMENT PLAN RAJBANDH STONE DEPOSIT VILLAGE Rajbandh POLICE STATION MALPAHARI DISTRICT PAKUR STATE JHARKHAND AREA 9.00 ACRES (3.64 HA) PRODUCTION RATE 338850 TPA PROJECT PROPONENT M/S

More information

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006

Project Code: Clearance Letter No. : MoEF vide letter No: - J-11015/423/2005-IA-II (M) Dated 18 th May 2006 Name of the Project: North North Naubasta Limestone Mine (ML 2) (A unit of M/s Jaiprakash Associates Limited) of Mining Capacity 1.85 MTPA at villages Naubasta, Sumeda, Atrauli and Garhwa Tehsil Huzur

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell) ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation

More information

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

Chapter- V MANAGEMENT PLAN (EMP)

Chapter- V MANAGEMENT PLAN (EMP) Chapter- V MANAGEMENT PLAN (EMP) The Environment Management Plan (EMP) for a development project prescribes the mitigation measures to be adopted to nullify or to minimize various anticipated environment

More information

J.K. Cement WORKS, NIMBAHERA (RAJ)

J.K. Cement WORKS, NIMBAHERA (RAJ) A. SPECIFIC CONDITIONS : J.K. Cement WORKS, NIMBAHERA (RAJ) Compliance report of Environment Clearance for Nimbahera - Ahirpura Lime Stone Mine (For the Period from April 2013 to September 2013) Reference

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT Aug 2018 PRE-FEASIBILTY REPORT OF M/S. J.M.R.MINES (MINING OF FELDSPAR, QUARTZ & MICA MINE) Lease Area : 5.78 Hectares(14.29 Acres) Sy.No.941,942,943 &947 Giddalur (V), Sydapuram (M), SPSR Nellore District

More information

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005

Project Code: Clearance Letter No. : MoEF vide letter No:- J-11016/202/2003-IA-II(M) Dated 6 th Jan 2005 Name of the Project: Naubasta Limestone Mine ( A Unit of M/s Jaiprakash Associates Limited ) for Expansion of Mining Capacity from 3.3 MTPA to 4.0 MTPA at villages Atrauli, Gadhwa, Kachoor, Naubasta, Kauadhan,

More information

Name of Project: Panchagavi Laterite Mine, M/s J.K. Cement Works, Muddapur (Karnataka)

Name of Project: Panchagavi Laterite Mine, M/s J.K. Cement Works, Muddapur (Karnataka) Panchagavi Laterite Mine, Village- Panchagavi, Taluka-Ramdurg, District- Belgaum, Karnataka Ref: - MoEF Letter No. SEIAA 107 MIN 2014 dtd. 24th December 2014 Compliance Report for the period from October

More information

INDEX S.NO ITEM PAGE NO 1. INTRODUCTION 3 2. DETAILS ABOUT THE MINE LEASE AREA 4 3. MINING ACTIVITY 5 4. ENVIRONMENTAL MANAGEMENT PLAN 8

INDEX S.NO ITEM PAGE NO 1. INTRODUCTION 3 2. DETAILS ABOUT THE MINE LEASE AREA 4 3. MINING ACTIVITY 5 4. ENVIRONMENTAL MANAGEMENT PLAN 8 M/s. Nandini Mineral Industries (Mine Lease Area 4.120 Ha.) Sy. Nos. 105, 105/1, 2 & 113/1A Kolumulapali Village, Bethamcherla Mandal, Kurnool District, ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY ISO 9001:

More information

Piplyakamil Murrum Quarry located at Khasra No 90/2, near Village Piplyakamil, Tehsil- Dharampuri, District Dhar M.P

Piplyakamil Murrum Quarry located at Khasra No 90/2, near Village Piplyakamil, Tehsil- Dharampuri, District Dhar M.P 1. INTRODUCTION The project namely Piplyakamil Murrum Quarry having an area of 2.0 ha at Khasra No.- 90/2 near Village- Piplyakamil Tehsil- Dharampuri, District-Dhar, State-Madhya Pradesh belongs to Shree

More information

S. No Parameter Details 1 Name & Address of the Applicant

S. No Parameter Details 1 Name & Address of the Applicant 1. EXECUTIVE SUMMARY S. No Parameter Details 1 Name & Address of the Applicant M/s AMULYA GRANITES Prop: Smt CH.SARALA H. No. FLAT NO.207 Roja Kishore Residency, Chenchupet, Tenali, AP-522 202 Guntur District,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD Madhya Pradesh State Mining Corporation Ltd (MPSMCL), a company of Government of Madhya Pradesh has been allotted Amelia (North) Coal Mining

More information

The project proponent shall develop fodder plots in the non-mineralized area in lieu of use of grazing land.

The project proponent shall develop fodder plots in the non-mineralized area in lieu of use of grazing land. J.K. Cement WORKS, MANGROL (RAJ) Dated 29.05.2018 Compliance report of Environment Clearance for Mangrol Lime Stone Mine (For the Period from October 2017 to March 2018) Reference Letter from MOEF, New

More information

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II

Deccan Cements Limited, Bhavanipuram Lime stone Mine -2, Mahankaligudam Palakeedu, Suryapet(Dist). Telangana MoEF No: J-11015/497/2007-IA II Status of Environmental Clearances received from MOEF vide MoEF No.J- 11015/497/2007-IA II(M) dated 18.10.2007-Bhavanipuram Limestone Mine 2(73.93.11 Ha), as on March 2017 1. Compliance reports are enclosed

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

ENVIRONMENTAL MANAGEMENT REPORT GRAVEL MINE

ENVIRONMENTAL MANAGEMENT REPORT GRAVEL MINE ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL MINE Survey No:98, Village: Morampudi, Mandal: Rajamahendravaram Rural, District: East Godavari, State: Andhra Pradesh. AREA OF MINING LEASE 6.791 Ha. For 1,50,501.20

More information

Municipal solid / hazardous waste

Municipal solid / hazardous waste (10) ENVIRONMENTAL MANAGEMENT PLAN The mitigation measures for reducing the adverse environmental impacts together constitute a part of EMP. The environmental issues, which need management, plan for the

More information

Sl. No. Conditions Compliance

Sl. No. Conditions Compliance Annexure-I CONDITIONS TO BE COMPLIED AS PER ENVIRONMENTAL CLEARANCE APPROVAL KATHAUTIA OPEN CAST COAL MINE, DALTONGANJ EC. No. J-11015 /61//2006-IA.II(M) dated 19 th June, 2006 A. SPECIFIC CONDITIONS Sl.

More information

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan Report on 1. PROJECT LOCATION & LAND USE The Ganesh Park 3 is a residential building project constructed on plot 608 to 613/5 Vil: GIDC Ankleshwar in Bharuch district of Gujarat state. The project land

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT GRANITE BUILDING STONE QUARRY MINING PROJECT STATE : KERALA DISTRICT : KANNUR THALUK : THALASSERY VILLAGE : THRIPPANGOTTUR BLOCK NO. : NIL SURVEY NO. : 275/1A MINERAL : GRANITE BUILDING

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,

More information

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES Environmental / Social issue/ aspect/ activity Anticipated negative impact Management and mitigation

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN EMP 1 INTRODUCTION In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts and where these are beneficial in nature, such impacts are to be enhanced/

More information

M/s.NEERAJ KUMAR JAIN

M/s.NEERAJ KUMAR JAIN EXECUTIVE SUMMARY OF DARSHANI LATERITE AND RED OCHRE DEPOSIT Area : 15.00 Ha. Village Budhanwara, Tahsil Bohriband, Dist. Katni MADHYA PRADESH For M/s.NEERAJ KUMAR JAIN KATNI 1 BUDHANWARA LATERITE AND

More information

1 Name of the Project Gonua Iron & Mn. Mine of Sri Pawan Kumar Ahluwalia

1 Name of the Project Gonua Iron & Mn. Mine of Sri Pawan Kumar Ahluwalia HALF YEARLY PROGRESSIVE CLEARANCE ACCORDED BY THE MINISTRY OF ENVIRONMENT & FOREST, GOVT. OF INDIA, TO THE PROJECT EXPANSION OF GANUA IRON & MN. MINE OF SHRI PAWAN KUMAR AHLUWALIA (FROM 0.140 MTPA TO 0.36

More information

Scrutiny comments on examination of FMCP ( lease expiring on 31/03/2020 )of Teherai Iron and Manganese Mine of M/s Bonai Industrial Co.

Scrutiny comments on examination of FMCP ( lease expiring on 31/03/2020 )of Teherai Iron and Manganese Mine of M/s Bonai Industrial Co. Scrutiny comments on examination of FMCP ( lease expiring on 31/03/2020 )of Teherai Iron and Manganese Mine of M/s Bonai Industrial Co. Limited GENERAL: 1. Lease number and lease period since execution

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR

More information

Sr.No Condition Status A. SPECIFIC CONDITIONS:

Sr.No Condition Status A. SPECIFIC CONDITIONS: J.K. CEMENT WORKS, MANGROL (RAJ.) Compliance report of Mangrol Lime stone mine (For the period from April 2011 to September 2011) Sub:- Conditions of Environment Clearance from MOEF, New Delhi Letter No.

More information

Mining is being carried out keeping safe distance from seasonal nallah/ stream.

Mining is being carried out keeping safe distance from seasonal nallah/ stream. Name of the Project : Gurha East Lignite Mine Project (1MTPA) of M/s. V.S. Lignite Power Private Ltd. Located at village- Gurha, Kolayat, Bikaner, Rajasthan. Project Code : Raj-456/753/09 Clearance Letter

More information

(A govt. of Kerala Undertaking)

(A govt. of Kerala Undertaking) Annexure - 1 Basic Information Important Note: Please send the information by e-mail in word format and a signed & scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy

More information

NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P.

NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P. NMDC Limited Arki Limestone Project, Post: Arki, Tehsil: Arki, District: Solan, H.P. Sub: Ref: Period: Six Monthly Environmental Progress Report Environmental clearance no: No.J-11015/82/2009-IA.II(M),

More information

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED Sr. STIPULATION ACTION No. 2A. Specific Conditions (i) (ii) All the conditions stipulated by the State Pollution Control Board in their Consent should be effectively implemented. The project proponent

More information

[ Form V] (See rule 14) PART - A. (iii) Production Capacity : 3.51 Lakh Tonnes.(Chrome Ore) Per Annum. PART B WATER & RAW MATERIAL CONSUMPTION

[ Form V] (See rule 14) PART - A. (iii) Production Capacity : 3.51 Lakh Tonnes.(Chrome Ore) Per Annum. PART B WATER & RAW MATERIAL CONSUMPTION [ Form V] (See rule 14) ENVIRONMENTAL STATEMENT FOR THE FINANCIAL YEAR ENDING THE 31 st MARCH 2014, OF SUKIDNA MINES (CHROMITE ) PROJECT OF M/S. INDIAN METALS & FERRO ALLOYS LTD. PART - A (i) Name & address

More information

Cluster Environmental Management Plan

Cluster Environmental Management Plan 1. INTRODUCTION Mining Environment and development have become complimentary to each other. As a result of developmental activities visible ill-effects of the environmental degradation are clear and give

More information

Smt. K. Venkata Lakshmi Gravel B2 Category Mine 2.44 Ha. APPENDIX - VIII FORM IM

Smt. K. Venkata Lakshmi Gravel B2 Category Mine 2.44 Ha. APPENDIX - VIII FORM IM Basic Information APPENDIX - VIII FORM IM S.No Item Details 1. Name of the Mining lease site Gravel Mine 2.44 Hects. Smt. Kampara. Venkata Lakshmi 2. Location /site (GPS Coordinates) Map Datum WGS -84

More information

THE RAMCO CEMENTS LIMITED

THE RAMCO CEMENTS LIMITED 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE JAYANTHIPURAM NORTH BAND MINING LEASE 2.0 MILLION TPA CAPACITY EC Lr. No. : J-11015/377/2006-IA.II

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN Of M/s. JAISHREE GRANITES (P) LTD. 7.0 HA. COLOUR GRANITE MINING SY. NO. 13/P GUMMALAPADU (V), PAMURU (M) PRAKASAM (DT), ANDHRA PRADESH Prepared & Submitted by SV ENVIRO LABS

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0. INTRODUCTION: The proposed M/s. Ordinary sand Mine of Shree Ramjibhai samjibhai Gujarati Area at near village Survey No.Bhadar River Bed, Vill.

More information

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P SITUATED AT KAKKUR VILLAGE KOZHIKODE TALUK KOZHIKODE DISTRICT KERALA STATE EXTENT: 2.0437 Ha STANDARD TERMS OF REFERENCE (TOR)

More information

3. Size of the Mining Lease 1.00 Hect. 4. Capacity of Mining lease (t/cu.m) Five Gravel Cu.m & Building Stone Cu.m

3. Size of the Mining Lease 1.00 Hect. 4. Capacity of Mining lease (t/cu.m) Five Gravel Cu.m & Building Stone Cu.m Sri.M.RamaKrishna Gravel & Building Stone B2 Category Mine 1.00 Hect. Form -1M APPENDIX - VIII FORM IM (1) Basic Information S.No Item Details 1. Name of the Mining lease site Gravel and Building Stone

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT EXCUTIVE SUMMARY Project : Mining Lease of Iron Ore (Ari Dongri Iron Ore Mine) Name of Company / Mine Owner : Godawari Power and Ispat Limited Location Village : Tehsil : District

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

SHRI.LAKSHMAN NAMDEV KOLI

SHRI.LAKSHMAN NAMDEV KOLI PRE-FEASIBILITY REPORT (PFR) FOR PROPOSED STONE QUARRY BY SHRI.LAKSHMAN NAMDEV KOLI AREA. 1.00 HA., GAT. NO. 811/2 PART, VILLAGE BASTAWADE, TAL.: TASGAON, DIST.: SANGLI PREPARED BY EQUINOX ENVIRONMENTS

More information

M/s Tiffin s Barytes Asbestos and Paints Ltd (VIGNESHWARA BARYTES MINE) Near Ramalayam, Velpula (V&P) Y.S.R. Disrict.

M/s Tiffin s Barytes Asbestos and Paints Ltd (VIGNESHWARA BARYTES MINE) Near Ramalayam, Velpula (V&P) Y.S.R. Disrict. PRE FEASIBILITY REPORT FOR Proposed Barytes Mine over an Extent of 49.46 Ha, In Sy. No. 1021/15, 1021/3, 1021/5 of Vemula Village, Vemula Mandal, Y.S.R.Kadapa District, Andhra Pradesh. Submitted To Ministry

More information

[FORM-V] PART-A PART-B

[FORM-V] PART-A PART-B [FORM-V] (See Rule 14) Environment Statement for the financial year ending the 31 st March 2015 PART-A (1) Name and address of the owner - M/s. Serajuddin and Co. / Occupier of the industry, Balda Block

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 Executive Summary The Mining lease was granted in favour of Shri Mukesh Kumar S/o Shri Harish Chandra, R/o Tatol vaya Bagra, Tehsil - Bhinmal, Dist.-Jalore

More information