M/S HERCULES PIGMENTS PVT. LIMITED

Size: px
Start display at page:

Download "M/S HERCULES PIGMENTS PVT. LIMITED"

Transcription

1 ON PROPOSED PROJECT FOR THE MANUFACTURE OF ORGANIC AZO PIGMENTS Category 5 (f) By M/S HERCULES PIGMENTS PVT. LIMITED Located at: Plot No. 1704, Chemical Zone GIDC Notified Industrial Area, GIDC Sarigam, Dist- Valsad Gujarat. New Project: 1 Manufacturing: Organic Azo Pigment

2 Project prefeasibility report for obtaining prior Environmental Clearance in terms of provisions of EIA Notification Executive Summary : Name & Location: Name of the Project : M/s. Hercules Pigments Pvt. Limited Location : Plot No , GIDC Notified Industrial Sarigam, Ta: Umbergaon, Project Dist- Valsad Gujarat. M/S Hercules pigments Pvt. limited is a new proposed project to be located in GIDC notified industrial area, falling under small Scale category & proposes to manufacture Organic Azo Pigments (Yellow, Orange, Red). Proposed Project Cost: Rs. 700 Lacs. Applicability of EIA notification 2006 Category as per the amended EIA notification- 2006: as proposed products (i.e. Organic Azo Pigments) are covered under the Category 5 (f) B. Hence, Environmental Clearance is required. Project Proponent The company in India comprising 3 Directors Small Scale Unit List of finished products & by- products SR. NO. PRODUCT MT/MONTH 1 Organic Azo Pigments (Orange/Yellow/Red) 150 Manufacturing process with chemical reaction & mass balance is attached as Annexure-3 Resource Requirement Components Proposed Resources availability Power, KVA 200 Will be sourced from Dakshin Gujarat Vij Co. Ltd. Fresh Water, kl/day 260 Will be sourced from GIDC water supply dept. Natural gas for Steam Boiler (2.5 TPH), SCM/day 1700 From GSPC Limited New Project: Page 2 Manufacturing: Organic Azo pigment

3 Natural gas for Hot air dryer (2.5 TPH), SCM/day Fuel (HSD) for D.G.Set (200 KVA), Kgs/Hr 800 From GSPC Limited 40 Will be sourced Local Dealer Raw material Consumption (1.0) ORGANIC YELLOW PIGMENT Sr. No. Raw Materials Quantity in MT Ton per ton of product Proposed, MT/Month Base (Amine) Ice Sulphamic acid Sodium nitrite Hydro Chloric Acid (30%) Caustic Acetic acid & others Total (2.0) ORGANIC RED PIGMENT 2.1 Base (Amine) Ice Sulphamic acid Sodium nitrite Sulphuric acid Caustic Hydro Chloric acid Coupler Total (3.0) ORGANIC ORANGE PIGMENT Base (Amine) Ice New Project: Page 3 Manufacturing: Organic Azo pigment

4 2.3.3 Sulphamic acid Sodium nitrite Hydro Chloric Acid (30%) Caustic Emulsifier & others Total Water and Waste Water Management Total raw water requirement is 260 M 3 /day supply will be met from GIDC water supply dept. Copy of GIDC water supply is enclosed herewith. Total Industrial Waste water generation is 250 M 3 /Day mainly from process, washing, boiler blow down, cooling which will be treated in proposed primary & secondary treatment plant & discharge into underground effluent drainage line of GIDC Sarigam to CETP Sarigam for further treatment & ultimate disposal into Arabian Sea through closed pipe line. Domestic waste water (5 M 3 /Day) will be disposed off through septic tank. Air Emission and its Control Measures Flue gas emission: The company proposes to install 2.5 TPH capacity of steam boiler for the requirement of process steam. The unit shall use 1700 SCM/day of natural gas as a fuel. Adequate height of stack will be provided. Also the unit shall use natural gas fired hot air dryer having consumption of natural gas will be 800 SCM/day. The company shall install one number of new 200 KVA capacity D G set, as standby. It will be used only during power failure. Average 40 kgs/hr of HSD will be used as a fuel. 11 meters height of exhaust will be provided. Process gas emission: Drying of % pigment wet cake shall be carried out in tray dryers. The process heat is provided by hot air dryer. The pulverization will be carried out in a closed system includes cyclone separator & bag filter. (Details of Air pollution control measures are attached as Annexure-8). New Project: Page 4 Manufacturing: Organic Azo pigment

5 Hazardous Wastes and its Management No Type of waste Category Qty. MT/ Year Treatment 1 ETP waste Dried, packed in bags 2 Used Oil Packed in carboys 3 Discarded containers Decontaminated, stored Disposal Dispose off into TSDF, Vapi Sell to Registered reprocessers Sell to authorized recycler New Project: Page 5 Manufacturing: Organic Azo pigment

6 2. Introduction of Project / Back Ground Information : (i) Identification of Project and proponent. Name of the project Proponent: M/S Hercules Pigments Pvt. Limited HERCULES PIGMENTS PVT LTD is a medium scale unit is located in notified industrial estate, GIDC, Sarigam, Di: Valsad having total plot area 4306 m 2 & total investment will be Rs. 700 Lacs. The proponent wishes to start the production of Organic Pigments (Red, Yellow and Orange) with capacity of 150 MT per month. The product is especially used in printing ink, paints and plastic formulation like newspaper inks, magazine, food packaging, home and industrial paints and plastic master batches as per requirement. The proposed project site lies on N Latitude & E Longitude. M/S HERCULES PIGMENTS PVT LTD is proposing to be located at plot. No. 1704, GIDC Sarigam, Ta: Umbergaon, Di: Valsad district in Gujarat state and same western part comes under Daman union Territory. GIDC is located nearby National Highway No. 8 connecting Mumbai and Ahmedabad and is surrounding by Union territories of Daman in western side. The western Railway Main Line is passing through the area (Double & Electrified). Nearest town & industrial estate Vapi is the biggest railway station in the study area; where, almost all the important mail & express trains stop. Entire study area is well connected with the other major cities of the state and the country. Beside the rail connectivity, and also well connected by road transport. There is a good network of roads in the area and contributes for the development and economic growth of the area. The National Highway No. 8 (Surat Mumbai) is now six lanes, double tracked, more elevated and Jam free highway, which is developed by M/s L & T Company. This highway has given a further boost to the economic growth of this area. The existing unit is operated by technocrats having more than 30 years of experience in manufacturing and marketing of various Organic pigments. The company has been established in 2008 with manufacturing plants in Vapi, Gujarat having well equipped production plant which is being managed by dedicated, qualified & skilled persons. The proponent shall to start production of Organic pigments with total capacity of 150 MT per month and process capabilities to manufacture High Performance pigment series. Hercules Pigments Pvt Ltd is established in 2008 and managed by a professional board of directors. It manufactures and markets a wide range of Organic Pigments. Senior personnel are available for providing support to the manufacturing unit in the areas of technology, R&D, manufacturing, quality control and quality assurance. Organic pigments are manufactured at the company s 3 manufacturing units located at Vapi Gujarat for sale in local & international market. It was co-founded by 3 technocrats. New Project: Page 6 Manufacturing: Organic Azo pigment

7 Identification of the project proponent: The company is managed by the promoters and whole time directors Mrs. Vatsala Narendra Desai, Mr. Swetal Narendra Desai and Mr. Anupam Desai having more than 30 years experience & their team members Mr. Pramod Kumar Tandon who is Masters in Chemical Technology having 45 years experience in chemical industries. The company emphasis on R & D, quality control, marketing, production, logistics, import & export. Company s strength is commitment, best quality, timely delivery at best prices. The Directors have good experience and exposure in Azo pigments industries as the main director has been in this line of business for more than 2 decades. They have developed wide ranging contacts in the country and abroad and do not foresee any problem in the marketing the product manufacturing. (ii) Brief description of nature of the Project : The proposed project involves the production of Organic Pigments which are used in Printing Inks, Paints, Plastics and cosmetic formulation like newspaper, magazine, flexible packaging, home and industrial paints, plastic master batches and cosmetics etc. as per requirement. As per the EIA notification as amended products are covered under any category 5(f) required Prior Environmental Clearance. For the proposed new project, the company intends to procure the available latest technology for manufacturing the products. A typical plant shall house of MS Rubber lined/stainless Steel reactors, Filter Press, dryers, multi-mills, jet mills, blenders etc. (iii) Need for the project and its importance to the country and or region : The proposed new project provides a potential growth opportunity for the running business of the company. The company is already engaged in the business of manufacturing of Organic Pigments. The project would increase the overall export and also increase the foreign revenue. Product is now well established and acceptable in the international markets. Additional capacities of product range required over & above our existing capacities, as the company expect strong growth of exports to the extent of 40-50%. Local market also showing strong growth potential. Domestic market concentrated in Pan-India, particularly in West and Northern belt, making Sarigam as ideal choice. This project will generate employment of up to 100 people. New Project: Page 7 Manufacturing: Organic Azo pigment

8 (iv) Demand Supply Gap : The products have very high specific demand as they are especially used in printing ink formulation like news paper and flexible packaging as per requirement. (v) Imports vs. Indigenous production : Existing products manufacturing in the country will be very much economical as compared to Import of the same. The export of this pigments will earn revenue for the county. (vi) Export Possibility : Existing products have high export potential. Also these products have very good sab potential in local market. Additional capacities of product range required over & above our existing capacities at Sarigam, as the company expect strong growth of exports to the extent of 40-50%. Local market also showing strong growth potential. (vii) Domestic / export Markets : The company s product is used as raw material to manufacture various printing inks, paints and master batches as per the required applications and having very good market in domestic and also having very good international markets. (viii) Employment Generation (Direct and Indirect) due to the project : 3. Project Description : There will be very good opportunity of employment generation directly and indirectly due to proposed new project. Due to proposed project there will be ~100 people will be directly/indirectly employed. (i) Type of Project including interlinked and interdependent projects, If any : The proposed project is an interdependent project of the company. (ii) Location (map showing general location, Specific location, and project boundary & project site layout) with coordinates : The map showing general location, specific location and project boundary and project site lay out is enclosed as Annexure-1.Plant layout is attached as Annexure-2. (iii) Details of alternate sites considered and the basis of selecting the proposed site, particularly the environmental considerations gone into should be highlighted : The proposed activity will be accommodated in the notified industrial area having proper industrial infrastructure so; there is no alternate site consideration. Proposed expansion will be carried out in existing premises only. (Land allotment letter is attached as Annexure-6). (iv) Size or magnitude of operation : As per the proposed project cost the project is covered under medium Scale category of manufacturing industries. New Project: Page 8 Manufacturing: Organic Azo pigment

9 (v) Project description with process details (a schematic diagram/ flow chart showing the project layout components of the project etc. should be given) : Detailed project description with process details is enclosed as Annexure-3 (vi) Raw material required along with estimated quantity, likely source, marketing area of final products/s, mode of transport of raw Material and finished product : Detailed raw material requirement along with estimated quantity, likely source, marketing are of final products mode of transport of raw material and finish product & characteristics of hazardous chemicals are as below: Sr. No. DETAILS ON PRODUCT/BY-PRODUCTS TRANSPORTATION Product Physical State Dispatch Means of Transportati on 1 Organic Azo Pigments (Red/Yellow/Orange) Solid Local/Export Truck/contai ners Sr. No. Substance DETAILS ON RAW MATERIAL TRANSPORTATION Physical State Source of Supply & packing 1 Base (Amine) Powder Local, 25 kgs bags 2 Ice solid Local, 50 kgs bags 3 Sulphamic Powder Local, 25 kgs acid bags Means of Transportation container tractor container Distance of supplier from project site (km) 200 kms 10 kms 200 kms 4 Sodium nitrite Powder Local, 25 kgs bags container 200 kms 5 Hydro Chloric Acid (30%) liquid Local, tanker tanker 25 kms 6 Caustic lye liquid Local, tanker tanker 25 kms 7 Acetic acid & others 8 Sulphuric acid liquid Local, tanker tanker 25 kms liquid Local, tanker tanker 25 kms New Project: Page 9 Manufacturing: Organic Azo pigment

10 DETAILS ON STORAGE & HANDLING OF HAZARDOUS CHEMICALS No Name of the Raw Materials Quantity stored, MT Max Actual BP. 0 C MP 0 C Place of its Storage State operati ng pressur e temper ature Possible type of hazards Control measures provided (vii) 1 DCB Bags N.A 132 Solid Avoid Use Chemical contact withgoggles, skin & eye. Gloves, Apron, Avoid breathing Purifying respirator. dust, mist or gas. 2 AAA Bags Does not bil up to Caustic lye Stor age tank /Dru ms New Project: Page 10 Manufacturing: Organic Azo pigment Liqui d Solid May causeuse Eye and Skin irritation, respiratory and digestive tract irritation. chemical safety goggles, Wear appropriate protective gloves and clothing to prevent skin Ingestion ofexposure. large Always use a amount mayniosh or cause European gastrointesti nal irritation. Standard EN149 approved respirator. Skin irritation with greater skin exposure, tissue. Contact lenses should be when Employee should be provided with impervious clothe, gloves, eye contactface causes shield(eightinch destructive to eyeminimum),dus t and splash proof safety goggles, notchemically worn resistant safety shoes, working witheyewash this station and

11 chemical. safety showers Swallowing must be Sodium Hydroxide available. may cause severe burns of mouth, throat, esophagus and stomach. 4 Hydro Chloric acid St or ag e ta nk Liqui d Corrosive Liquid. Mist causes severe burns to all body tissue, may be fatal if swallowed or inhaled, inhalation may cause lung damage. Use chemical safety goggles or full face shield, Rubber or neoprene gloves and additional protection including impervious boots, apron. NIOSH approved Respirators. 5 Sulpha mic acid 2 1 Ba gs N. A N.A Solid Irritant. Use Chemical safety face shield, Rubber hand gloves, Rubber or PVC apron. 6 Napht hol AS Ba gs N. A Solid In case of Skin and Eye contact (Slightly irritanting) Use Goggles, Gloves chemical and Respirators, avoid contact with eyes and skin. 7 Sodiu m nitrite Ba gs Solid Toxic if swallowed, very toxic on inhalation, irritation to eyes, possible skin sensitizer. Use Chemical goggles, full face shield, Wear PVC gloves, Rubber safety footwear or gumboots. The material may produce skin New Project: Page 11 Manufacturing: Organic Azo pigment

12 Contact with combustibl e material may cause fire. sensitization in predisposed individuals, care must be taken, when removing gloves and other PPE, to avoid all possible skin contact. 8 PMP Ba gs Solid Causes Irritation in case of Skin and Eye contact. Use splash resistant safety goggles, appropriate chemical resistant clothing and gloves. Resource optimization/ recycling and reuse envisaged in the project, if any, should briefly outlined Resource optimization/recycling and reuse envisaged in the project in detail are as mentioned below: The raw materials will be stored in closed containers and will be handled through closed system to avoid the handling losses. Proper earthing shall be provided were ever hazardous material handling is done. Entire plant will be flameproof. Wash water will be recycled to minimize the fresh water consumption. (viii) Availability of water its source, Energy/power requirement and source should be given : New Project: Page 12 Manufacturing: Organic Azo pigment

13 Availability of water its source, Energy/power required and its source is below. Water withdrawal permission is attached as Annexure-4. PRODUCTWISE WATER CONSUMPTION M 3 PER TONE OF PROPOSED PRODUCT INCLUDES PROCESSING, STEAM, COOLING & PRODUCT WASHING Sr. No. Product Processing Boiler (Live Steam) Cooling (Ice) Product Washing Total 1 Organic Red Pigment 2 Organic Yellow Pigment 3 Organic Orange Pigment Maximum PRODUCTWISE EFFLUENT GENERATION M 3 PER TONE OF PROPOSED PRODUCT INCLUDES PROCESSING, STEAM, COOLING & PRODUCT WASHING Sr. No. Product Processing Boiler (Live Steam) Cooling (Ice) Product Washing Total 1 Organic Red Pigment 2 Organic Yellow Pigment 3 Organic Orange Pigment Maximum New Project: Page 13 Manufacturing: Organic Azo pigment

14 PRODUCTWISE WATER CONSUMPTION M 3 PER DAY OF PROPOSED PRODUCT INCLUDES PROCESSING, STEAM, COOLING & PRODUCT WASHING Sr. No. Product Processing Boiler (Live Steam) Cooling (Ice) Product Washing Total 1 Organic Red Pigment 2 Organic Yellow Pigment 3 Organic Orange Pigment Maximum PRODUCTWISE EFFLUENT GENERATION M 3 PER DAY OF PROPOSEDPRODUCT INCLUDES PROCESSING, STEAM, COOLING & PRODUCT WASHING Sr. No. Product Processing Boiler (Live Steam) Cooling (Ice) Product Washing Total 1 Organic Red Pigment 2 Organic Yellow Pigment 3 Organic Orange Pigment Maximum New Project: Page 14 Manufacturing: Organic Azo pigment

15 OVERALL WATER CONSUMPTION & EFFLUENT GENERATION(M 3 /DAY) Sr. No. Particulars Water Consumption Effluent generation 1. Domestic Processing Boiler ( Live steam) Boiler blow down & DM rejection Product Washing Cooling as ice Floor/container washing Gardening Grand Total Total Industrial Note: Average 260 M 3 /day fresh water will be used for proposed plant and source from GIDC authority. Domestic effluent shall be passed through adequate capacity of septic tank/soak pit. Process effluent shall be sent ETP. Boiler blow down, D M rejection & live steam comes out as an effluent. Ice water comes out as effluent. Floor/container & vessel washing comes out as effluent. Entire industrial effluent will be treated in primary & secondary effluent treatment plant & sent to CETP through under ground drainage line for further treatment & ultimate disposal into Arabian Sea. New Project: Page 15 Manufacturing: Organic Azo pigment

16 Sr. No. 1 Steam requirement ENERGY REQUIREMENT AND ITS SOURCE Particulars Proposed Source 2500 kgs./hrs. Will be obtained from proposed NG fired steam boiler of 2.5 TPH capacity POWER REQUIREMENT AND ITS SOURCE Sr. Particulars Proposed Source No. 1 Power Electricity requirement 200 KVA Will be sourced from Dakshin Gujarat Vij Co. Ltd. (ix) Quantity of waste to be generated ( liquid and solid) and scheme for their Management/disposal : Quantity of waste to be generated (liquid and solid) and scheme for their Management/ disposal is enclosed as Annexure-4. (x) Schematic representations of the feasibility drawing which give information of EIA purpose: A schematic representations of the feasibility drawing is attached as Annexure-7 Site Analysis (i) Connectivity : The project is to be located in notified Industrial Estate of Sarigam which is very well connected to National Highway no.8, Western Railways. And the nearest air port (Mumbai) and port are 150 KM away from the project site by road. New Project: Page 16 Manufacturing: Organic Azo pigment

17 4. (ii) Land Form, Land use and Land ownership : The land is in the form of industrial shed owned by Gujarat Industrial Development Corporation. (iii) Topography (along with map) : Topography map showing the elevation of study area is below; The catchment area of the proposed project site altitude is 35 m (a.m.s.l) consists of the near site is flat topped, highly dissected plateaus and dyke ridges running in a west to east direction. The Main River (Daman Ganga) in the catchment area flows in incised meanders forming steep geomorphologically V shaped valleys with steep sides. The entire catchment has a rectangular and trellis pattern of drainage depicting the influence of the structures on the drainage development. (iv) Topography map showing the elevation of the study area below. The topographical map is enclosed as Annexure-5. Existing land use pattern (agriculture, non-agriculture, forest, water bodied ( including area under CRZ)), shortest distances from the periphery of the project to periphery of the forest, national park, wild life sanctuary, eco sensitive areas, water bodies (distance from the HFL of the river), CRZ. In case of notified industrial area, a copy of Gazette notification should be given : The existing land is located in the notified industrial area and a copy of possession letter and gazette notification is enclosed as Annexure-6. (v) Existing Infrastructure : GIDC notified industrial area of Sarigam has the entire available infrastructure like water, electricity, roads, rail, transportation, availability of raw material and drainage system. (vi) Soil classification : General soil classification of the area is as under : The area, being of basaltic formation, falls under the broad soil group of red loams and black clay soils. The transmission of water through similar parent material seems to have influenced the development of different physiographic characteristics of the soils in the area. The area in between the hills with sloping lands contains dark yellowish brown to very dark grayish brown gravelly clay loam to clayey soils of shallow to moderate thickness. The dissected hill and steep slopes suffer from severe erosion hazards. The steep hill slopes are almost devoid of soil. (vii) Climate data from secondary sources : Rainfall Data : The project site location receives annual rainfall of to 1300 mm in 35 rainy days with coefficient of variation of 65 %. There is large spatial and temporal variation in rainfall of the study area. The low rainfall areas receiving less than 500 mm rainfall are New Project: Page 17 Manufacturing: Organic Azo pigment

18 comprised of Kutch district and western parts of Banaskantha and Patan district and parts of Jamnagar, Rajkot and Surendranagar districts. These are also characterized by arid climate. The high rainfall (> 1400 mm) receiving areas (Project site, Dang, Valsad, Navsari and Surat, Dadra & nagar haveli and Daman & Diu) are characterized as sub humid climate. The rest part of the state receives rainfall between mm and generally fall under semi-arid climate. Temperature & Climate Data: Proposed project site falls under seismic zone-iii, which h is not highly earthquake prone area. Aside from the monsoon season, the climate is dry. The average maximum temperature o C and Minimum temperature, o C. The average humidity ranges from nearly 84% in August to about 31% in February. (viii) Social Infrastructure available : Social Infrastructure in Valsad district is as under : Education : There are 990 primary and 161 secondary and higher secondary Table 5: List of Educational Institutes schools in the district Educational Total With over 1,250 seats, there are 6 ITIs offering several industrial training Institutes programs which includes, fitting, armature & motor rewinding, Primary School 990 electrician, information technology and electronic system maintenance Secondary School etc 166 Higher Secondary School, One Government polytechnic College is present in the district offering courses in civil, chemical, electrical, mechanical and plastic engineering, ITI s 6 with an intake capacity of 360 Polytechnic 1 College With 120 seats, there is one Degree Engineering College present in Pharmacy College 2 Valsad offering engineering courses in mechanical and chemical Engineering 1 branches College Located in Vapi, G. M. Bilakhia Pharmacy College has an intake Management 1 College capacity of 60 students per year Other Colleges Rofel Institute of Management studies in Valsad offers full time MBA Other Colleges: Arts, Commerce, Science, B.Ed and Law College course and takes 120 students per annum Source: Department of Education, 2007 Health: There are 43 primary healthcare centres, 10 community healthcare centres, 10 Government and 1 Municipal hospital present in the district. Valsad has several private specialized hospitals to provide a comprehensive range of tertiary and secondary care services backed by state-of- the- art technology and trained medicos A multi-specialty 21 st Century Hospital, (branch of Nadkarni Group of Hospitals) is present in Vapi, giving services in general and laparoscopic surgery, trauma, orthopedic and urology etc. the hospital is one of the few centers in India offering Uterine Thermochoice thermal Balloon Therapy for Dysfunctioning Uterine Bleeding (DUB) patients. Beside this, several private hospitals such as, Kasturba Hospital, Bhatia General Hospital, and Adarsh Hospital are also present in Valsad Tourism: Tourism Built in 1742, the Fire Temple at Udawada, which is also known Fire Temple as Mecca for the Parsi community in India, makes the city a famous pilgrimage center throughout the world Dharampur is surrounded on three sides by the Sahyadri Mountains which grace the town with pleasant climate throughout the years The collection at the Lady Wilson Museum in Dharampur includes tribal art and art crafts that highlights the local culture. Besides this, District Science Centre is also New Project: Page 18 Manufacturing: Organic Azo pigment

19 present in Valsad Proximity of Valsad with Daman & Diu, has increased the graph of tourist flow in the district. 5. Planning Brief : (i) Planning Concept ( Type of industries, facilities, transportation etc) Town and Country Planning /Development authority Classification : There is a cluster of numerous large-scale, medium-scale and small-scale industries, engaged in manufacture of variety of products, for example pharmaceuticals, dyes and chemicals, paper mills, paints, plastics, packaging, textiles, specialilty chemicals, pesticides and others in the Gujarat Industrial Development Corporation (GIDC) notified area of Sarigam. (ii) Population Projection : Not applicable (iii) Land use Planning (breakup along with green belt etc) : The proposed project is located within the Notified Industrial Area by Government of Gujarat and due to the proposed project there will not be any change in the land use pattern of the region. Proposed Green belt planning in the project area is as below. For Green Belt Development, the company proposes to develop a green belt in 22% of the total plot area. i.e sq. meter. In addition to this company shall also develop green belt along the periphery of the proposed site and in common premises available outside the company premises. Site plan with Area table for proposed plant Sr. No Particulars Area in m 2 1 Production area Raw material storage area Finished product storage 50 4 Office & laboratory area Toilet block & others Utility & boiler Solid waste storage 40 8 ETP 60 9 Gardening & plantation Open space Watchman cabin Total 4306 New Project: Page 19 Manufacturing: Organic Azo pigment

20 Site plan & Key Plan New Project: Page 20 Manufacturing: Organic Azo pigment

21 (iv) Assessment of Infrastructure demand ( Physical & Social) : There is no need for any infrastructure demand in terms of physical or social needs for proposed expansion. (v) Amenities/ Facilities : GIDC notified industrial area of Sarigam has the entire available infrastructure like CETP, water, electricity, roads, rail, transportation, availability of raw material and drainage system. 6. Proposed Infrastructure : (i) Industrial Area (Processing Area). The proposed infrastructure to manufacture products will be built with standard engineering design considering all the relevant parameters related to environment, health and safety. (ii) Residential Area (Non Processing Area) : No residential area is involved in the proposed project. (iii) Green Belt : Green belt will be provided and maintained at the tune of 22% of the total land area. (iv) Social Infrastructure : Not applicable (v) Connectivity (Traffic and Transportation Road/ Rail/ Metro/ Water ways etc) : The project site is very well connected by road through National Highway no. 8, railways. (vi) Drinking Water management ( Source & Supply of water ) : Source of water is from GIDC water supply services. (vii) Sewerage System : GIDC has provided sewerage system to dispose the sewage effluent. (viii) Industrial Waste Management : Average 250 M 3 /day of Industrial liquid effluent generation during the manufacturing of proposed products will be treated in proposed primary & secondary effluent treatment plant and sent to CETP Sarigam through under ground effluent drainage line of GIDC Sarigam. Generated domestic liquid waste is being disposed off through soak pit system to drainage. New Project: Page 21 Manufacturing: Organic Azo pigment

22 (ix) Solid Waste Management : No Type of waste Category Qty. MT/ Year Treatment 1 ETP waste Dried, packed in bags 2 Used Oil Packed in carboys 3 Discarded containers Decontaminated, stored Disposal Dispose off into TSDF, Vapi Sell to Registered reprocessers Sell to authorized recycler (x) Power Requirement & Supply / Source : Power requirement for proposed project will be taken from DGVCL. 7. Rehabilitation and Resettlement (R&R) Plan: (i) Policy to be adopted (Central/ State) in respect of the project affected persons including home oustees, land oustees and landless laborers (a brief outline to be given): There will be no rehabilitation and resettlement undertaken as labours and workers from local & nearby areas for the proposed construction activity which will be minor as the proposed activity is to be undertaken at the existing plot/shed. 8. Project Schedule & Cost Estimates : (i) Likely date of start of construction and likely date of completion ( Time schedule for the project to be given ) : After obtaining Environmental clearance and Consent to Establish from GPCB, the company shall start the proposed construction and commissioning of the project. (ii) Estimated project cost along with analysis in terms of economic viability of the project: Estimated project cost along with the analysis in terms of economic viability of the project is given as below; Plant & Machinery, Pipeline & Fittings, Electrical Installation, Safety systems, etc. are the major heads considered in the Capital Cost Projection for the proposed project. Environment Protection has also been considered in planning the Cost Projection, which New Project: Page 22 Manufacturing: Organic Azo pigment

23 will include Green belt development, safety systems, etc. CAPITAL COST PROJECTION Sr. No. Particulars Cost in Rs.(Lacs) for proposed project 1.0 Land 4306 Sq. meters Building Plant & Machinery Utility Environmental Management 50 System 5.0 Total Project Cost Utilities 6.1 Steam Boiler, TPH Hot air dryer Three Nos. (Direct firing) 6.3 D.G. Set (Standby), KVA Power from DGVCL, KVA Fuel 8.1 Natural gas for steam boiler 2500 & hot air dryer, SCM/day 8.2 HSD, kgs/hr Water from GIDC Sarigam Waste Water (Industrial) PROJECT VIABILITY Sr. No. PARTICULARS AMOUNT INR Lacs/Anum 1 Proposed Sale Raw Material Cost Power & Fuel Labor Cost Environmental Management System 85 6 Maintenance Cost 50 7 Selling, packing & Office Expenses Proposed Profit 195 The company will provide budgetary provision for the recurring expenses for environmental issues while planning the allocation of funds during the annual budgetary planning. New Project: Page 23 Manufacturing: Organic Azo pigment

24 Sr. No. Component Recurring Cost per annum Proposed (Rs. In Lacs/annum) 1. Environment & Safety Management System Greenbelt Maintenance Solid waste Disposal 0.5 Total Analysis of Proposal ( Final Recommendations): (i) Financial and social benefits with special emphasis on the befit to the local people including tribal population, if any, in the area: Proposed expansion activity will provide benefits to the local people in terms of financial and social welfare. Local people will get direct financial benefit by way of employment. Local people will get some contracts of supply and services to get indirect income. Company will contribute in improving education and health facilities in nearby area. New Project: Page 24 Manufacturing: Organic Azo pigment

25 ANNEXURES ANNEXURES New Project: Page 25 Manufacturing: Organic Azo pigment

26 ANNEXURE-1 The map showing general location, specific location and project boundary and project site layout of M/S. Hercules Pigments Pvt. Limited, located at Plot No. 1704, GIDC,Sarigam , Dist- Valsad (Gujarat). The location of the project site can be viewed in Figure 1.1 Fig. 1.1: Location map showing the Project site and inter-state boundary with 10 kms radius New Project: Page 26 Manufacturing: Organic Azo pigment

27 New Project: Page 27 Manufacturing: Organic Azo pigment

28 ANNEXURE-2 Site Layout Plan & Key Plan New Project: Page 28 Manufacturing: Organic Azo pigment

29 GOOGLE MAP SHOWING PROPOSED PLOT. Proposed plant New Project: Page 29 Manufacturing: Organic Azo pigment

30 ANNEXURE-3 Detailed project description with process details - MANUFACTURING PROCESS The company will use the latest available process technology for the production. This chapter includes the manufacturing process of the product, chemical reactions, and material mass balance for the product. Manufacturing process: Azo Pigments (Organic Yellow/Orange/Red): (a) Preparation of Diazo solution. Water & Hydrochloric Acid is recd in Stirred tank. Primary Aromatic Amine is added along with Ice. Later Sodium Nitrite is slowly added at 0-5 Deg c. Solution is maintained at this temp. (b) Coupler Dissolution : Water, Caustic Lye & Coupler is taken in stirred vessel. This mixture is heated to required temp. to make uniform solution. And cooled back to room temp. (c) Coupling reaction : Receive Diazo Solution or Coupler into coupling reactor. Then add another component at reaction condition in 2-3 Hrs. Heat reaction mass to desired elevated temp. Check end Point. Stirrer for further 3-4 Hrs till reaction completion. Filter the Solution. Take out the wet cake. Filtrate is let out to ETP for treatment. Wet cake is Azo pigment which is further taken for drying, Pulverizing, blending and packing. Detailed Reaction, Flow Diagram with Material Balance is enclosed. ( 1 ) Organic Yellow Pigment CHEMICAL REACTION Cl NH 2 NH 2 Cl HCl NaNO 2 Cl N=N Cl Cl N=N Cl + 2 NaCl + 4 H 2 O 3 3 Dichlorobenzidine Mol.wt. 253 Diazo Cl Cl Cl N=N N=N Cl + 2CH 3 COCH 2 CONHC 6 H NaOH AcetoAcetanilide Mol. Wt. 177 Cl Cl CH 3 COCH 2 CONHC 6 H 4 - N=N N=N-C 6 H 4 NHCOCH 2 COCH NaCl + 2 H 2 O Yellow pigment Mol. Wt. 618 Base like: DCB, Fast red G Base, PCONA, MNPT & Coupler like Arylanilides, AAA, Napthol ASIRG New Project: Page 30 Manufacturing: Organic Azo pigment

31 ORGANIC YELLOW PIGMENT Water: 4000 Kgs Base (Amine) : 405 kgs Ice: 6000 kgs Sulphamic acid: 9 kgs Na Nitrite: 690 kgs HCl: 960 kgs Total: kgs Ice: 6000 kgs Acetic Acid & Others: 285 kgs Diazotization + Dissolution kgs Live steam: 4000 kgs Total: kgs DIAZOTIZATION Kgs kgs Hours: 1 ½+11/2=3hr COUPLING & TREATMENT kgs, Time: 6 Hrs DISSOLUTION 3990 Kgs Hours: ½ hr Water: 3000 lits Coupler : 640 kgs Caustic: 350 kgs Total: 3990 kgs Crude Pigment Slurry: kgs Total : kgs Crude Pigment Slurry: kgs Total: kgs Wet cake: 3400 kgs Water: kgs Total: kgs Wet cake: 3500 kgs Dry Powder: 1002 kgs FILTERATION kgs, Time: 3 Hrs WASHING, kgs, Time: 6Hrs TRAY DRYING ( 24 Hrs) 3500 kgs PULVERIZER & PACKING (Time: 6 Hrs) Filtrate as effluent: kgs to ETP Wet cake: 3400 kgs Total: 26339kgs Filtrate kgs to ETP Wet cake: 3500 kgs Total: kgs Water Vapors: 2498 kgs Dry Powder: 1002 kgs loss: 2 kgs ORGANIC YELLOW PIGMENT: 1000 kgs New Project: Page 31 Manufacturing: Organic Azo pigment

32 [2] Organic Orange Pigment Cl NH 2 NH 2 Cl HCl NaNO 2 Cl N=N Cl Cl N=NCl + 2 NaCl + 2 H 2 O Cl N=N Cl 3 3 dichlorobenzidine Mol wt. 253 Cl CH 2 O = C N=NCl + 2 N C N CH NaOH PMP Mol wt. 173 Cl Cl CH 3 CH N N CH-N=N C=O N=N- CH O=C N CH-CH 3 N + 2 NaCl + 2 H 2 O Base like: DCB, Coupler like PMP, MPMP Orange 13 pigment Mol.wt. 610 Water: 2600 Kgs Base (Amine) : 405 kgs Ice: 5000 kgs Sulphamic acid: 7 kgs Na Nitrite: 240 kgs HCl: 1080 kgs Total: 9332 kgs Ice: 4000 kgs Emulsifier & Others: 20 kgs Diazotization + Dissolution kgs Live steam: 4000 kgs Total: kgs ORGANIC ORANGE PIGMENT DIAZOTIZATION Crude Pigment Slurry: kgs Total: kgs Wet cake: 3400 kgs Water: kgs Total: kgs 9332 Kgs kgs Hours: 1 ½+11/2=3hr COUPLING & TREATMENT kgs, Time: 6 Hrs FILTERATION kgs, Time: 3 Hrs WASHING, kgs, Time: 6Hrs DISSOLUTION 5800 Kgs Hours: ½ hr Water: 4900 lits Coupler : 580 kgs Caustic: 320 kgs Filtrate as effluent: kgs to ETP Filtrate kgs to ETP Total: 5800 kgs Crude Pigment Slurry: kgs Wet cake: 3400 kgs Total: kgs Wet cake: 3500 kgs Total: kgs Total : kgs Wet cake: 3500 kgs Dry Powder: 1002 kgs TRAY DRYING ( 24 Hrs) 3500 kgs PULVERIZER & PACKING (Time: 6 Hrs) Water Vapors: 2498 kgs Dry Powder: 1002 kgs loss: 2 kgs ORGANIC YELLOW PIGMENT: 1000 kgs New Project: Page 32 Manufacturing: Organic Azo pigment

33 [3] Organic Red Pigment Cl NH 2 Cl N=NCl HCl NaNO 2 + Cl 2H 2 O + NaCL Cl N=NCl Cl 2:5 Dichloro Aniline Mol Wt O NH OH Diazo C 17 H 12 NO 2 ( Naphthol AS) Mol wt.263 O Cl OH C NH N=N Cl Base like: TCA, DCA, Scarlet G base, Coupler like Naphols Organic Red Pigment Mol wt. 436 New Project: Page 33 Manufacturing: Organic Azo pigment

34 (3) ORGANIC RED PIGMENT Water: 1500 lits Base: 432 kgs Ice: 4000 kgs Sulphamic acid: 25 kgs Na Nitrite: 200 kgs H2SO4: 3000kgs Total: 9157 kgs DIAZOTIZATION 9157 Kgs kgs Hours: 6 hrs DISSOLUTION Kgs Hours: 1 hr Water: 4000 lits Coupler: 590 kgs Caustic: 650 kgs Steam: 1000 kgs Ice: 5000 kgs Total: kgs Diazotization + Dissolution:20397 kgs Ice :2000 kgs Live steam: 3000 kgs HCL: 1000 kgs Total: kgs COUPLING kgs, Time: 10 Hrs Coupler: kgs Total: kgs Coupler: kgs Total: kgs Wet cake: 5000 kgs Water: liters Total: kgs Wet cake: 5000 kgs Total: 5000 kgs Dry Powder: 1030 kgs FILTERATION kgs, Time: 3 Hrs WASHING, kgs Time: 6Hrs TRAY DRYING ( 24 Hrs) 5000 kgs PULVERIZER & PACKING (Time: 6 Hrs) Filtrate as effluent: kgs to ETP Wet cake: 5000 kgs Total: 26397kgs Filtrate as effluent: kgs to ETP Wet cake: 5000 kgs Total: kgs Water Vapours: 3970 kgs Dry Powder: 1030 kgs Total: 5000 kgs PRODUCT (ORGANIC RED PIGMENT: 1030 kgs ) New Project: Page 34 Manufacturing: Organic Azo pigment

35 ANNEXURE-4 Quantity of waste to be generated (liquid and solid) and scheme for their Management/disposal. Quantity of Waste Water (liquid waste) generation and its management : Sr. No. Particulars Water Consumption Effluent generation 1. Domestic Processing Boiler ( Live steam) Boiler blow down & DM rejection Product Washing Cooling as ice Floor/container washing Note: 7. Gardening Grand Total Total Industrial Average 260 M 3 /day fresh water will be used for proposed plant and source from GIDC authority. Domestic effluent shall be passed through adequate capacity of septic tank/soak pit. Process effluent shall be sent ETP. Boiler blow down, D M rejection & live steam comes out as an effluent. Ice water comes out as effluent. Floor/container & vessel washing comes out as effluent. Entire industrial effluent will be treated in primary & secondary effluent treatment plant & sent to CETP through underground drainage line for further treatment & ultimate disposal into Arabian Sea. New Project: Page 35 Manufacturing: Organic Azo pigment

36 DETAILS OF PROPOSED EFFLUENT TREATMENT PLANT Design Criteria : Product : Organic Azo Pigment Source of Effluent : process, washing, Utilities & floor/container. Design Flow of Effluent : 260 KL/day Max. Design Parameters : As under Effluent Characteristics: No Effluent Parameter Untreated combined normal effluent Expected Results GPCB norms 1 ph to Color pt. Co <100 3 Suspended solids, Mg/L 4 Total dissolved solids, Mg/L < < Oil and grease, Mg/L <10 6 NH 3 -N, Mg/L <50 7 BOD, Mg/L <100 8 COD, Mg/L <250 9 Heavy metal, Mg/L Nil Nil < Phenolic Compounds, Mg/L Nil Nil <1 New Project: Page 36 Manufacturing: Organic Azo pigment

37 Based on the above criteria Effluent Treatment Plant having under mentioned specification is required to install. DETAILS OF EFFLUENT TREATMENT PLANT Average hydraulic load, M 3 /Day : 250 M 3 /Day Design hydraulic load, M 3 /Day : 260 M 3 /Day Average Inlet BOD, mg/l : Average Inlet COD, mg/l : No Name of the unit Size in meters Capacity in m 3 MOC No Detention time Remarks Reqd. provided Adequacy 1 Oil/grease trap 0.6 x 0.6 x RCC 1 1 min 1.44 min Adequate 2 Collection with sparger 7 x 5 x 5 m 175 RCC 1 8 hrs 16 hrs Adequate 3 Reaction tank 2.0 ø x MS 1 10 min 25 min Adequate 4 Floculator 2.0 ø x MS 1 10 min 25 min Adequate 5 Chemical dosing tanks HDPE Primary Lamella separator with tube deck packing 7 Secondary Aeration Tank with build in clarifier with tube deck 1.5 x 1.5 x x 5.0 x MS 1 15 min 32 min Adequate 200 RCC 1 12 hrs 18 hrs Adequate 8 Twin Lobe Air Blower 6500 mmwg 500 nm3/hr CI Adequate 9 Holding tank 5 x 5 x 5 m 125 RCC 1 6 hrs 12 hrs Adequate 10 Filter Press 24 x 24 PP Adequate New Project: Page 37 Manufacturing: Organic Azo pigment

38 FLOW DIAGRAM OF PROPOSED EFFLUENT TREATMENT PLANT LIME SLURRY TANKS FeSO 4 /PE tanks TWIN LOBE AIR BLOWER Primary Lamella Separator EFFLUENT O/G TRAP Collection/Equ tank Reaction. Tank FLOCCULATOR FILTER PRESS DIFFUSER SECONDARY AERATION TANK WITH BUILT IN SECONDARY CLARIFIER Holding Tank To GIDC Drain to CETP New Project: Page 38 Manufacturing: Organic Azo pigment

39 Quantity of Hazardous Waste generation and its management No Type of waste Category Qty. MT/ Year Treatment 1 ETP waste Dried, packed in bags 2 Used Oil Packed in carboys 3 Discarded containers Decontaminated, stored Disposal Dispose off into TSDF, Vapi Sell to Registered reprocessers Sell to authorized recycler Note: The unit will obtain membership of approved TSDF site of M/S VGEL, Vapi, for disposal of Hazardous waste. New Project: Page 39 Manufacturing: Organic Azo pigment

40 ANNEXURE-5 The topographical map New Project: Page 40 Manufacturing: Organic Azo pigment

41 Annexure-6 PLOT ALLOTMENT LETTER ISSUED BY THE GIDC New Project: Page 41 Manufacturing: Organic Azo pigment

42 New Project: Page 42 Manufacturing: Organic Azo pigment

43 Notification for Sarigam Notified industrial estate New Project: Page 43 Manufacturing: Organic Azo pigment

44 New Project: Page 44 Manufacturing: Organic Azo pigment

45 ANNEXURE-7 A schematic representation of the feasibility drawing New Project: Page 45 Manufacturing: Organic Azo pigment

46 ANNEXURE: 8 DETAILS OF PROPOSED AIR POLLUTION & ITS CONTROL MEASURES The utility emissions will be from the 2.5 TPH capacity of steam boiler. Natural gas (green fuel) as fuel will be used in the boiler. Also we will install a D.G. Set of 200 KVA capacity to use in case of power failure and HSD shall be used as a fuel. There will be no process gas emission. Details of which are as under; Sr. No. Particulars Details 1.0 Capacity of Steam boiler 2.5 TPH 1.1 Fuel Used Natural gas 1.2 Fuel Consumption 1700 SCM/Day 1.3 APC provided Chimney 1.4 Height/dia of chimney 11 meters 2.0 Capacity of D G set 200 KVA (Standby) 2.1 Fuel Used HSD 2.2 Fuel Consumption 40 liters/hr 2.3 APC provided Exhaust 2.4 Height/dia of Exhaust 11 meters 3.0 Hot air Dryer Direct firing through burner (3 Nos.) 3.1 Fuel used Natural gas 3.2 Fuel consumption 800 SCM/Day 3.3 APC Not required Drying of Pigment: Details of Air pollution control measures attached to Pulveriser Drying of % pigment wet cake shall be carried out in tray dryers. The process heat is provided by Hot air dryer system based on natural gas. Pulverization of pigments: This is carried out in a closed circuit grinding equipment, pulverizer as shown in the drawing. This consists of following parts: 1. Hopper feed box. 2. Screw feeder. 3. Closed grinder with box 4. cyclone separator 5. Bag filter. 6. Rotary valve for outlet of product. The pulverized material is collected in bags, weighed and dispatched. The material collected from bag filter is also mixed with the final product. Thus this is a completely closed system and does not involve any process gas emission. New Project: Page 46 Manufacturing: Organic Azo pigment

47 DETAILS OF AIR POLLUTION CONTROL EQUIPMENTS FOR PULVERISER Dried Material wet cake Bag Filter Tray Dryer Pulveriser Cyclone Separator Pulverized dyes New Project: Page 47 Manufacturing: Organic Azo pigment

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS

More information

M/S. Dain Colour Chem

M/S. Dain Colour Chem PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

Product Profile. Quantity in MT/Month CAS Solvent Dark Violet R Solvent Black

Product Profile. Quantity in MT/Month CAS Solvent Dark Violet R Solvent Black Annexure - A Product Profile Sr. No. Product Name Quantity in MT/Month CAS Existing Proposed Ultimate Number End Users 1 Acid Dyes 5.000-5.000 0.000 -- -- Solvent Yellow 82 12227-67-7 Solvent Dark Violet

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For EXPANSION IN EXISTING MANUFACTURING PLANT Of M/s. SHIVA DYE STUFF PVT. LTD Plot no. A2-11/6104,G.I.D.C. Industrial Estate, Ankleshwar-393002, Gujarat. 1 CONTENTS Sr. No. Description

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.

More information

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD.

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. FOR THE PROPOSED EXPANSION PROJECT FOR THE MANUFACTURING OF KETONIC RESINS Category: 5(f) OF RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. Located at: Plot No. C-1/46, 100 SHED AREA, GIDC, Vapi,

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,

More information

M/s. Lakeland Chemicals (India) Ltd.

M/s. Lakeland Chemicals (India) Ltd. FOR THE PROPOSED EXPANSION PROJECT FOR MANUFACTURING OF SPECALITY CHEMICALS Category: 5(f) A OF Located at: Plot no 63,6A,6B, Rasayani Road, Vill. Madap, Tq. Khalapur, Dist. Raigad.( Maharashtra) 1 Project

More information

PRE FEASIBILTY REPORT

PRE FEASIBILTY REPORT PRE FEASIBILTY REPORT FOR ENVIRONMENT CLEARANCE OF PROPOSED NEW PROJECT S. O. CHEMICALS (5 f Category) Proposed By: COREL PHARMA CHEM PVT. LTD. SURVEY NO. 473 & 481, BORISANA, KADI THOL ROAD, KADI, DIST

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management ANNEXURES Annexure No. Description 1 Google image showing proposed project site 2 Plant Lay-Out 3 Manufacturing process details 4 Details of hazardous waste management 5 Details of Effluent Treatment Plant

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project Of MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS of 850 MT/Month By PASHUPATI INDUSTRIES 169/1/A2, Phase 1, Opposite Telephone Exchange, GIDC Naroda, Ahmedabad-382330

More information

PRE-FEASIBILITY REPORT OF SAND QUARRY

PRE-FEASIBILITY REPORT OF SAND QUARRY PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL

More information

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600 Annexure A Product Profile Sr. No. 1 Product Crude OBA AND/ OR Standardized OBA liquid/ powder MT/ M Consented Ultimate 525 190 AND/ OR 2600-23 - Annexure - B Details of Raw Materials Qty (Kg/ Kg) Qty/

More information

For TOR New. 1. Basic Information of the Project:

For TOR New. 1. Basic Information of the Project: SEAC, Gujarat: Page 1 of 12 For TOR New. 1. Basic Information of the Project: i Name & Address of the Project site M/s. Shreenathji Dye Chem (Complete details with plot no./survey no., Landmark etc. )

More information

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant PRE FEASIBILITY REPORT FOR Silica Sand Beneficiation Plant BY Shree Silicaam Minerals LLP VILLAGE : CHOKI TALUKA : JAGADIA DIST : BHARUCH GUJARAT (INDIA) PRE-FEASIBILITY REPORT: SILICA SAND BENIFICIATION

More information

ANNEXURE A DETAILS OF PRODUCTS

ANNEXURE A DETAILS OF PRODUCTS Annexures to Form 1 & Pre Feasibility Report Proposed Project for manufacturing of Dyes Intermediates of M/s Jay Dyechem, Narol-Vatva Road,Ta : City, District : Ahmedabad, Gujarat. ANNEXURE A DETAILS OF

More information

vii Total cost of Proposed Project Existing : 0.16 Cr Proposed: 0.25 Cr Total : 0.41 Cr viii Total Plot area ( sq. meter)

vii Total cost of Proposed Project Existing : 0.16 Cr Proposed: 0.25 Cr Total : 0.41 Cr viii Total Plot area ( sq. meter) SEAC, Gujarat: Page 1 of 28 For TOR Expansion Case. 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot no./survey no., Landmark etc. ) M/s. Om Interchem

More information

PIDILITE INDUSTRIES LIMITED

PIDILITE INDUSTRIES LIMITED FOR PROPOSED EXPANSION PROJECT (FOR EXISTING PRODUCT RANGE) MANUFACTURING OF ORGANIC PIGMENTS Category: 5(f) AT PIDILITE INDUSTRIES LIMITED Located at: Plot No. 23, 1 st Phase, GIDC Notified Industrial

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF CARBON BLACK (10950 TPM TO 15750 TPM ) AND CO-GENERATION POWER PLANT (22 MW TO 32 MW) IN EXISTING PREMISES of M/s. PHILLIPS CARBON BLACK LTD. Survey No.

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

Ramans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR

Ramans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR Annexure A Product Profile Sr. No. 1 2 Product Crude OBA AND/OR Crude OBA-CBS-X Standardized OBA Solid AND/OR Standardized OBA Liquid Proposed Qty (MT/ M) 400 400 1600 Note : For making Standardized OBA

More information

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT FOR ORDINARY SAND PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS

More information

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II)

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II) BRIEF SUMMARY OF THE PROJECT for PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT of M/s. BASF INDIA LTD. (UNIT-II) PLOT NO. 8001 & 8001A, PHASE-VI, G.I.D.C., ANKLESHWAR, DIST: BHARUCH-393002,

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report M/s. Veer Poly Chem 0 1. Introduction M/s. Veer Polychem is an existing unit located at Plot 119 & 120, Ranpur road, GIDC Dhandhuka, Dist: Ahmedabad, Gujarat. Currently, unit is

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For NEW MANUFCTURING PLANT Of BHIMANI DYE CHEM INDUSTRIES Plot No. 2, Survey No. 316, At: Dhanot, Ta: Kalol, Dist: Gandhinagar, Gujarat. CONTENTS Sr.No. Description 1. Executive

More information

Synthetic Organic Chemicals 5(f)

Synthetic Organic Chemicals 5(f) SEAC, Gujarat Page 1 of 14 Synthetic Organic Chemicals 5(f) For Terms of Reference [ToR] New Project 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot

More information

PROJECT PRE-FEASIBILITY REPORT. For

PROJECT PRE-FEASIBILITY REPORT. For PROJECT PRE-FEASIBILITY REPORT For THE PROPOSED ORGANIC CHEMICALS MANUFACTURING IN EXISTING IN FORMULATION OF PESTICIDE, AGROCHEMICAL AND BIO FERTILIZERS MANUFACTURING UNIT AT M/S. SULPHUR MILLS LTD. PLOT

More information

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT LG Polymers India Pvt. Ltd. Sy. No.s

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

PROJECT PRE-FEASIBILITY REPORT

PROJECT PRE-FEASIBILITY REPORT PROJECT PRE-FEASIBILITY REPORT FOR EXPANSION OF DYES INTERMEDIATE UNIT [Schedule 5 (f) Category B as per EIA notification 2006 and its amendment thereof] At Plot No: 3101,3102, 3108, Phase IV, G.I.D.C,

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

Check list for construction Project of EC [Category 8(a)]:

Check list for construction Project of EC [Category 8(a)]: Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist

More information

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

For TOR New Projects. Mo. no. : Contact no. and  ID of the Applicant SEAC, Gujarat : Page 1 of 6 For TOR New Projects 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot /Survey, Landmark etc. ) M/s. Perstorp Industries

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY M/s Colorant Limited (Unit II) is a proposed expansion project located at Plot No. 3225, Phase IV, GIDC Vatva, Ahmedabad in Gujarat State. M/s Colorant Limited

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

THE PROPOSED NEW PROJECT FOR MANUFACTURING

THE PROPOSED NEW PROJECT FOR MANUFACTURING FOR THE PROPOSED NEW PROJECT FOR MANUFACTURING OF Various Auxiliary Chemicals "Textile Binder, Wetting & Dispersing Agents, Flock Binder and Paint Binder" synthetic organic chemicals industry Activity:

More information

Sub: - An application for obtaining Environment Clearance for New Unit.

Sub: - An application for obtaining Environment Clearance for New Unit. Brief Note: Sub: - An application for obtaining Environment Clearance for New Unit. We M/s. Nemi Chem Industries Unit-2 are planning to manufacturing activity following products at Plot 1, Survey 316,

More information

PRE FEASIBILITY REPORT FOR ENVIRONMENT CLEARANCES

PRE FEASIBILITY REPORT FOR ENVIRONMENT CLEARANCES PRE FEASIBILITY REPORT FOR ENVIRONMENT CLEARANCES 1)EXECUTIVE SUMMARY : M/s. Bizotic Life Science Pvt. Ltd. is to be involved in manufacturing of Bulk drugs & intermediate of 2 Ton of Pregablin per month

More information

LIST OF ANNEXURE. Details of products and raw materials and storage facility for the same. Details of water consumption and wastewater generation

LIST OF ANNEXURE. Details of products and raw materials and storage facility for the same. Details of water consumption and wastewater generation LIST OF ANNEXURE Annexure-1 Location of the project site Annexure-2 Layout plan Annexure-3 Break up of land area requirement Annexure-4 Details of products and raw materials and storage facility for the

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

UNSATURATED POLYESTER RESIN

UNSATURATED POLYESTER RESIN PROJECT REPORT ON UNSATURATED POLYESTER RESIN BY AQUA CHEM INDUSTRIES Survey No. 50/2, Jodhpar (Nadi), Morbi - 363641, Gujarat. I N D E X Sr. No. Contents Page No. 1 Introduction 3 2 Project Description

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

Annexure-I List of Products

Annexure-I List of Products Annexure-I List of Products Sr. No. Name of Products Quantity (MT/Month) 1. Mono Chloro Acetic Acid (MCA) 300 2. Chloro Acetyl Chloride (CAC) 150 3. Tri Chloro Acetyl Chloride (TCAC) 150 4. Aluminum Chloroide

More information

PRE FEASIBILTY REPORT MANUFACTURING OF ORGANIC PIGMENT M/S PRINCE CHEMICALS

PRE FEASIBILTY REPORT MANUFACTURING OF ORGANIC PIGMENT M/S PRINCE CHEMICALS PRE FEASIBILTY REPORT ON PROPOSED PROJECT FOR MANUFACTURING OF ORGANIC PIGMENT OF M/S PRINCE CHEMICALS AT PLOT NO: 9111/3,9111/2/1 GIDC ESTATE, ANKLESHWAR, DIST: BHARUCH, STATE: GUJARAT 1 Index Sr no.

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

ANNEXURE - A DETAILS OF PRODUCTS SR. NO. EXISTING PROPOSED TOTAL. 2. Basic Rhodamine B Rhodamine B Base

ANNEXURE - A DETAILS OF PRODUCTS SR. NO. EXISTING PROPOSED TOTAL. 2. Basic Rhodamine B Rhodamine B Base ANNEXURE - A DETAILS OF PRODUCTS SR. NO. NAME OF PRODUCTS QUANTITY (MT/MONTH) EXISTING PROPOSED TOTAL 1. Diethyl Meta Amino Phenol (DEMAP) 2.5 -- 2.5 2. Basic Rhodamine B 2.0 -- 2.0 3. Rhodamine B Base

More information

Proposed Project for Manufacturing of Pigments

Proposed Project for Manufacturing of Pigments PREFEASIBILITY STUDY REPORT Of Proposed Project for Manufacturing of Pigments of M/s. Nirva Pigments Located at PLOT NO. DP-10, Saykha industrial Estate Ta: Vagra, Dist.: Bharuch P a g e 1 27 Contents

More information

M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN:

M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN: Pre-feasibility Study Report For M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN: 401506 Prepared By: M/s SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited

More information

PROJECT PRE-FEASIBILITY REPORT

PROJECT PRE-FEASIBILITY REPORT PROJECT PRE-FEASIBILITY REPORT For EXPANSION OF DYE INTERMEDIATES MANUFACTURING UNIT At Plot No: 1712, Phase III, Notified Industrial Area, GIDC, Vapi - 396195 Tal.: Pardi, Dist.: Valsad, Gujarat Land/Plot

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (66460.23 SQ. M) BY GUJARAT HOUSING BOARD AFFORDABLE RESIDENTIAL BUILDING & COMMERCIAL PROJECT PACKAGE 23, PLOT NO. 61/1, 63/1 & 64, TARSAMIYA,

More information

10 PF Resin (liquid) PF Resin (powder) Silver refining Hexamine Hardener Hexamine Tablet

10 PF Resin (liquid) PF Resin (powder) Silver refining Hexamine Hardener Hexamine Tablet PREFEASBILITY REPORT: 1.0 INTRODUCTION : M/s.Simalin Chemicals Pvt. Ltd.. is an existing unit located at plot no. 13, GIDC, Nandesari, Dist. Vadodara which is a chemical notified zone. The unit is involved

More information

Prefeasibility Report For Pigments Manufacturing Plant. Plot No. FS- 34, Mahad Five star Industrial area, MIDC, Mahad, Raigad, Maharashtra

Prefeasibility Report For Pigments Manufacturing Plant. Plot No. FS- 34, Mahad Five star Industrial area, MIDC, Mahad, Raigad, Maharashtra Prefeasibility Report For Pigments Manufacturing Plant At Plot No. FS- 34, Mahad Five star Industrial area, MIDC, Mahad, Raigad, Maharashtra of Sapphire Pigments Private Limited A-1/12, Phase II GIDC,

More information

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State.

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State. ON Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District 561 205, Karnataka State. Table of Contents 1. EXECUTIVE SUMMARY 2. INTRODUCTION OF THE PROJECT/

More information

Prasol Chemicals Ltd., Add. Mahad MIDC BRIEF SUMMARY

Prasol Chemicals Ltd., Add. Mahad MIDC BRIEF SUMMARY 1. INTRODUCTION BRIEF SUMMARY Prasol Chemicals Limited (Prasol), form an integral part of the global chemical industry. Prasol is an ISO 9001: 2008, ISO 14001: 2004 and an OHSAS 18001:2007 certified company

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

Pre-feasibility Report

Pre-feasibility Report Pre-feasibility Report for expansion of production capacity of Fluoropolymers including Poly Tetrafluoro Ethylene (PTFE), manufacturing of new age refrigerant gas Difluoromethane (HFC 32) and related products,

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY M/s Merino Industries Limited has proposed for manufacturing Phenol Formaldehyde Resin, Melamine Formaldehyde Resin at Plot No D2 CH 36, Dahej Phase II, Dist. Bharuch, Gujarat. The

More information

LIST OF PRODUCTS (PROPOSED) Existing Quantity (MT/Month)

LIST OF PRODUCTS (PROPOSED) Existing Quantity (MT/Month) LIST OF PRODUCTS (PROPOSED) Sr.No. Name of Product Existing Total after expansion 1 Benzyl Acetate 20 50 2 Benzyl Benzoate 20 50 3 Benzyl Alcohol 20 50 4 Benzyl Cyanide 20 50 5 Phenyl Acetic Acid 20 50

More information

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT The Proposed Th Proposed Food Colours and Lake Colours Manufacturing Unit will be established on Plot 22/1 - B, Dhatav, MIDC

More information

PRE - FEASIBILITY REPORT. M/s. S. R. CHEMICALS

PRE - FEASIBILITY REPORT. M/s. S. R. CHEMICALS PRE - FEASIBILITY REPORT for PROPOSED EXPANSION BULK DRUG AND BULK DRUG INTERMEDIATES PLANT IN EXISTING PREMISES of M/s. S. R. CHEMICALS PLOT NO. 7516, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH, GUJARAT

More information

PRE-FEASIBILITY REPORT PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES. OF M/s. UMIYA CHEM INTERMEDIATES

PRE-FEASIBILITY REPORT PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES. OF M/s. UMIYA CHEM INTERMEDIATES PRE-FEASIBILITY REPORT ON PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES OF M/s. UMIYA CHEM INTERMEDIATES AT PLOT NO: 4705/1/1, GIDC ESTATE,ANKLESHWAR, DIST:BHARUCH STATE:-GUJARAT 1 1.0 EXECUTIVE

More information

PREFEASIBILITY REPORT OF EXISTING BENTONITE PROJECT OF

PREFEASIBILITY REPORT OF EXISTING BENTONITE PROJECT OF PREFEASIBILITY REPORT OF EXISTING BENTONITE PROJECT OF TRICHEMIN ASSOCIATES AT VILLAGE:- SATAPAR, TALUKA:- KALYANPUR, DIST.:- DEVBHUMI DWARKA 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KATIKELA RIVER SAND BED OVER 15.00 ACRES OR 6.070 HA IN VILLAGE KATIKELA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20)

More information

INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT

INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT 1 EXECUTIVE SUMMARY AIA Engineering Limited proposes expansion to install induction furnace for the manufacturing of Alloy Steel castings with production capacity of another 2,20,000 MT/year (existing

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Smt. J N Rukmini, has applied for extracting of Building stone in Sy No. 40, Kuroda Bore Kavala village, Hassan Taluk & District, Karnataka over an extent

More information

ANNEXURE-1 TERMS OF REFERENCES. TOR prescribed by MoEF & CC for this sector will be taken into account. M/s. RAMDEV CHEMICAL INDUSTRIES UNIT-(II)

ANNEXURE-1 TERMS OF REFERENCES. TOR prescribed by MoEF & CC for this sector will be taken into account. M/s. RAMDEV CHEMICAL INDUSTRIES UNIT-(II) ANNEXURE-1 TERMS OF REFERENCES TOR prescribed by MoEF & CC for this sector will be taken into account. M/s. RAMDEV CHEMICAL INDUSTRIES UNIT-(II) ANNEXURE-2 Sr. Products No. LIST OF PRODUCTS Existing Quantity

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

ANNEXURE I LIST OF PRODUCTS

ANNEXURE I LIST OF PRODUCTS Sr. No. ANNEXURE I LIST OF PRODUCTS Name of Products Proposed (MT/Month) 1 Dibasic Lead Phthalate 100 100 2 Lead Stearate 200 200 3 Dibasic Lead Stearate 100 100 4 Calcium Stearate 500 500 5 Zinc Stearate

More information

PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR

PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR PROPOSED CONSTRUCTION BUILDING PROJECT OF NILA INFRASTRUCTURES LTD (25988.59 m 2 Built up Area)

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL PARK, ATTIVARAM VILLAGE, OZILI MANDAL, SPSR NELLORE DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL

More information

M/S TECHNO PLASTIMER

M/S TECHNO PLASTIMER ON PROPOSED EXPANSION PROJECT FOR MANUFACTURING OF VINYL ESTER RESIN & UNSATURATED POLYESTER RESIN Category 5 (f) of M/S TECHNO PLASTIMER Located at: Plot No. C-1-B/3, Old GIDC, GIDC Notified Industrial

More information