1 Factory Name Address Shashongaon, Plot - S, A-646, Enayet nagar, Fatullah,Narayanganj Factory ID 9468 Electrical Safety dates Initial Date 07/07/ /09/2016 Date of 5 th Follow Up Report Received Date /11/2016 Date of 6 th Follow Up Date of 1 st Follow Up 30/12/ /02/2017 Date of 7 th Follow Up Date of 2 nd Follow Up 29/12/ /05/2017 Date of 8 th Follow Up Date of 3 rd Follow Up 27/03/2016 Date of 9 th Follow Up Date of 4 th Follow Up 17/07/2016 Date of 10 th Follow Up Inspected by Shafi Md. Imran te: Other Factory: 1 Transformer guarded with wire mesh fencing. (Typical Construct a separate room for the transformer by constructing barrier (brick) walls (fire rated wall) up to the ceiling; the minimum area of the transformer room should be sq.mm (according to BNBC 2006, Section-2.6.3). t. New timeline is given till 29/02/2016. On 27/03/2016: t. New timeline is given till 06/05/2016. On 17/07/2016. t. t corrected. On 28/11/2016: t. t. t. 06/05/2016 We have already installed Fire door and Fire rated wall up to the ceiling in Transformer room. As we are not able to fulfill the required area of 10-13sqmm so we are going to shift transfer room to another building which constriction work is almost done. We need little bit time to complete total work In Progress Page 1 of 21

2 2 Cables laid randomly in open (without cover) cable trench. Cables in trench must be supported on trays inside trench and should be protected with covers with ample strength and rigidity.. 30/12/2014 Done 3 Excessive HT cable with acute bend not Install separate cable tray supported and with protective cover for protected; The HT and LT cables; Latch HT and LT cables the HT cable properly are laid in the avoiding acute bend. same trench without separation.. 30/12/2014 Done 4 Arching horn not installed at transformer HT side. Arching horn should be installed at the HT bushing (may consult the servicing/supplier company).. 30/12/2014 Done Page 2 of 21

3 5 Silica gel in transformer breather, discoloured. Oil cup below transformer breather is empty. Replace silica gel and must include in routine maintenance to check and maintain. Breather oil cup must be filled with transformer oil to required level as instructed by the manufacturer.. 30/12/2014 Done 6 Cables/wires passing through floor are not protected /supported and remaining gaps around the cable/wiring are not sealed. Cables/wirings passing through floor must be protected/supported installing covered cable tray/ raceway/ rigid pipes and remaining gaps must be sealed with fire resistant materials. Cable tray/raceway shall be installed for the support of the cable throughout its length 10/08/ Openings in the panel base plate. Make circular hole at the top plate of panels and provide cable gland according to the respective cable size for cable entry and exit so that the cables are not stressed on the sharp edges of the hole of panels. Provide covers (of non-combustible material) if any additional gap remains after installing cable glands. 10/08/2015 Page 3 of 21

4 8 Phase barrier/ Phase barriers between separators different phases supplied by between different the breaker manufacturer phases are not must be installed to avoid installed. arc flashing. 30/12/2014 Done 9 Openings in the top plate after the cable passage. Make circular hole at the base plate/top plate of panels and provide cable gland according to the respective cable size for cable entry and exit so that the cables are not stressed on the sharp edges of the hole of panels. Provide covers (of non-combustible material) if any additional gap remains after installing. 30/12/2014 Done 10 Panel base plates removed to allow cable entry. Make circular hole at the base plate/top plate of panels and provide cable gland according to the respective cable size for cable entry and exit so that the cables are not stressed on the sharp edges of the hole of panels. Provide covers (of non-combustible material) if any additional gap remains after installing cable glands. 10/08/2015 Page 4 of 21

5 11 Panel base plates removed to allow cable entry. The extended cables, which are exposed, must be encased in a rigid conduit or a required size of cable duct/tray must be used. 30/12/2014 Done 12 Power cables laid on concrete floor. Cables must be laid inside covered cable-tray installed on the floor or trench. 06/01/2015 Done 13 Multiple cables are terminated into single point of bus bar. Terminate each cable individually on the bus bar. Multiple cables shall not be terminated on same point of bus bar. 06/01/2015 Done Page 5 of 21

6 14 Cables connecting to MCCB inside panel without cable lugs. Cables shall be connected to terminals only by cable lugs according to cable size. 30/12/2014 Done 15 Cables running along the ladder are not securely fastened. The service cables which are not securely fastened to the ladder must be fastened at regular intervals using cable ties. 30/12/2014 Done 16 Flexible PVC cable not supported. Replace the flexible pipe with PVC pipe to support and protect the cables. Ensure the industrial graded PVC pipe is properly clamped with saddle at a regular interval. 30/12/2014 Done Page 6 of 21

7 17 Cables entering or leaving distribution panel are not supported on tray/riser. Cables must be laid into a covered cable-ladder, installed on the wall to prevent any physical damages. 30/12/2014 Done 18 Generator panel base plates removed to allow cable entry. Make circular hole at the base plate/top plate of panels and provide cable gland according to the respective cable size for cable entry and exit so that the cables are not stressed on the sharp edges of the hole of panels. Provide covers (of non-combustible material) if any additional gap remains after installing cable glands. 30/12/2014 Done 19 Cables encased in flexible PVC pipe carried from one floor to another through floor not protected. Install covered cable tray or rigid pipe for passing cables and it should be prevailed throughout the permanent wall to protect cables insulation from damage and the remaining gaps must be sealed with fire resistant materials. 30/12/2014 Done Page 7 of 21

8 20 Cables or wiring drawn in flexible PVC conduits, extended from the BBT are not supported. Cables extended from BBT in flexible PVC conduit must be supported in covered cable trays. 30/12/2014 Done 21 Cables extended from BBT Cables from Bus breaker to distribution Bar Trunking boards at various floors must (BBT) in electrical be supported on trays/risers shaft, extended to or rigid pipes may be used different levels for passing through the slab. (floors) are not Flexible conduit must not be supported. used for passing through slab. & long point wiring (except for special wirings). 10/08/ Termination of body earthing is not properly done. Generator must be connected to earth securely at least at two points. Ensure the earthing cable size is not less than 35sq.mm. The termination must be done using cable lugs. 10/08/2015 Page 8 of 21

9 23 Storage in generator room. Remove all the combustible materials stored inside the Generator room. Immediately 30/12/2014 Done 24 Power cables of compressor are carried through flexible PVC pipe and it is not supported.. The compressor power cables must be supported in 30/12/2014 Done 25 Multiple cables inserted into a single lug. Use proper sized cable lugs for each single cable and punches them by proper hand puncher or hydraulic puncher to avoid loose connection. Enlarge the earth s bus-bar size according to the capacity of the panel and make more holes. Use single point (hole) of bus bar to terminate each single cable (lugs). 06/01/2015 Done Page 9 of 21

10 26 Electrical room used as maintenance room. The maintenance room must be relocated. The electrical room must not be used as maintenance room. s 30/12/2014 Done 27 Gland holes in cable base plates left open. Provide cable gland same as the cable size at the cable entry and exit so that the cables are not stressed on the sharp edges of the entry and exit hole of the panel board. Unused gland holes in base plates cover must be sealed with proper way. s On 27/03/2016: 29/02/2016 Done 28 Panel doors not connected with earth bond. Provide earth connection for body and doors of metallic distribution boards using green cables preferably braid so that the metallic door remains at zero potential all the time. s 06/01/2015 Done Page 10 of 21

11 29 Large exhaust fans in production floors are directly controlled by the MCB. Large exhaust fans must be connected through control device such that it will not restart automatically when power is restored. s 06/01/2015 Done 30 Cable ducts covered by the flexible PVC duct. Disconnect the electric supply to the duct and provide cover made of noncombustible material preferably metal on the duct to prevent ingression of dust and debris. 30/12/2014 Done 31 The flexible PVC conduit is supported against the overfilled aluminium duct.. The cable within the flexible PVC conduit may be laid in the aluminium cable duct. If the aluminium duct do not accommodate all the cables it may be replaced by a bigger cable duct. 06/01/2015 Done Page 11 of 21

12 32 Multiple cables terminating to MCCB in panel. Multiple cables connecting at a MCCB terminal must be removed. Individual circuit breaker must be used for each load according to the respective cable-size. 10/08/ Electrical Single Line Diagram (SLD) has inadequate information which has no effectiveness. Prepare SLD more informative thus anyone can understand it. t. New timeline is given till 29/02/2016. On 27/03/2016: t. New timeline is given till 06/05/2016. On 17/07/2016: t. Modification is not completed.. On 28/11/2016: t. t. 06/05/2016 We have already approved SLD from ACCORD, as the mismatch of our existing LT switch Gear we need to modify Sub Station-1. In the mean time we are going to rearrange, need few times. In Progress 34 Thermography scanning report is unavailable Keep a Thermography scanning record of your electrical system at lease twice a year On 27/03/2016: 29/02/2016 Page 12 of 21

13 35 MCCBs are not adjusted accordingly Adjust all the MCCBs according to cable ampacity (connected load). Avoid using different sized cable at the terminals 31/10/2015 Done 36 Lint and dust deposited on transformer top Keep always clean transformer top. 06/01/2015 Done 37 Battery cases are kept in wooden case. Moreover, battery terminal is not covered. Use non-flammable case/shelf to store battery. Again, the battery terminals need to be covered with non-flammable material. 10/08/2015 We have already change the battery case as per standard. And battery terminal we will covered with non flammable material within 1 month Page 13 of 21

14 38 Lightning Design LPS for your factory Protections according to NFPA System (LPS) is 780/BNBC 2006 and start inadequate for the installation. factory On 27/03/2016: t. New committed time line is given till 5/05/2016 to close this issue. On 17/07/2016:. 15/05/ Insulation resistance test of electrical cable is not performed Insulation resistant test of all the cables must be performed once every 2 2 Months year cycle and recorded (this must require a complete power shut off) On 27/03/2016: 28/02/ Earth Pit resistance record is unavailable All earthing systems shall be tested for resistance on any dry day not less than once in every two years. A record of every earth test made and 2 Months the result shall be kept for not less than two years and shall be available to the Inspector when required. On 27/03/2016: 28/02/2015 Page 14 of 21

15 41 42 Hot spots at terminations inside panel. Identify the overloading, loose connection, unbalanced load which may cause the excessive heat-rise and take action accordingly. However, immediately correct such points A. Distribution A. Ensure no damage may be board can be caused by the ingress of water damaged by ingress & 2.5m distance between of water or source of water source & distribution heat. board. Distribution board B. Panel/ needs to proper IP rated. Distribution boxes are inaccessible or B. Take necessary initiative can not be opened thus every panel/ distribution to perform any board can be easily accessible. maintenance work. 07 Days 2 Months On 27/03/2016: t. New committed time line is given till 05/05/2016. On 17/07/2016: t. Hot Spot Found in report. t corrected. On 28/11/2016: t. t.. hotspot found during inspection. t corrected. Time extension is given till 20/11/2016. On 28/11/2016: t.. 05/05/2016 We will relocate substation with balance load so need around 1 month time for installation work. 20/11/2016 Done 43 Power cable is buried in the concrete floor/wall or soil. Construct a cable trench for distributing power cables. Then cover it by checkered plate. 2 Months t corrected. Time extension is given till 20/11/2016. On 28/11/2016: t. t.. 20/11/2016 Done Page 15 of 21

16 44 Light in store room / storage areas is uncovered. Lights in store room / storage areas shall be covered 2 Months. 30/09/ Earth pits are not identifiable Identify each earth pit and mark it for periodic maintenance purpose 2 Months t corrected. Time extension is given till 20/11/2016. On 28/11/2016: t. t. t. 20/11/2016 In Progress 46 Distribution board/d panels are not sealed. (1)Keep always clean inside all the distribution boards/panels. Seal them properly and ensure adequate ventilation. (2)Clean all the cable 2 Months channels/ducts; then cover them (you may use checkered/perforated plate ). But ensure that you have options for further maintenance work. t corrected. Time extension is given till 20/11/2016. On 28/11/2016: t. t. t. 20/11/2016 In Progress Page 16 of 21

17 47 Instruction for CPR (Cardiopulmonar y Resuscitation)/El ectrical shock restoration is absent Hang CPR instruction near all electrical equipment (LT panel, MDB, FDB, DB, SDB) on a visible location 2 Months t corrected. Time extension is given till 20/11/2016. On 28/11/2016: t.. 20/11/2016 Done 48 Cable trench is not clean. Cable trays are not covered to protect from weather and heat. Install ladder type cable tray inside the trench lay cable in an organized way and ensure adequate cover for cable trench using checkered plate bearing 2 Months floor height. Cable trench to be kept clean. Cable trays needs to be covered to protect from hear, moisture, water etc. t corrected. Time extension is given till 20/11/2016. On 28/11/2016: t. t.. 20/11/2016 Done 49 Sign of over loading (Burn/ Discolour). Power bus bar/mccb are installed congested; and power cables touch opposite phased bus bar Bus bar may be overloaded. Rearrange the load or increase the size & quality of bus bar. Ensure that no power cable touches bare bus bar. Use insulated bus bar (just covering existing bus bar by heat shrink) 2 Months This issue was not found during inspection. 30/09/2016 Page 17 of 21

18 50 Combustible materials are stored within the substation room. Remove all combustible materials within the substation room. 2 Months t corrected. Time extension is given till 20/11/2016. On 28/11/2016: t. Combustible material must be stored at a place which is fully separated from substation room.. 20/11/2016 Done 51 Transformer Oil Test report is unavailable. Oil level in transformer oil tank is below minimum level. Check the transformer oil condition by performing oil test. Do it once in a year and keep the record. Ensure minimum oil level in the oil level tank. Check this level periodically. 2 Months t corrected. Time extension is given till 20/11/2016. On 28/11/2016:. 20/11/ MCCBs are not adjusted according to load demand. To save power cables all the MCCBs must be adjusted according to load demand; if adjustment is possible replacement will be the only way. 1.5 Month On 28/11/2016: t. New timeline is till 08/01/2017. t.. 08/01/2017 Done Page 18 of 21

19 53 Earth lead cable/earth Continuity Conductor size is inadequate/ undersize Resize earth lead cable/ecc for LT panel/mdb/db; follow BNBC 2006 Part 8 chapter 2 section 2.8 for sizing your earthing cables (Usually ECC should be equal to the half of the respective phase cable). t. New committed time line is given till 20/03/2017 to close this issue.. 20/03/2017 We will Maintain according to BNBC guideline. 54 Transformer Silica gel is discoloured Replace silica gel by a new one; or dry it under sun and reuse it, if colour regains.. 08/01/2017 Done 55 Lightning Protections System (LPS) is not connected with earth. LPS system must be connected with earth and earth pit resistance test must be performed.. 08/01/2017 Done Page 19 of 21

20 56 Multiple cables (came from different electrical circuits) terminated at MCCB terminals/ Bus bar. Each electrical circuit must be terminated at single MCB/MCCB terminals.. 20/03/2017 Already we have taken initiative to remove the multiple cable, in the meantime required DB in our hand. We are able to complete the task if our factory will close 1/2 days. Within short time our factory will be closed for 1/2 days that time will complete the task. 57 Loop connection Any kind of looped power has been used connection must be avoided powering multiple from electrical installation. MCB/MCCBs.. 20/03/2017 Already we have taken initiative to remove the Loop connection, in the meantime required DB in our hand. We are able to complete the task if our factory will close 1/2 days. Within short time our factory will be closed for 1/2 days that time will complete the task. 58 Cable duct/ channel terminals are left open Cable duct/channel terminals must be covered/end capped. 20/03/2017 Done Page 20 of 21

21 59 Electrical distribution box/panels are full of fluffs (lint/dirt) Each electrical distribution board/panel must be properly sealed to avoid of ingression of fluffs; but make sure that an adequate ventilation system is present there.. 20/03/2017 Done 60 Unterminated live wire is kept inside the electrical panel. All the unterminated live power cables must be removed as soon as possible.. 20/03/2017 Done Page 21 of 21

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (4th)

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (4th) Factory Name Address Joyna Bazer Road, Jamirdia, Valuka Factory ID 9504 Electrical Safety dates Initial Date 06/07/2014 Date of 5 th Follow Up Report Received Date 07/27/2015 Date of 6 th Follow Up Date

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT MAHID APPAREL LTD. Nowpara, Madhabdi, Narsingdi, Bangladesh Factory List: 1. MAHID APPAREL LTD. Inspected by: Nazmul Huda Report Generated by: Nazmul Huda Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ABIR FASHIONS Kutubail, Fatullah (Post Office Road), Narayangonj, Bangladesh Factory List: 1. Inspected by: Pema Wangdi & Mamun Report Generated by: Pema Wangdi Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT AHMED FASHIONS 34/1, Darus Salam Road (Technical), Mirpur-1, Dhaka, Bangladesh. Factory List: 1. Inspected by: Yang Generated by: Yang Inspected on 06 March 2015 SUMMARY

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT M/S. PROUD TEXTILE Plot 31/A, BSCIC Industrial Estate, Fatullah, Narayanganj, Bangladesh Factory List: 1. Inspected by: Pema Wangdi Report Generated by: Pema Wangdi

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT BOVS APPARELS LTD. JAMUR MUCHIPARA, HEMAYETPUR, SAVAR, DHAKA, BANGLADESH Factory List: 1. BOVS APPARELS LTD. Inspected on April 13, 2014 SUMMARY The Bovs Apparels Ltd

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT TARATEX (BD) LTD. Plot 23/1, Sataish Road, Tongi, Gazipur, Bangladesh Factory List: 1) Taratex (BD) Ltd. 2) S. P. M Design Ltd. Inspected by : Luv Kumar Chhetri Report

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ADVANCE WORLD LIMITED Lalkha Shair Char, Fatullah, Narayanganj, Dhaka, Bangladesh Factory List: 1.. Inspected by: Sherub Tenzin & Md. Moin Hasan Report Generated by:

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT FIRST WEAR LMITED 68/Y, Sagarika Road, Pahartoli, Chittagong, Bangladesh Factory List: 1. Inspected by: Moin Hasan Report Generated by: Moin Hasan Inspected on August

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT Zirabo Bazar, Ashulia, Savar, Dhaka, Bangladesh Factory List: 1. Inspected by: Khan & Tapu Report Generated by: Khan Inspected on Feb 6 th 2015 SUMMARY factory building

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT K.L FASHION LTD. 75/1, Mudafa West, Master Bari, Tongi, Gazipur, Bangladesh Factory List: 1. Inspected by: Jobair Ibna Abdul Alim Report Generated by: Jobair Ibna Abdul

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ACTIVE COMPOSITE MILLS LTD. Dewan Idris Road, Zirabo, Ashulia, Savar, Dhaka, Bangladesh Factory List: 1. Active Composite Mills Ltd. Inspected by: Hemlal Report Generated

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. Plot # B-32,BSCIC I/E,Tongi,Gazipur Factory List: 1. Kento Asia Limited. Inspected on May 15, 2014 SUMMARY Kento Asia Ltd. factory is established in a rented premises

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ADHUNIK POSHAK SHILPA LIMITED Civil Engineer Tower, Mirpur, Dhaka, Bangladesh Factory List: 1. Adhunik Poshak Shilpa Ltd. 2. Crazy Fashions Ltd. 3. Kazipur Fashion Ltd.

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. Sumilpara, Adamjee Nagar, Shiddirgonji, Narayangonj, Bangladesh Factory List: 1. Moonlux Kinit Garments Limited. 2. West knit Wear Limited. 3. West Fashion. 4. Moonlus

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT METRO KNITTING & DYEING MILLS LTD.(FACTORY-02), CHARBAG, ASHULIA, SAVAR, DHAKA, BANGLADESH Factory List: 1. Inspected by: Younten Report Generated by: Das Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT FRESH FASHION WEAR LTD. 638, Sharifpur, P.O-National University, Gazipur Sadar, Bangladesh Factory List: 1. Passion Apparels and Wears Ltd. 2. Inspected by: Jobair Ibna

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT AKH APPARELS LIMITED 128 Hemayetpur, AKH Tower, Savar, Dhaka-1340, Bangladesh. Factory List: 1. AKH Apparels Limited Inspected by: Deonarayan Khatiwara Report Generated

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. KAROTOA APPARELS LTD., TATKHANA ROAD, DHAKA, BANGLADESH. Factory List: 1. Inspected on May 14, 2014 ELECTRICAL SAFETY INSPECTION REPORT. KAROTOA APPARELS LTD., TATKHANA

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. SREERAMPUR, DHAKA, BANGLADESH Factory List: Graphics Textiles Limited Inspected on May 20, 2014 SUMMARY Graphics Textiles Limited is located in Sreerampur, Dhaka. Reportedly,

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT LIBAS TEXTILES LTD., Mouchak, Kaliakoir, Gazipur, Bangladesh Factory List: 1. Libas Textiles Ltd. Inspected on April 6, 2014 SUMMARY The Libas Textiles Ltd., factory

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT AG s APPARELS LIMITED. Plot No. A/1&2 Block-B, BSCIC I/A Fouzderhat, Sagarika Road, Dhaka-1207, Bangladesh Factory List: 1. AG s Apparels Limited. Inspected by: Sherub

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. House 8 & 10, Road 3, Section 7, Mirpur Industrial Area, Dhaka, Bangladesh Factory List: 1. Alliance Garments Ltd. Inspected on May 5, 2014 ELECTRICAL SAFETY INSPECTION

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT SINCERE KNIT GARMENTS LIMITED UNIT-1 East Isdair, Chandmari, Fatullah, Narayangonj, Bangladesh Factory List: 1. Unit-1 2. Fakir Knit Ltd. Inspected by: Sherab Dorji

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT, SOUTH VANGNAHATI, SREEPUR, GAZIPUR, BANGLADESH. Factory List: 1. Hams Garments Ltd. Inspected on April 03, 2014 ELECTRICAL SAFETY INSPECTION REPORT, GAZIPUR, BANGLADESH

More information

ELECTRICAL SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH

ELECTRICAL SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH ELECTRICAL SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH January 14, 2013 Redpoint Jackets Ltd. PAGE 1 SUMMARY The four-story factory housing Redpoint Jackets Ltd. located in Dhaka Export

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ALIF GARMENTS Ltd, Dhaka, Bangladesh Prepared for: JANUARY 14, 2014 Alif Garments Ltd. PAGE 1 SUMMARY The seven-story factory housing Alif Textiles Ltd. & Hexa Garments

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT FASHION FORUM LTD. 53-54, Diakhali, Zamgara, savar, Dhaka, Bangladesh. Factory List: 1. Fashion Forum Ltd. 2. IDS Washing Ltd. Inspected by: Karma Report Generated by:

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. ANTIM KNIT COMPOSITE LTD., Barpa, Rupshi, Rupgonj, Narayangonj, Bangladesh. Factory List: 1. Antim Knit Composite Ltd. 2. Antim Knitting & Finishing Ltd. Inspected

More information

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS DAIMLERCHRYSLER MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS ISSUE DATE: 5/1/90 EFFECTIVE DATE: 2/4/92 REVIEW DATE:

More information

PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION

PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION E11 : General Electrical Earthing and LIGHTNING Protection PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION 1 2009-05-12 Review of Mechanical / Electrical and Control

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin February 2019 Page 1 of 5 2018 CANADIAN ELECTRICAL CODE SUBJECT: Section 6 Services and service equipment Rule 6-102 Number of supply services permitted Row housing

More information

BILL OF MATERIALS Name of the work: F.T.S Modernisation Work

BILL OF MATERIALS Name of the work: F.T.S Modernisation Work 1 BILL OF MATERIALS Name of the work: F.T.S Modernisation Work Erection,Testing and commissioning of Converter transformer 3 PH,11 KV/2 X 1800 V,4000 KVA outdoor Transformer size of 3150 L X 2800 D X 3200

More information

CHAPTER 11 CONDUITS AND FITTINGS

CHAPTER 11 CONDUITS AND FITTINGS CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1

More information

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC).

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC). SECTION 16111 CONDUITS PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide conduits, complete, as shown, specified or required per Contract Documents. Principal items include: 1. Rigid aluminum conduit.

More information

NEC 2014 Code Changes

NEC 2014 Code Changes NEC 2014 Code Changes Articles 280.21-300.50 CHANGES FROM 2011 TO 2014 CODE ARE IN RED Chapter 2 - Wiring and Protection ARTICLE 280 Surge Arresters, Over 1000 volts II. Instillation III. Connecting Surge

More information

T. SUNDUPALLI BRANCH (04427)

T. SUNDUPALLI BRANCH (04427) STATE BANK OF INDIA T. SUNDUPALLI BRANCH (04427) REGION 2, KADAPA RURAL TIRUPATI (A.O) ELECTRICAL WORK BILL OF QUANTITIES SL. NO. DESCRIPTION QTY. UNIT RATE AMOUNT Rs. Rs. 1 Supply, installation, testing

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT (1ST FLOOR BOTH WINGS) CHITTAGONG EXPORT PROCESSING ZONE SOUTH HALISHAHAR, CHITTAGONG Factory List: 1. 2. Regency Garments Ltd. 3. ABC Camp Inspected on May 10, 2014

More information

CONDUITS AND FITTINGS

CONDUITS AND FITTINGS CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section

More information

UNDERGROUND SERVICES SECONDARY

UNDERGROUND SERVICES SECONDARY Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-

More information

ELECTRICAL WORKS RELATED TO AC & UPS OF CMP GOC & IAD, LINGAMPALLY, HYDERABAD IN TWO BID SYSTEM THROUGH E-TENDER PRICE BID

ELECTRICAL WORKS RELATED TO AC & UPS OF CMP GOC & IAD, LINGAMPALLY, HYDERABAD IN TWO BID SYSTEM THROUGH E-TENDER PRICE BID SBI INFRA MANAGEMENT SOLUTIONS PVT.LTD. 3 rd Floor, Local Head Office,Bank Street, Koti, Hyderabad- 500095 On behalf of On behalf of On behalf of Cash Management Product GOC (CMP GOC) & Internal Audit

More information

CHAPTER 13 GROUNDING AND BONDING

CHAPTER 13 GROUNDING AND BONDING GROUNDING AND BONDING CHAPTER 13 GROUNDING AND BONDING Grounding and bonding must be in accordance with Article 250 of the National Electrical Code (NEC). Bonding is defined in the NEC as the permanent

More information

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS PART 1 - GENERAL 01.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this Section.

More information

SECTION EARTHING AND EARTH FAULT PROTECTION

SECTION EARTHING AND EARTH FAULT PROTECTION SECTION 16660 PART 1 - GENERAL 1.01 DESCRIPTION A. The work to be performed includes, but is not necessarily limited to, all work involved with the construction and assembly of a complete electrical earthing

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 GROUNDING AND BONDING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Date Description of Change Pages / Sections Modified ID 6/15/16 Updated format, division title, and removed references to other sections. - mgl44 A. Summary This section contains design criteria for the

More information

Tender No.:- RITES/CO/B&A/EE/CUK- Gulbarga/External/E-2/2012.

Tender No.:- RITES/CO/B&A/EE/CUK- Gulbarga/External/E-2/2012. Amendment No. 1. Sub. : Tender: Supply, Erection, Testing & Commissioning of 11kV/440 V substation, Transformers, DG Sets, HT/ LT panels, HT/LT Cables, Street Lighting etc at University Campus at Khadaganchki

More information

TS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE

TS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE TORONTO TRANSPORTATION March 2012 TS 803 DUCTS TABLE OF CONTENTS 1. DRAWINGS TTD 803.001 TTD 803.010 DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE 2. CONSTRUCTION

More information

CS-21 STREET STRUCTURES TABLE OF CONTENTS

CS-21 STREET STRUCTURES TABLE OF CONTENTS TABLE OF CONTENTS CS-21.0 Street Structures... 1 CS-21.1 Road Signs... 1 CS-21.2 Safety Barriers... 1 CS-21.3 Bollards and Removable Bollards... 1 CS-21.4 Pedestrian Barrier Rails and Handrails... 1 CS-21.5

More information

Regulations of Connecticut State Agencies

Regulations of Connecticut State Agencies This document was prepared by the Connecticut State Library and is provided for the convenience of the reader. This is not the official version of the regulations. The official regulations are published

More information

Interiors Sources Decor LLC. Method Statement BLOCK WORK. Civil Works 6/26/2016

Interiors Sources Decor LLC. Method Statement BLOCK WORK. Civil Works 6/26/2016 Method Statement BLOCK WORK Civil Works 6/26/2016 The purpose of this Work Method Statement for Block Works (Concrete Masonry Units) is to outline and describe in detail the procedure such as setting and

More information

GN7 Amendment 3-5 Agricultural and horticultural premises

GN7 Amendment 3-5 Agricultural and horticultural premises GN7 Amendment 3-5 Agricultural and horticultural premises 5.1Introduction Amendment No. 3 to the 17th Edition Sect 705 There are no significant changes introduced in Section 705by Amendment No. 3 to the

More information

WALCHAND COLLEGE OF ENGINEERING, SANGLI An Autonomous Institute Government Aided Institute TENDER DOCUMENT. TENDER FORM COST : Rs.

WALCHAND COLLEGE OF ENGINEERING, SANGLI An Autonomous Institute Government Aided Institute TENDER DOCUMENT. TENDER FORM COST : Rs. WALCHAND COLLEGE OF ENGINEERING, SANGLI An Autonomous Institute Government Aided Institute TENDER DOCUMENT TENDER FORM COST : Rs.500/- LAST DATE OF RECEIVING 2 nd September, 2016 up to 12:00 noon DATE

More information

SECTION GROUNDING

SECTION GROUNDING SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and

More information

IET Wiring Regulations (BS 7671:2008+A3:2015) - SECTION 705 AGRICULTURAL AND HORTICULTURAL PREMISES

IET Wiring Regulations (BS 7671:2008+A3:2015) - SECTION 705 AGRICULTURAL AND HORTICULTURAL PREMISES IET Wiring Regulations (BS 7671:2008+A3:2015) - SECTION 705 AGRICULTURAL AND HORTICULTURAL PREMISES 705.1 Scope The particular requirements of this section apply to fixed electrical installations indoors

More information

SDCS-02 CONSTRUCTION STANDARD FOR

SDCS-02 CONSTRUCTION STANDARD FOR الشركة السعودية للكهرباء DATE: November 2016 CONSTRUCTION STANDARD FOR UNDERGROUND DISTRIBUTION NETWORK This specification is property of SEC and subject to change or modification without any notice الشركة

More information

1. Approved Manufacturers: Carlon Electrical Products, Cantex, or approved equal.

1. Approved Manufacturers: Carlon Electrical Products, Cantex, or approved equal. PART 1: GENERAL 1.01 Scope of Standard A. This standard provides general guidance concerning the specific preferences of Texas State University for for Electrical System. B. Texas State University recognizes

More information

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) TOOLKIT DOCUMENT #7 Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) This document has two sections. Neither section is all-inclusive

More information

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property 2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property A brief summary of the most used code references for residential wiring State of Idaho Division of Building Safety Electrical

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 8/1/17 Update sections Materials and Special Requirements 3 F. 2. 4 H. 2.; 10. & 11(added) 6/15/16 Updated division

More information

Electrical Services Standard Specification Cable Tray Installation. May For ROYAL HOLLOWAY UNIVERSITY OF LONDON

Electrical Services Standard Specification Cable Tray Installation. May For ROYAL HOLLOWAY UNIVERSITY OF LONDON Electrical Services Standard Specification 4.0 - Cable Tray Installation May 2010 For ROYAL HOLLOWAY UNIVERSITY OF LONDON Prepared For The Estates Division By: Hulley & Kirkwood Consulting Engineers Ltd

More information

CITY OF RICHMOND HEIGHTS DEPARTMENT OF BUILDING ZONING AND HOUSING STANDARDS AND REGULATIONS

CITY OF RICHMOND HEIGHTS DEPARTMENT OF BUILDING ZONING AND HOUSING STANDARDS AND REGULATIONS CITY OF RICHMOND HEIGHTS DEPARTMENT OF BUILDING ZONING AND HOUSING STANDARDS AND REGULATIONS By ordinance the following codes have been adopted governing construction in their most currently published

More information

SECTION TEMPORARY FACILITIES AND CONTROLS

SECTION TEMPORARY FACILITIES AND CONTROLS SECTION 015000 TEMPORARY FACILITIES AND CONTROLS PART 1 - GENERAL 1.1 GENERAL A. Each Contractor shall be responsible for arranging for and providing construction facilities and temporary controls as required

More information

Oregon Building Officials Association

Oregon Building Officials Association Oregon Building Officials Association Oregon Building Officials Association Inspector s Checklist 2010 Oregon Manufactured Dwelling Installation Specialty Code November 5, 2014 By: Frank Scheer, Building

More information

Design Standard Conduit for Electrical Systems

Design Standard Conduit for Electrical Systems Design Standard Purpose: This design standard has the purpose of creating a consistent application for the installation of conduits throughout the East Side Union High School District, therefore achieving

More information

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL 8.01 GENERAL This material is not intended to cover service from OPPD s network in the downtown Omaha area. See Chapter 12 for details

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 5/12/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 5/12/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 5/12/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Is it illegal to install a wet-niche luminaire face-up

More information

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS SECTION 270528 PATHWAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Communications equipment coordination and installation. 2. Sleeves for pathways and cables. 3. Raceway

More information

Please check with your local inspection authority for any additional requirements before installation.

Please check with your local inspection authority for any additional requirements before installation. Specifications for Residential Underground Electric Service Installation This brochure addresses most typical residential underground service installations. Variances for the following specifications must

More information

2015 Code Rollout Meeting Q & A

2015 Code Rollout Meeting Q & A 1 SECTION QUESTION SaskPower Inspections Dept. ANSWER 2 3 4 5 6 7 8 9 10 11 12 15-02-024 15-02-200 15-02-200 15-02-200 15-02-314 Are existing single or double 'weather proof when not in use' covers allowed

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 Page 1 of 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. AFC Cable Systems, Inc. Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-MC

More information

Given a functional welder, instruction and demonstration of use, each employee will be able to:

Given a functional welder, instruction and demonstration of use, each employee will be able to: I. Competencies Given a functional welder, instruction and demonstration of use, each employee will be able to: A. Identify the major parts of the arc welder. B. Pass a written test of safety and operating

More information

CHAPTER 5 METERING REQUIREMENTS

CHAPTER 5 METERING REQUIREMENTS CHAPTER 5 METERING REQUIREMENTS CHAPTER 5 METERING REQUIREMENTS 5.1 General 1. All installations connected to, or intended to be connected to HK Electric s supply of electricity must comply with HK Electric

More information

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 05 28 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp, TITLE 14 CHAPTER 10 PART 4 HOUSING AND CONSTRUCTION ELECTRICAL CODES 2011 NEW MEXICO ELECTRICAL CODE 14.10.4.1 ISSUING AGENCY: The Construction Industries Division of the Regulation and Licensing Department.

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information

BUILDER S CONSTRUCTION SUPPLIES (Temporary in permanent position) REQUIREMENTS. March 2014

BUILDER S CONSTRUCTION SUPPLIES (Temporary in permanent position) REQUIREMENTS. March 2014 BUILDER S CONSTRUCTION SUPPLIES (Temporary in permanent position) REQUIREMENTS March 2014 Energy Safe Victoria (ESV) continues to receive complaints concerning defective builder s construction supplies.

More information

Desktop Computer Model 1 (without. DVD RW and Front USB) Desktop Computer Model 2 ( with DVD. RW and Front USB) Dot Matrix Printer with one printer

Desktop Computer Model 1 (without. DVD RW and Front USB) Desktop Computer Model 2 ( with DVD. RW and Front USB) Dot Matrix Printer with one printer Line Item Description of Goods Quantity Physical unit Unit Price 1 2 3 4 5 6 7 8 9 1 11 12 Desktop Computer Model 1 (without 3839 DVD RW and Front USB) Desktop Computer Model 2 ( with DVD 36 RW and Front

More information

Price Bid Estimate of,electrification Voice, Data cabling works for B.O.I VARACHHA Branch Item Amount Electrification Voice & Data Cabling Works Total amount RS RS. RS./- Estimate. for electrification

More information

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 INDEX Page SECTION 1.0: SCOPE 1 1.1 Toronto Hydro Requirements 1 1.2 Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 SECTION 3.0: DEFINITIONS AND THE INTERNATIONAL SYSTEM OF UNITS 1 3.1 Definitions

More information

31-SDMS-03 REV. 01 SPECIFICATIONS FOR

31-SDMS-03 REV. 01 SPECIFICATIONS FOR 31-SDMS-03 REV. 01 SPECIFICATIONS FOR LOW VOLTAGE CABINET FOR POLE MOUNTED TRANSFORMER This specification is property of SEC and subject to change or modification without any notice CONTENTS Clause Description

More information

Revision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd

Revision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd RAM ELEVATORS Elevator Electrical Planning Guide This guide is intended for people with an understanding of electricity. If you are not, please consult a licensed electrician as errors in application of

More information

CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chitranjali Hills, Thiruvallam P.O., Thiruvananthapuram

CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chitranjali Hills, Thiruvallam P.O., Thiruvananthapuram CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chitranjali Hills, Thiruvallam P.O., Thiruvananthapuram 695 027 No. C-DIT/CG-Elec/18-19/T044 Date: 19.07.2018 TENDER NOTICE Sealed tenders are invited

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS March 2015 FREQUENTLY ASKED QUESTIONS Wiring Rules 2007 edition The sixth edition of the Australian/New Zealand Standard for Wiring Rules (AS/NZS 3000:2018) was released in June 2018 and the relevant technical

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES... DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements

More information

Specifications for Residential Underground Electric Service Installation

Specifications for Residential Underground Electric Service Installation Specifications for Residential Underground Electric Service Installation This brochure addresses most typical residential underground service installations. Variances for the following specifications must

More information

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information

Elevators and Lifts

Elevators and Lifts Sections Included In This Standard: 1.1 General Requirements 2.1 Elevators 2.2 Elevator Machine Rooms 2.3 Wheelchair Lifts 3.1 Closeout Deliverables 3.2 Service Contract 3.3 Inspection & Certification

More information

legend. #1 is a gas relief valve? If so does Enbridge supply with station?

legend. #1 is a gas relief valve? If so does Enbridge supply with station? Michael Pacholok, Director Purchasing and Materials Management Division City Hall, 8 th Floor, West Tower 00 Queen Street West Toronto, Ontario M5H N Joanne Kehoe Manager Construction Services May 4, 06

More information

UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES

UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES 7.01 GENERAL UNDERGROUND SERVICES (RESIDENTIAL) SINGLE FAMILY RESIDENTIAL, DUPLEXES, OR TOWNHOUSES Also refer to Chapter 3 (Service Entrances), and Chapter 4 (Metering Installation). OPPD will install,

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS March 2010 FREQUENTLY ASKED QUESTIONS Wiring Rules The new edition of the Australian/New Zealand Standard for Wiring Rules (AS/NZS 3000:2007) was released in November 2007 and revised by Amendment 1 in

More information