ANNUAL PAVEMENT ROADWAY REPAIRS 2017

Size: px
Start display at page:

Download "ANNUAL PAVEMENT ROADWAY REPAIRS 2017"

Transcription

1 ISSUED FOR BID FEBRUARY 2017 AUAL PAVEMET ROADWAY REPAIRS 2017 DE COSTRUCTIO COTRACT UMBER PROJECT LOCATIO \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_TS.dwg AS COSTRUCTED IFORMATIO COTRACTOR PROJECT EGIEER PROJECT STARTED PROJECT COMPLETED AS COSTRUCTED PLAS APPROVED BY PROJECT LOCATIO PROJECT LOCATIO MAP OT TO SCALE PROJECT LOCATIO Print 2017-APRL_TS.dwg TITLE SHEET Sheet Subset: GEERAL 1 of 5 001

2 PROJECT DESCRIPTIO: THIS PROJECT IS A COMPILATIO OF TYPICAL PAVEMET REHABILITATIO WORK O LADSIDE ROADWAY PAVEMETS. THE SCOPE OF WORK IS DIVIDED ITO SEPARATE SCHEDULES OF SIMILAR WORK ICLUDIG: ASPHALT OVERLAY, ASPHALT REHABILITATIO, COCRETE PAVEMET REHABILITATIO, AD MOD GRIDIG. SCHEDULE A: ASPHALT OVERLAY - THIS SCHEDULE WILL REQUIRE A 3-ICH HOT MIX ASPHALT OVERLAY OF EXISTIG COCRETE PAVEMET AT THE E 75TH AVE AD ELK ST (PIKES PEAK PARKIG LOT ETRACE) ITERSECTIO. APPROXIMATELY 2,700 TOS OF ASPHALT WILL BE PLACED, AS WELL AS AGGREGATE BASE SHOULDERIG MATERIAL, AD TEMPORARY AD FIAL EPOXY PAVEMET MARKIGS. SCHEDULE B: ASPHALT REHABILITATIO - THIS SCHEDULE WILL ICLUDE DISCOTIUOUS ASPHALT PATCHIG AT AREAS AS ECESSARY, IDETIFIED BY THE DE PROJECT MAAGER, A SEAL COAT TREATMET OVER EXISTIG ASPHALT PAVEMET (ALTERATE A OR B), AD FIAL EPOXY PAVEMET MARKIGS. ROADWAYS TO BE ADDRESSED ARE JACKSO GAP ST, E 71ST AVE, ROBERTSDALE ST, E 68TH AVE, AD VALLEY HEAD ST. "ALTERATE A" - SLURRY SEAL COAT OR "ALTERATE B" - MICRO-SURFACIG SEAL COAT SHALL BE ADDED TO THE BASE BID COTRACT, I REGARDS TO THE SPECIFIC TYPE OF SEAL COAT TREATMET TO BE SELECTED FOR THIS PROJECT. REFERECE DIVISIO ALTERATES FOR ADDITIOAL IFORMATIO. SCHEDULE C: COCRETE PAVEMET REHABILITATIO - THIS SCHEDULE WILL REQUIRE FULL DEPTH PAEL REMOVAL AD REPLACEMET WITH COCRETE CLASS E (6 HOUR), AD PARTIAL DEPTH SPALL REPAIRS, OF COCRETE PAVEMET ALOG PEÑA BLVD, E 75TH AVE, E 78TH AVE, AD OTHER SERVICE ROADS AS IDETIFIED. QUATITIES OF WORK ARE TYPICALLY LOW PRODUCTIO AD SCATTERED THROUGHOUT DE PROPERTY. SHEET IDEX SHEET UMBER SHEET TITLE GEERAL 001 TITLE SHEET 002 PROJECT DESCRIPTIO & SHEET IDEX 003 CDOT M&S STADARDS PLAS LIST 004 GEERAL OTES 005 SUMMARY OF APPROXIMATE QUATITIES SCHEDULE A 006 SCHEDULE A - PROJECT LOCATIO MAP 007 TABULATIO OF QUATITIES (A) 008 TABULATIO OF QUATITIES (A) 009 TYPICAL SECTIO (A) 010 REMOVAL PLA (A) 011 ROADWAY PLA (A) 012 STRIPIG PLA (A) SCHEDULE B 013 SCHEDULE B - PROJECT LOCATIO MAP 014 TABULATIO OF QUATITIES (B) 015 WORK LIMIT DETAILS (B) SCHEDULE C SHEET IDEX SHEET UMBER SHEET TITLE 034 PROJECT LOCATIO MAP 16 (C) 035 PROJECT LOCATIO MAP 17 (C) 036 PROJECT LOCATIO MAP 18 (C) 037 PROJECT LOCATIO MAP 19 (C) SCHEDULE D 038 SCHEDULE D - PROJECT LOCATIO MAP (1) 039 SCHEDULE D - PROJECT LOCATIO MAP (2) 040 TABULATIO OF QUATITIES (D) 041 WORK LIMIT DETAILS (D) \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_I.dwg SCHEDULE D: MOD GRIDIG - THIS SCHEDULE WILL REQUIRE COCRETE PAVEMET MOD GRIDIG ALOG PEÑA BLVD BETWEE PICADILLY AD JACKSO GAP ST, ICLUDIG RE-SEALIG ALL PAVEMET JOITS AD FIAL EPOXY PAVEMET MARKIGS AS MOD GRIDIG IS COMPLETED. TRAFFIC COTROL - ALL WORK O PEA BLVD WILL BE PERFORMED DURIG IGHT TIME HOURS, AS APPROVED BY AIRPORT OPERATIOS. 016 SCHEDULE C - PROJECT LOCATIO MAP 017 TABULATIO OF QUATITIES (C) 018 TYPICAL SECTIO (C) 019 PROJECT LOCATIO MAP 1 (C) 020 PROJECT LOCATIO MAP 2 (C) 021 PROJECT LOCATIO MAP 3 (C) 022 PROJECT LOCATIO MAP 4 (C) 023 PROJECT LOCATIO MAP 5 (C) 024 PROJECT LOCATIO MAP 6 (C) 025 PROJECT LOCATIO MAP 7 (C) 026 PROJECT LOCATIO MAP 8 (C) 027 PROJECT LOCATIO MAP 9 (C) 028 PROJECT LOCATIO MAP 10 (C) 029 PROJECT LOCATIO MAP 11 (C) 030 PROJECT LOCATIO MAP 12 (C) 031 PROJECT LOCATIO MAP 13 (C) 032 PROJECT LOCATIO MAP 14 (C) 033 PROJECT LOCATIO MAP 15 (C) Print 2017-APRL_I.dwg PROJECT DESCRIPTIO & SHEET IDEX Sheet Subset: GEERAL 2 of 5 002

3 \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SP.dwg EW OR REVISED STADARD PLA SHEETS APPLICABLE TO THIS PROJECT, IDICATED BY A MARKED BOX, CA BE FOUD O CDOT'S WEB SITE AT THE FOLLOWIG ADDRESS: Print 2017-APRL_SP.dwg CDOT M&S STADARDS PLAS LIST Sheet Subset: GEERAL 3 of 5 003

4 GEERAL OTES: 1. THE IFORMATIO SHOW O THESE PLAS COCERIG TYPE, SIZE AD LOCATIO OF EXISTIG UTILITIES (UDER AD ABOVE GROUD) IS OT GUARATEED TO BE ACCURATE OR ALL ICLUSIVE. THE COTRACTOR IS RESPOSIBLE FOR MAKIG A IDEPEDET DETERMIATIO AS TO THE TYPE AD LOCATIO OF UTILITIES AS ECESSARY TO AVOID DAMAGE. THE COTRACTOR SHALL COTACT THE UTILITY OTIFICATIO CETER OF COLORADO AT A MIIMUM OF 48 HOURS PRIOR TO AY EXCAVATIO AS REQUIRED BY LAW. DETERMIATIO OF UTILITY DEPTH WITHI AREAS OF EXCAVATIO SHALL BE DETERMIED USIG HIGH PRESSURE WATER AS ECESSARY TO AVOID DAMAGE. 2. THE COTRACTOR SHALL BE RESPOSIBLE FOR REPAIR OF DAMAGE DUE TO COSTRUCTIO ACTIVITIES ICLUDIG, BUT OT LIMITED TO, AY FACILITIES, PAVEMET, PAVEMET MARKIG, LIGHTIG, UTILITIES, SIGS, STRUCTURES, AD OTHER ASSOCIATED APPURTEACES. AY DISTURBED AREA OUTSIDE THE COSTRUCTIO LIMITS WILL BE THE COTRACTOR'S RESPOSIBILITY TO REESTABLISH. 3. THE COTRACTOR SHALL PREPARE A METHOD FOR HADLIG TRAFFIC (MHT) AD SUBMIT SHUTDOW REQUESTS I THE FOLLOWIG SEQUECE: MHT'S SHALL BE SUBMITTED FOR REVIEW AD APPROVAL AT LEAST 5 DAYS BEFORE SUBMITTIG A SHUTDOW REQUEST. SHUTDOW REQUEST SHALL BE SUBMITTED AT LEAST 5 DAYS BEFORE WORK IS TO BEGI. O WORK IMPACTIG TRAFFIC SHALL BE PERFORMED WITHOUT A APPROVED SHUTDOW REQUEST. EACH MHT SHALL COMPLY WITH MUTCD, CDOT, AD CITY STADARDS. 4. THE USE OF A UIFORMED POLICE AGECY OFFICER AD MARKED POLICE VEHICLE IS ICLUDED I THE PROJECT FOR WORK PERFORMED DURIG IGHTTIME HOURS O PEA BLVD, AS APPROVED BY THE DE PROJECT MAAGER. THE TOTAL UMBER OF HOURS REQUIRED FOR UIFORMED TRAFFIC COTROL, ICLUDIG MIIMUM SHIFT HOURS REQUIRED BY THE AGECY, SHALL BE APPROVED BY THE DE PROJECT MAAGER PRIOR TO SCHEDULIG BY THE COTRACTOR. HOURS OF UIFORMED TRAFFIC COTROL THAT ARE OT AUTHORIZED OR APPROVED WILL OT BE PAID FOR BY DE, AD WILL BE AT THE COTRACTORS EXPESE. HOURS THAT HAVE BEE SCHEDULED BUT CACELED WITHOUT MIIMUM OTICE REQUIRED BY THE AGECY WILL OT BE PAID FOR BY DE, AD WILL BE AT THE COTRACTOR'S EXPESE. SCHEDULIG OF UIFORMED TRAFFIC COTROL WILL OT BE MEASURED AD PAID FOR SEPARATELY, BUT SHALL BE ICIDETAL TO THE WORK. 5. AT THIS TIME, IT IS ATICIPATED A IGHTLY COORTIO MEETIG WILL BE HELD AT 4:00PM O THE IGHT OF THE SCHEDULED WORK FOR PEA BLVD. THIS MEETIG IS ITEDED TO DISCUSS AY OPERATIOAL IMPACTS OR WEATHER THAT WILL PROHIBIT WORK COMMECIG. REFER TO DIVISIO 02 SPECIFICATIO SECTIO TRAFFIC COTROL PLA - GEERAL FOR REQUIREMETS FOR WORKIG O PEA BLVD. THIS MEETIG SHALL BE KOW AS THE "GO-OR-O GO" MEETIG, COORTED BY THE DE PROJECT MAAGER WITH THE COTRACTOR'S PARTICIPATIO. ALL COSTS ASSOCIATED WITH THIS MEETIG OR AY OTHER COORIDATIO SHALL BE ICIDETAL TO THE WORK. 6. THE COTRACTOR SHALL ETER AD EXIT THE WORK AREAS AT LOCATIOS DESIGATED I THE APPROVED MHT. 13. ALL MATERIAL GEERATED WITHI THE PROJECT LIMITS SHALL BE DISPOSED OF PROPERLY OFF-SITE AD SHALL BE ICIDETAL TO THE PROJECT. 14. ASPHALT MILLIGS SHALL REMAI THE PROPERTY OF DE AD SHALL BE STOCKPILED O THE PROJECT FOR DE FIELD MAITEACE TO PICK UP. COORTE THROUGH THE DE PROJECT MAAGER FOR STOCKPILE LOCATIO AD PICK UP TIMES. THIS WORK WILL OT BE MEASURED AD PAID FOR SEPARATELY BUT SHALL BE ICLUDED I THE WORK. 15. A ASPHALT APPLICATIO RATE OF 110 LBS/SQUARE YARD-ICH WAS USED TO DETERMIE PLA QUATITY FOR ITEM HOT MIX ASPHALT (GRADIG SX) (75) (PG 64-22). 16. ASPHALT PAVEMET SMOOTHESS SHALL BE CATEGORY IV. 17. EMULSIFIED ASPHALT FOR TACK COAT SHALL BE DILUTED AT A RATE OF 50% EMULSIO AD 50% WATER OR GREATER. EMULSIFIED ASPHALT WILL OT BE PAID FOR SEPARATELY, BUT SHALL BE ICLUDED I THE WORK. 18. A EMULSIO COTET OF 12.0% (BASED O DRY UIT WEIGHT OF AGGREGATE) AD AGGREGATE APPLICATIO RATE OF 22 LBS/SY WAS USED TO DETERMIE PLA QUATITIES FOR ITEM SLURRY SEAL COAT. ACTUAL EMULSIO COTET TO BE MEASURED AD PAID FOR SHALL BE DETERMIED BY THE SUBMITTED AD APPROVED MIX DESIG. SEAL COAT SHALL BE TYPE III. 19. A EMULSIO COTET OF 10.5% (BASED O DRY UIT WEIGHT OF AGGREGATE) AD AGGREGATE APPLICATIO RATE OF 30 LBS/SY WAS USED TO DETERMIE PLA QUATITIES FOR ITEM MICRO-SURFACIG SEAL COAT. ACTUAL EMULSIO COTET TO BE MEASURED AD PAID FOR SHALL BE DETERMIED BY THE SUBMITTED AD APPROVED MIX DESIG. SEAL COAT SHALL BE TYPE III. 20. AY TEMPORARY COSTRUCTIO EQUIPMET GREATER THA 20 FEET I HEIGHT, OR GREATER THA THE HEIGHT OF AY ADJACET STREET LIGHT POLES, WILL REQUIRE OTICE TO THE FAA VIA THE 7460 OTICE OF PROPOSED COSTRUCTIO OR ALTERATIO PROCESS. IT IS OT ATICIPATED A FAA 7460 WILL BE REQUIRED FOR THIS PROJECT. IF THE COTRACTOR FORESEES A EED TO SUBMIT A 7460, COTACT THE DE PROJECT MAAGER IMMETELY. 21. PAY ITEM MOBILIZATIO (LS) SHALL OT EXCEED 5% OF THE BID. REFER TO DE TECHICAL SPECIFICATIOS DIVISIO I - GEERAL REQUIREMETS, SECTIO MOBILIZATIO FOR FURTHER DETAILS. 22. ITEMS REMOVAL OF ASPHALT MAT AD HOT MIX ASPHALT (PATCHIG) (ASPHALT) SHALL BE USED AT THE DISCRETIO OF THE DE PROJECT MAAGER ICLUDIG BUT OT LIMITED TO ASPHALT PATCH REPAIRS, AD TEMPORARY ASPHALT DETOUR PAVEMET TO AIDE I COCRETE PAEL REPLACEMETS. \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_G.dwg 7. TRAFFIC ALTERATIOS AD ROADWAY CLOSURES SHALL BE REMOVED DAILY AD FULL USE OF THE ROADWAY SHALL BE RESTORED AT THE ED OF EACH WORK SHIFT, ULESS OTHERWISE APPROVED BY THE DE PROJECT MAAGER, ICLUDIG FULL COMPLIACE STRIPIG. 8. DEVER WATER HYDRAT USE, COSTRUCTIO WATER: THE COTRACTOR WILL BE REQUIRED TO OBTAI A HYDRAT METER PERMIT FROM DEVER WATER LISTIG EACH HYDRAT USED AD A WATER TAK WAGO PERMIT FOR EACH TAK WAGO USED. THE PERMIT(S) SHALL BE I POSSESSIO OF THE COTRACTOR AT THE HYDRAT DURIG THE TIME THE HYDRAT IS BEIG USED. HYDRAT METER PERMITS WILL BE VALID FOR A PERIOD OF OE (1) YEAR FROM THE TIME OF ISSUACE OR UTIL COTRACT COMPLETIO, WHICHEVER OCCURS FIRST. AY DAMAGE DOE TO THE HYDRAT BY THE COTRACTOR WILL BE REPAIRED BY DEVER WATER, WITH THE ACTUAL COST OF SUCH REPAIRS BILLED TO THE COTRACTOR. I ACCORDACE WITH DEVER WATER'S EGIEERIG STADARDS AD OPERATIG RULES, COTRACTOR SHALL PROVIDE AD USE THE REQUIRED, APPROVED, AD PROPERLY SUPPORTED FIRE HYDRAT METER, BACK FLOW PREVETIO ASSEMBLY, AD GATE VALVE. THE COTRACTOR IS SUBJECT TO DEVER WATER'S HYDRAT USE RULES, REGULATIOS, AD FIES FOR VIOLATIO. THE COTRACTOR SHALL ARRAGE BILLIG FOR WATER USE THROUGH DEVER WATER. 9. THE COTRACTOR SHALL PREVET SEDIMET, DEBRIS AD ALL OTHER POLLUTATS FROM ETERIG THE STORM SEWER SYSTEM DURIG ALL COSTRUCTIO OPERATIOS THAT ARE PART OF THIS PROJECT. THE COTRACTOR SHALL BE HELD RESPOSIBLE FOR REMETIO OF AY ADVERSE IMPACTS TO THE MUICIPAL SEPARATE STORM SEWER SYSTEM, RECEIVIG WATERS, WATERWAYS, WETLADS, AD/OR OTHER PUBLIC OR PRIVATE PROPERTIES, RESULTIG FROM WORK DOE AS PART OF THIS PROJECT. 10. THE COTRACTOR SHALL PROTECT ALL STORM SEWER FACILITIES ADJACET TO AY LOCATIO WHERE PAVEMET CUTTIG OPERATIOS IVOLVIG WHEEL CUTTIG, SAW CUTTIG, OR ABRASIVE WATER JET CUTTIG ARE TO TAKE PLACE. THE COTRACTOR SHALL REMOVE AD PROPERLY DISPOSE OF ALL WASTE PRODUCTS GEERATED BY SAID CUTTIG OPERATIOS O A DAILY BASIS OR AS EEDED THROUGHOUT THE WORK DAY. THE DISCHARGE OF AY WATER COTAMIATED BY WASTE PRODUCTS FROM CUTTIG OPERATIOS TO THE STORM SEWER SYSTEM IS PROHIBITED. (SEC A, C; REVISED MUICIPAL CODE, CITY AD COUTY OF DEVER). 11. SAW CUTTIG AD COTAIMET OF SAW RESIDUE SHALL OT BE MEASURED AD PAID FOR SEPARATELY BUT SHALL BE ICLUDED I THE COST OF WORK. 12. ALL MATERIALS USED O THIS PROJECT SHALL BE O THE COLORADO DEPARTMET OF TRASPORTATIO'S APPROVED PRODUCTS LIST OR APPROVED BY THE DE PROJECT MAAGER. 23. WHE THE COTRACT DOES OT ICLUDE PAY ITEMS FOR AY WORK OR SUBMITTALS THAT ARE LISTED I THESE PLAS, THIS WORK WILL OT BE PAID FOR SEPARATELY BUT SHALL BE ICLUDED I THE WORK. 24. THE ACCEPTACE OF CLASS E COCRETE PAVEMET SHALL BE DETERMIED BY COMPRESSIVE STREGTH FOR THIS PROJECT. 25. O EQUIPMET SHALL BE STORED WITHI THE MIIMUM CLEAR ZOE DISTACE MEASURED FROM THE EDGE OF THE TRAVELED WAY. 26. ALL STATIOIG OTED I THE PLAS IS FOR REFERECE OLY TO DETERMIE PLA QUATITY. THE COTRACTOR IS RESPOSIBLE FOR MARKIG STATIOIG ALOG EACH ALIGMET AS EEDED TO COMPLETE THE WORK ACCURATELY. WHE USED TO DETERMIE QUATITIES ASSOCIATED WITH PAY ITEMS, THE DE FIELD REPRESETATIVE SHALL VERIFY STATIOIG FOR ACCURACY AD SHALL OTIFY THE DE PROJECT MAAGER OF AY DISCREPACIES. 27. A PORTIO OF VALLEY HEAD ST IS LOCATED OUTSIDE OF THE CITY AD COUTY OF DEVER AD SHALL REQUIRE A PUBLIC RIGHT-OF-WAY PERMIT FOR WORK I ADAMS COUTY. THE COTRACTOR IS RESPOSIBLE FOR OBTAIIG THIS PERMIT AD ALL ASSOCIATED COSTS SHALL BE AT THE COTRACTORS EXPESE AD SUBMITTED TO THE DE PROJECT MAAGER FOR PROJECT RECORDS. Print 2017-APRL_G.dwg GEERAL OTES Sheet Subset: GEERAL 4 of 5 004

5 \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SQ.dwg Print 2017-APRL_SQ.dwg SUMMARY OF APPROXIMATE QUATITIES Sheet Subset: GEERAL 5 of 5 005

6 ECOOMY PARKIG LOT E 78TH AVE \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-A_LM.dwg GU CLUB RD E 75TH AVE PIKES PEAK PARKIG LOT BEGI PROJECT STA= ED PROJECT STA= JACKSO GAP ST IBOUD PEA BLVD EMPLOYEE PARKIG LOT OUTBOUD PEA BLVD EMPLOYEE PARKIG LOT Print 2017-APRL_SCH-A_LM.dwg SCHEDULE A - PROJECT LOCATIO MAP Sheet Subset: SCHEDULE A 1 of 7 ASPHALT OVERLAY 006

7 \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-A_TB.dwg Print 2017-APRL_SCH-A_TB.dwg TABULATIO OF QUATITIES (A) Sheet Subset: SCHEDULE A 2 of 7 ASPHALT OVERLAY 007

8 \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-A_TB.dwg Print 2017-APRL_SCH-A_TB.dwg TABULATIO OF QUATITIES (A) Sheet Subset: SCHEDULE A 3 of 7 ASPHALT OVERLAY 008

9 EXISTIG WIDTH OF PAVEMET (VARIES) 6' 6' SEE ROADWAY PLA 2% TYP 3" - HMA (GR SX) (75) (PG 64-22) 1" - HMA (GR SX) (75) (PG 64-22) - LEVELIG COURSE 2% TYP AGGREGATE BASE COURSE (CLASS 6) (SHOULDERIG) 10:1 MAX EXISTIG PAVEMET 10:1 MAX A 011 TYPICAL SECTIO ASPHALT OVERLAY \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-A_TY01.dwg BEGI REMOVAL (PLAIG) 3" EXISTIG PAVEMET 150' (TYP) LIMITS OF ASPHALT OVERLAY REMOVAL OF COCRETE PAVEMET (PLAIG) OR REMOVAL OF ASPHALT MAT (PLAIG), AS APPLICABLE B 010 TYPICAL SECTIO REMOVALS (PLAIG) ED REMOVAL (PLAIG) EXISTIG PAVEMET Print 2017-APRL_SCH-A_TY01.dwg TYPICAL SECTIO (A) Sheet Subset: SCHEDULE A 4 of 7 ASPHALT OVERLAY 009

10 IBOUD PEA BLVD 150.0' 9' 9.0' ED REMOVAL (PLAIG) STATIO= ED REMOVAL (PLAIG) STATIO= ' 150.0' 9' 36' 8' 36' 18' BEGI REMOVAL (PLAIG) STATIO= ED REMOVAL (PLAIG) STATIO= OFFSET= ' 9.0' ADUST MAHOLE - 2 EA ADJUST VALVE BOX - 1 EA B 009 8' 42' BEGI REMOVAL (PLAIG) STATIO= ' 8' \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-A_RMPL.dwg PIKES PEAK PARKIG LOT ADUST MAHOLE - 3 EA ADJUST VALVE BOX - 3 EA 150.0' BEGI REMOVAL (PLAIG) STATIO= OFFSET= ' 74.4' ELK ST 100.0' 50.0' ED OF EXISTIG COCRETE PAVEMET LEGED: REMOVAL OF COCRETE PAVEMET (PLAIG) REMOVAL OF ASPHALT MAT (PLAIG) Print 2017-APRL_SCH-A_RMPL.dwg REMOVAL PLA (A) Sheet Subset: SCHEDULE A 5 of 7 ASPHALT OVERLAY 010

11 009 IBOUD PEA BLVD STATIO= STATIO= STATIO= STATIO= ED ASPHALT OVERLAY STATIO= ' 65' 65' 67' 65' 56' BEGI ASPHALT OVERLAY STATIO= STATIO= OFFSET=33.80 A \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-A_RDPL.dwg PIKES PEAK PARKIG LOT 75' ELK ST STATIO= OFFSET=250.94R LEGED: AGGREGATE BASE COURSE (CLASS 6) (SHOULDERIG) HOT MIX ASPHALT (GR SX) (75) (PG 64-22) Print 2017-APRL_SCH-A_RDPL.dwg ROADWAY PLA (A) Sheet Subset: SCHEDULE A 6 of 7 ASPHALT OVERLAY 011

12 IBOUD PEA BLVD ED PROJECT LIMITS 4" SKIP WHITE (10/30) (LAE LIE) - 30 LF TOTAL 4" SOLID WHITE (EDGE LIE) LF SOLID WHITE TUR ARROW (7 EA AS SHOW) 15.5 SF/EA (108.5 SF TOTAL) ED PROJECT LIMITS 4" SOLID DOUBLE YELLOW (CETER LIE) LF 8" SOLID WHITE (CHAELIZIG LIE) LF 4" SOLID DOUBLE YELLOW (CETER LIE) LF 8" SOLID WHITE (CHAELIZIG LIE) LF 4" SOLID WHITE (EDGE LIE) LF 4" SOLID DOUBLE YELLOW (CETER LIE) LF 4" SOLID WHITE (EDGE LIE) LF 4" SKIP WHITE (10/30) (LAE LIE) - 30 LF TOTAL 4" SOLID DOUBLE YELLOW (CETER LIE) LF 8" SOLID WHITE (CHAELIZIG LIE) LF SEE DETAIL A (THIS SHEET) \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-A_STR.dwg PIKES PEAK PARKIG LOT 2'x10' SOLID WHITE (STOPLIE) - 20 SF 4" SOLID WHITE LF 2'x10' SOLID WHITE (STOPLIE) - 20 SF ELK ST 8" SOLID WHITE (CHAELIZIG LIE) LF OTES: ED PROJECT LIMITS 1. TOTAL QUATITY OF ITEM PAVEMET MARKIG PAIT (WATERBORE) (FOR TEMPORARY PAVEMET MARKIGS) MAY VARY DEPEDET O COTRACTOR'S PROPOSED PHASIG PLA. 2'X12' SOLID WHITE (STOPLIE) - 24 SF 8" SOLID WHITE (CHAELIZIG LIE) - 71 LF 8" SOLID WHITE (CHAELIZIG LIE) - 74 LF 4.0' 4.0' 70.8' 74.0' 4" SOLID WHITE GOAL HATCH (4' O CETER) LF 4" SOLID WHITE (PERIMETER) LF DETAIL A STRIPIG DETAIL Print 2017-APRL_SCH-A_STR.dwg STRIPIG PLA (A) Sheet Subset: SCHEDULE A 7 of 7 ASPHALT OVERLAY 012

13 E-470 PEA BLVD PIKES PIKES PEAK PEAK PARKIG PARKIG LOT LOT DETAIL A SHEET 015 JACKSO GAP ST EMPLOYEE PARKIG LOT BEGI PROJECT STATIO= EMPLOYEE PARKIG LOT ED PROJECT STATIO= DEVER AEXATIO LIE BEGI PROJECT STATIO= MT. ELBERT PARKIG LOT ED PROJECT STATIO= DETAIL B SHEET 015 E 68TH AVE ED PROJECT STATIO= \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-B_LM.dwg E 56TH AVE DE AIRPORT PROPERTY LIE BEGI PROJECT STATIO= VALLEY HEAD ST E 64TH AVE Print 2017-APRL_SCH-B_LM.dwg SCHEDULE B - PROJECT LOCATIO MAP Sheet Subset: SCHEDULE B 1 of 3 SEAL COAT 013

14 \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-B_TB.dwg Print 2017-APRL_SCH-B_TB.dwg TABULATIO OF QUATITIES (B) Sheet Subset: SCHEDULE B 2 of 3 SEAL COAT 014

15 STATIO= JACKSO GAP ST DETAIL A WORK LIMITS (RECYCLE YARD ACCESS & JACKSO GAP ST) ROBERTSDALE ST DETAIL B WORK LIMITS (ROBERTSDALE ST & FAA TRACO) STATIO= MT ELBERT PARKIG LOT STATIO= FAA TRACO STATIO= \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-B_DT01.dwg STATIO= STATIO= RECYCLE YARD E 68TH AVE Print 2017-APRL_SCH-B_DT01.dwg WORK LIMIT DETAILS (B) Sheet Subset: SCHEDULE B 3 of 3 SEAL COAT 015

16 TOWER RD PROJECT LOCATIO IB/OB PEA BLVD E-470 TO JACKSO GAP ST E-470 PROJECT LOCATIO E 78TH AVE & EW CASTLE ST GU CLUB RD PROJECT LOCATIO E 75TH AVE PROJECT LOCATIO IB/OB PEA BLVD E-470 TO JACKSO GAP ST \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM.dwg E 64TH AVE PROJECT LOCATIO IB/OB PEA BLVD I-70 TO E 64TH AVE E 56TH AVE GREE VALLEY RACH BLVD VALLEY HEAD ST Print 2017-APRL_SCH-C_LM.dwg SCHEDULE C - PROJECT LOCATIO MAP 1 of 22 COCRETE REHAB 016

17 \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_TB.dwg Print 2017-APRL_SCH-C_TB.dwg TABULATIO OF QUATITIES (C) 2 of 22 COCRETE REHAB 017

18 LEGTH AD WIDTH AS SHOW I PLAS LEGTH AD WIDTH AS SHOW I PLAS EXISTIG PAVEMET EXISTIG PAVEMET EXISTIG PAVEMET EXISTIG PAVEMET MATCH EXISTIG SLOPE EXISTIG SUBGRADE UCLASSIFIED EXCAVATIO (CIP) ICH (MAX.)** REMOVAL OF COCRETE PAVEMET DRIVE LAE ICH (TYP.)** SHOULDER - 6 ICH (TYP.)** EXISTIG SUBGRADE COCRETE CLASS E (6 HOUR) DRIVE LAE - 15 ICH (MAX.)** SHOULDER ICH (MAX.)** \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_TY01.dwg TYPICAL REMOVAL SECTIO OTES: ** ACTUAL DEPTH OF EXCAVATIO AD COCRETE CLASS E (6 HOUR) WILL BE AT THE DISCRETIO OF THE DE PROJECT MAAGER OR FIELD REPRESETATIVE. VERIFICATIO OF DEPTHS AD DETERMIIG STABLE SUBGRADE SHALL BE GIVE APPROVAL BY THE DE PROJECT MAAGER AD/OR DESIGATED REPRESETATIVE. TYPICAL SECTIO Print 2017-APRL_SCH-C_TY01.dwg TYPICAL SECTIO (C) 3 of 22 COCRETE REHAB 018

19 KEY MAP E GU CLUB RD 024 JACKSO GAP ST OTES: OUTBOUD PEA BLVD 1. AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. RTD (A LIE) \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg IBOUD PEA BLVD IB-019-A Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 1 (C) 4 of 22 COCRETE REHAB 019

20 KEY MAP E GU CLUB RD 024 JACKSO GAP ST OTES: OB-020-B OB-020-A OB-020-C OB-020-F OB-020-E OB-020-D OB-020-G OB-020-H OB-020-I OB-020-J OB-020-L OB-020-M OB-020-K OB-020- TO -S OB-020-T OB-020-U OB-020-W OUTBOUD PEA BLVD OB-020-V OB-020-X 1. AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg IB-020-B IB-020-A IB-020-C IB-020-D PEA BLVD TO GU CLUB RD IBOUD PEA BLVD Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 2 (C) 5 of 22 COCRETE REHAB 020

21 KEY MAP OB-021-B OB-021-A OUTBOUD PEA BLVD OB-021-E OB-021-D OB-021-C E GU CLUB RD JACKSO GAP ST OTES: 1. AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg IBOUD PEA BLVD PEA BLVD TO GU CLUB RD C A B D E F G Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 3 (C) 6 of 22 COCRETE REHAB 021

22 KEY MAP PEA BLVD TO COOCO/FIAL APPROACH E GU CLUB RD 024 JACKSO GAP ST OTES: OUTBOUD PEA BLVD 1. AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg IBOUD PEA BLVD IB-022-B IB-022-A IB-022-C IB-022-D IB-022-E IB-022-F IB-022-G IB-022-H Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 4 (C) 7 of 22 COCRETE REHAB 022

23 KEY MAP D B A F H G E C E 75TH AVE E-470 OTES: GU CLUB RD JACKSO GAP ST GU CLUB RD 1. AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg PIKES PEAK PARKIG LOT Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 5 (C) 8 of 22 COCRETE REHAB 023

24 KEY MAP OUTBOUD PEA BLVD E GU CLUB RD 024 JACKSO GAP ST OTES: 1. AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. IBOUD PEA BLVD \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg A B C D E 75TH AVE Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 6 (C) 9 of 22 COCRETE REHAB 024

25 KEY MAP IBOUD PEA BLVD E GU CLUB RD JACKSO GAP ST OTES: 1. AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg E 75TH AVE A JACKSO GAP ST Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 7 (C) 10 of 22 COCRETE REHAB 025

26 KEY MAP RTD (A LIE) E GU CLUB RD 024 JACKSO GAP ST OTES: E 78TH AVE C 1. AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO A B \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg JACKSO GAP ST Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 8 (C) 11 of 22 COCRETE REHAB 026

27 KEY MAP IBOUD PEA BLVD IB-027-A E GU CLUB RD 024 JACKSO GAP ST OTES: 1. AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg FIRE STATIO 35 E 75TH AVE Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 9 (C) 12 of 22 COCRETE REHAB 027

28 KEY MAP EMPLOYEE PARKIG LOT E GU CLUB RD 024 JACKSO GAP ST OTES: OUTBOUD PEA BLVD OB-028-B OB-028-A OB-028-D OB-028-C OB-028-E OB-028-F OB-028-J OB-028-H OB-028-G OB-028-I OB-028-L OB-028-K 1. AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg IB-028-A IB-028-B IB-028-C IB-028-D IB-028-E IB-028-F E 75TH AVE IB-028-G IBOUD PEA BLVD Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 10 (C) 13 of 22 COCRETE REHAB 028

29 KEY MAP EMPLOYEE PARKIG LOT E GU CLUB RD 024 JACKSO GAP ST OTES: 1. AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. OB-029-B OB-029-F OB-029-D OB-029-C OB-029-E OB-029-A OB-029-H OB-029-I OB-029-G OB-029-J OB-029-K OB-029-L OUTBOUD PEA BLVD OB-029- OB-029-M OB-029-P OB-029-O 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg IBOUD PEA BLVD E 75TH AVE IB-029-A Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 11 (C) 14 of 22 COCRETE REHAB 029

30 KEY MAP OUTBOUD PEA BLVD RETUR TO TERMIAL E-470 OTES: GU CLUB RD 024 JACKSO GAP ST AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. BLUE MUSTAG 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg IB-030-A IB-030-B IB-030-C IB-030-D IBOUD PEA BLVD E 75TH AVE Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 12 (C) 15 of 22 COCRETE REHAB 030

31 KEY MAP IBOUD PEA BLVD IB-031-G E-470 OTES: GU CLUB RD JACKSO GAP ST AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg RETUR TO TERMIAL IB-031-A TO -B IB-031-C TO -D IB-031-E TO -F Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 13 (C) 16 of 22 COCRETE REHAB 031

32 KEY MAP E GU CLUB RD 024 JACKSO GAP ST OTES: IB-032-F IB-032-D IB-032-C IB-032-E IB-032-H IB-032-G SHADY GROVE ST 1. AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg IBOUD PEA BLVD IB-032-A TO -B Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 14 (C) 17 of 22 COCRETE REHAB 032

33 FROM TERMIAL WEST KEY MAP FROM TERMIAL EAST E GU CLUB RD JACKSO GAP ST OTES: 1. AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg OUTBOUD PEA BLVD OB-033-B OB-033-A RTD (A LIE) Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 15 (C) 18 of 22 COCRETE REHAB 033

34 KEY MAP E GU CLUB RD 024 JACKSO GAP ST OTES: 1. AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg C-034-A C-034-C C-034-B Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 16 (C) 19 of 22 COCRETE REHAB 034

35 KEY MAP E GU CLUB RD 024 JACKSO GAP ST OTES: 1. AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg C-035-C C-035-A C-035-B Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 17 (C) 20 of 22 COCRETE REHAB 035

36 KEY MAP C-036-E C-036-C C-036-B C-036-D E GU CLUB RD JACKSO GAP ST C-036-A OTES: OB-036-G TO -M 1. AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. OB-036-D TO -F OB-036-C \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg EW CASTLE ST OB-036-A OUTBOUD PEA BLVD OB-036-B WEST ECOOMY PARKIG LOT Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 18 (C) 21 of 22 COCRETE REHAB 036

37 KEY MAP E GU CLUB RD 024 JACKSO GAP ST OTES: IB-037-A IB-037-B IB-037-C TO -U TO LEVEL 4, 6 TERMIAL EAST TO LEVEL 5 TERMIAL EAST 1. AERIAL IMAGES ARE FOR REFERECE OLY. LAE COFIGURATIOS AD STRIPIG SHOW MAY OT REFLECT EXISTIG CODITIOS. 2. THE COTRACTOR SHALL VERIFY THE LOCATIOS OF ACTUAL WORK TO BE PERFORMED. THE DE PROJECT MAAGER MAY ADJUST THE LOCATIO AD/OR QUATITY OF PAEL REPLACEMETS BASED O THE ACTUAL CODITIO OF THE PAELS AT THE TIME OF COSTRUCTIO. \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-C_LM-PAELS.dwg EAST PARKIG GARAGE Print 2017-APRL_SCH-C_LM-PAELS.dwg PROJECT LOCATIO MAP 19 (C) 22 of 22 COCRETE REHAB 037

38 RTD A LIE \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-D_LM.dwg DETAIL A SHEET 041 PICADILLY BEGI OB PEA - MOD GRID STATIO= BEGI IB PEA - MOD GRID STATIO= DETAIL E SHEET 041 STATIO= STATIO= DETAIL D SHEET E 78TH AVE COECTOR COOCO/ FIAL APPROACH ED OB PEA - MOD GRID STATIO= STATIO= DETAIL E SHEET DETAIL A SHEET 041 ED IB PEA - MOD GRID STATIO= GU CLUB RD DETAIL A SHEET 041 MATCHLIE STATIO Print 2017-APRL_SCH-D_LM.dwg SCHEDULE D - PROJECT LOCATIO MAP (1) Sheet Subset: SCHEDULE D 1 of 4 MOD GRID 038

39 E 78TH AVE RTD A LIE \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-D_LM.dwg MATCHLIE STATIO PIKES PEAK PARKIG LOT E 75TH AVE TO AIRPORT STATIO= DETAIL C SHEET ED OB PEA - MOD GRID STATIO= DETAIL B SHEET 041 ED IB PEA - MOD GRID (LEFT LAE OLY) STATIO= JACKSO GAP ST Print 2017-APRL_SCH-D_LM.dwg SCHEDULE D - PROJECT LOCATIO MAP (2) Sheet Subset: SCHEDULE D 2 of 4 MOD GRID 039

40 \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-D_TB.dwg Print 2017-APRL_SCH-D_TB.dwg TABULATIO OF QUATITIES (D) Sheet Subset: SCHEDULE D 3 of 4 MOD GRID 040

41 ED ASPHALT PAVEMET BRIDGE EXPASIO JOIT 2.5' BEGI COCRETE PAVEMET 12' LAE 12' LAE TOTAL WIDTH 38.5' 12' LAE DETAIL C WORK LIMIT DETAILS - O-RAMP (JACKSO GAP ST TO OB PEA BLVD) BEGI 8" SOLID WHITE CHAELIZIG LIE DETAIL A WORK LIMIT DETAILS - BRIDGE LOCATIOS \\diagis05\-projects\landside\projects\2017\_cad Directory\Annual Pavement Rehabilitation Landside 2017\CAD_Files\2017-APRL_SCH-D_DT01.dwg TOTAL WIDTH 12' DETAIL B WORK LIMIT DETAILS - BRIDGE LOCATIOS 12' LAE BRIDGE EXPASIO JOIT DETAIL D WORK LIMIT DETAILS - O-RAMP DETAIL E WORK LIMIT DETAILS - OFF-RAMP ED 8" SOLID WHITE CHAELIZIG LIE Print 2017-APRL_SCH-D_DT01.dwg WORK LIMIT DETAILS (D) Sheet Subset: SCHEDULE D 4 of 4 MOD GRID 041

SILO SERVICE & MAINTENANCE DIVISION MAINTENANCE SPARES REPAIRS UPGRADES INSTALLATION

SILO SERVICE & MAINTENANCE DIVISION MAINTENANCE SPARES REPAIRS UPGRADES INSTALLATION SILO SERVICE & DIVISION SPARES REPAIRS UPGRADES INSTALLATION SPIROTECH-SRD GROUP LTD, ESTABLISHED DESIGNERS AND SUPPLIERS OF CONVEYING SYSTEMS AND SPECIALIST FABRICATIONS FOR ALL INDUSTRIES, OFFER A FULL

More information

5 Environmental Best Practices for Maintenance Activities

5 Environmental Best Practices for Maintenance Activities Evirometal Best Practices for Maiteace Activities 5 Evirometal Best Practices for Maiteace Activities The Evirometal Best Practices (BPs) i this documet have bee demostrated to be a effective ad practical

More information

BaanErp5.0b Manufacturing Product Configuration (PCF)

BaanErp5.0b Manufacturing Product Configuration (PCF) BaaErp5.0b Maufacturig Product Cofiguratio (PCF) Fuctioal Release Iformatio P3096A US Documetiformatio Documet Documet code : P3096A US Documet group : Product Iformatio Documet title : Product Cofiguratio

More information

BaanERP Distribution Item Sales Data

BaanERP Distribution Item Sales Data BaaERP Distributio Module Procedure UP028A US Documetiformatio Documet Documet code : UP028A US Documet group : User Documetatio Documet title : Editio : A Date : May 1998 Copyright 1998 Baa Developmet

More information

Production Order Costing

Production Order Costing BaaERP 5.0c Maufacturig Productio Order Costig Module Procedure UP127A US Documetiformatio Documet Documet code : UP127A US Documet group : User Documetatio Documet title : Productio Order Costig Applicatio/Package

More information

design brief Acceptance Testing Summary contents

design brief Acceptance Testing Summary contents desig brief Acceptace Testig Summary The State of Califoria s Title 24 Buildig Eergy Efficiecy Stadards have log provided atioal leadership i improvig buildig eergy efficiecy. First itroduced i the 2005

More information

INTRODUCTION. Authors:

INTRODUCTION. Authors: SJI First Editio CJ-Series Stadard Specificatios for Composite Steel Joists, Weight Tables, Bridgig Tables ad Code of Stadard Practice A Brief Overview Authors: Perry S. Gree, Techical Director, 3127 Mr.

More information

Maintaining Good Cleaning Practices

Maintaining Good Cleaning Practices Maitaiig Good Cleaig Practices Kathlee Kedrick Validatio Techology Maager NEPDA Meetig o PDA TR29 November 12, 2008 http://pdachapters.org/eweglad The Cleaig Program Life Cycle Cleaig Program Lifecycle

More information

OPTIONS AND PLANNING DIMENSIONS

OPTIONS AND PLANNING DIMENSIONS OPTIONS AND PLANNING DIMENSIONS KONE TrasitMaster 165/185 horizotal autowalk KONE TRANSITMASTER PRODUCT RANGE Well desiged ad maufactured autowalks are a must for today s highly demadig public areas. They

More information

Procedure Statistical Assessment of Sample Test Results

Procedure Statistical Assessment of Sample Test Results BAM - 3.2: Sectio Pressure Equipmet Pressure Receptacles; Fuel Gas Storage Systems 26 th September 204 Techical Aex Statistical Assessmet Samples (SAS) of the Cocept Additioal Tests (CAT): Procedure Statistical

More information

CITY OF NEW WESTMINSTER BUILDING CODE DATA SEE CODE REPORT BY GBA, DATED JULY 19, 2012, FOR DETAILED INFORMATION. GROUP D GROUP F3

CITY OF NEW WESTMINSTER BUILDING CODE DATA SEE CODE REPORT BY GBA, DATED JULY 19, 2012, FOR DETAILED INFORMATION. GROUP D GROUP F3 David orman ARCHITECTinc. Aintree Drive T 0.98.0 orth Vancouver, BC F 0.98.09 CITY OF EW WESTMISTER BUILDIG CODE DATA SEE CODE REPORT BY GBA, D JULY 9, 0, FOR DETAILED IFORMATIO. CODE EDITIO: MAJOR OCCUPACIES:

More information

U.S. POSTAL SERVICE SAFETY AND WORKPLACE ASSISTANCE HUMAN RESOURCES WASHINGTON DC Handbook EL-812 Hazardous Materials and Spill Response

U.S. POSTAL SERVICE SAFETY AND WORKPLACE ASSISTANCE HUMAN RESOURCES WASHINGTON DC Handbook EL-812 Hazardous Materials and Spill Response U.S. POSTAL SERVICE SAFETY AND WORKPLACE ASSISTANCE HUMAN RESOURCES WASHINGTON DC 20260-4231 Hadbook EL-812 Hazardous Materials ad Spill Respose May 1998 i TABLE OF CONTENTS I INTRODUCTION... 1 II TITLE

More information

PAPER. SPCC regs. Should I be worried about SPCC? 8 things you need to know.

PAPER. SPCC regs. Should I be worried about SPCC? 8 things you need to know. PAPER SPCC regs Should I be worried about SPCC? 8 thigs you eed to kow. Spill Prevetio Cotrol ad Coutermeasures (SPCC) may apply to you if you have large quatities of oils, fuels, or other oil-based fluids

More information

Innovative Solutions for Your Gas Processing Needs

Innovative Solutions for Your Gas Processing Needs Iovative Solutios for Your Gas Processig Needs A Track Record of Success More tha 250 compaies aroud the world at over 600 of their operatig facilities use Hutsma amies today for processig their sour gas.

More information

DENVER PUBLIC SCHOOLS

DENVER PUBLIC SCHOOLS LEGED HARDSCAPE TO DEMOLISH MILL VS. DEMOLITIO TBD BY GEOTECH REPORT ITEMS/AREAS TO DEMOLISH (DEMO) SHRUB TO DEMOLISH ITEMS TO SALVAGE SAW CUTS PARCEL BOUDARY T.S. DEMO 3 BACKSTOPS DEMO 3 STOES OF WALK

More information

Energy. Global Solutions

Energy. Global Solutions Eergy. Global Solutios > Fossil Fuel > Reewable Global Eergy Solutios Reold is a global egieerig group with over 130 years of experiece i the desig ad maufacture of high-quality power trasmissio products

More information

Poly Series. Polymer Preparation Unit. Your Choice, Our Commitment

Poly Series. Polymer Preparation Unit. Your Choice, Our Commitment Poly Series Polymer Preparatio Uit Your Choice, Our Commitmet 02 Solutios for Water & Idustry Polymer Preparatio Uit The POlY Series of Polymer Preparatio Uits, has bee specifically desiged to provide

More information

This guide assists printers to understand the Finsbury Green Star Rating (FGSR) questionnaire by:

This guide assists printers to understand the Finsbury Green Star Rating (FGSR) questionnaire by: A GUIDE TO THE FINSBURY GREEN STAR RATING This guide assists priters to uderstad the Fisbury Gree Star Ratig (FGSR) questioaire by: clarifyig the meaig of questios outliig scorig criteria i greater detail

More information

Waterways: Working for America. Waterways transportation keeps commerce on the move, with fewer societal impacts than truck or rail.

Waterways: Working for America. Waterways transportation keeps commerce on the move, with fewer societal impacts than truck or rail. A Ilad Marie Highway for Freight America s ilad river barge system moves freight more safely ad more efficietly tha rail or truck. It is a key compoet of the trasportatio etwork ad essetial our coutry

More information

Endangered Species and Pesticides Mariposa County Workshop December 11, 2013

Endangered Species and Pesticides Mariposa County Workshop December 11, 2013 Edagered Species ad Pesticides Mariposa Couty Workshop December 11, 2013 Leopoldo Moreo Evirometal Scietist Departmet of Pesticide Regulatio (916)324-3888 pmoreo@cdpr.ca.gov Edagered Species i the U.S.

More information

Introduction. Sacramento River Bank Protection Project: Phase II Supplemental Authorization Informational Meeting

Introduction. Sacramento River Bank Protection Project: Phase II Supplemental Authorization Informational Meeting Itroductio Sacrameto River Bak Protectio Project: Phase II Supplemetal Authorizatio Iformatioal Meetig Sacrameto River Bak Protectio Project US Army Corps Outlie Program Overview Backgroud / History Phase

More information

High Strength Epoxy Tested in Accordance to ICC-ES AC308

High Strength Epoxy Tested in Accordance to ICC-ES AC308 ADHESIVE ANCHORING SYSTEMS DESCRIPTION/SUGGEST SPECIFICATIONS* *Suggested Specificatios see pages RH The epoxy resi ad hardeer are completely mixed as they are dispesed from the dual cartridge through

More information

State-of-the-art technology you can build on.

State-of-the-art technology you can build on. State-of-the-art techology you ca build o. 2 Itroductio The ew productio facility a ivestmet i the future. Numerous uclear power statios ad high-efficiecy fossil-fuelled power plats with outputs of over

More information

Baan Central Invoicing Sales Invoicing

Baan Central Invoicing Sales Invoicing Baa Cetral Ivoicig Sales Ivoicig Module Procedure UP006A US Documetiformatio Documet Documet code : UP006A US Documet group : User Documetatio Documet title : Sales Ivoicig Applicatio/Package : Baa Cetral

More information

Operational Excellence

Operational Excellence Road Map to Operatioal Excellece i the Process Idustries This is a two ad oe half day semiar Oil ad Gas Productio for you, the Process Idustry Executive, Pipelies Plat Maager ad your Direct Reports Oil

More information

Costing in Vaccine Planning and Programming

Costing in Vaccine Planning and Programming Costig i Vaccie Plaig ad Programmig This work is licesed uder a Creative Commos Attributio-NoCommercial-ShareAlike Licese. Your use of this material costitutes acceptace of that licese ad the coditios

More information

PAPER HAZARDOUS WASTE. Ways. to Avoid HAZWASTE FINES!

PAPER HAZARDOUS WASTE. Ways. to Avoid HAZWASTE FINES! PAPER HAZARDOUS WASTE Ways to Avoid HAZWASTE FINES! Catastrophic chemical spills ad their resultig huge six- to eight-figure fies make the headlie ews ad serve as bold remiders of what happes whe thigs

More information

USING A MAP OF SHORT TERM STATISTICS IN THE PROCESS OF ORGANIZING BUSINESS SURVEYS

USING A MAP OF SHORT TERM STATISTICS IN THE PROCESS OF ORGANIZING BUSINESS SURVEYS Jacek Kowalewski Cetral Statistical Office of olad Statistical Office i ozań USING A MA OF SHORT TERM STATISTICS IN THE ROCESS OF ORGANIZING BUSINESS SURVEYS Short-term statistics (STS) ivolves collectig,

More information

ICM Internationales Congress Center München DETAILS FOYER GROUND FLOOR including technical specifi cations

ICM Internationales Congress Center München DETAILS FOYER GROUND FLOOR including technical specifi cations DETAILS FOYER GROUND FLOOR icludig techical specifi catios Areas/rooms Area i m² Foyer Groud Floor 4,850 (North: 2,530, South: 2,275) Commuicative Heart with a Sophisticated Atmosphere Groud Floor The

More information

Skills Essential for the Successful Completion of the Forest Measurements Section of the MSU Forestry Summer Field Program

Skills Essential for the Successful Completion of the Forest Measurements Section of the MSU Forestry Summer Field Program Page 1 of 3 Skills Essetial for the Successful Completio of the Forest Measuremets Sectio of the MSU Forestry Summer Field Program Commuity College studets who trasfer to the MSU Forestry program are expected

More information

Hyperchill precision chilled water.

Hyperchill precision chilled water. Hyperchill precisio chilled water www.domickhuter.com 1 Idustrial Chillers Hyperchill: Precisio Chilled Water domick huter Hyperchill water chillers celebrate a presece of over 30 years o the idustrial

More information

PROVO-OREM BUS RAPID TRANSIT

PROVO-OREM BUS RAPID TRANSIT PROVO-OREM BUS RAPD TRANST evirometal Assessmet Executive Summary The Preferred Alterative BRT will have a estimated 6,400 riders per day i 2030, compared to 3,600 curret riders per day o bus route 830.

More information

MEDIA: WN PDS #: LOCATION: Forrest City WWTP. System. of SFC 209 CITY: Forrest City, AR 8/1/20122 RESPONSIBL LE OFFICIAL 7/31/2017 PERMIT WATER

MEDIA: WN PDS #: LOCATION: Forrest City WWTP. System. of SFC 209 CITY: Forrest City, AR 8/1/20122 RESPONSIBL LE OFFICIAL 7/31/2017 PERMIT WATER AME: Forrest City WWTP LOCATIO: Approximately 3 miles West of Forrest City, at the end of SFC 209 CITY: Forrest City, AR 72336 AME: / TITLE W. H. Calvin Murdock, / Manager COMPAY: Forrest City WWTP MAILIG

More information

Page 1 of 23. Approved by the Resolution of the Management Board No 126/32/17 of May 23rd effective as of May 31st 2017

Page 1 of 23. Approved by the Resolution of the Management Board No 126/32/17 of May 23rd effective as of May 31st 2017 Detailed Tradig ad Clearig Rules for CHP property rights to certificates of origi for electricity geerated i high- efficiecy combied heat ad power uits Approved by the Resolutio of the Maagemet Board No

More information

EVALUATION OF CONCRETE HOMOGENEITY IN MASSIVE STRUCTURAL ELEMENT OF HYDROELECTRIC POWER PLANT BY MEANS OF NONDESTRUCTIVE IMPULSE RESPONSE METHOD

EVALUATION OF CONCRETE HOMOGENEITY IN MASSIVE STRUCTURAL ELEMENT OF HYDROELECTRIC POWER PLANT BY MEANS OF NONDESTRUCTIVE IMPULSE RESPONSE METHOD Czech Society for Nodestructive Testig NDE for Safety / DEFEKTOSKOPIE October - November, - Seč u Chrudimi - Czech Republic EVALUATION OF CONCRETE HOMOGENEITY IN MASSIVE STRUCTURAL ELEMENT OF HYDROELECTRIC

More information

Analysis of hybrid manufacturing systems based on additive manufacturing technology

Analysis of hybrid manufacturing systems based on additive manufacturing technology Solid Freeform Fabricatio 2017: Proceedigs of the 28th Aual Iteratioal Solid Freeform Fabricatio Symposium A Additive Maufacturig Coferece Reviewed Paper Aalysis of hybrid maufacturig systems based o additive

More information

How to define interface patterns in model-based system engineering

How to define interface patterns in model-based system engineering How to defie iterface patters i model-based system egieerig Idraja Elžbieta Germaaitė Departmet of Iformatio Systems Kauas Uiversity of Techology Kauas, Lithuaia e-mail: idraja.germaaite@ktu.lt Prof. dr.

More information

Brammer Standard Company, Inc.

Brammer Standard Company, Inc. Brammer Stadard Compay, Ic. Certificate of Aalysis BS 1018 Certified Referece Material for AISI 1018 - UNS Number G10180 Certified Estimate of Certified Values 3 Certified Estimate of Value 1 Ucertaity

More information

Facade systems. Technical specification. ExoTec facade panel and fixing system

Facade systems. Technical specification. ExoTec facade panel and fixing system Facade systems Techical specificatio ExoTec facade pael ad fixig system AUSTRALIA APRIL 2017 CONTENTS 1 applicatio ad scope 2 1.1 Applicatio 2 1.2 Scope 2 1.3 Specific desig ad detailig 2 2 desig 3 2.1

More information

Trend Terrazzo Tile. Waterproofing/Crack Isolation Crack Isolation Adhesives Sealant Grout

Trend Terrazzo Tile. Waterproofing/Crack Isolation Crack Isolation Adhesives Sealant Grout Tred Terrazzo Tile Waterproofig/Crack Isolatio Crack Isolatio Adhesives Sealat Grout The LATICRETE products i this brochure are recommeded for istallig Tred Terrazzo Tiles. A overview of each recommeded

More information

34-44 FREIGHT DRIVE SOMERTON VICTORIA ,740 sqm s Sold or Leased Commenced early stages construction

34-44 FREIGHT DRIVE SOMERTON VICTORIA ,740 sqm s Sold or Leased Commenced early stages construction 34-44 FREIGHT DRIVE SOMERTON VICTORIA 3062 3,740 sqm s Sold or Leased Commeced early stages costructio INTRODUCTION Freight Drive sets a ew bechmark for busiess parks, differetiatig itself from its competitors

More information

MOVING PEOPLE IN LOW- TO MID-RISE BUILDINGS

MOVING PEOPLE IN LOW- TO MID-RISE BUILDINGS MOVING PEOPLE IN LOW- TO MID-RISE BUILDINGS KONE MooSpace A GREAT EXPERIENCE FROM DAY ONE Twety years ago, we pioeered the revolutioary machie room-less elevator. Iovatio cotiues to drive us to improve

More information

""' \ \ \ WPOO~. WP002. Stanley Consultants 1NC. 1 of 1 0. Received by USACE: September 13, 2017

' \ \ \ WPOO~. WP002. Stanley Consultants 1NC. 1 of 1 0. Received by USACE: September 13, 2017 SI. LEGAcY LLC KIMWELL CORP. -- UTAH DEPARTMET Of TRASPORTATIO - ooooll WPOO~. WP WP ~ z ~ _J ::::i (/) z u i';j --' z DESIGED DRAW ROB CHECKED RB MROVED ~ MROVED @ 9-7-7 --- '-..._ ""' \ \ \... Stanley

More information

OUTLIERS AND SOME NON-TRADITIONAL MEASURES OF LOCATION IN ANALYSIS OF WAGES

OUTLIERS AND SOME NON-TRADITIONAL MEASURES OF LOCATION IN ANALYSIS OF WAGES Europea Scietific Joural September 0 /SPECIAL/ editio Vol. ISSN: 857 788 (Prit) e - ISSN 857-73 OUTLIERS AND SOME NON-TRADITIONAL MEASURES OF LOCATION IN ANALYSIS OF WAGES Mila Terek, Prof., PhD Matúš

More information

SHRM CUSTOMIZED PAID LEAVE BENCHMARKING REPORT

SHRM CUSTOMIZED PAID LEAVE BENCHMARKING REPORT SHRM CUSTOMIZED PAID LEAVE BENCHMARKING REPORT THANK YOU FOR ORDERING A SHRM CUSTOMIZED PAID LEAVE Your report is based o the followig criteria: SELECTION CRITERIA Idustry: Staff Size: Chemical Maufacturig

More information

Pumps & Mixers for Water and Wastewater

Pumps & Mixers for Water and Wastewater Our techology. Your success. Pumps Valves Service Pumps & Mixers for Water ad Wastewater 02 Pumps Submersible motor pumps Amarex N Submersible No-Clog Pump Discharge Size: up to 4 Q (gpm): up to 840 H

More information

Brammer Standard Company, Inc.

Brammer Standard Company, Inc. Brammer Stadard Compay, Ic. Certificate of Aalysis BS 101/5 Referece Material for Basic Oxyge Furce Slag 1 Certified Estimate of Certified Values 4 Certified Estimate of Value 2 Ucertaity 3 Value 2 Ucertaity

More information

Material Safety Data Sheet Food Grade Roller Grease NSF/USDA H1 (NH980008)

Material Safety Data Sheet Food Grade Roller Grease NSF/USDA H1 (NH980008) Last Reviewed: Apr 2013 Next Review Due: Apr 2016 Material Safety Data Sheet Food Grade Roller Grease NSF/USDA H1 (NH980008) MSDS-P-012 1. Product ad Compay Idetificatio IDENTIFIED USES: USES ADVISED AGAINST:

More information

LECTURE - 5 M/M/1/N QUEUING MODEL. Learning objective To discuss single server finite queues (M/M/1/N queues)

LECTURE - 5 M/M/1/N QUEUING MODEL. Learning objective To discuss single server finite queues (M/M/1/N queues) ECTURE - 5 M/M// QUEUIG MODE earig objective To discuss sigle server fiite queues (M/M// queues) 9.8 Queuig model with a fiite queue I real cases, queues ever become ifiite, but are limited due to space,

More information

Roxul ComfortBatt. Thermal Batt Insulation for Residential & Commercial Construction

Roxul ComfortBatt. Thermal Batt Insulation for Residential & Commercial Construction Thermal Batt Isulatio for Residetial & Commercial Costructio Thermal batt isulatio Superior Buildig Evelope Performace Roxul Comfortbatt is a semi-rigid batt isulatio desiged specifically for wood ad steel

More information

Instruction Handbook for Installation, Operation and Maintenance.

Instruction Handbook for Installation, Operation and Maintenance. F:\LK_Chadresh_2015_BOX & MANUALS\KENT\Maual\Export\Ket Maxx Date:09-3-15 Job: XXX Double Purificatio UV+UF Istructio Hadbook for Istallatio, Operatio ad Maiteace. GOLD MEMBER March, 2015 For customer

More information

Metropolitan Cities s Waste Transportation Model

Metropolitan Cities s Waste Transportation Model Available olie at www.sciecedirect.com Procedia - Social ad Behavioral Scieces 65 ( 0 ) 046 053 Iteratioal Cogress o Iterdiscipliary Busiess ad Social Sciece 0 (ICIBSoS 0) Metropolita Cities s Waste Trasportatio

More information

ORACLE COMMERCE CLOUD INTRODUCTION TO PROMOTIONS

ORACLE COMMERCE CLOUD INTRODUCTION TO PROMOTIONS ORACLE COMMERCE CLOUD INTRODUCTION TO PROMOTIONS INTRODUCTION Oracle Commerce Cloud makes it easy to create ad maage promotios, but we kow it takes more coordiatio creativity aalytical kow-how to deliver

More information

SMALL PACKAGES FOR 1-10 KG BAGS

SMALL PACKAGES FOR 1-10 KG BAGS HAVER & BOECKER HAVER CHEMICALS FOR 1-10 KG BAGS The HAVER & BOECKER Compay HAVER & BOECKER FILLING TECHNOLOGY The fully automatic fillig machies are especially suited for fillig bulk materials i the buildig

More information

DRUG-FREE WORKPLACE POLICY

DRUG-FREE WORKPLACE POLICY DRUG-FREE WORKPLACE POLICY 2 DISCLAIMER DISCLAIMER: Piacol Assurace is providig this resource for iformatioal purposes oly. It is ot desiged for use by ay reader, busiess or eterprise, or is this iteded

More information

MRI Pilot Systems. Optimizing Treatment Strategies

MRI Pilot Systems. Optimizing Treatment Strategies MRI Pilot systems MRI Pilot Systems Optimizig Treatmet Strategies MRI Pilot systems P redict treatmet efficacy with MRI Pilot Systems. Meurer Research, Ic. (MRI) bega buildig products to ehace water ad

More information

Custom Manufacturing Solutions

Custom Manufacturing Solutions Cao Virgiia, Ic. Custom Maufacturig Solutios CONTRACT MANUFACTURING REVERSE LOGISTICS MOLD MAKING Cao Put our good ame to work for yours. C-a--o-. Five letters that are syoymous with quality the world

More information

Facade systems. Installation guide. ExoTec facade panel and fixing system

Facade systems. Installation guide. ExoTec facade panel and fixing system Facade systems Istallatio guide ExoTec facade pael ad fixig system AUSTRALIA APRIL 2017 CONTeNTS 1 INTRODUCTION 2 2 INSTALLATION OVeRVIeW 3 3 PRODUCT INFORMATION 4 ExoTec facade pael 4 Accessories/tools

More information

Environmental, energetic and economic life-cycle assessment from cradle to cradle (3E-C2C) of buildings assemblies

Environmental, energetic and economic life-cycle assessment from cradle to cradle (3E-C2C) of buildings assemblies Evirometal, eergetic ad ecoomic life-cycle assessmet from cradle to cradle (3E-C2C) of buildigs assemblies José Diis Silvestre Assistat Techical Uiversity of Lisbo (TUL) - IST - Departmet of Civil Egieerig,

More information

Determination of Optimum Temperature and Moisture Content for Crop Germination

Determination of Optimum Temperature and Moisture Content for Crop Germination Determiatio of Optimum Temperature a Moisture Cotet for Crop Germiatio Yusuf* K. O., Iyaa, M. O. a Olayiwola, T. E Departmet of Agricultural a Biosystems Egieerig, Uiversity of Ilori, Ilori, Nigeria. *Correspoig

More information

2017 Kansas Flint Hills Update

2017 Kansas Flint Hills Update 2017 Kasas Flit Hills Update Douglas Watso, Meteorologist Chief, Moitorig ad Plaig Sec:o Bureau of Air Kasas Departmet of Health ad Eviromet CeSARA Fall 2017 Busiess Mee:g St. Louis, MO October 10, 2017

More information

Products and Applications

Products and Applications Uiclass L32232:L344 Cl/SfB (23)+(27) Ff4 Products ad Applicatios build with ease Cotets Itroductio 1 Performace ad Beefits 2 Buildig types 4 Applicatios 8 Build Systems 12 Solutios 14 Products 22 Service

More information

In the United States, every party to

In the United States, every party to Whe exporters ad freight-forwarders parter for compliace, both stad to beefit Exporters ad freight-forwarders should work together ad share their kowledge to esure that their trasactios comply with applicable

More information

n N E W I N S T A L L A T I O N S n

n N E W I N S T A L L A T I O N S n These types of surface fiishes look beautiful ad ca be very durable whe protected ad maitaied properly. Polished couters are ormally less porous the other surfaces. However, they are susceptible to staiig.

More information

Design and Thermal Analysis of a Supercritical CFB Boiler

Design and Thermal Analysis of a Supercritical CFB Boiler eissn: 2487X Desig ad Thermal Aalysis of a Supercritical CFB Boiler JUKURI.RAMAKRISHNA DEPARTMENT OF MECHANICAL NEWTONS INSTITUTE OF SCIENCE & TECHNOLOGY ABSTRACT A boiler is a closed vessel i which water

More information

CHAPTER 8: CONFIDENCE INTERVAL ESTIMATES for Means and Proportions

CHAPTER 8: CONFIDENCE INTERVAL ESTIMATES for Means and Proportions CHAPTER 8: CONFIDENCE INTERVAL ESTIMATES for Meas ad Proportios Itroductio: We wat to kow the value of a parameter for a populatio. We do t kow the value of this parameter for the etire populatio because

More information

Number of Households, ACS Five-Year Estimate

Number of Households, ACS Five-Year Estimate Marylad Food System Profile II Frederick Couty, MD Demographics These couty profiles preset the data compiled by the Marylad Food System Map Project, at the Johs Hopkis Ceter for a Livable Future. They

More information

Storage and Warehousing

Storage and Warehousing Warehouse Fuctios Storage ad Warehousig Chapter 0 Provide temporary storage of goods Put together customer orders Serve as a customer service facility Protect goods Segregate hazardous or cotamiated materials

More information

Installation Instructions

Installation Instructions IMPORTANT NOTES 1. Failure to istall, fiish or maitai this product i accordace with applicable buildig codes, regulatios, stadards ad James Hardie s writte applicatio istructios may lead to persoal ijury,

More information

Asbestos: The survey guide

Asbestos: The survey guide Health ad Safety Asbestos: The survey guide This is a free-to-dowload, web-friedly versio of HSG264 (Secod editio, published 2012). This versio has bee adapted for olie use from HSE s curret prited versio.

More information

of the power plat uits is also importat i load schedulig optimizatio formulatio. I this paper, a formulatio of UCELS optimizatio problem of Combied Cy

of the power plat uits is also importat i load schedulig optimizatio formulatio. I this paper, a formulatio of UCELS optimizatio problem of Combied Cy DYNAMIC LOAD SCHEDULING OPTIMIZATION OF POWER PLANTS S Moha Kumar* Scietist, Departmet of Research, ABB Global Idustries ad Services Ltd, Bagalore, Idia. moha.s.kumar@i.abb.com (Correspodig author) Abstract

More information

AN ASSESSMENT OF AEROBIC COMPOST QUALITY: COLLECTION AND ANALYSES OF EXISTING ONTARIO DATA

AN ASSESSMENT OF AEROBIC COMPOST QUALITY: COLLECTION AND ANALYSES OF EXISTING ONTARIO DATA AN ASSESSMENT OF AEROBIC COMPOST QUALITY: COLLECTION AND ANALYSES OF EXISTING ONTARIO DATA Preseted at the Natioal Compost Coferece The Compost Coucil of Caada September -3, 23 Toroto, Otario Lambert Otte,

More information

South Saskatchewan River Watershed Stewards Inc. Saskatchewan Watershed Authority

South Saskatchewan River Watershed Stewards Inc. Saskatchewan Watershed Authority Saskatchewa Watershed Authority South Saskatchewa River Watershed Stewards Ic. Table of Cotets 1. Commets from Participats 1 1.1 A message from your Watershed Advisory Committees 1 2. Watershed Protectio

More information

Contact us. Corrosion Mapping and Monitoring. James Fisher NDT. James Fisher NDT

Contact us. Corrosion Mapping and Monitoring. James Fisher NDT. James Fisher NDT Cotact us T: +44 (0) 1244 520058 F: +44 (0) 1244 535440 E: cotact@jfdt.com W: www.jfdt.com James Fisher NDT James Fisher NDT Corrosio Mappig ad Moitorig James Fisher NDT Uit 44, First Aveue, Deeside Idustrial

More information

Transportation Network Vulnerability

Transportation Network Vulnerability rasportatio Network Vulerability Vulerability Scaig Methodology Applied to Multiple Logistics rasport Networks Qiaqia Du, Kuihiro Kishi, Nobuori Aiura, ad akashi Nakatsuji rasport is a fudametal part of

More information

Installation Instructions

Installation Instructions IMPORTANT NOTES 1. Failure to istall, fiish or maitai this product i accordace with applicable buildig codes, regulatios, stadards ad James Hardie s writte applicatio istructios may lead to persoal ijury,

More information

IV. Summary of Findings. his report was written to inform the public about studies that industry says prove fields are safe.

IV. Summary of Findings. his report was written to inform the public about studies that industry says prove fields are safe. I N D U S T R Y S C L A I M S IV. Summary of Fidigs Careful readig of the 22 studies o idustry s list shows that may of them had serious testig flaws ad limitatios. T his report was writte to iform the

More information

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY Guidance on restoration of City Rights-of-Way Public Works Department Directors Office 747 Market Street Suite 408 Tacoma, WA 98402 253-591-5525 Right-of-Way

More information

Strategic Management Checklist

Strategic Management Checklist Strategic Maagemet Checklist for LeadigAge PA Members 3 Strategic Plaig 3 3 3 Fiacial Viability Goverace Operatios/Huma Resources a associatio of ot-for-profit seior services Itroductio LeadigAge PA has

More information

Rainwater systems. Guidelines for design and installation. Comprehensive gutter and downpipe systems in zinc RAINWATER SYSTEMS

Rainwater systems. Guidelines for design and installation. Comprehensive gutter and downpipe systems in zinc RAINWATER SYSTEMS RAINWATER SYSTEMS Raiwater systems Comprehesive gutter ad dowpipe systems i zic Guidelies for desig ad istallatio Uiclass L73141:P45 CI/SfB (52.5) Hh7 September 2017 Cotets Raiwater systems 3... Why use

More information

SECTION 4 WATER RESOURCES

SECTION 4 WATER RESOURCES Slippery Rock Creek Watershed Coservatio Pla Jue 2011 Beaver, Butler, Lawrece, Mercer, Veago Couties, PA Ohio River Basi SECTION 4 WATER RESOURCES A. INTRODUCTION Good water quality is essetial to the

More information

A Sewer System Optimization Hydraulic Design Model

A Sewer System Optimization Hydraulic Design Model Joural of Evirometal Iformatics 7(2) 66-74 (2006) 06JEI00068 1726-2135/1684-8799 2006 ISEIS www.iseis.org/jei A Sewer System Optimizatio Hydraulic Desig Model H. T. Weg * ad S. L. Liaw Graduate Istitute

More information

Request for Proposal: Due October 11, :00 pm

Request for Proposal: Due October 11, :00 pm Remove and replace approx. 6000 sq. ft. of asphalt, clean and tack 1200 sq. ft. of low spots, seal coat and stripe parking lot at 1030 Temple Ave Camarillo, CA 93010 Request for Proposal: Due October 11,

More information

6. Managing the challenges of tourism in protected areas

6. Managing the challenges of tourism in protected areas 6. Maagig the challeges of tourism i protected areas 6.1 Maagemet of risk ad safety All outdoor recreatio ivolves some level of risk. Dealig with such risk is a importat compoet of park tourism maagemet.

More information

THE DRACULA DYNAMIC TRAFFIC NETWORK MICROSIMULATION MODEL

THE DRACULA DYNAMIC TRAFFIC NETWORK MICROSIMULATION MODEL THE DRACULA DYNAMIC TRAFFIC NETWORK MICROSIMULATION MODEL Roghui Liu Istitute for Trasport Studies Uiversity of Leeds Leeds LS2 9JT UK Paper first preseted at the Iteratioal Symposium o Trasport Simulatio,

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

GUIDE ON SAMPLING FOR ANALYSIS OF FOODS

GUIDE ON SAMPLING FOR ANALYSIS OF FOODS No. 12 (214) Page: 1 (49) Date: February 214 GUIDE ON SAMPLING FOR ANALYSIS OF FOODS CONTENTS PREFACE... 2 1. INTRODUCTION... 3 2. DEFINITIONS... 3 3. AIM OF SAMPLING... 6 4. PROJECT DESCRIPTION INCLUDING

More information

APPENDIX A. Hydrologic Modeling of SunCreek Specific Plan, Analysis of Impacts to Groundwater Flow Direction and Gradients

APPENDIX A. Hydrologic Modeling of SunCreek Specific Plan, Analysis of Impacts to Groundwater Flow Direction and Gradients APPENDIX A Hydrologic Modelig of SuCreek Specific Pla, Aalysis of Impacts to Groudwater Flow Directio ad Gradiets Hydrologic Modelig of SuCreek Specific Pla Aalysis of Impacts to Groudwater Flow Directio

More information

Development Rate Monitoring (DRM)

Development Rate Monitoring (DRM) MCEE 505 Lithography Materials ad Processes Page 1 of 5 Developmet Rate Moitorig (DRM) Microelectroic Egieerig 1. OBJECTIVE The objective of this experimet is to uderstad ad characterize the developmet

More information

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS

SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3

More information

Criteria in Designing of Compressed Air Installation in Foundry Plants

Criteria in Designing of Compressed Air Installation in Foundry Plants ARCHIVES of FOUNDRY ENGINEERING DOI: 10.2478/afe-2014-0094 Published quarterly as the orga of the Foudry Commissio of the Polish Academy of Scieces ISSN (2299-2944) Volume 14 Issue 4/2014 103 108 Criteria

More information

MODELLING OF HVAC SYSTEM COMPONENTS FOR BUILDING DYNAMIC SIMULATION

MODELLING OF HVAC SYSTEM COMPONENTS FOR BUILDING DYNAMIC SIMULATION 13th Coferece of Iteratioal Buildig rformace Simulatio Associatio, Chambéry, Frace, August 26-28 MODELLING OF HVAC SYSTEM COMPONENTS FOR BUILDING DYNAMIC SIMULATION Luigi Schibuola, Massimiliao Scarpa,

More information

BCP DEPOSIT OUTPERFORMANCE BOND

BCP DEPOSIT OUTPERFORMANCE BOND BCP DEPOSIT AN INNOVATIVE DEPOSIT BASED SOLUTION DESIGNED TO GENERATE POTENTIAL RETURNS IN EXCESS OF CURRENTLY LOW BANK DEPOSIT INTEREST RATES. THE BOND WILL TRACK A LEADING MULTI-ASSET FUND WITH A SUCCESSFUL

More information

APPLICATION PROCEDURE FOR

APPLICATION PROCEDURE FOR OCBC Bak (Malaysia) Berhad (295400-W) Busiess Bakig Commercial Service Cetre : 1300-88-7000 OCBC Al-Ami Bak Berhad (818444-T) Busiess Bakig Commercial Service Cetre : 1300-88-0255 Meara OCBC, 18 Jala Tu

More information

An overview of ISO Anti-bribery management system standard WORKSHOP

An overview of ISO Anti-bribery management system standard WORKSHOP Committee o Ati-Corruptio (CAC) Lima, Peru 2016 A overview of ISO 37001 Ati-bribery maagemet system stadard WORKSHOP Marti Mauhwa & Jaime Satamaria [07 December 2016] 2016 GIACC 1 Subjects to be covered

More information

SYSTEM KAN-therm. High quality. universality. advantageous price. simple assembly. The modern water and heat installations

SYSTEM KAN-therm. High quality. universality. advantageous price. simple assembly.  The modern water and heat installations SYSTEM KAN-therm System KAN-therm Steel ad KAN-therm Iox High quality uiversality advatageous price simple assembly The moder water ad heat istallatios SYSTEM KAN-therm Steel ad Iox New quality i steel

More information

curtain wall Product Selector Reliance Reliance -IG SS Reliance -SS Reliance -TC Reliance -TC IG CW-250 ICW-250

curtain wall Product Selector Reliance Reliance -IG SS Reliance -SS Reliance -TC Reliance -TC IG CW-250 ICW-250 curtai wall Product Selector Reliace Reliace -IG SS Reliace -SS Reliace -TC Reliace -TC IG CW-250 ICW-250 See Blast Mitigatio ad Hurricae Resistat sectios for additioal Curtai Wall products Sectio 2 RBC

More information

IMPACTS OF OPERATIONAL CHANGES ON LLW SCALING FACTORS

IMPACTS OF OPERATIONAL CHANGES ON LLW SCALING FACTORS WM 04 Coferece, February 9- March 4, 004, Tucso, AZ IMPACTS OF OPERATIONAL CHANGES ON LLW SCALING FACTORS D. W. James D. W. James & Associates 855 Village Ceter Drive #330 North Oaks, MN 557 ABSTRACT Sice

More information

Customer Journey Design for Guiding Communications Service Providers

Customer Journey Design for Guiding Communications Service Providers Customer Jourey Desig for Guidig Commuicatios Service Providers Abstract I the past, commuicatios service providers (CSPs) were focused o buildig ad ruig a superior ad ef ciet etwork with the ext priority

More information

GA1.0 GENERAL NOTES ARCHITECTURAL ABBREVIATIONS FLORIDA PRODUCT APPROVAL MANUFACTURER BASIS OF DESIGN PLUMBING FIXTURE COUNT*

GA1.0 GENERAL NOTES ARCHITECTURAL ABBREVIATIONS FLORIDA PRODUCT APPROVAL MANUFACTURER BASIS OF DESIGN PLUMBING FIXTURE COUNT* AB ACOUST ADJ AFF AHU ALT ALUM AOD AP APPRO ARCH AT BD BFE BLDG BM BOT BUR C.F.C.I. CAB CG CI CJ CL CLO CMU CT COL COC COST COT COTR CORR CPT CT DET DIA DIAG DIM DISP D DWG EB EJ EL ELEC ELEV EP EQ EQUIP

More information