1 BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANT A BARBARA SANT A CRUZ OFFICE OF THE ASSIST ANT VICE CHANCELLOR CAMPUS ARCHITECT- FACILITIES DESIGN & CONSTRUCTION TEL: (858) FAX: (858) GILMAN DRIVE #0916 LA JOLLA, CALIFORNIA October 26, 2016 TO: ALL HOLDERS OF REQUEST FOR PROPOSALS (RFP) DOCUMENTS NUEVO WEST GRADUATE STUDENT HOUSING PROJECT NO.: 5053/A4L-406 Enclosed is the following: 1. Addendum No. 11 dated October 26, 2016, to the RFP Documents NOTE: THE PRICE PROPOSAL AND TECHNICAL PROPOSAL DUE DATE IS CHANGED TO 2:00 P.M., FRIDAY, NOVEMBER 4, Senior Director of Construction Services Facilities Design and Construction Enclosures
2 I. GENERAL ADDENDUM NO. ELEVEN TO THE DESIGN-BUILD REQUEST FOR PROPOSAL (RFP) DOCUMENTS October 26, 2016 The following changes, additions, or deletions shall be made to the following documents; all other conditions shall remain the same. II. REVISIONS TO THE REQUEST FOR PROPOSALS (PROPOSAL DOCUMENTS) 1. ANNOUNCEMENT TO PREQUALIFIED PROPOSERS Delete the sentence that reads: Proposals must be received on or before: 2:00 P.M., WEDNESDAY, NOVEMBER 2, and substitute the following sentence: Proposals must be received on or before: 2:00 P.M., FRIDAY, NOVEMBER 4, III. CLARIFICATIONS 1. QUESTION: Some items listed in the DPP and previously released addenda are above and beyond CA Building Code (i.e. direct exhaust kitchen hoods, high pressure sprinkler fittings). Can any item above and beyond 2013 CA Building Code be considered enhancements and not requirements of the RFP/DPP? UC San Diego has very specific standards that go above code in some areas because our buildings are intended to last 50+ years. These requirements will not be relaxed unless specifically stated otherwise. Note clarification on high pressure fittings in this document. 2. QUESTION: Regarding the 150 on-site parking spot requirement - would the University accept the code minimum ADA spots underground or on site with the balance of spots in the new off-site parking garage as satisfying this baseline DPP requirement? Can the 150 spots on site be considering an enhancement? ANSWER: Parking reallocation was addressed in Addendum 10. The teams should disperse the required amount of ADA spaces in a manner that best serves those with disabilities. 3. QUESTION: Please confirm that proprietary controls per chosen elevator manufacturers selected will be acceptable for compliance with DPP. UCSD spec (142100/2.2 /4a and /1.1/A1) identifies specific control requirements resulting in significant added cost and not much interest by the specified by manufacturers. ANSWER: This is a Campus standard and cannot be modified. Page 1 of 4
3 4. QUESTION: Please confirm that MRL elevators may be acceptable with DPP/project requirements. They are to be installed elsewhere on campus (Outpatient Facility) and the same spec was originally provided during bidding. ANSWER: MRL elevators are not acceptable. 5. QUESTION: Open parking garages are not required to be sprinkled per CBC. Can this scope be listed as an enhancement and not base scope? 6. QUESTION: Can requirements for galvanized pipe at the garage be removed? Can this scope be listed as an enhancement and not base scope? 7. QUESTION: Will schedule 10 or PVC sprinkler piping for pipe sizes 2 1/2" be acceptable per CBC. Can schedule 40 piping be listed as an enhancement and not base scope? 8. QUESTION: Can the Addendum 8 requested 1800A service for the kitchen/market space be listed as an enhancement and not requirement? ADDITIONAL CLARIFICATIONS: 1. There is still some question with regards to the Minimum STC requirements. The following shall be adhered to: Demising walls/floors/ceiling between bedrooms in adjacent apartments: STC 55 Demising walls/floors/ceiling between bedroom and living spaces or bathrooms in adjacent apartments: STC 60 Walls/floor/ceiling between apartment and amenity spaces (exercise, study, lounge, etc.): STC 60 Walls/floor/ceiling between apartment and MEP spaces: STC 60 Walls/floor/ceiling between apartment and stair: STC 55 Walls/floor/ceiling between apartment and corridor: STC 50 Page 2 of 4
4 2. Existing transformer location. In Addendum 9, Question 4 referenced a transformer that is now existing on the site. Please see attached RFI documentation which shows the location of the transformer pad and required clearances from operable windows. This location of this transformer was required to be moved per SDG&E requirements, as it was originally located too close to the windows. Any future buildings will be required to maintain the same clearances. The exact location will be provided via CAD to the winning team once selected. The following items are a reduction in the program requirements and can be applied by all teams. However, the Design-Build teams can still elect to provide any or all current program requirements for enhancement points. 3. Clarification to the requirements for High Pressure fittings on the sprinkler system per the CFMO: a. Given the potential for engine companies to pump water and pressure into the FDC at greater than 175 psi, NFPA 13 recommends that each system be evaluated individually because fire department pumping apparatus connected to the system FDC may over-pump the pressures required for effective system operation (for a fire on the 16 th floor, the standard 2-1/2 attack line, with a 250 gpm fog nozzle, connected to the standpipe system will require 100 psi nozzle pressure, 13 psi friction loss, 25 psi system loss and 75 psi elevation loss [standard SDFD Fireground Hydraulics calculation] or 213 psi ) The system designer shall provide a full sprinkler plan including full justifications and engineering judgments if they intend to incorporate lower pressure couplings into the system. The lower pressure couplings may work, especially if pressure reducing valves are used on higher floors, but assurances must be brought forward that such devices will not hinder manual firefighting operations and firefighter safety on upper floors of buildings (there is historical precedence of firefighter fatalities resulting from pressure reducing devices in high rise buildings). 4. The floor to ceiling height on housing floors only can be reduced to 8-6 minimum clear. This excludes first floor common areas. The University does not expect the schematic design documents to address this change, however the technical proposal shall be clear on the intended floor to ceiling height for all spaces. The corrections can be made in the design development documents. 5. The design teams can opt to reduce the minimum square feet required for living rooms by 5%. The University does not expect the schematic design documents to address this change, however, the technical proposal shall be clear on the intended living room areas for each type of unit. The corrections to the floor plans can be made in the design development documents. Page 3 of 4
5 6. Range hoods can be recirculating, but kitchen exhaust shall be provided per code. 7. ½ hp garbage disposals can be provided in lieu of the ¾ hp units specified. The manufacturer shall remain as specified. 8. Hollow core doors can be installed on interior unit doors only (bedroom, bathroom, closets). UC San Diego shall provide a specification that is acceptable. 9. Linoleum will be allowed in kitchen and bathroom areas in lieu of tile. 10. PVC waste and vent lines will be acceptable as code allows. All PVC shall be contained within wall cavities per fire code requirements. PVC shall not be allowed for water supply. The design-build team will be required to justify the product proposed will meet all code requirements. 11. A full height back splash in the kitchen will not be required. All teams must provide at a minimum a 4 backsplash of the same material as the countertop. 12. Provide one CAT 6 drop in each bedroom in lieu of two drops. End of Addendum Page 4 of 4
6 STRUCTUR SHEET L 101; SK C RFI PA FIRELANE AND PEDESTRIAN CONNECTION AT EXISTING PARKING BLDG. D TRANSFORMER CURRENT DESIGN LOCATION MATCHLINE L-403 MATCHLINE L-404 T PA 25' CLEARANCE FROM OPERABLE WINDOW BLDG. D TRANSFORMER PROPOSED RELOCATION T BUILDING D (ARENA) 10' max to curb at left side of transformer and 12' wide 0' 10' 20' 30' LAWN PA EXISTING WEST MESA APARTMENTS
UNIVERSITY OF CALIFORNIA, SAN DIEGO
UNIVERSITY OF CALIFORNIA, SAN DIEGO BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ OFFICE OF THE ASSIST ANT VICE CHANCELLOR CAMPUS ARCHITECT- FACILITIES
More informationJ~e~~r Senior Director of Construction Services Facilities Design and Construction UNIVERSITY OF CALIFORNIA, SAN DIEGO.
BERKELEY DAVIS IR VINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SAN!' A BARBARA SANT A CRUZ OFFICE OF THE ASSIST ANT VICE CHANCELLOR CAMPUS ARCHITECT - FACILITIES DESIGN & CONSTRUCTION TEL:
More informationUNIVERSITY OF CALIFORNIA, SAN DIEGO
BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANT A BARBARA SANT A CRUZ OFFICE OF THE ASSIST ANT VICE CHANCELLOR CAMPUS ARCHITECT- FACILITIES DESIGN & CONSTRUCTION TEL: (858)
More informationADDENDUM NO. FIVE TO THE DESIGN-BUILD REQUEST FOR PROPOSAL (RFP) DOCUMENTS September 26, 2016
I. GENERAL ADDENDUM NO. FIVE TO THE DESIGN-BUILD REQUEST FOR PROPOSAL (RFP) DOCUMENTS September 26, 2016 The following changes, additions, or deletions shall be made to the following documents; all other
More informationUNIVERSITY OF CALIFORNIA, SAN DIEGO
BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANT A BARBARA SANT A CRUZ OFFICE OF THE ASSOCIATE VICE CHANCELLOR CAPITAL PROGRAM MANAGEMENT TEL: (858) 534-2177 FAX: (858) 534-4363
More informationADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION
ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Subject to conditions prescribed by the University of California, San Diego, responses to the University's prequalification documents for a Design Build
More informationADDENDUM #2 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR. The University of Texas Health Science Center at San Antonio
ADDENDUM #2 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR The University of Texas Health Science Center at San Antonio Renovate Floor 1 and Floor 2 of the PARC Bldg. RFP No.: 745-16-9935
More informationUNIVERSITY OF CALIFORNIA, SAN DIEGO
UNIVERSITY OF CALIFORNIA, SAN DIEGO BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANT A BARBARA SANTA CRUZ OFFICE OF THE AS SOCIA TE VICE CHANCELLOR CAPITAL PROGRAM MANAGEMENT
More informationUCSB Audit and Advisory Services Audit Memorandum. Annual Report on Executive Compensation (AREC) March 29, 2016
UCSB Audit and Advisory Services Audit Memorandum Performed by: Laurie Liao, Staff Auditor Approved by: Robert Tarsia, Director Report No. 08-16-0012 This page intentionally left blank. University of California,
More informationr::=z--:> UNIVERSITY OF CALIFORNIA, SAN DIEGO October 17, 2016
BERKELEY DAVIS IR VINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANT A BARBARA SANTA CRUZ OFFICE OF THE ASSISTANT VICE CHANCELLOR CAMPUS ARCHITECT- FACILITIES DESIGN & CONSTRUCTION TEL: (858)
More informationADDENDUM 2 TO INVITATION FOR BID 5270-FG UNLV SOUTH RESIDENTIAL COMPLEX RENOVATION
ADDENDUM 2 TO INVITATION FOR BID 5270-FG UNLV SOUTH RESIDENTIAL COMPLEX RENOVATION University of Nevada, Las Vegas Purchasing Department 4505 Maryland Parkway Las Vegas, Nevada 89154-1033 (702) 895-3521
More informationTOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS
TOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS The Town of East Haddam is seeking bids from qualified contractors who will
More informationKITCHEN REMODELS CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA (949)
CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA 92691 (949) 470-3054 KITCHEN REMODELS A permit is required for kitchen remodels that include removal and replacement
More informationHow to Prepare Your LSE Report
LSE Rule Category Required Documentation Information Comments / Applicable Code Sections/ 10.1 Building Height Provide the Building height in Feet Provide the number of stories above grade Helpful Hints
More informationUCSB Audit and Advisory Services Internal Audit Report. Housing, Dining & Auxiliary Enterprises Internal Control Review.
Internal Audit Report Housing, Dining & Auxiliary Enterprises Internal Control Review June 12, 2017 Performed by: Antonio Manas-Melendez, Principal Auditor Irene Camargo, Staff Auditor Stacy Stone, Audit
More informationReason for Change Identifiers: OR= Owner Request; FC= Field Condition; AJ= Requirement of Local Authority CL= Clarification (No Scope Change)
Page 1 of 6 ADCI Bulletin No. 01 Date: March 30, 2015 Project: @580 Renovation for New Apartment Units Address: 580 Walnut Street Cincinnati, OH 45202 Commission: Prepared For: Prepared By: PDT P266 Cincinnati
More informationUCSB Audit and Advisory Services Internal Audit Report. UC Fair Wage/Fair Work Review. June 26, 2017
Internal Audit Report UC Fair Wage/Fair Work Review June 26, 2017 Performed by: Antonio Mañas-Melendez, Principal Auditor Irene Camargo, Staff Auditor Laurie Liao, Staff Auditor Approved by: Jessie Masek,
More informationLEVEL I PREQUALIFICATION DOCUMENTS OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA
Project No. 4484/A4L-379/964840 LEVEL I PREQUALIFICATION DOCUMENTS for OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North
More informationLEVEL I PREQUALIFICATION DOCUMENTS
Project No. LEVEL I PREQUALIFICATION DOCUMENTS for MUIR BIOLOGY BUILDING 3RD FLOOR RENOVATION University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North Torrey Pines Road La Jolla,
More informationTHE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS
THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE II RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING
More informationSoftware Licensing. Internal Audit Report No. I February 6, 2014
Software Licensing Internal Audit Report No. I2014-101 February 6, 2014 Prepared By Christopher Arias, Auditor Reviewed By Evans Owalla, IT Audit Manager Approved By Mike Bathke, Director UNIVERSITY OF
More informationMSA MOORE & SPENCE ARCHITECTS, P.A.
MSA MOORE & SPENCE ARCHITECTS, P.A. ADDENDUM NUMBER THREE (3): October 27, 2009 to the Construction Documents dated October 9, 2009 for: HACFM, Covington Meadows Apartments Lehigh Acres, Florida The following
More informationTO MEMBERS TO THE COMMITTEE ON GROUNDS AND BUILDINGS: DISCUSSION ITEM UNIVERSITY SEISMIC SAFETY POLICY AND UPDATE ON PROGRAM FOR SEISMIC IMPROVEMENTS
Office of the President GB3 TO MEMBERS TO THE COMMITTEE ON : For Meeting of DISCUSSION ITEM UNIVERSITY SEISMIC SAFETY POLICY AND UPDATE ON PROGRAM FOR SEISMIC IMPROVEMENTS EXECUTIVE SUMMARY This discussion
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 PROJECT: 300 Seneca New Academic Campus DATE: September 23, 2013 300 Seneca Ave., S.F.,
More informationUNIVERSITY OF CALIFORNIA, SAN DIEGO
UNIVERSITY OF CALIFORNIA, SAN DIEGO BERKELEY DAVIS 1R VINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ OFFICE OF THE ASSOCIATE VICE CHANCELLOR CAMPUS ARCHITECT- FACILITIES
More information&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and &
&01 GENERAL To be developed. All of the exceptions have to be coordinated. &02 SPECIAL USE AND OCCUPANCY &02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections &02.1.1 and &02.1.2.
More informationUNIVERSITY OF CALIFORNIA, SAN DIEGO UCSD. July 30, 2015
UCSD BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN FRANCISCO SANTA BARBARA SANTA CRUZ OFFICE OF THE ASSOC IA TE VICE CHANCELLOR CAMPUS ARCHITECT- FACILITIES DESIGN & CONSTRUCTION TEL: (858) 534-2177
More informationBID ADDENDUM #1 September 24, 2010
BID ADDENDUM #1 September 24, 2010 To: Prospective Bidders/Planholders For: Science 1 Seismic Retrofit & Renovation California State University Stanislaus One University Circle, Turlock, CA 95382 Bid /
More informationADDENDUM 3. Addendum #: 3 DATE OF ISSUANCE: October 28, 2015
ADDENDUM 3 Larkspur Commons PROJECT NO.: 15.114 Addendum #: 3 DATE OF ISSUANCE: October 28, 2015 Please make the following clarification and modifications to your construction documents. GENERAL ARCHITECTURAL
More information2012 IRC Sections R303 R310 Building Planning II
Study Session 3 2012 IRC Sections R303 R310 Building Planning II OBJECTIVE: To develop an understanding of the health and safety criteria of the code, including light and ventilation; minimum room areas
More informationLEVEL I PREQUALIFICATION DOCUMENTS GEISEL RESTROOM RENOVATIONS
Project No. 5005/A4L-424/ 962520 LEVEL I PREQUALIFICATION DOCUMENTS for GEISEL RESTROOM RENOVATIONS University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North Torrey Pines Road La
More informationALL HOLDERS OF LEVEL II CM DOCUMENTS WARREN COLLEGE HOUSING PEDESTRIAN BRIDGE REPLACEMENT
UNIVERSITY OF CALIFORNIA, SAN DIEGO UCSD BERKELEY DA VIS IR VINE LOS ANGELES MERCED RIVERSIDE SAN FRANCISCO SANTA BARBARA SANTA CRUZ OFFICE OF THE ASSOCIATE VICE CHANCELLOR CAMPUS ARCHITECT- FACILITIES
More informationNORMAL HILLS BUILDING 8 COSMESTIC UPGRADES PROJECT
NORMAL HILLS BUILDING 8 COSMESTIC UPGRADES PROJECT Bid No. 2K18-04 Addendum III The following shall be added to the indicated specification sections. (Changes are in red) SECTION 011000 SUMMARY / SCOPE
More informationNORMAL HILLS BUILDING 6 COSMESTIC UPGRADES PROJECT
NORMAL HILLS BUILDING 6 COSMESTIC UPGRADES PROJECT Bid No. 2K18-03 Addendum III The following shall be added to the indicated specification sections. (Changes are in red) SECTION 011000 SUMMARY / SCOPE
More informationRevised Drawings A, E, and M dated 11/13/18 (that include additional specifications)
Addendum No. 1 To: All Prospective Bidders Description: Holocaust Resource Center Expansion Stockton University Galloway, New Jersey 08205 Bid Number: B190003 Date: November 19, 2018 Pursuant to N.J.S.A.
More informationThe Building Codes A.R.E. Building Design and Construction Exam Prep
Know Thy Codes! The Building Codes Building Codes The Code of Hammurabi 4000bc Developed 19 th and 20 th c. Codes define what you can and can t do Allowable area and height based on degree of danger Fire
More information2018 IRC Sections R303 through R310 Building Planning II
Study Session 3 2018 IRC Sections R303 through R310 Building Planning II OBJECTIVE: REFERENCE: KEY POINTS: To develop an understanding of the health and safety criteria of the code, including light and
More informationKelly Village Apartments 3118 Green Houston, Texas 77020
Kelly Village Apartments 3118 Green Houston, Texas 77020 Houston Housing Authority J. Allen Management Managing Agent Scope for Kelly Village Unit #1125 Overall Scope: Demolition, Renovation, and Restoration
More informationCONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS
CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL
More informationDisclaimer for Review of Plans
Disclaimer for Review of Plans The San Francisco Planning Code requires that the plans of certain proposed projects be provided to members of the public prior to the Cityʹs approval action on the project.
More informationAddendum #4 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018
` Division of Finance and Business Operations Procurement & Strategic Sourcing 5700 Cass Avenue, suite 4200 Detroit, Michigan 48202 (313) 577-3734 FAX (313) 577-3747 January 11, 2019 Addendum #4 To Request
More informationREHABILITATION STANDARDS CHECKLIST
Project Name Date Built Date Last Rehabilitated (If applicable) EXTERIORS REHABILITATION STANDARDS CHECKLIST ROOF Age (Yrs) Poor Fair Good Excellent Roof /Pitch/Flat # of Layers Substrate Material Insulation
More informationADDENDUM NO. 3, February 8, Renovations to the Existing Shelby County Center Architect s job no. 2598/BN
ADDENDUM NO. 3, February 8, 2013 RE: Renovations to the Existing Shelby County 9-1-1 Center Architect s job no. 2598/BN FROM: TurnerBatson 1950 Stonegate Drive, Suite 200 Birmingham, Alabama 35242 (205)
More informationProject Address Applicant: (Please Print) Plan review Engineer: Phone: Date
BUILDING AND SAFETY Tenant Improvement Checklist Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date APPLICATION The following items will be required at the permit counter before
More informationINFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS
INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS November 2018 Contents 1. Introduction... 1 2. Ontario Building Code and Second Dwelling Units... 1 3. How Do I Make My Secondary Dwelling Unit
More informationBusiness Services Procurement University of North Texas University of North Texas Health Science Center University of North Texas at Dallas
DATE: September 25, 2018 TO: FROM: SUBJECT: Potential Proposers Denise Harpool Senior Buyer Addendum 1Answers to Questions RFP763-19-133521DH CMAR-UNTHSC East Parking Garage Renovation Clarification to
More informationRequest for Information #6
Subject: Request for Information #6 Questions to Bid Package Issue Date: February 12, 2014 Project Name: Distribution: In reference to: Questions and Answer: Peppertree Apartments All Plan Holders Ruiz
More informationQuestions and Answers Construction of New Amenities At Folly Beach County Park
Questions and Answers Construction of New Amenities At Folly Beach County Park 2019-003 1. A410, Keynotes 11.34 Responsibility Chart -stainless steel table does not indicate if it is provided by the owner
More informationSUBMISSION GUIDE FOR ARCHITECTS
SUBMISSION GUIDE FOR ARCHITECTS CONTENTS TAB 6 - SUBMISSION REQUIREMENTS FOR LIHTC DEVELOPMENTS NOT RECEIVING OR ASSUMING A PHFA LOAN Page Contents... 6.1 6.01 Submission Requirements... 6.2 6.02 Minimum
More informationCOUNCIL ROCK SCHOOL DISTRICT ADMINISTRATION & BUSINESS OFFICES The Chancellor Center 30 North Chancellor Street Newtown, PA ADDENDA No.
COUNCIL ROCK SCHOOL DISTRICT ADMINISTRATION & BUSINESS OFFICES The Chancellor Center 30 North Chancellor Street Newtown, PA 18940 Doug Taylor, Assoc. AIA, AVS TELEPHONE (215) 944-1015 Supervisor of Operational
More informationADDENDUM NO. A. April 18, 2017 BIDDING AND CONTRACT DOCUMENTS FOR
ADDENDUM NO. A April 18, 2017 BIDDING AND CONTRACT DOCUMENTS FOR LOTHIAN RESIDENCE HALL SEISMIC UPGRADES BID PACKAGE 4 PROJECT NO. 956366 CONTRACT NO. 956366-LF-2017-163 UC Rev. 0, August 1, 2007 UCR Rev
More informationAllied Diversified is the Prime General Contractor Allied Diversified is requesting ADDITIONAL BIDS All Trades INSTRUCTIONS TO BIDDERS
is the Prime General Contractor Allied Diversified is requesting ADDITIONAL BIDS All Trades INSTRUCTIONS TO BIDDERS BIDS DUE NO LATER THAN: PROJECT START DATE: April 2 nd, 2014 4:00 pm As Soon As Awarded
More informationADDENDUM NO 1 Issued November 21, 2017
SEATTLE HOUSING AUTHORITY #4936 SPRUCE STREET TOWNHOMES RENOVATION ADDENDUM 1 ADDENDUM NO 1 Issued November 21, 2017 FROM: TO: Seattle Housing Authority Mel Henley 190 Queen Anne Avenue North P.O. Box
More informationComparison of the life safety elements of the 1997 UBC and the IBC 2000.
Comparison of the life safety elements of the 1997 UBC and the IBC 2000. Introduction The Building Performance Research Institute s mission is primarily one of education on building safety and performance.
More informationIgloo Modular Building Addendum #1 Issued: January 7, This addendum modifies the Request for Proposal documents as noted below.
Igloo Modular Building Addendum #1 Issued: January 7, 2016 To: All Planholders of Record This addendum modifies the Request for Proposal documents as noted below. Questions & Answers: 1. Has a site been
More informationAll Plan Holders 3/3/
All Plan Holders 3/3/2017 14-044 Marina Middle School Window Replacement and Seismic Retrofit 5 Window Replacement and Seismic Retrofit 11 DSA No. 01-116273 San Francisco Unified School District 16 SFUSD
More informationCypress Walk, Orangewood, Hunters Creek, Oak Meadows Water Supply Facilities Chemical Feed System Upgrade. Bid Opening Date: July 21, 2016
July, 0 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Addendum No./IFB Y-8-PH Cypress Walk, Orangewood, Hunters Creek, Oak Meadows Water Supply Facilities Chemical Feed System Upgrade Bid Opening
More informationResidential Basement Finish Guide
Residential Basement Finish Guide Basement finish permits are typically issued same day, however standard review times may apply if: There is structural work (foundation, beams, etc.), or if the entire
More informationA New Municipal Building for Limerick Township
A New Municipal Building for Limerick Township DOCUMENT 00 9001 - ADDENDUM NUMBER 01 December 9, 2016 Re: A New Municipal Building for Limerick Township From: Kelly Clough Bucher & Associates, Inc. 8 East
More informationTO ALL HOLDERS OF PLANS AND SPECIFICATIONS:
ABCD October 27, 2016 TO ALL HOLDERS OF PLANS AND SPECIFICATIONS: 102 Asma Boulevard Suite 305 Lafayette, LA 70508 (337)232-5182 LA WATS(800)737-5182 FAX (337)237-7132 www.dsaengineering.com RE: South
More informationGH Phipps Construction Co. OAC 17D Thistle-Valmont Square Interior & Exterior Renovation Thursday, March 29, :00 AM
OAC 17D5780 - Thistle-Valmont Square Interior & Exterior Renovation Thursday, March 29, 2018 10:00 AM Meeting ID 024 Subject Weekly OAC Meetings Location 6000 Spine Rd #101, Boulder, CO 80301 Attendees
More informationNAHB s Recommendations on Critical 2015 ICC Code Change Proposals
NAHB s Recommendations on Critical 2015 ICC Code Change Proposals NAHB is urging our members to get involved locally in the ICC code development process and schedule a meeting with your state and local
More informationAcademic Business Administrators. Program Update 02 April 2013
Academic Business Administrators Program Update 02 April 2013 Agenda Introduction Program Updates: Schedules Program Updates: Projects What s Next Wrap-up 2 Introduction Introduction What is UCPath? Two
More informationCounty of Yolo Development Services Building Inspection Division
County of Yolo Development Services Building Inspection Division 292 W. Beamer Street Woodland, CA. 95695 www.yolocounty.org (530) 666-8775 Mechanical Plan Review Comments Plan Review No. Owners Name Job
More informationThis worksheet must be signed by the architect or engineer of record for the entire project for commercial or mixed-use buildings.
Application - City of Oxnard WORKSHEET FOR COMMERCIAL PLAN REVIEWS This worksheet must be signed by the architect or engineer of record for the entire project for commercial or mixed-use buildings. Note:
More informationThis section applies to service areas and loading docks for new construction and major renovations.
Basis of Design This section applies to service areas and loading docks for new construction and major renovations. Programming Minimum requirements: Defined custodial area, service area and loading docks
More informationREQUEST FOR QUALIFICATIONS ARCHITECTURAL/ENGINEERING SERVICES
I. PURPOSE REQUEST FOR QUALIFICATIONS ARCHITECTURAL/ENGINEERING SERVICES The Greensboro Housing Authority (GHA) invites qualifications for the Architectural/Engineering Services for RAD Renovations at
More informationLEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION
Project No. 4863/A4L-396 LEVEL I PREQUALIFICATION DOCUMENTS for COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North
More informationBUILDING BOARD OF APPEALS MINUTES
BUILDING BOARD OF APPEALS MINUTES JULY 10, 2002 The regular meeting of the Building Board of Appeals was held on Wednesday, July 10, 2002 at 1:00 p.m. in the Seventh Floor Conference Room of the City Center
More informationSection 7: Specifications
Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required
More informationSINCLAIR COMMUNITY COLLEGE Dayton, Ohio. February 4, Addendum No. 1 TRANSMISSION VIA RETURN RECEIPT REQUESTED
SINCLAIR COMMUNITY COLLEGE Dayton, Ohio February 4, 2016 Addendum No. 1 TRANSMISSION VIA EMAIL RETURN RECEIPT REQUESTED TO THE DRAWINGS AND SPECIFICATIONS FOR: PROJECT NO. FAC 16-05 RESTROOM RENOVATIONS
More informationQ. Do residential and historical buildings that are going to be protected with sprinklers need to conduct an LSE?
TECHNICAL AND CODE INTERPRETATION QUESTIONS: Q. For evaluation and scoring purposes, the Rules distinguish between Residential and Commercial occupancies. In terms of the referenced sections of the Chicago
More informationArchitect and Engineer: Friar Associates inc.
Architect and Engineer: Friar Associates inc. BACKGROUND In June, after soliciting and interviewing several professional firms, Friar Associates was hired to perform an Existing Conditions Survey and Facilities
More informationContractor/Owner initials are verification that items #1 and #2 and items (a) thru (g) above are included in the submitted plan/drawing.
FINISH BASEMENT/ADDITION/REMODEL PLAN CORRECTIONS LIST (Based on the current Editions of the International Codes and National Electrical Code) PLAN CHECKED BY: LOT/SUBDIVISION/ADDRESS: CONTRACTOR OR OWNER/BUILDER:
More informationUC Irvine Health Contract Management
UC Irvine Health Contract Management Internal Audit Report No. I2017-205 April 18, 2017 Prepared By Mike Shead, Senior Auditor Reviewed By Niran Joshi, Associate Director Approved By Mike Bathke, Director
More informationCITY OF LOS ANGELES LARUCP PLUMBING/MECHANICAL PLAN CHECK LIST
CITY OF LOS ANGELES LARUCP PLUMBING/MECHANICAL PLAN CHECK LIST Plan Check No. Plan Check Expiration Date Job Address: Square Footage Use Zone Fire Zone Occ. Group Type of Construction No. of Stories Applicant
More informationAnnual Announcement (January 1 to December 31, 2014)
Annual Announcement (January 1 to December 31, 2014) This annual announcement is intended to result in the identification of persons and firms which are interested in pursuing contracts to perform the
More informationBERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ
UNIVERSITY OF CALIFORNIA, MERCED BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ February 2014 SPACE RESERVATION SYSTEM WORK GROUP REPORT For the Campus
More informationPLAN CHECK CORRECTION SHEET FOR METHANE MITIGATION SYSTEMS 2014 LAPC
PLAN CHECK CORRECTION SHEET FOR METHANE MITIGATION SYSTEMS 2014 LAPC This is intended to provide uniform application of the codes by the plan check staff and to help the public apply the codes correctly.
More informationMIRAMONTE at DALE AVENUE CONDOS
MIRAMONTE at DALE AVENUE CONDOS Represented by Miramonte Homes, LLC License # LC625437001 www.miramontehomes.com (928) 707-3575 Miramonte at Dale Ave. Condominiums COMMUNITY INCLUDED FEATURES: Exterior
More informationADDENDUM # 3 DATE: February 16, 2018
ADDENDUM # 3 DATE: February 16, 2018 REFERENCE: Invitation for Bid No.: S-LB-18607 IFB Issue Date: January 25, 2018 Title: Stonewall Middle School Addition and Renovations Architect/Engineer: Architecture
More informationBASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)
BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018) PERMIT SUBMITTAL CHECKLIST: Signed and completed Building Permit application form. A separate Electrical permit is required from
More informationMarch BCA 2014 Section J Amendments
March 2014 BCA 2014 Section J Amendments Introduction BCA 2013 Amendments - Recap BCA 2014 Amendments Section J DTS(prescriptive) vs JV3(performance) Cost implications of DTS Building Envelope and Glazing
More informationApplications for building permits will not be reviewed until all of the required information has been submitted.
NOTICE: Applications for building permits will not be reviewed until all of the required information has been submitted. Once all items are submitted a minimum of ten (10) working days are required to
More informationS C H A M U M A C H O W S K I G R E C O PROJECT #11526 WEST VIRGINIA NORTHERN COMMUNITY COLLEGE WHEELING CAMPUS STUDENT CENTER/BARNES & NOBLE
S C H A M U M A C H O W S K I G R E C O ADDENDUM #2 PROJECT #11526 WEST VIRGINIA NORTHERN COMMUNITY COLLEGE WHEELING CAMPUS STUDENT CENTER/BARNES & NOBLE MARYLAND 1016 MORTON ST. BALTIMORE, MD 21201 TEL
More informationINFORMATIONAL HANDOUT FOR FINISHING A BASEMENT
7100 147 th Street West Telephone (952) 953-2588 Apple Valley, MN 55124-9016 Fax (952) 953-2515 www.cityofapplevalley.org INFORMATIONAL HANDOUT FOR FINISHING A BASEMENT 1. Submit plan showing the proposed
More informationDisclaimer for Review of Plans
Disclaimer for Review of Plans The San Francisco Planning Code requires that the plans of certain proposed projects be provided to members of the public prior to the Cityʹs approval action on the project.
More informationADDENDUM NO. 3 REQUEST FOR PROPOSALS HANGAR 1610/1612 FIRE SUPPRESSION RETROFIT PROJECT
ADDENDUM NO. 3 REQUEST FOR PROPOSALS HANGAR 1610/1612 FIRE SUPPRESSION RETROFIT PROJECT Effective September 6, 2018, Addendum No. 3 (THREE), {Pages 1-7 and the applicable attachment(s)}, is associated
More informationUNIVERSITY OF CALIFORNIA, SAN DIEGO
UNIVERSITY OF CALIFORNIA, SAN DIEGO BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ OFFICE OF THE ASSIST ANT VICE CHANCELLOR CAMPUS ARCHITECT- FACILITIES
More informationSpringdale Creek Springdale Road Austin Tx Price range: $480s-660s. For More Information. Juan Pablo Hisse Sales Consultant
Springdale Creek 4926 Springdale Road Austin Tx 78702 Price range: $480s-660s Urban Farmhouse Designs 1 Mile from Mueller HEB 3 Miles from Downtown 15 min from Bergstrom International Airport Easy access
More informationAppendix C: Space Allocation & Calculation Guidelines
Appendix C: Space Allocation & Calculation Guidelines Introduction Work Space Design The suggested space guidelines represented in this section establish the basis for the square footage projections and
More informationRESIDENTIAL PLAN CHECK LIST
RESIDENTIAL PLAN CHECK LIST Based on the 2013 California Residential Code (CRC) City of Hermosa Beach - Building Department 1315 Valley Drive Hermosa Beach, CA 90254 (310) 318-0235 General 1. Legal Owner,
More informationArchitecture, PLLC 2005 Beecham Circle Raleigh, NC Tel (919)
JA Jones Architecture, PLLC 2005 Beecham Circle Raleigh, NC 27607 Tel (919) 510-8186 wayne@wjonesarchitecture.com ADDENDUM NO. 1: Project: Iron Bridge Date: June 3, 2015 NOTICE TO ALL BIDDERS: The following
More informationFountain Square Renovation Project. Bid # ADDENDUM No. 2. February 14, 2017
Fountain Square Renovation Project Bid # 17-05 ADDENDUM No. 2 February 14, 2017 Any and all changes to the Contract Document are valid only if they are included by written addendum to all potential respondents,
More informationUniversity of North Carolina at Charlotte Design and Construction Manual Section 2, Division 11 Equipment SECTION 2 DIVISION 11 EQUIPMENT
SECTION 2 DIVISION 11 EQUIPMENT DIVISION 11 - EQUIPMENT Note: This is a guide for Designers only. Contents shall not be used in lieu of specifications as part of the Designer s contract documents. GENERAL
More informationALL PROSPECTIVE CONTRACTORS, PLAN ROOMS AND SUPPLIERS
Architect: Studio 2H Design, LLC 1721 4 th Avenue North, Suite 101 Birmingham, Alabama 35203 (205) 264-9988 July 26, 2018 ADDENDUM NO. 5 UA Project No.: 712-17-1081 EDA Investment No.: 04-79-07154 B.C.
More informationADDENDUM 1 August 28, Construction & Facility Management Office 1636 Gold Star Drive Raleigh, NC 27607
Nashville Readiness Center Building Renovation Smith Sinnett / 2013024 North Carolina National Guard SCO ID#: 130999902-E ADDENDUM 1 August 28, 2017 NASHVILLE READINESS CENTER BUILDING RENOVATION SCO#:
More informationCHANGE ORDER LOG FOR MOUNT NITTANY ELEMENTARY
PROJECT SUMMARY OF CHANGES TOTAL SITE CHANGES $0.00 $6,791.92 ($11,656.12) $11,902.24 $0.00 TOTAL CONCRETE CHANGES $644.78 $2,282.00 $0.00 $2,141.90 TOTAL MASONRY CHANGES $12,815.85 $0.00 $0.00 TOTAL STRUC.
More informationSECTION 2 DIVISION 11 EQUIPMENT
SECTION 2 DIVISION 11 EQUIPMENT DIVISION 11 - EQUIPMENT Note: This is a guide for Designers only. Contents shall not be used in lieu of specifications as part of the Designer s contract documents. GENERAL
More information1. Bidders shall note the following dates: 1.1. Anticipated contract award date: July 1, Date of Substantial Performance: August 19, 2016
BORTOLOTTO ADDENDUM #1 Project LI15-028 English Language Program Lakehead University Chancellor Paterson Library Project # el1606 Location 955 Oliver Road Thunder Bay, Ontario Date June 3, 2016 Pages 1