Implementation Status & Results Armenia Yerevan Water & Wastewater Project (P087641)
|
|
- Meagan Greer
- 5 years ago
- Views:
Transcription
1 losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Armenia Yerevan Water & Wastewater Project (P087641) Operation Name: Yerevan Water & Wastewater Project (P087641) Project Stage: Implementation Seq.No: 12 Status: ARCHIVED Archive Date: 29-Jun-2011 Country: Armenia Approval FY: 2005 Product Line: IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Municipal Development Project Monitoring Unit Key Dates Board Approval Date 24-Feb-2005 Original Closing Date 28-Feb-2011 Planned Mid Term Review Date Last Archived ISR Date 29-Jun-2011 Effectiveness Date 15-Sep-2005 Revised Closing Date 31-Dec-2011 Actual Mid Term Review Date 22-May-2010 Project Development Objectives Project Development Objective (from Project Appraisal Document) The project development objective is to provide Yerevan with safe,continuous water supply while reducing environmental pollution. Has the Project Development Objective been changed since Board Approval of the Project? Yes Component(s) Component Name No Component Cost YWWP Fund Technical Assistance and Training 3.25 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Implementation Status Overview 1. The Project implementation is overall satisfactory. Disbursements as of December 9, 2011 amounted to US$19.63 million or 97% of the US$20 million IDA Credit. Disbursements have been on track since the last supervision mission. The remaining funds are fully committed to be disbursed before the Project closes on December 31, The main performance indicators reveal continued progress towards meeting the Project objectives. Most of the key performance indicators have reached or exceeded the end-of project. - Average duration of water supply increased from 19.6 hours/day at baseline stage to 21.3 hours/day (end-of-project is 21 hours). Page 1 of 6
2 - Percentage of water samples in compliance with bacteriological safety requirements increased from 93% at baseline to 99% now (end-of-project is 98%). - Number of sites in Yerevan municipality with wastewater discharged into water courses upstream of existing treatment works decreased from 17 sites at baseline to 7 sites (end-ofproject is 8). - Water production decreased from 885 liter per capita/day to 853 (end-of-project is 840 l/c/d). - Electricity consumption decreased from 119 MwH per annum at baseline to 73 MwH now (end-of-project is 94 MwH). The progress indicates that the Project Development Objectives will be met by the closing date. 3. The private sector operator, Veolia, has made a good progress during the 5th year of lease contract. The independent technical auditor (audit report issued in September 2011) concluded that for the third consecutive year the services provided by the Lessee under the Lease Contract to Yerevan population have improved. This is substantiated by the reduction of production/abstraction of water, reduction of energy consumption, and reduction of losses, which is a very positive development of Year 5. The fact that Yerevan Djur has been able to achieve these reductions provides good prospects for further improvements in the coming years. Particularly, - For the second consecutive year, the Lessee has managed to reduce the abstraction of water from sources this year by about 6%, which equals approximately 20 million cubic meters. - In year 5, Yerevan Djur reduced leakages from the distribution system by 22 million cubic meters, which is required to sustain the hours of supply when water production is reduced. - Another positive trend is that billing on the basis of meters has increased both for domestic and non-domestic subscribers. - The s for water supply duration, bacteriological safety compliance, as well as customer complaint response time are fulfilled. 4. The Project Monitoring Unit and the Bank team closely monitor the implementation plan of all ongoing and remaining activities to ensure timely completion before the Project's closing date of December 31, Locations Country First Administrative Division Location Planned Actual Armenia Not Entered Hrazdan Armenia K'aghak' Yerevan Yerevan Armenia Kotayk'i Marz Yeghvard Armenia K'aghak' Yerevan Mushavan Armenia K'aghak' Yerevan Verin Shengavit' Armenia K'aghak' Yerevan Sarit'agh Armenia Kotayk'i Marz Karenis Armenia K'aghak' Yerevan K'anak'erravan Armenia K'aghak' Yerevan K'anak'err Armenia Kotayk'i Marz Goght' Armenia Kotayk'i Marz Garrni Armenia Kotayk'i Marz Dzoraghbyur Page 2 of 6
3 Country First Administrative Division Location Planned Actual Armenia K'aghak' Yerevan Jrvezh Armenia K'aghak' Yerevan Jrashen Armenia Kotayk'i Marz Davtashen Armenia Kotayk'i Marz Arzni Armenia Kotayk'i Marz Arzakan Armenia Kotayk'i Marz Aramus Armenia K'aghak' Yerevan Nor Arabkir Armenia K'aghak' Yerevan Erebuni Armenia K'aghak' Yerevan Nor Nork' Armenia K'aghak' Yerevan Nor Zeyt'un Armenia K'aghak' Yerevan Nerkin Shengavit' Armenia K'aghak' Yerevan Nor Marash Armenia K'aghak' Yerevan Avan-Arrinj Armenia K'aghak' Yerevan Noragyugh Armenia K'aghak' Yerevan Aj'ap'nyak Armenia K'aghak' Yerevan Lukashin Armenia Not Entered Kentron Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Increased weighted average of daily hours of Text Value drinking water service Page 3 of 6
4 Increased percentage of water samples in compliance with bacteriological safety requirements Decreased number of sites in Yerevan Municipality with wastewater discharged into water courses upstream of existing treatment works. Intermediate Results Indicators Text Value Date 01-Mar Nov Dec-2011 Text Value Indicator Name Core Unit of Measure Baseline Current End Target Decreased unaccounted for water (percentage Text Value of water losses) Decreased water production through pumping and gravity supply (ratio) Decreased electricity consumption (increased energy efficiency) New piped household water connections that are resulting from the project intervention Piped household water connections that are benefiting from rehabilitation works undertaken by the project Number of water utilities that the project is supporting Text Value 45/55 18/82 35/65 Megawatt hour(mwhvalue (the value will be revised as of December 1, 2011) Number Value Target achieved Number Value Target achieved Number Value Page 4 of 6
5 Indicator Name Core Unit of Measure Baseline Current End Target Number of people in urban areas provided with access to Improved Water Sources under the project Increased domestic water metering (as a percentage of domestic subscribers provided with water meters) Decreased water production (liter per capita per day) Increased domestic water consumption (liter per capita per day) Number Value Target achieved Percentage Value Date 01-Jun Nov Feb-2011 Text Value Date 01-Mar Nov-2011 Target on track to be achieved ( value will be recalculated as of Dec. 1, 2011) Text Value Date 30-Jun Nov-2011 Data on Financial Performance (as of 08-Dec-2011) Financial Agreement(s) Key Dates Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date P IDA Effective 24-Feb Apr Sep Dec-2011 Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IDA Effective XDR Disbursement Graph Page 5 of 6
6 Key Decisions Regarding Implementation The Project implementation is satisfactory. All activities under the Project are expected to be completed by the Project closing date of December 31, Restructuring History Level one Approved on 25-Dec-2010 Related Projects There are no related projects. Page 6 of 6
Implementation Status & Results Honduras Barrio-Ciudad Project (P088319)
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras Barrio-Ciudad Project (P88319) Operation
More informationImplementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation
More informationImplementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Operation Name: Second National
More informationImplementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Operation Name: ID-Urban Water Supply and
More informationImplementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation
More informationImplementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase
More informationImplementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Operation Name: Uzbekistan
More informationImplementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Operation Name: Uzbekistan
More informationImplementation Status & Results Pakistan Water Sector Capacity Buildling and Advisory Services Project (WCAP) (P110099)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Pakistan Water Sector Capacity Buildling and Advisory Services Project (WCAP) (P110099) Operation
More informationImplementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966)
More informationImplementation Status & Results Mauritania MAURITANIA: TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT (P089672)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mauritania MAURITANIA: TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT
More informationImplementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077) Operation Name: URBAN WATER SUPPLY AND WASTEWATER
More informationImplementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Operation Name: WAPP APL 2 - OMVS
More informationImplementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Operation Name: Bahia Integrated
More informationImplementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152)
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152) Operation
More informationImplementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural Development Project (P088799)
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural
More informationImplementation Status & Results Mozambique Health Commodity Security Project (P121060)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Health Commodity Security Project (P121060) Operation Name: Health Commodity Security
More informationImplementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation
More informationImplementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038) Operation Name: BR São Paulo Trains and Signalling
More informationImplementation Status & Results Samoa Samoa Agriculture & Fisheries Cyclone Response Project (P145938)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Samoa Samoa Agriculture & Fisheries Cyclone Response Project (P145938) Operation Name: Samoa Agriculture
More informationImplementation Status & Results Africa Central African Backbone - APL2 (P117652)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa Central African Backbone - APL2 (P117652) Operation Name: Central African Backbone - APL2
More informationImplementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Operation Name: Market
More informationImplementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910) Operation Name: IQ-TF EMERG. WATER, SANITATION
More informationImplementation Status & Results Benin Support to Protected Areas Management (P122419)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Support to Protected Areas Management (P122419) Operation Name: Support to Protected Areas
More informationImplementation Status & Results Philippines ARMM Social Fund Project (P073488)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Philippines ARMM Social Fund Project (P073488) Operation Name: ARMM Social Fund Project (P073488)
More informationImplementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523) Operation Name: Haiti Transport
More informationThe World Bank Vietnam Renewable Energy Development Project (P103238)
Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2009 Seq No: 15 ARCHIVED on 14-Feb-2018 ISR29615 Implementing Agencies:
More informationImplementation Status & Results Haiti Disaster Risk Management and Reconstruction (P126346)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Disaster Risk Management and Reconstruction
More informationImplementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Operation Name: CORRIDOR X HIGHWAY PROJECT (P108005) Project Stage:
More informationImplementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989) Operation Name: Nicaragua
More informationImplementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719) Operation Name:
More informationImplementation Status & Results Indonesia Integrating Environment and Forest Protection into the Recovery and Future Development of Aceh (P098052)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Integrating Environment and Forest Protection into the Recovery and Future Development
More informationAR B.A.URB.TSP (P039584)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR B.A.URB.TSP (P39584) Operation Name: AR B.A.URB.TSP (P39584) Project Stage: Implementation
More informationImplementation Status & Results Azerbaijan Highway 2 (P094488)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Azerbaijan Highway 2 (P094488) Operation Name: Highway 2 (P094488) Project Stage: Implementation
More informationImplementation Status & Results Cameroon Agricultural Competitiveness Project (P112635)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635) o C Operation
More informationImplementation Status & Results Ghana Ghana: Statistics Development Program (MDTF) (P118585)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ghana Ghana: Statistics Development Program (MDTF) (P118585) Operation Name: Ghana: Statistics Development
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized Public Disclosure Copy EUROPE AND CENTRAL ASIA Croatia Water Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 15 ARCHIVED on 24-Dec-2015 ISR22041 Implementing
More informationImplementation Status & Results Macedonia, former Yugoslav Republic of Second Trade and Transport Facilitation Project (P091723)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Macedonia, former Yugoslav Republic of Second Trade and Transport Facilitation Project (P091723) Operation Name:
More informationImplementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414) Operation Name:
More informationImplementation Status & Results Vietnam VIETNAM WATER RESOURCES ASSISTANCE (P065898)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Vietnam VIETNAM WATER RESOURCES ASSISTANCE (P065898) Operation Name: VIETNAM WATER RESOURCES ASSISTANCE (P065898)
More informationImplementation Status & Results Vietnam Customs Modernization Project (P085071)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam Customs Modernization Project (P085071) Operation Name: Customs Modernization Project (P085071)
More informationImplementation Status & Results Mongolia MONSTAT: Strengthening the National Statistical System of Mongolia (P113160)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mongolia MONSTAT: Strengthening the National Statistical System of Mongolia (P113160) Operation
More informationImplementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Operation Name: CORRIDOR X HIGHWAY PROJECT (P108005) Project Stage:
More informationImplementation Status & Results Indonesia Geothermal Power Generation Development (P099757)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Geothermal Power Generation Development
More informationImplementation Status & Results Benin Benin Emergency Urban Env. Project (P113145)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Operation Name: Benin Emergency Urban Env. Project
More informationImplementation Status & Results Ghana Ghana Urban Transport Project (P100619)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Ghana Ghana Urban Transport Project (P100619) Operation Name: Ghana Urban Transport Project (P100619) Project Stage:
More informationImplementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Operation Name: Development
More informationImplementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Operation Name: Western
More informationImplementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Report : ISR1437 Operation Name: CORRIDOR X HIGHWAY
More informationImplementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Operation
More informationImplementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329) Operation Name: Rajasthan Rural Livelihoods
More informationImplementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Operation Name: Market
More informationImplementation Status & Results Albania Energy Community of South East Europe APL Program - APL 5 for Albania DAM SAFETY (P110481)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Albania Energy Community of South East Europe APL
More informationImplementation Status & Results China SECOND SHANDONG ENVIRONMENT PROJECT (P077752)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results China SECOND SHANDONG ENVIRONMENT PROJECT (P077752) Operation Name: SECOND SHANDONG ENVIRONMENT
More informationImplementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture
More informationImplementation Status & Results Armenia Public Sector Modernization Project (P060786)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Armenia Public Sector Modernization Project (P060786) Operation Name: Public Sector Modernization
More informationImplementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931) Operation Name: Ministry
More informationImplementation Status & Results Africa WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) (P075994)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Africa WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) (P075994) Operation Name: WAPP APL 1 (1st Phase -
More informationImplementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS)
More informationPublic Disclosure Copy. Implementation Status & Results Report BD: Leveraging ICT Growth, Employment and Governance Project (P122201)
Public Disclosure Authorized SOUTH ASIA Bangladesh Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 06-Nov-2017 ISR30072 Implementing Agencies: Bangladesh
More informationUrban Local Government Strengthening Program
losure Authorized Tab 1: Overview and Performance Basic Information Urban Local Government Strengthening Program Operation Name Urban Local Government Strengthening Program (ULGSP) Project Stage Implementation
More informationImplementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Operation Name: Development
More informationImplementation Status & Results Croatia Coastal Cities Pollution Control Project 2 (P102732)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Croatia Coastal Cities Pollution Control Project 2 (P102732) Operation Name: Coastal Cities Pollution
More informationImplementation Status & Results Benin Support to Protected Areas Management (P122419)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Support to Protected Areas Management (P122419) Operation Name: Support to Protected Areas
More informationImplementation Status & Results India Uttar Pradesh Water Sector Restructuring Project (P050647)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Uttar Pradesh Water Sector Restructuring Project (P050647) Operation Name: Uttar Pradesh Water
More informationPublic Disclosure Copy. Public Disclosure Copy. The World Bank
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Sustainable Integrated Ecosystem
More informationImplementation Status & Results Indonesia Barefoot Engineers III (P131387)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Barefoot Engineers III (P131387) Operation
More informationImplementation Status & Results India Andhra Pradesh Road Sector Project (P096021)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Operation Name: Andhra Pradesh Road Sector Project
More informationImplementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Operation Name: Western
More informationImplementation Status & Results Mexico Mexico Forests and Climate Change Project (P123760)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mexico Mexico Forests and Climate Change Project (P123760) Operation Name: Mexico Forests and Climate Change Project
More informationImplementation Status & Results Argentina AR-GEF Sustainable and Transport and Air Quality Project (P114008)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR-GEF Sustainable and Transport and Air Quality Project (P114008) Operation Name: AR-GEF
More informationImplementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Operation Name: Bahia Integrated
More informationThe World Bank Vietnam Industrial Pollution Management Project (P113151)
Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 20-Apr-2018 ISR31553 Implementing
More informationImplementation Status & Results Botswana Northern Botswana Human Wildlife Coexistence Project (P095617)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Botswana Northern Botswana Human Wildlife Coexistence Project (P95617) Report No: ISR618 o o Operation
More informationThe World Bank Geothermal Clean Energy Investment Project (P113078)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 11 ARCHIVED on 05-Nov-2017 ISR29890 Implementing
More informationImplementation Status & Results Bangladesh Bangladesh Central Bank Strengthening Project (P062916)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bangladesh Bangladesh Central Bank Strengthening Project (P062916) Operation Name: Bangladesh Central
More informationImplementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913) Operation Name:
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized Public Disclosure Copy AFRICA Malawi Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 13 ARCHIVED on 04-Nov-2015 ISR21002 Implementing Agencies:
More informationThe World Bank. Key Dates. Project Development Objectives. Component(s) Public Disclosure Copy Overall Ratings
Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Operation Name: Benin Emergency Urban Env. Project (P113145) Project Stage: Implementation Seq.No: 3 Status: ARCHIVED
More informationThe World Bank Geothermal Clean Energy Investment Project (P113078)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy and Mining Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 6 ARCHIVED on 17-Jun-2015 ISR18126 Implementing Agencies:
More informationImplementation Status & Results Indonesia ID-Domestic Gas Market Development Project (P077175)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project
More informationImplementation Status & Results India Andhra Pradesh Road Sector Project (P096021)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Operation Name: Andhra Pradesh Road Sector Project
More informationImplementation Status & Results Jordan Promotion of a Wind Power Market (P093201)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Jordan Promotion of a Wind Power Market (P9321) Operation Name: Promotion of a Wind Power Market
More informationImplementation Status & Results Honduras HN Rural Infrastructure Project (P086775)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras HN Rural Infrastructure Project (P086775) Operation Name: HN Rural Infrastructure Project
More informationImplementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913) Operation Name:
More informationImplementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Operation Name: Third
More informationImplementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218) Operation
More informationPublic Disclosure Copy
Public Disclosure Authorized EAST ASIA AND PACIFIC Lao People's Democratic Republic Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 11 ARCHIVED on 08-Sep-2015
More informationImplementation Status & Results Colombia Justice Services Strenghtening (P083904)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Justice Services Strenghtening (P083904) Operation Name: Justice Services Strenghtening
More informationImplementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD) (P117243)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD)
More informationImplementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996) Operation Name: Rio de Janeiro Mass Transit
More informationImplementation Status & Results Africa Nyika Transfrontier Conservation Area Project (P108879)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa Nyika Transfrontier Conservation Area Project
More informationImplementation Status & Results Azerbaijan Water Users Association Development Support Project (P107617)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Azerbaijan Water Users Association Development Support Project (P107617) Operation Name: Water Users
More informationImplementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635) Operation Name:
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Africa Global Information/Communications Technology Global Practice IBRD/IDA Adaptable Program Loan FY 2011 Seq No: 7 ARCHIVED on 09-Jun-2015 ISR19619 Implementing Agencies:
More informationThe World Bank Stormwater Mgt. and Climate Change Adaptation Project (P122841)
Public Disclosure Authorized AFRICA Senegal Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 9 ARCHIVED on 30-Jun-2017 ISR26846 Implementing
More informationThe World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results South Africa Development, Empowerment and Conservation
More informationImplementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Operation Name: QUALITY PROTECT (GEF) (P085112)
More informationImplementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Operation Name: QUALITY PROTECT (GEF) (P085112)
More informationImplementation Status & Results Africa West Africa Agricultural Productivity Program (WAAPP) (P094084)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa West Africa Agricultural Productivity Program
More information