1 ELECTRICAL SAFETY INSPECTION REPORT K.L FASHION LTD. 75/1, Mudafa West, Master Bari, Tongi, Gazipur, Bangladesh Factory List: 1. Inspected by: Jobair Ibna Abdul Alim Report Generated by: Jobair Ibna Abdul Alim Inspected on September 4 th 2014
2 SUMMARY K.L FASHION LTD. is housed in a G+2 storied owned industrial building with 2 shades. One of the shade is for boiler another is for Generator and substation. The factory was constructed gradually started from 2004 and ended in But the production started in The total building height is approximately 9.23m and total floor area is about 25,000sqft. There are 600 workers working for the factory. The Factory was surveyed for electrical safety by Woosun Energy and Construction Co., Ltd. (WEC). The purpose of the survey was to identify significant electrical safety issues and to provide recommendations for remediation based on applicable standards specified by the Accord. The scope of this initial electrical safety inspection was limited to the review and identification of major electrical safety issues. The inspection did not include identification of minor deficiencies, which will be further addressed as part of follow-up inspections. Table below summarizes the major electrical safety issues identified during the inspection. Recommendations have been provided to address each issue. An implementation schedule shall be developed by the factory to remediate each of the findings. The Specific timing of improvements, including any requested extensions due to design / installation constraints shall be submitted to the Accord for approval. Page 2 of 12
3 FINDINGS AND RECOMMENDATIONS FINDING NO: E- 1 CATEGORY: DESIGN, DRAWINGS & RECORDS 1. As-built electrical SLD, wiring layout designs and drawings, machine layouts are not prepared. 2. Thermo graphic scanning of the entire electrical system has not been performed. 3. Insulation resistance test of electrical equipment has not been performed. 4. Earth resistance test is has not been performed. 5. Electric safety training program is not initiated. 1. The factory must have As-built electrical SLD with electrical wiring layout designs and drawings. Any changes in load, protection system, conductors, Generation and supply system must be reflected in the As-built SLD and drawings. 2. Thermo graphic scanning of the entire electrical system must be performed on tri-annual basis and recorded. 3. Insulation resistant test of all the cables must be performed once every 5 year cycle and recorded. 4. Earth resistance test should be done in five years cycle and recorded. 5. Electrical safety training and awareness program for the electrical personal and workers must be initiated and recorded. REMEDIATION TIME FRAME: 25 WEEKS FINDING NO: E-2 CATEGORY: GENERATOR ROOM Bottom of the generator output panel is not sealed. Install baseplate of panel to fix the cable on it with glands of required size. Generator output terminal box Page 3 of 12
4 FINDING NO: E- 3 Changeover handle is missing. Install the handle for the safe operation. Changeover without handle FINDING NO: E-4 Panel top/base plates removed to allow cable entry. Make circular hole at the base plate and provide cable gland according to the respective cable size for cable entry and exit so that the cables are not stressed on the sharp edges of the hole of panels. Provide covers (of noncombustible material) if any additional gap remains after installing cable glands. Top/bottom of the panel is not sealed Page 4 of 12
5 FINDING NO: E-5 Openings in the panel cover Replace the panel front cover with new one. PRIORITY: P3 Front of the panel is not sealed FINDING NO: E- 6 Panel door not connected with earth bond (Typical) Provide earth connection for body and doors of metallic distribution boards using green cables preferably braid so that the metallic door remains at zero potential all the time. Panel door earth bond missing. Page 5 of 12
6 FINDING NO: E-7 CATEGORY: GENERATOR ROOM Generator room wall has several holes; rain water may enter to the room. Seal the holes of the room and install exhaust fan for the ventilation. REMEDIATION TIME FRAME: 12 WEEKS Rain water may enter to the room FINDING NO: E-8 CATEGORY: GENERATOR ROOM Combustible materials stored and excessive dust/ lint deposit in generator room Electrical room must be free from materials (that are not required for regular operations) stored inside the room. Establish a routine cleaning program to keep neat and clean generator room. Combustible materials on substation room Page 6 of 12
7 FINDING NO: E-9 CATEGORY: CABLE & CABLE SUPPORT Generator output cables are laid directly on floor without any protections and support. Construct cable trench to protect the cables to ensure the mechanical protection of the cable laid on floor otherwise cable insulation may damage due to falling object or stepping of occupants onto it. Cable laid on floor REMEDIATION TIME FRAME: 12 WEEKS FINDING NO: E-10 No rubber mat in front of the panel. (Typical) Provide graded and adequate size of rubber mat in front of the panel. PRIORITY: P3 Rubber mat missing FINDING NO: E-11 Loop connection of MCBs inside panel. (Typical) Wiring looped at MCB terminals may be replaced by using Bus bars to distribute different circuits. Looping at switchgear terminal Page 7 of 12
8 FINDING NO: E-12 Multiple cables connected at a terminal of the busbar. (Typical) Terminate single cable (lugs/sockets) on a single point of bus-bar to get better electrical continuity and avoiding loose connection. Multiple cable at bus-bar terminal FINDING NO: E-13 Multiple cables terminating to MCCB in panel. (Typical) Remove all the multiple connections made at a single point of MCCB in panel and connect individual branch cables to individual MCCB in panel providing individual lug according to the respective cable size. Mixing of branch circuit is not allowed. Multiple cable at switchgear terminal FINDING NO: E-14 Barrier/separators between different phases of MCCB are not installed. (Typical) Install separators between different phases of MCCB. Standard separators must be used. PRIORITY: P3 Phase separator missing Page 8 of 12
9 FINDING NO: E-15 Burnt sign visible at terminal(s) inside panel.(typical) Arrange periodic inspection & thermal scan to identify the overloading, loose connection, unbalanced load which may cause the excessive heat-rise and take action accordingly. REMEDIATION TIME FRAME: 12 WEEKS Burning signs inside panel FINDING NO: E-16 CATEGORY: WIRINGS Cables/wires passing through wall not protected and remaining gaps around the cable/wiring not sealed. Cables passing through permanent walls must be protected in steel/pvc pipes and remaining holes around the pipe must be sealed. Seal all the penetrations using appropriate fire rated material and ensure the cable insulation does not get damaged during sealing work. Power cables passing through the wall. Page 9 of 12
10 FINDING NO: E-17 Splicing joint of the cable is found inside the panel. (Typical) Connect the cables using PVC connector with PIB tape wound around it. Improper cable joint FINDING NO: E-18 Connection without lugs at the bus-bar/mccb terminal. (Typical) Cables must be terminated to terminal providing lugs of required size according to the size of the respective cable. Use individual circuit breaker to connect each load. REMEDIATION TIME FRAME: 12 WEEKS Cable termination without lugs Page 10 of 12
11 FINDING NO: E-19 CATEGORY: BOILER ROOM Power and control wiring of boiler are carried through flexible PVC pipe. Use industrial graded (heat resistant) pipe for control and power wiring of boiler. REMEDIATION TIME FRAME: 12 WEEKS Cable in flexible PVC pipe in boiler room FINDING NO: E-20 CATEGORY: WIRINGS Cable duct without cover and deposit of lint and dust in it. Remove lint and dust from the cable duct and cover it with noncombustible material; make a periodical cleaning program. REMEDIATION TIME FRAME: 25 WEEKS No cover on cable duct FINDING NO: E-21 CATEGORY: BOILER ROOM MCBs mounted on wall without proper enclosure. MCBs (electrical devices) mounted on wall must be encased in metal enclosure made of steel sheet of thickness 18 SWG. MCCB without enclosure Page 11 of 12
12 FINDING NO: E-22 Power socket installed on combustible material. (Typical) Relocate the power socket from the wooden boards to a noncombustible material preferably on wall. Avoid installing electrical boards, switch, sockets etc on combustible materials. REMEDIATION TIME FRAME: 12 WEEKS Socket on combustible material. Page 12 of 12
ELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT FRESH FASHION WEAR LTD. 638, Sharifpur, P.O-National University, Gazipur Sadar, Bangladesh Factory List: 1. Passion Apparels and Wears Ltd. 2. Inspected by: Jobair Ibna
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT ABIR FASHIONS Kutubail, Fatullah (Post Office Road), Narayangonj, Bangladesh Factory List: 1. Inspected by: Pema Wangdi & Mamun Report Generated by: Pema Wangdi Inspected
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT FIRST WEAR LMITED 68/Y, Sagarika Road, Pahartoli, Chittagong, Bangladesh Factory List: 1. Inspected by: Moin Hasan Report Generated by: Moin Hasan Inspected on August
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT METRO KNITTING & DYEING MILLS LTD.(FACTORY-02), CHARBAG, ASHULIA, SAVAR, DHAKA, BANGLADESH Factory List: 1. Inspected by: Younten Report Generated by: Das Inspected
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT ADVANCE WORLD LIMITED Lalkha Shair Char, Fatullah, Narayanganj, Dhaka, Bangladesh Factory List: 1.. Inspected by: Sherub Tenzin & Md. Moin Hasan Report Generated by:
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT SINCERE KNIT GARMENTS LIMITED UNIT-1 East Isdair, Chandmari, Fatullah, Narayangonj, Bangladesh Factory List: 1. Unit-1 2. Fakir Knit Ltd. Inspected by: Sherab Dorji
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT MAHID APPAREL LTD. Nowpara, Madhabdi, Narsingdi, Bangladesh Factory List: 1. MAHID APPAREL LTD. Inspected by: Nazmul Huda Report Generated by: Nazmul Huda Inspected
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT Zirabo Bazar, Ashulia, Savar, Dhaka, Bangladesh Factory List: 1. Inspected by: Khan & Tapu Report Generated by: Khan Inspected on Feb 6 th 2015 SUMMARY factory building
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT BOVS APPARELS LTD. JAMUR MUCHIPARA, HEMAYETPUR, SAVAR, DHAKA, BANGLADESH Factory List: 1. BOVS APPARELS LTD. Inspected on April 13, 2014 SUMMARY The Bovs Apparels Ltd
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT LIBAS TEXTILES LTD., Mouchak, Kaliakoir, Gazipur, Bangladesh Factory List: 1. Libas Textiles Ltd. Inspected on April 6, 2014 SUMMARY The Libas Textiles Ltd., factory
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT AG s APPARELS LIMITED. Plot No. A/1&2 Block-B, BSCIC I/A Fouzderhat, Sagarika Road, Dhaka-1207, Bangladesh Factory List: 1. AG s Apparels Limited. Inspected by: Sherub
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT M/S. PROUD TEXTILE Plot 31/A, BSCIC Industrial Estate, Fatullah, Narayanganj, Bangladesh Factory List: 1. Inspected by: Pema Wangdi Report Generated by: Pema Wangdi
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT ADHUNIK POSHAK SHILPA LIMITED Civil Engineer Tower, Mirpur, Dhaka, Bangladesh Factory List: 1. Adhunik Poshak Shilpa Ltd. 2. Crazy Fashions Ltd. 3. Kazipur Fashion Ltd.
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT ACTIVE COMPOSITE MILLS LTD. Dewan Idris Road, Zirabo, Ashulia, Savar, Dhaka, Bangladesh Factory List: 1. Active Composite Mills Ltd. Inspected by: Hemlal Report Generated
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT TARATEX (BD) LTD. Plot 23/1, Sataish Road, Tongi, Gazipur, Bangladesh Factory List: 1) Taratex (BD) Ltd. 2) S. P. M Design Ltd. Inspected by : Luv Kumar Chhetri Report
More informationELECTRICAL SAFETY INSPECTION REPORT.
ELECTRICAL SAFETY INSPECTION REPORT. SREERAMPUR, DHAKA, BANGLADESH Factory List: Graphics Textiles Limited Inspected on May 20, 2014 SUMMARY Graphics Textiles Limited is located in Sreerampur, Dhaka. Reportedly,
More informationELECTRICAL SAFETY INSPECTION REPORT.
ELECTRICAL SAFETY INSPECTION REPORT. KAROTOA APPARELS LTD., TATKHANA ROAD, DHAKA, BANGLADESH. Factory List: 1. Inspected on May 14, 2014 ELECTRICAL SAFETY INSPECTION REPORT. KAROTOA APPARELS LTD., TATKHANA
More informationELECTRICAL SAFETY INSPECTION REPORT.
ELECTRICAL SAFETY INSPECTION REPORT. Plot # B-32,BSCIC I/E,Tongi,Gazipur Factory List: 1. Kento Asia Limited. Inspected on May 15, 2014 SUMMARY Kento Asia Ltd. factory is established in a rented premises
More informationELECTRICAL SAFETY INSPECTION REPORT.
ELECTRICAL SAFETY INSPECTION REPORT. Sumilpara, Adamjee Nagar, Shiddirgonji, Narayangonj, Bangladesh Factory List: 1. Moonlux Kinit Garments Limited. 2. West knit Wear Limited. 3. West Fashion. 4. Moonlus
More informationELECTRICAL SAFETY INSPECTION REPORT.
ELECTRICAL SAFETY INSPECTION REPORT. ANTIM KNIT COMPOSITE LTD., Barpa, Rupshi, Rupgonj, Narayangonj, Bangladesh. Factory List: 1. Antim Knit Composite Ltd. 2. Antim Knitting & Finishing Ltd. Inspected
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT AKH APPARELS LIMITED 128 Hemayetpur, AKH Tower, Savar, Dhaka-1340, Bangladesh. Factory List: 1. AKH Apparels Limited Inspected by: Deonarayan Khatiwara Report Generated
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT AHMED FASHIONS 34/1, Darus Salam Road (Technical), Mirpur-1, Dhaka, Bangladesh. Factory List: 1. Inspected by: Yang Generated by: Yang Inspected on 06 March 2015 SUMMARY
More informationELECTRICAL SAFETY INSPECTION REPORT.
ELECTRICAL SAFETY INSPECTION REPORT. House 8 & 10, Road 3, Section 7, Mirpur Industrial Area, Dhaka, Bangladesh Factory List: 1. Alliance Garments Ltd. Inspected on May 5, 2014 ELECTRICAL SAFETY INSPECTION
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT ALIF GARMENTS Ltd, Dhaka, Bangladesh Prepared for: JANUARY 14, 2014 Alif Garments Ltd. PAGE 1 SUMMARY The seven-story factory housing Alif Textiles Ltd. & Hexa Garments
More informationELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th)
Factory Name Address Shashongaon, Plot - S, A-646, Enayet nagar, Fatullah,Narayanganj Factory ID 9468 Electrical Safety dates Initial Date 07/07/2014 20/09/2016 Date of 5 th Follow Up Report Received Date
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT (1ST FLOOR BOTH WINGS) CHITTAGONG EXPORT PROCESSING ZONE SOUTH HALISHAHAR, CHITTAGONG Factory List: 1. 2. Regency Garments Ltd. 3. ABC Camp Inspected on May 10, 2014
More informationELECTRICAL SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH
ELECTRICAL SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH January 14, 2013 Redpoint Jackets Ltd. PAGE 1 SUMMARY The four-story factory housing Redpoint Jackets Ltd. located in Dhaka Export
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT, SOUTH VANGNAHATI, SREEPUR, GAZIPUR, BANGLADESH. Factory List: 1. Hams Garments Ltd. Inspected on April 03, 2014 ELECTRICAL SAFETY INSPECTION REPORT, GAZIPUR, BANGLADESH
More informationELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (4th)
Factory Name Address Joyna Bazer Road, Jamirdia, Valuka Factory ID 9504 Electrical Safety dates Initial Date 06/07/2014 Date of 5 th Follow Up Report Received Date 07/27/2015 Date of 6 th Follow Up Date
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT FASHION FORUM LTD. 53-54, Diakhali, Zamgara, savar, Dhaka, Bangladesh. Factory List: 1. Fashion Forum Ltd. 2. IDS Washing Ltd. Inspected by: Karma Report Generated by:
More informationELECTRICAL SAFETY Information Bulletin
ELECTRICAL SAFETY Information Bulletin February 2019 Page 1 of 5 2018 CANADIAN ELECTRICAL CODE SUBJECT: Section 6 Services and service equipment Rule 6-102 Number of supply services permitted Row housing
More informationT. SUNDUPALLI BRANCH (04427)
STATE BANK OF INDIA T. SUNDUPALLI BRANCH (04427) REGION 2, KADAPA RURAL TIRUPATI (A.O) ELECTRICAL WORK BILL OF QUANTITIES SL. NO. DESCRIPTION QTY. UNIT RATE AMOUNT Rs. Rs. 1 Supply, installation, testing
More informationUNDERGROUND SERVICES SECONDARY
Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-
More informationMANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS
DAIMLERCHRYSLER MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS ISSUE DATE: 5/1/90 EFFECTIVE DATE: 2/4/92 REVIEW DATE:
More informationSECTION EARTHING AND EARTH FAULT PROTECTION
SECTION 16660 PART 1 - GENERAL 1.01 DESCRIPTION A. The work to be performed includes, but is not necessarily limited to, all work involved with the construction and assembly of a complete electrical earthing
More informationELECTRICAL WORKS RELATED TO AC & UPS OF CMP GOC & IAD, LINGAMPALLY, HYDERABAD IN TWO BID SYSTEM THROUGH E-TENDER PRICE BID
SBI INFRA MANAGEMENT SOLUTIONS PVT.LTD. 3 rd Floor, Local Head Office,Bank Street, Koti, Hyderabad- 500095 On behalf of On behalf of On behalf of Cash Management Product GOC (CMP GOC) & Internal Audit
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards
Date Description of Change Pages / Sections Modified ID 6/15/16 Updated format, division title, and removed references to other sections. - mgl44 A. Summary This section contains design criteria for the
More informationPARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION
E11 : General Electrical Earthing and LIGHTNING Protection PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION 1 2009-05-12 Review of Mechanical / Electrical and Control
More informationSECTION GROUNDING AND BONDING
SECTION 16060 GROUNDING AND BONDING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationCONTENTS. B. System Design and Performance Requirements
16060 Grounding and Bonding This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or
More information37-SDMS-01 REV. 03 SPECIFICATIONS FOR
37-SDMS-01 REV. 03 SPECIFICATIONS FOR LOW VOLTAGE MOLDED CASE CIRCUIT BREAKERS FOR SERVICE CONNECTIONS This specification is property of SEC and subject to change or modification without any notice CLAUSE
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section
More information56-SDMS-01 REV. 01 SPECIFICATIONS FOR
56-SDMS-01 REV. 01 SPECIFICATIONS FOR 13.8KV UNIT SUBSTATIONS This specification is property of SEC and subject to change or modification without any notice CONTENTS PAGE No. 1.0 SCOPE 3 2.0 CROSS REFERENCES
More informationDesktop Computer Model 1 (without. DVD RW and Front USB) Desktop Computer Model 2 ( with DVD. RW and Front USB) Dot Matrix Printer with one printer
Line Item Description of Goods Quantity Physical unit Unit Price 1 2 3 4 5 6 7 8 9 1 11 12 Desktop Computer Model 1 (without 3839 DVD RW and Front USB) Desktop Computer Model 2 ( with DVD 36 RW and Front
More informationBILL OF QUANTITIES - PROJECT ELECTRICAL WORK OF PH-I FOR ASSAM RIFLES, DWARKA, NEW DELHI
Page 1 BILL OF QUANTITIES - PROJECT ELECTRICAL WORK OF PH-I FOR ASSAM RIFLES, DWARKA, NEW DELHI-110075 I. INSTALLATION OF SUB-STATION EQUIPMENT The rates shall include the following : 1. Assembling loose
More informationSECTION FIELD PANELS
Stanford University Facilities Design Guidelines SECTION 25 14 23 FIELD PANELS PART 1 - GENERAL 1.1 SUMMARY A. This section includes control panel and enclosure requirements for building control systems.
More informationSECTION GROUNDING AND BONDING
SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and
More information31-SDMS-03 REV. 01 SPECIFICATIONS FOR
31-SDMS-03 REV. 01 SPECIFICATIONS FOR LOW VOLTAGE CABINET FOR POLE MOUNTED TRANSFORMER This specification is property of SEC and subject to change or modification without any notice CONTENTS Clause Description
More informationCONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist
CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist
More informationBuilding Permit Application
Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:
More informationEssex County College - West Essex Campus Addition And Renovations dlb # / 11-14
SECTION 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More information6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.
6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection
More informationCHAPTER 5 METERING REQUIREMENTS
CHAPTER 5 METERING REQUIREMENTS CHAPTER 5 METERING REQUIREMENTS 5.1 General 1. All installations connected to, or intended to be connected to HK Electric s supply of electricity must comply with HK Electric
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationSECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
SECTION 26 05 26 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationPREPARING RESIDENTIAL PROPERTY FORTHE HOUSING HABITABILITY INSPECTION
CITY OF LOS ANGELES HOUSING DEPARTMENT HABITABILITY INSPECTION PROGRAM CODE ENFORCEMENT UNIT 3550 Wilshire Boulevard, 15 th Floor Los Angeles, CA 90010 PREPARING RESIDENTIAL PROPERTY FORTHE HOUSING HABITABILITY
More informationSUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard
SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard PART 1 GENERAL 1.1 Scope A. The intent of this specification is to provide power control for the parallel operation of generator
More informationSpecification Lightning Protection Systems
Specification Lightning Protection Systems General: Summary A) This Section specifies the lightning protection system for the building(s) or structure(s). This system provides safety for the building and
More informationSUPPLY ERECTION TOTAL RATE AMOUNT RATE AMOUNT AMOUNT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)
SBI-AO2 Project Residency Rd Br-elect/RBO-4 SCHEDULE OF QUANTITIES FOR ELECTRICAL WORKS. DATE : 24/4/2018 Sl. No. DESCRIPTION OF WORK UNIT QTY 1 READYMADE FINAL DISTRIBUTION BOARDS Supply, Instillation,
More information2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING
2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending
More informationSECTION ENCLOSED BUS ASSEMBLIES
SECTION 262500 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More information2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property
2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical
More informationELETRICAL DRAWINGS. Supply and Installation of refrigerated rooms. Location Jericho/West Bank/ Occupied Palestinian Territory
ELETRICAL DRAWINGS Supply and Installation of refrigerated rooms Location Jericho/West Bank/ Occupied Palestinian Territory Publication reference AID 010601/FGPII/TAP 02-2016 Project Support to productive,
More informationNEC 2014 Code Changes
NEC 2014 Code Changes Articles 280.21-300.50 CHANGES FROM 2011 TO 2014 CODE ARE IN RED Chapter 2 - Wiring and Protection ARTICLE 280 Surge Arresters, Over 1000 volts II. Instillation III. Connecting Surge
More informationHow to Prepare Your LSE Report
LSE Rule Category Required Documentation Information Comments / Applicable Code Sections/ 10.1 Building Height Provide the Building height in Feet Provide the number of stories above grade Helpful Hints
More informationSECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph
More informationELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS
Greenbook Prepared by: ABB1 ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS 052521 Asset Type: Electric Metering Function: Construction Issued by: Quoc Hoang (QxH1) Date: 08-15-17 Rev. #06:
More informationSECTION 07530CP EPDM MEMBRANE ROOFING
PART 1 GENERAL 1.1 SUMMARY SECTION 07530CP EPDM MEMBRANE ROOFING A. Section includes: 1. Adhered membrane roofing and flashing 2. Mechanically fastened roof insulation 3. Walkway pads 1.2 ARCHITECTURAL
More informationNYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017
SECTION 27 05 26 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationCENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chitranjali Hills, Thiruvallam P.O., Thiruvananthapuram
CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chitranjali Hills, Thiruvallam P.O., Thiruvananthapuram 695 027 No. C-DIT/CG-Elec/18-19/T044 Date: 19.07.2018 TENDER NOTICE Sealed tenders are invited
More informationSECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:
SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.
More informationCONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 48-05 Van Dam Street Long Island City, NY 11101 ELECTRIC METER SHOP DEPARTMENT METER ENGINEERING SPECIFICATION MES-350 REVISION 3 June 2016 EFFECTIVE DATE
More informationSDCS-02 CONSTRUCTION STANDARD FOR
الشركة السعودية للكهرباء DATE: November 2016 CONSTRUCTION STANDARD FOR UNDERGROUND DISTRIBUTION NETWORK This specification is property of SEC and subject to change or modification without any notice الشركة
More informationSECTION ENCLOSED BUS ASSEMBLIES
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the
More informationStack Parking Surface Mounted Stackers
1 / 6 Stack Parking Surface Mounted Stackers swiss-park V-2 Comfort The V-2 is designed to park cars of any size thanks to its vertical adjustability. It will accommodate cars as tall as the garage ceiling
More informationSECTION GROUNDING
SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment
More informationStandard of Practice - Campus Electrical Distribution System
A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all
More informationA. Section includes busway and fittings including plug-in units.
SECTION 26 25 00 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes busway and fittings including plug-in units. 1.2 REFERENCES A. Institute of Electrical and Electronics Engineers:
More informationOVERALL EXTERNAL SERVICES COSTS
EB-00-00 Tab Schedule Filed: 00 Aug Page of OVERALL EXTERNAL SERVICES COSTS INTRODUCTION THESL uses external services to complement its internal capacity to execute work programs. External services represent
More information3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC).
SECTION 16111 CONDUITS PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide conduits, complete, as shown, specified or required per Contract Documents. Principal items include: 1. Rigid aluminum conduit.
More information(Condensed from National Electric Code)
WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,
More informationMetering Requirements 750 Volts or Less
SECTION 1 - SCOPE 1.1 Toronto Hydro Requirements 1.2 Ontario Electrical Safety Code SECTION 2 - PURPOSE INDEX SECTION 3 - DEFINITIONS, PUBLICATIONS AND THE INTERNATIONAL SYSTEM OF UNITS 3.1 Definitions
More informationSECTION PART 1 GENERAL
SECTION 16060 GROUNDING AND BONDING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Grounding of electrical systems and equipment and basic requirements for ground for equipment, circuits, and systems.
More informationDOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES
Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating
More informationSection 7: Specifications
Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required
More informationA. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein.
16470 PANELBOARDS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 16 An optional keynote to
More informationTemporary Wiring. Low-Voltage Electrical Safety Orders
Temporary Wiring Low-Voltage Electrical Safety Orders 2405.1. Scope. Except as specifically modified in this Article, all other requirements of this Order for permanent wiring shall also apply to temporary
More informationLow-profile, 11U high cabinets hold networking equipment, servers, and phone equipment.
RM140A-R3 RM140A-M-R3 RM145A-R3 RM145A-M-R3 Small Office/Home Office (SOHO) Cabinets Low-profile, 11U high cabinets hold networking equipment, servers, and phone equipment. Fit under most desktops in the
More informationTanaz Fashions Ltd. & Zayantex Ltd. L Usine Fashion Ltd (Unit 1)
Tanaz Fashions Ltd. & Zayantex Ltd. L Usine Fashion Ltd (Unit 1) 216, Sataish Road, Gazipura, Tongi, Gazipur, Bangladesh (23.921458N,90.386581E) 22 September 2013 1 2 Local concrete spalling caused by
More informationDEVICES AND LUMINAIRES
CHAPTER 40 DEVICES AND LUMINAIRES SECTION E4001 SWITCHES E4001.1 Rating and application of snap switches. General-use snap switches shall be used within their ratings and shall control only the following
More informationGENERAL MECHANICAL SYSTEM REQUIREMENTS
CHAPTER 13 GENERAL MECHANICAL SYSTEM REQUIREMENTS SECTION M1301 GENERAL M1301.1 Scope. The provisions of this chapter shall govern the installation of mechanical systems not specifically covered in other
More informationAirBench EX Operation and Maintenance
AIRBENCH LTD AirBench EX Operation and Maintenance This Edition: 10 February 2016 AirBench Ltd, 14 Grange Farm Road, Colchester CO2 8JW www.airbench.com +44 (0) 1206 791191 Copyright AirBench Ltd 2016
More informationDesign Standard Conduit for Electrical Systems
Design Standard Purpose: This design standard has the purpose of creating a consistent application for the installation of conduits throughout the East Side Union High School District, therefore achieving
More informationSECTION CONVECTORS
SECTION 23 82 33 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph
More informationNSP/ 007/ 008 Guidance on Substation Design: 33kV Switchgear
Version:- 1.0 of Issue:- March 2016 Page 1 of 6 NSP/ 007/ 008 Guidance on Substation Design: 33kV Switchgear 1. Purpose The purpose of this document is to provide guidance on the selection and application
More informationOVERHEAD SERVICE. Table of Contents - Section 400
OVERHEAD SERVICE Table of Contents - Section 400 PARAGRAPH 400.0 OVERHEAD SERVICES (0-600 VOLTS)... 1 400.1 GENERAL 1 400.2 IDENTIFICATION OF CONDUCTORS. 1 400.3 MAXIMUM SERVICE ENTRANCE CONDUCTOR SIZE
More informationTESTING PTE EARTHING
1 SCOPE This section of the Power Systems Live Working Manual details the procedures to be followed to achieve Safety from the System when carrying out examination, testing and remedial work on PTE (Pole
More informationThis product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.
AFC Cable Systems, Inc. Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-MC
More informationDEVICES AND LUMINAIRES
CHAPTER 39 DEVICES AND LUMINAIRES SECTION E3901 SWITCHES E3901.1 Rating and application of snap switches [404.14(A)]. General-use snap switches shall be used within their ratings and shall control only
More informationPrice Bid Estimate of,electrification Voice, Data cabling works for B.O.I VARACHHA Branch Item Amount Electrification Voice & Data Cabling Works Total amount RS RS. RS./- Estimate. for electrification
More information