1 TAMPA - HILLSBOROUGH COUNTY EXPRESSWAY AUTHORITY Committee / Board Meeting January 17, E. Twiggs Street, Suite 300 Tampa, FL AGENDA I. Operations & Maintenance Committee Bennett Barrow, Chair / David May, PE, Staff A. Selmon West Extension Project: i. Cost Update ii. Schedule iii. Selection Process

2 Selmon West Extension Cost Estimates 1/17/2017 1

3 Selmon West Extension Cost Estimates Agenda PRELIMINARY COST ESTIMATION GENERAL INFORMATION PLANNING LEVEL/FEASIBILITY ESTIMATE PD&E/CONCEPTUAL ESTIMATE PRELIMINARY DESIGN/BUDGET ESTIMATE INTERMEDIATE DESIGN/PRELIMINARY BID ESTIMATE FINAL DESIGN/BID ESTIMATE & BID PRICES PRELIMINARY COST ACCURACY SELMON WEST EXTENSION PRELIMINARY COST ESTIMATE 2010 SEIR COST ESTIMATE 2016 CONCEPT PLANS PLANS PREPARATION MANUAL & DESIGN STANDARDS CHANGES BRIDGE & MOT DESIGN SCHEDULE REVIEW SELECTION PROCESS LOI TECHNICAL PROPOSAL OTHER PRICE FACTORS RECENT BIDS TECHNICAL REVIEW COMMITTEE (TRC) MEMBERS & TECHNICAL ADVISORS 2

4 Selmon West Extension Planning Level/Feasibility Estimates Based on Very General Project Overview Project Specifics Not Defined Detailed Survey/Site Specific Information Not Available Construction Costs based on averages from similar facilities (either per square foot or per mile basis) Maintenance of Traffic, Contractor Mobilization, Contingencies, Engineering/Design, Construction Engineering & Inspection (CEI), Contract/Project Management (PM)- Costs all estimated as Percentages of Construction Costs Accuracy of Estimate Ranges from -50% to +100%: General Services Administration (GSA) Guidelines 3

5 PRELIMINARY COST ESTIMATION GENERAL INFORMATION Updated as of: 08/02/16 FDOT Generic Cost Per Mile Models Disclaimer: These models are generic in nature, and not based on actual construction projects. They are for reference purposes only, and are not intended to predict or support future estimates. Models Cost Per Mile Model Details OTHER Two Directional, 12' Shared Use Path $331, Rails to Trails project (12' width) $306, Sidewalk construction; 5' one side, 4 inch depth $155, Mid-Block Crossing $120, RURAL New Construction Undivided 2 Lane Rural Road with 5' Paved Shoulders $2,209, New Construction Undivided 3 Lane Rural Road with 5' Paved Shoulders, Center Turn Lane $2,685, New Construction Undivided 4 Lane Rural Road with 5' Paved Shoulders $3,168, New Construction, 4 Lane Divided Rural Road with 2' Paved Shoulders Inside and 5' Paved Shoulders Outside $4,209, New Construction Divided Rural 4 Lane Interstate with Paved Shoulders 10' Outside and 4' Inside $5,310, New Construction Undivided 5 Lane Rural Road with 5' Paved Shoulders, Center Turn Lane $3,730, New Construction, 6 Lane Divided Rural Road with 5' Paved Shoulders Inside and Out $5,161, New Construction Divided Rural 6 Lane Interstate with 10' Paved Shoulders Inside and Out $6,310, New Construction Extra Cost for 1 Single Additional Lane on Rural Arterial $519, New Construction Extra Cost for 1 Single Additional Lane on a Rural Interstate $632, Milling and Resurfacing 2 Lane Rural Road with 5' Paved Shoulders $476, Milling and Resurfacing 3 Lane Rural Road with 5' Paved Shoulders and Center Turn Lane $661, Milling and Resurfacing 4 Lane Rural Road with 5' Paved Shoulders $999, Mill & Resurface 4 Lane Divided Rural Arterial with 5' Outside Shoulders and 2' Inside $1,056, Mill & Resurface 4 Lane Divided Rural Interstate with Paved Shoulders 10' Outside and 4' Inside $1,254, Milling and Resurfacing 5 Lane Rural Road with 5' Paved Shoulders and Center Turn Lane $1,203, Mill & Resurface 6 Lane Divided Rural Arterial with 5' Paved Shoulders Inside and Out $1,501, Mill & Resurface 6 Lane Divided Rural Interstate with 10' Paved Shoulders Inside and Out $1,783, Mill & Resurface 1 Additional Lane Rural Interstate $278, Mill & Resurface 1 Additional Lane Rural Arterial $228, Widen Existing 2 Lane Arterial to 4 Lanes Undivided; Add 1 Lane to Each Side; 5' Paved Shoulders $2,118, Widen Existing 2 Lane Arterial to 4 Lane Divided; Resurface Existing 2 Lanes; 5' Paved Shoulders Inside & Out $2,830, Widen Existing 4 Lane Divided Arterial to 6 Lane Divided; Resurface Existing 4 Lanes; 5' Paved Shoulders Inside & Out $2,486, Widen 4 Lane Interstate to 6 Lanes (In Median); Mill & Resurface Existing; 10' Paved Shoulders Inside & Out $3,675,

6 Selmon West Extension PD&E/Conceptual Cost Estimating Project Conceptually Defined/Major Commitments/Constraints Identified Limited Survey and Site Specific Information Obtained Construction Costs based on averages from similar facilities (either per square foot or per mile basis) Maintenance of Traffic, Contractor Mobilization, Contingencies, Engineering/Design, CEI, PM- Costs all estimated as percentages of Construction Costs Accuracy of Estimate Ranges from -40% to +75% : GSA Guidelines 5

7 FDOT Bridge Cost New Construction (Cost per Square Foot) Bridge Type Low High Short Span Bridges: Reinforced Concrete Flat Slab Simple Span* $115 $160 Pre-cast Concrete Slab Simple Span* $110 $200 Reinforced Concrete Flat Slab Continuous Span* NA NA Medium and Long Span Bridges: Concrete Deck/ Steel Girder - Simple Span* $125 $142 Concrete Deck/ Steel Girder - Continuous Span* $135 $170 Concrete Deck/ Pre-stressed Girder - Simple Span $90 $145 Concrete Deck/ Pre-stressed Girder - Continuous Span $95 $211 Concrete Deck/ Steel Box Girder Span Range from 150' to 280' (for $140 $180 curvature, add a 15% premium) Segmental Concrete Box Girders - Cantilever Construction, Span Range $140 $160 from 150' to 280' Movable Bridge - Bascule Spans and Piers $1,800 $2,000 Increase the cost by twenty percent for phased construction. Bridge Demolition and Widening (Cost per Square Foot) Bridge Demolition: Low High Typical Bridge Removal $35 $60 Movable Span Bridge (Bascule) $60 $70 Widening: Bridge Widening Construction $85 $160 6

8 Selmon West Extension Preliminary Design/Budget Cost Estimating Project Better Defined/Major Commitments/Constraints Identified Preliminary Survey and Some Site Specific Information Obtained Major Construction Pay Items Identified and Rough Quantities Estimated Construction Costs Based on FDOT Historical Cost Data Base 6 months to 1 year Old and Updated Regularly Covers all FDOT Projects Statewide or by Region Maintenance of Traffic, Contractor Mobilization, Contingencies, Engineering/Design, CEI, PM- Costs all estimated as Percentages of Construction Costs Accuracy of Estimate Ranges from -20% to +40%: GSA Guidelines 7

9 Florida Department of Transportation Item Average Unit Cost From 2015/11/01 to 2016/10/31 FDOT Average Unit Costs Statewide Moving 12 Month Average STATEWIDE Displaying: VALID ITEMS WITH HITS From: To: No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Description $ $45,744, , DA MAINTENANCE OF TRAFFIC $534, $25,112, LS SPECIAL DETOUR $100, $2,724, LS SPECIAL DETOUR $112, $1,912, LS SPECIAL DETOUR $186, $2,242, LS SPECIAL DETOUR $75, $677, LS SPECIAL DETOUR $84, $679, LS SPECIAL DETOUR $85, $596, LS SPECIAL DETOUR $44, $222, LS SPECIAL DETOUR $178, $894, LS SPECIAL DETOUR $16, $66, LS SPECIAL DETOUR $61, $123, LS SPECIAL DETOUR $43, $87, LS SPECIAL DETOUR $125, $251, LS SPECIAL DETOUR $109, $219, LS SPECIAL DETOUR $30, $30, LS SPECIAL DETOUR $43.97 $1,231, , CY COMMERCIAL MATL FOR TEM INT $42.67 $3,362, , HR TRAFFIC CONTROL OFFICER $0.27 $1,292, ,743, ED WORK ZONE SIGN $24.35 $69, , EA BUSINESS SIGN $0.98 $69, , ED BARRIER MOUNTED WORK ZONE SI $17.88 $1,426, , LF BARRIER WALL,TEMP,F&I,CONCRET $8.00 $13, , LF BARRIER WALL,TEMP,F&I,WATERFIL $36.78 $4,046, , LF BARRIER WALL,TEMP,F&I,LOW PROFI NC $15.11 $3,329, , LF BARRIER WALL,TEMP,F&I,TYPE K $6.29 $333, , LF BARRIER WALL,TEMP,REL,CONCRETE $7.15 $762, , LF BARRIER WALL,TEMP,REL,LOW PROFILE, ONC $4.77 $801, , LF BARRIER WALL,TEMP,REL,TYPE K $20.97 $71, , LF TEMPORARY GUARDRAIL $0.12 $2,290, ,468, ED CHANNEL DEVICE TYPS I,II,DI,VP, DRUM, LC $0.28 $301, ,083, ED CHANNELIZING DEVICE, TYPE III, 6' $0.30 $1,303, ,283, ED CHANNELIZING DEVICE PED LCD $13.63 $837, , LF TEMPORARY SEPARATOR, F&I REMOVE $4.60 $567, , ED ARROW BOARD /ADVANCE WARNING ARROW PANEL $3.44 $1,215, , EA TEMPORARY RETROREFLECTIVE PAVT MARKER $ $950, LO TEMPORARY CRASH CUSHION, RED OPT $6.58 $10, , LF TEMP GLARE SCREEN,F&I,WALL MAT CONC $12.85 $2,419, , ED PORTABLE CHANGEABLE MESSAGE SIGN,TEMP $12.48 $1, ED PORTABLE CHANG MESSAGE SIGN,TEMP, DEPT C 8

10 Selmon West Extension Intermediate Design/Preliminary Bid Cost Estimating Project Scope Specifically Defined/Majority of Commitments/ Constraints Identified PM Cost Identified: Negotiated for Design-Bid-Build (DBB) projects Design Scope of Services and Cost Identified: Negotiated for DBB Detailed Survey and Other Site Specific Information (Geotechnical, Utilities, etc.) Obtained All Applicable Construction Pay Items & Quantities Identified Engineer s Estimate provided with each Phase Submittal Construction Costs Estimated Based on FDOT Data Base for Region CEI, Maintenance of Traffic, Contractor Mobilization, Contingencies all estimated as percentages of Construction Costs Accuracy of Estimate Ranges from -10% to +20%: GSA Guidelines 9

11 Florida Department of Transportation Item Average Unit Cost From 2015/11/01 to 2016/10/31 FDOT Average Unit Costs AREAS: 08 Displaying: VALID ITEMS WITH HITS From: To: West FL Area Moving 12 Month Average No. of Weighted Total Total Unit Item Conts Average Amount Quantity Meas Description $ $10,427, , DA N MAINTENANCE OF TRAFFIC $255, $2,813, LS N SPECIAL DETOUR $78, $548, LS N SPECIAL DETOUR $24, $99, LS N SPECIAL DETOUR $15, $30, LS N SPECIAL DETOUR $19, $38, LS N SPECIAL DETOUR $35, $35, LS N SPECIAL DETOUR $37, $37, LS N SPECIAL DETOUR $61.50 $83, , CY N COMMERCIAL MATL FOR TEMP DRIVEWAY MAINT $53.03 $1,258, , HR NTRAFFIC CONTROL OFFICER $0.29 $277, , ED N WORK ZONE SIGN $72.61 $12, EA NBUSINESS SIGN $1.84 $19, , ED N BARRIER MOUNTE $31.56 $62, , LF N BARRIER WALL,TE $37.32 $1,813, , LF N BARRIER WALL,TEMP $12.61 $1,095, , LF N BARRIER WALL,TEMP, $13.88 $26, , LF N BARRIER WALL,TEMP,R $4.34 $171, , LF N BARRIER WALL,TEMP,RE $2.70 $246, , LF N BARRIER WALL,TEMP,REL $46.82 $37, LF NTEMPORARY GUARDRAIL $0.15 $610, ,945, ED N CHANNEL DEVICE TYPS I,II $0.31 $93, , ED NCHANNELIZING DEVICE, TYPE $0.37 $130, , ED N CHANNELIZING DEVICE PED L $26.62 $260, , LF NTEMPORARY SEPARATOR, F&I RE $6.81 $86, , ED N ARROW BOARD /ADVANCE WARNING $3.23 $294, , EA NTEMPORARY RETROREFLECTIVE PAVT $1, $276, LO NTEMPORARY CRASH CUSHION, RED OP $5.00 $6, , LF N TEMP GLARE SCREEN,F&I,WALL MAT C $13.83 $446, , ED N PORTABLE CHANGEABLE MESSAGE SIGN, $10.02 $335, , ED N TEMPORARY SIGNALIZATION AND MAINT, ER $7.42 $250, , ED N TEMP TRAFFIC DETECTION & MAINTEN, NTER $5.54 $51, , ED N PORTABLE REGULATORY,SIGN $5.64 $51, , ED N RADAR SPEED DISPLAY UNIT $73.00 $14, DA NTEMPORARY RAISED RUMBLE STRIPS $1.15 $42, , LF N PAVT MARKING REMOVABLE TAPE,WH BLK,SKIP $1.13 $98, , LF N PAVT MARKING REMOVABLE TAPE,WH BLK,SOLID $3.00 $18, , SF N PAVT MARKING REMOVABLE TAPE,WH BLK,OTHER $2.50 $ LF N PAVT MARKING REMOVABLE TAPE,YELLOW,SKIP $1.26 $48, , LF N PAVT MARKING REMOVABLE TAPE,YELLOW,SOLID $1.80 $70, , SY N ARTIFICIAL COVERINGS / ROLL EROSION CNTL 10

12 Selmon West Extension Final Design/Bid Estimating & Bid Prices Project Scope is Known/Design Plans are Complete All Known Applicable Quantities Accounted for and Calculated Engineer s Final Cost Estimate Compared to Contractor s Bids Material Costs Availability of Skilled Construction Labor Bonding Capacity Other On-Going Projects Other Upcoming Projects Accuracy of Estimate Ranges from -5% to +10%: GSA Guidelines 11

13 Cost Estimating Accuracy General Services Administration (GSA) Guidelines Types of Cost Estimates Usage Project Definition Accuracy Order of magnitude (5) Feasibility 0-2% -50% to +100% Intermediate (4) Concept Study 1-15% -40% to +75% Preliminary (3) Budget 10-40% -20% to +40% Substantive (2) Control or Bid 30%-70% -15% to +20% Definitive (1) Check/Bid 50%-100% -5% to +10% Preliminary Cost Estimate from 2009 State Environmental Impact Report (SEIR) Amount $165,000,000 Type Concept Study Project definition 1-15% Accuracy -40% to +75% Cost range $99,000,000 to $288,750,000 12

14 Selmon West Extension 13

15 Selmon West Extension Preliminary Cost Estimates 2010 SEIR Cost Estimate (Based on 2009 FDOT Costs) Construction: $ 99,000,000 * ROW: $ 1,500,000 Based on $50/SF Design: $ 7,400,000 Based on 10% of Construction Cost CEI: $ 7,400,000 Based on 10% of Construction Cost TOTAL $115,000,000 ($165,000,000 in 2016 value) * includes 15% Mobilization, 10% MOT & 20% Contingency 2016 Conceptual Plans Cost Estimate Construction: $197,000,000 ROW: $ 0 No ROW acquisition Design: $ 11,800,000 Based on 6% of Construction Cost* CEI: $ 11,800,000 Based on 6% of Construction Cost* DB Stipends $ 1,339,500 Based on FDOT Formula/3 teams TOTAL $221,999,500 *includes GEC PM & Plans Review 14

16 Selmon West Extension Summary of Major Factors Increasing Cost Based on REL SF Cost Based on Current Statewide Average SF Cost 140 /Span by span construction 210 /Balanced cantilever construction 6 segment depth/8 wide piers 10 segment depth/9 wide piers Piles or drilled shafts Redundant drilled shafts 27,100 LF/economy of scale 8,900 LF/reduced economy of scale MOT/Construction Methods Simple segment erection Phased segment erection Limited Access Facility Urban Arterial No median openings 3 signalized intersections/8 median openings Highly directional traffic volumes Equal bi-directional traffic volumes 3 high volume hrs each direction 15 high volume hrs both direction No lane closures am WB/pm EB No lane closures 6am-9pm Adjacent parallel detour route Lengthy off-site detour route 15

17 Selmon West Extension 2016 Conceptual Plans Cost Estimate- Changes Since 2010 Increasing Cost FDOT PPM - pier offset from 4 from the face of curb to 16 from travel lane Design Variations for: Lane Width Lateral Offset Clear Zone Intersection Stopping Sight Distance Increased span lengths 210 ft versus 140 ft average Redundant Drilled Shaft Foundations Deeper & Wider Superstructure Wider Piers/Larger Foundations/Longer Drilled Shafts Span by Span versus Balanced Cantilever Construction Method 16

18 PIER LOCATIONS 17

19 PIER LOCATIONS: INTERSECTIONS Must be no closer to median nose: Design variation mitigation Maximize offset from intersection Barrier wall retrofit around piers including: Impact attenuator Barrier wall transition 18

20 Selmon West Extension Preliminary Cost Estimates 2016 Conceptual Plans Cost Estimate- Changes Since 2010 Increasing Cost Increased Ramps/Lengths at Gandy/Dale Mabry Interchange Operational & Safety Improvements Bridge Demolition over Gandy Boulevard MOT Requirements Detour Routes Available/City of Tampa Truck Routes Construction over traffic 19

21 Selmon West Extension 20

22 Selmon West Extension 21

23 Maintenance Of Traffic Bay to Bay Blvd. Westshore Blvd. Dale Mabry Hwy. MacDill Ave. Manhattan Ave. Off Site Detours: City of Tampa truck routes 22

24 MAINTENANCE OF TRAFFIC Remove existing median curb (night work - lane closures) Foundation construction 23

25 MAINTENANCE OF TRAFFIC Superstructure construction (night work - lane closures) 24

26 MAINTENANCE OF TRAFFIC Superstructure construction (night work - lane closures) 25

27 Schedule December 14, 2016 January 5, 2017 January 20, 2017 January 20, 2017 February 10, 2017 February 17, 2017 February 20, 2017 February 27, 2017 March 1, 2017 March 2, 2017 March 08, 2017 March 08, 2017 March 08, 2017 March 30, 2017 April 6, 2017 April 13, 2017 Draft RFP for Industry Review RFP Comments Due Final Draft RFP Available Advertisement Phase I Letters of Interest Due TRC Evaluators Scores LOI TRC Phase I Scores Posted THEA Board Meeting LOI Scores & Stipend Approved Proposers Declare Intent for Phase II by 5:00 PM Contracts Manager Lists Phase II Firms Final RFP Available Mandatory Pre-Proposal Meeting 9:00 AM Mandatory Utility Pre-Proposal Meeting 10:30 AM Deadline to Request for ATC Meeting No. 1 Deadline to Submit ATC Meeting No. 1 Concepts ATC Meeting No. 1 26

28 Design Build Stipend Stipend for $197M Estimated Construction Cost $25,000 + $52,500 + $75,000 + $294,000= $446,500 27

29 Design Build Stipend Stipend will be for the 2 nd, 3 rd and 4 th place teams only- $446,500 for each team Standard FDOT DB Procedures award stipend only to teams ranked in top 4 after LOI Concerns with teams pursuing Gateway DB project Selection is in April after Selmon West Extension Phase II begins Winning Gateway firm might not continue on Selmon pursuit THEA proposing to award stipend to teams ranked 2 nd, 3 rd and 4 th in Final Rankings 28

30 Schedule April 20, 2017 April 27, 2017 May 4, 2017 May 16, 2017 May 16, 2017 May 19, 2017 May 26, 2017 June 02, 2017 June 12, 2017 June 27, 2017 July 5, 2017 July 5, 2017 July 12, 2017 July 17, 2017 July 24, 2017 Late August 2017 Deadline to Request for ATC Meeting No. 2 Deadline to Submit ATC Meeting No. 2 Concepts ATC Meetings No. 2 Deadline for Submittal of ATC Proposals 2:00 PM Deadline for Submittal of Variation/Exception Requests Deadline for the Submittal of Questions Deadline for Responses to Questions Technical Proposals Due Technical Proposals Page Turn Meetings Question & Answer Sessions Deadline for Submittal of Written Clarification Letter Deadline for Submittal of Pre-Bid Questions Deadline for Responses to Pre-Bid Questions Price Proposals Due / Final Scores Posted THEA Board Meeting Approval of Award Contract Execution 29

31 Selection Process Element: Points: Letter of Interest 20 Price Proposal 20 Schedule 20 Design 15 Construction 15 MOT Plan 10 Total Possible Points: 100 Highest Total is #1 Ranked Team Overall 2 nd, 3 rd and 4 th Ranked Teams Receive Stipend 30

32 LOI Scoring Letter of Interest (20 points) 10 pages plus Organizational Chart & Key Staff Resumes Evaluation Criteria Firms Qualifications Performance History with THEA, FDOT, other agencies or states Design-Build experience of Contractors and Professional Consultants Similar type of work experience Environmental Record Design-Build Firm organization Design-Build Firm staffing plan Design-Build Firm coordination plan Understanding of Design-Build Project requirements Identification of critical issues Outline for addressing critical issues 31

33 Technical Proposal Scoring Technical Proposal- Project Approach 25 pages Design (15 points) Evaluation Criteria Design Schedule & Process Structures Concepts & Design Roadway Design Drainage Design & Environmental Permitting Utilities Design & Coordination Design Aesthetics, including Landscaping & Hardscaping Roadway & Aesthetic Lighting Design Geotechnical Considerations ITS, Toll Facilities & Signing Design Maintenance & Constructability Considerations Innovation & Value Added 32

34 Technical Proposal Scoring Technical Proposal - Project Approach 25 pages Construction (15 points) Evaluation Criteria Construction Schedule & Process Construction Means & Methods Foundation Construction Methods Bridge Erection Concepts Environmental Permitting Compliance Methods Utilities Relocations & Coordination Minimization of Impacts to Motorists Minimization of Impacts to Pedestrians Minimization of Impacts to Businesses Noise Mitigation Methods Innovation & Value Added 33

35 Technical Proposal Scoring Technical Proposal - Project Approach 25 pages Maintenance of Traffic (10 points) Evaluation Criteria Maintenance of Traffic Concept Type & Quantity of Detours Type & Quantity of Median Closures Materials Delivery Methods Bridge Erection Methods Minimization of Impacts to Motorists Minimization of Impacts to Pedestrians Minimization of Impacts to Businesses Lane Shifts Innovation & Value Added 34

36 Proposal Scoring Proposed Schedule Schedule (20 points) Evaluation Criteria 20 points - Shortest Proposed Schedule (Y days) from all DB Teams Y/X*20 points- Where X is each DB Team s proposed schedule days Proposed Price Price (20 points) Evaluation Criteria 20 points - Lowest Proposed Price ($Y) from all DB Teams Y/X*20 points- Where X is each DB Team s proposed price 35

37 Other Price Factors RFP Incentives/Disincentives Cost of scheduled median closures more/less than proposed: $10,000/closure estimated closures Cost of scheduled detours more than proposed: $30,000/detour - 79 estimated detours Maximum Total lncentives or Disincentives - $1,000,000 Liquidated Damages past Proposed Construction Time $70,000/day 1000 Day Contract Duration Damage Recovery - Late Opening to Traffic Cost for first 30 minutes = $25,000 Cost for each 10 minutes after = $5,000 36

38 On-going Projects Other Price Factors I-4 Ultimate FDOT District 5 Orange County Wekiva Parkway FDOT District 5 Upcoming Projects Gateway Project FDOT District 7 Pinellas County SPP Channelside Development Tampa Howard Frankland Bridge FDOT District 7 I-4 Beyond the Ultimate FDOT District 5 Bonding Capacity of Contractors Skilled Construction Labor Shortages Materials Costs Increases Oil Prices 37

39 Recent Bids Pensacola Bay Bridge DB FDOT District 3 Estimated Cost - $482,000,000 Winning Bid - $398,500,000 BIDDER PRICE Skanska USA Civil Southeast Inc. $ 398,500,000 Johnson Bros. Corporation $ 467,576,200 Archer Western Contractors, LLC $ 495,875,000 Anderson/De Moya/Leware $ 509,000,000 Flatiron-Prince-Manson $ 573,552,173 38

40 Technical Review Committee (TRC) Members & Technical Advisors 39

41 TRC Members Dave May, PE THEA Bob Frey, AICP THEA Joe Waggoner, THEA Christina Boulnois, PE FDOT D7 Ben Goldsberry, PE FDOT CO 40

42 Technical Advisors Sue Chrzan THEA Jim Drapp, PE THEA GEC Al Stewart, PE THEA GEC Fred Ochoa, PE THEA GEC Ben Molenaar THEA CEI Tom Andres, PE FDOT CO 41

43 Questions? 42

44 Selmon West Extension FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 A. Conceptual Plans Description O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D B. SEIR Re-Evaluation & Acceptance C. Design Build (DB) Industry Forum D. D/B Criteria Package Development E. D/B Procurement (Letters of Interest, Shortlist, Selection) F. D/B CEI Procurement G. D/B Plan Development H. D/B Construction I. CUTR Economic Study J. Investment Grade Traffic & Revenue Study Schedule Schedule Overview1/9/2017

45 Description CONCEPTUAL PLANS (PB) PB - PROCUREMENT HNTB - ASSISTANCE (Scope, RFQ, Negotiations) TWO HNTB - PLANS REVIEW TWO SEIR RE-EVALUATION (AMERICAN) AMERICAN PROCUREMENT HNTB - DOCUMENT REVIEW TWO HNTB PROPERTY EVALUATION WEST END TWO SEIR APPROVAL PROCESS THEA FDOT PLANNING COMMISSION O N D J F MA MJ J A S O N D J F MA MJ J A S O N D J F MA MJ J A S O N D J F MA MJ J A S O N D J F MA MJ J A S O N D J F MA MJ J A S O N D HNTB - ASSISTANCE (Scope, RFQ, Negotiations) TWO PB - PROCUREMENT HNTB - PLANS REVIEW TWO AMERICAN PROCUREMENT HNTB - DOCUMENT REVIEW TWO HNTB PROPERTY EVALUATION WEST END TWO THEA FDOT PLANNING COMMISSION DESIGN BUILD PROCUREMENT (TBD) INDUSTRY FORUM 2 HNTB PRELIMINARY PROCUREMENT ASSISTANCE (LOI & Shortlist) HNTB FINAL PROCUREMENT ASSISTANCE (RFP, EVALUATIONS,SELECTION INPUT) DESIGN-BUILD PROJECT (TBD) HNTB CEI PROCUREMENT ASSIST. (RFQ,EVALUATIONS & SELECTION) CEI DB-RFP Support, Construction CEI HNTB Plans Review & Construction Support D-B FIRM Plans Development D-B FIRM Construction INDUSTRY FORUM 2 HNTB PROCUREMENT ASSISTANCE (LOI & Shortlist) HNTB PROCUREMENT ASSIST. (RFP & Selection) HNTB CEI PROCUREMENT ASSIST. (RFQ & Selection) D-B FIRM Plans Development CEI DB-RFP Support, Construction CEI HNTB Plans Review & Construction Support D-B FIRM Construction

Design-Build Selmon West Extension

Design-Build Selmon West Extension TAMPA-HILLSBOROUGH COUNTY EXPRESSWAY AUTHORITY Letter of Clarification No. 1 FOR REQUESTS FOR PROPOSALS Design-Build Selmon West Extension Page 1 of 8 Letter of Clarification No. 1 ~ Date of Letter of

More information

TAMPA BAY NEXT MAJOR PROJECTS UPDATE

TAMPA BAY NEXT MAJOR PROJECTS UPDATE TAMPA BAY NEXT MAJOR PROJECTS UPDATE Marshall Hampton, FDOT District Seven Tampa Bay Next Program Manager January 18, 2019 1 2 Program Overview Funding Priorities Fiscal Year 2018 2019 2020 2021 2022 2023

More information

FTBA 2018 Construction Conference Major Projects Update

FTBA 2018 Construction Conference Major Projects Update FTBA 2018 Construction Conference Major Projects Update Bill Jones, P.E. FDOT District 7 Director of Transportation Development 1 2 3 FUNDED PROJECTS Howard Frankland Bridge Industry Forum September 2018

More information

The Gateway Expressway FTBA Conference. February 2-3, 2017

The Gateway Expressway FTBA Conference. February 2-3, 2017 The Gateway Expressway FTBA Conference February 2-3, 2017 256996-1 SR 686 (Roosevelt Blvd.) at CR 611 (49th St. N) PD&E 256866-1 Segment 2A 256997-1 SR 686 (Roosevelt Blvd.) from 49th St. Bridge to north

More information

Gloucester Parkway Extension RFQ Information Meeting

Gloucester Parkway Extension RFQ Information Meeting Gloucester Parkway Extension RFQ Information Meeting May 24, 2013 Tim Hartzell, PE District Project Manager Kevin Reichert, PE APD Project Manager and POC Topics Project Location & Overview RFQ Information

More information

Design-Build and Design-Bid-Build

Design-Build and Design-Bid-Build Design-Build and Design-Bid-Build Comparison of Overall Cost and Time Question: How does the total cost and time to deliver a $55,000,000 and 814 day design-build project compare to using design-bid-build

More information

Design-Build. Authorization. Criteria Selection/Award Process. Design-Build Construction Engineering and Inspection

Design-Build. Authorization. Criteria Selection/Award Process. Design-Build Construction Engineering and Inspection DESIGN-BUILD Design-Build Authorization Project Selection Criteria Selection/Award Process Warranties Design-Build Construction Engineering and Inspection Materials Acceptance DESIGN-BUILD AUTHORIZATION

More information

CUY-480-Valley View Bridge. Matchmaker April 20, 2017 Bureau of Workers Compensation 4800 E. 131 st Street

CUY-480-Valley View Bridge. Matchmaker April 20, 2017 Bureau of Workers Compensation 4800 E. 131 st Street CUY-480-Valley View Bridge Matchmaker April 20, 2017 Bureau of Workers Compensation 4800 E. 131 st Street Agenda Welcome Project Overview Prequalification & Work types Procurement Overview Matchmaker 2

More information

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units)

Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) 10/16/2014 Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) July 2002 Prepared by Construction Cost Estimating Unit Program Support Services 10/16/2014 Table of Contents

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $3,379,844.00 Scott Construction Corporation - Portland, ME $3,572,184.50 CPM Constructors - Freeport, ME $3,732,667.25 Page 1 of 16 Wyman

More information

Pensacola Bay Bridge Replacement Design Build. Industry Forum. Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer

Pensacola Bay Bridge Replacement Design Build. Industry Forum. Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer Pensacola Bay Bridge Replacement Design Build Industry Forum Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer Project Location 2 GENERAL PROJECT INFORMATION Replacement of the structurally

More information

Florida Department of Transportation DESIGN-BUILD PUSH BUTTON Contract

Florida Department of Transportation DESIGN-BUILD PUSH BUTTON Contract Florida Department of Transportation DESIGN-BUILD PUSH BUTTON Contract (FEDERAL SAFETY AND STATE FUNDS) Presentation to FHWA EDC 3 Systemic Safety Implementation Peer Exchange, Nashville, TN September

More information

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida

Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida Engineering Design Services for Safety Improvements along CR 476 from the Hernando County Line to US 301 (SR 35) Sumter County, Florida November 7, 2014 SUBMITTED BY: Dewberry Bowyer-Singleton 520 South

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount CPM Constructors - Freeport, ME $13,984,117.36 Reed & Reed, Inc. - Woolwich, ME $14,883,139.00 Page 1 of 11 CPM Constructors Freeport, ME 201.11 Clearing AC 2.00 10000.00

More information

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0

MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes

More information

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the

More information

Florida Department of Transportation District-Wide DESIGN-BUILD TOPICS PUSH BUTTON Contract

Florida Department of Transportation District-Wide DESIGN-BUILD TOPICS PUSH BUTTON Contract Florida Department of Transportation District-Wide DESIGN-BUILD TOPICS PUSH BUTTON Contract (FEDERAL SAFETY AND STATE FUNDS) Contract Evaluation June 2013 06/18/13 FDOT DBPB Evaluation 1 Jobs Creation

More information

CHAPTER 3 SCOPE SUMMARY

CHAPTER 3 SCOPE SUMMARY CHAPTER 3 SCOPE SUMMARY GENERAL The SDDOT is an active member of AASHTO to share common national design standards for the state highway system. The AASHTO Task Force on Geometric Design has completed the

More information

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016

Rt. 29 Solutions Project Delivery Advisory Panel. February 18, 2016 Rt. 29 Solutions Project Delivery Advisory Panel February 18, 2016 Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Feb

More information

Shadow Lake Woods HOA

Shadow Lake Woods HOA A Regional Transportation Solution Shadow Lake Woods HOA November 22, 2016 WEKIVA PARKWAY Project Description $1.6 Billion Completion of Central Florida s Beltway 25-mile Toll Road Non-Toll Road Improvements:

More information

Tampa Hillsborough Expressway Authority

Tampa Hillsborough Expressway Authority Tampa Hillsborough Expressway Authority DESIGN-BUILD REQUEST FOR PROPOSAL for Selmon West Extension (SR-618) from the Gandy Bridge to the western terminus of the Selmon Expressway, Hillsborough County

More information

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016 Cleveland Opportunity Corridor Project Section 3 Subcontractor Informational Meeting August 12, 2016 Agenda Welcome and Opening Remarks Project Overview Prequalifications & Work Types Procurement Overview

More information

Maine Turnpike Authority

Maine Turnpike Authority PAVEMENT REHABILITATION & CLEAR ZONE IMPROVEMENTS MM 80.7 TO MM 88.6 202.121 Removing Existing Concrete (6CY) 1.00 LS 202.127 Removing of Existing Bituminous Pavement (470 SY) 1.00 LS 202.202 Removing

More information

Presented By: Debbie Hunt Florida Department of Transportation District Seven Director of Transportation Development October 16, 2013

Presented By: Debbie Hunt Florida Department of Transportation District Seven Director of Transportation Development October 16, 2013 PROJECT MANAGEMENT IN A DOT ENVIRONMENT Presented By: Debbie Hunt Florida Department of Transportation District Seven Director of Transportation Development October 16, 2013 Mission Safe Transportation

More information

Transportation Management Plan

Transportation Management Plan Transportation Management Plan I 80 PE County, MP 51.38 to MP 62.49 One Inch Mill and Two Inch Fill With Open Grade July 2016 Prepared by Lisa Ouellette Nevada Department of Transportation Executive Summary

More information

} SURVEY SR 429 STANDARD CLEARING & GRUBBING LIMITS OF FRICTION COURSE 8" 8" 8" 8" 12' VARIES 24'-36' VARIES VARIES * 4' SHLDR. PAVT.

} SURVEY SR 429 STANDARD CLEARING & GRUBBING LIMITS OF FRICTION COURSE 8 8 8 8 12' VARIES 24'-36' VARIES VARIES * 4' SHLDR. PAVT. } SURVEY SR 429 { CONST. SR 429 (WEKIVA PKWY) R/W (15 MIN.) 0'-10.4' R/W (15 MIN.) STANDARD CLEARING & GRUBBING 24'-36' 24'-48' 94' BORDER (2-30.) (2-30.) 94' BORDER 10' 4' 10' NATURAL GROUND, MAX. CUT

More information

Tampa Hillsborough Expressway Authority

Tampa Hillsborough Expressway Authority Tampa Hillsborough Expressway Authority DESIGN-BUILD REQUEST FOR PROPOSAL for Selmon West Extension (SR-618) from the Gandy Bridge to the western terminus of the Selmon Expressway, Hillsborough County

More information

I-64 Capacity Improvements Segment III RFQ Information Meeting

I-64 Capacity Improvements Segment III RFQ Information Meeting I-64 Capacity Improvements Segment III RFQ Information Meeting April 5, 2017 Janet Hedrick, P.E. Design Project Manager Joseph Clarke, P.E. APD Project Manager and POC I-64 Capacity Improvements Segment

More information

Dale Mabry Pedestrian Overpass Technical Feasibility Analysis. March 2017

Dale Mabry Pedestrian Overpass Technical Feasibility Analysis. March 2017 Dale Mabry Pedestrian Overpass Technical Feasibility Analysis March 2017 Overview Two Part Study: 1. Feasibility of Alternatives for a Pedestrian Overpass Across Dale Mabry Hwy Near I 275 2. Walk/Bike

More information

TURNPIKE PLANS PREPARATION AND PRACTICES HANDBOOK (TPPPH) VOLUME 1

TURNPIKE PLANS PREPARATION AND PRACTICES HANDBOOK (TPPPH) VOLUME 1 TURNPIKE PLANS PREPARATION AND PRACTICES HANDBOOK (TPPPH) VOLUME 1 FLORIDA S TURNPIKE ENTERPRISE PRODUCTION DESIGN DEPARTMENT OCOEE, FL June 2016 January 3, 2017 Addendum #2 The following are changes,

More information

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA ASHE NATIONAL PROJECT OF THE YEAR SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA For the PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Engineering District 12-0 Submitted By: January 29, 2018 AMERICAN

More information

Project Location. Pensacola Bay Bridge Replacement Design Build 03/02/16. Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer

Project Location. Pensacola Bay Bridge Replacement Design Build 03/02/16. Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer Pensacola Bay Bridge Replacement Design Build Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer Project Location 2 1 GENERAL PROJECT INFORMATION Replacement of the structurally deficient

More information

Rapid City, SD HDR Project No RE: Replacement of Existing I-190 Twin Bridges at I-190/Silver Street Interchange, Rapid City, SD

Rapid City, SD HDR Project No RE: Replacement of Existing I-190 Twin Bridges at I-190/Silver Street Interchange, Rapid City, SD To: Steve Gramm, SDDOT Memo From: HDR Project: SDDOT I-190 Silver Street Interchange Study Rapid City, SD HDR Project No. 000000000137390 Date: December 27, 2011 RE: Replacement of Existing I-190 Twin

More information

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager

Interstate 66 Widening from. RFQ Information Meeting. January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager Interstate 66 Widening from Gainesville to Haymarket RFQ Information Meeting January 4, 2012 Christiana Briganti-Dunn, P.E. District Project Manager John C. Daoulas, P.E. APD Project Manager and POC Introduction

More information

Maryland Transportation Authority (MDTA)

Maryland Transportation Authority (MDTA) Maryland Transportation Authority (MDTA) I-95 Major Deck and Superstructure Rehabilitation South of the Fort McHenry Tunnel Northeast Bridge Preservation Partnership Conference September 20, 2016 David

More information

MILTON-MADISON BRIDGE REPLACEMENT

MILTON-MADISON BRIDGE REPLACEMENT MILTON-MADISON BRIDGE REPLACEMENT Andy Barber P.E. Kevin Hetrick P.E. 1 Presentation Overview KYTC lead Environmental Study TIGER Grant INDOT lead Design Build solution Bridge Sliding Project Status Questions

More information

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA

TRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA 2008/09 $52.0 M 85% SELF-PERFORMED Widen 12 miles of Interstate 10 to six lanes including the reconstruction

More information

Red Wing Bridge Alternates

Red Wing Bridge Alternates Alternate 1 Tied Arch Alternate 2 Simple Span Truss Alternate 1 Design Drawing Alternate 2 Design Drawing Similar Bridge Design to Alternate 1 Similar Bridge Design to Alternate 2 Evaluation Matrix for

More information

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center Traffic Management Guide to Concrete Overlay Solutions December 5, 2014 ACPA Annual Meeting Dale S. Harrington P.E. Representing CP Tech Center Traffic Management- Concrete Overlays Traffic Management

More information

The purpose of this addendum is to respond to RFI s submitted to the County and issue a revised SECTION BID FORM.

The purpose of this addendum is to respond to RFI s submitted to the County and issue a revised SECTION BID FORM. HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS (HCBCC) PURCHASING DEPARTMENT DATE: 6/19/15 BID NO. ITB 15-044 ADDENDUM No. 2 Project.: Owner: Lake Josephine Drive resurfacing Highlands County BCC Attn:

More information

Review of Plans and Specs from a Constructability Perspective

Review of Plans and Specs from a Constructability Perspective Review of Plans and Specs from a Constructability Perspective The Executive Regional Manager and the Project Manager, with approval of the Director of Project Management, may request the Constructability

More information

Texas Department of Transportation Book 2 Technical Provisions. Grand Parkway Project. Attachment 2-2. Work Breakdown Structure Requirements

Texas Department of Transportation Book 2 Technical Provisions. Grand Parkway Project. Attachment 2-2. Work Breakdown Structure Requirements Texas Department of Transportation Book 2 Technical Provisions Grand Parkway Project Work Breakdown Structure Requirements Table 1 represents the minimum levels of the WBS that all schedule information

More information

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 2004 Specifications CSJ: 0932-01-076 SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 1.0 Description of Project 1.1. General. This project provides for the widening of

More information

Jobs & Transportation Ramping it Up Roadway and Traffic Dan Groh, P.E.

Jobs & Transportation Ramping it Up Roadway and Traffic Dan Groh, P.E. Jobs & Transportation Ramping it Up Roadway and Traffic Dan Groh, P.E. Ohio DOT Work Zone Process Review Ohio DOT Work Zone Process Review This review was conducted by the Ohio Department of Transportation

More information

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Scott Construction Corporation - Portland, ME $918,886.00 CPM Constructors - Freeport, ME $1,059,738.71 Wyman & Simpson Inc. - Richmond, ME $1,084,545.00 Page 1 of 7 Scott

More information

PUBLIC INFORMATION MEETING June 24, 2015

PUBLIC INFORMATION MEETING June 24, 2015 Gallows Road (RTE. 650) over Arlington Boulevard (RTE. 50) Fairfax County Bridge Rehabilitation, Preventive Maintenance and Pier Repairs Phase 1 - Project No. 0650-029-235; UPC 106956, Pier Repair Phase

More information

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures Cumberland Viaduct Rehabilitation Project Contract No. AL4095180R Presenter Bob Bofinger MDSHA Office of Structures Project Justification & Improvements Condition State The deck, superstructure and substructure

More information

Reconstruction Project Update

Reconstruction Project Update I-65/I-70 North Split Interchange Reconstruction Project Update September 18, 2017 Agenda Welcome/introductions Project overview Scope and limits Need Environmental Assessment Maintenance of traffic Financial

More information

Gerald Desmond Bridge. Design-Build Industry Workshop August 10, 2010

Gerald Desmond Bridge. Design-Build Industry Workshop August 10, 2010 Gerald Desmond Bridge Design-Build Industry Workshop August 10, 2010 Aug. 10 Workshop Questions? Email gdbridge@polb.com Or call 562.980.4983 Agenda Introduction and Purpose Scope of Work Budget & Funding

More information

CITY COUNCIL AGENDA Workshop Meeting: Tuesday, October 24, 2017

CITY COUNCIL AGENDA Workshop Meeting: Tuesday, October 24, 2017 1 2 CITY COUNCIL AGENDA Workshop Meeting: Tuesday, October 24, 2017 AGENDA ITEM: 2 Hear and deliberate on handrail, lighting, and walkway replacement options for Key Allegro Bridge on Bayshore Drive. SUBMITTED

More information

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction

More information

CHOOSING THE CORRECT BARRIER FOR THE WORK ZONE

CHOOSING THE CORRECT BARRIER FOR THE WORK ZONE CHOOSING THE CORRECT BARRIER FOR THE WORK ZONE Minnesota Statewide Work Zone Safety Committee March 31, 2015 Factors for a Work zone Duration of Time Length of Time Work zone will be Present Length of

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $984,032.05 Gordon Contracting - Sangerville, ME $985,607.00 CPM Constructors - Freeport, ME $1,177,689.54 Page 1 of 7 Wyman & Simpson

More information

Air Quality Analysis Technical Memorandum

Air Quality Analysis Technical Memorandum Air Quality Analysis Technical Memorandum Segment 2: State Road 400 (SR 400) / Interstate 4 (I-4) from West of SR 528 (Beachline Expressway) to West of SR 435 (Kirkman Road) Orange County (75280), Florida

More information

Public Information Meeting Information Packet: Childress Drive Bridge over South Utoy Creek June 29, 2016

Public Information Meeting Information Packet: Childress Drive Bridge over South Utoy Creek June 29, 2016 Public Information Meeting Information Packet: Childress Drive Bridge over South Utoy Creek June 29, 2016 Welcome to the Public Information Meeting for the proposed replacement of the Childress Drive Bridge

More information

Surface Transportation Resiliency Planning in Hillsborough County, FL

Surface Transportation Resiliency Planning in Hillsborough County, FL Surface Transportation Resiliency Planning in Hillsborough County, FL Allison Yeh, AICP, LEED GA Hillsborough County, Florida 158 miles of coastline 4 th Largest Population in Florida (1.3 Million) 25%

More information

Table of Contents. List of Appendices

Table of Contents. List of Appendices Table of Contents Page Executive Summary 3 Description of Project 3 TMP Roles and Responsibilities 3 Area Engineer 3 Communications Office 4 TMP Monitoring 4 Existing and Future Conditions 4 Traffic Counts

More information

Organization. Project Management Institute, Olympia Chapter Date Nov. 20, 2012

Organization. Project Management Institute, Olympia Chapter Date Nov. 20, 2012 Organization Project Management Institute, Olympia Chapter Date Nov. 20, 2012 Program Overview The Alaskan Way Viaduct Replacement Program includes projects led by the Washington State Department of Transportation,

More information

GDOT s Design-Build Program Past, Present and Future

GDOT s Design-Build Program Past, Present and Future GDOT s Design-Build Program Past, Present and Future John D. Hancock, P.E. Assistant State Innovative Program Delivery Engineer September 16, 2013 Agenda Program Overview GA Code 32-2-81 (SB 70) Look Ahead

More information

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017 VT 14 East Montpelier Bridge Project Informational Meeting February 22, 2017 Welcome & Introductions VTrans Mark Sargent, Project Manager Wayne Symonds, Structures Program Manager Chris Barker, Resident

More information

Town of Moraga Canyon Road Bridge Replacement Project October 10, 2018 Town Council Presentation

Town of Moraga Canyon Road Bridge Replacement Project October 10, 2018 Town Council Presentation Town of Moraga Canyon Road Bridge Replacement Project October 10, 2018 Town Council Presentation OVERVIEW History of Events 2018 Bridge Redesign Construction Schedule 2 ACRONYMS AND TERMINOLOGY FHWA =

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS CONTRACT NO COLORADO CENTER BICYCLE/PEDESTRIAN BRIDGE OVER I-25 201-00000 Clearing and Grubbing 1 LS 202-00010 Removal of Tree 1 EA 202-00035 Removal of Pipe 30 LF 202-00200 Removal of Sidewalk 431 SY 202-00203 Removal of Curb and Gutter 973 LF 202-00205 Removal of

More information

Route 7 Truck Climbing Lane. RFQ Information Meeting

Route 7 Truck Climbing Lane. RFQ Information Meeting Route 7 Truck Climbing Lane From West Market Street to Route 9 RFQ Information Meeting November 9, 2012 Mark Gibney, PE District Project Manager Ian Millikan, PE APD Project Manager and POC Introduction

More information

I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia. RFQ Information Meeting - November 9, 2016

I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia. RFQ Information Meeting - November 9, 2016 I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia RFQ Information Meeting - November 9, 2016 Krishna Potturi, PE Project Manager Suril Shah APD Project

More information

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, :30 PM 600 S. Commerce Ave. Sebring, FL AGENDA

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, :30 PM 600 S. Commerce Ave. Sebring, FL AGENDA HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, 2018 5:30 PM 600 S. Commerce Ave. Sebring, FL 33870 AGENDA 1 MEETING CALLED TO ORDER: Invitation to fill out "citizens not on the agenda

More information

Tampa Hillsborough Expressway Authority

Tampa Hillsborough Expressway Authority Tampa Hillsborough Expressway Authority DESIGN-BUILD REQUEST FOR PROPOSAL for Selmon West Extension (SR-618) from the Gandy Bridge to the western terminus of the Selmon Expressway, Hillsborough County

More information

FHWA Resilience & Durability to Extreme Weather Pilot Program

FHWA Resilience & Durability to Extreme Weather Pilot Program FHWA Resilience & Durability to Extreme Weather Pilot Program Let s Talk Resilency Session presented to AMPO Annual Conference San Antonio, TX presented by Beth Alden, AICP Hillsborough MPO September 28,

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2016 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Welcome! Route 1 Viaduct Rehabilitation Project Chelsea Project File No

Welcome! Route 1 Viaduct Rehabilitation Project Chelsea Project File No Welcome! Route 1 Viaduct Rehabilitation Project Chelsea Project File No. 605287 25% Design Public Hearing Chelsea City Hall January 24, 2018 6:30 p.m. Introduction Welcome & Introductions by MassDOT PM

More information

Gateway Expressway Workforce Training Pilot Program

Gateway Expressway Workforce Training Pilot Program Gateway Expressway Workforce Training Pilot Program January 18, 2019 Grant Cool The de Moya Group Gateway Expressway PM Ed McKinney FDOT District 7 Planning and Environmental Administrator 1 Gateway Expressway

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids General Info Number: PROJECT NO. 43-17-04 : BRIDGE DECK REPAIR AND BRIDGE REMOVAL OHIO TURNPIKE OVER QUARRY ROAD, M.P. 138.0 OHIO TURNPIKE OVER INACTIVE RAILROAD, M.P. 138.2 LORAIN COUNTY, OHIO Deadline:

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2018026 TRACS No. Project No. County District Gross

More information

Welcome!! Traffic Control Supervisor. Training Course

Welcome!! Traffic Control Supervisor. Training Course Welcome!! Traffic Control Supervisor Training Course Traffic Control Supervisor Training Course Two-day course Begins promptly at 8:00 AM Ends no later than 5:00 PM Flexible schedule!! 0-2 Course Objectives

More information

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199)) 11060 White Rock Road, Suite 200 Rancho Cordova, CA 95670 Phone: (916) 363-4210 Fax: (916) 363-4230 M e m o r a n d u m To: Reena Gohil, Environmental Planner Date: May 30, 2017 California Department of

More information

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc.

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. Paper prepared for presentation at the Bridges in a Climate of Change

More information

Pattullo Bridge Replacement Project. Cost Report

Pattullo Bridge Replacement Project. Cost Report Pattullo Bridge Replacement Project Cost Report January 2018 Cost Report Page i TABLE OF CONTENTS 1 PURPOSE... 1 2 BASIS FOR THE ESTIMATE... 2 2.1 Scope of the Works... 2 2.2 Scope of Capital Costs...

More information

Construction Cost Estimation Preparation Manual (Metric Units)

Construction Cost Estimation Preparation Manual (Metric Units) 07/25/2001 Construction Cost Estimation Preparation Manual (Metric Units) July 2001 Prepared by Cost Estimating Unit Program Support Services 07/25/2001 Table of Contents Section Page 1.0 Introduction

More information

BRIDGE GENERAL PLAN ESTIMATE OR PLANNING ESTIMATE X

BRIDGE GENERAL PLAN ESTIMATE OR PLANNING ESTIMATE X STATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATION BRIDGE GENERAL PLAN ESTIMATE OR PLANNING ESTIMATE X DPD-DSD-DIS (Rev 8/92) STRUCTURE BR. NO. RCVD BY ESTIMATING GROUP Wall 177 - Sta 177+00 to Sta 181+00

More information

SAMPLE. in Comments section the structure number and the

SAMPLE. in Comments section the structure number and the CTSS Sample DESIGN Interference Checklist Project Name: Direction/Milepost limits: Notes: DP #: Municipality(ies): County (ies): Project Manager: Designer: All item checked Y or N shall be briefly discussed

More information

Ohio Department of Transportation - Prebid Questions

Ohio Department of Transportation - Prebid Questions Project No. 120625 Sale Date - 12/14/2012 ATB-76747 - IR-90-7.56, PART 1;ATB-90-13.60, PART 2 12/11/2012 8:03:55 AM Per Addendum 5 Item 184 was reduced drastically. With over 35,000 LF of new guardrail

More information

Maclay Bridge Preservation Alternatives Analysis

Maclay Bridge Preservation Alternatives Analysis Maclay Bridge Preservation Alternatives Analysis Bitterroot River W of Missoula BR 9032(65) UPN 6296000 August 30, 2018 Maclay Bridge Preservation Alternatives Analysis August 30, 2018 Table of Contents

More information

10 Stockton 4. Guard Rail and Impact Attenuator Installation. HSIP Cycle 7

10 Stockton 4. Guard Rail and Impact Attenuator Installation. HSIP Cycle 7 10 Stockton 4 Guard Rail and Impact Attenuator Installation HSIP Cycle 7 2015 Form Date: April 26, 2015 HSIP Cycle 7 Application Form APPLICATION FOR CYCLE 7 HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) APPLICATION

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479),

More information

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Washington State s Skagit River Bridge Emergency Slide Bijan Khaleghi

More information

INNOVATIVE CONTRACTING GUIDELINES

INNOVATIVE CONTRACTING GUIDELINES Office of Construction and Innovative Contracting INNOVATIVE CONTRACTING GUIDELINES A+B Bidding Lane Rentals Incentives/ Disincentives Liquidated Savings Design-Build Warranties Pay for Performance No

More information

I-395 Reconstruction MDX SR Improvements I-95 Concrete Pavement Reconstruction

I-395 Reconstruction MDX SR Improvements I-95 Concrete Pavement Reconstruction I-395 Reconstruction MDX SR 83611 Improvements I-95 Concrete Pavement Reconstruction FTBA Conference February 10, 2016 Presentation Outline Project Overview I-395 Reconstruction MDX SR 83611 I-95 Pavement

More information

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS PAGE : 107-1 CONTRACT TIME : 08/31/12 COMPLETION DATE CONTRACT DESCRIPTION : URBAN PROJECT(S) : BR-078-5(110) ROUTE I-78 RAMP C OVER BEAVER BROOK DECK REPLACEMENT AND RESURFACING CONTRACT NO.019113160

More information

Plan Preparation Guide. Chapter 2. Typical Sections - Pavement Design

Plan Preparation Guide. Chapter 2. Typical Sections - Pavement Design Plan Preparation Guide Chapter 2 Typical Sections - Pavement Design Section Description Page 1 Typical Sections 2-1 2 Secondary ( C projects) Typical Sections 2-3 3 Base Course 2-4 4 Full Depth Asphalt

More information

St. Anthony Falls I-35W Bridge Replacement. ASHE National Conference June 13, Dustin Thomas, P.E. I-35W Bridge Construction Engineer

St. Anthony Falls I-35W Bridge Replacement. ASHE National Conference June 13, Dustin Thomas, P.E. I-35W Bridge Construction Engineer St. Anthony Falls I-35W Bridge Replacement ASHE National Conference June 13, 2014 Dustin Thomas, P.E. I-35W Bridge Construction Engineer The Former Bridge - 9340 Opened to traffic in 1967 Steel truss bridge

More information

6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT

6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT 6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT Project Location The 6 th Street Viaduct (Bridge No. 53C-1880) and Sixth Street Overcrossing (Bridge No. 53-0595) comprise a single structure, which spans

More information

I-290 Construction Approach. April 2016

I-290 Construction Approach. April 2016 I-290 Construction Approach April 2016 1 AGENDA Project Process - Phase I, II, & III Overall guiding principles I-290 construction approach I-290 construction schedule Construction mitigation Best Practices

More information

ARCHITECT - ENGINEER QUALIFICATIONS ESCAMBIA COUNTY, FL

ARCHITECT - ENGINEER QUALIFICATIONS ESCAMBIA COUNTY, FL ARCHITECT - ENGINEER QUALIFICATIONS PART 1 - CONTRACT-SPECIFIC QUALIFICATIONS 1. TITLE AND LOCATION (City and State) Professional Services as Governed by Florida Statute 287.055 A. CONTRACT INFORMATION

More information

MISCELLANEOUS PAVING PROJECTS & SIGNAL INSTALLATION

MISCELLANEOUS PAVING PROJECTS & SIGNAL INSTALLATION TAMPA-HILLSBOROUGH COUNTY EXPRESSWAY AUTHORITY LETTER OF CLARIFICATION NO. 1 REQUESTS FOR PROPOSALS FOR MISCELLANEOUS PAVING PROJECTS & SIGNAL INSTALLATION RFQ No. O-01616 THEA Page 1 of 6 LETTER OF CLARIFICATON

More information

General Info Number: PROJECT NO Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST TRUMBULL COUNTY, OHIO

General Info Number: PROJECT NO Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST TRUMBULL COUNTY, OHIO General Info Number: PROJECT NO. 59-18-03 Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST 209.20 TRUMBULL COUNTY, OHIO Deadline: April 25, 2018 at 2:00 P.M. (Eastern) (Estimated Cost: $3,100,000.00)

More information

M D 355 [FR E D E R IC K R O A D] OVER

M D 355 [FR E D E R IC K R O A D] OVER M D 355 [FR E D E R IC K R O A D] OVER LITTLE BENNETT CREEK MAINTENANCE OF TRAFFIC ALTERNATIVE ANA LYSIS Prepared by: INTRODUCTION The purpose of this report is to present the results of traffic analyses

More information

Virginia Department of Transportation. Tabulation of Bids. Counties: REPLACE SUPERSTRUCTURE OVER NORFOLK SOUTHERN RR

Virginia Department of Transportation. Tabulation of Bids. Counties: REPLACE SUPERSTRUCTURE OVER NORFOLK SOUTHERN RR Page 1 of 14 0010 00100 MOBILIZATION 0020 00101 CONSTRUCTION SURVEYING (CONSTRUCTION) 0030 00110 CLEARING AND GRUBBING 0040 00120 REGULAR EXCAVATION 0050 00126 EARTHWORK 0060 00140 BORROW EXCAVATION ACRE

More information

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,

More information

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your