REQUEST FOR PROPOSAL HAZARDOUS MATERIALS INVENTORY SERVICES BUIDLING HARVARD UNIVERSITY ADDRESS CAMBRIDGE, MA

Size: px
Start display at page:

Download "REQUEST FOR PROPOSAL HAZARDOUS MATERIALS INVENTORY SERVICES BUIDLING HARVARD UNIVERSITY ADDRESS CAMBRIDGE, MA"

Transcription

1 REQUEST FOR PROPOSAL HAZARDOUS MATERIALS INVENTORY SERVICES BUIDLING HARVARD UNIVERSITY ADDRESS CAMBRIDGE, MA INTRODUCTION Harvard University is seeking Hazardus Materials Inventry Supprt Services frm a qualified Industrial Hygienist (Cnsultant) t supprt an upcming cnstructin prject at XXXXXXX. The selected Cnsultant will wrk with the Design Team (architects, engineers and SCHOOL). The Cnsultant shall submit a draft prpsal t the President and Fellws f Harvard Cllege, thrugh its SCHOOL and Envirnmental Health & Safety (EHS) departments, hereinafter cllectively referred t as Harvard, t identify and quantify hazardus materials assciated with the prpsed prject at the abve-referenced site. The Cnsultant shall review the prpsed prject scpe, identify ptential areas that may be impacted by the prject, cllect and analyze representative samples f building materials, identify materials that may be prblematic (i.e., mercury in flurescent light bulbs), and assess the effect f these materials n the prpsed prject scpe, schedule, and budget. Hazardus materials t be assessed under this scpe f services will include, but nt be limited t asbests-cntaining materials, mercury, lead- based paint, refrigerants, cntainerized wastes and raw prducts strage (i.e. bulk cleaning prducts that may require dispsal). BACKGROUND Harvard is seeking Prpsals fr the cmpletin f the fllwing t aid in the design and cnstructin f a prpsed renvatin at BUILDING: Hazardus Materials Inventry, Hazardus Material Summary Reprt, Abatement Mnitring Services (include separate Rate Sheet), and Clseut Reprt This scpe specifically excludes evaluatin f PCB cntaining building material as a separate PCB- Cnsultant has been hired fr that scpe. The BUILDING is lcated at ADDRESS, Cambridge, MA. The existing building ftprint is apprximately XXX,XXX square feet. The prpsed renvatin prject includes: PROJECT SUMMARY Cnstructin is currently anticipated t begin in DATE. Explratry assessment wrk will begin in DATE and is expected t ccur, as needed, thrugh DATE. AVAILABLE DOCUMENTS

2 The pre-existing building surveys as well as design dcuments will be prvided fr the selected Cnsultant s use. Any prvided dcuments are fr infrmatinal purpses and as such, details f the prject may be mdified during develpment f schematic-level ptins. Any supplied infrmatin is cnsidered cnfidential and cnceptual in nature, and is nt t be shared r discussed with thers withut Harvard s written permissin. BID WALKTHROUGH (IF NEEDED) A Bid Walkthrugh will be held n DATE at TIME. Participants must cnfirm attendance with XXX - EH&S Envirnmental Prject Manager by DATE. COORDINATION The Design Team will be respnsible fr develping design and cnstructin specificatins and plans fr the prpsed prject. Hwever, assessment and quantificatin f ptential hazardus materials may have significant impact n the ptential csts, schedule, specificatins, and qualificatins f the cnstructin wrkfrce. Therefre, clse crdinatin between the Design Team and the Cnsultant is critical fr the success f this prject. EHS will facilitate the interactin f the parties but is requiring regular cmmunicatin frm the Cnsultant Design team t minimize miscmmunicatin and t create prmpt respnsiveness. Harvard is anticipating retaining the services f a separate Cnsultant specifically t aid the prject in the identificatin and management f PCBs in Building materials (caulking, sealants, etc.) (referred t herein as the PCB-Cnsultant). The selected Cnsultant will crdinate with the PCB-Cnsultant n all inventry/assessment actins as well as crdinate all reprts and assciated dcumentatin s that an integrated abatement/remedial apprach can be develped by the Prject Team. SCOPE OF WORK The Cnsultant will perfrm an evaluatin f the prject scpe t identify the presence f hazardus materials that may impact the cnstructin, quantify the vlumes and lcatins, prvide ptins fr addressing the hazardus materials, and prvide permitting bligatins, cst estimates, crdinatin issues and abatement timelines. Specified details regarding the prpsed scpe f services are presented belw. The Cnsultant shall identify in their respnse any ther tasks that shuld be included and shall identify the scpe and csts assciated with these additinal tasks. The name(s), title(s), and license numbers f the individuals wh will be perfrming the wrk shall be included. Task 1: Backgrund Review The Cnsultant shall evaluate the existing prpsed prject infrmatin prvided by the Design Team. This infrmatin includes prgrammatic data fr the prpsed rehabilitatin and/r demlitin. The Design Team shall supply infrmatin n areas f prpsed wrk as well as infrmatin n the mechanical systems and materials t be addressed. The Design Team shall prvide flr plans fr the building that are clearly marked as t rm type, numbers, uses f the varius rms, and anticipated wrk in these areas. The flr plans shall be prvided in an electrnic frmat. The previus reprts n assessment and abatement, if available, shall be reviewed as t ptential

3 impact n the prpsed cnstructin. Task 2: Phase I Site Recnnaissance The Cnsultant shall implement a tw-phase apprach. The initial phase will cnsist f develping an inventry f materials and their lcatins within the area t be impacted. The secnd phase, described in Task 4, cnsists f sampling and labratry analysis f suspect hazardus and cntaminated materials. Dependent n the scpe f the prject Tasks 2 and 4 may be cmbined. During the initial phase, the Cnsultant shall cntact and interview the facility manager with regard t strage f cleaning supplies, raw prducts, and waste materials. The Cnsultant shall inquire abut lcatins, quantities, and wrk practices regarding the afrementined infrmatin. The Cnsultant shall field verify the prvided infrmatin during the site recnnaissance. Additinally, the initial phase will include a rm-by-rm walk thrugh visual bservatin and dcumentatin f the cntents f the rm tgether with the type f building materials present. The Cnsultant shall use flr plans prvided by the Design Team. The initial phase will cncentrate n inventrying visibly accessible building materials and indicating this infrmatin n the building drawings, particularly the type f walls, flrs and ceilings, the presence f encapsulating materials, the cnditin f the material, (gd, fair r pr) and the material s ptential t becme disturbed. Pipe insulatin and windw caulking (interir/exterir in cnjunctin with EHS) will als be nted and assessed. As part f the initial phase, ptentially hazardus r cntaminated materials r systems will be identified and quantified within the prject limits. These materials and/r systems include, but are nt limited t: drums; PCB-cntaining transfrmers; capacitrs; switchgear; light ballasts; and refrigeratin equipment, including air cnditins and freezers. The Cnsultant shall cmpare cnditins reprted in the previus dcuments with existing cnditins t verify the accuracy f the previus dcuments. The Cnsultant will dcument all Phase I findings n a Rm Data Inventry Sheet (the RDIS frmat must be apprved, in advance, by EHS). During the field survey, digital phtgraphs will be taken f significant building features fr physical dcumentatin purpses. In the event that the rf systems may be impacted by the prpsed cnstructin, the Cnsultant shall examine the rf systems and identify cnstructin materials and the likelihd f these materials being ACM. The Cnsultant shall crdinate with the rfing subcntractr t cnduct intrusive sampling during Phase II. Task 3: Crdinatin Meetings (Assume X meetings) The Cnsultant shall attend crdinatin wrkshp/meetings t be held at the prject lcatins with the Design Team and the PCB-Cnsultant. The Design Team will present the basic thinking and the decisins made t date (in the verview). The Cnsultant will prvide a brief summary f the effrts taken t date, identify data gaps and suggest methds t address these gaps, discuss impacts assciated with the anticipated hazardus materials, prpse cnceptual methds t mitigate these impacts, and establish what if scenaris.

4 The bjectives f the discussin will be t reslve and/r clarify issues and t stimulate thughtprvking cnsideratins that may require further design develpment study. The meetings will be an pprtunity fr the Design Team t understand data gaps and implicatins f the cnceptual design cmpnents. Task 4: Phase II Field Sampling and Analyses The secnd phase f the site evaluatin will include a survey f identified individual building materials and the cntents f certain cntainers and equipment. A. Media Ptentially Hazardus and/r Cntaminated Cntainers r Systems Hazardus and/r cntaminated materials may be sampled during this aspect f the scpe f services. The Cnsultant shall make every effrt t btain as much infrmatin n the materials present within cntainers, heating and cling systems, and electrical and mechanical systems. The minimum infrmatin expected is an estimate f the ptential quantity, any indicatins f the cntents, and ptential sampling lcatins. Sampling is nt envisined fr cntainerized wastes, abvegrund strage tanks, transfrmers, capacitrs, switchgear, and refrigeratin units (including air cnditiners and freezers), and light ballasts. Equipment r cntainers assciated with the preceding systems will be examined t btain and recrd manufacturer data n flurescent light ballasts, transfrmers, HVAC equipment and ther systems suspected f cntaining ptential hazardus materials. 1. Asbests Cntaining Material (ACM) Based n the material inventries develped under Task 2 and the results f the meetings in Task 3, the Cnsultant will develp a wrk plan that clearly identifies the number f representative ptential ACM samples that need t be cllected in accrdance with the sample frequency presented in the Asbests Hazard Emergency Respnse Act (AHERA) regulatins and described later in this Plan. Crdinatin must be perfrmed between the Design Team and the cnsultant t ensure that all aspects f the wrk are cvered with respect t ACM (i.e., electrical and plumbing penetratins). The Cnsultant will cllect representative samples f all accessible building materials with additinal samples f materials suspected t be ACM. Suspected ACM will be quantified and classified accrding t: Type (e.g. surfacing, thermal system insulatin and/r miscellaneus); Encapsulated material, cnditin (gd, fair r pr), and Ptential t becme disturbed. The Cnsultant will dcument all findings in a Ptential ACM Inventry Sheet (the PAIS frmat must be apprved, in advance, by EHS). All building materials, including thse believed t be nn-acm, will be sampled and analyzed using standard prcedures and methdlgies. Sample lcatins, cnditins, and accessibility will be dcumented in bund field bks and Chain-f-Custdy frm(s) will accmpany each sample package. During this phase f the survey, the Cnsultant will cllect bulk samples f building

5 materials that have the ptential t becme disturbed during the subsequent phases f the survey (e.g. acustical ceiling tiles, gypsum wallbard r plaster surrunding access panels etc.). Analysis f these samples will be used t determine the methds t be used in accessing areas abve suspended ceiling tiles and inside plumbing / mechanical chases. The types f materials t be assessed include, but are nt limited t: Interir windw caulking/dr caulking; Thermal insulatin assciated with mechanical systems; Expansin jint material; Gypsum wallbard; Jint cmpund fr gypsum wallbard; Paint and varius interir wall and ceiling finish materials; Smth and textured wall and ceiling plasters; Varius types f flring materials; Mastic/adhesive assciated with flring materials; Basebards and assciated mastics; Ceiling tiles; Fireprfing n structural steel; Damprfing; Cncrete and cncrete patching material; and All caulking material. In the event that the rf systems may be impacted by the prpsed cnstructin, the Cnsultant shall examine the rf systems and identify cnstructin materials and the likelihd f these materials being ACM. The Cnsultant shall crdinate with the rfing subcntractr t cnduct intrusive sampling. A mre expansive descriptin f the cmpnents f the Phase II activities is prvided in the fllwing subsectins, tgether with sampling prcedures, sample frequency, analysis, schedule quality assessment/quality cntrl prcedures, and dcumentatin. ACM Sample Strategy/Frequency Surfacing materials - In a randmly distributed manner, cllect bulk samples f surfacing materials, representative f each hmgeneus area. Cllect at least three bulk samples frm each hmgeneus area that is less than r equal t 1,000 ft 2. Cllect at least five bulk samples frm each hmgeneus area that is greater than 1,000 ft 2, but less than r equal t 5,000 ft 2. Cllect at least seven bulk samples frm each hmgeneus area that is greater than 5,000 ft 2. Thermal systems insulatin. In a randmly distributed manner, cllect at a minimum, three (3) bulk samples f thermal systems insulatin material, representative f each hmgeneus area.

6 Cllect, at a minimum, ne (1) bulk sample f patched thermal systems insulatin, representative f each hmgenus area, prviding the sectin f patch is less than 6 linear r square feet. Cllect, at a minimum, three (3) representative bulk samples f each insulated mechanical system, including, but nt limited t cementitius material used n pipefittings such as tees, elbws, r valves. Representative sampling will be cnducted in a manner sufficient t identify whether each hmgenus area is either asbests r nn-asbests cntaining. Bulk samples are nt required t be cllected frm any hmgeneus area where the accredited asbests inspectr has determined that the thermal systems insulatin is a nn-suspect material (i.e., fiberglass, fam glass, rubber, r any ther nn-acm). Miscellaneus materials - Cllect, at a minimum, ne (1) representative bulk sample f each miscellaneus material, including, but nt limited t ceiling tiles, flr tiles, assciated flr tile mastic, etc. Representative sampling will be cnducted in a manner sufficient t identify whether each hmgenus area is either asbests r nn-asbests cntaining. It is the intentin that all suspect materials be sampled and analyzed fr asbests cntent t the extent that suspect materials can be classified as ACM r nn-acm, and that minimum materials will have t be assumed ACM. ACM Sampling Prcedures The asbests survey will be perfrmed by EPA-accredited and Massachusetts licensed Asbests Inspectrs. The Cnsultant s inspectrs will cnduct a thrugh inspectin f all accessible areas within the designated survey area. The Cnsultant will attempt t identify multiple layers f flring systems. Suspect asbests-cntaining materials lcated within wall chases, plenum chases, and plumbing chases will be bulk sampled wherever access can be made withut damaging wall and ceiling finishes. Bulk samples, representing individual hmgenus areas f suspect materials, will be cllected in a randmly distributed manner, in accrdance with thse methds utlined belw. ACM Analysis The majrity f the bulk samples will be cllected and analyzed fr asbests cntent in accrdance with the AHERA Methd (40 CFR Part 763, Appendix A t Subpart E). The analysis will be perfrmed using Plarized Light Micrscpy (PLM) With Dispersin Staining. Samples that indicate an asbests cntent between 1 and 10 percent asbests will be re-examined using pint cunt techniques. Transmissin Electrn Micrscpy (TEM) analysis will be used in cnjunctin with PLM analysis when analyzing nn-rganically bund materials. TEM analysis will be perfrmed n nn-rganically bund materials when PLM analysis indicates the asbests cntent t be less than 1 percent. All bulk samples will be submitted t the labratry fr the necessary turn-arund based n the Prject s needs.

7 All labratries perfrming asbests cntent analysis shall be an USEPA-accredited labratry and shall participate in USEPA s Interim Asbests Bulk Sample Analysis Assurance Prgram. The labratry shall als be accredited by the Natinal Vluntary Labratry Accreditatin Prgram (NVLAP). 2. Lead Paint All painted surfaces within the area t be impacted by the prpsed cnstructin will be screened using a XRF detectr. The XRF detectr is described in a subsequent subsectin. Crdinatin must be perfrmed between the Design Team and the cnsultant t ensure that all aspects f the wrk are cvered with respect t ACM (i.e., electrical and plumbing penetratins). Lead Sample Strategy / Frequency The Cnsultant will analyze the walls at a minimum frequency f ne analysis every 1000 square feet fr each painted surface. In additin, a minimum f ne dr and ne windw casement will be screened per rm. The data will be recrded tgether with the apprximate sample lcatins. Lead Sampling Prcedures The Cnsultant will perfrm field screening f painted surfaces t identify the ptential presence f lead (fr residential prperties, the inspectin shall be perfrmed by a licensed inspectr). Testing fr the lead-based paint will be cnducted using a prtable X- Ray flurescence analyzer (XRF) which uses a radiactive surce t excite the electrns f lead atms (if present) in the paint. The XRF measures the x-rays emitted by the atms as they return t their nrmal state. The measurement data is prcessed and the results cnverted t milligrams f lead per square centimeter f sampled surface area. Lead Analysis Samples f painted surfaces will nt nrmally be cllected during this phase. Based n the type f prpsed cnstructin, EHS may cnsider Txicity Characteristic Leaching Prcedure (TCLP) analysis f cmpsite materials, Csts assciated with these sample cllectin and analyzes will be cnsidered as a separate reimbursable. Task 5: Quality Assurance/Quality Cntrl The draft flr plans prvided by the Design Team will be field verified by the Cnsultant during the Phase 1 cmpnent f this prject. Any mdificatins f the flr plans will be prvided t the Design Team fr revisin. Field lgs will be used t maintain field dcumentatin. At a minimum, the fllwing infrmatin will be recrded during the daily screening and cllectin f samples: Sample identificatin, lcatin, and descriptin; Sampling area sketch shwing the sample lcatin; Sampler s name(s); Date and time f sample cllectin; Type f sample (discrete r cmpsite sample); Type f sampling equipment used;

8 Field bservatins and details related t analyses r integrity f the sample (e.g. interir cntractr placing carpet in the adjacent rm); and Sample identificatin numbers. In additin t the sampling infrmatin, the fllwing specific infrmatin will als be recrded in the field lg each day f sampling: Team members and their respnsibilities; Time f arrival and time f departure; Other persnnel n-site; Summary f any meetings r discussins with ther parties; and Deviatins frm written prcedures. Digital phtgraphs will be taken at every sample lcatin t dcument cnditins at the cmpletin f sample cllectin. Phtgraphs will als be taken at every entry abve the ceiling. These phtgraphs will be taken in a panramic manner shwing all directins, where pssible. A Chain-f-Custdy frm (COC) will be prvided with every sampling set sent t a labratry fr analysis. The COC will be kept t prvide dcumentatin linking the cllectin f the sample t the perfrmance f the analytical methd. The COC will include the lcatin f the sampling, the date and time f the sampling, and the names f the individuals wh transprted the sample frm the field t the labratry. The cmpleted COC will be shipped inside the sample-transprting cntainer with the samples. The final COC will be attached t the labratry reprt prviding the analyses t Harvard. Task 6: Reprt Preparatin The infrmatin and data generated frm the abve-nted tasks will be reviewed, cmpiled, and presented in a Hazardus Material Summary Reprt (the Reprt). The Reprt will include, at a minimum, the fllwing sectins in this specified rder: Intrductin Persnnel - The name(s), title(s), and license numbers f the Massachusetts Licensed Asbests Inspectr(s) wh cmpleted the inspectin. Prject Descriptin - A summary f the prpsed prject identifying the scpe, lcatin, and systems t be impacted by the prpsed cnstructin/rehabilitatin; Backgrund - A summary f previus assessments and/r remval and abatement activities; Sampling and Analysis - Prcedures used in cllecting and analyzing samples; Asbests Results ACM infrmatin shall be prvided in tabular frm including sample results, type, sample lcatins, integrity, friability, and quantity f all ACM identified,; A ptential expsure assessment f ACM t building ccupants and the public; Recmmendatins cncerning additinal sampling, if necessary; Cpies f cmpleted Tables 1 and 2; Estimated csts fr remval and/r abatement; Lead Results Lead infrmatin shall be prvided in tabular frm including sample results, type, sample lcatins, integrity, and quantity f all Lead identified,; Recmmendatins cncerning additinal sampling, if necessary; Estimated csts fr remval and/r abatement; Miscellaneus Hazardus Materials - Summary f infrmatin regarding ASTs,

9 cntainers, transfrmers, mercury lights, and ptential PCB light ballast. The summary shall include, in tabular frm, lcatins by rm number, media, type f cntaminatin, and estimated quantity; Figures Figures (Plan and Elevatin) shwing all sample lcatins; Figures shwing apprximate lcatins f all materials identified as ACM/Lead/Miscellaneus Hazardus Materials; Pht Lg Pht Lg with all assciated sample phts and assciated sample IDs; Field Lgs All Field Lgs generated during Task 5; Mitigatin - Prvide cnceptual recmmendatins fr mitigating adverse impacts; and Limitatins - Include a descriptin f building areas, systems, surfaces r structural cmpnents that were nt sampled due t inaccessibility and/r safety cncerns. Prject Specificatins - Prepare cntract specificatins and drawings that address asbests abatement requirements, incrprating the Harvard EHS template specificatin fr asbests abatement. These dcuments must be prepared under the directin f Massachusetts licensed Asbests Prject Designer. Cpies f the draft dcument shall be prvided t Harvard fr internal review and cmment. The Cnsultant will include in the Reprt, all plans and phtgraphs cllected r taken during Tasks 2 and 4. The final deliverable will cnsist f the Reprt, and including all text, tables, figures, appendices, and attachments, plans, and phtgraphs. Task 7: Asbests Abatement Mnitring Services and Reprt Prvide cnstructin phase services, including air sampling and signing/management f Harvard Asbests Waste Shipment Recrds (AWSRs). These services must be perfrmed by Massachusetts licensed Asbests Prject Mnitr. Include a separate Rate Sheet fr these services. The selected asbests abatement cnsultant will prepare and submit an Asbests Clse-ut Reprt that includes, but is nt limited t, the fllwing infrmatin: 1. Summary f Abatement Wrk: prvide a table that identifies the actual ACMs that were remved by the abatement cntractr, including the quantity remved and the date f remval. 2. Wrk Practices and Engineering Cntrls 3. Air Sample Cllectin and Analysis: prvide infrmatin n methdlgy, equipment and sampling persnnel. Include cpies f all daily/weekly mnitring reprts as an appendix. 4. Additinal Bulk Sample Cllectin and Analysis: as necessary, prvide a descriptin f the sampling and analysis that was cnducted during cnstructin phase services t identify any ACMs that were nt included in the riginal survey due t inaccessibility. 5. Asbests Waste Dispsal Management: prvide a table that summarizes the Harvard AWSRs that were used n the prject (AWSR #, waste vlume, transprter, landfill, etc). Nte that the riginal Generatr cpy f the AWSR that is retained by the asbests cnsultant at the time f signing must be ed t the EHS Prject Manager.

10 INSURANCE The minimum insurance requirements are as fllws: Prfessinal Liability: $1,000,000 General Cmmercial Liability: $1,000,000 Business Autmbile Liability: $1,000,000 (per ccurrence) Wrker s Cmpensatin: Minimum Statuary Limits PROJECT PERSONNEL The Cnsultant shall identify the persnnel assigned t the prject. The Cnsultant will ensure that nly persnnel with the apprpriate experience will be assigned t the prject. Any change in persnnel assigned t the prject will be identified t and apprved by EHS prir t any wrk cmmencing. SCHEDULE Fllwing written authrizatin t prceed, the Cnsultant will cmmence wrk. This schedule has assumed timely cmpletins f certain tasks and EHS realizes actual cnditins and/r prject cnstraints may vary the schedule. The site recnnaissance prcess may [NOT] be cnducted during nrmal business hurs such that all rms can be accessed. The sampling f suspect building materials may [NOT]be cnducted during nrmal business hurs t minimize incnvenience t the ccupants. Sampling in each rm will be cmpleted n the same day it cmmences. COST OF SERVICES AND CONDITIONS OF ENGAGEMENT Prpsal All cnsultants respnding t this Request fr Prpsal are required t submit a Lump Sum Prpsal fr Services that incrprates all f the tasks utlined in this dcument and includes the fllwing: A Scpe f Wrk, including a clear breakdwn and explanatin f tasks; The name(s), title(s), and license numbers f the individuals wh will be perfrming the wrk. Prpsed cst assciated with each task (Task 1 thrugh 6); Fee Schedule fr staff wh will be wrking n the tasks, including a breakdwn f all subcntractr csts and analytical csts (Task 7); Schedule fr perfrmance f services.

ASBESTOS ROOF INSPECTION REPORT OF MARSHALL COURT th STREET NEWPORT NEWS, VIRGINIA MCS JOB #13-031S

ASBESTOS ROOF INSPECTION REPORT OF MARSHALL COURT th STREET NEWPORT NEWS, VIRGINIA MCS JOB #13-031S ASBESTOS ROOF INSPECTION REPORT OF MARSHALL COURT 741-34 th STREET NEWPORT NEWS, VIRGINIA MCS JOB #13-031S Marine Chemist Service, Inc. 11850 Tug Bat Lane, Newprt News, VA 23606-2527 Phne: (757) 873-0933

More information

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap Digital Advisry Services Prfessinal Service Descriptin Sftware Defined Netwrking Strategy and Radmap 1. Descriptin f Services. 1.1 Sftware Defined Netwrking Strategy and Radmap. Verizn will prvide Sftware

More information

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority Request fr Prpsals t Develp a New Persnnel Plicy Manual fr the Red Wing Husing and Redevelpment Authrity March 20, 2015 Red Wing Husing and Redevelpment Authrity 428 West Fifth Street Red Wing, MN 55066

More information

Draft Hazardous Substances and Spill Management Plan

Draft Hazardous Substances and Spill Management Plan Page 1 Draft Hazardus Substances and Spill Management Plan Cntents 1 Intrductin... 2 1.1 Purpse... 2 1.2 Scpe... 2 2 Hazardus Substances... 2 3 Persnnel and Respnsibilities... 3 4 Methdlgies... 3 4.1 Strage

More information

Instructions for Conducting Sampling During Underground Storage Tank Closure

Instructions for Conducting Sampling During Underground Storage Tank Closure Instructins fr Cnducting Sampling During Undergrund Strage Tank Clsure Permitting and Cmpliance Assistance Prgram Divisin f Waste Management Flrida Department f Envirnmental Prtectin April 2016 [Incrprated

More information

Request for Qualifications

Request for Qualifications Request fr Qualificatins Writer and Cpy Editr Cnsultant RELEASE DATE» December 2018 1 Table f Cntents Intrductin... 2 Abut PetrLMI... 2 Prject Backgrund, Objectives and Scpe... 3 Cnsultant Selectin Prcess...

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Strmwater Pllutin Preventin Plan NUMBER: SPECIFIC SUBJECT: APPROVAL: Strmwater

More information

ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL

ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL PROFESSIONAL SERVICE CONTRACT PIER B SOUTH REHABILITATION RFQ Number: ASPA-TS-2018-02 MARCH 2018 REQUEST FOR QUALIFICATIONS (RFQ) FOR ENGINEER DESIGN &

More information

Kootenai River Restoration Master Plan: Master Plan Overview

Kootenai River Restoration Master Plan: Master Plan Overview Ktenai River Restratin Master Plan: Master Plan Overview Ktenai River Restratin Prject #200200200 Restre Natural Recruitment Ktenai River White Sturgen Prject Overview In late 2006, the KTOI received prject

More information

Green Building Standards

Green Building Standards Green Building Standards Harvard University Nvember 2009 Apprved Nvember 20, 2009 Frmatting Updates September 30, 2011 The Harvard Green Building Standards apply t all capital prjects. The Standards identify

More information

DRAFT Sampling Protocol For the LEED Canada for Homes Program Applicable to production builders (Balloted Version)

DRAFT Sampling Protocol For the LEED Canada for Homes Program Applicable to production builders (Balloted Version) DRAFT Sampling Prtcl Fr the LEED Canada fr Hmes Prgram Applicable t prductin builders (Ballted Versin) This dcument prvides guidance n using the Sampling Prtcl t verify LEED Hmes. It includes infrmatin

More information

PS ACID SULPHATE MATERIALS

PS ACID SULPHATE MATERIALS PS ACID SULPHATE MATERIALS PURPOSE AND SCOPE The purpse f this primary standard is t eliminate r minimise risk f envirnmental harm caused by acid sulphate materials including acid sulphate sils and acid

More information

IESBA Meeting (March 2013) Agenda Item

IESBA Meeting (March 2013) Agenda Item Agenda Item 7-A Backgrund Lng Assciatin f Senir Persnnel (Including Partner Rtatin) with an Audit Client Matters fr Cnsideratin 1. Paragraph 290.150 f the IESBA Cde f Ethics fr Prfessinal Accuntants (the

More information

PRINCIPLES OF PRTR AND AER REPORTING OF ANNUAL ENVIRONMENTAL INFORMATION

PRINCIPLES OF PRTR AND AER REPORTING OF ANNUAL ENVIRONMENTAL INFORMATION ENVIRONMENTAL PROTECTION AGENCY AER / PRTR GUIDANCE DOCUMENT N. 1: PRINCIPLES OF PRTR AND AER REPORTING OF ANNUAL ENVIRONMENTAL INFORMATION Fr use in reprting f: 1 PRTR Emissins and Waste Transfers infrmatin

More information

Revision Date: May Paragraph Table of Contents Page. 1.0 Scope Purpose Overview of Steps Approving an MRA Document 5

Revision Date: May Paragraph Table of Contents Page. 1.0 Scope Purpose Overview of Steps Approving an MRA Document 5 f 6 Dcument Owner: Justin Lee Owners Department: Supply Chain Management Paragraph Table f Cntents Page.0 Scpe 3 2.0 Purpse 3 3.0 Respnsibilities 3 4.0 MRA Term Definitins 3 5.0 Overview f Steps Apprving

More information

Interstate 91 Viaduct Study MassDOT Contract No Public Involvement Plan

Interstate 91 Viaduct Study MassDOT Contract No Public Involvement Plan Interstate 91 Viaduct Study MassDOT Cntract N. 82617 Public Invlvement Plan Prject Overview and Gals The prtin f Interstate 91 (I-91) between State Street and the interchange with I-291 parallels the Cnnecticut

More information

Nanogate Jay Systems

Nanogate Jay Systems Nangate Jay Systems Revisin: H Page 1 1.0 Purpse The purpse f this prcedure is t prvide fr a system and instructins t give each supplier the necessary tls t prvide prduct and services that meet the expectatins

More information

Asbestos Policy. Inmind Reference CO20. Version 1.2 Policy Review Team Group Operations Director Director of Nursing and Quality Hospital Directors

Asbestos Policy. Inmind Reference CO20. Version 1.2 Policy Review Team Group Operations Director Director of Nursing and Quality Hospital Directors Asbests Plicy Plicy Name Asbests Plicy Inmind Reference CO20 Categry Operatinal Versin 1.2 Plicy Review Team Grup Operatins Directr Directr f Nursing and Quality Hspital Directrs Lead Officer Directr f

More information

UNC 0594R: Meter Reading Submission for Advanced & Smart Metering. UNC Request Workgroup Report

UNC 0594R: Meter Reading Submission for Advanced & Smart Metering. UNC Request Workgroup Report UNC Request Wrkgrup Reprt At what stage is this dcument in the prcess? UNC 0594R: Meter Reading Submissin fr Advanced & Smart Metering The rllut f Advanced and Smart Metering delivers the pprtunity t utilise

More information

CONTRACT OPPORTUNITY ANNOUNCEMENT Professional Service Contract Construction Contract Service Contract Material Requirement Other

CONTRACT OPPORTUNITY ANNOUNCEMENT Professional Service Contract Construction Contract Service Contract Material Requirement Other Purchasing Plicy N. 3 Exhibit 1, Page 1 f 2 X CONTRACT OPPORTUNITY ANNOUNCEMENT Prfessinal Service Cntract Cnstructin Cntract Service Cntract Material Requirement Other Cntract Opprtunity Title: Overall

More information

Request for Quotes PennDOT Leadership Academy for Managers (PLAM) Solicitation Number:

Request for Quotes PennDOT Leadership Academy for Managers (PLAM) Solicitation Number: www.dt.state.pa.us Request fr Qutes PennDOT Leadership Academy fr Managers (PLAM) Slicitatin Number: 6100041372 Curse Title: Curse Date(s) & Lcatins: PennDOT Leadership Academy fr Managers (PLAM) This

More information

VET Student Recognition of Prior Learning (RPL) Kit Part B

VET Student Recognition of Prior Learning (RPL) Kit Part B VET Student Recgnitin f Prir Learning (RPL) Kit Part B Table f Cntents PART B Frmal RPL Applicatin... 3 Sectin B1 - Flwchart fr the RPL Frmal Assessment prcess... 3 Sectin B2 - Frmal RPL Assessment Prcess...

More information

STUDENT INFORMATION GUIDE BSB51315 Diploma of Work Health and Safety

STUDENT INFORMATION GUIDE BSB51315 Diploma of Work Health and Safety STUDENT INFORMATION GUIDE Abut Future Skills Future Skills is an industry wned and perated registered training rganisatin, specialising in pst trade electrical and wrk health and safety training in Queensland

More information

Instructions Fee Schedule

Instructions Fee Schedule City f Lndn Tree Prtectin By-Law C.P.-1515-228 Tree Prtectin Area Permit Applicatin Frestry Management Planning Services - Urban Frestry 267 Dundas Street, 3rd Flr Lndn, Ontari N6A 1H2 Telephne: 519-661-CITY

More information

TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE

TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE TOWN OF PAYSON Backflw Preventin Prgram Develpers, Cntractrs and Paysn Residents: An apprved backflw preventin assembly

More information

Flaw indications in the reactor pressure vessels of Doel 3 and Tihange 2

Flaw indications in the reactor pressure vessels of Doel 3 and Tihange 2 Flaw indicatins in the reactr pressure vessels f Del 3 and Tihange 2 1. Cntext Technical infrmatin nte 2013.02.01 Del 3 and Tihange 2 are tw f the seven Belgian nuclear reactrs perated by Electrabel, a

More information

ICP Linking and Fusing Service Enquiry Procedure

ICP Linking and Fusing Service Enquiry Procedure UK Pwer Netwrks ICP Linking and Fusing Service Enquiry Prcedure Owner Name Title Neil Clarke Head f Highway Services Signature Date 03 April 2018 Authriser Name Title Kevin Newnham Majr Prgrammes & ICP

More information

Technical Update: Construction, Renovation and Demolition Waste Management Guideline

Technical Update: Construction, Renovation and Demolition Waste Management Guideline GREEN BUILDING PROGRAM Technical Update: 2017-07-11 Cnstructin, Renvatin and Demlitin Waste Management Guideline Technical Update 2017-07-11 Cnstructin, Renvatin and Demlitin Waste Management Guideline

More information

STATEMENT OF WORK Learning Programs Assistant April 1, 2014

STATEMENT OF WORK Learning Programs Assistant April 1, 2014 1 STATEMENT OF WORK Learning Prgrams Assistant April 1, 2014 1. Prject Summary The Smithsnianʼs Natinal Museum f Natural Histry (NMNH) seeks a cntractr t wrk with the educatin team at NMNH t help supprt

More information

SOURCE INSPECTION QUALITY MANAGEMENT PLAN

SOURCE INSPECTION QUALITY MANAGEMENT PLAN SOURCE INSPECTION QUALITY MANAGEMENT PLAN Campus Parkway / State Rute 140 Prject BAR REINFORCEMENT APPENDIX I Table f Cntents 1 GENERAL... 3 1.1 Certificatins... 3 1.1.1 Black Bar Reinfrcement... 3 1.1.2

More information

FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP

FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP Objectives Q1. What are the bjectives f the Remediatin Technlgies prjects? A1. Kuwait Oil Cmpany is cmmitted t a sustainable remediatin slutin

More information

Los Angeles Unified School District Office of Environmental Health & Safety Tree Trimming and Removal Procedure

Los Angeles Unified School District Office of Environmental Health & Safety Tree Trimming and Removal Procedure Ls Angeles Unified Schl District Office f Envirnmental Health & Safety Tree Trimming and Remval Prcedure I. Purpse This Tree Trimming and Remval Prcedure (Prcedure) was develped t ensure the District is

More information

VENDOR DISPLAY SERVICE LEVEL AGREEMENT

VENDOR DISPLAY SERVICE LEVEL AGREEMENT OBJECTIVE: T ensure Vendr prvided displays are maintained in a fully functinal state by the Vendr fr life f display in Best Buy retail stres. It is in the best interest f bth Vendrs and Best Buy t ensure

More information

0XXX: Meter Reading Submission for Advanced & Smart Metering. Stage 01: Request

0XXX: Meter Reading Submission for Advanced & Smart Metering. Stage 01: Request Stage 01: Request 0XXX: Meter Reading Submissin fr Advanced & Smart Metering At what stage is this dcument in the prcess? The rllut f Advanced and Smart Metering delivers the pprtunity t utilise mre frequent

More information

PJM Manual 14A: New Services Request Process Revision: 22 Effective Date: April 26, Prepared by Interconnection Planning Department

PJM Manual 14A: New Services Request Process Revision: 22 Effective Date: April 26, Prepared by Interconnection Planning Department PJM Manual 14A: New Services Request Prcess Revisin: 22 Effective Date: April 26, 2018 Prepared by Intercnnectin Planning Department PJM 2018 Table f Cntents Table f Cntents Table f Exhibits...7 Apprval...8

More information

PUBLIC WORKS DEPARTMENT Resource Recovery & Recycling Division CONSTRUCTION & DEMOLITION (C&D) WASTE MANAGEMENT PLAN

PUBLIC WORKS DEPARTMENT Resource Recovery & Recycling Division CONSTRUCTION & DEMOLITION (C&D) WASTE MANAGEMENT PLAN PUBLIC WORKS DEPARTMENT Resurce Recvery & Recycling Divisin CONSTRUCTION & DEMOLITION (C&D) WASTE MANAGEMENT PLAN Plan Check #: 1. GENERAL PROJECT INFORMATION: Over-the-Cunter Permit Yes N City-Spnsred

More information

TG 19 SOUTH AUSTRALIAN WATER CORPORATION

TG 19 SOUTH AUSTRALIAN WATER CORPORATION TG 19 SOUTH AUSTRALIAN WATER CORPORATION TECHNICAL GUIDELINE Checklist: Water Netwrk Requirements fr Land Develpment Applicatins Issued by: Principal Engineer Water & Wastewater Netwrks Issue Date: SA

More information

Vacancies for Program Manager, Research Assistant, and Research Interns

Vacancies for Program Manager, Research Assistant, and Research Interns Vacancies fr Prgram Manager, Research Assistant, and Research Interns The Tata Institute f Scial Sciences (TISS), Mumbai is assisting Gvernment f Gujarat fr a study prject in mining-affected villages in

More information

JOB TITLE: LOGISTICS MANAGER

JOB TITLE: LOGISTICS MANAGER JOB TITLE: LOGISTICS MANAGER Lcatin: Shafer, Hajjah Jb family: Prperty and Lgistics Level: C 2 Duratin: One year Oxfam purpse: T wrk with thers t find lasting slutins t pverty and suffering under emergency

More information

CDM Plan Submission and Review Criteria Rules

CDM Plan Submission and Review Criteria Rules Cnservatin First Framewrk LDC Tl Kit Final v4.0 January 17, 2018 CDM Plan Submissin and Review Rules 1) Purpse and definitins 1.1 These Rules set ut: a) the rles, respnsibilities and timing fr CDM Plan

More information

ABC Business Magazines Reporting Standards (UK)

ABC Business Magazines Reporting Standards (UK) September 2016 ABC Business Magazines Reprting Standards (UK) Changes have been agreed t the ABC Business Magazine and Multi-Platfrm Reprting Standards. We have updated the latest Reprting Standards t

More information

Permit Application Guide For a Garage, Gazebo, Sauna, Pump House or Shed

Permit Application Guide For a Garage, Gazebo, Sauna, Pump House or Shed Permit Applicatin Guide Fr a Garage, Gazeb, Sauna, Pump Huse r Shed The fllwing pages cntain the permit applicatin, as well as ther frms that may be required fr yur permit applicatin. Apprvals required:

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directrate B Grwth and Innvatin Circular Ecnmy and Industrial Leadership Seville, 6 th April 2018 Level(s) testing phase Guidance and rules

More information

The BLOOM Performance Review Decision Guide

The BLOOM Performance Review Decision Guide The BLOOM Perfrmance Review Decisin Guide Intrductin Planning yur perfrmance review prcess needs careful cnsideratin. Sme questins yu might be cnsidering are: 1. Hw ften will the rganizatin cmplete frmal

More information

Induction procedure for new staff

Induction procedure for new staff Inductin prcedure fr new staff The fllwing prcedure is based upn the NCL Safer Recruiting guidelines. Its purpse is t: cnfirm the cnduct expected f staff within the schl supprt individuals in a way that

More information

INTERCEPT SURVEY DATA GUIDE JUNE Visitor/Shopper Intercept Survey Data Guide

INTERCEPT SURVEY DATA GUIDE JUNE Visitor/Shopper Intercept Survey Data Guide Visitr/Shpper Intercept Survey Data Guide June 26, 2014 Table f Cntents 1 Intrductin... 3 1.1 Timeline... 3 1.2 Availability f Data... 3 2 Overview... 4 2.1 Summary f Cntents... 4 2.2 Data Dictinary...

More information

CHAPTER EIGHT ELECTRICAL ITEMS

CHAPTER EIGHT ELECTRICAL ITEMS CHAPTER EIGHT ELECTRICAL ITEMS 8 ELECTRICAL ITEMS 8 OVERV IEW Electrical items have different dcumentatin requirements fr each unit f measure (UOM). All electrical items must be cunted and measured. Dcumentatin

More information

Facilities Study Report

Facilities Study Report Wellhead Pwer Cltn, LLC Facilities Study Reprt Revised May 15, 2014 Prepared by: Edgar Ramirez Rger Salas, P.E. Distributin Field Engineering Apprved by: Rger Salas Distributin Field Engineering Manager

More information

VI. ALTERNATIVES TO THE MASTER PLAN A. INTRODUCTION

VI. ALTERNATIVES TO THE MASTER PLAN A. INTRODUCTION VI. ALTERNATIVES TO THE MASTER PLAN A. INTRODUCTION INTRODUCTION As stipulated in Sectin 21002.1(a) f the CEQA Statutes (Public Resurces Cde): The purpse f an envirnmental impact reprt is t identify the

More information

Principle and Procedure of Analytical Test Method Validation for GMP Regulated Industry

Principle and Procedure of Analytical Test Method Validation for GMP Regulated Industry Principle and Prcedure f Analytical Test Methd Validatin fr GMP Regulated Industry Regulatry Basis: FDA Quality Systems Regulatins Reference: FDA CFR - Cde f Federal Regulatins Title 21 Purpse The purpse

More information

Disciplinary Procedure

Disciplinary Procedure Disciplinary Prcedure Applicatin Overview Definitins Prcedure Crss references Further assistance APPLICATION This prcedure nly applies t academic, prfessinal, security, grunds and dcument services staff

More information

Cleves Pump Station Stabilization, Project ID Date Issued: August 6, 2012

Cleves Pump Station Stabilization, Project ID Date Issued: August 6, 2012 Cleves Pump Statin Stabilizatin, Prject ID 10210020 Date Issued: August 6, 2012 ADDENDUM NO. 2 This addendum will nly be distributed via e-mail, but will remain available fr viewing n the MSDGC website

More information

New Product Approval Process

New Product Approval Process New Prduct Apprval Prcess 1. Scpe T prvide an assessment f the suitability f a new prduct fr prcurement and use by Manitba Infrastructure (MI). Manitba Infrastructure may require updates, resubmissin f

More information

DINÉ COLLEGE Request for Proposals (RFP)

DINÉ COLLEGE Request for Proposals (RFP) DINÉ COLLEGE Request fr Prpsals (RFP) PROJECT NAME: Tsaile Security Department Mdular Stucc Prject PROJECT NUMBER: TS1819SDM1 RFP Submitted By: Hereinafter referred t as Cnstructin Cntractr : crpratin,

More information

Communications White Paper

Communications White Paper Intrductin The quality and effectiveness f the cmmunicatin between the prject and the stakehlder grups is a significant cntributing factr t prject success r failure. Cmmunicatin is abut sending and receiving

More information

Report on Inspection of Grant Thornton LLP (Headquartered in Chicago, Illinois) Public Company Accounting Oversight Board

Report on Inspection of Grant Thornton LLP (Headquartered in Chicago, Illinois) Public Company Accounting Oversight Board 1666 K Street, N.W. Washingtn, DC 20006 Telephne: (202) 207-9100 Facsimile: (202) 862-8433 www.pcabus.rg Reprt n 2013 (Headquartered in Chicag, Illinis) Issued by the Public Cmpany Accunting Oversight

More information

Research Officer / Data Analyst

Research Officer / Data Analyst Psitin Descriptin Research Officer / Data Analyst Psitin details POSITION TITLE TEAM / UNIT BASE LOCATION EMPLOYMENT TYPE HOURS SALARY RANGE REPORTS TO Research Officer / Data Analyst Lirata Cnsulting

More information

Executive Summary European Union s General Data Protection Regulation (EU GDPR) January 2018

Executive Summary European Union s General Data Protection Regulation (EU GDPR) January 2018 Executive Summary Eurpean Unin s General Data Prtectin Regulatin (EU GDPR) January 2018 Legal Disclaimer The infrmatin in this presentatin is cnfidential and prprietary t SAP and may nt be disclsed withut

More information

PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2

PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2 PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2 ADDENDUM 2 des nt change the due date r time. STATEMENTS OF INTEREST are due by 4:30:00 p.m. (lcal time) Due Date: May 4, 2017 Successful Offerrs will be

More information

Manual 11: Energy & Ancillary Services Market Operations Revision History

Manual 11: Energy & Ancillary Services Market Operations Revision History 2.3.4 Minimum Generatr Operating Parameters Parameter Limited Schedules Belw is the list f business rules t require units t submit schedules that meet minimum accepted parameters. Market Sellers are required

More information

Office for Capital Facilities

Office for Capital Facilities Office fr Capital Facilities Guidance Dcument February 20, 2015 Phtvltaic Slar Prjects A resurce cntaining infrmatin related t the acquisitin f phtvltaic slar panels by state-perated campuses. Phtvltaic

More information

EAGLE SCOUT CANDIDATE PREPARATION GUIDE. The Eagle Scout Service Project

EAGLE SCOUT CANDIDATE PREPARATION GUIDE. The Eagle Scout Service Project September 2018 ~ Previus versins nt valid Sufflk Cunty Cuncil By Scuts f America EAGLE SCOUT CANDIDATE PREPARATION GUIDE T maintain the high standards f excellence recgnized in thse wh have achieved the

More information

B Asset Evaluation

B Asset Evaluation B-25.7.1.2 Asset Evaluatin Prcess Owner Team, Lead: Shawn Hynes (NAVFAC HQ) Nte, this PDF is fr training purpses nly. Nne f the links within this dcument functin. Prcess Step Assciated Prcedure Resurces

More information

MEVION SOURCING STRATEGY SUPPLIER CODE OF CONDUCT

MEVION SOURCING STRATEGY SUPPLIER CODE OF CONDUCT MEVION SOURCING STRATEGY The MEVION S250, while being the mst cmpact prtn therapy system in the wrld, is still a relatively large and cmplex prduct. As such, ur supply chain utilizes a high-mix, lw vlume

More information

The Core Team Process: Making Risk-Informed Decisions for On-site Monitoring at the SRS

The Core Team Process: Making Risk-Informed Decisions for On-site Monitoring at the SRS The Cre Team Prcess: Making Risk-Infrmed Decisins fr On-site Mnitring at the SRS Mary A. Flra Directr, Envirnmental Cmpliance & Area Cmpletin Prjects Savannah River Nuclear Slutins, LLC January 10, 2014

More information

KNOWLEDGE CAPTURE INTERVIEW

KNOWLEDGE CAPTURE INTERVIEW Inter-American Develpment Bank KNOWLEDGE AND LEARNING SECTOR (KNL) TECHNICAL NOTES KNOWLEDGE CAPTURE INTERVIEW N. IDB-TN-424 June 2012 KNOWLEDGE CAPTURE INTERVIEW Inter-American Develpment Bank 2012 http://www.iadb.rg

More information

Copies: Lisa Kellogg Janis Lutrick Mala Pattanayek Wini Curley Adrienne LaPierre Kim Walsh

Copies: Lisa Kellogg Janis Lutrick Mala Pattanayek Wini Curley Adrienne LaPierre Kim Walsh MEMO T: Yvnne Meeks/PG&E Cpies: Lisa Kellgg Janis Lutrick Mala Pattanayek Wini Curley Adrienne LaPierre Kim Walsh ARCADIS U.S., Inc. 100 Mntgmery Street Suite 300 San Francisc Califrnia 94104 Tel 415 374

More information

REQUEST FOR PROPOSAL KITCHEN FOOD SERVICE EQUIPMENT NEW ORANGEBURG COUNTY DETENTION CENTER ORANGEBURG, SOUTH CAROLINA REQUISITION NO: FY

REQUEST FOR PROPOSAL KITCHEN FOOD SERVICE EQUIPMENT NEW ORANGEBURG COUNTY DETENTION CENTER ORANGEBURG, SOUTH CAROLINA REQUISITION NO: FY REQUEST FOR PROPOSAL KITCHEN FOOD SERVICE EQUIPMENT FOR NEW ORANGEBURG COUNTY DETENTION CENTER ORANGEBURG, SOUTH CAROLINA REQUISITION NO: FY18-0424 ISSUED APRIL 9, 2018 RESPONSE DUE TUESDAY, APRIL 24,

More information

Career Entry and Development Profile Companion Guide. A Guide for ITT Tutors and Induction Tutors

Career Entry and Development Profile Companion Guide. A Guide for ITT Tutors and Induction Tutors Career Entry and Develpment Prfile Cmpanin Guide A Guide fr ITT Tutrs and Inductin Tutrs Intrductin Wh is the cmpanin guide fr? This guide is fr initial teacher training (ITT) tutrs wrking with trainees/teachers,

More information

Call for Expression of Interest

Call for Expression of Interest Call fr Expressin f Interest Pst Title: Expert Duty Statin: Hme-based Reference: UNWTO/HHRR/CFE/15/RDAP/2018 Start Date: As sn as pssible Department: Reginal Department fr Asia and the Pacific Duratin:

More information

Guidance notes for completing the International Start-up Form

Guidance notes for completing the International Start-up Form Guidance ntes fr cmpleting the Internatinal Start-up Frm These guidance ntes are designed t supprt yu in cmpleting the Internatinal start-up frm. Yu will als need t refer t a) yur Stage 2 applicatin frm

More information

What You Should Know About GDPR. What is the GDPR?

What You Should Know About GDPR. What is the GDPR? What Yu Shuld Knw Abut GDPR What is the GDPR? The Eurpean Unin s General Data Prtectin Regulatin ( GDPR), effective May 25, 2018, is a far-reaching regulatin applicable t rganizatins with Eurpean Ecnmic

More information

What You Should Know About GDPR. What is the GDPR?

What You Should Know About GDPR. What is the GDPR? What Yu Shuld Knw Abut GDPR What is the GDPR? The Eurpean Unin s General Data Prtectin Regulatin ( GDPR), effective May 25, 2018, is a far-reaching regulatin applicable t rganizatins with Eurpean Ecnmic

More information

DIRECTV POLICY Corrective Action Home Services Workforce Management

DIRECTV POLICY Corrective Action Home Services Workforce Management DIRECTV POLICY Wrkfrce Management DIRECTV Cmpany Plicy July 2015 Scpe... 3 Definitins... 3 Respnsibilities... 4 Emplyees... 4 Supervisrs... 4 Human Resurces... 4 Crrective Actin Categries... 4 Crrective

More information

MARINE CONSENTS GUIDANCE

MARINE CONSENTS GUIDANCE MARINE CONSENTS GUIDANCE FEBRUARY 2008 CONTROLLED DOCUMENT STATUS PROJECT TITLE DOCUMENT TITLE DOCUMENT REF BR Marine Cnsents Guide.dc REVISION RECORD STATUS DATE SUMMARY OF CHANGES CHECKED APPROVED 0

More information

VEHICLE MILES TRAVELED (VMT)

VEHICLE MILES TRAVELED (VMT) DATE: April 13, 2017 TO: FROM: RE: San Francisc Planning Department Transprtatin Cnsultants Wade Wietgrefe, Senir Planner In September 2016, a memrandum was sent t the transprtatin cnsultant pl regarding

More information

Regulations Amending the Food and Drug Regulations (1475 Good Manufacturing Practices)

Regulations Amending the Food and Drug Regulations (1475 Good Manufacturing Practices) Canada Gazette: Vl. 147, N. 10 May 8, 2013 Registratin SOR/2013-74 April 26, 2013 FOOD AND DRUGS ACT Regulatins Amending the Fd and Drug Regulatins (1475 Gd Manufacturing Practices) P.C. 2013-420 April

More information

1 INTRODUCTION AND SCOPE OF WORK

1 INTRODUCTION AND SCOPE OF WORK C & D Landfill 2 Landfill Rd Happy Valley Attentin: Christine Mrgan Dear Christine, RE: Review f Slpe Stability fr Resurce Cnsent, C & D Landfill, Happy Valley Our Reference: 09870.000.000 1 INTRODUCTION

More information

CALL FOR ARTIST OR ARTIST TEAM Request for Qualifications

CALL FOR ARTIST OR ARTIST TEAM Request for Qualifications CALL FOR ARTIST OR ARTIST TEAM Request fr Qualificatins Artwrk Opprtunity The City f Bellingham is seeking an artist r artist team t design, fabricate and install artwrk at the Nrth End Reginal Pnd (NERP)

More information

Request for Proposal

Request for Proposal Request fr Prpsal DMDII-17-02 Advanced Analytics fr Supply Chain Operatins Technlgy Thrust Area: Agile, Resilient Supply Chain Revisin 1.0 Release Date: 4 August 2017 POC: Sctt Kruse Prject Innvatin Engineer

More information

Washington County Public Health and Environment

Washington County Public Health and Environment Washingtn Cunty Public Health and Envirnment Tp Ten Things VERY SMALL QUANTITY GENERATORS Shuld Knw Very Small Quantity Generatr (VSQG) Hazardus Waste Cmpliance Guide This training packet was created fr

More information

Corporate Value Chain (Scope 3) Accounting & Reporting Standard. Summary of Changes

Corporate Value Chain (Scope 3) Accounting & Reporting Standard. Summary of Changes Nvember 2010 Wrld Business Cuncil fr Sustainable Develpment Crprate Value Chain (Scpe 3) Accunting & Reprting Standard Summary f Changes 1. Intrductin This dcument summarizes the changes made t the GHG

More information

Table of Contents. London BRT Transit Project Assessment Process Draft Environmental Project Report

Table of Contents. London BRT Transit Project Assessment Process Draft Environmental Project Report Lndn BRT Transit Prject Assessment Prcess Draft Envirnmental Prject Reprt Table f Cntents 6 Permits and Apprvals... 6-1 Federal... 6-2 Prvincial... 6-2 Municipal... 6-3 Utilities... 6-3 Institutins...

More information

Report on Inspection of PricewaterhouseCoopers LLP (Headquartered in New York, New York) Public Company Accounting Oversight Board

Report on Inspection of PricewaterhouseCoopers LLP (Headquartered in New York, New York) Public Company Accounting Oversight Board 1666 K Street, N.W. Washingtn, DC 20006 Telephne: (202) 207-9100 Facsimile: (202) 862-8433 www.pcabus.rg Reprt n 2014 (Headquartered in New Yrk, New Yrk) Issued by the Public Cmpany Accunting Oversight

More information

Company Policy Buying Additional Annual Leave

Company Policy Buying Additional Annual Leave Cmpany Plicy Buying Additinal Annual Leave Dcument Cntrl Table Dcument title: Buying Additinal Annual Leave Versin number: 2.3 Date apprved: 22.11.17 Apprved by: D Wythe Date f last review: 22.11.17 Departments

More information

BIRMINGHAM CITY COUNCIL STRATEGY FOR OPEN DATA

BIRMINGHAM CITY COUNCIL STRATEGY FOR OPEN DATA What we are trying t achieve BIRMINGHAM CITY COUNCIL STRATEGY FOR OPEN DATA This strategy sets ut hw Birmingham City Cuncil will prvide regular cmprehensive releases f public pen data and hw it will use

More information

Working Families Success Network in Community Colleges Definitions and Expected Design Elements

Working Families Success Network in Community Colleges Definitions and Expected Design Elements Wrking Families Success Netwrk in Cmmunity Clleges Definitins and Expected Design Elements Cre Prgram and Service Delivery Elements Clleges shuld prvide services in each f the three WFSNCC cre pillars:

More information

The Role of the CRC in a Clinical Trial

The Role of the CRC in a Clinical Trial The Rle f the CRC in a Clinical Trial Dr Saurendra Das Cuntry Head & Directr f Operatins, Excel Life Sciences The team cnducting a clinical trial at a site cnsists f the principal investigatr (PI), the

More information

NEW LAWS REGARDING BUILDING PRODUCTS (QLD)

NEW LAWS REGARDING BUILDING PRODUCTS (QLD) BUILDING SERVICES Ref: LEG 17-05 Current at Nvember 2017 NEW LAWS REGARDING BUILDING PRODUCTS (QLD) Frm 1 Nvember new laws regarding nn-cnfrming building prducts apply t all building prjects in Queensland.

More information

3. Direct the Engineer to prepare a feasibility study that complies with the requirements of the USACE and BCWMC criteria.

3. Direct the Engineer to prepare a feasibility study that complies with the requirements of the USACE and BCWMC criteria. Memrandum T: Bassett Creek Watershed Management Cmmissin Frm: Barr Engineering C. Subject: Item 6Dii Cnsider Apprval f Prpsal t Prepare Feasibility Study fr Westwd Lake Water Quality Imprvement Prject

More information

Progressive Intervention Plan for Community-Based Care Stage I

Progressive Intervention Plan for Community-Based Care Stage I Prgressive Interventin Plan fr Cmmunity-Based Care Stage I Fiscal Year 2019 Table f Cntents Intrductin... 1 Liquidated Damages fr N Eject/N Reject.... 1 Cntractr Nncmpliance... 1 SSCC Prgressive Interventin

More information

PUBLIC INFORMATION CENTRE May 29, 2017 MUNICIPALITY OF BRIGHTON

PUBLIC INFORMATION CENTRE May 29, 2017 MUNICIPALITY OF BRIGHTON PUBLIC INFORMATION CENTRE May 29, 2017 MUNICIPALITY OF BRIGHTON Brightn Wastewater Treatment System Schedule B Municipal Class Envirnmental Assessment Welcme! Please Sign In. PROJECT LOCATION AND OVERVIEW

More information

Nomination for Merit Award or Contribution Points

Nomination for Merit Award or Contribution Points Nminatin fr Merit Award r Cntributin Pints Wh is this dcument fr? Line Managers can submit individuals and/r teams fr cnsideratin fr a merit award r cntributin pints using ne f the frms included here.

More information

Birmingham Airport Response REDACTED (for external use)

Birmingham Airport Response REDACTED (for external use) The aim f the questins belw is t allw us t understand hw yu cnducted the recent pen tender prcesses. The questins frm a brad guide t ur areas f interest. We request that as well as either written r ral

More information

CHAPTER ELEVEN LIQUID AND EMULSIFIED ASPHALT ITEMS

CHAPTER ELEVEN LIQUID AND EMULSIFIED ASPHALT ITEMS CHAPTER ELEVEN LIQUID AND EMULSIFIED ASPHALT ITEMS 11 LIQUID AND EMULSIFIED ASPHALT ITEMS 1 1 OVERV IEW All Liquid and emulsified asphalt items have a unit f measure (UOM) f tns r square yards. All liquid

More information

Curdridge Reading Room Invitation to tender for renewable energy feasibility study

Curdridge Reading Room Invitation to tender for renewable energy feasibility study Curdridge Reading Rm Invitatin t tender fr renewable energy feasibility study Abut Curdridge Reading Rm Curdridge is a cmmunity f arund 1,500 residents in Suth Hampshire. The Reading Rm is effectively

More information

How it works. The following pages provide step by step instructions on the main stages of the MYOB Integration Module.

How it works. The following pages provide step by step instructions on the main stages of the MYOB Integration Module. Integrating MYOB with TimePr With TimePr s MYOB Integratin Mdule, yu can imprt TimePr time recrds int MYOB fr invice prcessing r payrll integratin. These recrds are then used t generate: Sales Invices,

More information