1 Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras HN Rural Infrastructure Project (P086775) Operation Name: HN Rural Infrastructure Project (P086775) Project Stage: Implementation Seq.No: 14 Status: ARCHIVED Archive : 20-Jun-2012 Country: Honduras Approval FY: 2006 Product Line: IBRD/IDA Region: LATIN AMERICA AND CARIBBEAN Lending Instrument: Specific Investment Loan Implementing Agency(ies): Finance Secretariat (SEFIN), Fondo Hondureno de Inversion Social, empresa nacional de energia electrica Key s Board Approval 07-Jul-2005 Original Closing 30-Jun-2010 Planned Mid Term Review Last Archived ISR 16-Dec-2011 Effectiveness 04-Aug-2006 Revised Closing Actual Mid Term Review Project Development Objectives HN Rural Infrastructure Project (P086775) Project Development Objective (from Project Appraisal Document) The project development objectives are (i) to improve access, quality and sustainability of infrastructure services (roads, water & sanitation, and electricity) for the rural poor in Honduras; and (ii) to develop capacities and enabling environment for locally-driven service provision and planning. Has the Project Development Objective been changed since Board Approval of the Program? Yes No losure Authorized Public Disclosure Authorized Rural Electrification Project (P090113) Global Environmental Objective (from Project Appraisal Document) The GEF project development objectives are: (i) improving access, quality and sustainability of electricity services through the development of offgrid electrification model projects, and (ii) developing capacities and enabling environment for offgrid electrification in a decentralized setting. The project's global environmental objective is to achieve greenhouse gas (GHG) reductions through the reduction of policy, informational, financing and institutional capacity barriers that currently hinder renewable energy technology (RET) dissemination and market development in Honduras Has the Global Environmental Objective been changed since Board Approval of the Program? Yes Component(s) No Component Name Component Cost Participatory local planning 1.30 Infrastructure Service Delivery Local Capacity Building and Policy Development TA 3.50 Project management, monitoring and evaluation 2.00 Page 1 of 9

2 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Progress towards achievement of GEO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Implementation Status Overview The project continues to be in a good position to achieve its development objectives. All integrated rural infrastructure investment plans are approved and most of the infrastructure sub-projects are either completed or under execution. Greater attention is now being paid to ensure the sustainability of the investments and the provision of the infrastructure services. The positive impacts of the integrated investments in the three sectors on rural livelihoods are evident and well recognized by the government at all levels, by local stakeholders, and by direct beneficiaries. The project has achieved a cumulative level of disbursements of 84% (US$39.6 million) for the credit and 60% (US$1.4 million) for the grant. Since the beginning of 2011 the project showed a high level of project execution leading to the disbursement of an amount of US$18.5 million from the credit. This in part is due to the advanced stage of project execution where a significant amount of sub-projects designs and studies had been prepared and ready to be implemented; but also because of effective project implementation where previously bottlenecks had been identified and now addressed by the project implementation unit. Despite the recent improvements in project execution, additional time beyond the current closing date would be necessary to enable all current project activities to be completed. Locations Country First Administrative Division Location Planned Actual Honduras Departamento de Olancho Yocon Honduras Departamento de Santa Barbara Trinidad Honduras Departamento de Olancho Silca Honduras Departamento de Ocotepeque Sensenti Honduras Departmento de La Paz Santiago Puringla Honduras Departamento de Copan Santa Rita Honduras Departmento de La Paz Santa Maria Honduras Departamento de Choluteca Santa Ana de Yusguare Honduras Departmento de La Paz San Pedro de Tutule Honduras Departamento de Copan San Nicolas Honduras Departamento de Choluteca San Marcos de Colon Honduras Departamento de Santa Barbara San Marcos Page 2 of 9

3 Country First Administrative Division Location Planned Actual Honduras Departamento de Santa Barbara San Luis Honduras Departamento de Santa Barbara San Jose de Colinas Honduras Departmento de La Paz San Jose Honduras Departamento de Copan San Jeronimo Honduras Departamento de Copan San Antonio Honduras Departamento de Olancho Salama Honduras Departamento de Santa Barbara Petoa Honduras Departamento de Choluteca Orocuina Honduras Departamento de Copan Nueva Arcadia Honduras Departmento de La Paz Marcala Honduras Departamento de Olancho Mangulile Honduras Departamento de Ocotepeque Lucerna Honduras Departamento de Olancho La Union Honduras Departmento de La Paz La Paz Honduras Departamento de Ocotepeque La Labor Honduras Departamento de Copan La Jigua Honduras Departamento de Olancho La Guata Honduras Departamento de Olancho Jano Honduras Departamento de Olancho Guayape Honduras Departamento de Ocotepeque Fraternidad Honduras Departamento de Copan Florida Honduras Departamento de Olancho Esquipulas del Norte Honduras Departamento de Olancho El Rosario Honduras Departamento de Copan El Paraiso Honduras Departamento de Choluteca El Corpus Page 3 of 9

4 Honduras Departamento de Choluteca Duyure Honduras Departamento de Ocotepeque Dolores Merendon Honduras Departamento de Copan Copan Ruinas Honduras Departamento de Olancho Concordia Honduras Departamento de Choluteca Concepcion de Maria Honduras Departamento de Santa Barbara Concepcion del Norte Honduras Departamento de Santa Barbara Chinda Honduras Departmento de La Paz Chinacla Honduras Departmento de La Paz Cane Honduras Departamento de Olancho Campamento Honduras Departamento de Copan Cabanas Honduras Departamento de Choluteca Apacilagua Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Direct project beneficiaries Number Value Female Beneficiaries Percentage Generation capacity of renewable energy constructed under the project (MW) Micro-enterprises for road maintenance trained on technical standards and entrepreneurial practices Sub Type Supplemental Megawatt hour (MWh) 07-Jul-2005 Value Value Number Value Page 4 of 9

5 Roads rehabilitated, Municipal kilometers program (kilometers) New household sewerage connections that are resulting from the project intervention Share of rural population with access to an allseason road Number of rural people with access to an allseason road Number of people in rural areas provided with access to Improved Water Sources under the project % population in target areas with access to water and sanitation, provided with quality and sustainability. Number of people in rural areas provided with access to sanitation under the project % population in target areas with access to electricity service, provided with adequate quality and sustainability Number of people provided with access to power electricity under the project by household connections Number of people provided with access to renewable electricity under the project by household connections Value of contracts successfully procured by UTIs (cumulative) Kilometers Value Number Value Percentage Value To be measured at the conclusion of the project Number Value Sub Type Supplemental Number Value Aug-2006 Text Value Jul-2005 This will be measured at the conclusion of the project Number Value Jul-2005 Text Value Jul-2005 This will be measured at the conclusion of the project Number Value Jul-2005 Number Value Jul-2005 Text Value US$25 million 07-Jul-2005 Page 5 of 9

6 This is for all 6 mancomunidades Kilometers under routine roadmaintenance Kilometers Value Jul additional micro-enterprises started up in January 2012 Global Environmental Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Sales amount of accredited solar companies Amount(USD) Value Jul-2005 Number of community electricity connections Number Value under project through renewable energy 07-Jul-2005 households with solar systems installed Number Value Jul-2005 village micro grids Number Value Jul-2005 Tons CO2 (greenhouse gas) emissions Text Value 46, ,000 avoided 07-Jul ,000 is now the revised expectation due to having 2 rather than 8 micro-hydros completed under the project Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Number of integrated mancomunal Text Value 0 6 infrastructure plans completed 07-Jul-2005 Percentage of planned sub projects actually Percentage Value implemented 07-Jul-2005 Page 6 of 9

7 Roads rehabilitated, Rural Kilometers Value Aug-2006 New piped household water connections that Number Value are resulting from the project intervention 01-Aug-2006 Piped household water connections that are Number Value benefiting from rehabilitation works undertaken 01-Aug-2006 by the project Latrines constructed Number Value Jul-2005 Number of new household electricity Number Value connections through grid extension 06-Jun-2005 Transmission and distribution lines constructed Kilometers Value Jul-2005 solar companies accredited Number Value Jul-2005 micro-financing companies accredited Number Value Jul-2005 Volume of Bank Support: Lines of Credit - Amount(USD) Value Microfinance Volume of Bank Support: Institutional Amount(USD) Value Development - Microfinance UTIs operating with trained staff Number Value Jul-2005 Page 7 of 9

8 Water Boards trained in operations and maintenance Monitoring and Evaluation Systems established. Data on Financial Performance (as of 17-May-2012) MAMNO is however receiving specific help from the UCP to meet its obligations Number Value Jul-2005 Text Value 0 Complied with Complied with 07-Jul-2005 Financial Agreement(s) Key s Project Ln/Cr/Tf Status Approval Signing Effectiveness Original Closing Revised Closing P IDA Effective 07-Jul Nov Aug Jun-2010 P TF Effective 21-Mar Mar Aug Jun-2008 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IDA Effective USD P TF Effective USD Disbursement Graph Page 8 of 9

9 Key Decisions Regarding Implementation The Bank has received a Government request for an extension of the closing date of the credit and the grant. The request is currently under review by the Bank. The additional time would be required to assure completion of all sub-projects, currently under implementation or due to be contracted, before June Restructuring History Level two Approved on 08-Apr-2010, Level two Approved on 29-Jun-2010 Related Projects P Rural Electrification Project Page 9 of 9

Implementation Status & Results Honduras HN Rural Infrastructure Project (P086775)

Implementation Status & Results Honduras HN Rural Infrastructure Project (P086775) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras HN Rural Infrastructure Project (P086775) Operation Name: HN Rural Infrastructure Project

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Implementation Status & Results Honduras Barrio-Ciudad Project (P088319)

Implementation Status & Results Honduras Barrio-Ciudad Project (P088319) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras Barrio-Ciudad Project (P88319) Operation

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989)

Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989) Operation Name: Nicaragua

More information

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429)

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase

More information

Implementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218)

Implementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218) Operation

More information

Implementation Status & Results Haiti Disaster Risk Management and Reconstruction (P126346)

Implementation Status & Results Haiti Disaster Risk Management and Reconstruction (P126346) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Disaster Risk Management and Reconstruction

More information

Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966)

Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966)

More information

Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523)

Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523) Operation Name: Haiti Transport

More information

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Operation Name: Second National

More information

Implementation Status & Results Argentina AR-GEF Sustainable and Transport and Air Quality Project (P114008)

Implementation Status & Results Argentina AR-GEF Sustainable and Transport and Air Quality Project (P114008) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR-GEF Sustainable and Transport and Air Quality Project (P114008) Operation Name: AR-GEF

More information

Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)

Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046) Operation Name: Second Agricultural Technology

More information

Public Disclosure Copy. Public Disclosure Copy. The World Bank

Public Disclosure Copy. Public Disclosure Copy. The World Bank Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Sustainable Integrated Ecosystem

More information

Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural Development Project (P088799)

Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural Development Project (P088799) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural

More information

Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)

Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046) Operation Name: Second Agricultural Technology

More information

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Geothermal Power Generation Development

More information

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045)

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Operation Name: Rural Productivity Project (GEF)

More information

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045)

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Operation Name: Rural Productivity Project (GEF)

More information

Implementation Status & Results Philippines ARMM Social Fund Project (P073488)

Implementation Status & Results Philippines ARMM Social Fund Project (P073488) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Philippines ARMM Social Fund Project (P073488) Operation Name: ARMM Social Fund Project (P073488)

More information

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719)

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Operation Name: Uzbekistan

More information

Implementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038)

Implementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038) Operation Name: BR São Paulo Trains and Signalling

More information

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Operation Name: Bahia Integrated

More information

AR B.A.URB.TSP (P039584)

AR B.A.URB.TSP (P039584) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR B.A.URB.TSP (P39584) Operation Name: AR B.A.URB.TSP (P39584) Project Stage: Implementation

More information

Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077)

Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077) Operation Name: URBAN WATER SUPPLY AND WASTEWATER

More information

The World Bank Mexico (CRL) Integrated Energy Services (P088996)

The World Bank Mexico (CRL) Integrated Energy Services (P088996) Public Disclosure Authorized Public Disclosure Copy LATIN AMERICA AND CARIBBEAN Mexico Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 17 ARCHIVED on 30-Oct-2015

More information

Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152)

Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152) Operation

More information

Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916)

Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Operation Name: WAPP APL 2 - OMVS

More information

The World Bank Mexico (CRL) Integrated Energy Services (P088996)

The World Bank Mexico (CRL) Integrated Energy Services (P088996) Public Disclosure Authorized Public Disclosure Copy LATIN AMERICA AND CARIBBEAN Mexico Energy and Mining Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 15 ARCHIVED on 30-Dec-2014 ISR17230

More information

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165)

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Operation Name: Market

More information

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719)

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Operation Name: Uzbekistan

More information

Implementation Status & Results Benin Support to Protected Areas Management (P122419)

Implementation Status & Results Benin Support to Protected Areas Management (P122419) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Support to Protected Areas Management (P122419) Operation Name: Support to Protected Areas

More information

Implementation Status & Results Africa Central African Backbone - APL2 (P117652)

Implementation Status & Results Africa Central African Backbone - APL2 (P117652) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa Central African Backbone - APL2 (P117652) Operation Name: Central African Backbone - APL2

More information

Implementation Status & Results Benin Support to Protected Areas Management (P122419)

Implementation Status & Results Benin Support to Protected Areas Management (P122419) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Support to Protected Areas Management (P122419) Operation Name: Support to Protected Areas

More information

Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719)

Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture

More information

Implementation Status & Results Samoa Samoa Agriculture & Fisheries Cyclone Response Project (P145938)

Implementation Status & Results Samoa Samoa Agriculture & Fisheries Cyclone Response Project (P145938) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Samoa Samoa Agriculture & Fisheries Cyclone Response Project (P145938) Operation Name: Samoa Agriculture

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 14 ARCHIVED on 21-Dec-2016 ISR25946 Implementing Agencies:

More information

Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719)

Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719) Operation Name:

More information

The World Bank. Key Dates. Project Development Objectives. Component(s) Overall Ratings. Public Disclosure Copy. Implementation Status Overview

The World Bank. Key Dates. Project Development Objectives. Component(s) Overall Ratings. Public Disclosure Copy. Implementation Status Overview Implementation Status & Results Brazil Rio de Janeiro Sustainable Rural Development Project (P101508) Operation Name: Rio de Janeiro Sustainable Rural Development Project Project Stage: Implementation

More information

Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources Management (P089929)

Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources Management (P089929) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources

More information

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165)

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Operation Name: Market

More information

The World Bank. Key Dates. Project Development Objectives. Component(s) Overall Ratings. Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Component(s) Overall Ratings. Public Disclosure Copy Implementation Status & Results Brazil Rio de Janeiro Sustainable Rural Development Project (P101508) Operation Name: Rio de Janeiro Sustainable Rural Development Project Project Stage: Implementation

More information

Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722)

Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Operation Name: Development

More information

Implementation Status & Results Indonesia Integrating Environment and Forest Protection into the Recovery and Future Development of Aceh (P098052)

Implementation Status & Results Indonesia Integrating Environment and Forest Protection into the Recovery and Future Development of Aceh (P098052) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Integrating Environment and Forest Protection into the Recovery and Future Development

More information

Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384)

Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS)

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Mexico Agriculture and Rural Development Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 13 ARCHIVED on 11-Feb-2015 ISR18140 Implementing

More information

Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722)

Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Operation Name: Development

More information

Implementation Status & Results Colombia Justice Services Strenghtening (P083904)

Implementation Status & Results Colombia Justice Services Strenghtening (P083904) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Justice Services Strenghtening (P083904) Operation Name: Justice Services Strenghtening

More information

Implementation Status & Results Africa Nyika Transfrontier Conservation Area Project (P108879)

Implementation Status & Results Africa Nyika Transfrontier Conservation Area Project (P108879) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa Nyika Transfrontier Conservation Area Project

More information

Implementation Status & Results Mexico Mexico Forests and Climate Change Project (P123760)

Implementation Status & Results Mexico Mexico Forests and Climate Change Project (P123760) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mexico Mexico Forests and Climate Change Project (P123760) Operation Name: Mexico Forests and Climate Change Project

More information

Implementation Status & Results Africa WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) (P075994)

Implementation Status & Results Africa WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) (P075994) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Africa WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) (P075994) Operation Name: WAPP APL 1 (1st Phase -

More information

The World Bank Vietnam Renewable Energy Development Project (P103238)

The World Bank Vietnam Renewable Energy Development Project (P103238) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2009 Seq No: 15 ARCHIVED on 14-Feb-2018 ISR29615 Implementing Agencies:

More information

Implementation Status & Results Peru Water Resources Management Modernization (P107666)

Implementation Status & Results Peru Water Resources Management Modernization (P107666) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Peru Water Resources Management Modernization (P107666) Operation Name: Water Resources Management

More information

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375)

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Operation

More information

Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910)

Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910) Operation Name: IQ-TF EMERG. WATER, SANITATION

More information

Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414)

Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414) Operation Name:

More information

The World Bank Geothermal Clean Energy Investment Project (P113078)

The World Bank Geothermal Clean Energy Investment Project (P113078) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 11 ARCHIVED on 05-Nov-2017 ISR29890 Implementing

More information

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991)

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Operation Name: ID-Urban Water Supply and

More information

Public Disclosure Copy. Implementation Status & Results Report BD: Leveraging ICT Growth, Employment and Governance Project (P122201)

Public Disclosure Copy. Implementation Status & Results Report BD: Leveraging ICT Growth, Employment and Governance Project (P122201) Public Disclosure Authorized SOUTH ASIA Bangladesh Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 06-Nov-2017 ISR30072 Implementing Agencies: Bangladesh

More information

Implementation Status & Results Mozambique Health Commodity Security Project (P121060)

Implementation Status & Results Mozambique Health Commodity Security Project (P121060) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Health Commodity Security Project (P121060) Operation Name: Health Commodity Security

More information

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy

The World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results South Africa Development, Empowerment and Conservation

More information

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Operation Name: Bahia Integrated

More information

Implementation Status & Results Benin Increased Access to Modern Energy (P110075)

Implementation Status & Results Benin Increased Access to Modern Energy (P110075) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Increased Access to Modern Energy (P110075) Operation Name: Increased Access to Modern Energy

More information

Implementation Status & Results Jordan Promotion of a Wind Power Market (P093201)

Implementation Status & Results Jordan Promotion of a Wind Power Market (P093201) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Jordan Promotion of a Wind Power Market (P9321) Operation Name: Promotion of a Wind Power Market

More information

Public Disclosure Copy. Implementation Status & Results Report Second Sustainable and Participatory Energy Management (PROGEDE II) (P120629)

Public Disclosure Copy. Implementation Status & Results Report Second Sustainable and Participatory Energy Management (PROGEDE II) (P120629) Public Disclosure Authorized AFRICA Senegal Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 13 ARCHIVED on 12-Jan-2018 ISR31048 Implementing Agencies: Government

More information

Implementation Status & Results Ghana Ghana Urban Transport Project (P100619)

Implementation Status & Results Ghana Ghana Urban Transport Project (P100619) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Ghana Ghana Urban Transport Project (P100619) Operation Name: Ghana Urban Transport Project (P100619) Project Stage:

More information

The World Bank Geothermal Clean Energy Investment Project (P113078)

The World Bank Geothermal Clean Energy Investment Project (P113078) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy and Mining Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 6 ARCHIVED on 17-Jun-2015 ISR18126 Implementing Agencies:

More information

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996)

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996) Operation Name: Rio de Janeiro Mass Transit

More information

Implementation Status & Results Ghana Ghana: Statistics Development Program (MDTF) (P118585)

Implementation Status & Results Ghana Ghana: Statistics Development Program (MDTF) (P118585) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ghana Ghana: Statistics Development Program (MDTF) (P118585) Operation Name: Ghana: Statistics Development

More information

Implementation Status & Results Brazil BR GEF Rio Grande do Sul Biodiversity (P086341)

Implementation Status & Results Brazil BR GEF Rio Grande do Sul Biodiversity (P086341) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR GEF Rio Grande do Sul Biodiversity (P86341) o C Operation

More information

Implementation Status & Results Pakistan Water Sector Capacity Buildling and Advisory Services Project (WCAP) (P110099)

Implementation Status & Results Pakistan Water Sector Capacity Buildling and Advisory Services Project (WCAP) (P110099) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Pakistan Water Sector Capacity Buildling and Advisory Services Project (WCAP) (P110099) Operation

More information

Implementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635)

Implementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635) Operation Name:

More information

Implementation Status & Results Mauritania MAURITANIA: TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT (P089672)

Implementation Status & Results Mauritania MAURITANIA: TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT (P089672) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mauritania MAURITANIA: TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT

More information

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)

Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Operation Name: Western

More information

Implementation Status & Results Armenia Yerevan Water & Wastewater Project (P087641)

Implementation Status & Results Armenia Yerevan Water & Wastewater Project (P087641) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Armenia Yerevan Water & Wastewater Project (P087641)

More information

Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Montenegro Montenegro Institutional Development and Agriculture Strengthening (MIDAS) (P107473)

More information

Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145)

Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Operation Name: Benin Emergency Urban Env. Project

More information

Implementation Status & Results Azerbaijan Highway 2 (P094488)

Implementation Status & Results Azerbaijan Highway 2 (P094488) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Azerbaijan Highway 2 (P094488) Operation Name: Highway 2 (P094488) Project Stage: Implementation

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy EUROPE AND CENTRAL ASIA Croatia Water Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 15 ARCHIVED on 24-Dec-2015 ISR22041 Implementing

More information

Implementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913)

Implementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913) Operation Name:

More information

Implementation Status & Results India India: Economic Empowerment Project for Women (SEWA) (P121475)

Implementation Status & Results India India: Economic Empowerment Project for Women (SEWA) (P121475) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India India: Economic Empowerment Project for Women (SEWA) (P121475) Operation Name: India: Economic

More information

Implementation Status & Results Brazil Sustainable Cerrado Initiative (P091827)

Implementation Status & Results Brazil Sustainable Cerrado Initiative (P091827) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Sustainable Cerrado Initiative (P091827) Operation Name: Sustainable Cerrado Initiative (P091827)

More information

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757) Operation

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy AFRICA Malawi Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 13 ARCHIVED on 04-Nov-2015 ISR21002 Implementing Agencies:

More information

Implementation Status & Results China SECOND SHANDONG ENVIRONMENT PROJECT (P077752)

Implementation Status & Results China SECOND SHANDONG ENVIRONMENT PROJECT (P077752) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results China SECOND SHANDONG ENVIRONMENT PROJECT (P077752) Operation Name: SECOND SHANDONG ENVIRONMENT

More information

Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931)

Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931) Operation Name: Ministry

More information

Implementation Status & Results Albania Energy Community of South East Europe APL Program - APL 5 for Albania DAM SAFETY (P110481)

Implementation Status & Results Albania Energy Community of South East Europe APL Program - APL 5 for Albania DAM SAFETY (P110481) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Albania Energy Community of South East Europe APL

More information

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Operation Name: CORRIDOR X HIGHWAY PROJECT (P108005) Project Stage:

More information

Implementation Status & Results Indonesia Barefoot Engineers III (P131387)

Implementation Status & Results Indonesia Barefoot Engineers III (P131387) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Barefoot Engineers III (P131387) Operation

More information

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Operation Name: CORRIDOR X HIGHWAY PROJECT (P108005) Project Stage:

More information

Implementation Status & Results Philippines Climate Change Adaptation Program (P101076)

Implementation Status & Results Philippines Climate Change Adaptation Program (P101076) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Philippines Climate Change Adaptation Program (P101076) Operation Name: Climate Change Adaptation

More information

Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD) (P117243)

Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD) (P117243) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Sustainable Management of Agricultural Research and Technology Dissemination (SMARTD)

More information

Implementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913)

Implementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913) Operation Name:

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy AFRICA Malawi Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 14 ARCHIVED on 30-Jun-2016 ISR23059 Implementing Agencies:

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Transport Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 13 ARCHIVED on 17-Jun-2015 ISR19767 Implementing Agencies: Hanoi Urban

More information

Implementation Status & Results Brazil Rio de Janeiro Public Sector Modernization (P106768)

Implementation Status & Results Brazil Rio de Janeiro Public Sector Modernization (P106768) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Public Sector Modernization (P106768) Operation Name: Rio de Janeiro Public

More information

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Report : ISR1437 Operation Name: CORRIDOR X HIGHWAY

More information

Implementation Status & Results Botswana Northern Botswana Human Wildlife Coexistence Project (P095617)

Implementation Status & Results Botswana Northern Botswana Human Wildlife Coexistence Project (P095617) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Botswana Northern Botswana Human Wildlife Coexistence Project (P95617) Report No: ISR618 o o Operation

More information

Implementation Status & Results Argentina AR Sustainable Natural Resources Management (formerly Sustainable Forestry Development) (P100806)

Implementation Status & Results Argentina AR Sustainable Natural Resources Management (formerly Sustainable Forestry Development) (P100806) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR Sustainable Natural Resources Management (formerly Sustainable Forestry Development)