Facility Improvements
|
|
- Austen Ellis
- 5 years ago
- Views:
Transcription
1 AR-SI-08 CURB RAMP ADDITIONS AR-SI-10 DISCUS THROW MODIFICATIONS Curb ramps needed to provide wheelchair access and to meet ADA requirements. Modifications are needed at the discus throw pad to comply with current high school track and field event regulations. AR-SI-13 FOOTBALL GOAL POST UPGRADE New football goal posts needed to replace existing posts that are no longer stable. AR-SI-14 FOOTBALL/SOCCER SYNTHETIC TURF UPGRADE New synthetic turf needed at the football / soccer field to replace existing turf that is worn and past its life expectancy. AR-SI-15 IRRIGATION SYSTEM UPGRADE Connection of irrigation system to the school s energy management system will reduce water consumption and utility costs. AR-SI-18 PAVEMENT MARKING UPGRADE New pavement markings needed for traffic control, parking and pedestrian safety. Auburn Riverside High School Page 1 of 12
2 AR-SI-27 TENNIS COURT SURFACE UPGRADE AR-SI-30 DISABLED PARKING STALL ADDITION Crack repair and new surfacing needed at tennis courts where existing surface is worn and fractured. Additional parking stalls are needed for disabled individuals and to meet ADA requirements. AR-SI-33 BASEBALL & SOFTBALL INFIELD CLAYBLOCK Installation of clay block soil material at pitcher s mound and home plate areas will improve drainage and reduce maintenance. AR-SI-34 STUDENT PARKING ENTRY DRIVE IMPROVEMENT Installation of a left-turn exit lane is needed at the student parking lot for improved safety and traffic flow. AR-SI-36 SOFTBALL FIELD DRAINAGE IMPROVEMENTS Underground drainage system is needed at the softball field to eliminate ponding water and saturated field conditions. AR-SI-37 TRACK & FIELD EVENT REPLACEMENT New rubberized surface needed at track and field event areas to replace surface that is worn and has seam and adhesion failures. Auburn Riverside High School Page 2 of 12
3 AR-EX-01 AUTOMATIC DOOR OPENER ADDITIONS AR-EX-04 EXTERIOR DOOR HARDWARE UPGRADE Installation of an automatic door opener at the main entry doors will improve access for disabled individuals. New exterior door locks will improve building security. AR-EX-05 EXTERIOR DOOR REPLACEMENT New exterior doors needed at entrance to Gym lobby to replace doors that are in poor condition from heavy use. AR-EX-09 MASONRY WATER REPELLENT APPLICATION Water repellent needed at exterior masonry walls to protect walls from moisture penetration. AR-IN-18 THEATER DISABLED SEATING SIGNAGE ADDITION Signage needed to identify seats in Theater that are accessible to disabled individuals and to meet ADA requirements. AR-IN-20 CORRIDOR FLOOR TILE ADDITION Floor tile needed in second floor corridors to replace existing carpeting that is worn and discolored. Auburn Riverside High School Page 3 of 12
4 AR-EQ-01 ADA GRAB BAR ADDITIONS AR-EQ-04 COMPUTER FURNITURE UPGRADE Additional grab bars needed in restrooms to assist disabled individuals and meet ADA requirements. Computer furniture is needed to properly accommodate students and computer equipment. AR-EQ-06 FOODS CLASSROOM EQUIPMENT REPLACEMENT New appliances needed in Foods classroom to replace equipment that does not operate reliably. AR-EQ-07 GYMNASTICS SPRING FLOOR UPGRADE New gymnastics spring floor is needed in the Gym to replace the existing spring floor that is old and unsafe to assemble. AR-EQ-08 KITCHEN EQUIPMENT REPLACEMENT New convection ovens and reach-in coolers needed to replace equipment that does not operate reliably. AR-EQ-12 MAIN GYM BLEACHER REPLACEMENT New bleachers needed in Main Gym to replace existing bleachers that frequently malfunction and are difficult to maintain. Auburn Riverside High School Page 4 of 12
5 AR-EQ-16 RECORDS STORAGE CABINET ADDITIONS AR-EQ-17 STUDENT CHAIR / DESK REPLACEMENT High capacity record storage cabinets needed to accommodate an extensive and growing amount of student records. New chairs and desks needed in some classrooms to replace existing furniture that is damaged or broken. AR-EQ-23 PROJECTION SCREEN ADDITION - COMMONS Installation of a large, motorized projection screen in the Commons is needed for assemblies, meetings and conferences. AR-ME-01 AHU VARIABLE SPEED DRIVE REPLACEMENT New variable speed drives are needed at air handling units to replace equipment that is failing and unreliable. AR-ME-02 AUTOMATIC CONTROLS UPGRADE Improvements to mechanical system controls will reduce maintenance costs, energy consumption and utility costs. AR-ME-04 COMPUTER CLASSROOM HVAC IMPROVEMENTS Additional ventilation and cooling is needed in Computer classrooms 200 and 202 to eliminate overheating. Auburn Riverside High School Page 5 of 12
6 AR-ME-05 CHILLER COMPRESSOR REPLACEMENT AR-ME-06 CO2 CONTROL ADDITION New compressors needed at the air conditioning chiller to replace equipment that requires frequent maintenance or has failed. Installation of CO2 controls for ventilation systems in Commons, Gym and Library will reduce energy consumption and utility costs. AR-ME-07 COMPUTER CLASSROOM HEAT PUMP ADDITION Installation of heat pumps for rooms 801 & 803 will eliminate overheating and reduce energy consumption and utility costs. AR-ME-08 CONSTRUCTION / MANUFACTURING DUST FILTRATION Installation of dust control system in the shop area will reduce exhaust fan use, energy consumption and utility costs. AR-ME-09 DISHWASHER BOOSTER HEATER REPLACEMENT Installation of a new booster heater for the Kitchen dishwasher will reduce energy consumption and utility costs. AR-ME-11 FIRE SPRINKLER HEAD REPLACEMENT New fire sprinkler heads needed throughout school to replace sprinkler heads that have been recalled because of defects. Auburn Riverside High School Page 6 of 12
7 AR-ME-13 HEATING WATER BOILER MODIFICATIONS AR-ME-14 HEATING WATER CIRCULATION PUMP REPLACEMENT Boiler modifications will reduce energy consumption and utility costs. New circulation pumps needed for heating water system to replace equipment that is unreliable and past its life expectancy. AR-ME-15 HEATING WATER SYSTEM CONTROL VALVE New control valves needed for heating water system to replace equipment that does not operate reliably. AR-ME-17 HVAC CONTROL SYSTEM COMMISSIONING Commissioning of mechanical systems will improve operations while reducing energy consumption and utility costs. AR-ME-19 KILN EXHAUST SYSTEM MODIFICATIONS Modifications to the kiln exhaust system will reduce energy consumption and utility costs. AR-ME-21 NATURAL GAS SYSTEM METERING Installation of an electronic meter for the natural gas system will reduce the gas consumption and utility costs. Auburn Riverside High School Page 7 of 12
8 AR-ME-22 OCCUPANCY SENSOR TEMP. CONTROL - SHOP AR-ME-23 OCCUPANCY SENSOR TEMP. CONTROL ADDITIONS Installation of occupancy sensors for the heating system in shop area will reduce energy consumption and utility costs. Installation of occupancy sensors for the heating systems in large rooms will reduce energy consumption and utility costs. AR-ME-25 SINK AERATOR ADDITIONS Installation of aerators at sink faucets will reduce water consumption and utility costs. AR-ME-26 STUDENT STORE HVAC IMPROVEMENTS Improvements to the ventilation system serving the Student Store needed to eliminate overheating caused by cooking equipment. AR-ME-28 VARIABLE SPEED DRIVE REPLACEMENT New variable speed drive needed to replace failed equipment at office area and to reduce energy consumption and utility costs. AR-ME-29 VARIABLE SPEED DRIVE RETROFIT - SCIENCE AREA Installation of variable speed drives at science area mechanical equipment will reduce energy consumption and utility costs. Auburn Riverside High School Page 8 of 12
9 AR-ME-30 VARIABLE SPEED DRIVE RETROFIT - WATER PUMPS AR-EL-06 DATA OUTLET ADDITIONS - COMMONS & THEATER Installation of variable speed drives at heating and cooling system water pumps will reduce energy consumption and utility costs. Additional data outlets needed in Commons and Theater for computer equipment. AR-EL-08 DAYLIGHTING CONTROL ADDITION Installation of daylight controls that reduce the use of artificial lighting will also reduce energy consumption and utility costs. AR-EL-09 ELECTRICAL SERVICE METERING Installation of an electronic meter for the electrical service will reduce the consumption of electricity and utility costs. AR-EL-11 EXTERIOR LIGHTING UPGRADE Replacement of exterior lights with energy efficient fixtures will improve lighting and reduce energy consumption and utility costs. AR-EL-16 INTERIOR LIGHTING UPGRADE Replacement of HID lights with energy efficient fixtures will reduce energy consumption and utility costs. Auburn Riverside High School Page 9 of 12
10 AR-EL-17 INTERIOR LIGHTING RETROFIT - CORRIDORS AR-EL-20 LIBRARY DATA AND ELECTRICAL OUTLET ADDITIONS Modifications to corridor light fixtures will reduce energy consumption and utility costs. Additional data and electrical outlets needed in Library for student computers. AR-EL-22 TELECOMMUNICATIONS ROOM IMPROVEMENTS Additional electrical capacity and equipment racks needed to accommodate the school s computer infrastructure equipment. AR-EL-23 OCCUPANCY SENSOR LIGHTING CONTROL Installation of occupancy sensors to control interior lights in Commons and Gyms will reduce energy consumption and utility costs. AR-EL-26 SOUND SYSTEM UPGRADES New sound system equipment needed in Commons and Gyms to replace equipment that is unreliable and has poor sound quality. AR-EL-27 SURVEILLANCE CAMERA ADDITION Installation of surveillance cameras at building exterior and parking lots will discourage vandalism and theft. Auburn Riverside High School Page 10 of 12
11 AR-EL-30 THEATER ELECTRICAL OUTLET ADDITIONS AR-EL-33 INTRUSION ALARM UPGRADE Additional electrical outlets needed in Theater Control Room, Workroom and catwalks to accommodate theater equipment. Installation of an audible alarm feature for the existing intrusion alarm system will discourage unauthorized entry into the building. AR-MD-07 CONSTRUCTION / MANUFACTURING WALL REMOVAL Removal of wall between the Const. / Manufacturing shop and classroom areas will improve classroom control and supervision. AR-MD-08 DARKROOM MODERNIZATION Conversion of chemical processing darkroom to digital photography lab will better accommodate the instructional program. AR-MD-09 DRAMA OFFICE ADDITION An office is needed in the Drama classroom to provide a secure area for the instructor s equipment and records. AR-MD-11 ELECTRONICS CLASSRM STORAGE MODERNIZATION Modifications to Room 349 are needed to provide a dedicated storage room for the Electronics classroom. Auburn Riverside High School Page 11 of 12
12 AR-MD-21 MUSIC AREA STORAGE MODERNIZATION AR-MD-22 MUSIC INSTRUMENT STORAGE UPGRADE Modifications needed at Music Storage room 513 to better accommodate storage of instruments, music equipment and uniforms. Installation of storage cabinets in music classrooms is needed for secure storage of student s musical instruments. AR-MD-27 SCIENCE CLASSROOM MODERNIZATION AR-MD-42 VIDEO LAB INTERIOR WINDOW ADDITION Conversion of general classroom 710 to a science classroom is needed to meet the demand for science instruction. Installation of an interior window between the Video Lab and adjacent Viscom classroom is needed for classroom supervision. Auburn Riverside High School Page 12 of 12
Facility Improvements
CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation
More informationFacility Improvements
AL-SI-02 ASPHALT PLAY AREA UPGRADE AL-SI-09 CURB RAMP ADDITIONS Asphalt improvements needed around building and playshed to provide a safe play area. Curb ramps needed to provide wheelchair access and
More informationFACILITY COMPONENTS - ELEMENTARY SCHOOL
SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking
More informationFACILITY COMPONENTS - ELEMENTARY SCHOOL
SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls
More informationFACILITY COMPONENTS - MIDDLE SCHOOL
SITE AREAS Parking and Access - Buses 2.0 2.0 0.30 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 1.0 3.0 0.22 Four fewer stalls
More information3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000
1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades $300,000 C. Tilden Entrance Upgrades $50,000 D. Door and Glass Improvements $500,000 E. Alert Systems $800,000
More informationChenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017
Chenango Bridge Elementary School Phase 1 Asphalt Pavement Reconstruction Reconstruct asphalt parking located on west side of building including access drive. Sidewalk Replacement Replace cracked sections
More information2016 BOND INFORMATION
2016 BOND INFORMATION This publication is provided as a public service by the offices of Operations and Maintenance, Communications and Financial Services. www.svvsd.org @svvsd 395 South Pratt Parkway,
More informationMOORESTOWN HIGH SCHOOL REFERENDUM PROJECTS
MOORESTOWN HIGH SCHOOL 06/22/15 08/28/15 Security vestibule at main entrance and transportation office; replacement of selected exterior doors; access controls at exterior doors 06/22/15 12/31/15 Upgrade
More informationN o v e m b e r
WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE N o v e m b e r 2 0 1 7 Agenda Overview of the Bond 2017 Update 2018 Work 2 Agenda Overview of the Bond 2017 Update 2018 Work 3 Overview of Bond Why
More informationSEATON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1969 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 428 ENROLLMENT 2008 280 WARD 2 PROPOSED PROGRAM CAPACITY 325 Site Plan SEATON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationPROPOSED FACILITY IMPROVEMENTS
PROPOSED FILITY IMPROVEMENTS RINIER MIDDLE SHOOL No. ategory R-SI-01 Site ccessible Parking Stall dditions hange 3 standard parking stalls to one Three additional handicap parking stalls and handicap stall
More informationHUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014
HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014 1. Upgrade Video Security and Surveillance Systems - Replace with New a. Existing
More informationLANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent
RENOVATION PRELIMINARY DESIGN PRESENTATION The Board of Education of Baltimore County Verletta White, Interim Superintendent AGENDA 2 Project Location General Information Existing Conditions Structural
More informationPLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationEdmonton Public School District No. 7
EXECUTIVE SUMMARY 1. Overall Impressions The 1966 non-core school has actively pursued an ongoing maintenance and upgrade program to improve a number of past problem areas within the school. Extensive
More informationDIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS
DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION 02001 Bus Traffic. Separation between bus traffic, regular vehicular flow, service traffic and pedestrian traffic. Bus traffic must have adequate
More informationFacilities Feasibility Study Frederick Douglass HS Condition Assessment
Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies
More informationFacilities Maintenance & Operations Update. Presidents Executive Cabinet March 6, 2017
Facilities Maintenance & Operations Update Presidents Executive Cabinet March 6, 2017 1 Update Proposition 39 Year 4: March 6 March 31 Will complete all exterior lighting upgrades to LED Aquatic Center
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope
More informationPriority 1 Maintenance Projects Total Investment Needed: $54,875,317. Elementary Schools
Priority 1 Maintenance Projects Total Investment Needed: $54,875,317 Appleton Elementary Elementary Schools Total Priority 1 Need: $1,513,280 * Replace roofing in 3 areas * Add air handling units in cafeteria,
More informationMAURY ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1886 BUILDING AREA 46,800 SF CURRENT PROGRAM CAPACITY 276 ENROLLMENT 2008 238 WARD 6 PROPOSED PROGRAM CAPACITY 325 Site Plan MAURY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationFacilities Feasibility Study Matthew A. Henson ES Condition Assessment
Summary of Findings The Matthew A. Henson ES Facility located at 1600 N. Payson Street in Baltimore, Maryland, was built in 1964. It comprises 75,228 gross square feet. The total current deficiencies for
More informationFrost Technical Center
Frost Technical Center 1955 Greenhouses Addition Various other additions and renovations Provide site security improvements Provide improved Admin area field of view to site entrance Provide security camera
More informationGFW Schools Task Force Meeting 1/23/19 R.A. MORTON & ASSOCIATES GLT ARCHITECTS 1
GFW Schools Task Force Meeting 1/23/19 1 AGENDA 1. Introductions 2. Review of building tours Primary Needs 3. Review Space Programs 4. Review Concept Options District and Facility needs 5. Review Concept
More informationBoynton High School & Blackford Site
Boynton High School & Blackford Site Balance (E- D) 980075 Blackford Campus Repairs (Asphalt, Plaster, Complete 100% 07/16/18 10/05/18 $725,367.67 $735,233.50 $352,463.56 -$9,865.83 $382,769.94 4 980066
More informationDAVIS ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1943 BUILDING AREA 71,100 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 227 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan DAVIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-
More informationWATKINS ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 69,300 SF CURRENT PROGRAM CAPACITY 578 ENROLLMENT 2008 550 WARD 6 PROPOSED PROGRAM CAPACITY 550 Site Plan WATKINS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationLOVEJOY Independent School District
Long-Range Facilities Planning Projected Bond Sale Project Series 2014 Series 2018 Series 2023 Total (2013 Cost) (with 6% Yearly Inflation) 1. Hart Elementary $ 6,716,424 $ 6,168,802 $ 1,200,121 $ - $
More informationCapital Project Recommendations Presented to the Board of Education 9/23/2014
Capital Project Recommendations Presented to the Board of Education 9/23/2014 The administration has been working to identify a division of the proposed $15M in capital projects between the athletic field
More informationEdmonton Public School District No. 7
EXECUTIVE SUMMARY 1. Overall Impressions Sherwood Elementary School resides in a quiet residential neighborhood with a shared parking area adjacent to the community league on the north and a generous play
More informationManchester-Shortsville Central School District Red Jacket Excellence Every Student, Every Class, Every Day WHY NOT DO A CAPITAL PROJECT?
Manchester-Shortsville Central School District Red Jacket Excellence Every Student, Every Class, Every Day WHY NOT DO A CAPITAL PROJECT? That is the real question. Manchester-Shortsville Central School
More informationSHEPHERD ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1932 BUILDING AREA 79,700 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 355 WARD 4 PROPOSED PROGRAM CAPACITY 400 Site Plan SHEPHERD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior
More informationMills Elementary School Site Summary
1 Mills Elementary School Site Summary Address 6201 Davis Lane Austin, TX 78749 Number of Permanent Campus Facilities 1 Original Year of Construction 1998 Total Campus Building Area (combined) 81,368 SF
More informationAppendix J - Custom Uniformat for EDU Migration
Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations
More informationDeferred Maintenance Plan
Deferred Maintenance Plan 2012-2015 1/5/2012 1 Table of Contents Title Page Introduction 3 Wallace Hall Deferred Maintenance 4 Wallace Hall Building Assessment 6 Wilson Hall Deferred Maintenance 7 Wilson
More informationRAYMOND EDUCATION CAMPUS
INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationMinuteman Regional Vocational Technical School
Minuteman Regional Vocational Technical School List of Recommendations L1 AAB compliance: Improvements to front entrance (concrete ramps, railings, etc.) Required by AAB cost trigger L2 AAB compliance:
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior
More informationWARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE M a y
WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE M a y 2 0 1 8 Agenda Overview of the Bond 2018 Work 2 Agenda Overview of the Bond 2018 Work 3 Overview of Bond Why Now? Interest rates remain at historic
More informationAUBURN SCHOOL DISTRICT NO. 408 CAPITAL PROJECTS DEPARTMENT. WORK IN PROGRESS August 2011
AUBURN SCHOOL DISTRICT NO. 408 CAPITAL PROJECTS DEPARTMENT WORK IN PROGRESS August 2011 Masonry and Concrete Improvements Status: Contractor: Pioneer Masonry Restoration Inc., Seattle WA. Construction
More informationLECKIE ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance Consent ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance Consent AGENDA ITEM: 7 L DATE: June 27-29, 2017 ****************************************************************************** SUBJECT: FY18 HEFF M&R Projects
More informationOverbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %
8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior
More informationNevada Joint Union HSD Facilities Improvement Plan - DRAFT ITEM NO. ITEM DESCRIPTION AREA (SF) PROJECT COST $/SF
PROJECT SUMMARY PROJECT: - DRAFT DATE: 6/19/2015 LEVEL: Conceptual ESTIMATOR: Javier Silva /DLM CLIENT: DLM Architecture SCHEDULE: 24 Months ITEM NO. ITEM DESCRIPTION AREA (SF) PROJECT COST $/SF 1 Bear
More informationCOOLIDGE SENIOR HIGH SCHOOL
INITIAL YEAR BUILT 1940 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1240 ENROLLMENT 2008 652 WARD 4 PROPOSED PROGRAM CAPACITY 1100 Site Plan COOLIDGE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationNALLE ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1950 BUILDING AREA 83,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 372 WARD 7 PROPOSED PROGRAM CAPACITY 400 Site Plan NALLE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationPACKAGE 3 ELEMENTARY AND MIDDLE SCHOOLS IMPROVEMENTS REPORT December 2015 Issue 1
PACKAGE 3 ELEMENTARY AND MIDDLE SCHOOLS IMPROVEMENTS REPORT December 2015 Issue 1 This document created by: BG Consultants, Inc 1405 Wakarusa Drive Lawrence, Kansas 66049 PACKAGE 3 ELEMENTARY AND MIDDLE
More informationLASALLE - BACKUS EDUCATION CAMPUS
INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationFacilities Feasibility Study Laurence G. Paquin Building Condition Assessment
Summary of Findings The Laurence G. Paquin Building Facility located at 2200 SINCLAIR LANE in Baltimore, Maryland, was built in 1975. It comprises 65,666 gross square feet. The total current deficiencies
More informationDeficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2
School and Site Level Deficiencies Site K Play Area Requires Impact Resistant Material 1320 1 Ea. 2 Exterior Basketball Goals Are Damaged And Require Replacement 1322 1 Ea. 4 Bus drop-off area does not
More informationCollins Middle School
Contents Collins Middle School...2 General comments, campus capacity, and student demographics:...2 1.0 School Site...4 2.0 Building Systems and Components...5 3.0 Building Safety and Security...19 4.0
More informationLaurel School Upper Campus Building Features
Laurel School Upper Campus Building Features INTRODUCTION Laurel School Upper Campus is tucked into the Willows neighborhood in Menlo Park surrounded by residential housing on all sides. The oddly shaped
More informationHartsville Area Schools - Building Evaluations
Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: West Hartsville Elementary Observed By: Cannon/Carter Principal:
More informationPRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016
PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 WORK LEGEND OVERALL WORK TO BOTH BUILDINGS 1 2 3 4 Existing corridors will receive new
More informationSTUART-HOBSON MIDDLE SCHOOL
INITIAL YEAR BUILT 1927 BUILDING AREA 105,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 399 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan STUART-HOBSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationCORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting
CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan Community Information Meeting October 2017 AGENDA Meeting Objectives Draft Plan Overview School Improvements for specific site Feedback/Listening
More informationSCHOOL DISTRICT OF LA CROSSE CAPITAL MAINTENANCE & IMPROVEMENT PROJECTS
SCHOOL DISTRICT OF LA CROSSE 2016-2017 CAPITAL MAINTENANCE & IMPROVEMENT PROJECTS June 6, 2016 SCHOOL DISTRICT OF LA CROSSE 2016 2017 CAPITAL MAINTENANCE AND IMPROVEMENTS INDEX Program Development Guidelines...
More informationWILKINSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationTimberglen Recreation Center Summary
Timberglen Recreation Center Summary Address Building Purpose 3810 Timberglen Road Dallas, TX 75287 Recreation Center Original Year of Construction 2003 Building Area 15,000 SF Inspection Date August 2,
More informationHealth Life Safety Survey and Master Facilities Plan
Health Life Safety Survey and Master Facilities Plan Community Presentation Board Meeting June 22, 2015 June 22, 2014 Board Presentation Overview and Summary of the Health Life Safety Survey and Master
More informationMADELEY RANCH ELEMENTARY SCHOOL
MADELEY RANCH ELEMENTARY SCHOOL CAMPUS DATA MADELEY RANCH ELEMENTARY SCHOOL 3500 Madeley Ranch Road, Montgomery TX 77356 Year Built 2009 Approx. Total Square Footage Grades Served 94,750 Pre-K - 4 th
More informationBRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING
PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING
More informationPRAIRIE ROSE SCHOOL DIVISION SECTION G: PERSONNEL
GGD GGM CUSTODIANS File Immediate Supervisors: Head custodian, the School Principal, and the Supervisor of Operations. Level 1 Casual Custodian Level 2 Custodian in a school with a Head Custodian Level
More informationFacility Assessment Report, Montgomery Independent School District
NATATORIUM CAMPUS DATA NATATORIUM 22628 Hwy 105 West, Montgomery TX 77356 Year Built 2009 Approx. Total Square Footage Grades Served 30,420 n/a Current Enrollment n/a Building Levels 1 1 MASTER PLAN 2
More informationHinsdale Township High School District 86 Referendum Project Listing April 2, Approved
Hinsdale Township High School District 86 Referendum Project Listing April 2, 2019 - Approved 1-12-2019 Project Category and Description Central South Total Security Replace Intercom System Install a completely
More informationKEY ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1925 BUILDING AREA 52,000 SF CURRENT PROGRAM CAPACITY 320 ENROLLMENT 2008 328 WARD 3 PROPOSED PROGRAM CAPACITY 325 Site Plan KEY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationPiping system (steam, hot water, chilled water system) including pipe and duct insulation needs replacement.
NW Corridor Transit Planning Union Station Existing Conditions Technical Memorandum (Physical and Operational Assessments) Executive Summary Capitol Region Council of Governments Prepared in cooperation
More informationFacilities Management Services & Funding Guide Centrally Funded and Recharge Services
Facilities Management Services & Funding Guide Centrally Funded and Recharge Services Table of Contents About the Funding Guide Page 3 Carpenter Shop Page 4 Custodial Services Page 5 Electrical Shop Page
More informationBARNARD ELEMENTARY SCHOOL
INITIAL YEAR BUILT 2002 BUILDING AREA 67,000 SF CURRENT PROGRAM CAPACITY 520 ENROLLMENT 2008 329 WARD 4 PROPOSED PROGRAM CAPACITY 450 Site Plan BARNARD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationHERITAGE MIDDLE SCHOOL. Overview: Livingston School District Heritage Middle School
HERITAGE MIDDLE SCHOOL Overview: The is located at 20 Foxcroft Drive and consists of a three-story building with Three-Story Classroom and Multi-Purpose Room Additions completed in 2002. The building has
More informationProject Status Report Property and Finance Committee Meeting August 6, 2013
Westmont Hilltop School District Project Status Report Property and Finance Committee Meeting August 6, 2013 S. Dwight Knouse II, AIA, LEED AP Russell D. Greaser, Project Manager Matthew T. Filan, PE,
More informationBoard Meeting Presentation FEASIBILITY STUDY South Montgomery Community School Corporation. June 13, 2016
Board Meeting Presentation FEASIBILITY STUDY South Montgomery Community School Corporation June 13, 2016 Schedule/Major Milestones 2015 November December Data Collection Board Meeting- Update 2016 January
More informationA/E Design Deliverable Checklist
A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic
More informationPOWELL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1925 BUILDING AREA 38,500 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 319 WARD 4 PROPOSED PROGRAM CAPACITY 325 Site Plan POWELL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-3
More informationCultural Facilities: Capital Needs Inventory and Priorities. Arts, Culture and Libraries Committee October 17, 2016
Cultural Facilities: Capital Needs Inventory and Priorities Arts, Culture and Libraries Committee October 17, 2016 Purpose To provide an overview of the buildings managed through the Office of Cultural
More informationSTEPHEN F. AUSTIN ELEMENTARY SCHOOL
STEPHEN F. AUSTIN ELEMENTARY SCHOOL BUS LANE CAMPUS DATA BUS LANE PORTABLES STEPHEN F. AUSTIN ELEMENTARY SCHOOL 1776 Texas Dr., Weatherford, TX 76086 Year Built 1988 No. of Buildings 1 No. of Portables
More informationWaverley Elementary School Feasibility Study
Waverley Elementary School Feasibility Study FREDERICK COUNTY PUBLIC SCHOOLS Feasibility Study Meeting #2 November 16, 2017 1 AGENDA 1. PROJECT OVERVIEW recap of last meeting, schedule 2. ARCHITECTURAL/
More informationTotal Schools/Projects in 2017 in 2017 Escalation in 2019 in 2020
Construction Project Project Project Schools/Projects in 2017 in 2017 Escalation in 2019 in 2020 Arlington High School 8,752,608 12,545,469 Building Additions 5,975,000 8,695,418 12.4% 9,773,649 1,198,608
More informationCampusMaker ModPod. Mobile Modular s. The Flexible Solution for Sustainable Learning Spaces
Mobile Modular s CampusMaker ModPod The Flexible Solution for Sustainable Learning Spaces CampusMaker ModPod the state-of-the-art eco-friendly modular classroom. Adaptable Classrooms for Today s Changing
More informationThe parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.
EAST LYME HIGH SCHOOL Located at 30 Chester Field Road, East Lyme, Connecticut 06333, the High School s original structure was built in 1967. An addition and alterations occurred in 1973. The building
More informationADDENDUM 2 - JULY 14, 2015
7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures
More informationClassification of Property
Classification of Property This list is not all inclusive. For assets not shown or for questions, please contact the Wake County Revenue Department for assistance at (919) 856-5400. Real Personal Description
More informationFacility Assessment Report, Montgomery Independent School District
ATHLETIC FACILITY CAMPUS DATA ATHLETIC FACILITY 22628 Hwy 105 West, Montgomery TX 77356 1 MASTER PLAN 2 CIVIL - SITE General Existing Conditions and Deficiencies Overall concrete site paving: Good Overall
More informationDarlington Area Schools - Building Evaluations
Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Brunson-Dargan Observed By: Creed/Carter Principal: Mrs. Ada O Sindab
More informationMeasure T Project List 2014 Santa Maria-Bonita School District Prop 39 School Bond November 4, 2014
Measure T Project List 2014 Santa Maria-Bonita School District Prop 39 School Bond November 4, 2014 Measure T DEFINED: Measure T is a local ballot measure on the November 2014 ballot seeking voter authorization
More informationGARFIELD ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1910 BUILDING AREA 58,908 SF CURRENT PROGRAM CAPACITY 446 ENROLLMENT 2008 278 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan GARFIELD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationNOYES EDUCATION CAMPUS
INITIAL YEAR BUILT 1930 BUILDING AREA 49,700 SF CURRENT PROGRAM CAPACITY 321 ENROLLMENT 2008 337 WARD 5 PROPOSED PROGRAM CAPACITY 450 Site Plan NOYES - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-8
More information/ Policy Number: Policy Name: Capital Planning and Development Processes Definitions
Page 1 7-101 Definition A. Alternative Construction Delivery Methods: Building Delivery Processes that vary from the more standard Design-Bid-Build model. These may include Construction Manager-At-Risk
More informationAddendum to Agenda Item: SUPERINTENDENT S PROPOSED CAPITAL IMPROVEMEMT PLAN
GREENWICH PUBLIC SCHOOLS Greenwich, CT November 27, 2017 Addendum to Agenda Item: 2018-2019 SUPERINTENDENT S PROPOSED CAPITAL IMPROVEMEMT PLAN Please note edited pages should replace original sheets in
More informationLegend. ANTICIPATED LONG-TERM CAPITAL PROJECTS: PER SCHOOL through
Legend Highlights Priority 1 Projects Highlights the projects identified through the building conditions survey that have been included in the 2017-18 through 2022-2023 Long Term Capital Plan ANTICIPATED
More informationHartsville Area Schools - Building Evaluations
Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: Southside Early Childhood Observed By: Cannon/Carter Principal: Grade
More informationJohn T Pirie Fine Arts & Academic Center ES 650 E 85th St Chicago, IL 60619
E 8th St Chicago, IL 19 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report will
More informationAssessment Report Burgess Park Gymnasium. Summary
Assessment Report Burgess Park Gymnasium Summary The existing Burgess Park Gymnasium is an approximately 17,460 gross square feet singlestory structure built of concrete, wood and steel. The building,
More informationBALLOU SENIOR HIGH SCHOOL
INITIAL YEAR BUILT 1960 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1565 ENROLLMENT 2008 9-12 (1,252) STAY (753) WARD 8 PROPOSED PROGRAM CAPACITY 1200 Site Plan BALLOU - 1 PROPOSED PROGRAM PROFILE
More informationArchitect and Engineer: Friar Associates inc.
Architect and Engineer: Friar Associates inc. BACKGROUND In June, after soliciting and interviewing several professional firms, Friar Associates was hired to perform an Existing Conditions Survey and Facilities
More informationDarlington Area Schools - Building Evaluations
Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Pate Elementary School Observed By: Creed/Carter Principal: Grade
More informationBoard Work Session Feasibility Study. January 9, 2017
Board Work Session Feasibility Study January 9, 2017 1 Process Staff Input Sessions at all schools What can you tell us about your building, your site, your space? Group collaboration exercise looking
More informationRevised Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Three Story Academic Additi
Original Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 75% Three Story Academic Addition with CTE Gymnasium Addition: Multi-court gym 3 courts
More information