1 Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office:

2 CONTENTS Sr. No. Description 1. Executive Summary 2. Introduction of the Project/Background information 3. Project Description 4. Site Analysis 5. Planning Brief 6. Proposed Infrastructure 7. Rehabilitation and resettlement (R & R) Plan 8. Project Schedule & Cost Estimates 9. Analysis of Proposal (Final Recommendations)

3 1.0 EXECUTIVE SUMMARY 1.1 Company Profile Introduction: The name of our unit is M/s. Shri Hari Dyes Chemicals. Our Unit is located at Plot No. C-1/ 5629, Phase- II, GIDC, Vatva, Ahmedabad. 1.2 Project Details: Sr. No. Product name Quantity (MT/Month) 1 Reactive Dyes - Re Brilliant Red M 5 B - Re Magenta - Re Brilliant EB - Re Yellow MYR 2 Reactive Black B 3 Reactive Black N Reactive Black WNN 5 Reactive Golden Yellow HR 6 Reactive Golden Yellow MERL 7 Reactive Golden Yellow R 8 Reactive Golden Yellow RNL 9 Reactive Blue 5RH 10 Reactive Blue BB 11 Reactive Blue BF 12 Reactive Blue ME2RL 13 Reactive Blue BRF 14 Reactive Magenta HB 15 Reactive Blue GG 16 Reactive Navy Blue ME2RL 17 Reactive Navy Blue RGB 18 Reactive Orange 2R Existing Proposed Total

4 19 Reactive Orange CD 20 Reactive Orange H2R 21 Reactive Orange ME2RL 22 Reactive Orange W3R 23 Reactive Blue P2R 24 Reactive Blue P3R 25 Reactive Red BS 26 Reactive Red CD 27 Reactive Red ME3BL 28 Reactive Red ME4BL 29 Reactive Red ME6BL 30 Reactive Red P2B 31 Reactive Red P4B 32 Reactive Red P6B 33 Reactive Red P8B 34 Reactive Red PB 35 Reactive Red RB 36 Reactive Red W3R 37 Reactive Blue RGB 38 Reactive Yellow FG 39 Reactive Yellow GR 40 Reactive Yellow H4G 41 Reactive Yellow ME4GL Total Spray Drying ( for Captive purpose only) 1.3 Green Belt Development Company shall develop an effective green belt within the factory and on periphery of the factory. In addition to this, majority of the vacant land shall be planted with trees, shrubs and grasses. 1.4 Power & Fuel Requirement Energy: Source of power is Torrent Power Ltd, Ahmedabad. Fuel:

5 Sr. No. Shri Hari Dyes & Chemicals Type of fuel Existing Qty. Proposed Qty. Total 01 Wood MT/Hr MT/Hr PNG 600 SCM/day 400 SCM/day 1000 SCM/day 1.5 Water Requirement and Wastewater Generation & Treatment Water Consumption & wastewater Generation: Sr. No. Category Water consumption (KL/Day) Waste Water Generation (KL/Day) Existing Proposed Total Existing Proposed Total 1 Domestic Gardening Industrial 3.1 Process Boiler Washing Scrubber Total Domestic water consumption will be 0.7 KLPD and sewage generated will be disposed to soak pit via septic 0.7 KLPD. Gardening water consumption will be 0.5 KLPD. Industrial waste water generation 29.7 KLPD, so will be 28.2 KLPD effluent treated in our ETP and after then treat in our RO plant. RO permit 21.9 KLPD is reused in process and RO reject 6.3 KLPD is sent to Spray Dryer. And remaining effluent 1.5 will be sent to CETP, vatva

6 1.6 Air Pollution Source and Control Management The source of air pollution due to the project will be Flue gas emission. The source of flue gas emission will be from the stack attached to Existing Boiler. Flue gas emission: Sr. No Stack Attached to Stack Height in meter 01 Baby Boiler 600 kg/hr (Existing) 02 Hot Air Generator 11 Parameter 11 Particulate matter SO2, NOX Permissible Limit 150 mg/nm3 100 ppm 50 ppm Process Gas Emission Details: Sr. No Stack attached to Existing Proposed Spray Dryer (1000 kg/hr) Spray Dryer (1000 kg/hr) Stack height 11 meter Cyclone Separator and water Scrubber 11 meter Wet Scrubber APC system Parameter Permissi ble Limit Particulate matter 150 Mg/Nm3 FUEL REQUIREMENT Sr. No. Type of fuel Existing Qty. Proposed Qty. Total 01 Wood MT/Hr MT/Hr PNG 600 SCM/day 400 SCM/day 1000 SCM/day

7 1.7 Hazardous Waste Management Sr. No. Waste Category Existing Proposed Total Facility 1. ETP waste MT/M 15 MT/M MT/M 2. Discarded Bags/Drums No./M 200 No./M 360 No./M 3. Used Oil Lit/yr Lit/yr 4. Sand Filter Media kg/m 1 kg/m 6 kg/m Collection, Storage, transportation Disposal at TSDF authorized by Board. Collection, Storage, Transportation, disposal by selling to authorized recycler. Collection, Storage, transportation Disposable by selling to registered Reprocess. Collection, Storage, Transportation, Disposal at TSDF authorized by Board. 2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION 2.1 Identification of the project and project proponent. In case of mining project, a copy of mining lease/letter of intent should be given. Identification of the project: Chemical Unit fall under Category 5 (f).

8 Identification of the project proponent Name of Proprietor: 1. Mr. Chandreshbhai G. Patel 2.2 Brief description of nature of the Project. We, M/s. Shri Hari Dyes Chemicals are going to do expansion in existing unit located at Plot No.439/1,147, Phase II, GIDC Vatva, Ahmedabad, Gujarat. Our product details are as per previous page. Based on the Proposed Products and location of our Project Site, our project is fall under Activity 5 (f) & category B. So, as per the MOEF notification dated 14th September 2006 & its amendment letter, we have to apply for obtaining Environment Clearance to SEAC/ SEIAA, Gujarat. 2.3 Need for the project and its importance to the country and or region The objective is to be achieved by: Continuously reducing the Costs & improving Quality. To generate local employment 2.4 Demands-Supply Gap Based on our informal survey of the market with our current customers and various traders, we have found that there is a big potential for the range of the products we are planning. These products will be an addition to the current range of our trading products. 2.5 Imports vs. Indigenous production Based on the current cost of indigenous raw materials and the non availability of some materials, No import will be done for any of our Raw Material. This will make us very competitive against imported finished products and we will be able to increase the export of our finished products. 2.6 Export possibility We shall explore the possibility of export the products.

9 2.7 Domestic/Export Markets We shall explore the possibility of domestic/export the products. 2.8 Employment Generation (Direct and Indirect) due to project. Employment would be as per prevailing norms of state government for skilled and unskilled people for the proposed expansion project. 3.1 Project Description 3.2Type of Project including interlinked and interdependent projects, if any. - Category: 5 (f) 3.3 Location (map showing general location, specific location and project boundary & project site layout) with coordinates. Map showing general location Latitude: & Longitude: GPS file is enclosed: Please Refer Enclosure: D Details of alternate sites considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted. Major factors involved in the selection of site are listed below: Expansion in Existing project. Unit is located in GIDC Estate Vatva. Site is very well connected by road Availability of sufficient land free from cultivation Availability of power evacuation facilities Availability of water for industrial use

10 Modern infrastructure support and amenities at par with industrial estates in other global markets, including: Efficient transport facilities within the industrial estate and to & from the city area. Environment-friendly zone. Uninterrupted power supply. 3.4 Size or Magnitude of Operation Sr. No. Product name Quantity (MT/Month) 1 Reactive Dyes - Re Brilliant Red M 5 B - Re Magenta - Re Brilliant EB - Re Yellow MYR 2 Reactive Black B 3 Reactive Black N Reactive Black WNN 5 Reactive Golden Yellow HR 6 Reactive Golden Yellow MERL 7 Reactive Golden Yellow R 8 Reactive Golden Yellow RNL 9 Reactive Blue 5RH 10 Reactive Blue BB 11 Reactive Blue BF 12 Reactive Blue ME2RL 13 Reactive Blue BRF 14 Reactive Magenta HB 15 Reactive Blue GG 16 Reactive Navy Blue ME2RL 17 Reactive Navy Blue RGB 18 Reactive Orange 2R 19 Reactive Orange CD 20 Reactive Orange H2R Existing Proposed Total

11 21 Reactive Orange ME2RL 22 Reactive Orange W3R 23 Reactive Blue P2R 24 Reactive Blue P3R 25 Reactive Red BS 26 Reactive Red CD 27 Reactive Red ME3BL 28 Reactive Red ME4BL 29 Reactive Red ME6BL 30 Reactive Red P2B 31 Reactive Red P4B 32 Reactive Red P6B 33 Reactive Red P8B 34 Reactive Red PB 35 Reactive Red RB 36 Reactive Red W3R 37 Reactive Blue RGB 38 Reactive Yellow FG 39 Reactive Yellow GR 40 Reactive Yellow H4G 41 Reactive Yellow ME4GL Total Spray Drying ( for Captive purpose only) Project Description with process details (a schematic diagram/flow chart showing the project layout, components of the project etc. should be given) Please refer Enclosure 07 in EC Application. 3.6 Raw material required along with estimated quantity, likely source, marketing area of final products. Mode of transport of raw materials and finished products. Please refer Enclosure 03,04 and 05 in Additional Attachments. 3.7 Resource optimization/recycling and reuse envisaged in the project, if any, should be briefly outlined.

12 There will not resource optimization/recycling and reuse envisaged in the project. 3.8 Availability of water its source, energy/power requirement and source should be given. Power & Fuel Requirement Energy: Power supply is available from Torrent Power Ltd, Ahmedabad. Fuel: PNG SCM/month 3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their management/disposal. Sr. No. Category Water Consumption & wastewater Generation Source of Water- GIDC water supply Water consumption (KL/Day) Waste Water Generation (KL/Day) Existing Proposed Total Existing Proposed Total 1 Domestic Gardening Industrial 3.1 Process Boiler Washing Scrubber Total Domestic water consumption will be 0.7 KLPD and sewage generated will be disposed to soak pit via septic 0.7 KLPD. Gardening water consumption will be 0.5 KLPD. Industrial waste water generation 29.7 KLPD, so will be 28.2 KLPD effluent treated in our ETP and after then treat in our RO plant. RO permit 21.9 KLPD is reused in process and RO reject 6.3 KLPD is sent to Spray Dryer. And remaining effluent 1.5 will be sent to CETP, vatva

13 DETAILS OF EFFLUENT TREATMENT PLANT Sr. No Name of Unit Number Capacity (KL) 1 Collection Tank Neutralization Tank Primary Settling Tank Holding Tank Aeration Tank Secondary Settling Tank Holding Tank Activated Carbon Filter Final Collection Tank Overhead Tank RO plant lit/hr 12 RO permit tank RO reject tank Sludge Drying Bed 2 --

14 3.10 Schematic representations of the feasibility drawing which give information of EIA purpose. ACTIVITIES OVERVIEW OF E. I. A. STUDIES SOURCE OF INFORMATION RECONNAISSANCE SURVEY OF EXISTING PLANT INTRODUCTION ANNUAL REPORT MARKET ASSESSMENT FINANCIAL REPORT PROJECT REPORT MONITORING OF AIR, WATER & SOIL QUALITY & NOISE LEVELS. DATA ON METEOROLOGY SOCIO-ECONOMIC STATUS & BASIC AMENITIES. SITE VISITS BY AND INTERVIEWS WITH LOCALS BASELINE ENVIRONMENTAL STATUS SOCIOECONOMIC STATUS & INFRASTRUCTURE PROPOSED PLANT ENVIRONMENTAL INFORMATION CENTRE CENTRAL GROUND WATER BOARD GUJARAT POLLUTION CONTROL BOARD (GPCB) PUBLIC HEALTH ENGINEERING DEPT. AGRICULTURE DEPARTMENT FOREST DEPARTMENT IRRIGATION DEPARTMENT EMPLOYMENT EXCHANGE HEALTH CENTER CENSUS DEPT. INDIAN METEOROLOGICAL DEPT. IDENTIFICATION & ASSESSMENT OF IMPACTS EVALUATION OF IMPACTS BY MATRIX METHOD 4.0 Site Analysis DESCRIPTION OF EFFLUENT TREATMENT PLAN, AIR POLLUTION CONTROL, HAZARDOUS WASTE MANAGEMENT, GREEN BELT DEVELOPMENT MONITORING PROGRAM IMPACTS METHODOLOGY OF IMPACT ASSESSMENT ENVIRONMENTAL MANAGEMENT PLAN FACILITY DESCRIPTION CONSEQUENCE ANALYSIS PREPARATION OF DISASTER MANAGEMENT PLAN RISK ANALYSIS STUDIES & DISASTER MANAGEMENT PLAN SAFETY, HEALTH & ENVIRONMENTAL POLICY, GUIDELINES BY DIRECTOR GENERAL OF FACTORY SAFETY, MINISTRY OF LABOR.

15 4.1 Connectivity Site is very well connected by road Availability of power evacuation facilities Availability of water for industrial use 4.2 Land Form, Land Use and Land Ownership It will be incorporated in EIA Studies. 4.3 Topography (along with map) Please Refer annexure: C. 4.4 Existing land use pattern (agriculture, non-agriculture, forest, water bodies (including area under CRZ)), shortest distances from the periphery of the project to periphery of the forests, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from HFL of the river), CRZ. In case of the notified industrial area, a copy of the Gazette notification should be given. It will be incorporated in EIA Studies. CRZ Clearance is not applicable to us. 4.5 Existing Infrastructure Existing Infrastructures facilities are listed below: Site is very well connected by road Proximity to Raw Material suppliers Availability of sufficient land free form cultivation. Availability of power evacuation facilities 4.6 Soil Classification It will be incorporated in EIA Studies. 4.7 Climatic data from secondary sources. Secondary Sources Indian Meteorological Department, Ahmedabad or our own weather station. 4.8 Social infrastructure available.

16 Depending on the growth of the company the required social infrastructure will be provided. 5.0 Planning Brief 5.1 Planning Concept (type of industries, facilities, transportation etc) Town and Country planning/development authority classification. Type of Industry: Synthetic Organic Chemical Industries Facility: Canteen, Administration, Transportation 5.2 Population Projection We will include in EIA Report. 5.3 Land use planning (breakup along with green belt etc.) Total Plot Area 2315 Sq.m 5.4 Assessment of Infrastructure Demand (Physical & Social) Employment would be as per prevailing norms of state government for skilled and unskilled people for the proposed project. Social Welfare Cordial relation with the industry shall be established and representation shall be made to villagers for help for creation of facilities related to health, education, etc. 5.5 Amenities/Facilities It will be incorporated in the EIA Studies. 6.0 Proposed Infrastructure 6.1 Industrial Area (Processing Area) Processing Area (Processing Zone, and Utility Area) Please refer Plant Layout.- Annexure -14 in additional details. 6.2 Residential Area (Non Processing Area) Non Processing Area (Green belt, Raw material storage area, Finished storage area, Open space) Please refer plant Layout- Annexure -14 in additional details.

17 6.3 Green Belt Shri Hari Dyes & Chemicals Company shall develop an effective green belt within the factory and on periphery of the factory. In addition to this, majority of the vacant land shall be planted with trees, shrubs and grasses. 6.4 Social Infrastructure Depending on the growth of the company the required social infrastructure will be provided. 6.5 Connectivity (Traffic and Transportation Road/ Rail/Metro/ Water ways etc) Site is very well connected by road & railway 6.6 Drinking water Management (Source & Supply of water) Water requirement will meet through the GIDC water supply. 6.7 Sewerage System Sewage pipes would be laid in entire company for the removal and disposal of mainly nonharmful liquid wastes from the offices, canteen and domestic waste coming from different sections. These liquid wastes would be treated (If required) and disposed by septic tank and soak pit. 6.8 Solid Waste Management Details of Hazardous Waste Generation & Disposal

18 Sr. No. Shri Hari Dyes & Chemicals Waste Category Existing Proposed Total Facility 1. ETP waste MT/M 15 MT/M MT/M 2. Discarded Bags/Drums 6.9 Power Requirement & Energy: Power will be met from Torrent Power Ltd., Ahmedabad. 7.0 Rehabilitation and Resettlement (R & R) Plan 7.1 Policy to be adopted (central/state) in respect of the project affected including home oustees, land ouatees and landless laborers (a brief outline to be given R & R policy is not applicable to this project No./M 200 No./M 360 No./M 3. Used Oil Lit/yr Lit/yr 4. Sand Filter Media kg/m 1 kg/m 6 kg/m There shall be no displacement of any population in project area. Collection, Storage, transportation Disposal at TSDF authorized by Board. Collection, Storage, Transportation, disposal by selling to authorized recycler. Collection, Storage, transportation Disposable by selling to registered Reprocess. Collection, Storage, Transportation, Disposal at TSDF authorized by Board.

19 8. Project Schedule & Cost Estimates 8.1 Likely date of start of construction and likely date of completion (Time schedule for the project to be given). This is an existing unit. Construction activity is already done. We will do modification in existing construction activity after obtaining Environment Clearance and required permission from state pollution control board. 8.2 Estimated Project cost along with analysis in terms of economic viability of the project. Existing project cost is Rs 3.67 crore Proposed Project cost is Rs crore Total project cost: 4.87 crore 9. Analysis of Proposal (Final Recommendations) 9.1 Financial and social benefits with special emphasis on the benefit to be local people including tribal population, if any, in the area. Employment would be as per prevailing norms of state government for skilled and unskilled people for the proposed project. Social Welfare shall be done. Cordial relation with the industry shall be established and representation shall be made to villagers for help for creation of facilities related to health, education, etc.

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED EXPANSION OF DISTILLERY of M/s. SHREE GANESH KHAND UDYOG SAHKARI MANDLI LTD. Shri Harisinhji Mahida Bhavan, At & Po: Vataria, Tal: Valia, Dist: Bharuch, Gujarat-393001

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

Kana Aroma Industries. Pre-Feasibility Report

Kana Aroma Industries. Pre-Feasibility Report Pre-Feasibility Report 1. INTRODUCTION M/s. is a proposed unit to be located at Shed no. C1-41/B/1 & 2, GIDC Industrial Estate, Nandesari, Vadodara, Gujarat and proposes to manufacture Allyl Iso Thiocynate,

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (BUILT UP AREA: 77420.15 SQ. M) BY AMC EWS HOUSING PROJECT RESIDENTIAL BUILDING & COMMERCIAL PROJECT F. P. NO. 174, T.P. NO. 32, GOTA,

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016)

Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated (Period April 2016 to September 2016) Compliance of Environmental Clearance SEIAA/GUJ/EC/8(a)/251/2012 Dated 06.09.2012 (Period April 2016 to September 2016) Sr. No. Conditions Compliance status A. Specific Conditions A.1 Water 1. The fresh

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT PREPARED FOR SHIV SHANTHI CEMENT PRIVATE LIMITED Sy. Nos. 92, 93 & 94, Tatiguda Village, Garividi Mandal, Vizianagaram District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS III PLOT NO.116, 116A, 116B & 126C, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY

More information

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private

More information

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE

RED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For EXISTING MINING ACTIVITY CATEGARY B2 UNDER THE EIA NOTIFICATION 2006 AMENDED ON 31/05/2012 TO PIRABHAI VALABHAI NANDASANIYA LOCATED

More information

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC

Prefeasibility Report. 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC Prefeasibility Report For 30,000 KLPY Anhydrous (Absolute) Alcohol Manufacturing Plant at Patalganga MIDC of Alkyl Amines Chemicals Limited 401-407 Nirman Vyapar Kendra, Plot No. 10, Sector 17, Vashi,

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

LIST OF PRODUCTS (PROPOSED) Existing Quantity (MT/Month)

LIST OF PRODUCTS (PROPOSED) Existing Quantity (MT/Month) LIST OF PRODUCTS (PROPOSED) Sr.No. Name of Product Existing Total after expansion 1 Benzyl Acetate 20 50 2 Benzyl Benzoate 20 50 3 Benzyl Alcohol 20 50 4 Benzyl Cyanide 20 50 5 Phenyl Acetic Acid 20 50

More information

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Summary For Ria Organics Private Limited, D-26/2, Kurkumbh - MIDC, Taluka - Daund Dist. Pune, Maharashtra, India. Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited by QCI NABET Lab. Recognized

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka) J.K. Cement Works, Village- Muddapur, Taluka- Mudhol, Distt.- Bagalkot, Karnataka MoEF Letter No. F.No. J-11011/263/2009-IA II (I) dated 21-06-2010 Name of Project: J.K. Cement Works (Unit: J.K. Cement

More information

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations. 1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad

More information

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA) Proposed at: Bonda Industrial

More information

Mangalam Cement Ltd. (Unit-II) Stack No.

Mangalam Cement Ltd. (Unit-II) Stack No. Mangalam Cement Ltd. (Unit-II) Name of the Project :- Expansion of cement grinding capacity from 1.7 MTPA to 2.3 MTPA Project Code :- Clearance Letter No. : - F NO. J - 11011 /110 /2012 - IA II (I), dtd

More information

ANNEXURE-1 TERMS OF REFERENCES. TOR prescribed by MoEF & CC for this sector will be taken into account. M/s. RAMDEV CHEMICAL INDUSTRIES UNIT-(II)

ANNEXURE-1 TERMS OF REFERENCES. TOR prescribed by MoEF & CC for this sector will be taken into account. M/s. RAMDEV CHEMICAL INDUSTRIES UNIT-(II) ANNEXURE-1 TERMS OF REFERENCES TOR prescribed by MoEF & CC for this sector will be taken into account. M/s. RAMDEV CHEMICAL INDUSTRIES UNIT-(II) ANNEXURE-2 Sr. Products No. LIST OF PRODUCTS Existing Quantity

More information

.in Dated 9th August, Sharma ;

.in Dated 9th August, Sharma  ; F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in

More information

PRE FEASIBILITY REPORT FOR THE PROPOSED KRAFT PAPER MANUFACTURING INDUSTRY

PRE FEASIBILITY REPORT FOR THE PROPOSED KRAFT PAPER MANUFACTURING INDUSTRY PRE FEASIBILITY REPORT FOR THE PROPOSED KRAFT PAPER MANUFACTURING INDUSTRY Plot No.97/P1, Survey No. 214, 216 and 219 Humnabad Industrial Area, Humnabad Taluk, Bidar At Project Proponents, Plot No.97/P1,

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

SEAC, Gujarat: Page 1 of 5 SEAC, Gujarat [TOR New Projects] For TOR New Projects

SEAC, Gujarat: Page 1 of 5 SEAC, Gujarat [TOR New Projects] For TOR New Projects For TOR New Projects i 1. Basic Information of the Project: Name & Address of the Project site (Complete details with plot no./survey no., Landmark etc. ) SEAC, Gujarat: Page 1 of 5 SEAC, Gujarat [TOR

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

Telefax : 011: Dated 1 st March, 2013

Telefax : 011: Dated 1 st March, 2013 F. No. J-11011/263/2012- IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 To, Shri Jigar Shah, Director M/s

More information

For. Coal Washery. Promoter. : Budbud & Kerajharia. Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012

For. Coal Washery. Promoter. : Budbud & Kerajharia. Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012 Pre-feasibility Report For Coal Washery at Village Tehsil District : Budbud & Kerajharia : Pali : Korba [C.G.] Promoter Plot No.29, Transport Nagar, Indira Complex, Korba [C.G.] May 2012 Contents 1.0 Executive

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Stone Quarry (Area 1.00 ha) Survey No: - 526, 527 & 528 (Part) Village Raimoha, Taluka Shirur (Kasar), Dist - Beed (M.S). Owner & Lessee Shri. Chakradhar Subhash Dhakane Prepared

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

M/s.Aarti Industries Limited (Apple Organics Division), Vapi.

M/s.Aarti Industries Limited (Apple Organics Division), Vapi. EXECUTIVE SUMMARY M/s. Aarti Industries Limited (Apple Organics Division) first obtained CCA order 3431, issued on 16/08/2004. Further it was extended by CCA order no. AWH-73091 dated 14/09/2015 for manufacturing

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- Oct. 2015 to March 2016 Ref: MOEF, New Delhi Environment Clearance F. No. J-11011/118/2007- IA II (I) dated 25 th August,

More information

PRE FEASIBILITY REPORT INCREASE IN THE PRODUCTION OF PENTAERYTHRITOL FROM 560 MTM TO 730 MTM & SODIUM FORMATE FROM 336 MTM TO 480 MTM

PRE FEASIBILITY REPORT INCREASE IN THE PRODUCTION OF PENTAERYTHRITOL FROM 560 MTM TO 730 MTM & SODIUM FORMATE FROM 336 MTM TO 480 MTM PRE FEASIBILITY REPORT INCREASE IN THE PRODUCTION OF PENTAERYTHRITOL FROM 560 MTM TO 730 MTM & SODIUM FORMATE FROM 336 MTM TO 480 MTM (PRODUCT IS IN POWDER & SOLUTION FORM) at SIPCOT INDUSTRIAL COMPLEX,

More information

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 i) Name and address of the owner / Occupier ii) Industry category Primary (STC Code) Secondary (SIC Code) PART

More information

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx COMPLIANCE STATUS OF ENVIRONMENT CLEARANCE EC letter no. J-11011/79/2007-IA II (I) Dated 16.04.2009 A. Specific Conditions : SN Condition Compliance 1. Continuous stack monitoring facilities to monitor

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

Infrastructure Development and Environment

Infrastructure Development and Environment Infrastructure Development and Environment Few Stories Lift irrigation from Chambal River No Development Zone around Numaligarh Refinery NH - 31 C passing through Jaldapara, Mahananda and Buxa Nh-72 cutting

More information

PRE FEASIBILITY REPORT (PFR)

PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 27 PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 28 INDEX S. No. Contents Page No. 1.0 EXECUTIVE SUMMARY 30 2.0 INTRODUCTION OF THE PROJECT / BACKGROUND

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu

Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Compliance Report for Environmental Clearance No.11.63/2005.1A.III dated 19.12.2005 Specific Conditions

More information

Improvements in Pollution Management Vapi Industrial Estate

Improvements in Pollution Management Vapi Industrial Estate Improvements in Pollution Management Vapi Industrial Estate August 2009 Background Vapi is a highly successful industrial estate in Gujarat, India. Developed by Gujarat Industrial Development Corporation

More information

Ministry of Environment and Forests Telefax : 011: M/s Posco India Private Limited

Ministry of Environment and Forests   Telefax : 011: M/s Posco India Private Limited F. No. J-11011/285/2007- IA II (I) Government of India Ministry of Environment and Forests Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi 110 003 E-mail : tchand2003@yahoo.co.uk Telefax : 011: 24363963

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Stone Quarry (Area 2.01 ha) Survey No: - 161/2 & 162 (Part) Village Mandavghorad,Taluka Hingana, Dist - Nagpur (M.S). Owner & Lessee M/s Saikrupa Stone Crusher (LLP) Through Partner

More information

PRE - FEASIBILITY REPORT PROPOSED SPECIALTY CHEMICALS MANUFACTURING UNIT M/S. NIC BIOSCIENCE PVT. LTD.

PRE - FEASIBILITY REPORT PROPOSED SPECIALTY CHEMICALS MANUFACTURING UNIT M/S. NIC BIOSCIENCE PVT. LTD. PRE - FEASIBILITY REPORT For PROPOSED SPECIALTY CHEMICALS MANUFACTURING UNIT Of M/S. NIC BIOSCIENCE PVT. LTD. PLOT NO. 907/5, GIDC ESTATE, PANOLI 394116, TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT Prepared

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT By Agrawal Iron & Industries (Unit # 2) [Regularisation of Pellet plant 90,000 MTPA along with Coal Gasifier 5000 Nm3/Hr] at Kh.No.219, 220, 221, P.H.No.54, Village Billory, Tehsil

More information

MIDC, Nagpur Expansion of Existing Butibori Industrial Area (BIA Phase II) - Form-1

MIDC, Nagpur Expansion of Existing Butibori Industrial Area (BIA Phase II) - Form-1 ANNEXURE I SITE LOCATION MAP Building Environment (India) Pvt. Ltd 1 ANNEXURE II LAYOUT PLAN Building Environment (India) Pvt. Ltd 2 ANNEXURE III LAND DETAILS Sr. No. LAND DETAILS (In Ha.) 1. LARGE SIZE

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary TABLE OF CONTENTS Title page Table of contents List of tables List of figures Non- technical summary Page i ii vii viii ix CHAPTER 1: INTRODUCTION 1 1.1 Project Background 1 1.2 Aims and Objectives 3 1.3

More information

STANDARD OPERATING PROCEDURE

STANDARD OPERATING PROCEDURE STANDARD OPERATING PROCEDURE Consent to Established/Operate Procedural Guidelines Consent to Establish NOC Check List Consent to Operate NOC Check List Renewal to Consent to Operate Check List Time Frame

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT (Proposed Expansion of Inorganic Compounds to Inorganic Compounds & Fine Chemicals Manufacturing Unit) of M/s. Vishnu Chemicals Limited Plot No. 18-26, Industrial Estate, Nandini

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1. P. G. D. E. M. (Semester - I) Examination

Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1. P. G. D. E. M. (Semester - I) Examination Total No. of Questions : 5] [Total No. of Printed Pages : 2 [3683]-1 P. G. D. E. M. (Semester - I) Examination - 2009 ENVIRONMENTAL MANAGEMENT TECHNIQUES - I (1) Answer any four questions. (3) Use of calculator

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

PROPOSED TERM OF REFERENCE

PROPOSED TERM OF REFERENCE PROPOSED TERM OF REFERENCE FOR ESTABLISHMENT OF PROPOSED MOLASSES/GRAIN BASED DISTILLERY HAVING CAPACITY: 160.0 KLD (MOLASSES BASED) OR 120.0 KLD (MOLASSES BASED) + 40.0 KLD (GRAIN BASED) ALONGWITH 7.0

More information

DEVELOPMENT of. LPG Storage & Bottling Plant. Haldia. Project Feasibility Report

DEVELOPMENT of. LPG Storage & Bottling Plant. Haldia. Project Feasibility Report Hindustan Aegis LPG Limited DEVELOPMENT of LPG Storage & Bottling Plant Haldia Project Feasibility Report August 2017 1 Amendment Record: Amendment Inserted by (Name printed) Date Signature Remarks 2 Table

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

ZZH/CLAB-KSPCB/04/ Environmental Officer,

ZZH/CLAB-KSPCB/04/ Environmental Officer, ZZH/CLAB-KSPCB/04/ 21273 08-12-2014 Environmental Officer, Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16 th Cross Near Hari Om Trust, Habbuwada

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project

FORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project FORM I I. BASIC INFORMATION. Item Details 1 Name of the project Proposed Mixed Use Development Project SPR Binny 2 no. in the schedule 8 (b) 3 Proposed area Area Details: Total land area: 200243.50 Sqm

More information

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server. Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.

More information

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1. INTRODUCTION Executive Summary 1.1 Background: M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area. 1.2 Proposed Project:

More information

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any;

TERMS OF REFERENCE. Identification of the sources of pollution and assessing the impacts on the environment due to proposed project if any; TERMS OF REFERENCE 1.0 PROPOSED SCOPE OF WORK FOR EIA STUDY The components of the EIA study include: Determination of baseline data using primary data generation and secondary data available from various

More information

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report

Torrent Pharmaceuticals Ltd. Indrad EC Compliance Report Status of Compliance of stipulated conditions of the Environment Clearance J- 01 It is noted that total water consumption will increase from 1000-1200 m 3 /day to 1200-1300 m 3 /day. Fresh water requirement

More information

Pre-Feasibility Report. for. Proposed Construction project of Santnagari

Pre-Feasibility Report. for. Proposed Construction project of Santnagari Pre-Feasibility Report for Proposed Construction project of Santnagari at Survey No. 1439, Near Dharoi Dam, Village Mahor, Taluka Vadali, District Sabarkantha, Gujarat By Gujarat Pavitra Yatradham Vikas

More information

Telefax : 011: Dated 1 st November, 2011

Telefax : 011: Dated 1 st November, 2011 Drilling of Development Well (17 Nos.) and Exploratory Well (14 Nos.) at Tengakhat Kathaloni Dikom Area, District Dibrugarh, Assam by M/s Oil India Limited Environmental Clearance reg. ***********************

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

Mangalam Cement Ltd.

Mangalam Cement Ltd. Mangalam Cement Ltd. Name of the Project :- New Cement Plant Unit - III and 17.5 mw CPP-II Project Code :- Raj- 80-600 - 2008 Clearance Letter No. :-F NO. J - 11011 / 30/2006 - IA II (I), dtd 17/07/2007

More information

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease

More information

Sustainable Industrial Waste Water Management for a Industrial development cooperation in Thane, Maharashtra

Sustainable Industrial Waste Water Management for a Industrial development cooperation in Thane, Maharashtra Sustainable Industrial Waste Water Management for a Industrial development cooperation in Thane, Maharashtra Pratik Patil #, Oshmi Ghosh*and H. Jeswani** # Graduate Student, Civil Engineering Dept., Sardar

More information

M/S HERCULES PIGMENTS PVT. LIMITED

M/S HERCULES PIGMENTS PVT. LIMITED ON PROPOSED PROJECT FOR THE MANUFACTURE OF ORGANIC AZO PIGMENTS Category 5 (f) By M/S HERCULES PIGMENTS PVT. LIMITED Located at: Plot No. 1704, Chemical Zone GIDC Notified Industrial Area, GIDC Sarigam,

More information

DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA)

DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA) DR. SANJAY V. PATIL HEAD AND TECHNICAL ADVISER DEPARTMENT OF ALCOHOL TECHNOLOGY VASANTDADA SUGAR INSTITUTE, MANJARI, PUNE (INDIA) Email: sv.patil@vsisugar.org.in AIDA Technical Seminar www.vsisugar.com

More information

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT Annexure B Land Possession letters & N.A. permission letters Annexure C Photograph of the Site Annexure D Details of Buildings Area Calculation Annexure 1 Topo Sheet Annexure 2 Soil Analysis Report Annexure

More information

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M. MAJHIGAWAN LIMESTONE MINE Mine Lease area 362.68 ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

Monitoring the Implementation of Environmental Safeguards

Monitoring the Implementation of Environmental Safeguards Monitoring the Implementation of Environmental Safeguards Ministry of Environment & Forest Western Region, Regional Office, Bhopal MONITORING REPORT PART I DATA SHEET RASHTRIYA CHEMICAS AND FERTILISERS

More information

Toshiba Group Site Information 2016 (2015/4/1-2016/3/31)

Toshiba Group Site Information 2016 (2015/4/1-2016/3/31) Toshiba Tec Malaysia Manufacturing Sdn. Bhd. Site Report Information Address: Plot 111-A, Hala Kampung Jawa 2, Bayan Lepas Industrial Estate, 119 Penang. Lot area: 28,686 m 2, Building area: 12,478 m 2,

More information

M/S. CLEAN SCIENCE PRIVATE LIMITED.

M/S. CLEAN SCIENCE PRIVATE LIMITED. M/S. CLEAN SCIENCE PRIVATE LIMITED. PFR for Environmental Clearance (EC) of Proposed Greenfield project of Manufacturing of Synthetic Organic Chemicals at Plot No.: No.: D-25/1/1 MIDC, Kurkumbh, Tehsil

More information

LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695]

LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695] LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695] 1. Notwithstanding all other permits and clearances, the following clearances shall be obtained prior to

More information

FOR SPECTRUM DYES AND CHEMICALS PVT.LTD.

FOR SPECTRUM DYES AND CHEMICALS PVT.LTD. TECHNO ECONOMIC FEASIBILITY REPORT FOR EXPANSION OF DYES AND CHEMICALS MANUFACTURING UNIT AT SPECTRUM DYES AND CHEMICALS PVT.LTD. BLOCK NO-484, 502, 503-A, 504 & 505, N.H.NO.8, PALSANA-394315, DIST.: SURAT,

More information

Phase II (BIA Phase-II),

Phase II (BIA Phase-II), PROJECT PREFEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENTAL CLEARENCE IN TERMS OF PROVISIONS OF EIA NOTIFICATION-2006 1.0 EXECUTIVE SUMMARY OF THE PROJECT Sr. No Description Details 1 Proposed project

More information

4 Onsite Sewage Systems

4 Onsite Sewage Systems 4 Onsite Sewage Systems The term onsite system refers to any system which is used to store, treat and dispose of liquid waste at the premises where the waste is generated. Many households and industries

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

(Period Apr. 17 to Sept. 17) No. A.1 SPECIFIC CONDITION. Agreed

(Period Apr. 17 to Sept. 17) No. A.1 SPECIFIC CONDITION. Agreed COMPLIANCE OF CONDITIONS GIVEN IN ENVIRONMENT CLEARANCE (No. : SEIAA/GUJ/EC/5(f)/228/2016 dated 31/03/2016) FOR SETTING UP NEW 40000 MTPA MELAMINE PLANT WITHIN THE EXISTING COMPLEX Sr. Conditions No. A.1