1 TAB Associates, Inc. The Architectural Balance 0056 Edwards Village Boulevard Suite 210, Edwards, Colorado (970) (970) fax Addendum Project: Lake Creek Village Apartments Project No: 0547 Date: July 18, 2016 RE: Addendum #1 The following items are changes/modifications/clarifications to the Construction Documents. These have been published a minimum of four (4) days prior to bid and are to be considered part of the Construction Documents. Reference receipt of any addenda on your bid form. SPECIFICATIONS: 1- Clarification, will there be any work going on with the garage buildings, clubhouse, etc? The scope of work will be focused on the residential buildings. 2- Clarification, will the exhaust fan and dryer caps be replaced or salvaged and reinstalled? Items will be salvaged and reinstalled. RE: D2.1 through A Clarification, will the attic vents be reused and repainted or will they need to be replaced? Attic vents will remain in place and be repainted. RE: D2.1 through A Clarification, existing landscaping will need to be worked around however it will be the owners responsibility to determine what will be fixed. No allowance will be needed in the bid. 5- Clarification, in developing a schedule you will need to indicate what will be the most efficient. There are no special considerations for any buildings. 6- Clarification, if the construction schedule is split into two phases, 2017 and 2018, the builder will need to schedule which buildings will be done when and how to be the most efficient. 7- Clarification, Detail to Stair stringers on Building Type B and C is close to the adjacent wall, if there is not enough room to install new sheathing and siding, the stair will be relocated to allow installation. We have observed all the buildings and we believe there is enough room to install siding in all locations. With the exception of the West stairs of Building 8 which may need to be shifted. RE: A Clarification, there are no gutters or downspouts in the area of work so no allowance for removal and reinstall required. 9- Clarification, the window counts for Type 3 and Type 4 windows have been revised on A Clarification, the existing column caps are to remain in place and be repainted, no new flashing will be installed at this time. A2.1, A2.2, A Clarification, all of the existing guardrails and handrails will be removed, refinished and reinstalled. A2.1, A2.2 and A Clarification, rim joists will be treated the same as the wall conditions, if access to the joist space is not possible it will be an area of no work. A2.1, A2.2, A Clarification, no onsite storage will be available, however space will be available for onsite storage compartments. GC to provide as necessary, locations to be determined during phasing discussions. 14- Clarification, as doors are moved out with the new sheathing a trim board will be added to the jambs and head and painted to match adjacent drywall. An additional piece of trim will be added to the floor and painted/stained to match the existing threshold. A2.1, A2.2, A Clarification, there should be no allowance for screw pops on the inside face of the rooms. 16- Clarification, window coverings and blinds will be removed and reinstalled, however if they will not fit the new openings the owner will be responsible for replacement. 17- Clarification, doors will be removed and reinstalled, the owner will be responsible for replacement of damaged thresholds if they are damaged during removal. A2.1, A2.2, A Clarification, we have always called out for the repainting of gas meters to help them blend in with the adjacent wall and have never come across a problem, repainting of the gas meter is to remain in the scope of work. A2.1, A2.2, A2.3.
2 19- Clarification, the current scope of work calls for the satellite dishes to be removed and reinstalled, the wiring will remain in the current locations. The Owners are considering an option to switch to a different service provider but this is not finalized. For now stick with the existing scope of work. A2.1, A2.2, A Clarification to hours of work, 8am-dusk, 7 days a week. Coordinate w/ Bill for any work time inside the units. 21- Clarification for the bidding process, assume all wall insulation is of sufficient quality to allow reinstallation, no allowance to be included for replacement of damaged installation, this will be done as an change order as needed. A2.1, A2.2, A Clarification Is the base bid GMP amount to include/consider the construction schedule/duration defined as alternate 1? The base bid GMP should include the Alternate 1 option for pricing. 23- Clarification Keynote 18 for windows references scope of work #4 which deals with trim for the doors. This should reference scope of work #3 which deals with the windows. D2.1, D2.2, D Clarification there was some confusion about Alternate 1 on A0.1. This has been revised to alternate Clarification Detail 4/A2.1 is labeled Exterior Elevation Elec Shed but it appears to show a unit. This elevation is the same as 5/A2.1 with the exception of the Electrical Shed. Similar situation on A2.2 and A Clarification Alternate on sheet A0.1 indicates replacement of sliding doors, but keynote 12 on sheet D2.1 indicates the alternate is to provide for replacement of all doors, not just sliding doors. Please clarify/confirm alternate scope. Alternate on A0.1 is just for the replacement of the sliding doors. All entry doors will be removed and reinstalled. 27- Clarification Exterior finish legend states 3/4" Stucco on Diamond lath, spec section states 1/8" EFIS on glass fiber reinforcing mesh. Please clarify the system to be priced. Use 3/4 stucco on Diamond Lath per the Legends on A2.1, A2.2, and A2.3. We will update the Specifications. 28- Clarification to Dew Point Calculation, We did a calculation and the wall assemblies 13/A5.2 all worked to our satisfaction. 29- Clarification, Will a section of shingles need to be removed where the roofs meet walls so that we can properly dry in the wall to roof transition with the new wall plane? The goal is to not remove any shingles. We will revise this detail as to how we believe this can be accomplished. 5/A5.2 and 5/A Clarification Will the gable ends be insulated with the new work? Is there insulation currently? Some gable ends will not have insulation. Price the drawings as having the Ox Product with sheathing as shown on A2.1. Please provide an alternate to replace the Ox Sheathing on Building Type A with Densglass and Tyvek and on Buildings Type B and C replace the Ox with Tyvek in the specified Areas see A2.2 and A2.3. We will provide details for this alternate. It will be added as Alternate 4 on A0.1. DRAWINGS: 1- REPLACE Drawing A0.1 WITH A0.1 attached. Revised Window Counts and initial areas of Storage Indicated. 2- REPLACE Drawing A2.1 WITH A2.1 Attached. Added Typ Deck Elevation and Gable End Insulation Alternate. 3- REPLACE Drawing D2.1 WITH D2.1 Attached. Added Typ Deck Elevation. 4- REPLACE Drawing A5.2 WITH A2.2 Attached. Gable End Insulation Alternate. 5- REPLACE Drawing A2.3 WITH A2.3 Attached. Added Typ Deck Elevation and Gable End Insulation Alternate. 6- REPLACE Drawing D2.3 WITH D2.3 Attached. Added Typ Deck Elevation. 7- REPLACE Drawing A5.2 WITH A5.2 Attached. Revised Detail Numbers. O:\FORMS\Addndm.doc Addendum No. 1 Project No Date: 07/18/16 Page - 2
3
4
5
6
7
8
9
Carpentry. The following describes the scope and sequence of instruction for Carpentry.
Carpentry The Montgomery County Students Construction Trades Foundation, Inc has developed a comprehensive construction technology program designed to prepare students for a rewarding career in the construction
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationCity of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage
City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number
More informationTown of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:
S FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE: Included Costs: Items that must be included in the costs of improvement or costs to repair are those that are directly associated with the
More informationBELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY
BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY The list below contains those building elements most commonly found in buildings found in a condominium
More informationBrewery South. Elevations - North. Elevations - South. Elevations - East. Elevations - West NOT FOR REGULATORY APPROVAL, PERMITTING OR CONSTRUCTION
A5.. A5.. Elevations North Elevations South BRICK PAINTED STUCCO 3 6" SMOOTH FINISH HORIZ. FIBER CEMENT SIDING 4 CLEAR SEALED CEDAR SHIPLAP SIDING 5 METAL PANEL 6 4" METAL GUARDRAIL W/ /" METAL PICKETS
More informationWindbrooke Townhome Association, Inc. Maintenance & Service Responsibility Chart
Building Maintenance Roof Repair and restoration of interior damage caused by roof leak; repair or replacement of structural supports under the roof decking and sheathing (i.e. trusses). Siding Repair
More informationBELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY
BELLA PALERMO HOMEOWNERS ASSOCIATION MAINTENANCE MATRIX DIVISION OF MAINTENANCE AND REPAIR RESPONSIBILITY The list below contains those building elements most commonly found in buildings found in a condominium
More informationHandyman & Maintenance Cost Estimator
Handyman & Maintenance Cost Estimator 2013 Quickly & Accurately Estimate Small Jobs Compiled & Edited by Bill O'Donnell ISBN 978-1-300-58228-1 Copyright 2013 by RemodelMAX, Inc. Printed in the United States
More informationBIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample
BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS Project Name: Address: Owner: Phone/Fax/Email: Architect / General Contractor Name: : BID DEADLINE DATE: SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME:
More informationWork Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free
/ / Paperport 2000 official estimating report Work Write Up / Specification of Repairs Toll Free 1-877-932-7177 Clients Name. GREAT CLIENT Property Address. NUMBER ONE GOOD ROAD METRO, VA 20000 Primary
More informationDistances are not shown to scale. Existing porch. Community. Building. Distances are not shown to scale
patio and deck 00 Building Two story Four-plex Entrance 0 0 00 Building Single Story Duplex 0 patio Contact Information: Owner: Housing Authority of Yamhill County, NE Dunn Place, McMinnville, OR 9. Contact:
More informationProposal Request (attachment to AIA Form G709)
Proposal Request (attachment to AIA Form G09) PR No: PR-0 Date: January, 06 Project: Great Work Montessori School Owner: Great Work Inc. Architect: Cuningham Group Copy To: File DESCRIPTION OF WORK The
More informationChapter 32 - Garage. June 2015 Garages 32-1
Chapter 32 - Garage Contents Chapter 32 - Garage... 32-1 Foundation... 32-3 Walls... 32-3 Roof Framing... 32-4 Roofing... 32-4 Exterior Dow Board... 32-5 Doors... 32-5 Siding... 32-5 Gutters... 32-6 Painting...
More informationPORCH PLAN. Existing House. New Porch. Page A.1. Boxed Beams. 5/4x6 Cedar Decking. Roof Overhang. Wood Columns. Hip Roof. Step
Porch Plan 28 68 2'-0" 7'-8" 2'-0" 7'-0" PORCH PLAN SCALE: /4" = '-0" CD24 0 SECT D A.6 7 /4" 7 /4" Boxed Beams Existing House 23'-2 /4" 30 68 New Porch Step Wood Columns 8'-0" 2'-0 /2" 2'-0 /2" 8'-0"
More informationA.ENVELOPE AIR SEALING
(Page 1 of 4) Note: The Energy Efficiency Standards Section 110.7 requires that all joints, penetrations and other openings in the building envelope that are potential sources of air leakage shall be caulked,
More informationBuilding Guide. Colorado Chapter of the International Conference of Building Officials. Building Guide
12/29/16 Building Guide Colorado Chapter of the International Conference of Building Officials Building Guide Colorado Chapter of the International Code Council Single Family Residential Enclosing Existing
More informationDr. Edward Livingston Trudeau Building. 118 Main Street, Saranac Lake, NY. Building Systems Report. June 24, 2018
G2 Gordon + Gordon Architecture. LLC Dr. Edward Livingston Trudeau Building 118 Main Street, Saranac Lake, NY Building Systems Report June 24, 2018 Harry Gordon, FAIA 164 Otter Slide Road Saranac Lake
More information3. Appliances - Free Standing x
EXHIBIT "B" CARLSBAD CREST HOMES ASSOCIATION, INC. ASSOCIATION/ MAINTENANCE, REP AIR & REPLACEMENT MATRIX The following is a listing of the items within the Development, the maintenance, repair and replacement
More informationAMENDMENT TO SPECIFICATIONS
AMENDMENT TO SPECIFICATIONS SECTION 01 10 00, Paragraph 1.01: Revise subparagraphs A, B, and C as follows: A. BASE WORK 1) Temporarily remove and store items mounted on the building exterior for reinstallation
More informationItem 2.3 Unit pricing GC to provide a square foot unit cost for material and labor to replace plywood decking beneath new concrete walkway slab.
Willow Glen Housing Repairs Project #9-59 Addendum Item. Change to bid date The bid date will be extended to March 8, 09, :00pm at the Housing Authority of Columbus Central Office,000 Wynnton Road Columbus,
More informationINSTALLING WATER-RESISTIVE BARRIERS & FLASHING
INSTALLING WATER-RESISTIVE BARRIERS & FLASHING IN A TWO-LAYER STUCCO APPLICATION Fortifiber Building Systems Group provides this guide to assist installers by demonstrating a two-layer installation of
More informationRepair or replace section of driveway, approach, or sidewalk that are a trip hazard.
City of Gibraltar Pre-Sale Inspection Report Checklist FLATWORK: Repair or replace section of driveway, approach, or sidewalk that are a trip hazard. EXTERIOR PROPERTY: Fences/Sheds/Retaining walls: Repair,
More informationCountry Village Maintenance Responsibility Guidelines BUILDING - EXTERIORS AND INTERIORS
BUILDING - EXTERIORS AND INTERIORS Building Interior / Framework Blocking Braces Foundation and Interior Slab Rafters Ridge Boards Studs Trusses Internal portion of exterior walls & roofing (i.e. interior
More informationWindbrooke Townhome Association, Inc. Maintenance & Service Responsibility Chart
Windbrooke Townhome Association, Inc. Maintenance & Service Responsibility Chart Building Maintenance Roof Repair and restoration of interior damage caused by roof leak; repair or replacement of structural
More informationSpring Lake Public Schools. Spring Lake, MI. March RE: High School Storage Buildings
Spring Lake Public Schools Spring Lake, MI March 2018 RE: High School Storage Buildings Advertisement for bids Bid Proposal Sealed bids for Spring Lake Public Schools-High School Storage Buildings will
More informationWeatherSmart Air Barrier Installation Guide
WeatherSmart Air Barrier Installation Guide 1 The intent of this document is to provide a guide for the installation of WeatherSmart as both a Weather Resistive Barrier (W.R.B.) and an Air Barrier Material
More informationPerkins Statewide Articulation Agreement. Documentation item: Secondary Competency Task List Coversheet
Perkins Statewide Articulation Agreement Documentation item: Secondary Task List Coversheet The Secondary School agrees to: A. Implement the approved PDE Program(s) of Study. B. Provide assessment of student
More information1065 N Canyon St, Ste. 8, Hildale, UT Cell: (435) N Richard
385 N Richard CRITICAL IMPROVEMENTS Windows, Doors, Cabinets Replace Crtitically Broken Windows Recommended to Finish Windows, Doors, Cabinets Replace Broken Windows 1065 N Canyon St, Ste. 8, Hildale,
More informationFOR IFB #PC436 Exterior Improvements at Colton Public Housing Complex
HOUSING AUTHORITY OF THE COUNTY OF SAN BERNARDINO PROCUREMENT AND CONTRACTS DEPARTMENT 715 E. BRIER DRIVE, SAN BERNARDINO, CA 92408 (909) 890-0644 FAX (909) 890-2349 http://www.hacsb.com/procurement.htm
More informationAqua Coast Engineering
Aqua Coast Engineering Ltd. P.O. Box 1367 Station A Delta, B.C. V4M 3Y8 Tel: (604)948-0958 Fax: 604)948-0959 September 1, 2011 Matthew Cheng File#:11145 Matthew Cheng Architect Inc. Fax: 604-731-3908 Unit
More informationHOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS
St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the
More informationThe Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage
The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco
More informationSOLICITATION ADDENDUM
TO: SOLICITATION NO.: CITY OF PALM BEACH GARDENS PURCHASING DEPARTMENT SOLICITATION ADDENDUM Addendum No. 8 All Potential Bidders ITB2017-078PS DATE: June 18, 2018 TITLE: OPENING DATE: Municipal Complex
More informationELEVATION GENERAL NOTES: 1. ALL PAINT / FINISH SYMBOL DEFINITIONS FOUND ON A8.1. 2. ALL NEW GLAZING WITHIN 18" OF GROUND OR ADJACENT TO DOOR(S) TO BE TEMPERED. 3. REMOVE ALL EXISTING METLA COPING CAPS
More informationNorth Village Condominiums
North Village Condominiums An ambient community in Douglas, Massachusetts encompassing the luxury of Blackstone Valley s serene country surroundings FOUNDATION Builders General Specifications (As of 1/1/2017)
More informationREVISIONS AND CLARIFICATIONS TO DOCUMENTS
5656 Waterman PAGE 1 OF 1 ADDENDUM #4 (drawing revision #5) PROJECT: 5656 WATERMAN DATE OF ISSUE: 2017.08.22 OWNER: K.C. ELLIOT FROM: Jeff McGee TO: Altman Charter Company St. Louis Design Alliance, Inc.
More informationFINEGAN INSPECTION SERVICES, INC. 76 WEST FOSTER MAINEVILLE ROAD MAINEVILLE, OHIO PHONE FAX
FINEGAN INSPECTION SERVICES, INC. 76 WEST FOSTER MAINEVILLE ROAD MAINEVILLE, OHIO 45039 683-0733-PHONE 697-0163-FAX HOME INSPECTION REPORT 2/15/05 CLIENT: Mr. and Ms. RESIDENCE LOCATION: McJunkin Road,
More information2015 IECC Air Sealing Multifamily For Code Compliance Funding for Energy Code Training
2015 IECC Air Sealing Multifamily For Code Compliance 2 Funding for Energy Code Training 1 Sponsor Also Recognize Resources Provided by Department of Energy: DOE Building America Program https://www.energycodes.gov/
More informationSECTION R327.3 STANDARDS OF QUALITY
California Residential Code Section R327 Conformance Checklist Per CRC R327.1.4 The local building official shall, prior to construction, provide the owner or applicant a certification that the building
More informationChapter 33 - Checklists
Chapter 33 - Checklists Contents Chapter 33 - Checklists... 33-1 Framing Checklist... 33-2 Exterior Water Plane Checklist... 33-3 Air Sealing Checklist... 33-4 Insulation Checklist... 33-6 Painting Checklist...
More informationArchitectural Design Standards - Character
RESIDENTIAL DESIGN STANDARDS - ALL BUILDINGS The design of individual residential buildings and groups of buildings shall employ a variety of design features. In addition to the design features used on
More informationCarpentry/Carpenter CIP Task Grid
Secondary Task List 100 SAFETY/OCCUPATIONAL ORIENTATION 101 Identify and follow all basic safety practices and procedures. 102 Identify and follow all lab safety practices and procedures. 103 Identify
More informationPLYMOUTH CREEK HOME OWNERS ASSOCIATION
Page 1 of 8 PLYMOUTH CREEK HOME OWNERS c/o Omega Management, Inc. 15350 25th Avenue North #108 Plymouth, MN 55447 MAINTENANCE SERVICE POLICY In general, the common facilities which are available for use
More informationCHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS A. ITEMS FROM PREVIOUS SITE INSPECTIONS-INCOMPLETE OR ON HOLD
TAB D-2b CHANCELLORS RESIDENCE ANNUAL INSPECTION REPORT BY BOT GOVERNANCE COMMITTEE MEMBERS August 5, 2015 Items added to Inspection performed by Facilities Management Team of July 16, 2015 The care of
More informationMagnum Board Coatings
Master Wall Mesh and Base Coat Plastic Control Joint Accessory, Plastic Components 22027-16 or equal. See notes for placement recommendations Notes: Control joints are required and should be located by
More informationAppalachian Log Structures Construction Cost Estimating Guide
PLANNING Design/Architect Fees General Contractor Fees LOT CONSIDERATIONS Lot Costs Property Tax Surveying Zoning PRELIMINARY COSTS Taxes Building Permit Hazard/Liability Insurance Performance Bond Impact
More informationRESIDENTIAL BUILDING PLAN REQUIREMENTS
CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us RESIDENTIAL BUILDING PLAN REQUIREMENTS
More informationTOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT
TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT 06045-0191 138 MCKEE STREET MANCHESTER, CT BID NO. 16/17-5 ADDENDUM NO. 1 1. The bid opening has been
More informationDate: Lot #: Address: Phone # Name: Phase # Address: Cell Fax . Address Phone No. Cell Fax . Address Phone No.
1 of 6 To: MUIRFIELD DESIGN CONTROL COMMITTEE Application for: New Home Construction Date: Lot #: Email Address: Phone # Name: Phase # Address: This application is presented to the Muirfield Design Control
More informationMETROPOLITAN PIER AND EXPOSITION AUTHORITY INVITATION FOR BIDS (IFB) # M OFFICE BUILD OUT, 5 TH FLOOR OF ABC BUILDING ADDENDUM NO.
METROPOLITAN PIER AND EXPOSITION AUTHORITY INVITATION FOR BIDS (IFB) #2017-20-M OFFICE BUILD OUT, 5 TH FLOOR OF ABC BUILDING ADDENDUM NO. (1) September 28, 2017 This Addendum No. 1 consists of seven (7)
More informationPOSSIBLE TREATMENT STRATEGIES 1/3 From Archibald Johnston Mansion Stabilization Study - Recommendations
POSSIBLE TREATMENT STRATEGIES 1/3 Minimal short-term stabilization The plan for minimal short-term stabilization represents all of the recommended items to be completed if the Township only wishes to buy
More informationSAMPLE REPORT. January 1, 201#
January 1, 201# The Strata Council of Townhouse Village, BCS#### c/o Mr. John Smith, Strata Management Company XYZ 1234 Someplace Street City BC V0V 1A1 Dear Strata Council: The enclosed Depreciation Report
More informationA Summary of the Basic Duties of Maintenance, Repair and Replacement for CARRIAGE PARK CONDOMINIUM ASSOCIATION
A Summary of the Basic Duties of Maintenance, Repair and Replacement for CARRIAGE PARK CONDOMINIUM ASSOCIATION PLEASE TE: This Summary is for convenience of reference only. It does not supersede or alter
More informationT T LEGAL DESCRIPTION: LEGEND X FOUND MONUMENT AS NOTED A.M. ~ AS MEASURED IN FIELD REC. ~ DEED OR PLAT DISTANCE PL ~ PROPERTY LINE FF ~ FINISHE
T T LEGAL DESCRIPTION: LEGEND X 99.44 FOUND MONUMENT AS NOTED A.M. ~ AS MEASURED IN FIELD REC. ~ DEED OR PLAT DISTANCE PL ~ PROPERTY LINE FF ~ FINISHED FLOOR CALLED NORTH N EXIST. SPOT ELEVATION N00 04'58"W
More informationGarris Evans Estimating Department. Project Name: Project Address: Customer Phone Number: Project Type: Residential Commercial Homeowner
Garris Evans Estimating Department Date: Project Name: Project Address: Customer Phone Number: Customer email: Salesman: Project Type: Residential Commercial Homeowner The following information is both
More informationThe developer / builder desires to follow the Design Guidelines and Design Features as listed below in lieu of the Basic Standards.
Section 2. Single Family and Two Family Guidelines. A. Basic Standard. The developer / builder desires to follow the Design Guidelines and Design Features as listed below in lieu of the Basic Standards.
More informationAdministrative Changes
Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings
More informationInspection Report. Prepared for: Tonia Mann. Property Address: 1295 Greyland Hills Drive Lawrenceville, GA Date: April 24, 2012
Inspection Report Prepared for: Tonia Mann Property Address: Lawrenceville, GA 30046 Date: April 24, 2012 Inspector: Charles Mann (770) 594-2222 www.edificeinspections.com Page 1 INSPECTION CONDITIONS
More informationInspection Report. Property Address:
Inspection Report provided by: Safe Side Home Inspection Inspector: Corey Stuart TN License # 778 434 Margaret Circle McMinnville, TN 37110 safesideinspection@blomand.net Property Address: 1234 Anywhere
More informationPolicies & Guidelines
Policies & Guidelines Facilities Maintenance and Repair These Policies and Guidelines are provided by the Falconbridge Homeowners Association (FHA) Board of Directors to explain how the Declarations of
More informationChapter 2 Understanding The Problem
Chapter 2 Understanding The Problem What Causes Most Of The Problems With Stucco? EIFS was originally intended to seal and insulate the exterior of the home from the elements. Problems occur when poorly
More informationCITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS
CITY OF OAK CREEK SINGLE FAMILY & TWO-FAMILY CONSTRUCTION/PERMIT REQUIREMENTS Update April 29, 2013 12 Permit application forms and contact information can be found on our website under Inspection Department
More informationARCHITECTURAL GUIDELINES of Vantage Homes Association, Inc. 30 JUNE 1995
ARCHITECTURAL GUIDELINES of Vantage Homes Association, Inc. Preface 30 JUNE 1995 The Vantage/Kingsbrooke community is made up of differing architectural styles. The two original designs contrast dramatically:
More informationRESPONSIBILITY OF THE BUILDER/OWNER
NOTE: 1 2'-5" 1'-4" 19'-4" 1'-4" 2'-5" 1 1) ALL REPRESENTATIONS OF FIXTURES, EQUIPMENT, MATERIALS, ELECTRICAL, PLUMBING, FASTENERS, ETC. ON CLIENTS DESIGN ARE NOT INCLUDED WITH CLIENT'S PACKAGE PURCHASED
More informationCalculated Quantities and Details
Estimate # 8/14/2007 Estimate For: Bill Johnston Finest Quality Homes 1234 Heght Blvd #204 Houston Tx 77079- Ph: (281) 555-5555 Fax: (281) 555-5556 P.O. Box 323 Simonton Tx. 77476 Phone: (281) 346-2462
More informationARCHITECTURAL GUIDELINES of Vantage Homes Association, Inc. 30 JUNE 1995
ARCHITECTURAL GUIDELINES of Vantage Homes Association, Inc. Preface 30 JUNE 1995 The Vantage community is made up of differing architectural styles. The two original designs contrast dramatically: from
More informationMaterial Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5
Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey 01-2320 sqft.spf] Page 1 of 5 PREPARATION PRELIM PERMITS & FEES Building Permit 1 each 2200.00 _ 2200.00
More informationInspection Report. Prepared for: Yaron Sternberg. Property Address: 926 Hemingway Road Stone Mountain, GA. Date: April 15, 2011
Inspection Report Prepared for: Yaron Sternberg Property Address: Stone Mountain, GA. Date: April 15, 2011 Inspector: Charles Mann (770) 594-2222 www.edificeinspections.com Page 1 INSPECTION CONDITIONS
More informationTELEPHONE: (215) Addendum No. 1
THE SCHOOL DISTRICT OF PHILADLPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor - Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 Addendum No. 1 Subject:
More informationWELCOME HOME VETERANS SHELTER 2112 BUSINESS LOOP 70 EAST COLUMBIA, MISSOURI PWA #201430
2120 Forum Boulevard, Suite 101 Columbia, Missouri 65203 573.449.2683 Fax: 573.442.6213 www.pwarchitects.com ADDENDUM #1 DATE: June 21, 2016 TO BIDDING DOCUMENTS ENTITLED: WELCOME HOME VETERANS SHELTER
More informationFINEGAN INSPECTION SERVICES, INC.
FINEGAN INSPECTION SERVICES, INC. TERRY FINEGAN 76 WEST FOSTER MAINEVILLE ROAD MAINEVILLE, OHIO 45039 683-0733-PHONE 697-0163-FAX Email- finegan @ fuse.net CLIENT: 1/14/08 Mr. BUILDING LOCATION As in all
More information1065 N Canyon St, Ste. 8, Hildale, UT Cell: (435) S Pioneer
1065 N Canyon St, Ste. 8, Hildale, UT 84784-0283 Cell: (435) 819-0128 125 S Pioneer 1065 N Canyon St, Ste. 8, Hildale, UT 84784-0283 Cell: (435) 819-0128 CRITICAL IMPROVEMENTS Framing Demo Tin Fence Exterior
More informationSureHome Inspection Company. Home Inspection. Grant st Street Omaha, NE 68048
Home Inspection Grant 7142 21st Street Omaha, NE 68048 Page 1 of 13 Table of Contents Definitions 2 General Information 2 Roof 3 Exterior 4 Grounds 5 Attic 5 Garage 6 Bathroom 6 Interior 7 Kitchen 7 Laundry
More informationSchedule C STANDARD Specifications
Schedule C STANDARD Specifications RTM Finished Home Specifications Name: Job #: Address: Phone: Standard Specifications FRAMING 2x6 exterior wall construction 3/8 OSB sheeting 2x4 interior wall construction
More informationDOCUMENT ADDENDUM NO. 1
DOCUMENT 00 91 01 ADDENDUM NO. 1 1. GENERAL This document includes requirements that clarify or supersede portions of the bid and/or contract requirements for the project. This Addendum is a Contract Document.
More informationValues That Matter PLAN CERTIFICATION WORKSHEET
Values That Matter PLAN CERTIFICATION WORKSHEET Builder Name: Main Floor: sq. ft. Plan Name/Number: Upper Floor: sq. ft. Contact Person: Total: sq. ft. Phone: Email: For any item labeled as (option), you
More informationCopyright 2002-present, Natural Element Homes naturalelementhomes.com CABIN (2224)
28'-0" 11'-2" Copyright 2002-present, Natural Element Homes naturalelementhomes.com 1-800-970-CABIN (2224) 105'-2 7/8" 29'-6 3/8" DECK 29'-6 3/8" 14'-6 1/2" 25'-3" 14'-6 1/2" 25'-7 1/2" 25'-3 3/8" 26'-4"
More informationCopyrighted Home Plan 2011 Natural Element Homes, LLC
64'-0" DECK 24'-0" 13'-10" 10'-2" 8'-0" 7'-6" WALK-IN 4-0 14'-10 1/2" 4'-2 1/2" '-5" 2'-6" 1832-T FRENCH FRENCH 6" PLUMBING WALL BENCH 4-2X4 POST W/ SCREW JACK ASSEMBLY (TYP.) MASTER BEDROOM 5'-10" '-2"
More informationGARAGE MAIN FLOOR PLAN SDSCAD Specialized Design Systems
BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS. BARN TO BE BUILT AS PER IRC,UBC OR CURRENT LOCAL CODE To the best of my knowledge
More informationButte County Fire Department Fire Prevention Bureau 176 Nelson Avenue Oroville, CA Office (530)
2016 CBC Chapter 7A and CRC Section R337 (The use of paints, coatings, stains, or other surface treatments are not an approved method of protection as required in this chapter.) The Wildland Urban Interface
More informationInspection Report. Prepared for: Yossi Berg. Property Address: 4925 Diggers Way Sugar Hill, GA. Date: July 20, 2011
Inspection Report Prepared for: Yossi Berg Property Address: Sugar Hill, GA. Date: July 20, 2011 Inspector: Charles Mann (770) 594-2222 www.edificeinspections.com Page 1 INSPECTION CONDITIONS CLIENT &
More informationMARSHALL HOUSING AUTHORITY
MARSHALL HOUSING AUTHORITY ARCHITECTURAL COVER SHEET LOCATION MAP & SHEET INDEX SlTE A PINE WOOD CIRCLE (VEST CIRCLE) 275 South Redman SITE B REDWOOD CIRCLE (MARROW CIRCLE) Marshall, MO 65340 Miscellaneous
More informationSchedule A Development Permit No Issued this 18 day of April, 2018
Schedule A Development Permit No. 001610 Issued this 18 day of April, 2018 N No. Revision/Issue Date MM/DD/YY 1 ISSUED FOR TENDER 10/26/17 LEGEND: WORK AREA VILLAGE STROLL VILLAGE GREEN SOUTH WING 1 0
More informationBROCHURE # 108 CONSTRUCTION PLAN COMPONENTS
BROCHURE # 108 CONSTRUCTION PLAN COMPONENTS Please note: This construction plan component list is to be used as a guide to assist you with your project. There may be elements unique to your project not
More informationExterior structures (fences, sheds, decks, retaining walls, detached garages) in good condition, no evidence of termite damage or rotted wood
Please Note: This checklist should not be relied upon as a home inspection report, nor should it be considered a substitute for a home inspection. This list is representative, but NOT exhaustive. If you
More informationProperty Inspection Checklist
Property Inspection Checklist Use a checklist like this to make sure that you are looking at all parts of the house. Check off those items that are in good condition and make notes about those that are
More informationSAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1
SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 PROJECT: 300 Seneca New Academic Campus DATE: September 23, 2013 300 Seneca Ave., S.F.,
More informationResidential Building Inspections
Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved
More informationZ & C Construction, Inc. Subdivision:
: Buyer(s): Address: Lot: Block: Model: Subdivision: A. Foundations Unfinished basement or crawlspace included per buyer selection (extra fees may apply) Engineered concrete foundation Perimeter drainage
More informationHome Condition Checklist
Home Condition Checklist What to bring: 1. Flashlight 2. Pen 3. Paper 4. Gloves 5. Old Clothes/shoes 6. This list Start with the exterior of the home and work in one direction, with enough distance to
More informationNARI National 2018 CotY Program Categories Please read category descriptions carefully as some criteria have changed.
Please read category descriptions carefully as some criteria have changed. New for 2018! Green and Universal Design Categories *Cost is defined as contract price, all extras, change orders and the fair
More informationInspection Report. Prepared for: Gil Turiel. Property Address: 545 Briar Run Court Loganville, GA Date: July 17, 2011
Inspection Report Prepared for: Gil Turiel Property Address: Loganville, GA 30052 Date: July 17, 2011 Inspector: Charles Mann (770) 594-2222 www.edificeinspections.com Page 1 INSPECTION CONDITIONS CLIENT
More informationBid due date has been extended. Bids are due Wednesday, December 7 th at 2:00PM
AA. GENERAL STANDARDS AND CONDITIONS AA.1 AA.2 AA.3 AA.4 Bid due date has been extended. Bids are due Wednesday, December 7 th at 2:00PM Bids shall be emailed to Doug Sage at GSG Group, Inc. - Doug@GSGGroup.net.
More informationSC-01 Cross-Section. Cement Board Substrate Master Wall Mesh and Base Coat Superior Finish
Master Wall Mesh and Base Coat Plastic Control Joint Accessory, Plastic Components 22027-16 or equal. See notes for placement recommendations Notes: Control joints are required and should be located by
More informationInstallation Guidelines
Installation Guidelines The Vertibreak Wall System: Installation Guidelines Rainscreen Insulation for New or Retrofit Construction Applications Vertibreak rainscreen insulation is an expanded polystyrene
More informationThe Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits
The Compass ( 270 Lisgar Street, Brighton ) Features General Site Work 1. Construction Drawings 2. Building, Plumbing Electrical and Entrance Permits 3. Development and Septic Fees 4. Tarion New Home Warranty
More informationSMOKY RIDGE HOMEOWNERS ASSOCIATION ARCHITECTURAL CONTROL COMMITTEE (ACC) GUIDELINES EFFECTIVE DATE: April 22, 2019
SMOKY RIDGE HOMEOWNERS ASSOCIATION ARCHITECTURAL CONTROL COMMITTEE (ACC) EFFECTIVE DATE: April 22, 2019 The Process Defined 1. The completed Architectural Improvement Request Form and all supporting documentation
More information2. House Designs. SAL Review
2. House Designs 1 Roof has a minimum of 6:12 pitch 2 Minimum roof overhang is 2 feet 3 Roof design must incorporate dormers or gables to the 4 Long slopes of unbroken roof line will not be accepted 5