1 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview
2 The Planned Procurement Opportunities Report is updated and posted on the Authority s website each month. The various competitive solicitation methods include: RFI - Request for Information - Request for Qualifications - Request for Proposals - Invitation to Bid ITQ - Invitation to Quote ITO - Online Bid Event Solicitation information and dates published are subject to change at any time. Dates that have not been determined are noted as <TBD>. Additional information for all advertised solicitations is available at If you are interested in business opportunities with the Aviation Authority it is recommended that you register on the Supplier Registration Database. Registration is a simple, online process. One of the primary benefits is the opportunity to receive notification of Aviation Authority solicitations and contract opportunities. Supplier Registration Online Bid Event is an Invitation to Online Bid, which is made up of two parts: Part 1, Qualification Process and Part 2, Online Bid Event. In Part 1, each Respondent will submit a Response Form that lists all requirements for being deemed qualified to participate in the Online Bid Event. Prior to Part 2, each qualified bidder will be trained on how to participate in the online bid event. During the event, the bidders have the opportunity to lower their prices during a fixed time. At the close of the event, the low bidder receives the award. Please contact the appropriate Procurement Agent if you have questions regarding a particular solicitation. Page 2
3 Airside C Boarding Level and Bridges Carpet Replacement, HCAA Project No for Airside C carpet replacement at the passenger boarding level, bridges, and a portion of the tile flooring at Tampa International DUE 5-Jul Jul Aug-17 5-Oct-17 Boarding Passes and Bag Tags for the purchase of boarding passes and bag tags at Tampa International This solicitation is a cooperative effort with the Airport Purchasing Group enabling any commercial airport to procure boarding passes and bag tags. Tampa International Airport will serve as the lead agency. 5-Jul Jul Aug-17 5-Oct-17 Damaris Cordova DTorresCordova@Tampacom (813) Selection of Firm to Provide Forward Direct Placement Financing to provide fixed rate forward direct placement financing to refund the Authority's outstanding bonds when callable at Tampa International Selection and Award of Staffing Solutions and Services for temporary employment for administrative, trades, property control, IT tech support and other positions as needed at Tampa International Plumbing Supplies for the purchase of plumbing supplies for all Aviation Authority Airports. This solicitation is expected to be a cooperative solicitation with at least one other government agency. 14-Jul-17 N/A 11-Aug-17 2-Nov-17 4-Aug-17 N/A 7-Sep-17 2-Nov Aug-17 N/A 25-Sep-17 2-Nov-17 Cathy Tefft CTefft@Tampacom (813) Damaris Cordova DTorresCordova@Tampacom (813) Anita Hoover AHoover@Tampacom (813) Page 3
4 Economy Parking Garage North & South Level 6 & Ramps Rehabilitation, HCAA Project No, to extend the life of the Economy Parking Garage at Tampa International DUE 9-Aug Aug Sep-17 2-Nov-17 Selection of Firm and Award of Contract, Land Acquisition and Relocation Consulting Services for land acquisition and relocation consulting services at Tampa International 1-Aug Aug Sep-17 7-Dec-17 Cathy Tefft CTefft@Tampacom (813) Operation of Taxicab Services to provide taxicab services at Tampa International Short Term Parking Garage Level 8 Rehabilitation, HCAA Project No to rehabilitate Level 8 of the Short Term Parking Garage at Tampa International 30-Aug-17 N/A 3-Oct-17 7-Dec-17 9-Aug Aug-17 4-Oct-17 7-Dec-17 Connie Mundzak CMundzak@Tampacom (813) Selection of Design Professional, North Cargo Building Apron, TW A and TW Extension for a Design Professional to design the North Cargo Building Apron, TW A Bridge and TW extension at Tampa International 16-Aug Aug-17 4-Oct-17 7-Dec-17 Window Washing Services for window washing services at Tampa International 13-Sep Sep Oct-17 7-Dec-17 Tom Thalheimer TThalheimer@Tampacom (813) Amy Flack AFlack@Tampacom (813) Checked Baggage System Upgrades and Optimization, HCAA Project No for checked baggage system upgrades and optimization at Tampa International 25-Sep Oct Oct-17 7-Dec-17 JHanney@Tampacom Page 4
5 Selection of Design-Builder, Parkway Expansion, Tampa International Airport for a new 2-lane roadway exit onto the George Bean Parkway from the Economy Parking Road along with improvements to the existing exit from the Airport Service Road. Also included is the widening and rehabilitation of segments of the inbound and outbound Parkway from the most southern end to the Main Terminal Complex. DUE 6-Sep Sep-17 8-Nov-17 1-Feb-18 JHanney@Tampacom Authority Offices and Garage Developer, HCAA Project No to select a Developer for Authority offices and garage at Tampa International Selection will shortlist Respondents to three. 18-Oct Nov Nov Feb-18 Tom Thalheimer TThalheimer@Tampacom (813) Support Buildings and Pavement Repairs, HCAA Project No for the repair of support buildings and structures including limited remedial repairs at all Authority Airports. 3-Nov Nov-17 5-Dec-17 1-Feb-18 RPZ and Approach Areas Tree Trimming, HCAA Project No to trim trees at all Authority RPZ and Approach Areas. <TBD> <TBD> <TBD> 1-Feb-18 Shuttle Guideway Railing Improvements, HCAA Project No to improve guard railings along the shuttle guideway bridges between the Main Terminal and Airsides at Tampa International 13-Sep Sep Oct-17 1-Mar-18 Page 5
6 Insurance Consultant Services to provide insurance consulting services at Tampa International Selection of Design-Builder, Main Terminal Curbside Expansion, Energy Plant and Related Work, HCAA Project Nos , , & to upgrade Tampa International Airport's Red and Blue Curbsides and also to provide new energy plant facilities, reconfigure the existing FAA parking lot to provide space for the new energy plant, provide a replacement facility for the existing loading dock in the administration building and demolish the administration building. DUE 5-Oct Oct-17 9-Nov-17 1-Mar Oct Oct Dec-17 1-Mar-18 Cathy Tefft CTefft@Tampacom (813) JHanney@Tampacom Selection of Design Professional, Airside A and E Restrooms, HCAA Project No for Design Professional to upgrade Airside A and Airside E restrooms at Tampa International 15-Nov Nov Dec-17 1-Mar-18 Tom Thalheimer TThalheimer@Tampacom (813) Long Term Parking Garage RAC Environmental Reclamation, HCAA Project No to perform limited site rehabilitation at the petroleum storage system associated with the RAC quick turn-around facility in the Long Term Parking Garage at Tampa International 30-Nov Dec Feb-18 5-Apr-18 Pest Control Services for pest control services at Tampa International Grease Drainage System and Enzyme Treatment Service for grease drainage and enzyme services at Tampa International 13-Dec-17 4-Jan Feb-18 5-Apr Feb Feb Mar-18 3-May-18 Damaris Cordova DTorresCordova@Tampacom (813) Amber Hamilton AHamilton@Tampacom (813) Page 6
7 North Cargo Building Renovation, HCAA Project No to renovate approximately 30,000 SF of the existing north cargo building. DUE 7-Mar Mar Apr-18 7-Jun-18 Page 7
Planned Procurement Opportunities Report. August 2017
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationPlanned Procurement Opportunities Report. September 2017
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationPlanned Procurement Opportunities Report. July 2017
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationPlanned Procurement Opportunities Report. November 2017
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationPlanned Procurement Opportunities Report. December 2017
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationPlanned Procurement Opportunities Report. May 2017
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationPlanned Procurement Opportunities Report. January 2018
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationPlanned Procurement Opportunities Report. February 2018
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationPlanned Procurement Opportunities Report. April 2018
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationPlanned Procurement Opportunities Report. March 2018
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationPlanned Procurement Opportunities Report. October 2018
HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the
More informationPLANNING & DEVELOPMENT AIRPORT INFRASTRUCTURE MANAGEMENT MICHAEL SHEEHAN SR DIRECTOR OF AIM DEVELOPMENT
PLANNING & DEVELOPMENT AIRPORT INFRASTRUCTURE MANAGEMENT MICHAEL SHEEHAN SR DIRECTOR OF AIM DEVELOPMENT AIRPORT INFRASTRUCTURE MANAGMENT 2 FACILITY SERVICES Facility Development Capital Projects Management
More informationTraffic Department Anchorage: Performance. Value. Results.
Traffic Department Anchorage: Performance. Value. Results. Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements.
More informationAviation Authority Capital Improvement Program Project Status Report
Aviation Authority Capital Improvement Program Project Status Report June 2018 Prepared by Planning and Development and Development Program Services Capital Improvement Project Status Report Overview The
More informationAviation Capital Construction Program Update
Aviation Capital Construction Program Update 2012 Completed Projects 2013 Active Projects Bern Seals Program Manager Parsons Management Consultants April 2013 0 Discussion Agenda Program Safety Performance
More informationTraffic Division Public Works Department Anchorage: Performance. Value. Results.
Mission Promote safe and efficient area-wide transportation that meets the needs of the community and the Anchorage Municipal Traffic Code requirements. Direct Services Design, operate and maintain the
More informationTAMPA BAY NEXT MAJOR PROJECTS UPDATE
TAMPA BAY NEXT MAJOR PROJECTS UPDATE Marshall Hampton, FDOT District Seven Tampa Bay Next Program Manager January 18, 2019 1 2 Program Overview Funding Priorities Fiscal Year 2018 2019 2020 2021 2022 2023
More informationDulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting
Dulles Corridor Enterprise Financial Update Dulles Corridor Advisory Committee Meeting June 22, 2016 Discussion Outline Finance Plan for the Metrorail Project Financial Developments Since December 2015
More informationBriefing Session: A406 STRATEGIC PROJECTS PROGRAM MANAGEMENT. January 24, 2019
Briefing Session: A406 STRATEGIC PROJECTS PROGRAM MANAGEMENT January 24, 2019 BRIEFING SESSION 1. Introduction to strategic projects at Logan B to C Roadway Improvements Terminal C Canopy and Curbside
More informationDec Board of Education: Approve Educational Specifications. Dec Jan. 2016
Dec. 2015 Dec. 2015 Jan. 2016 Jan 2016 Fairfield Public Schools Develops Project Team Initial Funding request analysis (including temporary classrooms costs) for services through Design Development Board
More informationAviation Authority Capital Improvement Program Project Status Report April and May 2018
Aviation Authority Capital Improvement Program Project Status Report April and May 2018 Prepared by Planning and Development and Development Program Services Capital Improvement Project Status Report Overview
More informationWoking. q business confidence report
Woking q1 business confidence report Woking q1 report headlines saw a new record in company registrations in Woking when compared to any previous. was a record quarter for company registrations in Woking
More informationCapability List Document Document QA-TCL
Capability List Document FAA Approved Repair Station TAMY352I José María Córdova Int'l Airport Cargo Zone, Tampa Cargo Hangar Rionegro, Ant Colombia APPROVED: YALILE MAHMUD QUALITY CONTROL CHIEF Capability
More informationHILLSBOROUGH COUNTY AVIATION AUTHORITY REQUEST FOR INFORMATION FOR. Commercial Ground Transportation Services Consultant
HILLSBOROUGH COUNTY AVIATION AUTHORITY REQUEST FOR INFORMATION FOR Commercial Ground Transportation Services Consultant SOLICITATION NUMBER: 14-534-802 ISSUE DATE: April 11, 2014 1.0 Project Background
More informationAviation Authority Capital Improvement Program Project Status Report December 2017
Aviation Authority Capital Improvement Program Project Status Report December 2017 Prepared by Planning and Development and Development Program Services Capital Improvement Project Status Report Overview
More informationFTP/SIS Steering Committee Work Plan and PPI Update
FTP/SIS Steering Committee Work Plan and PPI Update Work Plan and PPI Update Presented by: Dana Reiding September 30, 2015 FTP and SIS Update Process and Schedule Issues Identification Jan Feb Potential
More informationGreening Buildings at the Dallas/Fort Worth International Airport. Sustainable Communities Conference Dallas, TX. March 10, 2009
Greening Buildings at the Dallas/Fort Worth International Airport Sustainable Communities Conference Dallas, TX March 10, 2009 Agenda Energy Efficiency in New Construction Energy Efficiency in Retrofits
More informationProperty Insurance Clearinghouse Actuarial & Underwriting Committee Update November 18, 2013
Property Insurance Clearinghouse Actuarial & Underwriting Committee Update November 18, 2013 Participating Carrier Update Participating Carriers Distributed the Insurer Readiness Questionnaire and the
More informationGDOT s Design-Build Program Past, Present and Future
GDOT s Design-Build Program Past, Present and Future John D. Hancock, P.E. Assistant State Innovative Program Delivery Engineer September 16, 2013 Agenda Program Overview GA Code 32-2-81 (SB 70) Look Ahead
More informationDoing Business with the Metropolitan Washington Airports Authority
Doing Business with the Metropolitan Washington Airports Authority MWMCA Quarterly Economic Summit Brown Advisory November 7, 2017 Introduction to MWAA Ronald Reagan Washington National Airport Washington
More informationVIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDA NEW AND REVISED IIM
VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDA JULY 2015 MAY 2018 May 21, 2018 IIM-LD-195.10 Virginia Stormwater Management Program May 21,
More informationNew Hope Crushed Stone. Monthly Update Solebury Communications Group October 2017
New Hope Crushed Stone Monthly Update Solebury Communications Group October 2017 Tom Wolf, Governor Patrick McDonnell, Secretary October 2017 Project Status STATUS AS OF: October 31, 2017 PROJECT START
More informationFiddler's Marsh Cove
Fiddler's Marsh Cove Tom McLellan 450-0326 Prepared: 6/14/2018 Lot Number D16 D31 D6 D25 D18 D15 D29 D7 D26 D20 Model MADISON2 MADISON2 CHANDLER MADISON2 MADISON2 MADISON2 LYNDON VALE ULYSSA MADISON2 Elevation
More informationEnhanced Pavement Management Program. Pavement Management Program
Enhanced Pavement Management Program Presented to the Transportation and Environment Committee Feb. 12, 2007 VISION STATEMENT Creating the Most Cost Effective, Pavement Management Program in the Nation
More informationDepartment of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD Phone: 605/ FAX: 605/
Connecting South Dakota and the Nation Department of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD 57709-1970 Phone: 605/394-2244 FAX: 605/394-1904 July 9, 2014
More informationAriba Project Outcomes October 2017 Update. Presented by Procurement Department October 2017
Ariba Project Outcomes October 2017 Update Presented by Procurement Department October 2017 1 Topics 1. P2P Module Transactional Procurement 2. Purchase Requisition Cycle Time 3. Supplier Enablement and
More informationProject Risk Management Bootcamp. Contents are subject to change. For the latest updates visit
Bootcamp Page 1 of 7 Why Attend The overall aim of this program is to enable participants to plan, manage and control project risks. Moreover, participants will be able to develop project risk management
More informationPresentation for Business Opportunities & Entrepreneurial Training Summit
Welcome to the Presentation for Business Opportunities & Entrepreneurial Training Summit October 9, 2018 Ned Carey, C.M. Chief - Division of Administration & Performance Management Safety Management System
More informationProject Budget and Schedule Status Report
Item 52 Transit Program Project Budget and Schedule Status Report Construction Committee June 19, 2014 & Schedule Performance Summary Chart Slide # Project Performance Schedule Performance Comments 3 Crenshaw/LAX
More informationFEASIBILITY STUDY SEPTEMBER 1 8,
FEASIBILITY STUDY SEPTEMBER 1 8, 2 0 1 2 OVERVIEW PAUL SWARTZ, AIA, PP PRINCIPAL-IN-CHARGE JIM PETRO, AIA PROJECT ARCHITECT STUART J. HEISEY, PE MECHANICAL ENGINEER LEED AP BD+C The last feasibility study
More informationTL 9000 Quality Management System. Measurements Handbook. BRR Examples
Quality Excellence for Suppliers of Telecommunications Forum (QuEST Forum) TL 9000 Quality Management System Measurements Handbook Copyright 2012 QuEST Forum Version 1.0 7.2 7.2.1 Basic Calculation Example
More information[ITEMS IN BOLD REQUIRE APPROVAL BY THE AVIATION AUTHORITY BOARD]
CONSTRUCTION COMMITTEE MEETING AGENDA DATE: Tuesday, February 12, 2019 TIME: 8:30 a.m. ~ GREATER ORLANDO V AVIATION AUTHORITY PLACE: GOAA ANNEX BUILDING, 1ST FLOOR - CONFERENCE ROOMS (APOLLO/GEMINI/TAURUS),
More informationREQUEST FOR QUALIFICATIONS DESIGN BUILD SERVICES FACILITY IMPROVEMENTS AT MUSIC HALL, AFRICAN AMERICAN MUSEUM & AQUARIUM ANNEX FAIR PARK DALLAS, TEXAS
REQUEST FOR QUALIFICATIONS for DESIGN BUILD SERVICES for FACILITY IMPROVEMENTS AT MUSIC HALL, AFRICAN AMERICAN MUSEUM & AQUARIUM ANNE at FAIR PARK DALLAS, TEAS ISSUED: MARCH 8, 2018 DUE: APRIL 6, 2018
More informationIssued: July 23, Revised: December 16, 2013 July 5, 2014 June 29, 2015 February 7, 2016
Issued: July 23, 2013 Revised: December 16, 2013 July 5, 2014 June 29, 2015 February 7, 2016 Rev. 2 7 16 Supplier Guide Page 1 of 12 TABLE OF CONTENTS Who We Are Mission Statement Vision Statement Values
More informationRail-Volution Roundtable Sustainable Planning & Design
Rail-Volution Roundtable Sustainable Planning & Design October 28, 2008 1. Extension of Caltrain 2. New Intermodal Bus and Rail Station 3. New Neighborhood Transbay Transit Center Program Transbay Location
More informationBusiness Education Courses Facility Services Project Review DAVID MASHBURN, DIRECTOR DENVER INTERNATIONAL AIRPORT JANUARY 25 TH, 2017
Business Education Courses Facility Services Project Review DAVID MASHBURN, DIRECTOR DENVER INTERNATIONAL AIRPORT JANUARY 25 TH, 2017 AGENDA Facility Services Organization at DEN Project Lifecycle Design
More informationContract Preparation, Tendering and Bids Evaluation. Contents are subject to change. For the latest updates visit
Contract Preparation, Tendering and Bids Evaluation Page 1 of 7 Why Attend The overall aim of this course is to provide participants with the knowledge, concepts and skills needed to perform all the tasks
More informationMIDAMERICA ST. LOUIS AIRPORT Passenger Terminal and Loading Bridge Improvements AIP Project XXX
MIDAMERICA ST. LOUIS AIRPORT AIP Project 3-17-0146-XXX TO: ISSUED BY: All Plan Holders and Meeting Attendees (Meeting Roster Attached) Crawford, Murphy & Tilly, Inc. DATE: August 8, 2016 Re: Passenger
More informationCORVALLIS SCHOOL DISTRICT
RFP 003-2018 Testing & Inspection Services CORVALLIS SCHOOL DISTRICT Request for Proposals RFP 003-2018 Testing & Inspecting Services For 2018-2021 Bond Projects Issued: October 09, 2018 Due: By 4:00 PM,
More informationAFRICAN DEVELOPMENT FUND
AFRICAN DEVELOPMENT FUND PROJECT: JOMO KENYATTA INTERNATIONAL AIRPORT EMERGENCY INTERIM TERMINAL CONSTRUCTION PROJECT COUNTRY: KENYA OITC/EARC DEPARTMENTS October 2013 1. INTRODUCTION 1.1 Management hereby
More informationMay Monthly Development Report 34,440. Current Population Est.
Monthly Development Report 34,440 Current Population Est. Town of Little Elm Development Services Department 100 W. Eldorado Parkway Little Elm, TX 75068 214-975-0472 The Development Services Department
More informationAGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor April 9, :30 a.m.
AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting March 12, 2014 Executive Director Approval
More informationPROCUREMENT PLAN. Date of First Procurement Plan: 22 October 2009 Date of this Procurement Plan: 13 December 2018, Version 12 Advance Contracting: No
PROCUREMENT PLAN Basic Data Project Name: Shaanxi Qinling Biodiversity Conservation and Demonstration Project Project : 39321-013 Approval : 2572/0169 Country: China, People's Republic of Executing Agency:
More informationWELCOME. NEW NORTH CONCOURSE PACKAGE #3 Open House 10/20/2017
WELCOME NEW NORTH CONCOURSE PACKAGE #3 Open House 10/20/2017 Today s with Turner Team Introductions Project Overview Pre-Qualification Requirements & Bid Process Contracting Opportunities Introductions:
More informationCalifornia Independent System Operator Corporation. California ISO. Import resource adequacy. Department of Market Monitoring
k California Independent System Operator Corporation California ISO Import resource adequacy September 10, 2018 Department of Market Monitoring Summary This report provides an update of analysis and trends
More informationRoute 29 Solutions. October 23, 2014 Rt. 29 Project Delivery Advisory Panel Meeting
October 23, 2014 Rt. 29 Project Delivery Advisory Panel Meeting Agenda item 1: Introductions Project Delivery Advisory Panel Technical Team 2 Agenda item 2: Interaction and Feedback Live Streaming Viewers:
More informationSupply Chain Risk Management. Contents are subject to change. For the latest updates visit
Supply Chain Risk Page 1 of 7 Why Attend Supply chain managers, procurement managers and sourcing professionals manage company's activities and spend with its suppliers, which can be a very significant
More informationProcurement Planning and Bid Management. Contents are subject to change. For the latest updates visit
Procurement Planning and Bid Page 1 of 8 Why Attend Planning is both the most critical and the most challenging phase of any procurement operation. It provides direction towards how the function intends
More informationJune Monthly Development Report. The Town with a Lake Attitude 33,198. Current Population Est.
The Town with a Lake Attitude Monthly Development Report 33,198 Current Population Est. Town of Little Elm Development Services Department 100 W. Eldorado Parkway Little Elm, TX 75068 214-975-0472 The
More informationCapital Project Tracking Report
Bus Shelter Lighting Upgrades Firm: Start: End: Bus Shelter Pad & Installation Phase 6 Firm: GCW, Inc. Funding: $107,500 Start: Jun 2018 End: Jan 2019 % Complete: 33% Continue to submit exhibits for permit
More informationMaterials and Supply Chain Management. Contents are subject to change. For the latest updates visit
Materials and Supply Chain Page 1 of 7 Why Attend Supply Chain (SCM) has been consistently cited as one of the most critical processes in any operational company. The impact SCM has on business is major
More informationElectric Forward Market Report
Mar-01 Mar-02 Jun-02 Sep-02 Dec-02 Mar-03 Jun-03 Sep-03 Dec-03 Mar-04 Jun-04 Sep-04 Dec-04 Mar-05 May-05 Aug-05 Nov-05 Feb-06 Jun-06 Sep-06 Dec-06 Mar-07 Jun-07 Sep-07 Dec-07 Apr-08 Jun-08 Sep-08 Dec-08
More informationStreet Maintenance Section Maintenance and Operations Division Public Works Department Anchorage: Performance. Value. Results.
Street Maintenance Section Anchorage: Performance. Value. Results. Purpose Protect, maintain, and improve Municipal roads and drainage systems through organized efforts and effective use of resources.
More informationBackbone Transportation Service
Backbone Transportation Service California Producer Set-Aside Rights 2005 San Diego Gas and Electric and Southern California Gas Company. All copyright and trademark rights reserved Overview Firm Access
More informationProject Budget and Schedule Status
Item Program Management Project Budget and Schedule Status Transit Project Delivery Transit Project Delivery Construction Committee February 20, 2014 & Schedule Performance Summary Chart Slide # Project
More informationAUSTIN AREA SUMMARY REPORT ON BUSINESS February 2018
INSTITUTE FOR SUPPLY MANAGEMENT- ISM AUSTIN, INC. P.O. Box 26155 Austin, Texas 78755-0155 Steven Leatherwood, CPSM, MCIPS Econ-report@ism-austin.org AUSTIN AREA SUMMARY REPORT ON BUSINESS Region Economy
More informationSECTION 3 PROJECT IMPLEMENTATION
SECTION 3 PROJECT IMPLEMENTATION PROJECT IMPLEMENTATION 3.1 CONCEPTUAL DESIGN The conceptual design process begins by using stakeholder feedback to finalize the preferred development concept. Having an
More informationTHE CORPORATION OF THE CITY OF OWEN SOUND
THE CORPORATION OF THE CITY OF OWEN SOUND PROGRAMME AND CONCEPTUAL DESIGNS FOR A RENOVATION TO THE EXISTING OWEN SOUND CITY HALL IN OWEN SOUND, ONTARIO MAY 2, 2016 KONGATS ARCHITECTS CITY HALL DOWNTOWN
More informationUniversity of Michigan Eco-Driving Index (EDI) Latest data: August 2017
University of Michigan Eco-Driving Index () http://www.ecodrivingindex.org Latest data: August 2017 Developed and issued monthly by Michael Sivak and Brandon Schoettle Sustainable Worldwide Transportation
More informationIndustry Perspective on Well Decommissioning Pennsylvania Orphaned and Abandoned Well Workshop May 16, 2018
Industry Perspective on Well Decommissioning Pennsylvania Orphaned and Abandoned Well Workshop May 16, 2018 Abandoned wells present a significant danger to the public. 2 Understanding the tactical nuances
More informationCILT Certified Procurement Professional. Contents are subject to change. For the latest updates visit
CILT Certified Procurement Professional Page 1 of 7 Why Attend Procurement is at the heart of the supply chain function as the purchasing department can spend up to 70% of a company's money. In this course,
More informationORAT Operational Readiness & Airport Transfer
Bahrain, 10 October 2017 ORAT Operational Readiness & Airport Transfer Christoph Aumüller, On-Block GmbH Fraport & On-Block From Asia to South America Recent ORAT and other projects 2 From Asia to South
More informationTransportation Committee Meeting date: January 11, 2016 For the Metropolitan Council meeting of January 13, 2016
Business Item No. 2016-7 SW Transportation Committee Meeting date: January 11, 2016 For the Metropolitan Council meeting of January 13, 2016 Subject: Review of Metropolitan s Commission 2016-2022 Capital
More informationAdministration Division Public Works Department Anchorage: Performance. Value. Results.
Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,
More informationAviation Authority Capital Improvement Program Project Status Report November and December 2016
Aviation Authority Capital Improvement Program Project Status Report November and December 2016 Prepared by Planning and Development and Development Program Services Capital Improvement Project Status
More informationEconomic Stimulus Package RCA Forum
Economic Stimulus Package RCA Forum April 2009 Cate Quinn, Programmes Manager, H&NO Fast-tracked public projects give $500m boost O Education $216.7 million of spending, including five new schools, school
More informationCertified Purchasing Professional. Contents are subject to change. For the latest updates visit
Certified Purchasing Professional Page 1 of 7 Why Attend Purchasing is at the heart of the supply chain function as the purchasing department can spend up to 70% of a company's money. In this course, we
More informationRegional Goods Movement Planning in the Bay Area
M E T R O P O L I T A N T R A N S P O R T A T I O N C O M M I S S I O N Regional Goods Movement Planning in the Bay Area Matt Maloney, Principal September 17, 2015 Metropolitan Transportation Commission
More informationGH Phipps Construction Co. OAC 17D Thistle-Valmont Square Interior & Exterior Renovation Thursday, November 2, :00 AM
GH Phipps Construction Co. OAC 17D5780 - Thistle-Valmont Square Interior & Exterior Renovation Thursday, November 2, 2017 10:00 AM Meeting ID 003 Subject Weekly OAC Meetings Location 6000 Spine Rd #101,
More informationGoods Movement COLLABORATIVE AND PLAN. Arthur L. Dao, Alameda CTC Executive Director ALAMEDA COUNTY TRANSPORTATION COMMISSION. September 17, 2015
ALAMEDA COUNTY TRANSPORTATION COMMISSION Goods Movement COLLABORATIVE AND PLAN A presentation to the California Marine Affairs and Navigation Conference Arthur L. Dao, Alameda CTC Executive Director 1
More informationREPORT TO THE 2013 LEGISLATURE SEMI-ANNUAL REPORT ON HAWAI I CANCER RESEARCH SPECIAL FUND. Pursuant to Section 304A-2168, Hawai i Revised Statutes
REPORT TO THE 2013 LEGISLATURE SEMI-ANNUAL REPORT ON HAWAI I CANCER RESEARCH SPECIAL FUND Pursuant to Section 304A-2168, Hawai i Revised Statutes January 2013 REPORT TO THE 2013 LEGISLATURE Hawai i Cancer
More informationReport to the Finance Committee Comprehensive Annual Financial Report. Prepared by the Office of Finance April 2016
Report to the Finance Committee 2015 Comprehensive Annual Financial Report Prepared by the Office of Finance April 2016 Audit Opinion date April 11, 2016 Unmodified or clean audit opinion on financial
More informationProject Budget and Schedule Status
Item Program Management Project Budget and Schedule Status Transit Project Delivery Construction Committee November 21, 2013 & Schedule Performance Summary Chart 2 1 Crenshaw/LAX Transit 1,749 2,058 2,058
More informationIronton Russell Bridge Project
Construction Update January 1, 2016 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails
More informationACEC/MA Annual State Markets John Audi, PhD. Assistant Director
ACEC/MA Annual State Markets 2019 John Audi, PhD. Assistant Director PROGRAM STRUCTURE Facility Program Project Project Status Funded Not Funded Complete All Work Complete All payments made Ongoing At
More informationPhase 1 Benzene Studies Quick Update
Phase 1 Benzene Studies Quick Update April 2011 Provide a snapshot of benzene concentrations in our air before EPA- mandated reduction of benzene content in gasoline MSAT2 rule is expected to cut benzene
More informationChangi Airport Group Changi eprocure (Powered by Zycus) Frequently Asked Questions for Suppliers Version 2.0
This list of Frequently Asked Questions (FAQs) is meant to help with your transition towards the new Changi eprocure (powered by Zycus). General: 1. Who is Zycus? Zycus is the vendor that CAG has engaged
More informationDesign Division Project Management & Engineering Department Anchorage: Performance. Value. Results.
Design Division Anchorage: Performance. Value. Results. Mission Design and prepare construction documents that produce safe, functional and costeffective capital infrastructure projects, i.e., roads, drainage,
More informationOrange Education Center Project Update. Board of Trustees Meeting February 25, 2019
Orange Education Center Project Update Board of Trustees Meeting February 25, 2019 1 ORANGE EDUCATION CENTER 2 Topics 1. Need for Adult Education (AE) in Orange 2. Location of AE Center 3. Fiscal Feasibility
More informationL1548 D1, TERMINAL C CANOPY AND UPPER DECK
MASSACHUSETTS PORT AUTHORITY CAPITAL PROGRAMS AND ENVIRONMENTAL AFFAIRS DEPARTMENT SUITE 209S LOGAN OFFICE CENTER SUITE 209S ONE HARBORSIDE DRIVE EAST BOSTON MA 02128-2909 REQUEST FOR QUALIFICATIONS L1548
More informationArlington East WRF Influent Channel Rehabilitation - Final
T E C H N I C A L M E M O R A N D U M 135-11 ARLINGTON EAST WRF INFLUENT CHANNEL 135-11 Arlington East WRF Influent Channel Rehabilitation - Final PREPARED FOR: PREPARED BY: JEA Capital Budget Planning
More informationState Project No.: , N501 Contract ID Number: C DB66
Request for Proposal Letter of Submittal Design-Build I-64 Pavement Rehabilitation From: Hampton Roads Bridge Tunnel (East Abutment) To: Little Creek Road Bridge (West Abutment) Norfolk, Virginia State
More informationDulles Corridor Metrorail Project
Dulles Corridor Metrorail Project PHASE 2 MONTHLY COST AND SCHEDULE UPDATE AS OF DECEMBER 31, 2016 FEBRUARY 2017 Phase 2 Cost Summary December Expenditures $ 79.6 Million Total Expenditures $ 1.068 Billion
More informationSHOP IT RFP Update & Review. November 5, 2014
SHOP IT RFP Update & Review November 5, 2014 Agenda How did we get here? Process Review Current Status Next Steps/Timeline Review RFP Evaluation Methodology Summary of RFP Sections SHOP RFP - How Did We
More informationCommunities Roadmap. As of July 24, PJM 2018
Communities Roadmap As of July 24, 2018 2018 Communities Roadmap Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Membership Management Community: Contact Management Member Feedback Production Go-Live Legend
More informationSouthport A Unique Perspective on P3s
Southport A Unique Perspective on P3s 1 Snapshot in Time 2014-2015 Expansion Considerations Background Noise Container capacity peaking 3 rd time to market Time for a change of leadership No Plan Energy
More informationGround Transportation Management Services
ONE (1) HARDCOPY ORIGINAL AND ONE (1) ELECTRONIC COPY FLASH DRIVE MUST BE SUBMITTED REQUEST FOR INFORMATION - RFI #PGT-2018-002 Ground Transportation Management Services Department of Ground Transportation
More informationLove Field Concessions Options
Love Field Concessions Options Briefing for the City Council Department of Aviation August 18, 2010 Background 6/11/07 Briefed proposal to TEC to extend existing concession contracts through period of
More informationREQUEST FOR QUALIFICATIONS PROFESSIONAL AIRPORT ENGINEERING SERVICES RUNWAY 16R-34L IMPROVEMENTS PROGRAM RENO-TAHOE INTERNATIONAL AIRPORT
REQUEST FOR QUALIFICATIONS PROFESSIONAL AIRPORT ENGINEERING SERVICES RUNWAY 16R-34L IMPROVEMENTS PROGRAM RENO-TAHOE INTERNATIONAL AIRPORT The Reno-Tahoe Airport Authority (RTAA) Reno, Nevada, is seeking
More informationPresentation for the Local Government Commission and the Community Environmental Council. July 13, 2007
Community Choice Aggregation Presentation for the Local Government Commission and the Community Environmental Council July 13, 2007 1 Community Choice Aggregation (CCA) CCA Legislation (AB117) allows cities
More information