ELECTRICAL SAFETY INSPECTION REPORT

Size: px
Start display at page:

Download "ELECTRICAL SAFETY INSPECTION REPORT"

Transcription

1 ELECTRICAL SAFETY INSPECTION REPORT TARATEX (BD) LTD. Plot 23/1, Sataish Road, Tongi, Gazipur, Bangladesh Factory List: 1) Taratex (BD) Ltd. 2) S. P. M Design Ltd. Inspected by : Luv Kumar Chhetri Report Generated by : Luv Kumar Chhetri Inspected on April 26, 2014

2 SUMMARY The (G+6) storied building constructed in 2003 house two factories namely; Taratext (BD) Ltd. and S.P.M Design Ltd. The Factory was surveyed for electrical safety by Woosun Energy and Construction Co., Ltd. (WEC). The purpose of the survey was to identify significant electrical safety issues and to provide recommendations for remediation based on applicable standards specified by the Accord. The scope of this initial electrical safety inspection was limited to the review and identification of major electrical safety issues. The inspection did not include identification of minor deficiencies, which will be further addressed as part of follow-up inspections. Table below summarizes the major electrical safety issues identified during the inspection. Recommendations have been provided to address each issue. An implementation schedule shall be developed by the factory to remediate each of the findings. The Specific timing of improvements, including any requested extensions due to design / installation constraints shall be submitted to the Accord for approval. TARATEX (BD) LTD. Page 2 of 17

3 FINDINGS AND RECOMMENDATIONS Finding #: E- 1 TRANSFORMER ROOM No protection between the transformer and surrounding area. The transformer must be installed with barrier walls between transformer and other panels. The walls must be fire resistant and should have height up to the ceiling. No barrier wall between transformer and surrounding electrical installations. Finding #: E- 2 TRANSFORMER ROOM Arcing horns on HT bushings of transformer, not installed. Arcing horns may be installed as per the transformer manufacturer's requirement. Arcing horns on HT bushing of transformer are not installed. TARATEX (BD) LTD. Page 3 of 17

4 Finding #: E- 3 Flexible PVC conduit is used for service cable protection. The cables must be supported on Ladder cable tray with cover. Flexible PVC conduit is not adequate for protection. LT cable conduit. drawn in PVC flexible Finding #: E- 4 Service cables run on walls are not supported. Cables supported on external walls must be laid horizontal/vertical to the wall, supported in cable trays/ladder. 6 Months. Conduit running on wall is not supported adequately for protections. Finding #: E- 5 HT cable while entering, it touches the sharp steel edges of the panel. Cables must be protected from sharp edges of the panels. Provide rubber grommet to the sharp edges of the panel. Remaining openings should be filled with fire sealant material. HT cable entering and leaving panel not protected. TARATEX (BD) LTD. Page 4 of 17

5 Finding #: E- 6 Excess cable length not arranged and supported. Excess length of existing HT cables coiled near transformer must be protected and laid safely. Excess HT cables coiled (not arranged) and laid on floor inside transformer room. Finding #: E- 7 Cable laid directly on concrete floor. HT cable must be supported in cable trays or laid in trenches. The cable must be protected against physical injury. 6 Months HT power cable laid directly on floor inside transformer room. Finding #: E- 8 Cable entering electrical room, through wall & fence, is not protected. Cables passing through permanent walls must be protected in steel pipes and remaining holes around the pipe must be sealed. HT cable entering HT panel inside electrical room is left open without protections outside the building. TARATEX (BD) LTD. Page 5 of 17

6 Finding #: E- 9 SWITCH BOARD & PANELS Panel base plates removed to allow cable entry. Panel base plates must be installed, at all time, and cable(s) entering panel must be firmly fixed with cable gland. Panel base plate not installed. Finding #: E- 10 SWITCH BOARD & PANELS Spacing around the MCCBs narrow and crowded inside panel. Rearrange the devices inside panel such that it can be easily accessible during operation and maintenance. Wires crowded inside panel may be securely fastened installing ducts or using cable ties. MCCB installed close to each other inside panel. Within 1 Month Finding #: E- 11 SWITCH BOARD & PANELS Cables looped at the MCCB Individual connection shall be taken from bus bar for individual circuit breaker but where not possible, it is recommended to use pin type bus bar instead of looping. Within 1 Month Looping arrays of MCBs with jumper wires in panel. TARATEX (BD) LTD. Page 6 of 17

7 Finding #: E- 12 Category : GENERATOR ROOM Cables terminating to generator output terminal box are laid on floor. Cable must be arranged and latched properly on the cable tray. Provide cover made of non-combustible material preferably metallic sheet to protect the cables insulation from physical damage as well as prevent the ingress of debris, dust and lint. Cable from generator output terminal to LT panel drawn in flexible conduit, laid on floor. Finding #: E- 13 CABLE & CABLE SUPPORTS Disconnected cables from equipment are left naked. The used cables on the ceiling must be tapped properly with electrical tape to avoid short circuit and electric shock. The cables must be protected and supported above floor. Immediate Wire disconnected from load left open without proper insulation. Finding #: E- 14 CABLE & CABLE SUPPORTS Ducts not covered and cables in it are randomly placed. Cable ducts must be cleaned regularly and covered to prevent ingression of dust and lint. 6 Months Cable/wires in wiring duct congested/overloaded. Wires not arranged properly. Duct not covered and lint deposited in wiring duct. TARATEX (BD) LTD. Page 7 of 17

8 Finding #: E- 15 CABLE & CABLE SUPPORTS Flexible PVC conduit wiring not supported. Flexible conduits (standard and approved for industrial use) must be securely clamped or fastened at regular intervals. Flexible conduit use for wiring and power socket extension not supported on wall. Power socket not installed permanently on wall. Finding #: E- 16 CABLE & CABLE SUPPORTS Flexible PVC conduit wiring not supported. Cables must be protected and supported on tray, duct or conduits to protect against weather and possible physical damages. Wiring extended from wiring duct to ceiling light in flexible conduit not supported adequately. Flexible conduit sagging. Finding #: E- 17 CABLE & CABLE SUPPORTS Wiring fixed to ceiling by clamps or saddle at longer intervals. Existing wiring in flexible PVC conduits fixed to ceiling must be additionally supported in tray or ducts. Flexible conduit must not be used for long point wiring (except for special wirings). Surface wiring in PVC flexible conduit running on ceiling are not supported adequately. Wiring not protected (Typical) TARATEX (BD) LTD. Page 8 of 17

9 Finding #: E- 18 CABLE & CABLE SUPPORTS Cable/wiring duct cover is missing. Wiring duct has deposit of lint and dust. The cover of the tray/duct should be installed to keep it free from the ingress of debris, dust and lint. Establish a periodic cleaning program to keep all the duct/trays/channel dust-free. Top cover of wiring duct above work bench left open. Wiring duct has deposit of lint and dust. Finding #: E- 19 WIRINGS Cables passing through window grills. Cables must be protected and supported and installed through a safe route. Existing cables passing through window and ventilators must be removed immediately. Cables drawn in PVC conduits passing through ventilator. Finding #: E- 20 WIRINGS Wiring/cables passing through doors or gate. Existing cables or wiring passing installed through door or gate must be protected against possible damages from the shutters or door panel. Wiring in flexible conduit supported between wall and gate. TARATEX (BD) LTD. Page 9 of 17

10 Finding #: E- 21 WIRINGS Wires joined in wiring supports, between terminations. Existing joints in wiring between terminals must be checked and tightly connected using sockets and then insulated using heat shrink insulating tubes. Junction boxes with cover may be used to protect joints. Branching/Tapping of circuit from existing wiring in wiring duct. Finding #: E- 22 WIRINGS Wiring in flexible PVC conduit not supported. Wiring in flexible PVC conduit must be additionally supported and securely fixed at regular intervals. Within 1 Month Flexible conduit on ceiling not supported adequately (Typical) Finding #: E- 23 WIRINGS Wiring duct overloaded with cables and wires. Additional ducts may be installed in tiers or replace the existing duct. The existing ducts may be widened or wiring system may be redesigned to reroute by installing additional distribution panels. Wiring duct congested with wires and cables. TARATEX (BD) LTD. Page 10 of 17

11 Finding #: E- 24 WIRINGS Wires exposed and not supported between ducts. Wires between ducts must be protected and supported in conduits or in ducts. Cable should be latch with cable duct by using cable ties. Within 1 Month Wires in wiring duct/channel not dressed properly. TARATEX (BD) LTD. Page 11 of 17

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. Sumilpara, Adamjee Nagar, Shiddirgonji, Narayangonj, Bangladesh Factory List: 1. Moonlux Kinit Garments Limited. 2. West knit Wear Limited. 3. West Fashion. 4. Moonlus

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. SREERAMPUR, DHAKA, BANGLADESH Factory List: Graphics Textiles Limited Inspected on May 20, 2014 SUMMARY Graphics Textiles Limited is located in Sreerampur, Dhaka. Reportedly,

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. KAROTOA APPARELS LTD., TATKHANA ROAD, DHAKA, BANGLADESH. Factory List: 1. Inspected on May 14, 2014 ELECTRICAL SAFETY INSPECTION REPORT. KAROTOA APPARELS LTD., TATKHANA

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT LIBAS TEXTILES LTD., Mouchak, Kaliakoir, Gazipur, Bangladesh Factory List: 1. Libas Textiles Ltd. Inspected on April 6, 2014 SUMMARY The Libas Textiles Ltd., factory

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ACTIVE COMPOSITE MILLS LTD. Dewan Idris Road, Zirabo, Ashulia, Savar, Dhaka, Bangladesh Factory List: 1. Active Composite Mills Ltd. Inspected by: Hemlal Report Generated

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ADHUNIK POSHAK SHILPA LIMITED Civil Engineer Tower, Mirpur, Dhaka, Bangladesh Factory List: 1. Adhunik Poshak Shilpa Ltd. 2. Crazy Fashions Ltd. 3. Kazipur Fashion Ltd.

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ABIR FASHIONS Kutubail, Fatullah (Post Office Road), Narayangonj, Bangladesh Factory List: 1. Inspected by: Pema Wangdi & Mamun Report Generated by: Pema Wangdi Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT BOVS APPARELS LTD. JAMUR MUCHIPARA, HEMAYETPUR, SAVAR, DHAKA, BANGLADESH Factory List: 1. BOVS APPARELS LTD. Inspected on April 13, 2014 SUMMARY The Bovs Apparels Ltd

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT K.L FASHION LTD. 75/1, Mudafa West, Master Bari, Tongi, Gazipur, Bangladesh Factory List: 1. Inspected by: Jobair Ibna Abdul Alim Report Generated by: Jobair Ibna Abdul

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT Zirabo Bazar, Ashulia, Savar, Dhaka, Bangladesh Factory List: 1. Inspected by: Khan & Tapu Report Generated by: Khan Inspected on Feb 6 th 2015 SUMMARY factory building

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ALIF GARMENTS Ltd, Dhaka, Bangladesh Prepared for: JANUARY 14, 2014 Alif Garments Ltd. PAGE 1 SUMMARY The seven-story factory housing Alif Textiles Ltd. & Hexa Garments

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. Plot # B-32,BSCIC I/E,Tongi,Gazipur Factory List: 1. Kento Asia Limited. Inspected on May 15, 2014 SUMMARY Kento Asia Ltd. factory is established in a rented premises

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ADVANCE WORLD LIMITED Lalkha Shair Char, Fatullah, Narayanganj, Dhaka, Bangladesh Factory List: 1.. Inspected by: Sherub Tenzin & Md. Moin Hasan Report Generated by:

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT AKH APPARELS LIMITED 128 Hemayetpur, AKH Tower, Savar, Dhaka-1340, Bangladesh. Factory List: 1. AKH Apparels Limited Inspected by: Deonarayan Khatiwara Report Generated

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT MAHID APPAREL LTD. Nowpara, Madhabdi, Narsingdi, Bangladesh Factory List: 1. MAHID APPAREL LTD. Inspected by: Nazmul Huda Report Generated by: Nazmul Huda Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT FRESH FASHION WEAR LTD. 638, Sharifpur, P.O-National University, Gazipur Sadar, Bangladesh Factory List: 1. Passion Apparels and Wears Ltd. 2. Inspected by: Jobair Ibna

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT FIRST WEAR LMITED 68/Y, Sagarika Road, Pahartoli, Chittagong, Bangladesh Factory List: 1. Inspected by: Moin Hasan Report Generated by: Moin Hasan Inspected on August

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT METRO KNITTING & DYEING MILLS LTD.(FACTORY-02), CHARBAG, ASHULIA, SAVAR, DHAKA, BANGLADESH Factory List: 1. Inspected by: Younten Report Generated by: Das Inspected

More information

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th)

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Shashongaon, Plot - S, A-646, Enayet nagar, Fatullah,Narayanganj Factory ID 9468 Electrical Safety dates Initial Date 07/07/2014 20/09/2016 Date of 5 th Follow Up Report Received Date

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT AG s APPARELS LIMITED. Plot No. A/1&2 Block-B, BSCIC I/A Fouzderhat, Sagarika Road, Dhaka-1207, Bangladesh Factory List: 1. AG s Apparels Limited. Inspected by: Sherub

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT M/S. PROUD TEXTILE Plot 31/A, BSCIC Industrial Estate, Fatullah, Narayanganj, Bangladesh Factory List: 1. Inspected by: Pema Wangdi Report Generated by: Pema Wangdi

More information

ELECTRICAL SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH

ELECTRICAL SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH ELECTRICAL SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH January 14, 2013 Redpoint Jackets Ltd. PAGE 1 SUMMARY The four-story factory housing Redpoint Jackets Ltd. located in Dhaka Export

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. House 8 & 10, Road 3, Section 7, Mirpur Industrial Area, Dhaka, Bangladesh Factory List: 1. Alliance Garments Ltd. Inspected on May 5, 2014 ELECTRICAL SAFETY INSPECTION

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT, SOUTH VANGNAHATI, SREEPUR, GAZIPUR, BANGLADESH. Factory List: 1. Hams Garments Ltd. Inspected on April 03, 2014 ELECTRICAL SAFETY INSPECTION REPORT, GAZIPUR, BANGLADESH

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT AHMED FASHIONS 34/1, Darus Salam Road (Technical), Mirpur-1, Dhaka, Bangladesh. Factory List: 1. Inspected by: Yang Generated by: Yang Inspected on 06 March 2015 SUMMARY

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT FASHION FORUM LTD. 53-54, Diakhali, Zamgara, savar, Dhaka, Bangladesh. Factory List: 1. Fashion Forum Ltd. 2. IDS Washing Ltd. Inspected by: Karma Report Generated by:

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. ANTIM KNIT COMPOSITE LTD., Barpa, Rupshi, Rupgonj, Narayangonj, Bangladesh. Factory List: 1. Antim Knit Composite Ltd. 2. Antim Knitting & Finishing Ltd. Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT SINCERE KNIT GARMENTS LIMITED UNIT-1 East Isdair, Chandmari, Fatullah, Narayangonj, Bangladesh Factory List: 1. Unit-1 2. Fakir Knit Ltd. Inspected by: Sherab Dorji

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT (1ST FLOOR BOTH WINGS) CHITTAGONG EXPORT PROCESSING ZONE SOUTH HALISHAHAR, CHITTAGONG Factory List: 1. 2. Regency Garments Ltd. 3. ABC Camp Inspected on May 10, 2014

More information

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (4th)

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (4th) Factory Name Address Joyna Bazer Road, Jamirdia, Valuka Factory ID 9504 Electrical Safety dates Initial Date 06/07/2014 Date of 5 th Follow Up Report Received Date 07/27/2015 Date of 6 th Follow Up Date

More information

FrostGuard 120 V 120 V PREASSEMBLED ELECTRIC HEATING CABLES FOR PIPE FREEZE PROTECTION AND ROOF & GUTTER DE-ICING INSTALLATION INSTRUCTIONS

FrostGuard 120 V 120 V PREASSEMBLED ELECTRIC HEATING CABLES FOR PIPE FREEZE PROTECTION AND ROOF & GUTTER DE-ICING INSTALLATION INSTRUCTIONS FrostGuard 120 V 120 V PREASSEMBLED ELECTRIC HEATING CABLES FOR PIPE FREEZE PROTECTION AND ROOF & GUTTER DE-ICING INSTALLATION INSTRUCTIONS DESCRIPTION FrostGuard 120 V preassembled self-regulating heating

More information

PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION

PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION E11 : General Electrical Earthing and LIGHTNING Protection PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION 1 2009-05-12 Review of Mechanical / Electrical and Control

More information

SECTION EARTHING AND EARTH FAULT PROTECTION

SECTION EARTHING AND EARTH FAULT PROTECTION SECTION 16660 PART 1 - GENERAL 1.01 DESCRIPTION A. The work to be performed includes, but is not necessarily limited to, all work involved with the construction and assembly of a complete electrical earthing

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 614 NOVEMBER 2012 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT TABLE OF CONTENTS 614.01 SCOPE 614.02 REFERENCES 614.03 DEFINITIONS

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin February 2019 Page 1 of 5 2018 CANADIAN ELECTRICAL CODE SUBJECT: Section 6 Services and service equipment Rule 6-102 Number of supply services permitted Row housing

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 GROUNDING AND BONDING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

T. SUNDUPALLI BRANCH (04427)

T. SUNDUPALLI BRANCH (04427) STATE BANK OF INDIA T. SUNDUPALLI BRANCH (04427) REGION 2, KADAPA RURAL TIRUPATI (A.O) ELECTRICAL WORK BILL OF QUANTITIES SL. NO. DESCRIPTION QTY. UNIT RATE AMOUNT Rs. Rs. 1 Supply, installation, testing

More information

A. This Section includes steel cable trays and accessories.

A. This Section includes steel cable trays and accessories. SECTION 26 05 36 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Fire-Rated Bulkhead Batt

Fire-Rated Bulkhead Batt High density mineral fibre board for the containment of fire and smoke Approved to AS1530.4(2005) Technical Data Sheet KEY BENEFITS - Up to 56.1dB sound reduction - Low cost & highly efficient method of

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES SECTION 262500 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Interiors Sources Decor LLC. Method Statement BLOCK WORK. Civil Works 6/26/2016

Interiors Sources Decor LLC. Method Statement BLOCK WORK. Civil Works 6/26/2016 Method Statement BLOCK WORK Civil Works 6/26/2016 The purpose of this Work Method Statement for Block Works (Concrete Masonry Units) is to outline and describe in detail the procedure such as setting and

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. AFC Cable Systems, Inc. Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-MC

More information

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS SECTION 270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Communications equipment coordination and installation. 2. Sleeves for pathways and cables. 3. Raceway

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC).

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC). SECTION 16111 CONDUITS PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide conduits, complete, as shown, specified or required per Contract Documents. Principal items include: 1. Rigid aluminum conduit.

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information

CONDUITS AND FITTINGS

CONDUITS AND FITTINGS CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit

More information

Residential Building Inspections

Residential Building Inspections Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

(Condensed from National Electric Code)

(Condensed from National Electric Code) WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information

CHAPTER 13 GROUNDING AND BONDING

CHAPTER 13 GROUNDING AND BONDING GROUNDING AND BONDING CHAPTER 13 GROUNDING AND BONDING Grounding and bonding must be in accordance with Article 250 of the National Electrical Code (NEC). Bonding is defined in the NEC as the permanent

More information

Revision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd

Revision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd RAM ELEVATORS Elevator Electrical Planning Guide This guide is intended for people with an understanding of electricity. If you are not, please consult a licensed electrician as errors in application of

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

CHAPTER 11 CONDUITS AND FITTINGS

CHAPTER 11 CONDUITS AND FITTINGS CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1

More information

SUPPLY ERECTION TOTAL RATE AMOUNT RATE AMOUNT AMOUNT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)

SUPPLY ERECTION TOTAL RATE AMOUNT RATE AMOUNT AMOUNT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) SBI-AO2 Project Residency Rd Br-elect/RBO-4 SCHEDULE OF QUANTITIES FOR ELECTRICAL WORKS. DATE : 24/4/2018 Sl. No. DESCRIPTION OF WORK UNIT QTY 1 READYMADE FINAL DISTRIBUTION BOARDS Supply, Instillation,

More information

STANDARD DRAWINGS. September 2013 UPDATED FEBRUARY 2016

STANDARD DRAWINGS. September 2013 UPDATED FEBRUARY 2016 STANDARD DRAWINGS September 2013 UPDATED FEBRUARY 2016 CONSTRUCTION STANDARD DRAWINGS DIVISION 15 LIST OF DRAWINGS: 1. 01 2004-1 Rev. A - Concrete Standards General Outline and Reinforcement Notes 2. 01

More information

SECTION FIELD PANELS

SECTION FIELD PANELS Stanford University Facilities Design Guidelines SECTION 25 14 23 FIELD PANELS PART 1 - GENERAL 1.1 SUMMARY A. This section includes control panel and enclosure requirements for building control systems.

More information

CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION

CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 604 NOVEMBER 2004 CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used

More information

DETAIL INSTRUCTION No. 1

DETAIL INSTRUCTION No. 1 BEFORE BEGINNING INSTALLATION, PLEASE READ THROUGH ALL INSTRUCTIONS. Uncrate shipment and check against packing list to insure all materials are included before beginning installation. If any discrepencies

More information

SECTION CONDUITS AND BOXES PART 1- GENERAL. A. Work covered by this section includes the furnishing and installation of conduits and boxes.

SECTION CONDUITS AND BOXES PART 1- GENERAL. A. Work covered by this section includes the furnishing and installation of conduits and boxes. SECTION 16111 CONDUITS AND BOXES 1.01 DESCRIPTION PART 1- GENERAL A. Work covered by this section includes the furnishing and installation of conduits and boxes. 1.02 SUBMITTALS A. The Contractor shall

More information

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS DAIMLERCHRYSLER MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS ISSUE DATE: 5/1/90 EFFECTIVE DATE: 2/4/92 REVIEW DATE:

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section

More information

Please check with your local inspection authority for any additional requirements before installation.

Please check with your local inspection authority for any additional requirements before installation. Specifications for Residential Underground Electric Service Installation This brochure addresses most typical residential underground service installations. Variances for the following specifications must

More information

GENERAL NOTES PEDERNALES ELECTRIC COOPERATIVE, INC. RESIDENTIAL AND COMMERCIAL AMP METER LOOP SPECIFICATIONS

GENERAL NOTES PEDERNALES ELECTRIC COOPERATIVE, INC. RESIDENTIAL AND COMMERCIAL AMP METER LOOP SPECIFICATIONS GENERAL NOTES 1. Residential and commercial meter loops are typically used when constructing facilities for permanent service. It is important that all guidelines outlined in this document be followed

More information

SECTION GROUNDING

SECTION GROUNDING SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment

More information

Installation, Inspection and Maintenance of Dry Type Transformers

Installation, Inspection and Maintenance of Dry Type Transformers Dry Type TX 1 of 8 Installation, Inspection and Maintenance of Dry Type Page 1 of 8 Dry Type TX 2 of 8 Table Of Contents Page Number 1. General... 3 2. Installation... 3 3. Safety Inspections... 4 4. Safety

More information

Douglas County Traffic Signal Installation Guidelines (January 2013)

Douglas County Traffic Signal Installation Guidelines (January 2013) Douglas County Traffic Signal Installation Guidelines (January 2013) The following guidelines are minimum requirements for equipment installation. Section A. Poles and Foundations ( Wood, Concrete, Mast

More information

AS/NZS 3000: 2018 Changes to Wiring Rules Standard

AS/NZS 3000: 2018 Changes to Wiring Rules Standard BUILDING SERVICES Ref: BCA 19-01 Current at January 2019 AS/NZS 3000: 2018 Changes to Wiring Rules Standard The new edition of AS/NZS 3000 Wiring Rules Standard (Electrical Installations) was published

More information

Temporary Wiring. Low-Voltage Electrical Safety Orders

Temporary Wiring. Low-Voltage Electrical Safety Orders Temporary Wiring Low-Voltage Electrical Safety Orders 2405.1. Scope. Except as specifically modified in this Article, all other requirements of this Order for permanent wiring shall also apply to temporary

More information

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) TOOLKIT DOCUMENT #7 Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) This document has two sections. Neither section is all-inclusive

More information

Section 7: Specifications

Section 7: Specifications Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required

More information

SPECIAL SPECIFICATION 6499 Environmentally controlled Communications Building

SPECIAL SPECIFICATION 6499 Environmentally controlled Communications Building 2004 Specifications CSJ 0720-03-095 SPECIAL SPECIFICATION 6499 Environmentally controlled Communications Building 1. Description. Furnish and install Environmentally Controlled Communications Building

More information

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 772 NOVEMBER 2017 (Formerly OPSS 772, November 2012) Note: The PROV published in November 2017 replaces OPSS 772 COMMON, November 2012 with no technical

More information

Details of technical leaflets/write-up on various pieces of equipment.

Details of technical leaflets/write-up on various pieces of equipment. Details of technical leaflets/write-up on various pieces of equipment. (1) Insulator Designs: The insulators are provided in one, two, three, or four insulator designs per location and spaced to provide

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 604 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used

More information

Kaf-Tech Product Specification

Kaf-Tech Product Specification Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-LUMINARY CABLE

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14 SECTION 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

PREPARING RESIDENTIAL PROPERTY FORTHE HOUSING HABITABILITY INSPECTION

PREPARING RESIDENTIAL PROPERTY FORTHE HOUSING HABITABILITY INSPECTION CITY OF LOS ANGELES HOUSING DEPARTMENT HABITABILITY INSPECTION PROGRAM CODE ENFORCEMENT UNIT 3550 Wilshire Boulevard, 15 th Floor Los Angeles, CA 90010 PREPARING RESIDENTIAL PROPERTY FORTHE HOUSING HABITABILITY

More information

SECTION HVAC INSTRUMENTATION AND CONTROLS INSTALLATION. (Applicable to IUPUI Only)

SECTION HVAC INSTRUMENTATION AND CONTROLS INSTALLATION. (Applicable to IUPUI Only) SECTION 15957 (Applicable to IUPUI Only) I. GENERAL A. NOTES 1. The University has a pre-purchase agreement (PPA) with Johnson Controls (JCI) and Siemens Building Technologies (SBT). The University will

More information

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein.

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein. 16470 PANELBOARDS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 16 An optional keynote to

More information

Tower Site Inspection Procedures

Tower Site Inspection Procedures Engineering, Manufacturing, Construction & Erection Specializing in Radio & TV Communication Towers 6037 S. Industrial Rd. 918-789-9020 Office 918-789-9922 Fax www.belltowercorp.com bob@belltowercorp.com

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION Page 210500-1 SECTION 210500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. Kaf-Tech Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519 METAL CLAD CABLE - MC-PLUS Neutral

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 8/1/17 Update sections Materials and Special Requirements 3 F. 2. 4 H. 2.; 10. & 11(added) 6/15/16 Updated division

More information

Electrical Services Standard Specification Cable Tray Installation. May For ROYAL HOLLOWAY UNIVERSITY OF LONDON

Electrical Services Standard Specification Cable Tray Installation. May For ROYAL HOLLOWAY UNIVERSITY OF LONDON Electrical Services Standard Specification 4.0 - Cable Tray Installation May 2010 For ROYAL HOLLOWAY UNIVERSITY OF LONDON Prepared For The Estates Division By: Hulley & Kirkwood Consulting Engineers Ltd

More information

DX - Application Manual

DX - Application Manual Sr. No. Application Base Material Benefits Fastener 1 Concrete Fast operation X-DNI Fixing of dry wall tracks 2 Concrete Fast operation X-DNI Fixing of junction box, conduits 3 Fast operation Marking characters

More information

UNDERGROUND SERVICES SECONDARY

UNDERGROUND SERVICES SECONDARY Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-

More information

Tanaz Fashions Ltd. & Zayantex Ltd. L Usine Fashion Ltd (Unit 1)

Tanaz Fashions Ltd. & Zayantex Ltd. L Usine Fashion Ltd (Unit 1) Tanaz Fashions Ltd. & Zayantex Ltd. L Usine Fashion Ltd (Unit 1) 216, Sataish Road, Gazipura, Tongi, Gazipur, Bangladesh (23.921458N,90.386581E) 22 September 2013 1 2 Local concrete spalling caused by

More information

legend. #1 is a gas relief valve? If so does Enbridge supply with station?

legend. #1 is a gas relief valve? If so does Enbridge supply with station? Michael Pacholok, Director Purchasing and Materials Management Division City Hall, 8 th Floor, West Tower 00 Queen Street West Toronto, Ontario M5H N Joanne Kehoe Manager Construction Services May 4, 06

More information

Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington

Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington Rev 062017 Provided by UNCW Physical Security and Access OVERVIEW... 3 CABLE INSTALLATION... 3

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 604 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used

More information

SIEMENS. Instructions. Outdoor Metal Clad Switchgear. Installation Assembly OGM&SGM SG kV and 15kV. www. ElectricalPartManuals.

SIEMENS. Instructions. Outdoor Metal Clad Switchgear. Installation Assembly OGM&SGM SG kV and 15kV. www. ElectricalPartManuals. SIEMENS Outdoor Metal Clad Switchgear 5kV and 15kV Instructions Installation Assembly OGM&SGM SG 3258-00 THIS EQUIPMENT CONTAINS HAZARDOUS VOLTAGES. SEVERE PERSONAL INJURY OR PROPERTY DAMAGE CAN RESULT

More information

TELECOMMUNICATIONS ROOMS. Table of Contents PART 1 GENERAL 2 A. LOCATION: 2 B. SIZE 2 C. STRUCTURAL 3 D. ENVIRONMENTAL 3 E. ELECTRICAL AND LIGHTING 3

TELECOMMUNICATIONS ROOMS. Table of Contents PART 1 GENERAL 2 A. LOCATION: 2 B. SIZE 2 C. STRUCTURAL 3 D. ENVIRONMENTAL 3 E. ELECTRICAL AND LIGHTING 3 UNIVERSITY CONTACT: Network Services (302) 831-3722 TELECOMMUNICATIONS ROOMS Table of Contents PART 1 GENERAL 2 A. LOCATION: 2 B. SIZE 2 C. STRUCTURAL 3 D. ENVIRONMENTAL 3 E. ELECTRICAL AND LIGHTING 3

More information

B. Provide equipment complying with this specification and manufactured by one of the following:

B. Provide equipment complying with this specification and manufactured by one of the following: SECTION 230910 PAINT SPRAY BOOTH PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide Paint Spray Booth, Prep Booth and Paint Mix Room, and associated ventilation equipment, complying with the

More information