1 BID ADDENDUM #1 September 24, 2010 To: Prospective Bidders/Planholders For: Science 1 Seismic Retrofit & Renovation California State University Stanislaus One University Circle, Turlock, CA Bid / Project Number: Bid Opening Date:...November 4, 2010 Bid Opening Time:...2:00 p.m. This addendum consisting of the following: 5 page Narrative document 113 pages of Volume 2 Specification Revisions 21 partial Size Drawing Revisions( 8-1/2 x 11 SK format) 22 Full Size Drawing Revisions This Addendum forms a part of the contract documents and modifies the original bidding documents dated August 13, 2010 and September 7, Addendum shall be noted as received and acknowledged on the Bid Proposal Form when submitted as outlined in the Bid Package referenced above. The following corrections, additions, deletions, and/or modifications to the above package, by this reference, shall be incorporated therein: Bid Set - Clarifications: 1 OF 5

2 1. Please note that all specified products will be eligible for review of Contractor proposed equals or substitutions as defined by the Section Submittals and the Contract General Conditions unless noted as no substitutions, campus standard etc. 2. SK-A17 (included in this Bid Addendum 1) has revisions to the architectural sheet index on A0.01. Please ignore the reference to A as an added sheet. This sheet will be added in Bid Addendum 2. Bid Set - Specific Questions: (see attached as required): 1. Question: (none received) a). Bid Set - Specification Revisions: (see attached revised specification sections): Project Manual Volume 2 - Specifications: 1. Please revise the Project Manual Table of Contents: a) Project Manual Table of Contents has been revised. 2. Please add the following landscape specification sections: a) Site Prep & Plant Protection b) Architectural Pavers c) Site Concrete d) Irrigation e) Site Furnishings f) Planting 3. Please revise the following civil specification section: a) Section Storm Drainage Piping (addition of furnishing and installing inlets, catch basins and area drain components). 4. Please revise the following specification section: a) Section Ornamental Metals (clarification on glass specification for premanufactured guardrails). 5. Please revise the following specification section: a) Section Architectural Woodwork (under countertop support substrate material added). 6. Please add the following specification section: a) Section Composite Surfacing Fabrications 7. Please revise the following specification section: a) Section Solid Polymer Fabrications (scope clarified in Work Summary). 8. Please revise the following specification section: 2 OF 5

3 a) Section Glazing (ceramic frit glass for exterior glazing and interior guardrails added). 9. Please revise the following specification section: a) Section Tile (Section tile has been revised, and glass tile has been added for countertop backsplash areas). 10. Please revise the following specification section: a) Section Painting (scope revised to include all exposed areas of exterior concrete to now be sealed after powerwashing). 11. Please revise the following specification section: a) Section Drainage systems (References to spec sections 02300: Earthwork and 02360: Trenching have been removed). 12. Please revise the following specification section: a) Section Plumbing Fixtures (SK-1 and SK-2 revised to undermount sinks). Bid Set - Drawing Revisions: (see attached revised full-size drawings and partialsize SK format drawings): Partial-Size SK Format Revised Drawings: 1. Please note the following revisions to drawing A5.1: a) Note revised to include sealing of exterior concrete typically 1/A5.1 (see SK-A1). 2. Please note the following revisions to drawing A5.2: a) Note revised to include sealing of exterior concrete typically 1/A5.2 (see SK-A2). 3. Please note the following revisions to drawing A6.1: a) Glass railing revised 1/A6.1 (see SK-A3). 4. Please note the following revisions to drawing A6.2: a) Glass railing revised 1/A6.2 (see SK-A4). 5. Please note the following revisions to drawing A7.4: a) Addition of mosaic tile backsplash 6/A7.4 (see SK-A5). b) Addition of mosaic tile backsplash 7/A7.4 (see SK-A6). c) Addition of mosaic tile backsplash 8/A7.4 (see SK-A7). 6. Please note the following revisions to drawing A7.7: a) Changes at backsplash & elevation of outlets and added acoustical panel to elevation 4/A7.7 (see SK-A8). b) Changes at backsplash, height of outlets, and height of acoustical panel to elevation 5/A7.7 (see SK-A9). c) Changes at backsplash, height of outlets, and height of acoustical panel to elevation 7/A7.7 (see SK-A10). 3 OF 5

4 7. Please note the following revisions to drawing A7.8: a) Addition of mosaic tile backsplash 3/A7.8 (see SK-A11). b) Addition of mosaic tile backsplash 7/A7.8 (see SK-A12). 8. Please note the following revisions to drawing A7.9: a) Addition of mosaic tile backsplash 4/A7.9 (see SK-A13). b) Changes at backsplash & elevation of outlets and added acoustical panel to elevation 6/A7.9 (see SK-A14). 9. Please note the following revisions to drawing A8.5: a) Glass railing wall support posts added 1/A8.5 (see SK-A15). 10. Please note the following revisions to drawing A9.3: a) Added Ceramic Frit Insulated Glass to Glazing Material Legend (see SK-A16). b) Added glazing FTI reference to Window Type 18 (see SK-A16). c) Added glazing FTI reference to Window Type 19 (see SK-A16). 11. Please note the following revisions to drawing A0.01: a) Revised Sheet Index to show new Architectural, Civil, Electrical and Landscape sheets (see SK-A17). 12. Please note the following revisions to drawing A0.2: a) Revised note to refer to Landscape drawings for location of Exterior Monument Signage 1/A0.2 (see SK-A18). b) Revised note and location of Light Standard outside Northwest corner of building 1/A0.2 (see SK-A18). 13. Please note the following revisions to drawing A3.5: a) Revised note and location of Light Standard outside Northwest corner of building 2/A3.5 (see SK-A19). 14. Please note the following revisions to drawing E0.1: a) Drawing List revised to show added sheet (see SK-E1). 15. Please note the following revisions to drawing E0.6: a) Panel Schedules revised panels LP-1B & LPH-1A (see SK-E2). Full-Size Revised Drawings: 1. Please note the following revisions to drawing A10.1: a) Countertop materials revised to composite surfacing. b) Countertop backsplash heights revised. c) Fabric wrapped acoustical panels added (1/A10.1) d) Mosaic tile backsplash noted at 2/A10.1, 3/A10.1, 6/A10.1, 7/A10.1, 8/A Please note the following revisions to drawing A10.2: a) Countertop materials revised to composite surfacing. b) Countertop substrate material revised to marine grade plywood. c) Countertop backsplash heights revised. 4 OF 5

5 d) Fabric wrapped acoustical panels added (2/A10.2) e) Mosaic tile backsplash noted at 5/A10.2, 6/A10.2 f) Countertop support added (3/A10.2) 3. Please add the following full size landscape drawings: a) L1.0 Landscape Demolition Plan b) L2.0 Landscape Construction Plan c) L3.0 Layout Plan d) L4.0 Construction Details e) L4.1 Site Furnishings f) L5.0 Planting Plan g) L5.1 Planting Details h) L6.0 Irrigation Plan i) L6.1 Irrigation Legend j) L6.2 Irrigation Details 4. Please add the following full size civil drawings: a) C3.1 Storm Drain Details b) C4.1 Grading Plan c) C4.2 Grading Plan d) C4.3 Grading Plan 5. Please note the following revisions to drawing C3.0: a) Revision of grade to existing inlet at east side of new plaza. b) Addition of storm drain inlet to existing 24 line at new plaza. c) Revision to storm drain tie-ins at west of new plaza. 6. Please add the following full size site electrical drawings: a) E1.1 Electrical Site Plan 7. Please note the following revisions to drawing E0.3: a) Addition of Title 24 Lighting Compliance Summary for site lighting. 8. Please note the following revisions to drawing E0.4: a) Addition of Site Lighting to Lighting Relay Cabinet Schedule LRC-1A b) Addition of Site Lighting Fixture Schedule. END OF ADDENDUM #1 5 OF 5

J~e~~r Senior Director of Construction Services Facilities Design and Construction UNIVERSITY OF CALIFORNIA, SAN DIEGO.

J~e~~r Senior Director of Construction Services Facilities Design and Construction UNIVERSITY OF CALIFORNIA, SAN DIEGO. BERKELEY DAVIS IR VINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SAN!' A BARBARA SANT A CRUZ OFFICE OF THE ASSIST ANT VICE CHANCELLOR CAMPUS ARCHITECT - FACILITIES DESIGN & CONSTRUCTION TEL:

More information

ADDENDUM #4 FOR THE WEST VALLEY FACILITIES INCREMENT 2 REPLACEMENT PROJECT WEST VALLEY COLLEGE

ADDENDUM #4 FOR THE WEST VALLEY FACILITIES INCREMENT 2 REPLACEMENT PROJECT WEST VALLEY COLLEGE ADDENDUM #4 FOR THE WEST VALLEY FACILITIES INCREMENT 2 REPLACEMENT PROJECT AT WEST VALLEY COLLEGE Owner West Valley-Mission Community College District Saratoga, California Bid #01-1516 12-22-15 WEST VALLEY-MISSION

More information

BID ADDENDUM #3 August 24, 2011

BID ADDENDUM #3 August 24, 2011 BID ADDENDUM #3 August 24, 2011 To: Prospective Bidders/Planholders Science 1 Seismic Retrofit & Renovation California State University Stanislaus One University Circle, Turlock, CA 95382 Bid / Project

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

DALLAS-FORT WORTH INTERNATIONAL AIRPORT

DALLAS-FORT WORTH INTERNATIONAL AIRPORT DALLAS-FORT WORTH INTERNATIONAL AIRPORT ADDENDUM NO. 2 TO THE REQUEST FOR BIDS Contract No. 9500445 Restroom Rehabilitation at Terminal B (Phase 3 & 4) December 20, 2010 THE REQUEST FOR BIDS (RFB) FOR

More information

ADDENDUM NUMBER 3. Date: December 6, Towneplace Suites by Marriott Springfield, MO. General Contractors Baron Design & Associates, L.L.C.

ADDENDUM NUMBER 3. Date: December 6, Towneplace Suites by Marriott Springfield, MO. General Contractors Baron Design & Associates, L.L.C. ADDENDUM NUMBER 3 Date: December 6, 2012 Project: Towneplace Suites by Marriott Springfield, MO To: From: General Contractors Baron Design & Associates, L.L.C. Documents for the referenced project are

More information

BUREAU Joe Iuviene, AIA January 20, 2017

BUREAU Joe Iuviene, AIA January 20, 2017 architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

Project Manual Index of Specifications Shenandoah Schools Concession Building

Project Manual Index of Specifications Shenandoah Schools Concession Building INDEX OF SPECIFICATIONS Division 0..BIDDING AND CONTRACT REQUIREMENTS 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 41 00 Bid Forms 00 43 13 Bid Security Form 00 72 00 General Conditions

More information

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders

More information

TOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS

TOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS TOWN OF EAST HADDAM INVITATION TO BID EAST HADDAM COMPANY #1 FIREHOUSE INTERIOR RENOVATIONS ADDENDUM NO. 1 TO CONTRACT DOCUMENTS The Town of East Haddam is seeking bids from qualified contractors who will

More information

TABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages

TABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages TABLE OF CONTENTS VOLUME 1 DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages SCHEDULE OF DRAWINGS...... 1 PROJECT PERSONNEL & DIRECTORY......

More information

Port KC RFP NORTHLAND PARK BUILDING V

Port KC RFP NORTHLAND PARK BUILDING V Port KC RFP NORTHLAND PARK BUILDING V 1. The RFP refers to landscaping plans. However, it does not appear that the landscaping plans were issued with the rest of the RFP. Will these be issued with an addendum?

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION Section 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Invitation

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

A. Remove Table of Contents and insert new attached Table of Contents.

A. Remove Table of Contents and insert new attached Table of Contents. ADDENDUM NO. 01 PROJECT Colby Glass E.S. Window Upgrades and ADA Work PROJECT NO. 16043 DATE February 07, 2018 TO: All Prime Contract Bidders and all others to whom Drawings and Specifications have been

More information

City of Miami ADDENDUM NO. 5. January 12, 2017 INVITATION TO BID NO.: CURTIS PARK NEW SWIMMING POOL FACILITY

City of Miami ADDENDUM NO. 5. January 12, 2017 INVITATION TO BID NO.: CURTIS PARK NEW SWIMMING POOL FACILITY City of Miami ADDENDUM NO. 5 January 12, 2017 INVITATION TO BID NO.: 15-16-040 CURTIS PARK NEW SWIMMING POOL FACILITY OFFICE OF CAPITAL IMPROVEMENTS ( OCI ) PROJECT NO.: TO: ALL PROSPECTIVE BIDDERS: The

More information

Division 00 Procurement and Contracting Requirements

Division 00 Procurement and Contracting Requirements SECTION 00 01 10 TABLE OF CONTENTS Division SECTION NO. VOLUME ONE Title SECTION TITLE Division 00 Procurement and Contracting Requirements 00 11 00 Invitation to Bidders 00 21 00 Instructions to Bidders

More information

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

ADDENDUM NO. 2 Consisting of 3 pages and Attachments 10404-125 Street, Edmonton, AB. T5N 1T2 Tel: 780.455.5975 Fax: 780.454.2397 info@cdyarchitect.com ADDENDUM NO. 2 Consisting of 3 pages and Attachments PROJECT: Maina Centre Ville Phase II, Beaumont, Alberta

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No C

PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No C PHASE I ACADEMIC BUILDING CORE RENOVATIONS RCNJ Project No. 20140101C CONSTRUCTION ESTIMATE AND PROJECT BUDGET Dated June 7. 2014 Estimated Cost HARD COSTS $ 1,560,284 Core Renovations (Toilet Rooms, Ceilings

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE, LLC 1827 1 ST AVENUE NORTH, SUITE 104 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 3 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS

More information

PAULDING COLLEGE & CAREER ACADEMY

PAULDING COLLEGE & CAREER ACADEMY PAULDING COLLEGE & CAREER ACADEMY 000110 OF THE PROJECT MANUAL FOR THE CONSTRUCTION OF: PAULDING COLLEGE & CAREER ACADEMY DALLAS, GEORGIA DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 000101 TITLE

More information

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

REBECCA LG BOSTICK, ARCHITECTS, INC

REBECCA LG BOSTICK, ARCHITECTS, INC REBECCA LG BOSTICK, ARCHITECTS, INC 703-768-2250 ADDENDUM NO. 3 Page 1 of 4 (plus attachments -2 pages) SILVERBROOK ELEMENTARY SCHOOL RENOVATION Fairfax County Public Schools 9350 Crosspointe Drive, Fairfax

More information

This Addendum modifies the Project Manual, Specifications, and Drawings as follows:

This Addendum modifies the Project Manual, Specifications, and Drawings as follows: ADDENDUM #1 Project: Willamette Valley Co Research & Development Facility 675 McKinley Street PIVOT Project Number 1644.01 Date: Friday, June 1, 2018 To: Chambers Construction and Interested Sub-Bidders

More information

September 23, 2016 ADDENDUM #2

September 23, 2016 ADDENDUM #2 September 23, 2016 ADDENDUM #2 To: From: Subject: Prospective Bidders St. Johns County Purchasing Department Bid No. 16-55 St. Johns County Building Services Renovation & Remodeling. This Addendum #2 is

More information

AMENDMENT OF SOLICITATION

AMENDMENT OF SOLICITATION Metropolitan Washington Airports Authority PROCUREMENT AND CONTRACTS DEPT. AMENDMENT OF SOLICITATION PAGE 1 Metropolitan Washington Airports Authority 1A. AMENDMENT OF SOLICITATION NO. 1B. DATED Procurement

More information

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL

More information

ADVERTISEMENT FOR BIDS

ADVERTISEMENT FOR BIDS 1. INVITATION ADVERTISEMENT FOR BIDS Sealed proposals for the following work will be received by the University of Kentucky, Capital Construction Procurement Section, Room #322 Peterson Service Building,

More information

ADDENDUM # 3 DATE: February 16, 2018

ADDENDUM # 3 DATE: February 16, 2018 ADDENDUM # 3 DATE: February 16, 2018 REFERENCE: Invitation for Bid No.: S-LB-18607 IFB Issue Date: January 25, 2018 Title: Stonewall Middle School Addition and Renovations Architect/Engineer: Architecture

More information

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...

More information

TABLE OF CONTENTS. (Δ = Rev 06/08)

TABLE OF CONTENTS. (Δ = Rev 06/08) TABLE OF CONTENTS (Δ = Rev 06/08) INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-9 Record Drawings B-10 Variance Procedure B-11 Surface Water Procedures (New Section)

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 PROJECT: 300 Seneca New Academic Campus DATE: September 23, 2013 300 Seneca Ave., S.F.,

More information

Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017

Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017 Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017 Plumbing - 220000 Without limiting the application of all of the Contract Documents to the Subcontract,

More information

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS Watercrest - Sand Hill - Columbia, SC 00 0110-1 TABLE OF CONTENTS DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS INTRODUCTORY INFORMATION Document 00 0101 Document 00 0110 Project Title Page CONTRACTING

More information

SOLICITATION ADDENDUM

SOLICITATION ADDENDUM TO: SOLICITATION NO.: CITY OF PALM BEACH GARDENS PURCHASING DEPARTMENT SOLICITATION ADDENDUM Addendum No. 8 All Potential Bidders ITB2017-078PS DATE: June 18, 2018 TITLE: OPENING DATE: Municipal Complex

More information

ADDENDUM NO. 2. DATE: January 19, 2017 INVITATION FOR BID: IFB J Monroe Park Renovations Project DATED: December 20, 2016

ADDENDUM NO. 2. DATE: January 19, 2017 INVITATION FOR BID: IFB J Monroe Park Renovations Project DATED: December 20, 2016 ADDENDUM NO. 2 DATE: January 19, 2017 INVITATION FOR BID: IFB J170012535 Monroe Park Renovations Project DATED: December 20, 2016 RECEIPT DATE: February 8, 2017 (CHANGED) OPENING DATE: February 9, 2017

More information

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS AIA General Conditions... GC-1 to GC-44 Amendments to General Conditions... AM-1 to AM-2 Supplements to General Conditions... SU-1 to SU-7 00200 Instructions To Bidders... 1 3 00201 Contractor s Bidding

More information

A D D E N D U M T O B I D PRE-ENGINEERED METAL BUILDING

A D D E N D U M T O B I D PRE-ENGINEERED METAL BUILDING Guadalupe County Auditor s Office 307 W. Court, Suite 205 Seguin, Texas 78155 830-303-4188 Ext. 1328 A D D E N D U M T O B I D PRE-ENGINEERED METAL BUILDING Bid Title: PRE-ENGINEERED METAL BUILDING Bid

More information

Item # 1: Attached are the revised Table of Contents and Specifications added: Section Cabinets and Vanities

Item # 1: Attached are the revised Table of Contents and Specifications added: Section Cabinets and Vanities ADDENDUM NO. 1 Proposed Residence 422 Hickory Street Buffalo, New York 14204 February 15, 2019 Long Associates, Architects 189 Kenmore Avenue Buffalo, New York 14223 This addendum is issued to amend the

More information

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6 PROJECT MANUAL for: FRANKLIN VILLAGE APARTMENTS Building I Morristown, NJ 07960 Block: 3901 Lots: 4,5,6 Owner: Atlantic Health Investment Corp. 200 American Road Morris Plains, NJ 07950 Architect NETTA

More information

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements SECTION A CM INSTRUCTIONS TO BIDDERS SECTION B BID CATEGORY DESCRIPTIONS & BID FORMS BC-07: Building HVAC and Plumbing BC-08: Building Electric BC-09: General Trades BC-10: Masonry BC-11: Precast Structural

More information

Q&A: The Block/Parsons Alley Construction RFP

Q&A: The Block/Parsons Alley Construction RFP Q&A: The Block/Parsons Alley Construction RFP 1. Is there a Geotechnical Report available? 2. Would it be possible to extend the bid date to a day other than a Monday? 3. Is it possible to extend the date

More information

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7 TABLE OF CONTENTS ( = Rev 11/15) Update #7 INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-4 International Suite of Codes (New) B-9 Record Drawings B-10 Variance Procedure

More information

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE TABLE OF CONTENTS SECTION TITLE DATE Division 00 Procurement and Contracting Requirements 000101... Project Title Page 000116... CAD Standards 001116... Invitation to Bid 002113... Instructions to Bidders

More information

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8 TABLE OF CONTENTS ( = Rev 04/17) Update #8 INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-4 International Suite of Codes B-9 As-Builts and Record Drawings B-10 Variance

More information

A1.01 SITE PLAN 394 W OLENTANGY ST POWELL, OH BUILDING TO BE RENOVATED SITE PLAN. P F www. archa ll.

A1.01 SITE PLAN 394 W OLENTANGY ST POWELL, OH BUILDING TO BE RENOVATED SITE PLAN. P F www. archa ll. N O R T H F I F T H S T R E E T C O L U M B U S O H I O P.. 00 F.. 000 www. archa ll. com W OLENTANGY ST POWELL, OH 0 DRAWING SET 0 0 0 preliminary check bid permit construction REVISIONS BUILDING TO BE

More information

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows: ADDENDUM NO. 1 TO THE DRAWINGS AND SPECIFICATIONS FOR THE New Dishman-McGinnis Elementary School Bowling Green Independent Schools Bowling Green, Kentucky BG 12-256 RTA 1209 March 11, 2013 To All Plan

More information

DOCUMENT BID DOCUMENT

DOCUMENT BID DOCUMENT DOCUMENT 00 40 00 BID DOCUMENT 1 Submit bids in compliance with Document 00 21 00Instructions to Bidders. Fill in blanks which pertain to the project or indicate N/A. The Owner reserves the right to reject

More information

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO. 2017-26R Stone Group Architects Project No. 1731 ADDENDUM DATE: September 14, 2017 BID DATE: September 18, 2017 2:00 P.M. C.S.T. SCOPE OF THIS ADDENDUM:

More information

SOLICITATION ADDENDUM

SOLICITATION ADDENDUM CITY OF PALM BEACH GARDENS PURCHASING DEPARTMENT SOLICITATION ADDENDUM Addendum No. 7 DATE: August 22, 2018 TO: SOLICITATION NO.: TITLE: OPENING DATE: All Potential Bidders ITB2018-095RC Construction of

More information

SECTION ADDENDUM NUMBER ONE

SECTION ADDENDUM NUMBER ONE Softball Field Repairs and Upgrades 03 February 2012 University of South Carolina Upstate State Project Number: H34-I350 DP3 Architects Project Number: 11124 GENERAL INFORMATION SECTION 00 09 10 ADDENDUM

More information

MPA Project No. L1429-C1 Project Title: Terminal C Enhancements Location: Logan International Airport

MPA Project No. L1429-C1 Project Title: Terminal C Enhancements Location: Logan International Airport MPA Project No. L1429-C1 Project Title: Terminal C Enhancements Location: Logan International Airport RESPONSES TO QUESTIONS and/or RFI s Date: 6/1/2018 The attention of Contractors submitting Filed Sub-Bids

More information

a. "Packaged Rooftop Electric Cooling / Heating Unit Schedule", remark #5 (M001), has the condensate drain requirement for RTU-1.

a. Packaged Rooftop Electric Cooling / Heating Unit Schedule, remark #5 (M001), has the condensate drain requirement for RTU-1. June 10, 2014 Addendum No. 2 WICOMICO YOUTH & CIVIC CENTER RENOVATIONS & ADDITIONS 500 Glen Avenue Salisbury, MD, 21804 2012.095.01 The following items supplement, change, delete or add to the 100% Construction

More information

CIBL Categories of Work Classification Guidelines

CIBL Categories of Work Classification Guidelines 11 May 06 CIBL Categories of Work Classification Guidelines The following is provided as guidelines for classifying design, engineering and construction work. Project examples are provided for reference

More information

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen:

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen: March 6, 2018 Subject: Addendum No. 2 Toyota Park Transit Center Phase II Ladies and Gentlemen: This Addendum No. 2 is being issued to provide responses to questions submitted by potential bidders and

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

PROJECT MANUAL FOR: HUMPHREYS CO. SHERRILL BUILDING RENOVATIONS: NEW URGENT CARE CLINIC & EXTENSION SERVICE OFFICE

PROJECT MANUAL FOR: HUMPHREYS CO. SHERRILL BUILDING RENOVATIONS: NEW URGENT CARE CLINIC & EXTENSION SERVICE OFFICE PROJECT MANUAL FOR: HUMPHREYS CO. SHERRILL BUILDING RENOVATIONS: NEW URGENT CARE CLINIC & EXTENSION SERVICE OFFICE HUMPHREYS COUNTY BOARD OF SUPERVISOR BELZONI, MISSISSIPPI APRIL 20, 2016 EMILY POOLE ARCHITECTURE,

More information

Capital 21 Realty, LLC

Capital 21 Realty, LLC Capital 21 Realty, LLC 742 US Highway One, North Palm Beach, FL 33408 For More Information and Showings Contact Brian Mylett, 561-707-2710 742 US Highway One Building Details 1. 10,570 Under AC 2. Complete

More information

See attached answers to questions and requests for clarification received.

See attached answers to questions and requests for clarification received. Office of the Vice President 971 Elmore Drive and Chief Financial Officer PO Box 115250 Procurement Services Gainesville, FL 32611-5250 http://procurement.ufl.edu/ (352) 392-1331 Fax 352-392-8837 June

More information

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

Florida Army National Guard Construction Facilities Management Office. Scope of Work: Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines September 2011 Scope of Work: To provide complete design for the renovation/alterations

More information

327 King Street Exterior Repairs & Interior Renovations Project No. H15-N200-PG

327 King Street Exterior Repairs & Interior Renovations Project No. H15-N200-PG StudioA Architecture ADDENDUM NO. 2 Date: 11 October 2013 Re: 327 King Street Exterior Repairs & Interior Renovations Project No. H15-N200-PG From: Whitney Powers To: Bidders/Planholders This Addendum

More information

Date: 4/13/2018 Project Name: Presidential Residence Project Number: Prepared By: Libby Ramirez. Design Program and Specification Narrative

Date: 4/13/2018 Project Name: Presidential Residence Project Number: Prepared By: Libby Ramirez. Design Program and Specification Narrative Date: 4/13/2018 Project Name: Presidential Residence Project Number: 2073-18 Prepared By: Libby Ramirez Subject: Design Program and Specification Narrative The following is a summary of architectural space

More information

4.1.3 Project Manual

4.1.3 Project Manual 4.1.3 Project Manual (*Section requires Filed Sub-Bid) PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP Division 00 Procurement and Contracting Requirements Section 00 01 03 Project Directory Section 01

More information

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested. Purpose 355 West Queens Road Single Family New Construction Required Inspection Stages Master Requirement GEN 110 Building Department: 604-990-2480, building@dnv.org, fax: 604-984-9683 The following procedure

More information

ADDENDUM NO 1 Issued November 21, 2017

ADDENDUM NO 1 Issued November 21, 2017 SEATTLE HOUSING AUTHORITY #4936 SPRUCE STREET TOWNHOMES RENOVATION ADDENDUM 1 ADDENDUM NO 1 Issued November 21, 2017 FROM: TO: Seattle Housing Authority Mel Henley 190 Queen Anne Avenue North P.O. Box

More information

Bid due date has been extended. Bids are due Wednesday, December 7 th at 2:00PM

Bid due date has been extended. Bids are due Wednesday, December 7 th at 2:00PM AA. GENERAL STANDARDS AND CONDITIONS AA.1 AA.2 AA.3 AA.4 Bid due date has been extended. Bids are due Wednesday, December 7 th at 2:00PM Bids shall be emailed to Doug Sage at GSG Group, Inc. - Doug@GSGGroup.net.

More information

ADDENDUM NO. 1. PROJECT: Lowell High School DATE: January 28, Eucalyptus Drive, SF, CA 94132

ADDENDUM NO. 1. PROJECT: Lowell High School DATE: January 28, Eucalyptus Drive, SF, CA 94132 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM LOWELL HIGH SCHOOL PROJECT #11493 INTERIM HOUSING for VOLUNTARY SEISMIC STRENTHENING ADDENDUM NO. 1 PROJECT: Lowell High School DATE:

More information

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION 1 PLAN INFORMATION Residential plans must be legible and capable of digital scanning. All sheets shall be the same size and distinctly labeled with a sheet title and number. The minimum dimension of the

More information

STANMYRE + NOEL Architects, P.C Preston White Drive, Suite 104 Reston, VA v f

STANMYRE + NOEL Architects, P.C Preston White Drive, Suite 104 Reston, VA v f STANMYRE + NOEL Architects, P.C. 1890 Preston White Drive, Suite 104 Reston, VA 20191 v. 703.471.9350 f. 703.834.1031 info@snarchitects.com S E P T E M B E R 19, 2 0 1 6 ADDENDUM #3 PROJECT: WHITE OAKS

More information

RESIDENTIAL GRADE FACTORS

RESIDENTIAL GRADE FACTORS RESIDENTIAL GRADE FACTORS FOUNDATION TYPE: 1. PIERS OR RUBBLE 2. FROST WALL OR FULL STONE / SLAB 3. 8 CONCRETE OR BLOCK / GOOD GRANITE 4. 8 REINFORCED CONCRETE 5. 10 REINFORCED CONCRETE OR 12 BLOCK 6.

More information

Proposal. Lexington, MA. Price Work Description

Proposal. Lexington, MA. Price Work Description PROPOSAL Assumptions Sample Client Lexington, MA The is based on plans dated 3/3/15, with Sally's list of adjustments The price assumes the owners will be living in the house The owners will be responsible

More information

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE II RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING

More information

1. Add Carpeting to this scope of work as outlined per the schedule of alternates.

1. Add Carpeting to this scope of work as outlined per the schedule of alternates. NORTH CENTRAL HIGH SCHOOL, PHASE Addendum 8 GENERAL BID PACKAGE 7 FLOORING AND TILE WORK. Delete CARPETING from Scope of Work, Item 6 in this bid package. Carpeting will be addressed in the schedule of

More information

RFP P1319, Cobb Career Academy Questions and Answers

RFP P1319, Cobb Career Academy Questions and Answers 1. Blakely Downs McKnight Do you have a Square footage on the Cobb Career Academy addition? The Cobb Career Academy is 67,648 sf as is listed on the coversheet. 2. Alphonso Henderson Integrated Office

More information

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

Florida Army National Guard Construction Facilities Management Office. Scope of Work: Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines October 2008 Scope of Work: To provide complete design for the renovation/alterations

More information

Requests for Information pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 2018

Requests for Information pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 2018 Requests for Information - 05.0.1 5pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 201 RFI 01 Is the RFP due at 4pm or 5pm on May 16th? Response: RFI 02 Do you have an anticipated

More information

Addendum #1. January 22, 2018

Addendum #1. January 22, 2018 Addendum #1 January 22, 2018 Building B 8500 Public Works Drive Renovation for City of Manassas Water & Sewer Department 8500 Public Works Drive Manassas, VA 20110 Job Description Renovation of the existing

More information

RPQ ADDENDUM. Project Manager Frank Ramirez

RPQ ADDENDUM. Project Manager Frank Ramirez Port of Miami Contracts, Procurement & Materials Management 1007 N. America Way, Suite 311 Miami Fl 33132 MIAMI-DADE COUNTY, FLORIDA REQUEST FOR PRICE QUOTATION (RPQ) Contract No: MCC 7360 Plan - CICC

More information

Addendum #4 July 13, 2015

Addendum #4 July 13, 2015 Five Counties Children s Centre Addition 872 The Dutton Firehouse Road Complex Addendum #4 Peterborough, 721 Monaghan ON Road, K9H Peterborough, 7G1 ON K9J 5J8 Page 1 Addendum #4 July 13, 2015 The following

More information

Addendum #4 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018

Addendum #4 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018 ` Division of Finance and Business Operations Procurement & Strategic Sourcing 5700 Cass Avenue, suite 4200 Detroit, Michigan 48202 (313) 577-3734 FAX (313) 577-3747 January 11, 2019 Addendum #4 To Request

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

University of Akron. Addendum No. 2. For. Zook Hall Renovation Phase 2A Abatement & Demolition Project #: UAK120015

University of Akron. Addendum No. 2. For. Zook Hall Renovation Phase 2A Abatement & Demolition Project #: UAK120015 University of Akron Addendum No. 2 For Zook Hall Renovation Phase 2A Abatement & Demolition Project #: UAK120015 University of Akron Capital Planning & Facilities Management Lincoln Building Akron, Ohio

More information

TABLE OF CONTENTS SECTION TITLE PAGE. Bidder s Signature Page List of Subcontractors Construction Agreement Guaranty...

TABLE OF CONTENTS SECTION TITLE PAGE. Bidder s Signature Page List of Subcontractors Construction Agreement Guaranty... TABLE OF CONTENTS SECTION TITLE PAGE Forms Notice to Contractors... 1 Bid Proposal... 4 A. Unit Price Schedule... 5 B. Bid Form... 10 C. Reservation... 10 D. Subcontractors... 10 E. Notice... 10 F. Disclosure...

More information

MANETT STREET TOWNHOUSES

MANETT STREET TOWNHOUSES MANETT STREET TOWNHOUSES FOUR CONTEMPORARY RESIDENCES 2528 N. Fitzhugh Avenue Knox-Henderson Submarket Dallas, Texas Development Team SALES MEDLEY BUTTERMORE SABADIE (214) 443-1923 MEDLEY@LARKSPURCAP.COM

More information

NEW MIDDLE SCHOOL PROJECT

NEW MIDDLE SCHOOL PROJECT Monthly Report November 2018 INTRODUCTION P.J. Dick Incorporated is pleased to present to the Chartiers Valley Board of School Directors the following Construction Report for the Chartiers Valley Middle

More information

ADDENDUM 2 TO INVITATION FOR BID 5270-FG UNLV SOUTH RESIDENTIAL COMPLEX RENOVATION

ADDENDUM 2 TO INVITATION FOR BID 5270-FG UNLV SOUTH RESIDENTIAL COMPLEX RENOVATION ADDENDUM 2 TO INVITATION FOR BID 5270-FG UNLV SOUTH RESIDENTIAL COMPLEX RENOVATION University of Nevada, Las Vegas Purchasing Department 4505 Maryland Parkway Las Vegas, Nevada 89154-1033 (702) 895-3521

More information

MSA MOORE & SPENCE ARCHITECTS, P.A.

MSA MOORE & SPENCE ARCHITECTS, P.A. MSA MOORE & SPENCE ARCHITECTS, P.A. ADDENDUM NUMBER THREE (3): October 27, 2009 to the Construction Documents dated October 9, 2009 for: HACFM, Covington Meadows Apartments Lehigh Acres, Florida The following

More information

RFI REPLY. Project: Palm Coast Readiness Center Date: 07/22/16 Flagler County, Florida Comm. No.: 09005

RFI REPLY. Project: Palm Coast Readiness Center Date: 07/22/16 Flagler County, Florida Comm. No.: 09005 Project: Palm Coast Readiness Center Date: 07/22/16 Flagler County, Florida Comm. No.: 09005 To: All Bidding General Contractors Fax Email U.S. Mail Attn. Messenger We are sending the following: Quick

More information

DOCUMENT B. 2. The low bidder shall submit this Expanded Subcontractors Listing to the Owner within 24 hours after the bid opening.

DOCUMENT B. 2. The low bidder shall submit this Expanded Subcontractors Listing to the Owner within 24 hours after the bid opening. DOCUMENT 00 43 36B EXPANDED SUBCONTRACTORS LISTING TO: CLARK COUNTY SCHOOL DISTRICT hereinafter called "Owner" FROM: ~AU;)"''"-' Oeve\,(;p,-...e,.,,... IA... t. ~o~ t>.m..e>u,i-j (Print Company Name) Pe-Mo1..,,,-t,:;>.tJ

More information

The following shall be incorporated into the Contract Documents dated 26 MAR 2018.

The following shall be incorporated into the Contract Documents dated 26 MAR 2018. ADDENDUM NO. 2 DATE: April 12, 2018 PROJECT: OWNER: BID DATE: Munising Public Schools Mather Elementary Renovation Munising Public Schools Friday, April 20, 2018 at 10:00 a.m. The following shall be incorporated

More information

RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number:

RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number: RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number: 13-146 A D D E N D U M NO. 1 The following shall form part of the tender documents

More information

VOLUME 4 DIVISION SPECIFICATIONS

VOLUME 4 DIVISION SPECIFICATIONS Page 1 Section Title Consultant Pages VOLUME 4 DIVISION 00-01 SPECIFICATIONS Division 00 - Procurement and Contracting Requirements 00 01 07 SEALS PAGE All 5 00 01 11r6 TABLE OF CONTENTS All 7 00 21 13r1

More information

ADVERTISEMENT FOR BIDS

ADVERTISEMENT FOR BIDS 1. INVITATION ADVERTISEMENT FOR BIDS Sealed proposals for the following work will be received by the University of Kentucky, Capital Construction Procurement Section, Room #322 Peterson Service Building,

More information

Addendum No. 3 pg. 1. Project: Prolift Project No.: Subject: Addendum No. 3 Date: Monday, July 18, 2016

Addendum No. 3 pg. 1. Project: Prolift Project No.: Subject: Addendum No. 3 Date: Monday, July 18, 2016 Addendum No. 3 pg. 1 Project: Prolift Project No.: 201613.01 Subject: Addendum No. 3 Date: Monday, July 18, 2016 This addendum is a part of the bid documents. Acknowledge receipt on the proposal form.

More information

UCC Permit Application Procedures

UCC Permit Application Procedures How do I apply for a permit? UCC Permit Application Procedures 1. Please complete the CodeMaster Pan Review Application 2. Please provide the scope of work description and/or construction documents/plans.

More information

KIPLING SCHOOL RENOVATION AND EXPANSION PHASE 2 KIPLING, SASKATCHEWAN

KIPLING SCHOOL RENOVATION AND EXPANSION PHASE 2 KIPLING, SASKATCHEWAN 2012-07-26 00 91 14 31/2011 ADDENDUM NO. 2 Kipling School Renov. & Expansion Phase 2, Kipling, SK. Page 1 of 2 ADDENDUM NUMBER: ISSUED BY: PROJECT: TWO SEPW Architecture Inc. 109 3725 Pasqua St., Regina,

More information

ADDENDUM NUMBER ONE. for BOLDEN STADIUM RENOVATIONS & BUILDING ADDITIONS PHASE 2 RICHLAND COUNTY SCHOOL DISTRICT ONE COLUMBIA, SOUTH CAROLINA

ADDENDUM NUMBER ONE. for BOLDEN STADIUM RENOVATIONS & BUILDING ADDITIONS PHASE 2 RICHLAND COUNTY SCHOOL DISTRICT ONE COLUMBIA, SOUTH CAROLINA for RICHLAND COUNTY SCHOOL DISTRICT ONE COLUMBIA, SOUTH CAROLINA PREPARED BY: Clayton Design, Inc. 2549 Forest Drive, Suite 3 Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720

More information