1 losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Albania Energy Community of South East Europe APL Program - APL 5 for Albania DAM SAFETY (P110481) Operation Name: Energy Community of South East Europe APL Program - Project Stage: Implementation Seq.No: 6 Status: ARCHIVED Archive : 23-Apr-2014 APL 5 for Albania DAM SAFETY (P110481) Country: Albania Approval FY: 2008 Product Line: IBRD/IDA Region: EUROPE AND CENTRAL ASIA Lending Instrument: Adaptable Program Loan Implementing Agency(ies): Albanian Power Corporation (KESH) Key s Board Approval 30-Jun-2008 Original Closing 31-Dec-2013 Planned Mid Term Review 31-Mar-2014 Last Archived ISR 13-Apr-2013 Effectiveness 16-Dec-2008 Revised Closing Actual Mid Term Review Project Development Objectives Project Development Objective (from Project Appraisal Document) The development objectives of the project are to: (i) contribute to safeguarding the major hydroelectric dams of Albania; and (ii) improve their operational efficiency and enhance the stability of power supply for the regional electricity market. The proposed project supports the development of the Energy Community in accordance with the objectives of the Energy Community of South Eastern Europe (ECSEE) APL. The key objectives of the ECSEE Program are to: (a) Create a stable regulatory and market framework to attract investment in gas networks and power systems so that all states in the region have access to the stable and continuous energy supply, essential for economic development and social stability; (b) Establish integrated regional markets in South East Europe, closely linked to the internal energy market of the European Union, and complying with the rules applicable within the European Union; (c) Enhance the energy security of South East Europe and the European Union by providing incentives to connect the Balkans to Caspian and North African gas reserves; and (d) Improve the environmental situation in relation to energy in the region. Has the Project Development Objective been changed since Board Approval of the Project? Yes Component(s) No Component Name Component Cost Physical infrastructure investments Technical Assistance and Training 9.23 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Unsatisfactory Overall Risk Rating Low Implementation Status Overview Page 1 of 7

2 Construction works have started at the Komani Power Plant (electromechanical rehabilitation). The power house cranes are commissioned and Unit 2 was dewartered on February 3, Evaluation is underway for the Spillways Packages for Rehabilitation of Komani and Fierza HPP and the Vau Dejes Spillway Gates and construction of new stoplog. The contracts for Project Implementation and for Safety of Dam Experts Panel have both been extended. Consultant selection process is progressing for Institutional Strengthening of Dam Safety and Emergency Preparedness and for Safe Flood Management of Drin River Cascade. Parts of the project financed by Swiss State Secretariat for Economic Affairs (SECO); i.e. the Dam, Geological and Seismic Monitoring, Geodetic Monitoring, and the Rockfall protection at Fierza Dam, are almost completed. Locations Country First Administrative Division Location Planned Actual Albania Not Entered Ulez Albania Not Entered Shkopet Albania Not Entered Lumi i Matit Albania Not Entered Vau i Dejes Hydroelectric Power Station Albania Not Entered Fierze Hydroelectric Power Station Albania Not Entered Komani Hydroelectric Power Station Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Total safeguarded dams and generation Text Value 0% of Albania's hydropower 20% 80% capacity capacity affected by safeguard measures. The Dam Safety Project will contribute to the Safeguarding the major hydroelectric plants on Drin and Mat River Cascades in Albania. The risk of dam failure is reduced with well-maintained and structurally safe dam and appurtenant structures. Also, the loss of life is reduced, when events affecting the dam safety can be predicted in advance. The development objectives of contributing towards the safeguarding of major hydroelectric dams in Albania is progressing well and the capacities affected by the safeguard measures has increased by 20%. Page 2 of 7

3 Electricity output due to reduced water Text Value 0 GWh 0 GWh 11 GWh leakages and electro-mechanical equipment rehabilitation. Electricity output is expected to increase after rehabilitation of electromechanical equipment in Komani HPP and rehabilitation of spillways gates in three power plants in Drin Cascade are completed. Electricity output due to improved reservoir Text Value 0 GWh 0GWh 20 GWh optimization procedures The Bank financed the study 'Optimization of the Operation of Hydroelectric Plants in Albania.' A report was provided by the consulting firm with procedures to follow on the simulation of the Albanian System in order to optimize the utilization of hydro resources throughout the timeframe. The methods are being applied but it is too early to obtain results yet. Regional Market Liberalization Text Value 0% in most countries While the potential for a regional integrated market is very high in South East Europe, the opening of the energy market is still far from reality given that the an environment dominated by the State. The markets consist of regulated and nonregulated segments with only a few industrial retail customers supplied by either regional traders or local incumbents in the nonregulated market. Except for a few non-regulated customers and situation of shortage of domestic generation, trading Report Page 3 of 7

4 on regional markets is not developed in the Energy Community. Also, price regulation is still too low to generate funding for the necessary investments in generation capacity and networks and even to maintain security of supply. This discourages most utilities as they could go bankrupt. Besides market designs, there is a lack of institutions such as power exchanges for the day, ahead market, regional balancing markets and, joing capacity allocation mechanisms. Most laws envisage full market opening by While the potential for a regional integrated market is very high in South East Europe, the opening of the energy market is still far from reality given that the environment is dominted by the State. The markets consist of regulated and nonregulated segments with only a few industrial retail customers supplied by either regional traders or local incumbents in the nonregulated market. Except for a few non-regulated customers and situation of shortage of domestic generation, trading on regional markets is not developed in the Energy Community. Also, price regulation is still too low to generate funding for the necessary investments in Page 4 of 7

5 generation capacity and networks and even to maintain security of supply. This discourages most utilities as they could go bankrupt. Besides market designs, there is a lack of institutions such as power exchanges for the day, ahead market, regional balancing markets, and joint capacity allocation mechanisms. Most laws envisage full market opening by Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target The rehabilitated spillways are tested and functional for very high priority investments. Text Value Feasibility study outcomes and results. Testing not done yet. Rehabilitation tested and completed. 19-May-2008 Bids for rehabilitation of the spillways on (i) Komani &Fierza HPP and (ii) Vau i Dejes dam were opened on Jan 31, 2014, and evaluation of the bids is underway. High priority remedial measures completed. Text Value Feasibility study outcomes and results Remedial measures of medium priority and operational improvements completed. 19-May-2008 The high priority remedial measures are subjects of the Dam Safety Project under implementation. Text Value Feasibility study outcomes and results. Work on rehabilitation of electromechanical equipment in the Komani HPP has started. The contract was signed on July 3, 2012 and the work started on unit one on February 3, Some improvement has taken place. 19-May-2008 The medium priority remedial measures and operational improvements are subjects of (i) Dam Safety Procedures, Maintenance and Internal Emergency Action Plan are Rehabilitation completed Remedial measures and operational improvements completed. Page 5 of 7

6 the Dam Safety Project under implementation. partially established. The concept of safety maintenance procedures is based on the laws and regulations related to dam safety in Albania and Switzerland. Existing Plans are exemplifiedby the Internal Emergency Action Plan ( IEAP.) (ii) The Dam Safety department at KESH has been reorganized at their headquarters aswellas at each HPPand are now staffedwith qualified experts. (iii) The experts at KESH participated in a two week study tour (June 3-16,2012) study in the USA and Canadaon Dam Safety programs and Emergency Preparedness Plan. (iv) Selection of a consultant undertheta for Instructional Strengtheningof Dam Safety and Emergency Preparedness Plan is underway (v) Selection for a consultant underthe TA for Prefeasibility and Feasibility Study for providing the Safe Flood Management is underway. Safety of Dams Expert Panel Text Value Terms of reference drafted Panel has been selected and in full operation. 20-Mar-2014 The Expert Panel for Dam Safety was established by the end of The Panel is operating since end 2010 and will continue throughout the life of the project. Panel in full operation. 31-Dec-2010 The Expert Panel for Dam Safety was established by the end of The Panel is operating since end 2010 and will continue throughout the life of the project. Data on Financial Performance (as of 28-Feb-2014) Page 6 of 7

7 Financial Agreement(s) Key s Project Ln/Cr/Tf Status Approval Signing Effectiveness Original Closing Revised Closing P IBRD Effective 20-Dec Feb May-2012 P IDA Effective 30-Jun Jul Dec Dec-2013 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IBRD Effective USD P IDA Effective USD Disbursement Graph Key Decisions Regarding Implementation Construction works have started at the Komani Power Plant. Restructuring History There has been no restructuring to date. Related Projects P DAM SAFETY - ADDITIONAL FINANCING Page 7 of 7

Implementation Status & Results Pakistan Water Sector Capacity Buildling and Advisory Services Project (WCAP) (P110099)

Implementation Status & Results Pakistan Water Sector Capacity Buildling and Advisory Services Project (WCAP) (P110099) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Pakistan Water Sector Capacity Buildling and Advisory Services Project (WCAP) (P110099) Operation

More information

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Operation Name: Second National

More information

Implementation Status & Results Honduras Barrio-Ciudad Project (P088319)

Implementation Status & Results Honduras Barrio-Ciudad Project (P088319) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras Barrio-Ciudad Project (P88319) Operation

More information

Implementation Status & Results Africa Central African Backbone - APL2 (P117652)

Implementation Status & Results Africa Central African Backbone - APL2 (P117652) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa Central African Backbone - APL2 (P117652) Operation Name: Central African Backbone - APL2

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916)

Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Operation Name: WAPP APL 2 - OMVS

More information

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429)

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase

More information

Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152)

Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152) Operation

More information

Implementation Status & Results Azerbaijan Highway 2 (P094488)

Implementation Status & Results Azerbaijan Highway 2 (P094488) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Azerbaijan Highway 2 (P094488) Operation Name: Highway 2 (P094488) Project Stage: Implementation

More information

Implementation Status & Results Vietnam VIETNAM WATER RESOURCES ASSISTANCE (P065898)

Implementation Status & Results Vietnam VIETNAM WATER RESOURCES ASSISTANCE (P065898) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Vietnam VIETNAM WATER RESOURCES ASSISTANCE (P065898) Operation Name: VIETNAM WATER RESOURCES ASSISTANCE (P065898)

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384)

Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS)

More information

Implementation Status & Results Philippines ARMM Social Fund Project (P073488)

Implementation Status & Results Philippines ARMM Social Fund Project (P073488) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Philippines ARMM Social Fund Project (P073488) Operation Name: ARMM Social Fund Project (P073488)

More information

Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077)

Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077) Operation Name: URBAN WATER SUPPLY AND WASTEWATER

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719)

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Operation Name: Uzbekistan

More information

Implementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038)

Implementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038) Operation Name: BR São Paulo Trains and Signalling

More information

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Geothermal Power Generation Development

More information

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Operation Name: CORRIDOR X HIGHWAY PROJECT (P108005) Project Stage:

More information

Implementation Status & Results Mauritania MAURITANIA: TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT (P089672)

Implementation Status & Results Mauritania MAURITANIA: TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT (P089672) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mauritania MAURITANIA: TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT

More information

Implementation Status & Results Haiti Disaster Risk Management and Reconstruction (P126346)

Implementation Status & Results Haiti Disaster Risk Management and Reconstruction (P126346) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Disaster Risk Management and Reconstruction

More information

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991)

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Operation Name: ID-Urban Water Supply and

More information

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Operation Name: CORRIDOR X HIGHWAY PROJECT (P108005) Project Stage:

More information

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Operation Name: Bahia Integrated

More information

Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910)

Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910) Operation Name: IQ-TF EMERG. WATER, SANITATION

More information

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Operation Name: Western

More information

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165)

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Operation Name: Market

More information

The World Bank Geothermal Clean Energy Investment Project (P113078)

The World Bank Geothermal Clean Energy Investment Project (P113078) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy and Mining Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 6 ARCHIVED on 17-Jun-2015 ISR18126 Implementing Agencies:

More information

Implementation Status & Results Benin Support to Protected Areas Management (P122419)

Implementation Status & Results Benin Support to Protected Areas Management (P122419) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Support to Protected Areas Management (P122419) Operation Name: Support to Protected Areas

More information

Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966)

Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966)

More information

Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931)

Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931) Operation Name: Ministry

More information

Implementation Status & Results Africa WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) (P075994)

Implementation Status & Results Africa WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) (P075994) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Africa WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) (P075994) Operation Name: WAPP APL 1 (1st Phase -

More information

The World Bank Vietnam Renewable Energy Development Project (P103238)

The World Bank Vietnam Renewable Energy Development Project (P103238) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2009 Seq No: 15 ARCHIVED on 14-Feb-2018 ISR29615 Implementing Agencies:

More information

Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722)

Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Operation Name: Development

More information

AR B.A.URB.TSP (P039584)

AR B.A.URB.TSP (P039584) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR B.A.URB.TSP (P39584) Operation Name: AR B.A.URB.TSP (P39584) Project Stage: Implementation

More information

Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722)

Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Operation Name: Development

More information

Implementation Status & Results Ghana Ghana: Statistics Development Program (MDTF) (P118585)

Implementation Status & Results Ghana Ghana: Statistics Development Program (MDTF) (P118585) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ghana Ghana: Statistics Development Program (MDTF) (P118585) Operation Name: Ghana: Statistics Development

More information

Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414)

Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414) Operation Name:

More information

Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural Development Project (P088799)

Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural Development Project (P088799) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural

More information

Implementation Status & Results Jordan Promotion of a Wind Power Market (P093201)

Implementation Status & Results Jordan Promotion of a Wind Power Market (P093201) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Jordan Promotion of a Wind Power Market (P9321) Operation Name: Promotion of a Wind Power Market

More information

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375)

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Operation

More information

Implementation Status & Results Azerbaijan Water Users Association Development Support Project (P107617)

Implementation Status & Results Azerbaijan Water Users Association Development Support Project (P107617) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Azerbaijan Water Users Association Development Support Project (P107617) Operation Name: Water Users

More information

Implementation Status & Results Indonesia Integrating Environment and Forest Protection into the Recovery and Future Development of Aceh (P098052)

Implementation Status & Results Indonesia Integrating Environment and Forest Protection into the Recovery and Future Development of Aceh (P098052) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Integrating Environment and Forest Protection into the Recovery and Future Development

More information

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Operation Name: Western

More information

Implementation Status & Results Samoa Samoa Agriculture & Fisheries Cyclone Response Project (P145938)

Implementation Status & Results Samoa Samoa Agriculture & Fisheries Cyclone Response Project (P145938) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Samoa Samoa Agriculture & Fisheries Cyclone Response Project (P145938) Operation Name: Samoa Agriculture

More information

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021)

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Operation Name: Andhra Pradesh Road Sector Project

More information

Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD) (P117243)

Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD) (P117243) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD)

More information

Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719)

Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719) Operation Name:

More information

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719)

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Operation Name: Uzbekistan

More information

Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719)

Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture

More information

Implementation Status & Results Mongolia MONSTAT: Strengthening the National Statistical System of Mongolia (P113160)

Implementation Status & Results Mongolia MONSTAT: Strengthening the National Statistical System of Mongolia (P113160) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mongolia MONSTAT: Strengthening the National Statistical System of Mongolia (P113160) Operation

More information

Implementation Status & Results Benin Support to Protected Areas Management (P122419)

Implementation Status & Results Benin Support to Protected Areas Management (P122419) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Support to Protected Areas Management (P122419) Operation Name: Support to Protected Areas

More information

Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523)

Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523) Operation Name: Haiti Transport

More information

The World Bank Geothermal Clean Energy Investment Project (P113078)

The World Bank Geothermal Clean Energy Investment Project (P113078) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 11 ARCHIVED on 05-Nov-2017 ISR29890 Implementing

More information

Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project (P077175)

Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project (P077175) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project

More information

Implementation Status & Results Croatia Coastal Cities Pollution Control Project 2 (P102732)

Implementation Status & Results Croatia Coastal Cities Pollution Control Project 2 (P102732) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Croatia Coastal Cities Pollution Control Project 2 (P102732) Operation Name: Coastal Cities Pollution

More information

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Operation Name: QUALITY PROTECT (GEF) (P085112)

More information

Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

More information

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165)

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Operation Name: Market

More information

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)

Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Operation Name: QUALITY PROTECT (GEF) (P085112)

More information

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Report : ISR1437 Operation Name: CORRIDOR X HIGHWAY

More information

Implementation Status & Results Mexico Mexico Forests and Climate Change Project (P123760)

Implementation Status & Results Mexico Mexico Forests and Climate Change Project (P123760) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mexico Mexico Forests and Climate Change Project (P123760) Operation Name: Mexico Forests and Climate Change Project

More information

Implementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913)

Implementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913) Operation Name:

More information

Implementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218)

Implementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218) Operation

More information

Implementation Status & Results Macedonia, former Yugoslav Republic of Second Trade and Transport Facilitation Project (P091723)

Implementation Status & Results Macedonia, former Yugoslav Republic of Second Trade and Transport Facilitation Project (P091723) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Macedonia, former Yugoslav Republic of Second Trade and Transport Facilitation Project (P091723) Operation Name:

More information

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757) Operation

More information

Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989)

Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989) Operation Name: Nicaragua

More information

Implementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913)

Implementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913) Operation Name:

More information

Implementation Status & Results Colombia Justice Services Strenghtening (P083904)

Implementation Status & Results Colombia Justice Services Strenghtening (P083904) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Justice Services Strenghtening (P083904) Operation Name: Justice Services Strenghtening

More information

Implementation Status & Results Peru Water Resources Management Modernization (P107666)

Implementation Status & Results Peru Water Resources Management Modernization (P107666) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Water Resources Management Modernization (P107666) Operation Name: Water Resources Management

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy EUROPE AND CENTRAL ASIA Croatia Water Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 15 ARCHIVED on 24-Dec-2015 ISR22041 Implementing

More information

Implementation Status & Results Armenia Yerevan Water & Wastewater Project (P087641)

Implementation Status & Results Armenia Yerevan Water & Wastewater Project (P087641) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Armenia Yerevan Water & Wastewater Project (P087641)

More information

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021)

Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Operation Name: Andhra Pradesh Road Sector Project

More information

Implementation Status & Results Indonesia Barefoot Engineers III (P131387)

Implementation Status & Results Indonesia Barefoot Engineers III (P131387) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Barefoot Engineers III (P131387) Operation

More information

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Operation Name: Bahia Integrated

More information

Implementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635)

Implementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635) Operation Name:

More information

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996)

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996) Operation Name: Rio de Janeiro Mass Transit

More information

Implementation Status & Results Mozambique Health Commodity Security Project (P121060)

Implementation Status & Results Mozambique Health Commodity Security Project (P121060) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Health Commodity Security Project (P121060) Operation Name: Health Commodity Security

More information

Implementation Status & Results Vietnam Customs Modernization Project (P085071)

Implementation Status & Results Vietnam Customs Modernization Project (P085071) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam Customs Modernization Project (P085071) Operation Name: Customs Modernization Project (P085071)

More information

Implementation Status & Results Africa Nyika Transfrontier Conservation Area Project (P108879)

Implementation Status & Results Africa Nyika Transfrontier Conservation Area Project (P108879) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa Nyika Transfrontier Conservation Area Project

More information

Implementation Status & Results Benin Increased Access to Modern Energy (P110075)

Implementation Status & Results Benin Increased Access to Modern Energy (P110075) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Increased Access to Modern Energy (P110075) Operation Name: Increased Access to Modern Energy

More information

Implementation Status & Results Brazil Rio de Janeiro Public Sector Modernization (P106768)

Implementation Status & Results Brazil Rio de Janeiro Public Sector Modernization (P106768) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Public Sector Modernization (P106768) Operation Name: Rio de Janeiro Public

More information

Implementation Status & Results Brazil Minas Gerais Partnership II SWAP (P101324)

Implementation Status & Results Brazil Minas Gerais Partnership II SWAP (P101324) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Minas Gerais Partnership II SWAP (P101324) Operation Name: Minas Gerais Partnership II SWAP

More information

Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145)

Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Operation Name: Benin Emergency Urban Env. Project

More information

Implementation Status & Results China SECOND SHANDONG ENVIRONMENT PROJECT (P077752)

Implementation Status & Results China SECOND SHANDONG ENVIRONMENT PROJECT (P077752) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results China SECOND SHANDONG ENVIRONMENT PROJECT (P077752) Operation Name: SECOND SHANDONG ENVIRONMENT

More information

Implementation Status & Results India Uttar Pradesh Water Sector Restructuring Project (P050647)

Implementation Status & Results India Uttar Pradesh Water Sector Restructuring Project (P050647) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Uttar Pradesh Water Sector Restructuring Project (P050647) Operation Name: Uttar Pradesh Water

More information

Implementation Status & Results Philippines Climate Change Adaptation Program (P101076)

Implementation Status & Results Philippines Climate Change Adaptation Program (P101076) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Philippines Climate Change Adaptation Program (P101076) Operation Name: Climate Change Adaptation

More information

Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources Management (P089929)

Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources Management (P089929) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources

More information

Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635)

Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635) o C Operation

More information

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375)

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Operation Name: Third

More information

Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

More information

Implementation Status & Results Bangladesh Bangladesh Central Bank Strengthening Project (P062916)

Implementation Status & Results Bangladesh Bangladesh Central Bank Strengthening Project (P062916) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bangladesh Bangladesh Central Bank Strengthening Project (P062916) Operation Name: Bangladesh Central

More information

Public Disclosure Copy. Public Disclosure Copy. The World Bank

Public Disclosure Copy. Public Disclosure Copy. The World Bank Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Sustainable Integrated Ecosystem

More information

Implementation Status & Results Ghana Ghana Urban Transport Project (P100619)

Implementation Status & Results Ghana Ghana Urban Transport Project (P100619) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Ghana Ghana Urban Transport Project (P100619) Operation Name: Ghana Urban Transport Project (P100619) Project Stage:

More information

RUSSIA FOREST FIRE RESPONSE PROJECT (P123923)

RUSSIA FOREST FIRE RESPONSE PROJECT (P123923) EUROPE AND CENTRAL ASIA Russian Federation Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 14 ARCHIVED on 28-Dec-2018 ISR35669 Implementing Agencies:

More information

Implementation Status & Results Armenia Public Sector Modernization Project (P060786)

Implementation Status & Results Armenia Public Sector Modernization Project (P060786) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Armenia Public Sector Modernization Project (P060786) Operation Name: Public Sector Modernization

More information

The World Bank Vietnam Industrial Pollution Management Project (P113151)

The World Bank Vietnam Industrial Pollution Management Project (P113151) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 20-Apr-2018 ISR31553 Implementing

More information

Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384)

Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384) Public Disclosure Authorized Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384) EAST ASIA AND PACIFIC Indonesia Governance Global Practice IBRD/IDA

More information

Implementation Status & Results Africa West Africa Agricultural Productivity Program (WAAPP) (P094084)

Implementation Status & Results Africa West Africa Agricultural Productivity Program (WAAPP) (P094084) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa West Africa Agricultural Productivity Program

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 14 ARCHIVED on 21-Dec-2016 ISR25946 Implementing Agencies:

More information