CCR Rule Siting Criteria Unstable Areas
|
|
- Frank Berry
- 6 years ago
- Views:
Transcription
1 CCR Rule Siting Criteria Unstable Areas FGD Pond 5 Naughton Power Plant Kemmerer, Wyoming October 3, 217 PREPARED FOR PacifiCorp 147 West North Temple Salt Lake City, UT (81) Fax (81) PREPARED BY Tetra Tech 1551 Three Crowns Drive Suite 2 Casper, Wyoming 82648
2 PROFESSIONAL ENGINEER CERTIFICATION I hereby certify, as a Professional Engineer in the State of Wyoming, that the information in this document was assembled under my direct supervisory control. This report is not intended or represented to be suitable for reuse by PacifiCorp or others without specific verification or adaptation by the Engineer. I hereby certify, as a Professional Engineer in the State of Wyoming that the Unstable Areas assessment provided herein meets the requirements of 4 Code of Federal Regulations October 3, 217 Jason M. Stratton, P.E. Date
3 Siting Criteria Unstable Areas PacifiCorp Naughton Power Plant FGD Pond 5 TABLE OF CONTENTS PROFESSIONAL ENGINEER CERTIFICATION...II 1. INTRODUCTION EXISTING CONDITIONS UNSTABLE AREAS EVALUATION CONCLUSIONS...2 SOURCE(S)...2 REVISIONS...3 FIGURES Figure 1. Site Vicinity...4 APPENDICES Appendix B.... GEOTECHNICAL STUDY i October 3, 217
4 Siting Criteria Unstable Areas PacifiCorp Naughton Power Plant FGD Pond 5 1. INTRODUCTION The PacifiCorp Naughton Power Plant is located approximately three miles southwest of Kemmerer, Wyoming. This report addresses the requirements of Unstable Areas, as it pertains to FGD Pond 5 at the Plant. FGD Pond 5 was constructed in 217. This report presents the initial evaluation immediately following completion of construction and prior to the pond being placed into service. Specifically, indicates the pond must not be located within unstable areas defines an unstable area as a location that is susceptible to natural or human-induced events or forces capable of impairing the integrity, including structural components, of some or all of the CCR unit that are responsible for preventing releases from such unit. Unstable areas can include poor foundation conditions, areas susceptible to mass movements, and karst terrains. 2. EXISTING CONDITIONS The Naughton Power Plant is located approximately 3 miles southwest of Kemmerer, Wyoming. The Plant consists of three coal-fueled units, rated with a net dependable capacity of 156 MW, 21 MW, and 33 MW, respectively. Coal combustion by-products at the Plant include several types of materials including bottom ash, fly ash, and FGD materials. FGD Pond 5 was constructed in 217 at the location shown on Figure 1. The pond has a permitted capacity of 1,467 acre-ft which is expected to provide approximately years of disposal capacity. The pond may remain operational when full to allow additional evaporation of water. As water evaporates, additional effluent may be added eventually filling the pond with solids. When filled with solids or when continued operation is no longer feasible, a cover will be constructed and the pond will be permanently closed. The pond has a surface area of 49 acres at the crest with a maximum interior depth of 46 ft. The pond is located on a topographically high area with surface water drainage away from the pond in all directions. The only source of water or waste entering the pond is through two effluent delivery pipelines as well as any precipitation falling within the pond area. No surface water run-on is allowed to enter the pond. The pond has no discharge outlets or spillways (all water entering the pond will be evaporated). The pond embankments have 3 horizontal to 1 vertical slopes and was constructed using soil excavated from within the pond limits and an adjacent borrow area. The pond foundation materials consist of stiff clay and claystone bedrock. Permanent ballast consisting of grout filled tubes was placed over the geomembrane to prevent wind damage. A chain link security fence was installed around the pond to prevent larger wildlife from entering the area. A bird hazing system was installed to reduce impacts to migratory water fowl. The pond was constructed with a composite liner system consisting of a 6-mil HDPE geomembrane (upper component) in direct contact with a two-foot layer of compacted soil with a hydraulic conductivity of no more than 1 x -7 cm/sec (lower component). 3. UNSTABLE AREAS EVALUATION The site is underlain by a thin veneer of stiff clay overlying claystone bedrock (Appendix B). These materials are not susceptible to excessive deformation or mass movement and provide adequate stability for the pond foundation. No karst or other unstable features are present at this site.. October 3, 217
5 Siting Criteria Unstable Areas PacifiCorp Naughton Power Plant FGD Pond 5 4. CONCLUSIONS FGD Pond 5 meets the requirements of Unstable Areas. SOURCE(S) [1] USEPA, CFR Parts 257 and 261, Hazardous and Solid Waste Management System; Disposal of Coal Combustion Residuals from Electric Utilities; Final Rule. April 17, pp. October 3, 217
6 Siting Criteria Unstable Areas PacifiCorp Naughton Power Plant FGD Pond 5 REVISIONS Revision Number Date Revision Made By Whom /3/217 Initial Issue Tetra Tech October 3, 217
7 MONTANA POWELL LOVELL SHEDIDAN NEW EFFLUENT PIPELINE SEC. 1 SEC. 6 IDAHO CODY GREYBULL SUNDANCE BUFFALO GILLETTE BASIN MOORCROFT WORLAND TEN SLEEP MORAN NEWCASTLE THERMOPOLIS DUBOIS LINCH JACKSON MIDWEST SHOSHONI LANCE CREEK FORT WASHAKIE EVANSVILLE PINEDALE RIVERTON GLENROCK LUSK LANDER CASPER AFTON DOUGLAS BIG PINEY SUNRISE TORRINGTON SOUTH DAKOTA NEBRASKA KEMMERER EDEN HANNA MEDICINE BOW WHEATLAND GREEN RIVER RAWLINS MOUNTAIN LYMAN VIEW EVANSTON ROCK SPRINGS SARATOGA LARAMIE ORCHARD VALLEY CHEYENNE UTAH KEY MAP COLORADO R:\N-S\PacifiCorp\ Naughton FGD Pond\1-2D CADD\SheetFiles\1-Vicinity Map.dwg SAVED:1/12/17 PRINTED:1/12/17 BY:MARK.COOK NEW FGD POND 5 ACCESS ROAD Three Crowns Drive, Suite 2 Casper, WY NEW FGD EFFLUENT DISPOSAL POND 5 3 SEC This Drawing, in the form transmitted, is the original work product of TETRA TECH. This drawing cannot be altered, revised or reproduced without the prior written consent of TETRA TECH. An original will be retained by TETRA TECH as the "record copy" for purposes of this project. TETRA TECH does not approve of or warrant these documents if any alteration or modification is made without TETRA TECH's written approval. 4 5 CO. RD. 34 (ELKOL ROAD) Point # POINT COORDINATES Northing 78,549.81' 78,84.84' 78,75.88' 78,313.29' 779,532.25' 779,251.2' 779,298.33' 779,615.' Easting 2,485,79.83' 2,485,938.61' 2,486,941.83' 2,487,845.6' 2,487,921.4' 2,487,426.65' 2,485,988.22' 2,485,679.7' All point coordinates are in the NAD83 Wyoming State Planes, West Zone, US Foot datum. Feet January 12, 217 FIGURE 1 FGD EFFLUENT DISPOSAL POND 5 NAUGHTON POWER PLANT KEMMERER, WYOMING SITE VICINITY
8 FGD Effluent Disposal Pond 5 PacifiCorp Naughton Power Plant APPENDIX B GEOTECHNICAL STUDY November, 216
9 R:\N-S\PacifiCorp\ Naughton FGD Pond\1-2D CADD\SheetFiles\1-Vicinity Map.dwg SAVED:11/15/16 PRINTED:11/15/16 BY:MARK.COOK NEW EFFLUENT PIPELINE NEW FGD POND 5 ACCESS ROAD NEW FGD EFFLUENT DISPOSAL POND 5 SEC. 12 CO. RD. 34 (ELKOL ROAD) This Drawing, in the form transmitted, is the original work product of TETRA TECH. This drawing cannot be altered, revised or reproduced without the prior written consent of TETRA TECH. An original will be retained by TETRA TECH as the "record copy" for purposes of this project. TETRA TECH does not approve of or warrant these documents if any alteration or modification is made without TETRA TECH's written approval. November 15, West 2 South, Ste 4 Salt Lake City, UT 8412 PHONE: (81) FAX: (81) FIGURE 1 FGD EFFLUENT DISPOSAL POND 5 NAUGHTON POWER PLANT, KEMMERER, WYOMING SITE VICINITY
10 R:\N-S\PacifiCorp\ Naughton FGD Pond\1-2D CADD\SheetFiles\2-Locations of Exploration Borings.dwg SAVED:11/15/16 PRINTED:11/15/16 BY:MARK.COOK SEC. 2 LEGEND EXISTING CONTOUR (MAJOR) EXISTING CONTOUR (MINOR) PROPERTY BOUNDARY GEOTECHNICAL BORING UNMARKED PROPERTY LINE PROPOSED FGD POND 5 SITE SEC. 11 EXISTING GATE EXISTING SNOW FENCES SEC. 12 UNMARKED PROPERTY LINE This Drawing, in the form transmitted, is the original work product of TETRA TECH. This drawing cannot be altered, revised or reproduced without the prior written consent of TETRA TECH. An original will be retained by TETRA TECH as the "record copy" for purposes of this project. TETRA TECH does not approve of or warrant these documents if any alteration or modification is made without TETRA TECH's written approval West 2 South, Ste 4 Salt Lake City, UT 8412 PHONE: (81) FAX: (81) Feet 6 November 15, 216 FIGURE 2 FGD EFFLUENT DISPOSAL POND 5 NAUGHTON POWER PLANT, KEMMERER, WYOMING LOCATIONS OF EXPLORATORY BORINGS
11 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (6 inches thick). CLAYSTONE BEDROCK, medium hard to very hard, brown to dark gray, slightly moist to wet STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ /6." /5." Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Client: Tetra Tech, Inc. Date Drilled: 6/14/216 Drill Rig: CME 55 Borehole Dia.: 4" SSA Groundwater Depth: 47.5' Drilled By: STRATA Logged By: M. Medley (Continued Next Page) BORING LOG B-1 Sheet 1 Of 2
12 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface CLAYSTONE BEDROCK, medium hard to very hard, brown to dark gray, slightly moist to wet. (continued) 35 /4." STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ 4 45 /5." /6." /6." Borehole Terminated at.5 Feet. Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Client: Tetra Tech, Inc. Date Drilled: 6/14/216 Drill Rig: CME 55 Borehole Dia.: 4" SSA Groundwater Depth: 47.5' Drilled By: STRATA Logged By: M. Medley BORING LOG B-1 Sheet 2 Of 2
13 USCS Description TOPSOIL, (6 inches thick). (CL) Sandy LEAN CLAY, stiff, brown, slightly moist. Depth (ft) CLAYSTONE BEDROCK, medium hard to very hard, brown to dark gray, slightly moist to wet. Symbol CL Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) 114 Pocket Penetrometer, TSF % Passing No. 2 Sieve PL MC LL TEST RESULTS SPT, N-Value Note: BGS = Below Ground Surface STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ /6." Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Date Drilled: 6/15/216 Groundwater Depth: 36' Client: Tetra Tech, Inc Drill Rig: CME 55 Drilled By: STRATA Borehole Dia.: 4" SSA Logged By: M. Medley (Continued Next Page) BORING LOG B-2 Sheet 1 Of 2
14 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface CLAYSTONE BEDROCK, medium hard to very hard, brown to dark gray, slightly moist to wet. (continued) STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ 4 45 Borehole Terminated at.1 Feet. /6." /1." 122 Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Client: Tetra Tech, Inc. Date Drilled: 6/15/216 Drill Rig: CME 55 Borehole Dia.: 4" SSA Groundwater Depth: 36' Drilled By: STRATA Logged By: M. Medley 15 BORING LOG B-2 Sheet 2 Of 2
15 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (6 inches thick). (CL) Sandy LEAN CLAY, stiff to hard, brown, slightly moist CL STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ CLAYSTONE BEDROCK, medium hard to very hard, browny, slightly moist. Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Date Drilled: 6/8/216 Groundwater Depth: 26' /6." Client: Tetra Tech, Inc Drill Rig: CME 55 Drilled By: STRATA Borehole Dia.: 4" SSA Logged By: M. Medley (Continued Next Page) BORING LOG B-3 Sheet 1 Of 2
16 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface CLAYSTONE BEDROCK, medium hard to very hard, browny, slightly moist. (continued) 35 /1." STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ Borehole Terminated at.1 Feet /4." /3." /1." Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Client: Tetra Tech, Inc. Date Drilled: 6/8/216 Drill Rig: CME 55 Borehole Dia.: 4" SSA Groundwater Depth: 26' Drilled By: STRATA Logged By: M. Medley BORING LOG B-3 Sheet 2 Of 2
17 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (12 inches thick) STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ (CL) Sandy LEAN CLAY, stiff, brown, slightly moist. CLAYSTONE BEDROCK, medium hard to very hard, brown to dark gray, dry to moist. /6." /6." Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Date Drilled: Groundwater Depth: N.E. Client: Tetra Tech, Inc Drill Rig: CME 55 Drilled By: STRATA CL Borehole Dia.: 4" SSA Logged By: M. Medley (Continued Next Page) BORING LOG B-4 Sheet 1 Of 2
18 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface CLAYSTONE BEDROCK, medium hard to very hard, brown to dark gray, dry to moist. (continued) 35 /5." STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ Borehole Terminated at.1 Feet /3." /4." /1." Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Client: Tetra Tech, Inc. Date Drilled: Drill Rig: CME 55 Borehole Dia.: 4" SSA Groundwater Depth: N.E. Drilled By: STRATA Logged By: M. Medley BORING LOG B-4 Sheet 2 Of 2
19 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (6 inches thick). CLAYSTONE BEDROCK, firm to very hard, brown to dark gray, slightly moist to wet STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ /6." /5." /4." Borehole Terminated at 3.9 Feet. Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Client: Tetra Tech, Inc. Date Drilled: 6//216 Drill Rig: CME 55 Borehole Dia.: 4" SSA Groundwater Depth: 25' Drilled By: STRATA Logged By: M. Medley BORING LOG B- Sheet 1 Of 1
20 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (6 inches thick). CLAYSTONE BEDROCK, medium hard to very hard, brown to dark gray, slightly moist to wet STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ Borehole Terminated at 3.4 Feet. Project Number: WY1634A 28 /5." Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Date Drilled: 6/15/216 Groundwater Depth: 16' Client: Tetra Tech, Inc Drill Rig: CME 55 Drilled By: STRATA Borehole Dia.: 4" SSA Logged By: M. Medley BORING LOG B-11 Sheet 1 Of 1
21 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (6 inches thick). (CL) Sandy LEAN CLAY, stiff, brown, slightly moist. CLAYSTONE BEDROCK, medium hard to very hard, brown to dark gray, slightly moist to wet. CL STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ Borehole Terminated at 3.9 Feet. Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Date Drilled: 6/9/216 Groundwater Depth: 25' /5." Client: Tetra Tech, Inc Drill Rig: CME 55 Drilled By: STRATA Borehole Dia.: 4" SSA Logged By: M. Medley BORING LOG B-12 Sheet 1 Of 1
22 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (6 inches thick). CLAYSTONE BEDROCK, medium hard to very hard, brown to dark gray, slightly moist to wet STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ /5." Borehole Terminated at 3.4 Feet. Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Client: Tetra Tech, Inc. Date Drilled: 6/15/216 Drill Rig: CME 55 Borehole Dia.: 4" SSA Groundwater Depth: 19' Drilled By: STRATA Logged By: M. Medley BORING LOG B-13 Sheet 1 Of 1
23 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (6 inches thick). (CL) Sandy LEAN CLAY, very stiff, brown, slightly moist CL STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ CLAYSTONE BEDROCK, medium hard to very hard, brown to dark gray, slightly moist to wet. Borehole Terminated at 3.4 Feet. Project Number: WY1634A /5." /6." /5." Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Date Drilled: 6/14/216 Groundwater Depth: 26' Client: Tetra Tech, Inc Drill Rig: CME 55 Drilled By: STRATA 44 Borehole Dia.: 4" SSA Logged By: M. Medley BORING LOG B-14 Sheet 1 Of 1
24 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (6 inches thick). (CL) Sandy LEAN CLAY, hard, brown, slightly moist STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ CLAYSTONE BEDROCK, medium hard to very hard, brown to dark gray, slightly moist. Borehole Terminated at 3.4 Feet. Project Number: WY1634A /5." Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Date Drilled: 6/14/216 Groundwater Depth: N.E. Client: Tetra Tech, Inc Drill Rig: CME 55 Drilled By: STRATA CL Borehole Dia.: 4" SSA Logged By: M. Medley BORING LOG B-15 Sheet 1 Of 1
25 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (6 inches thick). (CL) Sandy LEAN CLAY, stiff, brown, slightly moist. CL CLAYSTONE BEDROCK, firm to very hard, brown to dark gray, slightly moist. 3 STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ /4." /4." Borehole Terminated at 3.3 Feet. Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Client: Tetra Tech, Inc. Date Drilled: 6/8/216 Drill Rig: CME 55 Borehole Dia.: 4" SSA Groundwater Depth: 2' Drilled By: STRATA Logged By: M. Medley BORING LOG B-16 Sheet 1 Of 1
26 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (6 inches thick). (CL) Sandy LEAN CLAY, stiff, brown, slightly moist STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ CLAYSTONE BEDROCK, firm, brown to dark gray, slightly moist. Borehole Terminated at 25.3 Feet. Project Number: WY1634A /4." Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Date Drilled: 6/8/216 Groundwater Depth: 13.5' Client: Tetra Tech, Inc Drill Rig: CME 55 Drilled By: STRATA CL 46 Borehole Dia.: 4" SSA Logged By: M. Medley BORING LOG B-17 Sheet 1 Of 1
27 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (6 inches thick). (CL) Sandy LEAN CLAY, stiff, brown, slightly moist. CL CLAYSTONE BEDROCK, medium hard to very hard, gray to dark gray, slightly moist to moist. 4 STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ /3." /4." Borehole Terminated at 3.3 Feet. Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Client: Tetra Tech, Inc. Date Drilled: 6/8/216 Drill Rig: CME 55 Borehole Dia.: 4" SSA Groundwater Depth: 18' Drilled By: STRATA Logged By: M. Medley BORING LOG B-18 Sheet 1 Of 1
28 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (6 inches thick). (CL) Sandy LEAN CLAY, stiff to very stiff, brown, slightly moist CL 14 STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ CLAYSTONE BEDROCK, firm to very hard, gray to dark gray, slightly moist to moist. Borehole Terminated at 3.3 Feet. Project Number: WY1634A /4." /3." Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Date Drilled: Groundwater Depth: N.E. Client: Tetra Tech, Inc Drill Rig: CME 55 Drilled By: STRATA Borehole Dia.: 4" SSA Logged By: M. Medley BORING LOG B-19 Sheet 1 Of 1
29 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (6 inches thick). CLAYSTONE BEDROCK, very hard, brown to dark gray, slightly moist to wet. /6." STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ /5." Borehole Terminated at 2.4 Feet. Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Client: Tetra Tech, Inc. Date Drilled: 6//216 Drill Rig: CME 55 Borehole Dia.: 4" SSA Groundwater Depth: 18' Drilled By: STRATA Logged By: M. Medley BORING LOG B-2 Sheet 1 Of 1
30 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (6 inches thick). (CL) Sandy LEAN CLAY, stiff, brown, slightly moist. CLAYSTONE BEDROCK, medium hard to very hard, brown to dark gray, slightly moist to moist. CL STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ Borehole Terminated at 2.7 Feet. Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Client: Tetra Tech, Inc. Date Drilled: 6/9/216 Drill Rig: CME 55 Borehole Dia.: 4" SSA Groundwater Depth: 15' Drilled By: STRATA Logged By: M. Medley BORING LOG B-21 Sheet 1 Of 1
31 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (6 inches thick). (CL) Sandy LEAN CLAY, very hard, brown, slightly moist. CL STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ CLAYSTONE BEDROCK, firm to very hard, brown to dark gray, slightly moist. Borehole Terminated at 2.7 Feet. Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Date Drilled: 6/9/216 Groundwater Depth: N.E. Client: Tetra Tech, Inc Drill Rig: CME 55 Drilled By: STRATA 25 4 Borehole Dia.: 4" SSA Logged By: M. Medley BORING LOG B-22 Sheet 1 Of 1
32 STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ USCS Description TOPSOIL, (6 inches thick). (CL) Sandy LEAN CLAY, stiff, brown, slightly moist. CLAYSTONE BEDROCK, firm, gray to dark gray, slightly moist. Borehole Terminated at 2.8 Feet. Depth (ft) Sample Type SPT Blows Per 6 Inches Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Date Drilled: 6/8/216 Groundwater Depth: N.E. Symbol Client: Tetra Tech, Inc Drill Rig: CME 55 Drilled By: STRATA CL SPT - N Dry Density (pcf) Borehole Dia.: 4" SSA Logged By: M. Medley TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface BORING LOG B-23 Sheet 1 Of 1
33 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (6 inches thick). CLAYSTONE BEDROCK, very hard, brown to dark gray, slightly moist STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ 5 15 /6." 2 /5." Borehole Terminated at 2.4 Feet. Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Client: Tetra Tech, Inc. Date Drilled: 6/13/216 Drill Rig: CME 55 Borehole Dia.: 4" SSA Groundwater Depth: N.E. Drilled By: STRATA Logged By: M. Medley BORING LOG B-24 Sheet 1 Of 1
34 USCS Description Depth (ft) Symbol Sample Type SPT Blows Per 6 Inches SPT - N Dry Density (pcf) TEST RESULTS Pocket Penetrometer, TSF SPT, N-Value % Passing No. 2 Sieve PL MC LL Note: BGS = Below Ground Surface TOPSOIL, (6 inches thick). CLAYSTONE BEDROCK, weathered to very hard, brown to dark gray, slightly moist STRATA BOREHOLE - STRATA.GDT - 11/9/16 14:46 - V:\STRATA - CASPER PROJECTS\T-Z\TETRA TECH, INC\WY1634A - FGD POND 5 - GT DRILLING\GEO\GINT LOGS\WY1634A LOGS.GPJ Borehole Terminated at 15.8 Feet. Project Name: FGD Pond 5 - Naughton Power Plant - Kemmerer, Wyoming Project Number: WY1634A Client: Tetra Tech, Inc. Date Drilled: 6/14/216 Drill Rig: CME 55 Borehole Dia.: 4" SSA Groundwater Depth: N.E. Drilled By: STRATA Logged By: M. Medley BORING LOG B-25 Sheet 1 Of 1
35 Particle Size Distribution Report 6 in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 # #2 #3 #4 #6 # #14 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay.1 SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) #4. # Lean CLAY Atterberg Limits PL= 2 LL= 39 PI= 19 Coefficients D 9 = D 85 = D 6 = D = D 3 = D 15 = D = C u = C c = USCS= CL Soil Description Classification AASHTO= A-6(19) * (no specification provided) Source of Sample: B-2 Depth: 2.5' Tetra Tech Billings, MT Client: Project: Project No: Naughton FGD Pond Date: Figure
36 Particle Size Distribution Report 6 in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 # #2 #3 #4 #6 # #14 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay.1 SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) #4. # Fat CLAY Atterberg Limits PL= 19 LL= 52 PI= 33 Coefficients D 9 = D 85 = D 6 = D = D 3 = D 15 = D = C u = C c = USCS= CH Soil Description Classification AASHTO= A-7-6(36) * (no specification provided) Source of Sample: B-2 Depth: 7.5' Tetra Tech Billings, MT Client: Project: Project No: Naughton FGD Pond Date: Figure
37 Particle Size Distribution Report 6 in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 # #2 #3 #4 #6 # #14 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay.1 SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) #4. # Leam CLAY Atterberg Limits PL= 19 LL= 49 PI= 3 Coefficients D 9 = D 85 = D 6 = D = D 3 = D 15 = D = C u = C c = USCS= CL Soil Description Classification AASHTO= A-7-6(32) * (no specification provided) Source of Sample: B-2 Depth: ' Tetra Tech Billings, MT Client: Project: Project No: Naughton FGD Pond Date: Figure
38 Particle Size Distribution Report 6 in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 # #2 #3 #4 #6 # #14 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay.1 SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) #4. # Lean CLAY Atterberg Limits PL= 17 LL= 49 PI= 32 Coefficients D 9 = D 85 = D 6 = D = D 3 = D 15 = D = C u = C c = USCS= CL Soil Description Classification AASHTO= A-7-6(34) * (no specification provided) Source of Sample: B-2 Depth: 15' Tetra Tech Billings, MT Client: Project: Project No: Naughton FGD Pond Date: Figure
39 Particle Size Distribution Report 6 in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 # #2 #3 #4 #6 # #14 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay.1 SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) #4. #2 98. Lean CLAY Atterberg Limits PL= 2 LL= 48 PI= 28 Coefficients D 9 = D 85 = D 6 = D = D 3 = D 15 = D = C u = C c = USCS= CL Soil Description Classification AASHTO= A-7-6(3) * (no specification provided) Source of Sample: B-2 Depth: 2' Tetra Tech Billings, MT Client: Project: Project No: Naughton FGD Pond Date: Figure
40 Particle Size Distribution Report 6 in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 # #2 #3 #4 #6 # #14 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay.1 SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) #4. #2 7.9 Soil Description Lean CLAY with Sand Atterberg Limits PL= 16 LL= 35 PI= 19 Coefficients D 9 = D 85 =.565 D 6 = D = D 3 = D 15 = D = C u = C c = USCS= CL Classification AASHTO= A-6(11) * (no specification provided) Source of Sample: B-3 Depth: 2.5' Tetra Tech Billings, MT Client: Project: Project No: Naughton FGD Pond Date: Figure
41 Particle Size Distribution Report 6 in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 # #2 #3 #4 #6 # #14 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay.1 SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) #4. #2 66. Soil Description Sandy Lean CLAY Atterberg Limits PL= 15 LL= 41 PI= 26 Coefficients D 9 = D 85 =.7613 D 6 = D = D 3 = D 15 = D = C u = C c = USCS= CL Classification AASHTO= A-7-6(15) * (no specification provided) Source of Sample: B-3 Depth: ' Tetra Tech Billings, MT Client: Project: Project No: Naughton FGD Pond Date: Figure
42 Particle Size Distribution Report 6 in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 # #2 #3 #4 #6 # #14 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay.1 SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) #4. # Fat CLAY Atterberg Limits PL= 22 LL= 52 PI= 3 Coefficients D 9 = D 85 = D 6 = D = D 3 = D 15 = D = C u = C c = USCS= CH Soil Description Classification AASHTO= A-7-6(31) * (no specification provided) Source of Sample: B-4 Depth: 2.5' Tetra Tech Billings, MT Client: Project: Project No: Naughton FGD Pond Date: Figure
43 Particle Size Distribution Report 6 in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 # #2 #3 #4 #6 # #14 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay.1 SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) #4. # Lean CLAY Atterberg Limits PL= 17 LL= 38 PI= 21 Coefficients D 9 = D 85 = D 6 = D = D 3 = D 15 = D = C u = C c = USCS= CL Soil Description Classification AASHTO= A-6(2) * (no specification provided) Source of Sample: B- Depth: 2.5' Tetra Tech Billings, MT Client: Project: Project No: Naughton FGD Pond Date: Figure
44 Particle Size Distribution Report 6 in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 # #2 #3 #4 #6 # #14 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay.1 SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) #4. # Lean CLAY Atterberg Limits PL= 18 LL= 37 PI= 19 Coefficients D 9 = D 85 = D 6 = D = D 3 = D 15 = D = C u = C c = USCS= CL Soil Description Classification AASHTO= A-6(19) * (no specification provided) Source of Sample: B- Depth: 7.5' Tetra Tech Billings, MT Client: Project: Project No: Naughton FGD Pond Date: Figure
45 Particle Size Distribution Report 6 in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 # #2 #3 #4 #6 # #14 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay.1 SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) #4. # Lean CLAY Atterberg Limits PL= 19 LL= 36 PI= 17 Coefficients D 9 = D 85 = D 6 = D = D 3 = D 15 = D = C u = C c = USCS= CL Soil Description Classification AASHTO= A-6(16) * (no specification provided) Source of Sample: B- Depth: 2' Tetra Tech Billings, MT Client: Project: Project No: Naughton FGD Pond Date: Figure
46 Particle Size Distribution Report 6 in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 # #2 #3 #4 #6 # #14 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay.1 SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) #4 # #2 #4 #8 # Lean CLAY Atterberg Limits PL= 16 LL= 38 PI= 22 Coefficients D 9 =.845 D 85 = D 6 = D = D 3 = D 15 = D = C u = C c = USCS= CL Soil Description Classification AASHTO= A-6(19) * (no specification provided) Source of Sample: B-14 Depth: 1'-5' Tetra Tech Billings, MT Client: Project: Project No: Naughton FGD Pond Date: Figure
47 Particle Size Distribution Report 6 in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 # #2 #3 #4 #6 # #14 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay.1 SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) 3/8 #4 # #2 #4 #8 # Lean CLAY Atterberg Limits PL= 18 LL= 46 PI= 28 Coefficients D 9 =.92 D 85 = D 6 = D = D 3 = D 15 = D = C u = C c = USCS= CL Soil Description Classification AASHTO= A-7-6(25) * (no specification provided) Source of Sample: B-23 Depth: 1'-5' Tetra Tech Billings, MT Client: Project: Project No: Naughton FGD Pond Date: Figure
48 Particle Size Distribution Report 6 in. 3 in. 2 in. 1½ in. 1 in. ¾ in. ½ in. 3/8 in. #4 # #2 #3 #4 #6 # #14 # PERCENT FINER GRAIN SIZE - mm. % Gravel % Sand % Fines % +3" Coarse Fine Coarse Medium Fine Silt Clay.1 SIEVE PERCENT SPEC.* PASS? SIZE FINER PERCENT (X=NO) # #2 #4 #8 # Lean CLAY Atterberg Limits PL= 19 LL= 46 PI= 27 Coefficients D 9 = D 85 = D 6 = D = D 3 = D 15 = D = C u = C c = USCS= CL Soil Description Classification AASHTO= A-7-6(29) * (no specification provided) Source of Sample: B-24 Depth: 5'-' Tetra Tech Billings, MT Client: Project: Project No: Naughton FGD Pond Date: Figure
49 COMPACTION TEST REPORT %, 7.8 pcf Dry density, pcf 6 4 ZAV for Sp.G. = Water content, % Test specification: ASTM D Method A Standard Elev/ Classification Nat. % > % < Sp.G. LL PI Depth USCS AASHTO Moist. #4 No.2 1'-5' CL A-6(19) TEST RESULTS MATERIAL DESCRIPTION Maximum dry density = 7.8 pcf Lean CLAY Optimum moisture = 17.5 % Project No Client: : Project: Naughton FGD Pond 5 Source of Sample: B-14 Tetra Tech Billings, MT Figure
50 COMPACTION TEST REPORT %, 4.3 pcf Dry density, pcf ZAV for Sp.G. = Water content, % Test specification: ASTM D Method A Standard Elev/ Classification Nat. % > % < Sp.G. LL PI Depth USCS AASHTO Moist. #4 No.2 1'-5' CL A-7-6(25) TEST RESULTS MATERIAL DESCRIPTION Maximum dry density = 4.3 pcf Lean CLAY Optimum moisture = 19.3 % Project No Client: : Project: Naughton FGD Pond 5 Source of Sample: B-23 Tetra Tech Billings, MT Figure
51 COMPACTION TEST REPORT %, 6.1 pcf Dry density, pcf 6 5 ZAV for Sp.G. = Water content, % Test specification: ASTM D Method A Standard Elev/ Classification Nat. % > % < Sp.G. LL PI Depth USCS AASHTO Moist. #4 No.2 5'-' CL A-7-6(29) TEST RESULTS MATERIAL DESCRIPTION Maximum dry density = 6.1 pcf Lean CLAY Optimum moisture = 18.7 % Project No Client: : Project: Naughton FGD Pond 5 Source of Sample: B-24 Tetra Tech Billings, MT Figure
52
53
54
55 Project: Naughton FGD Pond 5 Job #: Hole # Depth wet+t dry+t t % m Mst Wt diameter height volume Wet Dens Dry Dens B B B B B-14. B B-24 5-
CCR Rule Siting Criteria Fault Areas
CCR Rule Siting Criteria 257.62 Fault Areas FGD Pond 5 Naughton Power Plant Kemmerer, Wyoming October 30, 2017 PREPARED FOR PacifiCorp 1407 West North Temple Salt Lake City, UT 84116 (801) 521-0376 Fax
More informationCCR Rule Design Criteria (a)(2) Periodic Hazard Potential Classification Assessment
CCR Rule Design Criteria 257.74(a)(2) Periodic Hazard Potential Classification Assessment FGD Pond 5 Naughton Power Plant Kemmerer, Wyoming October 30, 2017 PREPARED FOR PacifiCorp 1407 West North Temple
More informationCCR Rule Operating Criteria Closure Plan
CCR Rule Operating Criteria 257.102 Closure Plan FGD Pond 2 Jim Bridger Plant Point of Rocks, Wyoming PREPARED FOR PacifiCorp 1407 West North Temple Salt Lake City, UT 84116 (801) 521-0376 Fax (801) 220-4748
More informationNAUGHTON POWER PLANT NORTH ASH POND INITIAL CLOSURE PLAN
NAUGHTON POWER PLANT NORTH ASH POND INITIAL CLOSURE PLAN Prepared for: PacifiCorp Energy Project Manager: Chad Tomlinson Date: 01 September 2016 Document No.: NP-TR-022 Quality Assurance Statement Office
More informationREPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS
FIGURE 3 Geotechnical Report (2) REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS RIVER TOWER RESTORATION RIVER TOWER PARK TAMPA, FLORIDA AREHNA PROJECT NO. B-13-002 February 22, 2013 Prepared
More informationB. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form.
City of Casper Baler Building / MRF Expansion DOCUMENT 9113 ADDENDUM.1 ADDENDUM NUMBER: 1.2 PROJECT INFORMATION A. Project Name: Baler Building / MRF Expansion B. Owner: City of Casper C. Architect: Hein
More informationDEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E.
LD-0 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Revised Soil Survey Report November 2, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia
More informationArdaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants
SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS PROPOSED WEIRS AT STATIONS 130+00 AND 16+00 DRAINAGE IMPROVEMENTS TO THE FOUR CORNERS MSBU HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical,
More informationEvaluation of Existing Surface Impoundment Liner, West and East Scrubber Ponds
Evaluation of Existing Surface Impoundment Liner, West and East Scrubber Ponds Lewis and Clark Station Prepared for Montana-Dakota Utilities Co. September 2016 Paul T. Swenson 2016.09.30 16:49:35-05'00'
More informationEXHIBIT G GEOTECHNICAL REPORT (DRAFT)
EXHIBIT G GEOTECHNICAL REPORT (DRAFT) APPENDIX 1 PROJECT SITE 'B' B-1 B-2 I-2 B-3 B-4 B-5 I-1 PROJECT LOCATION LEGEND B-1 = APPROXIMATE BORING LOCATION I-1 = APPROXIMATE INFILTRATION
More informationSacramento Modesto Roseville Pleasanton. Jeff Black, PE Blackwater Consulting Engineers, Inc. 605 Standiford Ave., Suite N Modesto, CA 95350
Sacramento Modesto Roseville Pleasanton December, 01 File Number: 1-19.1 Jeff Black, PE Blackwater Consulting Engineers, Inc. 605 Standiford Ave., Suite N Modesto, CA 9550 Subject: Mr. Black, GEOTECHNICAL
More informationGeotechnical Investigation Report
Geotechnical Investigation Report Proposed,000-Gallon Water Storage Tank Fagasa Pass Tank Upper Pago Pago, American Samoa Prepared for: ASPA Water Engineering Division Tafuna, American Samoa PO Box PPB
More informationReport of Exploratory Test Pits
Report of Exploratory Test Pits UNF Transportation Projects Stockpile Investigation Osprey Ridge Road Extension Jacksonville, Florida CSI Geo Project No.: 71-17-135-20 Arcadis Project No.: JK017002.0001
More informationApril 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1
PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes
More informationAppendix A - Vicinity Map Vicinity Map: Palm Beach Gardens City Hall Additions, 000 N Military Trail, Palm Beach Gardens, FL Proposed Location of Police Dept. Attached Addition Proposed Location of New
More informationSepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL
Bay County Solid Waste 11411 Landfill Rd. Panama City Beach, Florida 32413 Telephone: (850) 236-2212 Fax: (850) 233-5053 Board of County Commissioners www.baycountyfl.gov Sepetember 27, 2018 Florida Department
More informationGEOTECHNICAL ENGINEERING REPORT
GEOTECHNICAL ENGINEERING REPORT PROJECT MINECRAFT ACCESS ROAD BOYDTON PLANK ROAD DINWIDDIE COUNTY, VIRGINIA JOB NUMBER: 37775.003 PREPARED FOR: DINWIDDIE COUNTY PO BOX 70 DINWIDDIE COUNTY, STATE 23841
More informationHISTORY OF CONSTRUCTION 40 CFR (c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY
HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i) (xii) PLANT HAMMOND ASH POND (AP 2) GEEORGIA POWER COMPANY (i) Site Name and Ownership Information: Site Name: Plant Hammond Site Location: Site Address:
More informationTypical Subsurface Profile. November 28, 2016
November 28, 2016 RSCCD Facility Planning, District Construction and Support Services 2323 N. Broadway, Suite 112, Santa Ana, CA 92706 Attn: Re: Ms. Allison Coburn Facilities Project Manager P: (714) 480-7530
More informationSite Location. Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe County, Michigan
Site Location 0606 1771 North Dixie Highway Monroe, Michigan 48162 Tel: 734-289-2200 Fax: 734-289-2345 www.manniksmithgroup.com Figure 1: Site Location Map US-24 and I-275 Interchange Ash Township, Monroe
More informationGEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO
GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST
More informationCONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133
GEOTECHNICAL EXPLORATION AND ENGINEERING SERVICES REPORT CONDUCTED FOR: Immokalee Stormwater Master Plan Implementation Immokalee, Collier County, Florida PREPARED FOR: Mr. Marc Stonehouse, P. E. Project
More informationGEOTECHNICAL ENGINEERING REPORT. KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas. Project No. D16G1696. KU No. Lz_n/11062.
GEOTECHNICAL ENGINEERING REPORT KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas April 1, 2016 Prepared for: University of Kansas Bartlett & West Prepared by: GeoSource, LLC April 1, 2016
More informationGEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E
GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO. 15-945E TO VILLAGE OF TIKI ISLAND TIKI ISLAND, TEXAS BY SERVICING TEXAS, LOUISIANA, NEW MEXICO, OKLAHOMA
More informationGEOTECHNICAL SUBSURFACE DATA REPORT
GEOTECHNICAL SUBSURFACE DATA REPORT SC-41 REPLACEMENT BRIDGE OVER MAIDEN DOWN SWAMP MARION COUNTY, SOUTH CAROLINA PREPARED FOR Mr. Joshua Meetze, E.I.T. RPG-2 GDS South Carolina Department of Transportation
More informationDEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Soil Survey Report March 29, 2015 Matthew G. Moore, P.E.
LD-40 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Soil Survey Report March 29, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia Insert
More informationWritten Closure Plan. Comanche Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado. October 17, 2016
Written Closure Plan Comanche Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado October 17, 2016 Table of Contents 1.0 General Information... 1 2.0 Description of Closure
More informationPROJECT NO A. ISSUED: February 29, 2016
INTERPRETIVE REPORT FOR INFILTRATION SYSTEM DESIGN, PROPOSED VILLA VERONA APARTMENT COMMUNITY, ASSESSOR S PARCEL NUMBERS 311-040-015, 311-040-021, 311-040-024, 311-040-026 AND 311-040-013, LOCATED ON THE
More informationReport of CCR Rule Stability Analyses AEP Clifty Creek Power Plant Boiler Slag Pond Dam and Landfill Runoff Collection Pond
Report of CCR Rule Stability Analyses AEP Clifty Creek Power Plant Boiler Slag Pond Dam and Landfill Runoff Collection Pond Madison, Jefferson County, Indiana Prepared for: American Electric Power Columbus,
More informationSTRUCTURAL STABILITY ASSESSMENT. Bremo Power Station CCR Surface Impoundment: North Ash Pond STRUCTURAL STABILITY ASSESSMENT
STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT Bremo Power Station CCR Surface Impoundment: North Ash Pond ~,Dominion Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff,
More informationCONTRACT 5E-2 APPENDIX A - TEST HOLE LOGS DYREGROV ROBINSON INC. PORTAGE AVE WINSTON DR BOURKEVALE CAVELL PARKSIDE DR ASSINIBOINE AVE
APPENDIX A - TEST HOLE LOGS PORTAGE AVE TH -9 CONTRACT E- DR DR BOURKEVALE CAVELL WINSTON DR PARKSIDE DR ASSINIBOINE AVE AUTHORIZED BY: DATE: CONSULTING GEOTECHNICAL ENGINEERS AUTHORIZED /0/ CLIENT DRAWING
More information1. Introduction Site Information Site Characteristics Hydrogeologic Setting... 2
Table of Contents 1. Introduction... 1 1.1 Site Information... 1 1.2 Site Characteristics... 1 1.3 Hydrogeologic Setting... 2 2. Closure Plan... 5 2.1 Closure Description... 5 2.2 Closure Timeframe...
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Turner Turnpike Widening Milepost 203 to 210 Drainage Structure Pipe Jacking Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Pavement Subgrade Survey State Highway 125 over Hudson Creek Ottawa County, Oklahoma September 23, 21 Terracon Project No. 415121 Prepared for: Guy Engineering Services,
More informationJim Bridger Power Plant
2015 Coal Combustion Residuals Annual Inspection Jim Bridger Power Plant Industrial Landfill Prepared for PacifiCorp Energy North Temple Office 1407 West North Temple Salt Lake City, Utah 84116 Final December
More informationGeotechnical Data Report
Geotechnical Data Report Proposed Prairie Lane HDD Cores D7-A and D7-B Wayne County, Ohio February 14, 2015 Terracon Project No. N4149328 Prepared for: Project Consulting Services, Inc. Prepared by: Terracon
More informationAMERICAN ELECTRIC POWER (SWEPCO)
2016 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-16-163 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION
More informationSoil Survey Summary Report
Soil Survey Summary Report Benton Boulevard Extension Pooler, Chatham County, Georgia February, 206 Terracon Project No. ES5553 Prepared for: McGee Partners, Inc. Atlanta, Georgia Prepared by: Terracon
More informationGeotechnical Engineering Report
BIG CYPRESS SEMINOLE INDIAN RESERVATION WATER TREATMENT FACILITY October 29, 2015 Terracon Project No. HD155065 Prepared for: REISS ENGINEERING, INC. 1016 Spring Villas Pt. Winter Springs, FL 32708 Prepared
More informationREPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA
REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida
More informationAPPENDIX A DRAINAGE STUDY PHASE 2 ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE 4C IMPROVEMENTS LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC
DRAINAGE STUDY PHASE ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE C IMPROVEMENTS ` FOR: LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC APPENDIX A J-.000 Prepared by: Savannah, GA Charleston, SC Myrtle
More informationGeotechnical Data Report
Geotechnical Data Report Proposed State Road 52 HDD Cores E2-D and E2-E Washtenaw County, Michigan May 29, 2015 Terracon Project No. N4149328 Prepared for: Project Consulting Services, Inc. Prepared by:
More informationSUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464
SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 PREPARED FOR: AAA DEVELOPMENT AND CONSULTING, INC GREENFIELD, INDIANA
More informationINITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257
INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT BOWEN PRIVATE INDUSTRY SOLID WASTE DISPOSAL FACILITY (ASH LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Turner Turnpike Widening Milepost 210 to 218 Drainage Structure Pipe Jacking Creek County, Oklahoma July 1, 2016 Terracon Project No. 04165017 Prepared for: Benham Tulsa,
More informationPRELIMINARY ENGINEERING DESIGN MEMORANDUM WATER TREATMENT PLANT FLOOD WALL TO PROTECT BACKWASH SETTLING BASIN CITY OF NEW BUFFALO, MI
PRELIMINARY ENGINEERING DESIGN MEMORANDUM WATER TREATMENT PLANT FLOOD WALL TO PROTECT BACKWASH SETTLING BASIN CITY OF NEW BUFFALO, MI City of New Buffalo, MI Preliminary Engineering Design Memorandum Water
More informationMcElroy s Run Impoundment Structural Stability Assessment Report
Allegheny Energy Supply Company, LLC A FirstEnergy Company Pleasants Power Station Pleasants County, West Virginia October 2016 Prepared for: Allegheny Energy Supply Company, LLC A FirstEnergy Company
More informationFIGURES Printed By: aday Print Date: 3/23/2011 12:48:08 PM File Name: \\geodesign.local\files\jobs\m-r\penskeauto\penskeauto-1\penskeauto-1-01\figures\cad\penskeauto-1-01-vm01.dwg Layout: FIGURE 1 VICINITY
More informationAppendix C Geotechnical Soil Testing Data
Appendix C Geotechnical Soil Testing Data rjmmmrorr Table C-1 Laboratory Soil Testing Results Groundwater Assessment Report UMore Mining Area Dakota County, Minnesota Sample Particle Size Particle Size
More informationAugust 15, 2006 (Revised) July 3, 2006 Project No A
August 15, 2006 (Revised) July 3, 2006 Project No. 01-05-0854-101A Mr. David Reed, P.E. Protean Design Group 100 East Pine Street, Suite 306 Orlando, Florida 32801 Preliminary Soil Survey Report Polk Parkway
More informationCivil Geotechnical Surveying
Civil Geotechnical Surveying Mr. David Burnett Cabarrus County Schools 4425 Old Airport Road Charlotte, North Carolina 28025 May 16, 2017 Reference: Geotechnical Engineering Evaluation Future PLC Site
More informationCONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146
GEOTECHNICAL EXPLORATION SERVICES REPORT CONDUCTED FOR: Collier Boulevard PREPARED FOR: Mr. Christopher L. Johnson Director of Land Development Stock Development, LLC Professional Circle, Suite 01 Naples,
More informationCCR COMPLIANCE LINER CERTIFICATION FLY ASH AND BOTTOM ASH BASINS. Prepared for:
CCR COMPLIANCE LINER CERTIFICATION FLY ASH AND BOTTOM ASH BASINS Prepared for: Louisiana Generating LLC, a subsidiary of NRG Big Cajun II 10431 Cajun II Road New Roads, LA 70760 Prepared by: CB&I Environmental
More informationLANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN
LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO. 0200-S3N-R2 AFIN 32-00042 OCTOBER 12, 2016 LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT
More informationREPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784
REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO. 35-55 CLIENT ID: 78 Prepared for: Construction & Engineering Services Consultants, Inc. 93 Baymeadows
More informationAMERICAN ELECTRIC POWER (SWEPCO)
2015 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-15-034 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION
More informationHISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY
HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 1 (AP-1) GEORGIA POWER COMPANY (i) Site Name and Ownership Information: Site Name: Site Location: Site Address: Owner: Address:
More informationNovember 13, Eckas Water 1514 Ambrosia Court Fort Collins, Colorado Attn: Mr. Wayne Eckas
November 13, 2018 Eckas Water 1514 Ambrosia Court Fort Collins, Colorado 80526 Attn: Mr. Wayne Eckas (wayne@eckaswater.com) Re: Geotechnical Subsurface Exploration Walker Recharge Pipeline Project Morgan
More informationGEOTECHNICAL ENGINEERING REPORT
GEOTECHNICAL ENGINEERING REPORT INNSBROOK DOMINION BOULEVARD OUTPARCEL 4101 DOMINION BOULEVARD HENRICO COUNTY, VIRGINIA JOB NUMBER: 36310 PREPARED FOR: BELLEAU WOOD DEVELOPMENT P.O. BOX 2022 BURLINGTON,
More informationNovember 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112
November 13, 2015 103IP3406 Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 Subject: Infiltration Testing Gates Road Valve Site Sunoco Pennsylvania Pipeline
More informationProposed Two-Cell Wastewater Treatment Lagoon for Rock Lake Holding Ltd. (SE WPM)
ENVIRONMENT ACT PROPOSAL Proposed Two-Cell Wastewater Treatment Lagoon for Rock Lake Holding Ltd. (SE 1-13-1 WPM) Prepared by: 12 Aviation Boulevard St. Andrews, Manitoba R1A 3N5 Contact: Charles Liu,
More informationGEOTECHNICAL REPORT US 95 WIDENING ANN ROAD
GEOTECHNICAL REPORT US 95 WIDENING ANN ROAD to KYLE CANYON ROAD Package 2 E.A. 73627 January 212 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION
More informationCell 2 Composite Liner Design Certification
Cell 2 Composite Liner Design Certification SWEPCO John W. Turk, Jr. Power Plant Class 3N Landfill Permit No. 311-S3N-R1 AFIN: 29-56 July 16, 218 Project No. 35177127 Prepared for: Southwestern Electric
More informationGEOTECHNICAL EXPLORATION REPORT
GEOTECHNICAL EXPLORATION REPORT LITTLE MIAMI WWTP STORM DRAIN REALIGNMENT CINCINNATI, HAMILTON COUNTY, OHIO MSDGC PROJECT NO. 10270180 PREPARED FOR: METROPOLITAN SEWER DISTRICT OF GREATER CINCINNATI 1600
More informationMonitoring Well Installation Report
Monitoring Well Installation Report Comanche Station Xcel Energy August 1, 2016 Updated June 14, 2018 Comanche Station, Pueblo County, Colorado Xcel Energy Monitoring Well Installation Report Comanche
More informationGroundwater Monitoring System Certification
Groundwater Monitoring System Certification for Compliance with the Coal Combustion Residuals (CCR) Rule Xcel Energy July 21, 2016, Denver, Colorado Table of Contents 1.0 Introduction... 1 2.0 Facility
More informationResults of Onsite Percolation Testing Ellis Commons Senior Housing Development APN City of Perris, California
Lansing Companies 12671 High Bluff Drive, Suite 150 San Diego, California 92130 April 18, 2017 Project No. 11607.001 Attention: Subject: References: Mr. Casey Malone Results of Onsite Percolation Testing
More informationDraft Geotechnical Engineering Services
May 20, 2011 Draft Geotechnical Engineering Services Proposed Weir Wall at Stockbridge Stormwater Management Facility Prince William County, Virginia 19955 Highland Vista Drive, Suite 170 Ashburn, VA 20147
More informationGEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY
GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA 73171 JANUARY 06 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT I-15
More informationTECHNICAL MEMORANDUM
TECHNICAL MEMORANDUM SOIL SAMPLING, TESTING AND LOGGING ULOP GEOTECHNICAL EVALUATION STAR BEND SETBACK LEVEE Sutter County, California Prepared by: BLACKBURN CONSULTING 2491 Boatman Avenue West Sacramento,
More informationFlorida s Leading Engineering Source
Since 1988 Florida s Leading Engineering Source Environmental Geotechnical Construction Materials Testing Threshold and Special Inspections Plan Review & Code Compliance Mr. Ron Ridenour Hanson Professional
More informationGEOTECHNICAL REPORT B-1942
GEOTECHNICAL REPORT TUSCARORA BRIDGE REPLACEMENT B-1942 E.A. 73561 March 2011 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Shaw AFB East Gate Entrance Control Facility Amendment Sumter, South Carolina September 13, 2010 Terracon Project No. 73105020A Prepared for: TranSystems North Charleston,
More informationThis is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.
This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact
More informationEarth Mechanics, Inc. Geotechnical & Earthquake Engineering
Earth Mechanics, Inc. Geotechnical & Earthquake Engineering TECHNICAL MEMORANDUM DATE: June 3, 2009 EMI PROJECT NO: 01-143 TO: COPY: FROM: SUBJECT: John Chun, P.E. / Port of Long Beach (POLB) Jorge Castillo
More informationHISTORY OF CONSTRUCTION 40 CFR (c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 2 (AP-2) GEORGIA POWER COMPANY
HISTORY OF CONSTRUCTION 40 CFR 257.73(c)(1)(i)-(xii) PLANT MCDONOUGH ASH POND 2 (AP-2) GEORGIA POWER COMPANY (i) Site Name and Ownership Information: Site Name: Site Location: Site Address: Owner: Address:
More informationFor. Report of Geotechnical Exploration. St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St.
Report of Geotechnical Exploration For St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St. Johns County, FL MAE Project No. 0106-0005 June 14, 2017 Prepared for: CPH, Inc.
More informationDetermination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities
Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission
More informationPRELIMINARY GEOTECHNICAL INVESTIGATION UCCS ACADEMIC OFFICE BUILDING COLORADO SPRINGS, COLORADO
PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS COLORADO SPRINGS COLORADO Prepared for: UNIVERSITY OF COLORADO AT COLORADO SPRINGS Facilities Services 1420 Austin Bluffs Parkway Colorado Springs Colorado 80918
More informationNovember 14, Robert Peccia & Associates, Inc. PO Box 5653 Helena, MT Mr. Bill Burkland, P.E.
November 14, 2018 Robert Peccia & Associates, Inc. PO Box 63 9604 Attention: Subject: Gentlemen: Mr. Bill Burkland, P.E. bill@rpa-hln.com Final Report of Geotechnical Investigation Upgrades to Taxiways
More informationGeotechnical Engineering Report
The Residence at Yukon Hills Cornwell Drive and Vandament Avenue Yukon, Oklahoma May 20, 2016 Terracon Project No. 03165108 Prepared for: Jones Gillam Renz Architects, Inc. Salina, Kansas Prepared by:
More informationSubsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois
AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,
More informationApplied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois
AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West
More information2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:
2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO. 0200-S3N-R2 AFIN: 32-00042 JANUARY 15, 2016 ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING
More informationFor. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida
Report of Geotechnical Exploration For University of North Florida Parking Lot 47 Jacksonville, Florida MAE Project No. 0019-0009 April 5, 2017 Revised: April 6, 2017 Prepared for: Prepared by: Jacksonville,
More informationCLECO POWER LLC Dolet Hills Power Station
OCTOBER 2016 CLECO POWER LLC Dolet Hills Power Station ASH BASIN NO. 1 CCR LINER VERIFICATION Prepared By: Providence Engineering and Environmental Group LLC 1201 Main Street Baton Rouge, Louisiana 70802
More informationMonitoring Well Installation Report
Monitoring Well Installation Report Xcel Energy February 1, 2016, Morgan County, Colorado Xcel Energy Monitoring Well Installation Report Table of Contents 1.0 Introduction... 1 2.0 Background Information...
More informationSTRUCTURAL STABILITY ASSESSMENT
STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) East and West Bottom Ash Pond Pirkey Plant Hallsville, Texas October, 2016 Prepared for: Southwest Electric Power Company (SWEPCO) - Pirkey Plant Hallsville,
More informationSUBSURFACE EXPLORATION RECOMMENDATIONS
SUBSURFACE EXPLORATION RECOMMENDATIONS PROPOSED STONEBRIDGE INDUSTRIAL DEVELOPMENT Lafayette Center and Fogwell Drive Fort Wayne (Allen County), Indiana GME TESTING PROJECT NO. G13-052421 PREPARED FOR
More informationAnnual Report to the Joint Minerals, Business, and Economic Development Interim Committee
Annual Report to the Joint Minerals, Business, and Economic Development Interim Committee Municipal Solid Waste Prioritization,, and Remediation June 2018 Table of Contents 1.0 Introduction...1 2.0 Background
More informationEXECUTIVE SUMMARY. August 2016 ES
August 2016 ES-1 1657212 EXECUTIVE SUMMARY Golder Associates Inc. (Golder) has prepared this report for Westar Energy (Westar) to summarize the results of Golder s slope stability evaluation of the bottom
More information2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:
2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO. 0199-S3N-R3 AFIN: 35-00110 JANUARY 15, 2016 ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING
More informationREPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199
REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO. 3-6187-A CLIENT ID: 0199 Prepared for: JEA 1 West Church Street Jacksonville, Florida
More informationPROJECT INFORMATION... 1 SITE AND SUBSURFACE CONDITIONS... 2 EVALUATION AND RECOMMENDATIONS... 4 CONSTRUCTION CONSIDERATIONS... 5
TABLE OF CONTENTS Page No. PROJECT INFORMATION... 1 Project Authorization... 1 Project Description... 1 Purpose and Scope of Services... 1 SITE AND SUBSURFACE CONDITIONS... 2 Site Location and Description...
More informationGEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax
GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 September 8, 2016 City of Viborg 101 N. Main Street 57070 Attn:
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Shaw AFB West Gate Entrance Control Facility Amendment Sumter, South Carolina September 13, 20 Terracon Project No. 735021A Prepared for: TranSystems North Charleston, South
More informationALLIANT ENERGY WISCONSIN POWER AND LIGHT COLUMBIA ENERGY CENTER CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT. January 15, 2016
ALLIANT ENERGY WISCONSIN POWER AND LIGHT COLUMBIA ENERGY CENTER CCR SURFACE IMPOUNDMENT ANNUAL INSPECTION REPORT January 15, 2016 EXECUTIVE SUMMARY This annual inspection report has been prepared in accordance
More informationFOUR CORNERS POWER PLANT CLOSURE PLAN (b) DRY FLY ASH DISPOSAL AREA (DFADA) FC_ClosPlan_004_
FOUR CORNERS POWER PLANT CLOSURE PLAN 257.102(b) DRY FLY ASH DISPOSAL AREA (DFADA) FC_ClosPlan_004_20161017 Closure Plan Contents 257.102(b)(1) The owner or operator of a CCR unit must prepare a written
More informationGeotechnical Engineering Study
Geotechnical Engineering Study SAWS Service Road Brackish Desalinization Production Well Services Package I Bexar County, Texas Arias Job No. 09-1122 Prepared For LBG Guyton & Associates March 9, 11 TABLE
More informationNovember 13, IP3406. Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112
November 13, 2015 103IP3406 Mr. Uriah Sowell Rooney Engineering 115 Inverness Drive East, Suite 300, Englewood, CO 80112 Subject: Infiltration Testing Hopeland Road Valve Site Sunoco Pennsylvania Pipeline
More information