ELECTRICAL SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH

Size: px
Start display at page:

Download "ELECTRICAL SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH"

Transcription

1 ELECTRICAL SAFETY INSPECTION REPORT REDPOINT JACKETS LTD, DHAKA, BANGLADESH January 14, 2013

2 Redpoint Jackets Ltd. PAGE 1 SUMMARY The four-story factory housing Redpoint Jackets Ltd. located in Dhaka Export Processing Zone, Dhaka, Bangladesh was surveyed for Electrical Safety on 08 December 2013 by Woosun Energy and Construction Co Ltd. This summary identifies the critical and major deficiencies that were identified during the inspection as documented in the Electrical Safety Inspection Report, dated 13 January 2014, submitted to the Accord. The factory building was surveyed to identify significant electrical safety issues and to provide recommendations for remediation based on applicable standards specified by the Accord. The scope of this initial inspection was limited to the review and identification of critical and major electrical safety issues. The inspection did not include identification of minor deficiencies, which will be further addressed as part of follow-up inspections. Table 1 summarizes the critical and major electrical safety issues identified during the inspection. Recommendations have been provided to address each issue. Reference photos are provided in Attachment 1. An implementation schedule shall be developed by the factory to remediate each of the findings in Table 1. The specific timing of improvements, including any requested extensions due to design / installation constraints, shall be submitted to the Accord for approval.

3 Redpoint Jackets Ltd. PAGE 2 Table 1. Findings and Recommendations No. Category Finding Recommendation Timeline E-1 500kVA, 11/0.415 kv, Transformer separated with metal Transformer must be separated Power Transformer rails around the transformer. with fire barrier walls to protect against damages to generators and panels during emergency, E-2 Empty oil container attached below the breather (silica gel container). E-3 Neutral earth connected to transformer body earth. E-4 Silica gel in the transformer breather turned pinkish white. E-5 Raised cable channel/trenches in substation room are covered with rubber mat. Portion of the cables are laid directly on the concrete floor. such as transformer failure. The container must be filled with oil at required level (manufacturer s instruction) to trap moistures/dust entering transformer. Neutral earth must be connected to earth at the main earth strip. All earth connections in substation must be distributed from an earth strip. Silica gel must be regularly checked and replaced when necessary to prevent moisture ingression in transformer oil. Cables must either be laid in trenches below floor level 1 protected with covers or supported on cable tray/raceways. Cables must be protected and supported throughout its length. Within 6 Within 6 Photo Ref E.1 E.2 E.3 E.4 E.5 1 Cable channel/trenches raised above floor level are not a standard practice in industrial floors. In case the local standards permit to such installation, it must be protected with metallic covers and the walls of the channel must be grouted to the floor.

4 Redpoint Jackets Ltd. PAGE 3 No. Category Finding Recommendation Timeline E-6 Panels Openings are cut from sides, top Wirings and cables entering panel or bottom to enable cable and must be fixed using glands wiring entry into panels. (cables) and sockets (conduits) and must remain sealed to prevent dust and rats (small animals) E-7 Connection to motors and electrical appliances are not firmly fixed. Often glands are not used. E-8 Wiring inside panels (Main & Sub- Distribution panels) are haphazardly arranged and does not follow specific route. E-9 Wirings (smaller conductors) used for long points and supported on cable trays and raisers are not supported. E-10 Multiple wires are connected at a point crimped using a single ferrule (socket). E-11 Base/gland plates of the panels are removed to let the cable enter. Top covers of come panels are removed to let the cable enter/leave. entering panel and damaging it. Wiring / connection to electric motors and other appliances must be firmly fixed using cable glands and lugs. All wirings/cables inside panel must be arranged and route through safe spaces. Smaller wires or conductors used for wiring and supported on cable trays / raceways must be protected against external impacts 2. Each wire must individually be crimped with lug/socket and connected separately on the bars (earth or the current carrying conductor). Panels must be closed from all sides to prevent dust and varmint from entering. Cable ends must be firmly fixed at the base or gland plates using cable glands. Unused holes must be closed again by dummy or plugs. Photo Ref E.6 E.7 E.8 E.9 E.10 E.11 2 The smaller wires and conductors rum on cable trays / raceways must be protected by enclosing in conduits or bunching & covering. When ladder type trays are used, the wires must be supported in conduits.

5 Redpoint Jackets Ltd. PAGE 4 No. Category Finding Recommendation Timeline E-12 Phase barrier between different Phase barriers between different phases are not installed. phases must be installed to E-13 Wiring inside panels re repaired and joined for extensions. E-14 Cables & Wiring Systems Metal channels without covers are used to support wirings in production floors. E-15 Flexible PVC conduits used to support cables/wires connecting between different ducts are joined (tee) without junction box/tee. E-16 11kV (HT) Cables laid directly on concrete floor (not supported and unprotected). E-17 Leakage current collector of 11kV power cable connecting to earth is joined to extend connection. prevent flashover/arcing. Wires must be continuous and all repairs must be carried out in accordance to the standard requirement and minimum requirement by the cable manufacturers. Metal channels installed as ducts to support wirings at the production floor to distribute supply to various appliances must be covered and supported firmly. The joints must be avoided wherever possible and all extensions must be made by cables. If flexible conduits of adequate grade and specifications, the joints (if unavoidable) must be realized through commercially available junction 3 box or tee. Cables on ground level must be laid in cable trenches supported and protected from physical damages. Leakage current collector may be connected to the clamp from where it can be extended to earth connection point. Within 6 Within 6 Photo Ref E.12 E.13 E.14 E.15 E.16 E.17 3 If conduit joints are unavoidable, all joints or Tee must be realized through junction boxes but the wiring/cables must not be joined.

6 Redpoint Jackets Ltd. PAGE 5 No. Category Finding Recommendation Timeline E-18 Wooden frames (locally made) are Cables in ladders must be Within 6 used to hold/support cables in tied/fixed on the ladders at the place through walls and ladders. steps (bars) and cables on walls must be supported on ladder/raiser E-19 Cables leading from cable supports to the panels are not supported. E-20 Cables supported on cable trays are repaired. E-21 Remaining opening after the cables have passed through walls are not protected / sealed. E-22 Wiring in flexible PVC conduits is extended from panel to ducts without supports. or cable trays. Cable trays or supports must be extended till the panel and cable lead connecting to panels must be protected 4 Cables must not have mid-span joints between the two designated points of connection 5. In case of insulation repairs, shrink tubes (near cable ends) must be used and special tapes (repairs far from ends) must be used 6. Remaining holes/gaps after cables(s) have passed through the walls must be covered or sealed with specifications required by the fire safety. Flexible PVC conduit must not be used for long extensions/points and must be supported and protected. Photo Ref E.18 E.19 E.20 E.21 E.22 4 Cable lead connecting between the cable supports to the panels may be protected in industrial grade flexible conduit and supported firmly. 5 If unavoidable due to long span/length of cable between the two points, joints must electrically and mechanically meet the standards without compromising the minimum requirement for cable joints by the cable manufacturers. 6 Section of the cable (near) joints must be mechanically protected firmly fixing on the supports on both sides of the joints.

7 Redpoint Jackets Ltd. PAGE 6 No. Category Finding Recommendation Timeline E-23 PVC Pipes ( mm dia) are Wiring ducts must be designed to used as wiring ducts in production meet safety and electrical floors. standards for industrial use. PVC conduits must not be used as ducts when points for appliances are distributed at various points in E-24 Wiring in flexible PVC conduits on walls (approaching distribution panels) are not supported/fixed on walls. E-25 Earth Earth strip/bar in substation has multiple earth wire conductors terminating at a point. E-26 Earth connection joined at midspan (tapping) to extend earth connections to other equipment. E-27 Boiler Room Wiring and cables used to connect devices and equipment in boiler room are not protected against external heat. the floor. Wiring approaching distribution panels may be extended in the same system (duct or conduits) and flexible conduit must be limited to short lead before entering the panel. The conduits on walls must be firmly fixed and supported. Each earth conductor must be connected to earth strip/bar independently to avoid loose connection and increased joint resistance. Earth connection (conductor) must be connected from distribution to equipment without joints or looped at appropriate points All cables or the wiring used in boiler room must be protected from external heat from boiler. Within 6 Photo Ref E.23 E.24 E.25 E.26 E.27

8 Redpoint Jackets Ltd. PAGE 7 ATTACHMENT 1 PHOTOGRAPHS OF FINDINGS/ISSUES

9 Redpoint Jackets Ltd. PAGE kVA 500kVA Photo E.1 Transformer fenced with GI Pipe rails Photo E.2 Oil container attached below breather to trap dust and moisture is empty

10 Redpoint Jackets Ltd. PAGE 9 Photo E.3 Earth looped from transformer body earth Photo E.4 Silica gel in transformer breather turned pinkish white

11 Redpoint Jackets Ltd. PAGE 10 Photo E.5 Channel/Cable Trench raised above floor level covered with rubber mat. Portion of the cables laid directly on the concrete floor (typical in substation) Photo E.6 Panels cut open for cable entry and not sealed /covered (typical)

12 Redpoint Jackets Ltd. PAGE 11 Photo E.7 Connections for motor (equipment) not firmly connected (typical) Photo E.8 Wiring inside sub-distribution panel, haphazardly arranged and not safely routed (typical)

13 Redpoint Jackets Ltd. PAGE 12 Photo E.9 Smaller wires or conductors laid on ladder type cable tray without protection (typical) Photo E.10 Multiple wires in panels connected to a terminal crimped using a lug or socket (typical) Photo E.11 Panels top (left) and bottom (right) covers removed for cable entry

14 Redpoint Jackets Ltd. PAGE 13 Photo E.12 Phase barriers between different phases not installed in many of the MCCBs Photo E.13 Cables/wires in panels joined and repaired Photo E.14 Metal channels used for wiring ducts in factory floors without covers

15 Redpoint Jackets Ltd. PAGE 14 Photo E.15 Flexible PVC conduit joint without junction boxes Photo E.16 11kV (HT) cables laid directly on concrete floor

16 Redpoint Jackets Ltd. PAGE 15 Photo E.17 Leakage current collector from HT cable end termination joined Photo E.18 Cables supported by wooden frame on walls and cable raisers (typical) Photo E.19 Cables leading from cable supports to panels are not supported

17 Redpoint Jackets Ltd. PAGE 16 Photo E.20 Cables repaired in mid-span (typical) Photo E.21 Remaining holes/gaps after passing cables through walls are left open Photo E.22 Flexible PVC conduit used to for connection from panel to ducts / cable trays (typical)

18 Redpoint Jackets Ltd. PAGE 17 Photo E.23 PVC conduit used as duct to support wiring in production floors. Duct ends not sealed (inset) Photo E.24 Wiring in PVC flexible conduit near panels not supported Photo E.25 Multiple earth conductors terminated at a point on earth strip/bar

19 Redpoint Jackets Ltd. PAGE 18 Photo E.26 Earth conductor joined to extend earth connection to other equipment Photo E.27 Wirings and cables used in boiler room not protected from external heat

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ALIF GARMENTS Ltd, Dhaka, Bangladesh Prepared for: JANUARY 14, 2014 Alif Garments Ltd. PAGE 1 SUMMARY The seven-story factory housing Alif Textiles Ltd. & Hexa Garments

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT TARATEX (BD) LTD. Plot 23/1, Sataish Road, Tongi, Gazipur, Bangladesh Factory List: 1) Taratex (BD) Ltd. 2) S. P. M Design Ltd. Inspected by : Luv Kumar Chhetri Report

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. Sumilpara, Adamjee Nagar, Shiddirgonji, Narayangonj, Bangladesh Factory List: 1. Moonlux Kinit Garments Limited. 2. West knit Wear Limited. 3. West Fashion. 4. Moonlus

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. Plot # B-32,BSCIC I/E,Tongi,Gazipur Factory List: 1. Kento Asia Limited. Inspected on May 15, 2014 SUMMARY Kento Asia Ltd. factory is established in a rented premises

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. SREERAMPUR, DHAKA, BANGLADESH Factory List: Graphics Textiles Limited Inspected on May 20, 2014 SUMMARY Graphics Textiles Limited is located in Sreerampur, Dhaka. Reportedly,

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. KAROTOA APPARELS LTD., TATKHANA ROAD, DHAKA, BANGLADESH. Factory List: 1. Inspected on May 14, 2014 ELECTRICAL SAFETY INSPECTION REPORT. KAROTOA APPARELS LTD., TATKHANA

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ADVANCE WORLD LIMITED Lalkha Shair Char, Fatullah, Narayanganj, Dhaka, Bangladesh Factory List: 1.. Inspected by: Sherub Tenzin & Md. Moin Hasan Report Generated by:

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT FIRST WEAR LMITED 68/Y, Sagarika Road, Pahartoli, Chittagong, Bangladesh Factory List: 1. Inspected by: Moin Hasan Report Generated by: Moin Hasan Inspected on August

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ABIR FASHIONS Kutubail, Fatullah (Post Office Road), Narayangonj, Bangladesh Factory List: 1. Inspected by: Pema Wangdi & Mamun Report Generated by: Pema Wangdi Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT FRESH FASHION WEAR LTD. 638, Sharifpur, P.O-National University, Gazipur Sadar, Bangladesh Factory List: 1. Passion Apparels and Wears Ltd. 2. Inspected by: Jobair Ibna

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ADHUNIK POSHAK SHILPA LIMITED Civil Engineer Tower, Mirpur, Dhaka, Bangladesh Factory List: 1. Adhunik Poshak Shilpa Ltd. 2. Crazy Fashions Ltd. 3. Kazipur Fashion Ltd.

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT BOVS APPARELS LTD. JAMUR MUCHIPARA, HEMAYETPUR, SAVAR, DHAKA, BANGLADESH Factory List: 1. BOVS APPARELS LTD. Inspected on April 13, 2014 SUMMARY The Bovs Apparels Ltd

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT K.L FASHION LTD. 75/1, Mudafa West, Master Bari, Tongi, Gazipur, Bangladesh Factory List: 1. Inspected by: Jobair Ibna Abdul Alim Report Generated by: Jobair Ibna Abdul

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ACTIVE COMPOSITE MILLS LTD. Dewan Idris Road, Zirabo, Ashulia, Savar, Dhaka, Bangladesh Factory List: 1. Active Composite Mills Ltd. Inspected by: Hemlal Report Generated

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT M/S. PROUD TEXTILE Plot 31/A, BSCIC Industrial Estate, Fatullah, Narayanganj, Bangladesh Factory List: 1. Inspected by: Pema Wangdi Report Generated by: Pema Wangdi

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT (1ST FLOOR BOTH WINGS) CHITTAGONG EXPORT PROCESSING ZONE SOUTH HALISHAHAR, CHITTAGONG Factory List: 1. 2. Regency Garments Ltd. 3. ABC Camp Inspected on May 10, 2014

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT Zirabo Bazar, Ashulia, Savar, Dhaka, Bangladesh Factory List: 1. Inspected by: Khan & Tapu Report Generated by: Khan Inspected on Feb 6 th 2015 SUMMARY factory building

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT METRO KNITTING & DYEING MILLS LTD.(FACTORY-02), CHARBAG, ASHULIA, SAVAR, DHAKA, BANGLADESH Factory List: 1. Inspected by: Younten Report Generated by: Das Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT AKH APPARELS LIMITED 128 Hemayetpur, AKH Tower, Savar, Dhaka-1340, Bangladesh. Factory List: 1. AKH Apparels Limited Inspected by: Deonarayan Khatiwara Report Generated

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT AG s APPARELS LIMITED. Plot No. A/1&2 Block-B, BSCIC I/A Fouzderhat, Sagarika Road, Dhaka-1207, Bangladesh Factory List: 1. AG s Apparels Limited. Inspected by: Sherub

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. House 8 & 10, Road 3, Section 7, Mirpur Industrial Area, Dhaka, Bangladesh Factory List: 1. Alliance Garments Ltd. Inspected on May 5, 2014 ELECTRICAL SAFETY INSPECTION

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT LIBAS TEXTILES LTD., Mouchak, Kaliakoir, Gazipur, Bangladesh Factory List: 1. Libas Textiles Ltd. Inspected on April 6, 2014 SUMMARY The Libas Textiles Ltd., factory

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT, SOUTH VANGNAHATI, SREEPUR, GAZIPUR, BANGLADESH. Factory List: 1. Hams Garments Ltd. Inspected on April 03, 2014 ELECTRICAL SAFETY INSPECTION REPORT, GAZIPUR, BANGLADESH

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT MAHID APPAREL LTD. Nowpara, Madhabdi, Narsingdi, Bangladesh Factory List: 1. MAHID APPAREL LTD. Inspected by: Nazmul Huda Report Generated by: Nazmul Huda Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT.

ELECTRICAL SAFETY INSPECTION REPORT. ELECTRICAL SAFETY INSPECTION REPORT. ANTIM KNIT COMPOSITE LTD., Barpa, Rupshi, Rupgonj, Narayangonj, Bangladesh. Factory List: 1. Antim Knit Composite Ltd. 2. Antim Knitting & Finishing Ltd. Inspected

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT FASHION FORUM LTD. 53-54, Diakhali, Zamgara, savar, Dhaka, Bangladesh. Factory List: 1. Fashion Forum Ltd. 2. IDS Washing Ltd. Inspected by: Karma Report Generated by:

More information

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th)

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (8th) Factory Name Address Shashongaon, Plot - S, A-646, Enayet nagar, Fatullah,Narayanganj Factory ID 9468 Electrical Safety dates Initial Date 07/07/2014 20/09/2016 Date of 5 th Follow Up Report Received Date

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT AHMED FASHIONS 34/1, Darus Salam Road (Technical), Mirpur-1, Dhaka, Bangladesh. Factory List: 1. Inspected by: Yang Generated by: Yang Inspected on 06 March 2015 SUMMARY

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT SINCERE KNIT GARMENTS LIMITED UNIT-1 East Isdair, Chandmari, Fatullah, Narayangonj, Bangladesh Factory List: 1. Unit-1 2. Fakir Knit Ltd. Inspected by: Sherab Dorji

More information

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (4th)

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (4th) Factory Name Address Joyna Bazer Road, Jamirdia, Valuka Factory ID 9504 Electrical Safety dates Initial Date 06/07/2014 Date of 5 th Follow Up Report Received Date 07/27/2015 Date of 6 th Follow Up Date

More information

PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION

PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION E11 : General Electrical Earthing and LIGHTNING Protection PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION 1 2009-05-12 Review of Mechanical / Electrical and Control

More information

CS-21 STREET STRUCTURES TABLE OF CONTENTS

CS-21 STREET STRUCTURES TABLE OF CONTENTS TABLE OF CONTENTS CS-21.0 Street Structures... 1 CS-21.1 Road Signs... 1 CS-21.2 Safety Barriers... 1 CS-21.3 Bollards and Removable Bollards... 1 CS-21.4 Pedestrian Barrier Rails and Handrails... 1 CS-21.5

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

BILL OF MATERIALS Name of the work: F.T.S Modernisation Work

BILL OF MATERIALS Name of the work: F.T.S Modernisation Work 1 BILL OF MATERIALS Name of the work: F.T.S Modernisation Work Erection,Testing and commissioning of Converter transformer 3 PH,11 KV/2 X 1800 V,4000 KVA outdoor Transformer size of 3150 L X 2800 D X 3200

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin February 2019 Page 1 of 5 2018 CANADIAN ELECTRICAL CODE SUBJECT: Section 6 Services and service equipment Rule 6-102 Number of supply services permitted Row housing

More information

1.2 REFERENCES.1 CSA C22.2 No.0.3, Test Methods for Electrical Wires and Cables.

1.2 REFERENCES.1 CSA C22.2 No.0.3, Test Methods for Electrical Wires and Cables. Issued 2005/06/01 Section 16122 Wire and Cables (0 1000V) Page 1 of 5 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 16151 Wire and Box Connectors 0 1000 1.2 REFERENCES.1 CSA C22.2 No.0.3, Test Methods

More information

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS DAIMLERCHRYSLER MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS ISSUE DATE: 5/1/90 EFFECTIVE DATE: 2/4/92 REVIEW DATE:

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11

Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11 Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11 Underground Residential Distribution (URD) Index General Discussion... 1-2 Description... 3-7 Drawings (Available

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and

More information

SECTION EARTHING AND EARTH FAULT PROTECTION

SECTION EARTHING AND EARTH FAULT PROTECTION SECTION 16660 PART 1 - GENERAL 1.01 DESCRIPTION A. The work to be performed includes, but is not necessarily limited to, all work involved with the construction and assembly of a complete electrical earthing

More information

SECTION GROUNDING

SECTION GROUNDING SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment

More information

BILL OF QUANTITIES - PROJECT ELECTRICAL WORK OF PH-I FOR ASSAM RIFLES, DWARKA, NEW DELHI

BILL OF QUANTITIES - PROJECT ELECTRICAL WORK OF PH-I FOR ASSAM RIFLES, DWARKA, NEW DELHI Page 1 BILL OF QUANTITIES - PROJECT ELECTRICAL WORK OF PH-I FOR ASSAM RIFLES, DWARKA, NEW DELHI-110075 I. INSTALLATION OF SUB-STATION EQUIPMENT The rates shall include the following : 1. Assembling loose

More information

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL

UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL UNDERGROUND SERVICES - GENERAL SERVICE AND MULTI-UNIT RESIDENTIAL 8.01 GENERAL This material is not intended to cover service from OPPD s network in the downtown Omaha area. See Chapter 12 for details

More information

CONDUITS AND FITTINGS

CONDUITS AND FITTINGS CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit

More information

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC).

3. Intermediate metal conduit (IMC). 4. Electric metallic tubing (EMT). 5. Flexible metal conduit (FLEX). 6. Polyvinyl chloride conduit (PVC). SECTION 16111 CONDUITS PART 1 - GENERAL 1.01 DESCRIPTION A. General: Provide conduits, complete, as shown, specified or required per Contract Documents. Principal items include: 1. Rigid aluminum conduit.

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Date Description of Change Pages / Sections Modified ID 6/15/16 Updated format, division title, and removed references to other sections. - mgl44 A. Summary This section contains design criteria for the

More information

Price Bid Estimate of,electrification Voice, Data cabling works for B.O.I VARACHHA Branch Item Amount Electrification Voice & Data Cabling Works Total amount RS RS. RS./- Estimate. for electrification

More information

PUBLIC WORKS DEPARTMENT NOTICE INVINTING QUOTATION

PUBLIC WORKS DEPARTMENT NOTICE INVINTING QUOTATION PUBLIC WORKS DEPARTMENT No. 5(30)/AE (E) /M-2512/2015-16/457ह Dated:-24.06.2015 NOTICE INVINTING QUOTATION Sealed quotation are invited by the Assistant Engineer (E) EMSD M- 2512, PWD EMD M- 251,DC (NE)

More information

Tender No. : GAIL/PA14/51603/ /RK [E-Tender Bid Invitation No ]

Tender No. : GAIL/PA14/51603/ /RK [E-Tender Bid Invitation No ] 1.1 SCHEDULE OF RATES SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF 8A RATING, MMO VERTICAL ANODE BED: Supply, installation, testing and commissioning of 8 A rating, MMO tubular anode in vertical type

More information

SUPPLY ERECTION TOTAL RATE AMOUNT RATE AMOUNT AMOUNT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.)

SUPPLY ERECTION TOTAL RATE AMOUNT RATE AMOUNT AMOUNT (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) SBI-AO2 Project Residency Rd Br-elect/RBO-4 SCHEDULE OF QUANTITIES FOR ELECTRICAL WORKS. DATE : 24/4/2018 Sl. No. DESCRIPTION OF WORK UNIT QTY 1 READYMADE FINAL DISTRIBUTION BOARDS Supply, Instillation,

More information

T. SUNDUPALLI BRANCH (04427)

T. SUNDUPALLI BRANCH (04427) STATE BANK OF INDIA T. SUNDUPALLI BRANCH (04427) REGION 2, KADAPA RURAL TIRUPATI (A.O) ELECTRICAL WORK BILL OF QUANTITIES SL. NO. DESCRIPTION QTY. UNIT RATE AMOUNT Rs. Rs. 1 Supply, installation, testing

More information

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS SECTION 26 05 26 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

CONSTRUCTION SPECIFICATION FOR TRAFFIC ACTUATION EQUIPMENT

CONSTRUCTION SPECIFICATION FOR TRAFFIC ACTUATION EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 623 JANUARY 1990 CONSTRUCTION SPECIFICATION FOR TRAFFIC ACTUATION EQUIPMENT 623.01 SCOPE 623.02 REFERENCES 623.05 MATERIALS TABLE OF CONTENTS 623.05.01

More information

BUILDER S CONSTRUCTION SUPPLIES (Temporary in permanent position) REQUIREMENTS. March 2014

BUILDER S CONSTRUCTION SUPPLIES (Temporary in permanent position) REQUIREMENTS. March 2014 BUILDER S CONSTRUCTION SUPPLIES (Temporary in permanent position) REQUIREMENTS March 2014 Energy Safe Victoria (ESV) continues to receive complaints concerning defective builder s construction supplies.

More information

CHAPTER 11 CONDUITS AND FITTINGS

CHAPTER 11 CONDUITS AND FITTINGS CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1

More information

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017 SECTION 27 05 26 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Vishnu Trading Company

Vishnu Trading Company +91-8071804748 Vishnu Trading Company https://www.indiamart.com/vishnutrading/ We are involved in trading, supplying, wholesaling and retailing a huge range of PVC pipe and fittings, electrical products,

More information

GB Translated English of Chinese Standard: GB NATIONAL STANDARD OF THE PEOPLE S REPUBLIC OF CHINA

GB Translated English of Chinese Standard: GB NATIONAL STANDARD OF THE PEOPLE S REPUBLIC OF CHINA Translated English of Chinese Standard: GB50169-2016 www.chinesestandard.net Buy True-PDF Auto-delivery. Sales@ChineseStandard.net GB NATIONAL STANDARD OF THE PEOPLE S REPUBLIC OF CHINA UDC P GB 50169-2016

More information

WIRING METHODS CHAPTER 38

WIRING METHODS CHAPTER 38 CHAPTER 38 WIRING METHODS SECTION E3801 GENERAL REQUIREMENTS E3801.1 Scope. This chapter covers the wiring methods for services, feeders and branch circuits for electrical power and distribution. E3801.2

More information

SECTION WIRES AND CABLES

SECTION WIRES AND CABLES SECTION 16120 PART 1 - GENERAL 1.01 DESCRIPTION A. The work to be performed includes, but is not necessarily limited to, all work involved with the supply and installation of wires and cables and the associated

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards Change History Date Description of Change Pages / Sections Modified Change Approver Initials 8/1/17 Update sections Materials and Special Requirements 3 F. 2. 4 H. 2.; 10. & 11(added) 6/15/16 Updated division

More information

ELECTRICAL WORKS RELATED TO AC & UPS OF CMP GOC & IAD, LINGAMPALLY, HYDERABAD IN TWO BID SYSTEM THROUGH E-TENDER PRICE BID

ELECTRICAL WORKS RELATED TO AC & UPS OF CMP GOC & IAD, LINGAMPALLY, HYDERABAD IN TWO BID SYSTEM THROUGH E-TENDER PRICE BID SBI INFRA MANAGEMENT SOLUTIONS PVT.LTD. 3 rd Floor, Local Head Office,Bank Street, Koti, Hyderabad- 500095 On behalf of On behalf of On behalf of Cash Management Product GOC (CMP GOC) & Internal Audit

More information

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS PART 1 - GENERAL 01.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this Section.

More information

Please check with your local inspection authority for any additional requirements before installation.

Please check with your local inspection authority for any additional requirements before installation. Specifications for Residential Underground Electric Service Installation This brochure addresses most typical residential underground service installations. Variances for the following specifications must

More information

Rate Amount Rate Amount MCB DBs

Rate Amount Rate Amount MCB DBs Item No: Description Qty Supply Erection 01.01.00 MCB DBs Supplying,fixing,connecting & commissioning the following Compartmentalised MCB DISTRIBUTION BOARDS fixed flush with the wall. All MCB DBs shall

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 604 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF CABLE TABLE OF CONTENTS 604.01 SCOPE 604.02 REFERENCES 604.03 DEFINITIONS - Not Used

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

ROOFING Sika ROOF CONTROL SYSTEM

ROOFING Sika ROOF CONTROL SYSTEM Sika ROOF CONTROL SYSTEM SYSTEM FOR PRECISE LEAK DETECTION SYSTEM FOR PRECISE LEAK DETECTION ON FLAT ROOFS helps protecting the building and its material assets from damages during its entire service life.

More information

UNDERGROUND SERVICES SECONDARY

UNDERGROUND SERVICES SECONDARY Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-

More information

SECTION MEDIUM-VOLTAGE CABLES PART 1 GENERAL

SECTION MEDIUM-VOLTAGE CABLES PART 1 GENERAL SECTION 260513 - MEDIUM-VOLTAGE CABLES PART 1 GENERAL 1.1 SECTION INCLUDES A. Medium voltage cable. B. Cable terminations. C. This specification describes single conductor EPR (Ethylene-propylene-rubber)

More information

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. AFC Cable Systems, Inc. Product Specification This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update. SECTION 260519.13 METAL CLAD CABLE-MC

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information

General Symbols, Ducts and Cables

General Symbols, Ducts and Cables MUNICIPAL AND COMMON DIVISION 2000 ABBREVIATIONS 2009 11 2000.001 0 Abbreviations, General 2009 11 2011.101 0 General Symbols, Ducts and Cables 2009 11 2011.201 0 General Symbols, Maintenance Holes, Junction

More information

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 05 28 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14

Essex County College - West Essex Campus Addition And Renovations dlb # / 11-14 SECTION 270526 - GROUNDING AND BONDING FOR COMMUNICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

NOTICE INVITING QUOTATIONS

NOTICE INVITING QUOTATIONS ITI LIMITED KANJIKODE WEST: PALAKKAD 678 623 Phone: (0491) 2566010 (4 Lines) FAX: (0491)2566009 E-mail: plant_pkd@itiltd.co.in PALAKKAD NOTICE INVITING QUOTATIONS Ref: EE/PE/420/17/10-01 Date: 08/11/2017

More information

System No. SP777 (FOR HORIZONTAL OR VERTICAL SEPARATIONS)

System No. SP777 (FOR HORIZONTAL OR VERTICAL SEPARATIONS) System No. SP777 (FOR HORIZONTAL OR VERTICAL SEPARATIONS) F Rating - hr FT Rating - 0, /, 1 and 1-1/ hr (See Item ) FH Rating - hr FTH Rating - 0, /, 1 and 1-1/ hr (See Item ) A B A B C C SECTION A-A CONFIGURATION

More information

Design Standard Conduit for Electrical Systems

Design Standard Conduit for Electrical Systems Design Standard Purpose: This design standard has the purpose of creating a consistent application for the installation of conduits throughout the East Side Union High School District, therefore achieving

More information

GENERAL NOTES PEDERNALES ELECTRIC COOPERATIVE, INC. RESIDENTIAL AND COMMERCIAL AMP METER LOOP SPECIFICATIONS

GENERAL NOTES PEDERNALES ELECTRIC COOPERATIVE, INC. RESIDENTIAL AND COMMERCIAL AMP METER LOOP SPECIFICATIONS GENERAL NOTES 1. Residential and commercial meter loops are typically used when constructing facilities for permanent service. It is important that all guidelines outlined in this document be followed

More information

The University of Texas at Austin September 30, 2011

The University of Texas at Austin September 30, 2011 SECTION 27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS PART 1 - GENERAL 1.1 SUMMARY A. This section governs the products and execution requirements relating to furnishing and installing grounding and

More information

Section-12 (Revision 01 dated ) Page 1 of 9. SPECIAL CONDITIONS OF CONTRACT (for both parts A and B) 12.

Section-12 (Revision 01 dated ) Page 1 of 9. SPECIAL CONDITIONS OF CONTRACT (for both parts A and B) 12. Section-12 (Revision 01 dated 05.05.2006) Page 1 of 9 SPECIAL CONDITIONS OF CONTRACT (for both parts A and B) 12.0 TERMS OF PAYMENT 12.0.1 The contractor should submit his monthly on account bills with

More information

AS/NZS 3000: 2018 Changes to Wiring Rules Standard

AS/NZS 3000: 2018 Changes to Wiring Rules Standard BUILDING SERVICES Ref: BCA 19-01 Current at January 2019 AS/NZS 3000: 2018 Changes to Wiring Rules Standard The new edition of AS/NZS 3000 Wiring Rules Standard (Electrical Installations) was published

More information

PIP PCEPA003 Process Analyzer System Field Installation Guidelines

PIP PCEPA003 Process Analyzer System Field Installation Guidelines January 2016 Process Control PIP PCEPA003 Process Analyzer System Field Installation Guidelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

DETAILED SCOPE OF WORK IN-STREAM TIDAL GENERATING PLANT TISEC COLLECTOR CIRCUITS DEVELOPMENT

DETAILED SCOPE OF WORK IN-STREAM TIDAL GENERATING PLANT TISEC COLLECTOR CIRCUITS DEVELOPMENT PAGE I TABLE OF CONTENTS SECTION DESCRIPTION PAGE 1 GENERAL 1 1.1 OVERVIEW 1 1.2 PREPARATORY WORK CARRIED OUT BY OTHERS 2 1.3 MATERIALS TO BE SUPPLIED BY THE OWNER 2 1.4 PROJECT SCHEDULE 3 1.5 PROJECT

More information

CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chitranjali Hills, Thiruvallam P.O., Thiruvananthapuram

CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chitranjali Hills, Thiruvallam P.O., Thiruvananthapuram CENTRE FOR DEVELOPMENT OF IMAGING TECHNOLOGY (C-DIT) Chitranjali Hills, Thiruvallam P.O., Thiruvananthapuram 695 027 No. C-DIT/CG-Elec/18-19/T044 Date: 19.07.2018 TENDER NOTICE Sealed tenders are invited

More information

NEC 2014 Code Changes

NEC 2014 Code Changes NEC 2014 Code Changes Articles 280.21-300.50 CHANGES FROM 2011 TO 2014 CODE ARE IN RED Chapter 2 - Wiring and Protection ARTICLE 280 Surge Arresters, Over 1000 volts II. Instillation III. Connecting Surge

More information

WALCHAND COLLEGE OF ENGINEERING, SANGLI An Autonomous Institute Government Aided Institute TENDER DOCUMENT. TENDER FORM COST : Rs.

WALCHAND COLLEGE OF ENGINEERING, SANGLI An Autonomous Institute Government Aided Institute TENDER DOCUMENT. TENDER FORM COST : Rs. WALCHAND COLLEGE OF ENGINEERING, SANGLI An Autonomous Institute Government Aided Institute TENDER DOCUMENT TENDER FORM COST : Rs.500/- LAST DATE OF RECEIVING 2 nd September, 2016 up to 12:00 noon DATE

More information

2015 Code Rollout Meeting Q & A

2015 Code Rollout Meeting Q & A 1 SECTION QUESTION SaskPower Inspections Dept. ANSWER 2 3 4 5 6 7 8 9 10 11 12 15-02-024 15-02-200 15-02-200 15-02-200 15-02-314 Are existing single or double 'weather proof when not in use' covers allowed

More information

QUOTATION FOR THE ELECTRICAL WORK OF BANK OF INDIA, CHERTHALA BRANCH.

QUOTATION FOR THE ELECTRICAL WORK OF BANK OF INDIA, CHERTHALA BRANCH. QUOTATION FOR THE ELECTRICAL WORK OF BANK OF INDIA, CHERTHALA BRANCH. PART-B Date:- Sl.No Description Qty Unit Rate Amount I METER BOX II Supply,installation,testing & commisioning of dust & vermine proof

More information

General Symbols, Ducts and Cables

General Symbols, Ducts and Cables DIVISION 2000 - ABBREVIATIONS 2009 11 2000.001 0 Abbreviations, General 2009 11 2011.101 0 General Symbols, Ducts and Cables 2009 11 2011.201 0 General Symbols, Maintenance Holes, Junction Boxes, Pads,

More information

VOLUME-2 (PRICE BID) FOR TENDER NO. NABI/7(171)/2019-WORKS

VOLUME-2 (PRICE BID) FOR TENDER NO. NABI/7(171)/2019-WORKS VOLUME-2 (PRICE BID) FOR TENDER NO. NABI/7(171)/2019-WORKS NAME OF WORK- Supply, Installation, Testing & Commissioning of 200kVA/KW Modular Uninterruptible Power Supply(UPS) system for Central Instrumentation

More information

General Symbols, Ducts and Cables

General Symbols, Ducts and Cables DIVISION 2000 ABBREVIATIONS 2009 11 2000.001 0 Abbreviations, General 2009 11 2011.101 0 General Symbols, Ducts and Cables 2009 11 2011.201 0 General Symbols, Maintenance Holes, Junction Boxes, Pads, and

More information

TESTING PTE EARTHING

TESTING PTE EARTHING 1 SCOPE This section of the Power Systems Live Working Manual details the procedures to be followed to achieve Safety from the System when carrying out examination, testing and remedial work on PTE (Pole

More information

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1- GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

BILL OF QUANTITY ARM work (Electrical Side) of regional office, Panchdeep Bhawan Patna for the year Estimated Cost Rs. 5,55,272.

BILL OF QUANTITY ARM work (Electrical Side) of regional office, Panchdeep Bhawan Patna for the year Estimated Cost Rs. 5,55,272. BILL OF QUANTITY ARM work (Electrical Side) of regional office, Panchdeep Bhawan Patna for the year 2011-12 Estimated Cost Rs. 5,55,272.00 Sl. Description of items in brief Qty Unit Rate in figure & word

More information

SECTION INSULATED WIRE AND CABLE

SECTION INSULATED WIRE AND CABLE SECTION 16120 INSULATED WIRE AND CABLE PART 1 GENERAL 1.01 DESCRIPTION A. This section covers the contract item Insulated Wire and Cable, which includes the following items with accessories, and appurtenances:

More information

Ultra slim mats, only 3.5mm in height, ensure the ECmat is suitable for virtually any new build or renovation project.

Ultra slim mats, only 3.5mm in height, ensure the ECmat is suitable for virtually any new build or renovation project. Electric Underfloor Heating The safe choice in underfloor heating Ready to lay and easy to use the EC range offers a luxurious, and reliable solution to electric underfloor heating Ultra slim mats, only

More information