1 ADDENDUM 3 - RFP 693-BC NEVADA STATE COLLEGE FACILITY MAINTENANCE SERVICES University of Nevada, Las Vegas Purchasing Department 4505 Maryland Parkway Las Vegas, Nevada (702) Date of Addendum: March 6, 2017 THE FOLLOWING ADDITIONS, DELETIONS, CLARIFICATIONS AND/OR CHANGES SHALL BE MADE AND INCORPORATED IN THE SUBJECT IFB: The following are incorporated into the RFP document: Attachment 1: NSC Food Service Equipment Schedule dated QUESTION 1: Can NSC provide a list of equipment & specifications; such as cooling tower, Boiler; switchgears, pumps, generator, and etc. for each building location. ANSWER 1: Equipment Location Make Serial Number Age (years) Cooling Tower LAS BAC U Chiller LAS Carrier 4307Q Chiller LAS Carrier 4307Q07942 End T&C
2 Boiler LAS Lochinvar J07H Boiler LAS Lochinvar J07H Pump LAS Baldor F Pump LAS Baldor F Switchgear LAS Siemens A Cooling Tower Plant Evapco years Cooling Tower Plant Evapco on ( Fans, Bearings, Pulleys, Shafts, Drive Couplings, Electric Fan motors, Mechanical equipment support, All structural components, fill and fill supports drift eliminators and their supports, Air inlet Louvers or screens and their supports Chiller Plant Carrier 4814Q Chiller Plant Carrier 4814Q Boiler Plant Lochinvar K14H Boiler Plant Lochinvar K14H Yrs Parts only 5Yrs Parts only 10 Yrs. Heat Exchanger only 10 Yrs. Heat Exchanger
3 only Boiler Plant Lochinvar K14H Boiler Plant Lochinvar K14H Pump Plant Taco Pumps ED12959/5 2 Pump Plant Taco Pumps ED12959/ Yrs. Heat Exchanger only 10 Yrs. Heat Exchanger only Switchgear Plant Spectra Series Switchgear A QUESTION 2: Can NSC provide Contractor and/or Equipment Manufacturer s warranty terms & conditions and remaining period? ANSWER 2: See answer 1 QUESTION 3: Can NSC provide As-Built Document; such as, drawings and Equipment Operation & Maintenance Manuals? ANSWER 3: As-Builts and Manuals are on site and available to the awarded contractor. QUESTION 4: Can NSC provide serial numbers for all installed Mechanical, Plumbing, and Electrical equipment? ANSWER 4: See QUESTION 1
4 QUESTION 5: Can NSC provide current Boiler Operating Permits? ANSWER 5: Boiler Permits are current and on site. QUESTION 6: Can NSC provide equipment Trending Reports? ANSWER 6: Trend reports are available on the EMS. We cannot provide at this time. QUESTION 7: Can NSC provide Engineering Reports for each building location? ANSWER 7: The reports are onsite and available to the awarded contractor. QUESTION 8: Will we need to submit a pricing for Fire Alarm Monitoring service? ANSWER 8: Yes. Please add the pricing to the Fire Systems line item of Pricing Response Form Section E. QUESTION 9: Maintenance scope of work for Fire Alarm System only applies to the State Testing & Inspection requirements? ANSWER 9: Contractor will be responsible for ensuring any necessary repairs QUESTION 10: Please clarify how NSC wants our proposal to address any emergency service for MEP & Life Safety scope? Just hourly rate and cost of material plus OH & Fee? ANSWER 10: The proposal may contain rates and overhead. Or, it may contain different solutions for minor repairs and major repairs.
5 QUESTION 11: Do we need to price any major repair as a budgetary line item; such as geothermal line break; major equipment failure, or underground utility repair? ANSWER 11: It is up to the contractor to propose how major repairs will be handled. QUESTION 12: Please advise what MEP & Life Safety maintenance requirement for the Dawson leased property and the office located in downtown Henderson. ANSWER 12: The lease in Downtown will terminate at the end of Nov The landlord is responsible for MEP/life safety. The contractor will liaise between subtenants and landlord until the lease terminates. The contractor will provide MEP/life safety to Dawson as it would to the main campus. The caveat is that it will work with administration and the City of Henderson on all major repairs. QUESTION 13: Will personnel working on campus require background check and provide with security key pad for access? ANSWER 13: We would expect your personnel to undergo a pre-hire background check that would include, at a minimum: SSN verification National Criminal Check County Specific check based on address or previous addresses National Sex Offender Registry QUESTION 14: Any special condition and requirement to clean in the Laboratory Chemical Storage area? ANSWER 14: Republic Services is the current contractor for bio waste. All areas are to be cleaned. Risk Management will provide guidance and training for contractor employees. Contractor will be required to determine and provide appropriate PPE.
6 QUESTION 15: How often do you want us to proposal to clean all window surfaces (interior & exterior); including the entrance curtain wall area? ANSWER 15: It is up to the contractor to propose an acceptable level of service. That said, there may be special events for which windows and surfaces will need to be clean at the request of the college. These times may not correspond to proposed schedules. QUESTION 16: Will each building have sufficient space to allow janitorial and maintenance services to keep their equipment and supplies on premises? ANSWER 16: Yes. QUESTION 17: Do you want us to proposal a building weather-tight assessment evaluation? ANSWER 17: It is up to the contractor to propose an acceptable level of service. QUESTION 18: Does NSC have an established janitorial schedule and scope of cleaning service with the existing buildings? ANSWER 18: We currently have day porters and night crews. QUESTION 19: Does NSC have an established landscaping and general site cleaning with the existing buildings? ANSWER 19: Yes QUESTION 20: Can NSC provide the lease termination date for the Dawson leased property and the office space in downtown Henderson?
7 ANSWER 20: Downtown expires Nov. 30, 2017 and will not renew. Dawson expires Nov 6, 2022 but may be extended. QUESTION 21: Will it be possible for the Janitorial Service install a washer & dryer on site? ANSWER 21: It may be possible. QUESTION 22: Will NSC want us to include pest control as part of overall ground maintenance services? ANSWER 22: Yes QUESTION 23: Being NSC main campus has about total of about 170,000 square feet; would it be possible to staff full time staffing on site to perform continuous janitorial & ground maintenance services during school hours? ANSWER 23: As long as the service does not interfere with the educational mission of the college. QUESTION 24: Will all labor performed for all maintenance services must be paid in prevailing wages regardless of the respective contract amount? ANSWER 24: NSC's preference is to award to a single Proposer. The Contract is subject to prevailing wage laws. QUESTION 25: Should we included in our proposal cost to patch & paint in all building major corridors walls and ceiling where is applicable; bi-annually? ANSWER 25: It is up to the contractor to propose and appropriate level of service. The RFP includes a requirement for painting work as needed.
8 QUESTION 26: Can there be an extension for B contracting license? If the contractor can show that they are 'in process'? ANSWER 26: NO, Please reference the RFP documents Page 1: Each proposer shall be properly licensed by the Nevada state contractors board prior to the opening of bids on the opening date. Nevada state college cannot award a contract to any proposer who, at the time of the opening is not properly licensed under the provisions of Nevada revised statutes chapter 624 or to a proposer for whom the award would exceed the limits of their license. Proposers must be qualified as a bidder at the time of proposal submittal with the state public works division of the department of administration for the cost category required for the project. Please refer to Please refer to QUESTION 27: Could you provide an Equipment Asset List with: quantities model numbers serial numbers age updates/recalls warranty left from original installation ANSWER 27: See attachment in answer to QUESTION 1 QUESTION 28: Could you list all equipment used for maintaining the NSC campus including leased equipment with assumable costs if any. ANSWER 28: We do not have an inventory of all tools and equipment. Any tools and equipment would be available for use. QUESTION 29: What warehouse spare parts and consumables inventory would be transferred? ANSWER 29: There is various attic stock remaining from the construction (carpet tile, etc). It is assumed that those items would remain with the college but that the Contractor would use in carrying out their scope of work.
9 QUESTION 30: Could you provide the campus master plan including campus standards i.e. colors, brands of equipment, and sole sourced items? ANSWER 30: QUESTION 31: Could you provide the referenced deferred maintenance plan? ANSWER 31: We are unable to locate at this time. QUESTION 32: What is the dollar threshold for preventive maintenance vs. capital repair? ANSWER 32: It is up to the contractor to propose. QUESTION 33: Is the selected vendor responsible for all repairs on the equipment? ANSWER 33: The contractor is responsible for ensuring that all equipment is in working order and that they have the tools to perform the scope of work. QUESTION 34: Will the selected vendor have access to the current equipment housed or used by Nevada State College? ANSWER 34: We do not have an inventory of all tools and equipment. Any tools and equipment would be available for use. QUESTION 35: What CMMS does NSC favor? ANSWER 35: No preference. It is up to the contractor to propose as part of their integrated approach to facilities management at NSC.
10 QUESTION 36: Does Nevada State have any type of Facilities assessment Report? If not, will the selected vendor be required to provide one? ANSWER 36: There is a FCI report that is slightly aged. The contractor will not be required to provide but may be asked to assist with updating from time to time at the college s expense. QUESTION 37: Can you explain the phrase "beyond special offer limits" ANSWER 37: Actually, the quote is beyond specified limits. This is meant to imply that the contractor will propose a limit or threshold for work that will be contained within their stated contract amount. Work above this limit may need to be contracted out. QUESTION 38: If a piece of mechanical equipment at NSC is deemed inoperable or in need of repair before selected vendor is in place, who is responsible for that repair? ANSWER 38: It is up to the contractor to propose what is work will be included in their contract amount and what would require additional contracting or cost. QUESTION 39: What key management system is NSC implementing currently? ANSWER 39: Hard keys are Yale. Access controls are on the Millennium System. QUESTION 40: Emergency generators are not referenced. Are they to be included? ANSWER 40: Yes QUESTION 41: What version of Energy Management System is being operated? Is it current and are licenses and updates a cost plus expense?
11 ANSWER 41: Delta Controls, license is current the company that manage the license and services the system and the devices is Envise QUESTION 42: Are the building envelopes the demarcation for responsibility for utilities? If not, what extents for each utility is covered? ANSWER 42: Electricity from the switchgear Gas from the meter Water from the meter QUESTION 43: Scoreboards, bleachers, and Facility time clocks? What systems are installed currently? ANSWER 43: We currently have none, but are included for when we do. QUESTION 44: Campus mail has how many stops? Any mailboxes for students? ANSWER 44: One stop per department, approx. 10. We do not have student mailboxes at this time. QUESTION 45: Does the management of deliveries refer to only Facility ordered pieces? ANSWER 45: Includes all campus shipments. QUESTION 46: During site walk all kitchen and food prep equipment was stated to be included. Can we have a provided list and current vendor (EcoLab?). Hood cleaning vendors? ANSWER 46: See attached Attachment 1 QUESTION 47: Please list the drill types and annual inspections that need support and coordination.
12 ANSWER 47: Backflows Elevators Fire extinguishers Boilers Fire pumps service Fire pump performance test Fire hydrants Fire sprinkler system Kitchen hood system QUESTION 48: Page 18. Oversight of contracts. We need list and values of existing contracts listed in the detail. Which ones are still warranted? ANSWER 48: This is only a list of current vendors. Contractor is to propose which are necessary and to include in their contracted price. ACCURATE BUILDING MAINTENANCE, Custodial Services 193, AQUA SERV ENGINEERS, INC. Water Treatment 11, CANYON ELECTRIC COMPANY, INC. Electrical 4, CHILL RITE INC. HVAC, Mechanical 67, COMMUNICATION ELECTRONIC SYSTE Fire Pumps and Suppression 10, DESERT FIRE PROTECTION, L.P. Fire Alarms 17, GREENSCAPES OF NEVADA LLC Landscaping 17, HAWTHORNE PHC Plumbing 2, PREMIER PEST CONTROL Pest Control 5, ROBERTSON BRIGHT INDUSTRIES Electrical 4, SCHINDLER ELEVATOR CORPORATION Elevators 12, SILVER STATE GOLF CARTS Cart Repair 2, VEGAS VALLEY LOCKING SYSTEMS, Access controls and keys 12, QUESTION 49: How many devices or points are in the access control system? ANSWER 49: Approximately 237
13 QUESTION 50: Is there an assumable list of grounds equipment? ANSWER 50: We do not have an inventory of all tools and equipment. Any tools and equipment would be available for use. QUESTION 51: Hazardous chemical storage and transfer to be performed by whom? ANSWER 51: Republic Services QUESTION 52: Is generator fuel included as fuel for powered equipment? What storage is available on site? ANSWER 52: Contractor will ensure that generators are operational, including fuel. We have storage areas. QUESTION 53: Who is responsible for space planning? ANSWER 53: The contractor is not responsible for space planning but will be involved in ensuring that new spaces comply with current systems and will provide input on finishes, etc. that affect maintenance. QUESTION 54: Who is responsible for ergonomic adjustments and maintenance? ANSWER 54: Employee accommodations are handled through Human Resources. The contractor may be required to install and maintain resulting equipment as part of their scope of work. QUESTION 55: Will you provide unit counts and provide each buildings food service schedules for: Commercial Cooking Kitchen Equipment Commercial Refrigeration Equipment ANSWER 55: There is only one food service area, open from 7-6 M-F. See question 46 for list of equipment.
14 QUESTION 56: Who is the current water treatment provider ANSWER 56: Aqua Service Engineers, Inc QUESTION 57: Who is the Building Automation company ANSWER 57: Johnson Controls ALL OTHER TERMS, CONDITIONS AND SPECIFICATIONS REMAIN THE SAME
BUSINESS CENTER SOUTH THE NEVADA SYSTEM OF HIGHER EDUCATION ( NSHE ), ON BEHALF OF THE NEVADA STATE COLLEGE ( NSC )
BUSINESS CENTER SOUTH THE NEVADA SYSTEM OF HIGHER EDUCATION ( NSHE ), ON BEHALF OF THE NEVADA STATE COLLEGE ( NSC ) REQUEST FOR INFORMATION# 700-BC FOR NEVADA STATE COLLEGE FACILITY MAINTENANCE SERVICES
More informationADDENDUM TO REQUEST FOR IFB 5234-BC. UNLV Wright Hall Build Out. University of Nevada, Las Vegas. Purchasing Department Maryland Parkway
ADDENDUM TO REQUEST FOR IFB 5234-BC UNLV Wright Hall Build Out University of Nevada, Las Vegas Purchasing Department 4505 Maryland Parkway Las Vegas, Nevada 89154-1033 (702) 895-3521 Date of Addendum:
More informationADDENDUM 2 TO INVITATION FOR BID 5270-FG UNLV SOUTH RESIDENTIAL COMPLEX RENOVATION
ADDENDUM 2 TO INVITATION FOR BID 5270-FG UNLV SOUTH RESIDENTIAL COMPLEX RENOVATION University of Nevada, Las Vegas Purchasing Department 4505 Maryland Parkway Las Vegas, Nevada 89154-1033 (702) 895-3521
More informationTechnical Facility Management FACILITY CONSULTING SERVICES. The Facility Audit Program
Technical Facility Management FACILITY CONSULTING SERVICES The Facility Audit Program TFM Audit Program - Schedule Customer: Dates of Visit: AREA TFM CUSTOMER SUBJECT Goals/Objectives Schedule Key Interviews
More informationQuestions and Answers for RFP Facility Management Services
Questions and Answers for RFP 18-09 Facility Management Services 1. Do you currently outsource any of the following services to an outsource service provider? Facilities Management, General Facility Maintenance,
More informationLUFacilities Policy Service Level Agreement v1.1
PURPOSE The Service Level Agreement (SLA) for University provides a detailed list of services offered by the LU Department. The SLA identifies which services are funded by the approved Lehigh University
More informationADDENDUM 3. Conversion of Machine Shop to Tissue Culture Laboratory
ADDENDUM 3 DATE: July 21, 2015 PROJECT: RFP NO: 744-B1531 OWNER: TO: Conversion of Machine Shop to Tissue Culture Laboratory University of Texas Health Science Center Houston, Texas Prospective Bidders
More informationEric Pfister Assistant Director, Technology Procurement
DATE: January 26, 2018 TO: FROM: All Prospective Proposers Lauren Jaber Senior Buyer, Technology Procurement 301-985-7415 And Eric Pfister Assistant Director, Technology Procurement 301-985-7095 RE: RFP
More informationCITY OF CHINO HILLS. Request for Proposals (RFP) for. On-call Electrical Repair Service. On-call Electrical Repair including Water and Wastewater
CITY OF CHINO HILLS Request for Proposals (RFP) for On-call Electrical Repair Service March 30, 2016 Department: Project Name: Public Works On-call Electrical Repair including Water and Wastewater Proposal
More informationOFFICE OF PROCUREMENT COOLING TOWER REPLACEMENT, CT BUILDING RFP NO.: RFP OPENING DATE: APRIL 16, 3:00 PM ADDENDUM #4.
OFFICE OF PROCUREMENT COOLING TOWER REPLACEMENT, RFP NO.: 618-009 RFP OPENING DATE: APRIL 16, 2018 @ 3:00 PM ADDENDUM #4 April 9, 2018 THIS ADDENDUM IS TO PROVIDE ANSWERS TO THE FOLLOWING QUESTIONS: NOTE:
More information3.0 PERFORMANCE SPECIFICATIONS
3.0 PERFORMANCE SPECIFICATIONS 3.1 Scope of work: Work includes, but is not limited to, providing all labor, tools, equipment, test equipment, and services required to perform program management, preventative
More informationIgloo Modular Building Addendum #1 Issued: January 7, This addendum modifies the Request for Proposal documents as noted below.
Igloo Modular Building Addendum #1 Issued: January 7, 2016 To: All Planholders of Record This addendum modifies the Request for Proposal documents as noted below. Questions & Answers: 1. Has a site been
More informationErie County Medical Center Corporation. Addendum Number 1 to RFP # 21728
Erie County Medical Center Corporation RFP # 21728 Addendum Number 1 Erie County Medical Center Corporation Addendum Number 1 to RFP # 21728 ARCHITECTURAL / ENGINEERING SERVICES FOR: MEP SYSTEMS / ELEVATOR
More informationRICHMOND PUBLIC SCHOOLS DIVISION OF PURCHASES 2395 Hermitage Road, Vatex Building RICHMOND, VIRGINIA May 24, 2016 ADDENDUM NO.
RICHMOND PUBLIC SCHOOLS DIVISION OF PURCHASES 2395 Hermitage Road, Vatex Building RICHMOND, VIRGINIA 23220-1307 May 24, 2016 ADDENDUM NO. 1 Invitation No.: BID#16-6721-5 Dated: May 13, 2016 Opening Date:
More informationADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP # February 1, 2018
ADDENDUM NO. 1 FOR RENOVATIONS TO LINCOLN ANIMAL SHELTER RFP #2018-09-01 NOTICE TO PROSPECTIVE BIDDERS February 1, 2018 Prospective bidders are hereby informed of the following corrections, additions,
More informationREQUEST FOR PROPOSAL COMMISSIONING AGENT SERVICES GARRISON ELEMENTARY SCHOOL RENOVATIONS PHASE I
Dover School District (Owner) requests written proposals to secure commissioning authority (CxA) services for the renovations project at the Garrison Elementary School in Dover, New Hampshire. The Owner
More informationMechanical and Electrical System Services Facilities Management Twin Cities Campuses January 2019
Index Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Summary of RFP 10256-18-0701-DL One Hundred Hour Job Simulation Purchase Order Overview Purchase Order Administration
More informationOverbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %
8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior
More informationSECTION SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 01 81 13.21 SUSTAINABLILITY CERTIFICATION REQUIREMENTS - GREEN GLOBES A. This section describes general requirements and procedures to comply with the Green Building
More informationPORTLAND COMMUNITY COLLEGE SW 49 th Avenue Portland, Oregon ADDENDUM NO. 4
RE: ITB: PORTLAND COMMUNITY COLLEGE 12000 SW 49 th Avenue Portland, Oregon 97219 Sylvania Campus Bookstore Remodel Dated: February 22, 2017 April 11, 2017 ADDENDUM NO. 4 This addendum, together with the
More informationADDENDUM # FAMU Custodial Service Contract. Questions
ADDENDUM #4 0012-2014 FAMU Custodial Service Contract Questions 1. Please clarify the correct time for the pre-bid meeting. On page 9 it is noted as 1:00 PM and on page 10 it is noted as 10:00 am. Which
More informationADDENDUM # 1 To: File RFP for: New Affordable Home Construction Services
Procurement Department ADDENDUM # 1 To: File 1605-909-23-4532 RFP for: New Affordable Home Construction Services Please note the following change: Change #1 RFP closing date and time is changed to July
More informationRevised Drawings A, E, and M dated 11/13/18 (that include additional specifications)
Addendum No. 1 To: All Prospective Bidders Description: Holocaust Resource Center Expansion Stockton University Galloway, New Jersey 08205 Bid Number: B190003 Date: November 19, 2018 Pursuant to N.J.S.A.
More informationAPPENDIX A SHOP RATES
APPENDIX A SHOP RATES Service Hourly Rate Overtime Rate Operations and Maintenance $ 34.00 $ 51.00 Events and Setups $ 24.00 $ 36.00 Vehicle Maintenance $ 34.00 $ 51.00 Housekeeping (other than BAS provided
More informationCity of Miami ADDENDUM NO. 5. January 12, 2017 INVITATION TO BID NO.: CURTIS PARK NEW SWIMMING POOL FACILITY
City of Miami ADDENDUM NO. 5 January 12, 2017 INVITATION TO BID NO.: 15-16-040 CURTIS PARK NEW SWIMMING POOL FACILITY OFFICE OF CAPITAL IMPROVEMENTS ( OCI ) PROJECT NO.: TO: ALL PROSPECTIVE BIDDERS: The
More informationRequests for Information pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 2018
Requests for Information - 05.0.1 5pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 201 RFI 01 Is the RFP due at 4pm or 5pm on May 16th? Response: RFI 02 Do you have an anticipated
More informationDIRECTIVE 15H-9 Issue date: October 2018 COMMISSIONING
DIRECTIVE 15H-9 Issue date: October 2018 COMMISSIONING Purpose: The purpose of this Directive is to describe, in outline, the requirements of Commissioning on SUCF Projects. 1. Applicability a. New York
More informationCommunity Action Partnership of Kern TH Street, Bakersfield, CA Fax: REQUEST FOR PROPOSAL
Date: May 2, 2013 Community Action Partnership of Kern 300 19 TH Street, Bakersfield, CA 93301 661-336-5236 Fax: 661-336-5228 REQUEST FOR PROPOSAL Community Action Partnership of Kern (CAPK) issues this
More informationContained within this addendum: Time Extension, Revised Bid Sheet, questions and answers received.
April 16, 2018 POLK COUNTY, A POLITICAL SUBDIVISION OF THE STATE OF FLORIDA ADDENDUM #1 BID #18-439 Utilities Potable Water & Reclaimed Water Maintenance Connection & Replacement of Meters This addendum
More informationCONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS
CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL
More informationEnergy Savings Performance Contracting Southwest CERT April 2, 2012
Energy Savings Performance Contracting Southwest CERT April 2, 2012 Energy Services Coalition, Minnesota Chapter Madonna Rykken, Ben Glynn Agenda What is Performance Contracting (PC)? How does it work?
More informationDayton Metropolitan Housing Authority Rosemont/Hoch Electrical Upgrades
Dayton Metropolitan Housing Authority 111071 Rosemont/Hoch Electrical Upgrades Addendum No. 3 August 10, 2011 DMHA 400 Wayne Ave. Dayton, OH 45410 Re: 1432-1438 Rosemont oh5-12b 261 Hoch Street oh5-18d
More informationBARNARD ELEMENTARY SCHOOL
INITIAL YEAR BUILT 2002 BUILDING AREA 67,000 SF CURRENT PROGRAM CAPACITY 520 ENROLLMENT 2008 329 WARD 4 PROPOSED PROGRAM CAPACITY 450 Site Plan BARNARD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationPARKING ENFORCEMENT SERVICES. Specification No
DEPARTMENT OF PROCUREMENT SERVICES CITY OF CHICAGO May 29, 2018 ADDENDUM NO. 2 This document contains: REQUEST FOR PROPOSAL (RFP) PARKING ENFORCEMENT SERVICES Specification No. 562237 I. Notice of Proposal
More informationPROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Building Commissioning Services
PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Building Commissioning Services SUBMISSION DEADLINE: October 23, 2009 11:00am FAIR AND OPEN PUBLIC SOLICITATION PROCESS FOR PROFESSIONAL SERVICES
More informationMIAMI DADE COLLEGE WOLFSON CAMPUS REMODEL & RENOVATION PROJECT FOR THE DAVID W. DYER FEDERAL BUILDING AND UNITED STATES COURTHOUSE MIAMI, FLORIDA
MIAMI DADE COLLEGE WOLFSON CAMPUS REMODEL & RENOVATION PROJECT FOR THE DAVID W. DYER FEDERAL BUILDING AND UNITED STATES COURTHOUSE MIAMI, FLORIDA General Scope of Work The total approximate area to be
More informationWESTERN ILLINOIS UNIVERSITY CONSTRUCTION PROJECT PROCEDURES WESTERN ILLINOIS UNIVERSITY CONSTRUCTION POLICY
WESTERN ILLINOIS UNIVERSITY CONSTRUCTION PROJECT PROCEDURES WESTERN ILLINOIS UNIVERSITY CONSTRUCTION POLICY Management of all campus construction projects will be provided exclusively through the Facilities
More informationBuilding Permit Application
Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:
More informationC o u n t y o f F a i r f a x, V i r g i n i a
001961 Page 2 C o u n t y o f F a i r f a x, V i r g i n i a A D D E N D U M DATE: August 2, 2016 ADDENDUM NO. 4 TO: REFERENCE: FOR: DUE DATE/TIME: ALL PROSPECTIVE BIDDERS Government Center Generator System
More informationMETROPOLITAN PIER AND EXPOSITION AUTHORITY INVITATION FOR BIDS (IFB) # M OFFICE BUILD OUT, 5 TH FLOOR OF ABC BUILDING ADDENDUM NO.
METROPOLITAN PIER AND EXPOSITION AUTHORITY INVITATION FOR BIDS (IFB) #2017-20-M OFFICE BUILD OUT, 5 TH FLOOR OF ABC BUILDING ADDENDUM NO. (1) September 28, 2017 This Addendum No. 1 consists of seven (7)
More informationNMHU STUDENT UNION BUILDING STUDIO SW PROJECT NO 0918
NMHU STUDENT UNION BUILDING STUDIO SW PROJECT NO 0918 MAY 03, 2010 ADDENDUM 4 Project: NMHU Student Union Building Architect's Project Number: 0918 IFB # 905 From: Studio Southwest Architects To: Prospective
More informationSOLICITATION ADDENDUM
CITY OF PALM BEACH GARDENS PURCHASING DEPARTMENT SOLICITATION ADDENDUM Addendum No. 1 DATE: January 30, 2018 TO: SOLICITATION NO.: TITLE: OPENING DATE: All Potential Bidders ITB2018-097GF Prefabricated
More informationPERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS
Collier Township 2418 Hilltop Road, Suite 100, Presto, PA 15142 Ph. 412-279-9998 PERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS This guide applies to all projects except 1 & 2 family dwellings and townhouses
More informationOwner Project Requirements
Owner Project Requirements How to get what you need From an Owner s Perspective Learning Objectives What is an OPR Case Study (CHC) Looking to the Future Closing Arguments Crafton Hills College 1 What
More informationFull-Scope Commissioning for High-Quality Buildings
Full-Scope Commissioning for High-Quality Buildings Pieter L. van der Mersch, PE, QCxP University of Colorado Boulder 21 st National Conference on Building Commissioning AIA Quality Assurance The Building
More informationADDENDUM #2 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR. The University of Texas Health Science Center at San Antonio
ADDENDUM #2 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR The University of Texas Health Science Center at San Antonio Renovate Floor 1 and Floor 2 of the PARC Bldg. RFP No.: 745-16-9935
More informationADDENDUM B - IFB 5236-BC. UNLV White Hall Animal Care Facility. University of Nevada, Las Vegas. Purchasing Department Maryland Parkway
ADDENDUM B - IFB 5236-BC UNLV White Hall Animal Care Facility University of Nevada, Las Vegas Purchasing Department 4505 Maryland Parkway Las Vegas, Nevada 89154-1033 (702) 895-3521 Date of Addendum: August
More informationUSD 480 Auxiliary Services Department Michael Rogg, Director
USD 480 Auxiliary Services Department Michael Rogg, Director Maintenance, Buildings & Grounds Custodial Tim Hickert, Supervisor Joseph Chavez, Supervisor Phone: (620) 629-1684 Phone: (620) 309-1350 Fax:
More informationIntroduction. What is a CO? » All Plan submittals must be signed, dated, and stamped by the responsible licensed professional.
Building Services Tenant Improvement-Submittal Requirements Introduction The City of Meridian requires a Tenant Improvement (TI) application when a interior remodel or alteration is going to occur in an
More informationApplication for a Building Permit Commercial Work Building Commissioner 37 Main Street Charlton, MA
Paid Amount: Date: Check Number: Initials 1. Owner, Applicant Information Application for a Building Permit Work Building Commissioner 37 Main Street Charlton, MA 01507 508-248-2241 Date: Approved by:
More informationREQUEST FOR PROPOSAL
September 20, 2016 REQUEST FOR PROPOSAL Design/Build Services for Wood Frame, Metal Siding, Open Front Storage Building for Sewer Department RFP Due October 12, 2016 @ 2:00 pm (local time) BIDDER NAME:
More informationFacility Department Integration
Facility Department Integration FACILITIES DEPARTMENT INTEGRATION - CUSTODIAL, MAINTENANCE, AND CAPITAL IMPROVEMENTS The primary role of the District s Facilities Department is to support the students
More informationDESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST
DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Design Development Review Package. Provide a written explanation for any omissions. The following items,
More informationQuestion 2: Regarding Section VII, part 10, which jurisdiction issues permits for work performed at Ronald Reagan Washington National Airport?
RONALD REAGAN WASHINGTON NATIONAL AIRPORT METROPOLITAN WASHINGTON AIRPORTS AUTHORITY SOLICITATION RFP 1-11-C138 TERMINAL B/C PRE-SECURITY RESTROOM RENOVATIONS RESPONSES TO CONTRACTOR QUESTIONS Question
More informationAll subcontractor bidders are responsible for assuring that their subcontractors and vendors are properly apprised of the contents of this Addendum.
ADDENDUM NUMBER: 2 PROJECT: UNC Charlotte Residence Hall Phase XIV - Elevator Bid Package DATE: May 28, 2015 OWNER: UNC Charlotte ARCHITECT: FWA Group NOTICE TO BIDDERS: This addendum is issued prior to
More informationFACILITY COMPONENTS - ELEMENTARY SCHOOL
SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking
More informationSAN JOAQUIN COUNTY PURCHASING AND SUPPORT SERVICES PURCHASING DIVISION
SAN JOAQUIN COUNTY PURCHASING AND SUPPORT SERVICES PURCHASING DIVISION David M. Louis, C.P.M., CPPO, CPPB Director Jon Drake, C.P.M. Deputy Director Date: November 9, 2011 To: From: Bid#6769 Janitorial
More informationREQUEST FOR QUALIFICATIONS
Delivery Method: Prequalification for Design-Bid-Build Contracts Issue Date: November 17, 2017 Project Name: SWaM 18-20 Pre-qualified Contractors Term Project Code: SWaM-18-20 Commodity/Service: Construction
More informationVacant Unit Turnover Services Invitation for Bid (IFB) Project No
Vacant Unit Turnover Services Invitation for Bid (IFB) Project No. 1516-041 SCOPE OF WORK (SOW) & TECHNICAL SPECIFICATIONS 1.0 GENERAL DESCRIPTION: The Invitation for Bid (IFB) provides parameters for
More informationElement Z General Design Requirements Existing Facilities Information
Smithville Campus PART 1 - GENERAL 1.01 OVERVIEW A. This Section identifies requirements particular to the MD Anderson Smithville Campus that may vary from requirements indicated within the Master Construction
More informationElement Z General Design Requirements Existing Facilities Information
PART 1 - GENERAL 1.01 OVERVIEW A. This Section identifies requirements particular to the MD Anderson Smithville Campus that may vary from requirements indicated within the Master Construction Specifications
More informationREQUEST FOR QUALIFICATIONS
Issue Date: August 11, 2013 Title: Issuing Agency & Address Location of Work: RFQ#: SWaM-2013-15 Pre-Qualified Contractors Term Small, Women, and Minority Owned (SWaM) Contractors for Renovation, Replacement
More informationAddendum #3 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018
Division of Finance and Business Operations Procurement & Strategic Sourcing 5700 Cass Avenue, suite 4200 Detroit, Michigan 48202 (313) 577-3734 FAX (313) 577-3747 January 11, 2019 Addendum #3 To Request
More informationINVITATION FOR BID FOR GENERAL CONTRACTORS
INVITATION FOR BID FOR GENERAL CONTRACTORS Arlington Public Schools Purchasing Department BID TITLE: BID #: ARLINGTON PUBLIC SCHOOLS REMOVAL AND REPLACEMENT OF THE STADIUM BLEACHERS AND PRESS BOX AT WAKEFIELD
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationADDENDUM 1. Repair and Maintenance of Landfill Gas Chiller System. Return date: Bid must be received no later than 2:00 PM, Monday, June 25, 2018
ADDENDUM 1 Date: June 13, 2018 Bid No.: Title: 18-11/AL Repair and Maintenance of Landfill Gas Chiller System Return date: Bid must be received no later than 2:00 PM, Monday, June 25, 2018 This Addendum
More informationADDENDUM NO. 2 REQUEST FOR PROPOSAL NO. R DESIGN SERVICES FOR RENOVATIONS TO KREILING HALL
December 1, 2015 ADDENDUM NO. 2 Attention to Proposers: This constitutes Addendum No. 2 to the referenced Request for Proposals (RFP), and consists of this six (6) page cover letter, and a two (2) page
More informationEL PASO INDEPENDENT SCHOOL DISTRICT P R O C U R E M E N T S E R V I C E S
P R O C U R E M E N T S E R V I C E S AWARD SUMMARY Solicitation: RFP #1-19 Risograph Duplicator Maintenance and Repair * This solicitation number must be referenced on all EPISD Purchase Orders * Effective
More informationJune 12, 2017 Addendum #6 RFP # Modular Relocation & Site Development
June 12, 2017 Addendum #6 RFP #2017-003 Modular Relocation & Site Development Questions & Answers 1) To better facilitate a functional and qualified design build budget, please provide details, drawings,
More informationSolicitation Number: FA B-A001 Project Numbers: RKMF Demo Base Gymnasium & RKMF Demo Pool Facilities.
Solicitation Number: FA4861-14-B-A001 Project Numbers: RKMF 13-0134 Demo Base Gymnasium & RKMF 130135 Demo Pool Facilities Responses to RFIs 1. Does all the building material get hauled off base? Response:
More informationFacilities Feasibility Study Frederick Douglass HS Condition Assessment
Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies
More informationMain Building Auditorium
Main Building Auditorium Theatre and Lighting Upgrade Moberly Area Community College 101 College Avenue Moberly, Missouri This document contains all necessary instructions and specifications to perform
More informationPlan Submittal Checklist 2015 I-Codes
City of Aurora Building Division Public Works Department LIMITED PLAN REVIEW Plan Submittal Checklist 2015 I-Codes Permit Center 15151 E. Alameda Parkway, Ste 2400 Aurora, CO 80012 303.739.7420 Fax: 303.739.7412
More informationINFRASTRUCTURE ONTARIO
INFRASTRUCTURE ONTARIO 2015 BUILDING SYSTEMS DESIGN GUIDELINE INSTRUMENT NO. 2.1.2.T3V1 DECEMBER 12 TH, 2014 INFRASTRUCTURE ONTARIO 2015 Building Systems Design Guideline 1 This document is intended for
More informationREQUEST FOR PROPOSALS FOUR YEAR CONTRACT FOR TEMPORARY EMPLOYEE SERVICES BID NO: Addendum 1: August 16, 2018
REQUEST FOR PROPOSALS FOUR YEAR CONTRACT FOR TEMPORARY EMPLOYEE SERVICES BID NO: 18-2050 : August 16, 2018 has been issued to address the following: 1. Modify one requirement to the Scope of Service. 2.
More informationReason for Change Identifiers: OR= Owner Request; FC= Field Condition; AJ= Requirement of Local Authority CL= Clarification (No Scope Change)
Page 1 of 6 ADCI Bulletin No. 01 Date: March 30, 2015 Project: @580 Renovation for New Apartment Units Address: 580 Walnut Street Cincinnati, OH 45202 Commission: Prepared For: Prepared By: PDT P266 Cincinnati
More informationGainesville Regional Transit System Facilities and Equipment MAINTENANCE PLAN
EXHIBIT 3 ISION EFFECTIVE DATE G-0013 3 March 1, 2012 1 of 12 Gainesville Regional Transit System Facilities and Equipment 1. PURPOSE The mission of the Facility Maintenance Department is to provide safe,
More informationCAPITAL CONSTRUCTION MANAGEMENT
Dear Contractors: would like to invite you to provide a proposal for our new Salata Restaurant - 3411 Nelson Rd suite 400 lake Charles LA 70605. A complete bid package can be obtained from CCM This document
More informationTexas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017
Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017 Automatic Fire Suppression - 210000 Without limiting the application of all of the Contract Documents to
More informationJEFFERSON PARISH SHERIF S OFFICE
ADDENDUM NO. 1 TO THE BID DOCUMENTS FOR: NEW JEFFERSON PARISH SHERIFF S OFFICE 1 ST DISTRICT STATION 3620 HESSMERAVENUE METAIRIE, LOUISIANA 70002 JEFFERSON PARISH SHERIF S OFFICE Jefferson Parish Bid No.:
More informationNote #2: Refer to Commercial Permitting Handbook 2016 Denver Building and Fire Code for asbestos regulations.
CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY Subject: PREPARATORY DEMOLITION, NON-STRUCTURAL FRAMING, ELECTRICAL, MECHANICAL, PLUMBING, FIRE SUPPRESSION, AND FIRE ALARM
More information815 East Market St. PO Box 527 New Berlin, PA Bid Conditions and Specifications. For. Network Cabling & Equipment
815 East Market St. PO Box 527 New Berlin, PA 17855 Bid Conditions and Specifications For Network Cabling & Equipment Bid Opening Date: January 15, 2016 Bid Identification No. 011516 Return One Copy Retain
More informationAppendix J - Custom Uniformat for EDU Migration
Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior
More informationIf you are already on the maintenance roster, please submit: Profile of Firm Form Listing of Maintenance Services Available Fee Structure Form W-9
Solicitation of Interest for the Housing Authority of the City of Bremerton Maintenance Roster The Bremerton Housing Authority (BHA) is soliciting applications for qualified contractors interested in being
More informationFrequently Asked Questions UC Fair Wage/Fair Work (FW) Plan
Frequently Asked Questions UC Fair Wage/Fair Work (FW) Plan TABLE OF CONTENTS SECTION I: Fair Wage/ Fair Work Application 2 A. Existing Agreements, Extramural Agreements, Renewals and Extensions.. 2 B.
More informationCITY OF KOTZEBUE REQUEST FOR PROPOSAL ADMINISTRATION IT SERVICES FOR FY18 REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES
CITY OF KOTZEBUE REQUEST FOR PROPOSAL 18-01 ADMINISTRATION IT SERVICES FOR FY18 REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES Vendors are required to provide as much detail as possible in
More information1. Revision to page 170
ADDENDUM No. 2 IFB No.V-1208A Design, Build, Operate and Maintain a new turnkey CNG Fueling Station. Date: January 7, 2015 To Prospective Bidders: The purpose of this addendum is to clarify answers in
More informationDATE: December 15, 2009 BID NO.: FWC 09/ CALENDAR OF EVENTS-BID OPENING DATE CHAGED FROM DECEMBER 18, 2009 to DECEMBER 22, 2009 AT 3:00 PM
DATE: December 15, 2009 ADDENDUM NO.: 1 BID NO.: FWC 09/10-48 BID TITLE: CHANGE: ADD: RENOVATION OF THE PRAIRIE LAKES FIELD OFFICE AT THE THREE LAKES WMA CALENDAR OF EVENTS-BID OPENING DATE CHAGED FROM
More informationThe Housing Authority of the County of Marin ( MHA ) 4020 Civic Center Drive. San Rafael, CA Addendum #1. Released October 3, 2016
The Housing Authority of the County of Marin ( MHA ) 4020 Civic Center Drive San Rafael, CA 94903 Addendum #1 Released October 3, 2016 Addendum #1 to IFB MHA-010-2016 Re-Roofing, HVAC Unit Replacements
More informationCOMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION
COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION OFFICIAL USE ONLY Date: Permit #: Received by: For Staff Use Only: OFD ELEC Planning SITE LOCATION Site Address: Tax Parcel Number: TYPE OF WORK Building
More informationADDENDUM No. 1. ITB No Janitorial Services - WWTSU. Bids Due: June 19, 2018 at 2:00 P.M. (Local Time)
ADDENDUM No. 1 ITB No. 4542 Janitorial Services - WWTSU Bids Due: June 19, 2018 at 2:00 P.M. (Local Time) The following changes, additions, and/or deletions shall be made to the Invitation to Bid for Janitorial
More informationFacilities Management Services & Funding Guide Centrally Funded and Recharge Services
Facilities Management Services & Funding Guide Centrally Funded and Recharge Services Table of Contents About the Funding Guide Page 3 Carpenter Shop Page 4 Custodial Services Page 5 Electrical Shop Page
More informationFacilities Management
UAB - Facilities - HOME Contact Us Emergency Contacts Project Information Service Requests Facilities Quick Links Staff Home provides overall administrative and management services in the following areas:
More informationADDENDUM NO. FIVE TO THE DESIGN-BUILD REQUEST FOR PROPOSAL (RFP) DOCUMENTS September 26, 2016
I. GENERAL ADDENDUM NO. FIVE TO THE DESIGN-BUILD REQUEST FOR PROPOSAL (RFP) DOCUMENTS September 26, 2016 The following changes, additions, or deletions shall be made to the following documents; all other
More informationInvitation to Bid CUSTODIAL PAPER PRODUCTS
Invitation to Bid CUSTODIAL PAPER PRODUCTS 2013-2014 Responses to an Invitation to Bid will be received by the Purchasing Coordinator, Sumner County Board of Education, 1500 Airport Road, Gallatin, TN
More informationSTATE UNIVERSITY CONSTRUCTION FUND
STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant
More informationADVERTISEMENT FOR SUBCONTRACTOR QUALIFICATION AND ADVERTISEMENT FOR PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS)
ADVERTISEMENT FOR SUBCONTRACTOR QUALIFICATION AND ADVERTISEMENT FOR PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS) PROJECT NOTICE DPR Construction, hereinafter called DPR, intends to award
More informationREQUEST FOR PROPOSAL # ARCHITECTURAL/ENGINEERING CONSULTING SERVICES. Main Hall Science Lab Renovations
REQUEST FOR PROPOSAL # 10337 ARCHITECTURAL/ENGINEERING CONSULTING SERVICES Main Hall Science Lab Renovations MIDDLESEX COUNTY COLLEGE 2600 WOODBRIDGE AVENUE EDISON, NEW JERSEY 08818 Prepared By: Donald
More informationCONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST
CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Contract Documents Review Package. Provide a written explanation for any omissions. The following items,