1 Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Increased Access to Modern Energy (P110075) Operation Name: Increased Access to Modern Energy (P110075) Project Stage: Implementation Seq.No: 4 Status: ARCHIVED Archive Date: 08-Jan-2012 Country: Benin Approval FY: 2009 Product Line: IBRD/IDA Region: AFRICA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Ministere de l Energie et de l Eau (MME), Societe Beninoise d'energie Electrique (SBEE), Agence Beninoise d'electrification Rurale et de la Maitrise d'energie (ABERME), Communaute Economique du Benin (CEB) Key Dates Board Approval Date 23-Jun-2009 Original Closing Date 30-Jun-2015 Planned Mid Term Review Date 30-Jun-2013 Last Archived ISR Date 27-Mar-2011 Effectiveness Date 30-Apr-2010 Revised Closing Date 30-Jun-2015 Actual Mid Term Review Date Project Development Objectives Increased Access to Modern Energy (P110075) Project Development Objective (from Project Appraisal Document) The project's objectives are to improve reliability and efficiency of, and access to, modern energy services in Benin. Has the Project Development Objective been changed since Board Approval of the Program? Yes No losure Authorized Public Disclosure Authorized Benin GEF Energy Efficiency Program (P115064) Global Environmental Objective (from Project Appraisal Document) The overall objective of this program is to enhance standards and labels for efficient light bulbs and air-conditioners in Benin, and to introduce efficient light bulbs to households through a bulk procurement scheme and awareness. Has the Global Environmental Objective been changed since Board Approval of the Program? Yes Component(s) No Component Name Component Cost Component A1-3: Construction of 161 kv interconnections between Onigbolo-Parakou and Sakete Porto Novo Component A4: Rehabilitation and Reinforcement of the SBEE network Component A5: Improving Lighting and Appliance Efficiency 3.47 Component B1: Rural Electrification Fund Component B2: Modernizing Biomass Energy Services 5.50 Component C: Sustainable Energy Services 6.68 Page 1 of 7
2 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Progress towards achievement of GEO Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Moderate Moderate Implementation Status Overview Implementation of the project is picking up, after a slow start. Locations Country First Administrative Division Location Planned Actual Benin Not Entered Yoko Benin Not Entered Tourou Benin Not Entered Toui Benin Not Entered Tekparou Benin Not Entered Tchatchou Benin Not Entered Tchaourou Benin Not Entered Save Benin Not Entered Sakete Benin Departement du Plateau Sakete Benin Departement de l' Oueme Porto-Novo Benin Departement du Borgou Parakou Benin Departement de l' Oueme Departement de l' Oueme Benin Not Entered Okpometa Benin Not Entered Okounfo Benin Not Entered Misserete Benin Not Entered Kilibo Benin Not Entered Ketou Page 2 of 7
3 Country First Administrative Division Location Planned Actual Benin Not Entered Kayo Benin Not Entered Katagon Benin Not Entered Issale Benin Not Entered Issaba Benin Not Entered Idouya Benin Not Entered Idigny Benin Not Entered Gogoro Benin Not Entered Gbede Benin Not Entered Diho Benin Not Entered Demon Benin Not Entered Borone Benin Departement du Borgou Departement du Borgou Benin Not Entered Bakperou Benin Not Entered Badekparou Benin Not Entered Avrankou Benin Departement du Collines Departement du Collines Benin Departement de l' Oueme Onigbolo Results Project Development Objective Indicators Page 3 of 7
4 Percentage reduction of power losses in Percentage Value Benin's transmission and distribution networks Dec, 2011 for the construction of T-Lines and substations. Preparation of the bid documents will start in CYQ Increased number of people with improved Number Value access to modern energy and electricity services Number of people with access to modern energy will increased after the completion of the Transmission, distribution and rural electrification components. Benin transmission network responds to (N-1) Text Value No Yes criteria Dec, 2011 for the construction of T-Lines and substations. Global Environmental Objective Indicators Lighting efficiency standards developed and applied (A4) Compact fluorescent light bulbs installed (Number) Text Value No standards developed Standards developed and applied Date 23-Jun Dec Jun-2015 The beginning of the development of lighting efficiency standards is scheduled for Number Value Date 28-May Dec Jun-2015 There are some difficulties in the implementation of the contract for the pilot phase. Page 4 of 7
5 Intermediate Results Indicators Component A - A1: Construction of 310 km of Kilometers Value transmission lines Dec, 2011 Component A - A2: Distribution-level voltage Yes/No Value No No Yes fluctuations less than 7 percent in the project's network area in key cities in Benin The preparation of the bids document for the distribution component will start in CY Q Component A - A3. Reduction of Benin's peak Text Value 0 9.7/14 load and energy savings (in MW/GWh) Dec, 2011 Component A - A4: Lighting efficiency standards developed and applied Component B - B1: Rural electrification fund (REF) established and fully operational Text Value No standards Standards for at least 2 appliances The beginning of the development of lighting efficiency standards is scheduled for 2012 Text Value REF not functional REF fully functional Component B - B2: Number of decentralized, stand-alone generation systems set up Component B- B3: Area of managed forest in the context of setting up a community-based sustainable woodfuel supply system (in ha) Number Value Date 29-May Dec Jun-2015 None expected before Hectare(Ha) Value Not expected before Page 5 of 7
6 Component B - B4: Number of new workers Number Value trained in production of efficient wood stoves, and increased use of energy efficient wood Date 28-May Dec Jun-2015 stoves. Not expected before Component C - C1: Energy Sector Master Plan completed and endorsed Component C - C2: SBEE business plan developed and endorsed Text Value No current Master Plan Master Plan endorsed The Master plan not expected to be complete before Text Value No business plan Business plan produced annually Date 28-May Feb Jun-2015 Not expected before Component C - C3: CEB business plan developed and endorsed Component C - C4. Environmental and social safeguards regularly monitored and mitigation measures implemented Text Value No complete business plan Business plan produced annually Date 28-May Feb Jun-2015 Not expected before Yes/No Value No Yes Yes Social and Environmental safeguards have been monitored and complied with. Data on Financial Performance (as of 14-Oct-2011) Financial Agreement(s) Key Dates Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date P IDA Effective 23-Jun Jul Apr Jun-2015 P TF Effective 13-Jul Jul Jul Jun-2015 Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IDA Effective USD P TF Effective USD Page 6 of 7
7 Disbursement Graph Key Decisions Regarding Implementation The AFREA grant agreement for the biomass component signed on November 9, 2011 Restructuring History Level two Approved on 12-Oct-2011 Related Projects P Benin GEF Energy Efficiency Program Page 7 of 7
The World Bank Increased Access to Modern Energy (P110075)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INCREASED ACCESS TO MODERN ENERGY APPROVED ON JUNE 23, 2009 TO THE REPUBLIC
More informationImplementation Status & Results Honduras Barrio-Ciudad Project (P088319)
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras Barrio-Ciudad Project (P88319) Operation
More informationImplementation Status & Results Benin Support to Protected Areas Management (P122419)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Support to Protected Areas Management (P122419) Operation Name: Support to Protected Areas
More informationImplementation Status & Results Haiti Disaster Risk Management and Reconstruction (P126346)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Disaster Risk Management and Reconstruction
More informationImplementation Status & Results Benin Support to Protected Areas Management (P122419)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Support to Protected Areas Management (P122419) Operation Name: Support to Protected Areas
More informationImplementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Operation Name: WAPP APL 2 - OMVS
More informationImplementation Status & Results Africa WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) (P075994)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Africa WAPP APL 1 (1st Phase - COASTAL TRANSMISSION BACKBONE) (P075994) Operation Name: WAPP APL 1 (1st Phase -
More informationImplementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Operation Name: Market
More informationImplementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523) Operation Name: Haiti Transport
More informationImplementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation
More informationImplementation Status & Results Azerbaijan Highway 2 (P094488)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Azerbaijan Highway 2 (P094488) Operation Name: Highway 2 (P094488) Project Stage: Implementation
More informationImplementation Status & Results Mauritania MAURITANIA: TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT (P089672)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mauritania MAURITANIA: TRANSPORT SECTOR INSTITUTIONAL DEVELOPMENT AND TECHNICAL ASSISTANCE PROJECT
More informationImplementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural Development Project (P088799)
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural
More informationImplementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Operation Name: Second National
More informationImplementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Operation Name: Bahia Integrated
More informationImplementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture
More informationImplementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Operation Name: ID-Urban Water Supply and
More informationImplementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Operation Name: Market
More informationImplementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation
More informationImplementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Operation Name: CORRIDOR X HIGHWAY PROJECT (P108005) Project Stage:
More informationImplementation Status & Results Panama Rural Productivity Project (GEF) (P083045)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Operation Name: Rural Productivity Project (GEF)
More informationImplementation Status & Results Pakistan Water Sector Capacity Buildling and Advisory Services Project (WCAP) (P110099)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Pakistan Water Sector Capacity Buildling and Advisory Services Project (WCAP) (P110099) Operation
More informationImplementation Status & Results Africa Central African Backbone - APL2 (P117652)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa Central African Backbone - APL2 (P117652) Operation Name: Central African Backbone - APL2
More informationImplementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152)
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152) Operation
More informationImplementation Status & Results Benin Benin Emergency Urban Env. Project (P113145)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Operation Name: Benin Emergency Urban Env. Project
More informationImplementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077) Operation Name: URBAN WATER SUPPLY AND WASTEWATER
More informationImplementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Operation Name: CORRIDOR X HIGHWAY PROJECT (P108005) Project Stage:
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized Public Disclosure Copy EUROPE AND CENTRAL ASIA Croatia Water Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 15 ARCHIVED on 24-Dec-2015 ISR22041 Implementing
More informationPublic Disclosure Copy. Public Disclosure Copy. The World Bank
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Sustainable Integrated Ecosystem
More informationImplementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038) Operation Name: BR São Paulo Trains and Signalling
More informationImplementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Operation Name: Uzbekistan
More informationImplementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Morocco MA-Modernization of Irrigated Agriculture in the Oum Er Rbia Basin (P093719) Operation Name:
More informationImplementation Status & Results Indonesia Geothermal Power Generation Development (P099757)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Geothermal Power Generation Development
More informationImplementation Status & Results Ghana Ghana: Statistics Development Program (MDTF) (P118585)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ghana Ghana: Statistics Development Program (MDTF) (P118585) Operation Name: Ghana: Statistics Development
More informationImplementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Report : ISR1437 Operation Name: CORRIDOR X HIGHWAY
More informationRUSSIA FOREST FIRE RESPONSE PROJECT (P123923)
EUROPE AND CENTRAL ASIA Russian Federation Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 14 ARCHIVED on 28-Dec-2018 ISR35669 Implementing Agencies:
More informationImplementation Status & Results Vietnam VIETNAM WATER RESOURCES ASSISTANCE (P065898)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Vietnam VIETNAM WATER RESOURCES ASSISTANCE (P065898) Operation Name: VIETNAM WATER RESOURCES ASSISTANCE (P065898)
More informationImplementation Status & Results Jordan Promotion of a Wind Power Market (P093201)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Jordan Promotion of a Wind Power Market (P9321) Operation Name: Promotion of a Wind Power Market
More informationImplementation Status & Results Panama Rural Productivity Project (GEF) (P083045)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Operation Name: Rural Productivity Project (GEF)
More informationImplementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Operation Name: Uzbekistan
More informationImplementation Status & Results Indonesia Integrating Environment and Forest Protection into the Recovery and Future Development of Aceh (P098052)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Integrating Environment and Forest Protection into the Recovery and Future Development
More informationImplementation Status & Results Africa Nyika Transfrontier Conservation Area Project (P108879)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa Nyika Transfrontier Conservation Area Project
More informationImplementation Status & Results Cameroon Agricultural Competitiveness Project (P112635)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635) o C Operation
More informationThe World Bank. Key Dates. Project Development Objectives. Component(s) Public Disclosure Copy Overall Ratings
Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Operation Name: Benin Emergency Urban Env. Project (P113145) Project Stage: Implementation Seq.No: 3 Status: ARCHIVED
More informationImplementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Operation Name: Western
More informationImplementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation
More informationThe World Bank Geothermal Clean Energy Investment Project (P113078)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy and Mining Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 6 ARCHIVED on 17-Jun-2015 ISR18126 Implementing Agencies:
More informationImplementation Status & Results India Andhra Pradesh Road Sector Project (P096021)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Operation Name: Andhra Pradesh Road Sector Project
More informationImplementation Status & Results Ghana Ghana Urban Transport Project (P100619)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Ghana Ghana Urban Transport Project (P100619) Operation Name: Ghana Urban Transport Project (P100619) Project Stage:
More informationImplementation Status & Results India Andhra Pradesh Road Sector Project (P096021)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Operation Name: Andhra Pradesh Road Sector Project
More informationImplementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910) Operation Name: IQ-TF EMERG. WATER, SANITATION
More informationImplementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase
More informationImplementation Status & Results Samoa Samoa Agriculture & Fisheries Cyclone Response Project (P145938)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Samoa Samoa Agriculture & Fisheries Cyclone Response Project (P145938) Operation Name: Samoa Agriculture
More informationImplementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414) Operation Name:
More informationImplementation Status & Results Croatia Coastal Cities Pollution Control Project 2 (P102732)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Croatia Coastal Cities Pollution Control Project 2 (P102732) Operation Name: Coastal Cities Pollution
More informationImplementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931) Operation Name: Ministry
More informationImplementation Status & Results Philippines ARMM Social Fund Project (P073488)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Philippines ARMM Social Fund Project (P073488) Operation Name: ARMM Social Fund Project (P073488)
More informationImplementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Operation Name: Development
More informationImplementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966)
More informationAR B.A.URB.TSP (P039584)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR B.A.URB.TSP (P39584) Operation Name: AR B.A.URB.TSP (P39584) Project Stage: Implementation
More informationImplementation Status & Results Argentina AR-GEF Sustainable and Transport and Air Quality Project (P114008)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR-GEF Sustainable and Transport and Air Quality Project (P114008) Operation Name: AR-GEF
More informationImplementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras Honduras Education Quality, Governance, & Institutional Strengthening (P101218) Operation
More informationThe World Bank Geothermal Clean Energy Investment Project (P113078)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 11 ARCHIVED on 05-Nov-2017 ISR29890 Implementing
More informationPublic Disclosure Copy. Implementation Status & Results Report Second Sustainable and Participatory Energy Management (PROGEDE II) (P120629)
Public Disclosure Authorized AFRICA Senegal Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 13 ARCHIVED on 12-Jan-2018 ISR31048 Implementing Agencies: Government
More informationImplementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Aceh-Nias Livelihoods and Economic Development Program (LEDP) (P110635) Operation Name:
More informationImplementation Status & Results Vietnam Second Transmission and Distribution Project (P084871)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam Second Transmission and Distribution Project
More informationImplementation Status & Results Albania Energy Community of South East Europe APL Program - APL 5 for Albania DAM SAFETY (P110481)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Albania Energy Community of South East Europe APL
More informationImplementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS)
More informationImplementation Status & Results Azerbaijan Water Users Association Development Support Project (P107617)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Azerbaijan Water Users Association Development Support Project (P107617) Operation Name: Water Users
More informationImplementation Status & Results Mongolia MONSTAT: Strengthening the National Statistical System of Mongolia (P113160)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mongolia MONSTAT: Strengthening the National Statistical System of Mongolia (P113160) Operation
More informationImplementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Tanzania Development of a National Statistical System for Tanzania (P107722) Operation Name: Development
More informationImplementation Status & Results Honduras HN Rural Infrastructure Project (P086775)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras HN Rural Infrastructure Project (P086775) Operation Name: HN Rural Infrastructure Project
More informationImplementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996) Operation Name: Rio de Janeiro Mass Transit
More informationImplementation Status & Results Mexico Mexico Forests and Climate Change Project (P123760)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Mexico Mexico Forests and Climate Change Project (P123760) Operation Name: Mexico Forests and Climate Change Project
More informationImplementation Status & Results Mozambique Health Commodity Security Project (P121060)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Health Commodity Security Project (P121060) Operation Name: Health Commodity Security
More informationImplementation Status & Results Indonesia ID-Domestic Gas Market Development Project (P077175)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project
More informationImplementation Status & Results Botswana Northern Botswana Human Wildlife Coexistence Project (P095617)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Botswana Northern Botswana Human Wildlife Coexistence Project (P95617) Report No: ISR618 o o Operation
More informationImplementation Status & Results Brazil Sustainable Cerrado Initiative (P091827)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Sustainable Cerrado Initiative (P091827) Operation Name: Sustainable Cerrado Initiative (P091827)
More informationThe World Bank. losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized. Public Disclosure Copy
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results South Africa Development, Empowerment and Conservation
More informationThe World Bank Vietnam Renewable Energy Development Project (P103238)
Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2009 Seq No: 15 ARCHIVED on 14-Feb-2018 ISR29615 Implementing Agencies:
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized Public Disclosure Copy AFRICA Malawi Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 13 ARCHIVED on 04-Nov-2015 ISR21002 Implementing Agencies:
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Mexico Agriculture and Rural Development Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 13 ARCHIVED on 11-Feb-2015 ISR18140 Implementing
More informationImplementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Operation Name: Western
More informationImplementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913) Operation Name:
More informationPublic Disclosure Copy. Implementation Status & Results Report BD: Leveraging ICT Growth, Employment and Governance Project (P122201)
Public Disclosure Authorized SOUTH ASIA Bangladesh Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 06-Nov-2017 ISR30072 Implementing Agencies: Bangladesh
More informationThe World Bank AO-Market Oriented Smallholder Agriculture Project (P093699)
Public Disclosure Authorized AFRICA Angola Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 06-Nov-2015 ISR21246 Implementing Agencies: Ministry of Agriculture
More informationImplementation Status & Results Philippines Climate Change Adaptation Program (P101076)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Philippines Climate Change Adaptation Program (P101076) Operation Name: Climate Change Adaptation
More informationImplementation Status & Results India Uttar Pradesh Water Sector Restructuring Project (P050647)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Uttar Pradesh Water Sector Restructuring Project (P050647) Operation Name: Uttar Pradesh Water
More informationImplementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989) Operation Name: Nicaragua
More informationImplementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Operation Name: QUALITY PROTECT (GEF) (P085112)
More informationImplementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Java-Bali Power Sector Restructuring and Strengthening Project (P063913) Operation Name:
More informationImplementation Status & Results Indonesia Barefoot Engineers III (P131387)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Barefoot Engineers III (P131387) Operation
More informationThe World Bank MZ PROIRRI Sustainable Irrigation Development (P107598)
Public Disclosure Authorized AFRICA Mozambique Water Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 12 ARCHIVED on 04-Jan-2018 ISR30926 Implementing Agencies: Ministry of Economy
More informationImplementation Status & Results Africa West Africa Agricultural Productivity Program (WAAPP) (P094084)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa West Africa Agricultural Productivity Program
More informationImplementation Status & Results Indonesia Geothermal Power Generation Development (P099757)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757) Operation
More informationImplementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329) Operation Name: Rajasthan Rural Livelihoods
More informationImplementation Status & Results Colombia Justice Services Strenghtening (P083904)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Justice Services Strenghtening (P083904) Operation Name: Justice Services Strenghtening
More informationImplementation Status & Results Macedonia, former Yugoslav Republic of Second Trade and Transport Facilitation Project (P091723)
Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Macedonia, former Yugoslav Republic of Second Trade and Transport Facilitation Project (P091723) Operation Name:
More informationImplementation Status & Results Vietnam Customs Modernization Project (P085071)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam Customs Modernization Project (P085071) Operation Name: Customs Modernization Project (P085071)
More informationImplementation Status & Results Brazil Energy Sector Technical Assistance Project (P076977)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Energy Sector Technical Assistance Project (P076977) Operation Name: Energy Sector Technical
More information