ELECTRICAL SAFETY INSPECTION REPORT

Size: px
Start display at page:

Download "ELECTRICAL SAFETY INSPECTION REPORT"

Transcription

1 ELECTRICAL SAFETY INSPECTION REPORT AHMED FASHIONS 34/1, Darus Salam Road (Technical), Mirpur-1, Dhaka, Bangladesh. Factory List: 1. Inspected by: Yang Generated by: Yang Inspected on 06 March 2015

2 SUMMARY The is currently operated in a seven (B+G+6) storied building. The building was constructed in 2009 and production was started from The factory had approximately 1,019 workers. The Factory was surveyed for electrical safety by Woosun Energy and Construction Co., Ltd. (WEC). The purpose of the survey was to identify significant electrical safety issues and to provide recommendations for remediation based on applicable standards specified by the Accord. The scope of this initial electrical safety inspection was limited to the review and identification of major electrical safety issues. The inspection did not include identification of minor deficiencies, which would be further dealt with as part of follow-up inspections. The table below summarizes the major electrical safety issues identified during the inspection. Recommendations have been provided to each finding. The implementation schedule shall be developed by the factory to remediate each of the findings. The specific timing of improvements, including any requested extensions due to design/installation constraints, shall be submitted to the Accord for an approval. Page 2 of 17

3 FINDINGS AND RECOMMENDATIONS FINDING NO: E-1 CATEGORY: DESIGN, DRAWINGS & RECORDS Electrical Single Line Diagram (SLD) has inadequate information, and thus is unusable. Prepare an accurate SLD with all necessary information, so any experienced person will then be able to understand the system. REMEDIATION TIMEFRAME: 12 WEEKS FINDING NO: E-2 CATEGORY: DESIGN, DRAWINGS & RECORDS Thermographic scanning of the entire electrical system has not been tested and recorded. Thermographic scanning for the entire electrical system must be performed on a bi-annual basis and recorded. REMEDIATION TIMEFRAME: 8 WEEKS FINDING NO: E-3 CATEGORY: DESIGN, DRAWINGS & RECORDS Insulation resistance test of electrical equipment is not performed. Insulation resistant test of all the cables must be performed once every 2 year cycle and recorded (this must require a complete power shut off). REMEDIATION TIMEFRAME: 8 WEEKS Page 3 of 17

4 FINDING NO: E-4 CATEGORY: DESIGN, DRAWINGS & RECORDS Electrical safety training program is not initiated/conducted. Electrical safety training and awareness program for the electrical personnel and staff must be initiated and recorded. REMEDIATION TIMEFRAME: 8 WEEKS FINDING NO: E-5 CATEGORY: DESIGN, DRAWINGS & RECORDS Instruction for CPR (Cardiopulmonary Resuscitation) or Electrical shock restoration is not present. Hang this first aid and CPR instructions near all electrical equipment (LT panel, MDB, FDB, DB, SDB) on a visible location. FINDING NO: E-6 CATEGORY: DESIGN, DRAWINGS & RECORDS Maintenance records are unavailable. Maintenance Manager or Safety Officer must keep accurate records and ensure that they reflect actual factory day to day operations. Page 4 of 17

5 FINDING NO: E-7 CATEGORY: LIGHTNING PROTECTION Lightning Protection System (LPS) is needed but has not been installed yet. Design and install Lightning Protection System (LPS) in the factory; the LPS designs must be submitted to Accord before starting installation. REMEDIATION TIMEFRAME: 16 WEEKS FINDING NO: E-8 CATEGORY: EARTHING SYSTEM Earth Pit resistance record is unavailable. Record earth pit resistances for all the earth pits, and do it once a year. REMEDIATION TIMEFRAME: 8 WEEKS FINDING NO: E-9 CATEGORY: EARTHING SYSTEM Earth pits are not identifiable. Clearly identify each earth pit, and mark it for periodic maintenance purposes. REMEDIATION TIMEFRAME: 8 WEEKS Page 5 of 17

6 FINDING NO: E- 10 CATEGORY: GENERATOR ROOM Inadequate working clearance around the generator/s. Working clearance around each generator should be 1.07m. If multiple generators are installed then the gap between two generators must be equal to the width of bigger generator. REMEDIATION TIMEFRAME: 12 WEEKS Diesel generator sets. FINDING NO: E- 11 CATEGORY: GENERATOR ROOM Generator body has been earthed by inadequate/improper sized (type) cable. Ensure minimum two earthing connection for generator body (consult with your generator supplier). Generator body earthing. FINDING NO: E-12 CATEGORY: GENERATOR ROOM Earthing cable remains uninsulated. Insulate the earthing cable properly. PRIORITY: P3 REMEDIATION TIMEFRAME: 1 WEEK Generator body earthing cable. Page 6 of 17

7 FINDING NO: E-13 CATEGORY: GENERATOR ROOM Battery terminals are left open. Use insulated rubber cap to cover all the battery terminals. PRIORITY: P3 REMEDIATION TIMEFRAME: 1 WEEK Generator batteries without terminal cap. FINDING NO: E-14 CATEGORY: GENERATOR ROOM Earth conductors are improperly jointed to extend earth connection. Provide earth bus bar for making any earth junction point. PRIORITY: P3 Generator earthing conductor. Page 7 of 17

8 FINDING NO: E-15 CATEGORY: TRANSFORMER ROOM Inadequate working clearance around the transformer. Working clearance around transformer should be 1.07m. REMEDIATION TIMEFRAME: 16 WEEKS Transformer in a congested place. FINDING NO: E-16 CATEGORY: TRANSFORMER ROOM Excess cables coiled and kept at the back of panel. Rearrange cables using cable tray/ladder; trim the unnecessary cables and use only the required length. (Note: if it is a HT cable, do not trim it instead rearrange it to remove coils). Cables behind the LT panel. FINDING NO: E-17 CATEGORY: TRANSFORMER ROOM Transformer body earthing is not connected properly. Connect the earthing cable properly. PRIORITY: P3 REMEDIATION TIMEFRAME: 5 WEEKS Transformer body earthing. Page 8 of 17

9 FINDING NO: E-18 CATEGORY: TRANSFORMER ROOM Transformer Silica gel is discolored, breather cup empty. Replace silica gel by a new one; or dry it under sun and reuse it, if color regains. Fill the transformer breather oil cup with transformer oil. Silica gel. FINDING NO: E-19 CATEGORY: TRANSFORMER ROOM One arcing horn is missing. Install the missing arcing horn. Arcing horn on HT bushing. FINDING NO: E-20 CATEGORY: TRANSFORMER ROOM Inflammable materials are stored beside the transformer. Remove the inflammable materials from transformer room. REMEDIATION TIMEFRAME: IMMEDIATELY Oil container beside the transformer. Page 9 of 17

10 FINDING NO: E-21 CATEGORY: TRANSFORMER ROOM Lint and dust deposited on transformer top. Ensure that transformer is always kept clean. Dust on top. FINDING NO: E-22 CATEGORY: CABLE & CABLE SUPPORTS Factory's service cables have excessive sagging/inadequate support. Excessive sagging should be fixed by adding adequate support to avoid any arcing/flashing at the Grid terminal/factory terminal. HT cable. Page 10 of 17

11 FINDING NO: E-23 CATEGORY: CABLE & CABLE SUPPORTS Power cables entering to or exiting panel are not properly fixed. Power cables entering or exiting the panel must be fixed through Panel base/top plate using cable glands (metal/pvc). Cable trays/ladders may be used to support the cables. REMEDIATION TIMEFRAME: 6 WEEKS Changeover switches. FINDING NO: E-24 CATEGORY: CABLE & CABLE SUPPORTS Power cable is covered by sand in the cable trench (or cable trench is filled with sand). If the cable trench is designed to be covered with sand, the trench may be left as is; otherwise remove sand from cable trench to avoid physical damage to the HT cable. REMEDIATION TIMEFRAME: 6 WEEKS Cable trench. FINDING NO: E-25 CATEGORY: CABLE & CABLE SUPPORTS Cables passing through wall/floor slab are not protected at the entry/exit point(s). Cables passing through permanent wall/floor slab must be protected. Seal the opening by fire rated material protecting power cables preventing any smoke form passing thorough the gap. Penetration on the wall. Page 11 of 17

12 FINDING NO: E-26 CATEGORY: CABLE & CABLE SUPPORTS Sanitary PVC pipes are used for cable support. Use aluminum/ms channel instead of PVC pipe. REMEDIATION TIMEFRAME: 8 WEEKS PVC pipe for cable support. FINDING NO: E-27 Excessive lint/dirt under the distribution panel. Clean all lint and dirt under electrical distribution box/panels. REMEDIATION TIMEFRAME: 3 WEEKS Dust and lint under the panel. Page 12 of 17

13 FINDING NO: E-28 Changeover switch contacts smeared with bearing grease. Clean excess grease from the contacts. Use thin layer of contact grease for lubricating. PRIORITY: P3 Changeover switch contacts. FINDING NO: E-29 Panel doors are not connected with earth. All metal panel doors must have an earth connection of at least 4 rm earth cable. Door earthing. FINDING NO: E-30 Phase barrier/separator is missing. Put a purposely made phase separator (rubber type) between two phases; also terminate cables by proper sized cable lugs and cover cable lugs by heat shrink. LT panel. Page 13 of 17

14 FINDING NO: E-31 Distribution Board's top/bottom is left open (typical issue). Seal each distribution board's top/bottom; and use cable glands holding/supporting cables. Panel base plate is missing. FINDING NO: E-32 Cables insulation at termination point is deteriorated. Check the cables and re-insulate them. Termination point of MCCBs. FINDING NO: E-33 MCCB is not fixed on the panel. MCCB must be fixed on the panel. PRIORITY: P3 MCCB laid on the panel. Page 14 of 17

15 FINDING NO: E-34 Cables terminated at electrical busbar without cable lugs. Terminate all the power/earth/neutral cable with proper sized cable lug. Termination without lug. FINDING NO: E-35 Multiple cables terminated at MCCB terminals. Terminate each power cable at single terminal and use proper sized cable lug. Multiple cables termination can be used if all are all soldered properly and powering a single circuit. Multiple connection. FINDING NO: E-36 Power cables are bent excessively. Avoid power cable bending in electrical system; in unavoidable case bend cables without any stress but not less than 135 degrees. Excessive bend on cable. Page 15 of 17

16 FINDING NO: E-37 Joint in cable not spliced firmly. Mid-length joints in earth down conductor must be avoided. Cable joint inside panel. FINDING NO: E-38 Wires are not terminated. Remove the wires or terminate properly. Unterminated wires. FINDING NO: E-39 CATEGORY: TRANSFORMER ROOM Oil level in transformer oil tank is below minimum level. Ensure minimum oil level in the oil level tank. Check this level periodically. Transformer oil tank. Page 16 of 17

17 FINDING NO: E- 40 Inflammable materials stacked adjacent to electrical panel. Inflammable materials must be stacked maintaining a safe clearance of at least 1.5 m from any electrical installation. REMEDIATION TIMEFRAME: IMMEDIATELY Inflammable materials. FINDING NO: E- 41 Hot spot was found at the termination point of MCCB. Check the connection and load of the phases. Replace the MCCB, if required. REMEDIATION TIMEFRAME: IMMEDIATELY Over heat at MCCB. Page 17 of 17

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT MAHID APPAREL LTD. Nowpara, Madhabdi, Narsingdi, Bangladesh Factory List: 1. MAHID APPAREL LTD. Inspected by: Nazmul Huda Report Generated by: Nazmul Huda Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT Zirabo Bazar, Ashulia, Savar, Dhaka, Bangladesh Factory List: 1. Inspected by: Khan & Tapu Report Generated by: Khan Inspected on Feb 6 th 2015 SUMMARY factory building

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT M/S. PROUD TEXTILE Plot 31/A, BSCIC Industrial Estate, Fatullah, Narayanganj, Bangladesh Factory List: 1. Inspected by: Pema Wangdi Report Generated by: Pema Wangdi

More information

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (4th)

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (4th) Factory Name Address Joyna Bazer Road, Jamirdia, Valuka Factory ID 9504 Electrical Safety dates Initial Date 06/07/2014 Date of 5 th Follow Up Report Received Date 07/27/2015 Date of 6 th Follow Up Date

More information

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th)

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Shashongaon, Plot - S, A-646, Enayet nagar, Fatullah,Narayanganj Factory ID 9468 Electrical Safety dates Initial Date 07/07/2014 20/09/2016 Date of 5 th Follow Up Report Received Date

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ADVANCE WORLD LIMITED Lalkha Shair Char, Fatullah, Narayanganj, Dhaka, Bangladesh Factory List: 1.. Inspected by: Sherub Tenzin & Md. Moin Hasan Report Generated by:

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT FIRST WEAR LMITED 68/Y, Sagarika Road, Pahartoli, Chittagong, Bangladesh Factory List: 1. Inspected by: Moin Hasan Report Generated by: Moin Hasan Inspected on August

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT K.L FASHION LTD. 75/1, Mudafa West, Master Bari, Tongi, Gazipur, Bangladesh Factory List: 1. Inspected by: Jobair Ibna Abdul Alim Report Generated by: Jobair Ibna Abdul

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. Sumilpara, Adamjee Nagar, Shiddirgonji, Narayangonj, Bangladesh Factory List: 1. Moonlux Kinit Garments Limited. 2. West knit Wear Limited. 3. West Fashion. 4. Moonlus

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ABIR FASHIONS Kutubail, Fatullah (Post Office Road), Narayangonj, Bangladesh Factory List: 1. Inspected by: Pema Wangdi & Mamun Report Generated by: Pema Wangdi Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ADHUNIK POSHAK SHILPA LIMITED Civil Engineer Tower, Mirpur, Dhaka, Bangladesh Factory List: 1. Adhunik Poshak Shilpa Ltd. 2. Crazy Fashions Ltd. 3. Kazipur Fashion Ltd.

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT TARATEX (BD) LTD. Plot 23/1, Sataish Road, Tongi, Gazipur, Bangladesh Factory List: 1) Taratex (BD) Ltd. 2) S. P. M Design Ltd. Inspected by : Luv Kumar Chhetri Report

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. KAROTOA APPARELS LTD., TATKHANA ROAD, DHAKA, BANGLADESH. Factory List: 1. Inspected on May 14, 2014 ELECTRICAL SAFETY INSPECTION REPORT. KAROTOA APPARELS LTD., TATKHANA

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT AKH APPARELS LIMITED 128 Hemayetpur, AKH Tower, Savar, Dhaka-1340, Bangladesh. Factory List: 1. AKH Apparels Limited Inspected by: Deonarayan Khatiwara Report Generated

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT BOVS APPARELS LTD. JAMUR MUCHIPARA, HEMAYETPUR, SAVAR, DHAKA, BANGLADESH Factory List: 1. BOVS APPARELS LTD. Inspected on April 13, 2014 SUMMARY The Bovs Apparels Ltd

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. SREERAMPUR, DHAKA, BANGLADESH Factory List: Graphics Textiles Limited Inspected on May 20, 2014 SUMMARY Graphics Textiles Limited is located in Sreerampur, Dhaka. Reportedly,

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT FRESH FASHION WEAR LTD. 638, Sharifpur, P.O-National University, Gazipur Sadar, Bangladesh Factory List: 1. Passion Apparels and Wears Ltd. 2. Inspected by: Jobair Ibna

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ACTIVE COMPOSITE MILLS LTD. Dewan Idris Road, Zirabo, Ashulia, Savar, Dhaka, Bangladesh Factory List: 1. Active Composite Mills Ltd. Inspected by: Hemlal Report Generated

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT, SOUTH VANGNAHATI, SREEPUR, GAZIPUR, BANGLADESH. Factory List: 1. Hams Garments Ltd. Inspected on April 03, 2014 ELECTRICAL SAFETY INSPECTION REPORT, GAZIPUR, BANGLADESH

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT AG s APPARELS LIMITED. Plot No. A/1&2 Block-B, BSCIC I/A Fouzderhat, Sagarika Road, Dhaka-1207, Bangladesh Factory List: 1. AG s Apparels Limited. Inspected by: Sherub

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. Plot # B-32,BSCIC I/E,Tongi,Gazipur Factory List: 1. Kento Asia Limited. Inspected on May 15, 2014 SUMMARY Kento Asia Ltd. factory is established in a rented premises

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT METRO KNITTING & DYEING MILLS LTD.(FACTORY-02), CHARBAG, ASHULIA, SAVAR, DHAKA, BANGLADESH Factory List: 1. Inspected by: Younten Report Generated by: Das Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT SINCERE KNIT GARMENTS LIMITED UNIT-1 East Isdair, Chandmari, Fatullah, Narayangonj, Bangladesh Factory List: 1. Unit-1 2. Fakir Knit Ltd. Inspected by: Sherab Dorji

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT LIBAS TEXTILES LTD., Mouchak, Kaliakoir, Gazipur, Bangladesh Factory List: 1. Libas Textiles Ltd. Inspected on April 6, 2014 SUMMARY The Libas Textiles Ltd., factory

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ALIF GARMENTS Ltd, Dhaka, Bangladesh Prepared for: JANUARY 14, 2014 Alif Garments Ltd. PAGE 1 SUMMARY The seven-story factory housing Alif Textiles Ltd. & Hexa Garments

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. House 8 & 10, Road 3, Section 7, Mirpur Industrial Area, Dhaka, Bangladesh Factory List: 1. Alliance Garments Ltd. Inspected on May 5, 2014 ELECTRICAL SAFETY INSPECTION

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT (1ST FLOOR BOTH WINGS) CHITTAGONG EXPORT PROCESSING ZONE SOUTH HALISHAHAR, CHITTAGONG Factory List: 1. 2. Regency Garments Ltd. 3. ABC Camp Inspected on May 10, 2014

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. ANTIM KNIT COMPOSITE LTD., Barpa, Rupshi, Rupgonj, Narayangonj, Bangladesh. Factory List: 1. Antim Knit Composite Ltd. 2. Antim Knitting & Finishing Ltd. Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH

ELECTRICAL SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH ELECTRICAL SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH January 14, 2013 Redpoint Jackets Ltd. PAGE 1 SUMMARY The four-story factory housing Redpoint Jackets Ltd. located in Dhaka Export

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT FASHION FORUM LTD. 53-54, Diakhali, Zamgara, savar, Dhaka, Bangladesh. Factory List: 1. Fashion Forum Ltd. 2. IDS Washing Ltd. Inspected by: Karma Report Generated by:

More information

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS DAIMLERCHRYSLER MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS ISSUE DATE: 5/1/90 EFFECTIVE DATE: 2/4/92 REVIEW DATE:

More information

CHAPTER 13 GROUNDING AND BONDING

CHAPTER 13 GROUNDING AND BONDING GROUNDING AND BONDING CHAPTER 13 GROUNDING AND BONDING Grounding and bonding must be in accordance with Article 250 of the National Electrical Code (NEC). Bonding is defined in the NEC as the permanent

More information

Installation, Inspection and Maintenance of Dry Type Transformers

Installation, Inspection and Maintenance of Dry Type Transformers Dry Type TX 1 of 8 Installation, Inspection and Maintenance of Dry Type Page 1 of 8 Dry Type TX 2 of 8 Table Of Contents Page Number 1. General... 3 2. Installation... 3 3. Safety Inspections... 4 4. Safety

More information

ELECTRICAL WORKS RELATED TO AC & UPS OF CMP GOC & IAD, LINGAMPALLY, HYDERABAD IN TWO BID SYSTEM THROUGH E-TENDER PRICE BID

ELECTRICAL WORKS RELATED TO AC & UPS OF CMP GOC & IAD, LINGAMPALLY, HYDERABAD IN TWO BID SYSTEM THROUGH E-TENDER PRICE BID SBI INFRA MANAGEMENT SOLUTIONS PVT.LTD. 3 rd Floor, Local Head Office,Bank Street, Koti, Hyderabad- 500095 On behalf of On behalf of On behalf of Cash Management Product GOC (CMP GOC) & Internal Audit

More information

CHAPTER 11 CONDUITS AND FITTINGS

CHAPTER 11 CONDUITS AND FITTINGS CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1

More information

DIVISION 16. Electrical Specifications

DIVISION 16. Electrical Specifications DIVISION 16 Electrical Specifications 16.1 General - Provide all electrical materials and methods as shown on the Drawings, as specified herein, and as needed for a complete and proper installation, including

More information

SECTION 807 PUMP STATION REHABILITATION

SECTION 807 PUMP STATION REHABILITATION SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but

More information

BILL OF MATERIALS Name of the work: F.T.S Modernisation Work

BILL OF MATERIALS Name of the work: F.T.S Modernisation Work 1 BILL OF MATERIALS Name of the work: F.T.S Modernisation Work Erection,Testing and commissioning of Converter transformer 3 PH,11 KV/2 X 1800 V,4000 KVA outdoor Transformer size of 3150 L X 2800 D X 3200

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 Page 1 of 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General

More information

CONDUITS AND FITTINGS

CONDUITS AND FITTINGS CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit

More information

SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES

SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES MANUALLY OPERATED / REMOTELY OPERATED DEAD FRONT PADMOUNTED SWITCHGEAR WITH VACUUM LOAD INTERRUPTING

More information

PRICE BID FOR TENDER NOTICE NO- CONSTRUCTION OF 11KV LINE, LT LINE & SUBSTATION FOR SAMBALPUR FLYOVER PROJECT- WESCO / INSTALLATION / WORKS

PRICE BID FOR TENDER NOTICE NO- CONSTRUCTION OF 11KV LINE, LT LINE & SUBSTATION FOR SAMBALPUR FLYOVER PROJECT- WESCO / INSTALLATION / WORKS PRICE BID FOR TENDER NOTICE NO- CONSTRUCTION OF 11KV LINE, LT LINE & SUBSTATION FOR SAMBALPUR FLYOVER PROJECT- / INSTALLATION / A - DIG BUILDING TO LAXMI TALKIES CHOWK 1 2 Supply & of 3-ph 3-wire 11KV

More information

Enhance Power Equipment Reliability with Predictive Maintenance Technologies

Enhance Power Equipment Reliability with Predictive Maintenance Technologies Enhance Power Equipment Reliability with Predictive Maintenance Technologies November 2012/1910DB1208 by S. Frank Waterer, Electrical Engineerinig, Fellow Schneider Electric USA, Inc. Make the most of

More information

MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT

MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 2476 JANUARY 1990 MATERIAL SPECIFICATION FOR LUMINAIRE RAISING AND LOWERING EQUIPMENT 2476.01 SCOPE 2476.02 REFERENCES 2476.05 MATERIALS TABLE OF CONTENTS

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES... DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements

More information

SECTION EARTHING AND EARTH FAULT PROTECTION

SECTION EARTHING AND EARTH FAULT PROTECTION SECTION 16660 PART 1 - GENERAL 1.01 DESCRIPTION A. The work to be performed includes, but is not necessarily limited to, all work involved with the construction and assembly of a complete electrical earthing

More information

NEC 2017 Code Changes Chapter 1 - General

NEC 2017 Code Changes Chapter 1 - General NEC 2017 Code Changes Chapter 1 - General Changes from the 2014 code are highlighted in yellow. ARTICLE 110 - Requirements for Electrical Installations Part I. General 110.1 Scope. This article covers

More information

SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR

SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR SPECIAL REPAIRS TO EXTERNAL SANITARY ARRANGMENTS AND STREET LIGHTS IN ESI DISPENSARY I & II CAMPUS AT PERAMBUR FINANCIAL BID Item DSR Item Description Qty Units No No. Total 1.1.1 Excavating trenches of

More information

SWITCH GEAR SERVICE AND MAINTAINNANCE SAFETY MEASURES AND REQUIREMENTS

SWITCH GEAR SERVICE AND MAINTAINNANCE SAFETY MEASURES AND REQUIREMENTS SWITCH GEAR SERVICE AND MAINTAINNANCE SAFETY MEASURES AND REQUIREMENTS i) A thorough site risk assessment to be done before commencement of work. ii) All personnel involved in the job to be taken through

More information

Desktop Computer Model 1 (without. DVD RW and Front USB) Desktop Computer Model 2 ( with DVD. RW and Front USB) Dot Matrix Printer with one printer

Desktop Computer Model 1 (without. DVD RW and Front USB) Desktop Computer Model 2 ( with DVD. RW and Front USB) Dot Matrix Printer with one printer Line Item Description of Goods Quantity Physical unit Unit Price 1 2 3 4 5 6 7 8 9 1 11 12 Desktop Computer Model 1 (without 3839 DVD RW and Front USB) Desktop Computer Model 2 ( with DVD 36 RW and Front

More information

STANDARD PHRASEOLOGY SECTION B. 1. This section of standard phraseology is for general use in all disciplines.

STANDARD PHRASEOLOGY SECTION B. 1. This section of standard phraseology is for general use in all disciplines. STANDARD PHRASEOLOGY SECTION B 1. This section of standard phraseology is for general use in all disciplines. SHALL BE USED WHEN THE EXCEPTIONS LISTED IN 3.1 OF 009-23 ARE TO BE REMOVED/INSTALLED AS INTERFERENCES.

More information

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /19/2011 PAGE 1 OF 4 FACILITY LIGHTING SYSTEMS INSTALLATION

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /19/2011 PAGE 1 OF 4 FACILITY LIGHTING SYSTEMS INSTALLATION Project Procedure 07/19/2011 PAGE 1 OF 4 1.0 PURPOSE The purpose of this procedure is to ensure that facility lighting system installations are accomplished in compliance with Project specifications, applicable

More information

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) TOOLKIT DOCUMENT #7 Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) This document has two sections. Neither section is all-inclusive

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 8/1/17 Update sections Materials and Special Requirements 3 F. 2. 4 H. 2.; 10. & 11(added) 6/15/16 Updated division

More information

SECTION GROUNDING

SECTION GROUNDING SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment

More information

Reference Information:

Reference Information: Solar PV Simplified Standard Permit Application Requirements For: Central/String Inverter(s) & Micro-Inverter(s) Systems for One and Two Family Dwellings SCOPE: Use this application only for utility-interactive

More information

TESTING PTE EARTHING

TESTING PTE EARTHING 1 SCOPE This section of the Power Systems Live Working Manual details the procedures to be followed to achieve Safety from the System when carrying out examination, testing and remedial work on PTE (Pole

More information

PIP PCEPA003 Process Analyzer System Field Installation Guidelines

PIP PCEPA003 Process Analyzer System Field Installation Guidelines January 2016 Process Control PIP PCEPA003 Process Analyzer System Field Installation Guidelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

Objectives and Task Analysis for the Installer of Grid Connect Photovoltaic System

Objectives and Task Analysis for the Installer of Grid Connect Photovoltaic System Objectives and Task Analysis for the Installer of Grid Connect Photovoltaic System Introduction This document presents an in-depth task analysis (job analysis or key skills analysis) for practitioners

More information

Design Standard Conduit for Electrical Systems

Design Standard Conduit for Electrical Systems Design Standard Purpose: This design standard has the purpose of creating a consistent application for the installation of conduits throughout the East Side Union High School District, therefore achieving

More information

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 INDEX Page SECTION 1.0: SCOPE 1 1.1 Toronto Hydro Requirements 1 1.2 Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 SECTION 3.0: DEFINITIONS AND THE INTERNATIONAL SYSTEM OF UNITS 1 3.1 Definitions

More information

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard PART 1 GENERAL 1.1 Scope A. The intent of this specification is to provide power control for the parallel operation of generator

More information

Forklift Operator Safety Safe Operation and Pre-Use Inspection

Forklift Operator Safety Safe Operation and Pre-Use Inspection EXERCISE #1 Target Audience: Forklift operators Exercise Objective: Evaluate understanding of safe forklift operation and pre-use inspection criteria Instructions: Answer the questions below. Review your

More information

HUNTINGTON STATION POWER FLOOR PLAN

HUNTINGTON STATION POWER FLOOR PLAN 0/09/5 ADDENDUM 0/09/5 ADDENDUM TIME CLOCK SWITCH KEYED NOTES: EXISTING PANEL "SS2" 2 PROVIDE 2 CIRCUIT ASTRONOMICAL TIME CLOCK SWITCH FOR CANOPY LIGHTING CONTROL. CONNECT CANOPY LIGHTING THROUGH TIME

More information

It is standard practice and all manufacturers to abide by this. It is standard practice and all manufacturers to abide by this.

It is standard practice and all manufacturers to abide by this. It is standard practice and all manufacturers to abide by this. 1 162 General 2 162 General We recommend to specify door handle to singe shot latch type, bolted construction of Door shall not be acceptable. Closing and Tripping Coils shall be rated for continuous supply,

More information

INSTALLATION AND TESTING PROCEDURES FOR ERM LEAK DETECTION

INSTALLATION AND TESTING PROCEDURES FOR ERM LEAK DETECTION 14.601 Materials & Equipment MATERIALS: 1. Teflon Coated Insulated Wire with Crimps 2. Shop Rags 3. Standard ANALOG Ohmmeter INSTALLATION AND TESTING PROCEDURES FOR ERM 4. Wire Crimping and Stripping Tool

More information

INDEX. Page 2 to 3 Structured Wiring Specifications. Page 4 Structured Wiring Schemes: Basement Plan

INDEX. Page 2 to 3 Structured Wiring Specifications. Page 4 Structured Wiring Schemes: Basement Plan 30 Greenway, NW Suite 11 Glen Burnie, Maryland 21061 tel 410.528.8899 fax 410.558.6312 www.gbalternatives.com INDEX Page 2 to 3 Structured Wiring Specifications Page 4 Structured Wiring Schemes: Basement

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section

More information

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 05 28 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE

TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE GETCO/E/TS LUC058/R1

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin February 2019 Page 1 of 5 2018 CANADIAN ELECTRICAL CODE SUBJECT: Section 6 Services and service equipment Rule 6-102 Number of supply services permitted Row housing

More information

OSHA s Enforcement and Significant Changes in 2015 NFPA 70E. Doug Tellin Title, Electrical Safety Specialists

OSHA s Enforcement and Significant Changes in 2015 NFPA 70E. Doug Tellin Title, Electrical Safety Specialists OSHA s Enforcement and Significant Changes in 2015 NFPA 70E Doug Tellin Title, Electrical Safety Specialists Learning Objectives: 1. OSHA requires Qualified Persons to work on or near live parts. 2. An

More information

DETAIL INSTRUCTION No. 1

DETAIL INSTRUCTION No. 1 BEFORE BEGINNING INSTALLATION, PLEASE READ THROUGH ALL INSTRUCTIONS. Uncrate shipment and check against packing list to insure all materials are included before beginning installation. If any discrepencies

More information

Distribution Transformer Failures and Counter Measures

Distribution Transformer Failures and Counter Measures Distribution Transformer Failures and Counter Measures Dr. Katsutoshi Toda Executive Chairman, Toshiba Transmission & Distribution Systems (India) Pvt. Ltd. Role of Distribution Transformer In Network

More information

Youngstown State University

Youngstown State University SECTION 260533 - RACEWAYS PART 1 - GENERAL SUMMARY A. This section includes raceways for electrical wiring. Types of raceways in this section include the following: 1. Flexible metal conduit 2. Liquid

More information

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein.

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein. 16470 PANELBOARDS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 16 An optional keynote to

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION SPECIFICATION EO- 4035 REVISION 12 OCTOBER, 2006 OPERATION AND MAINTENANCE

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

ComEd Customer Requirements for Proper Installation of Metering Equipment Residential and Commercial Customers

ComEd Customer Requirements for Proper Installation of Metering Equipment Residential and Commercial Customers 1 st Edition ComEd Customer Requirements for Proper Installation of Metering Equipment Residential and Commercial Customers Dear customer, This booklet contains some of the most common metering equipment

More information

PACKAGED SYSTEMS INSTALLATION INSTRUCTIONS

PACKAGED SYSTEMS INSTALLATION INSTRUCTIONS PACKAGED SYSTEMS INSTALLATION INSTRUCTIONS NOTE! To the installer: Please make sure you provide this manual to the owner of the equip ment or to the responsible party who maintains the system. Part #FMF-03-333

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 604 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used

More information

37-SDMS-01 REV. 03 SPECIFICATIONS FOR

37-SDMS-01 REV. 03 SPECIFICATIONS FOR 37-SDMS-01 REV. 03 SPECIFICATIONS FOR LOW VOLTAGE MOLDED CASE CIRCUIT BREAKERS FOR SERVICE CONNECTIONS This specification is property of SEC and subject to change or modification without any notice CLAUSE

More information

31-SDMS-03 REV. 01 SPECIFICATIONS FOR

31-SDMS-03 REV. 01 SPECIFICATIONS FOR 31-SDMS-03 REV. 01 SPECIFICATIONS FOR LOW VOLTAGE CABINET FOR POLE MOUNTED TRANSFORMER This specification is property of SEC and subject to change or modification without any notice CONTENTS Clause Description

More information

SECTION CONVECTORS

SECTION CONVECTORS SECTION 23 82 33 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph

More information

CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chitranjali Hills, Thiruvallam P.O., Thiruvananthapuram

CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chitranjali Hills, Thiruvallam P.O., Thiruvananthapuram CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chitranjali Hills, Thiruvallam P.O., Thiruvananthapuram 695 027 No. C-DIT/CG-Elec/18-19/T044 Date: 19.07.2018 TENDER NOTICE Sealed tenders are invited

More information

Northeast Gas Operation School Thursday June 5 th

Northeast Gas Operation School Thursday June 5 th Northeast Gas Operation School Thursday June 5 th Recognition and Assessment of Atmospheric Corrosion Presented by Donald A. Doubleday Jr. National Grid New England Corrosion Engineer & Team Lead Contents

More information

Addendum - 2 for 11KV VCB Panel Specifications GETCO / E / TS HTPB 5401 / R1 Dt and GETCO / E / TS HTPB 5402 / R1 Dt

Addendum - 2 for 11KV VCB Panel Specifications GETCO / E / TS HTPB 5401 / R1 Dt and GETCO / E / TS HTPB 5402 / R1 Dt Addendum - 2 for 11KV VCB Panel Specifications GETCO / E / TS HTPB 5401 / R1 Dt. 25.01.12 and GETCO / E / TS HTPB 5402 / R1 Dt. 27.01.2012 Part - A 11KV Common Standard Busbar Configuration with Integrated

More information

1 AND 2 FAMILY DWELLING REQUIREMENTS

1 AND 2 FAMILY DWELLING REQUIREMENTS PLAN REQUIREMENTS: 1 AND 2 FAMILY DWELLING REQUIREMENTS All residential plans including additions and attached garages shall be designed to the current edition of the International Residential Code. Plans

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin February 2019 Page 1 of 8 2018 CANADIAN ELECTRICAL CODE SUBJECT: Section 10 Grounding and bonding Rule 10-102 Grounding electrodes Replacing metal water service lines

More information

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS SECTION 16711-27 05 28.33 PART 1 - GENERAL 1.01 SUMMARY A. This section includes Labor, materials and equipment necessary to complete the installation required for the items specified under this Section,

More information

8.1.2 Under no circumstances shall a service entrance be left unmetered. Notify the Company if an unmetered service is encountered.

8.1.2 Under no circumstances shall a service entrance be left unmetered. Notify the Company if an unmetered service is encountered. 2012 Edition Redbook 8.0 REVENUE METERING 8.1 INTRODUCTION The purpose of this section is to outline requirements of the Customer, as set forth herein by LIPA, as they pertain to Electric Revenue Metering

More information

SECTION FACILITY LIGHTNING PROTECTION

SECTION FACILITY LIGHTNING PROTECTION PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 41 00 FACILITY LIGHTNING PROTECTION SPEC WRITER NOTE: Delete between //----//if not applicable to project. Also delete any other item or paragraph not applicable

More information

AMIGA. Installation Instructions

AMIGA. Installation Instructions AMIGA These installation instructions are for use with Drexan Energy Systems PipeGuard Hot (PGH), PipeGuard Warm (PGW) and MultiTrace (MT) self regulating heater products. This kit may be installed in

More information

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL 8.01 GENERAL This material is not intended to cover service from OPPD s network in the downtown Omaha area. See Chapter 12 for details

More information

[Type text] Heber Light & Power. Developers & Excavators. Electrical Service Requirements Manual

[Type text] Heber Light & Power. Developers & Excavators. Electrical Service Requirements Manual [Type text] Heber Light & Power Developers & Excavators Electrical Service Requirements Manual May 2017 E.1.1 - GENERAL REQUIREMENTS PURPOSE This section was prepared to aid developers, contractors, engineers

More information

UNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1

UNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1 GENERAL: The scope of this document is to provide instruction for the installation and testing of chilled water piping installed for the University of Missouri. DESIGN GUIDELINES: 1. Materials 1.1. Pipe

More information

CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION

CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 604 NOVEMBER 2004 CONSTRUCTION SPECIFICATION FOR CABLE INSTALLATION TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used

More information

2200-Lb. Semi-Electric Stacker OWNER S MANUAL

2200-Lb. Semi-Electric Stacker OWNER S MANUAL 2200-Lb. Semi-Electric Stacker OWNER S MANUAL WARNING: Read carefully and understand all ASSEMBLY AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic safety

More information