Pre-Feasibility Report. for. Proposed Construction project of Santnagari

Size: px
Start display at page:

Download "Pre-Feasibility Report. for. Proposed Construction project of Santnagari"

Transcription

1 Pre-Feasibility Report for Proposed Construction project of Santnagari at Survey No. 1439, Near Dharoi Dam, Village Mahor, Taluka Vadali, District Sabarkantha, Gujarat By Gujarat Pavitra Yatradham Vikas Board (By Govt. of Gujarat) Block No. 6, Second Floor Jivaraj Mehta Bhavan, Gandhinagar

2 EXECUTIVE SUMMARY OF THE REPORT The proposed tourism development project of Santnagari will be established at Survey No. 1439, Near Dharoi Dam Village Mahor, District Sabarkantha, Gujarat. The proposed project will be constructed on the Govt. owned land, with a total built up area of approx 1,12,160 sq.mt of area. Gujarat has one of the most revered spiritual destinations in India. The temples of Ambaji, Somnath, Dwarka, Palitana, Girnar, and Dakor attract pilgrims from India and abroad. Religious tourist accounts for more than one third of the tourist foot falls in the State. The Santnagari Project was conceptualized as a mega interpretation center for the life and living of the great saints of India. Santnagari shall exhibit the teachings of the Saints across time, layers of history, religion and region, forming a project of international peace, harmony and enlightenment. The underlying vision of Santnagari is to create an opportunity and forum to expose people to the life and lessons of the great saints of India. Eventually this will act as a physical model of enlightenment as well as guide for basic ethics of life to Indians as well as foreigners. PROJECT COST Project cost of the proposed development project would be around Rs crores. REQUIREMENTS FOR THE PROJECT Land: Around hectors (11,40,900 sq.mt.) barren land will be utilized for the proposed tourism development project. Water: During construction phase approx 100 KLD water will be utilized for the domestic purpose and for construction activities. This will be sourced from Dharoi dam near the project site. During Operational Phase water requirement is assumed on the basis of visitors to be visited the Santnagari i.e. Peak traffic season, Average traffic season and minimum traffic season so water requirement according to these seasons will be around 3,170 KLD, 536 KLD and 245 KLD respectively for Domestic purpose only, this will be sourced from Dharoi dam. Electrical Energy: During Operational Phase total power requirement will be 25MW (Multiple of 500 to 750 KVA in different location). Power supply shall be met from Uttar Gujarat Vij Company Limited (UGVCL). In case of power failure, and D. G. Set 3 MW, 250 KVA and 500 KVA will be provided. WASTE WATER GENERATION AND ITS TREATMENT: During construction phase 35 KLD waste water will be generated which will be treated in Proposed STP. During Operational Phase domestic waste water will be generated, which is assumed on the basis of persons/saints to be visited the Santnagari i.e. Peak traffic season, Average traffic season and minimum traffic season so waste water generation will be around 2,536 KLD, 429 KLD and 196 KLD which will be treated in STP and reused for gardening and flushing purpose. SOLID WASTE GENERATION AND ITS DISPOSAL METHOD Solid waste collection, segregation and disposal system will be developed and followed. GREEN BELT DEVELOPMENT Green Belt shall be developed as per the layout entire project will be environment friendly with maximum greenery through plantation.

3 INDEX CHAPTER NO. CONTENT 1 Introduction of the project 2 Project description 3 Site analysis 4 Planning brief 5 Proposed infrastructure 6 Rehabilitation and resettlement (R & R) plan 7 Project schedule & cost estimates

4 INTRODUCTION OF THE PROJECT CHAPTER IDENTIFICATION OF PROJECT AND PROJECT PROPONENT The proposed tourism development project will be established by Gujarat Pavitra Yatradham Vikas Board (GPYVB). They are the custodian of the religious tourism in the State. They undertake planning, maintenance & development related works. This Board was constituted in the year This Board was associated with Gujarat Tourism Corporation Ltd. initially and became independent from the year Proposed project will be having below mentioned facilities with capacities: A. Sant Areas: Description Nos. of Total land area Unit Land area (sq. mt) Saint (sq. mt) Sant Pavilion-A type 80 2,500 2,00,000 Sant Pavilion-B type 166 1,200 1,99,200 Sant Pavilion-C type ,66,500 Sant Pavilion-D type 1, ,000 Total 4,220 5,85,700 B. Residential Building/Infrastructure: Description Nos. of Total land area Unit Land area (sq. mt) Building (sq. mt) Guest House(50 Rooms) (G+2) 1 2,000 2,000 Admin complex (G+1) 1 3,000 3,000 Total 5,000 5,000 C. Special Infrastructures Description Nos. of Total land area Unit Land area (sq. mt) Building (sq. mt) Cave construction ,000 Stone carving (3mt*2mt) ,000 Inscription (5mt*2mt) (Story telling) ,300 Divine element (7mt*7mt) (Land) ,000 Total 49,000 77,300 D. Common facilities Description Food court, Toilets, Rest room, Public lounge, First aid, Fire station, Etc. Road, Parking, Substations, UGR, OHR, Gardens, Water tanks, Etc. Nos. of Building Unit Land area (sq. mt) Total land area (Sq. mt) 1 2,500 2, ,00,000 1,00,000 Total 1,02,500 1,02, DESCRIPTION OF THE PROJECT Santnagari was conceptualized by Shri Narendra Modi during his tenure of Chief Minister of Gujarat. He envisaged it as a world class museum depicting the lives and teaching of the famous saints of India. The project site has been identified at Mahor village in Sabarkantha District. The project is being implemented by the Gujarat Pavitra Yatra Dham Vikas Board. SANTNAGARI, SABARKANTHA, GUJARAT 1

5 1.3 NEED FOR THE PROJECT 1. To create awareness about our cultural heritage. 2. To propagate the message of the great saints of India, across geography, religion and time. 3. To develop a world class Spiritual Tourism Site in a format that is attractive to the younger generation as well as international visitors. Santnagari is expected to attract both tourists and researchers. 4. To create a center of pilgrimage to preserve, promote and tell the world about India's high tradition of 'Live and Let Live'. 5. To induce development and employment opportunities in the Sabarkantha are through this Mega Tourism Project. 1.4 EMPLOYMENT GENERATION Being a tourism development project it will create direct and indirect employment generation in large numbers. During construction phase around 100 personnel will be required. Santnagari is essentially a spiritual tourism project. During peak days it is expected to attract ~65,000 visitors while there will be ~1,625 residents/staff/overnight visitors in the facility. SANTNAGARI, SABARKANTHA, GUJARAT 2

6 PROJECT DESCRIPTION CHAPTER TYPE OF PROJECT Gujarat has one of the most revered spiritual destinations in India. The temples of Ambaji, Somnath, Dwarka, Palitana, Girnar, and Dakor attract pilgrims from India and abroad. Religious tourist accounts for more than one third of the tourist footfalls in the State. 2.2 LOCATION OF THE PROJECT WITH COORDINATES The latitude and longitude of the proposed project site are mentioned below: CODE LATITUDE LONGITUDE A 23 58'48.88"N 72 52'11.95"E B 23 59'3.36"N 72 51'46.56"E C 23 58'19.76"N 72 51'35.04"E FIGURE-1 GENERAL LOCATION OF THE PROJECT SANTNAGARI, SABARKANTHA, GUJARAT 3

7 2.3 SELECTION OF THE PROPOSED PROJECT SITE The proposed project is for the tourism development along with cultural heritage display and transferring culture to future generations. The proposed project site is suitable for a disturbance free environment for Saints to do meditations. Moreover, the selected site is between Ahmedabad and Ambaji/Abu Road for better road connectivity for pilgrimages. 2.4 SIZE OF OPERATION Total built up area will be approx 1,12,160 sq.mt., out of these 2 residential buildings, 473 special infrastructures and 2 common facilities will be developed. 2.5 RAW MATERIAL REQUIREMENTS Construction materials i.e. cement reinforced steel, sand, Coarse Aggregate, bricks etc. will be procured from the local market as per requirements. Approximate Quantities are mentioned below table: TABLE-2 RAW MATERIALS REQUIREMENT SR. NO. ITEM QUANTITY UNITS MODE OF TRANSPORTATION 1 Cement 3,93, kg Bags Trucks 2 Sand 14, 12,518 CFT. Trucks 3 Coarse aggregate 6,15,712 CFT. Trucks 4 Reinforced steel 9,65,824 kg Trucks 5 Bricks 3,48,17,955 Nos. Trucks 2.6 AVAILABILITY OF WATER AND ITS SOURCE & POWER REQUIREMENT AND ITS SOURCE WATER REQUIREMENT AND ITS SOURCE Dharoi dam will be the main source of water supply for construction and operation. During construction phase 100 KLD water will be required. Operational Phase water requirement is assumed on the basis of visitors to be visited the Santnagari i.e. Peak traffic season, Average traffic season and minimum traffic season. So water requirement according to these seasons will be around 3,170 KLD, 536 KLD and 245 KLD respectively for domestic purpose only POWER REQUIREMENT AND ITS SOURCE During Construction total power requirement will be 1000 KVA (Multiple of 50 to 70 KW in different location) and source will be Uttar Gujarat Vij Company Limited (UGVCL). In case of power failure 500 KVA, 50 KVA and 75 KVA D. G. Set will be provided. During Operational Phase total power requirement will be 25MW (Multiple of 500 to 750 KVA in different location). Power supply shall be met from Uttar Gujarat Vij Company Limited (UGVCL). In case of power failure, D. G. Set 3 MW, 250 KVA and 500 KVA of D. G. Set will be provided. 2.7 QUANTITY OF WASTES TO BE GENERATED AND THEIR DISPOSAL During construction phase 35 KLD waste water will be generated which will be treated in Proposed STP. During Operational Phase domestic waste water shall be generated, which is assumed on the basis of visitors to be visited the Santnagari i.e. Peak traffic season, Average traffic season and minimum traffic season so waste water generation will be around 2,536 KLD, 429 KLD and 196 KLD which will be treated in STP and reused for gardening and flushing purpose. Solid waste collection, segregation and disposal system will be developed and followed. SANTNAGARI, SABARKANTHA, GUJARAT 4

8 SITE ANALYSIS CHAPTER CONNECTIVITY Transportation facilities to access various markets are readily available. Both skilled and unskilled labours are easily available in the area. The proposed selected site is well connected with developed roads. Pilgrims and visitors who visit Ambaji or Abu road can visit the Santnagari Road Connectivity NH-76A is around 16 km in East direction from the proposed project site Rail The Area is well connected by Railway. From proposed project Taranga hill railway station is located at approximately 16 km in WSW direction Airport The nearest airport is Mehsana, which is at 64 km from the proposed site in SW direction Communication The site has telephone, internet and mobile connectivity. 3.2 LAND USE AND LAND OWNERSHIP The facilities to be built will be on the barren land earmarked for this project. 3.3 LAND USE PATTERN Land area for the proposed project is barren land and it is hilly area. The area location about 60 km northeast of Cambay basin and is covered by rocks and 2-5m thick layer of soil in the foothill part. Granite hard rocks are exposed near the surface. The Project area falls within the hilly portion and comprises of the southern extremity of the Aravalli range. Topographically, the study area is quite rugged with granitic hillocks and having elevation between 170 m to 350 m from mean sea level. Broadly, it s Western, northern and eastern portions are hilly, while the southern portion forms flat low ground 3.4 SOCIAL INFRASTRUCTURE The following are the infrastructure facilities available and distance from site is given in the following table: TABLE-4 DETAILS OF SOCIAL INFRASTRUCTURE SR. NO. PARTICULAR DISTANCE 1. Hospital 2. Colleges Present within School km radius. 4. Temple 3.5 SOIL CLASSIFICATION The drainage of the project area is evidently controlled by the lithology and the structure of the rocks. The general slope of the ground is southwesterly and is indicated by the flow of the various streams (Sabarmati River) and streamlets practically all of which flow from northeast to southwest. The soil surrounding the project area is of a sandy loam variety of pink colour, formed by the decomposition and disintegration of the granitic rocks. The Sendra-Ambaji granite is exposed in the major portion of the project. In general the granite is grey to pink color coarse grained and porphyritic in nature and phenocrysts are mostly of microcline. These phenocrysts are almost anhedral in shape and range in size from a few cm to about 6 cm in length. In hand specimen, the rocks are characterized by large feldspar phenocrysts, anhedral quartz and patchy mafic minerals. SANTNAGARI, SABARKANTHA, GUJARAT 5

9 PLANNING BRIEF CHAPTER PLANNING CONCEPT The proposed tourism development project will be established on the basis of Saints and required infrastructural facilities related to them. 4.2 POPULATION PROJECTION During construction period approximately 100 nos. of manpower will be required per day. Santnagari is essentially a spiritual tourism project. During peak days it is expected to attract ~65,000 visitors while there will be ~1,625 residents/staff/overnight visitors in the facility. 4.3 LAND USE PLANNING For the proposed project Green Belt area will be developed at boundaries and all around project site. Detailed land use breakup mentioned in the below mentioned table: Table-4.1 Details of Land Use Breakup NO. PARTICULAR AREA (SQ. M.) 1 Plot / Land Area 11,40,900 2 Built-up Area 1,12,160 3 FSI Area 5,13,405 4 Ground Coverage area 1,71,135 5 Common plot area 2,28,180 6 Green belt area 3,76, ASSESSMENT OF INFRASTRUCTURE DEMAND The proposed project site is in rural area which is more than 100 km from the Ahmedabad city. Ahmedabad is one of the fastest growing cities in India with a population in 2010, nearly the double of that in For the proposed developmental project, road, electricity, water, manpower, transportation vehicles, construction equipment and machineries are primarily required. For the proposed project following infrastructures are planned: Cave construction, Stone carving, Inscription (Story telling), Divine element, Food court, toilets, rest room, public lounge, first aid, Fire station, Road, parking, substations, UGR, OHR, Gardens, Water tanks, etc. SANTNAGARI, SABARKANTHA, GUJARAT 6

10 PROPOSED INFRASTRUCTURE CHAPTER RESIDENTIAL AREA The proposed tourism development project of Santnagari is having inclusive of residential facilities of land area as below: Table-5.1 Residential Building/Infrastructure Description Nos. of Total land area Unit Land area (sq. mt) Building (sq. mt) Guest House(50 Rooms) (G+2) 1 2,000 2,000 Admin complex (G+1) 1 3,000 3,000 Total 5,000 5,000 Table-5.2 Details of Units Sr. Total land Type of units No. area (sq.mt.) 1 Sant Areas 5,85,700 2 Residential Building/Infrastructure 5,000 3 Special Infrastructures 77,300 4 Common facilities 1,02, GREEN BELT For the proposed project Green Belt area near the boundary and road side will been developed. 5.4 CONNECTIVITY The proposed project site is having connectivity with the road, railway and air. 5.5 DRINKING WATER SOURCE The main source of water will be supplied from Dharoi dam near to the project site. 5.6 SEWERAGE SYSTEM Waste water generated from the proposed project will be treated in proposed STP and treated water will be reused in gardening and flushing purpose. 5.7 SOLID WASTE MANAGEMENT The solid waste management is one of the key considerations in the area. Solid waste collection, segregation and disposal system will be developed and followed. Composting facility will be developed. SANTNAGARI, SABARKANTHA, GUJARAT 7

11 CHAPTER 6 REHABILITATION AND RESETTLEMENT (R & R) PLAN The proposed project will be developed on barren land. No acquisition is being done for the proposed project. There is no human population on the barren land, so there is no need of Rehabilitation & Resettlement plan. SANTNAGARI, SABARKANTHA, GUJARAT 8

12 PROJECT SCHEDULE & COST ESTIMATES CHAPTER PROJECT SCHEDULE Implementation of Project within a pre-determined time frame is an important factor for the success of a project. Timely implementation saves on various costs like interest, administrative overheads and helps to realize the goals as per pre-determined objectives. Implementation of Project involves co-ordination of different activities at various levels of the firm and amongst different outside agencies. The Project Implementation details are as below: TABLE-7 PROJECT IMPLEMENTATION SCHEDULE Year Phase Mar-17 Aug 17 Aug 17 Feb 18 Feb-18 Aug 18 Aug 18 Feb19 Feb-19 Aug 19 Aug 19 Feb 20 Feb-20 Aug 20 Aug 20 Feb 21 Feb-21 Aug21 Aug 21 Feb 22 Phase 1 Phase 2 Phase ESTIMATED PROJECT COST Cost of the construction project was approx Rs crores. SANTNAGARI, SABARKANTHA, GUJARAT 9

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath Pre-Feasibility Report for Educational Institute Allen Career Institute-Supath at Plot No. 1, Educational Scheme, Naya Nohra & Hanuwantkhera, Kota, Rajasthan-324001 By M/s. Allen Career Institute Registered

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (66460.23 SQ. M) BY GUJARAT HOUSING BOARD AFFORDABLE RESIDENTIAL BUILDING & COMMERCIAL PROJECT PACKAGE 23, PLOT NO. 61/1, 63/1 & 64, TARSAMIYA,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

Check list for construction Project of EC [Category 8(a)]:

Check list for construction Project of EC [Category 8(a)]: Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS

More information

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant PRE FEASIBILITY REPORT FOR Silica Sand Beneficiation Plant BY Shree Silicaam Minerals LLP VILLAGE : CHOKI TALUKA : JAGADIA DIST : BHARUCH GUJARAT (INDIA) PRE-FEASIBILITY REPORT: SILICA SAND BENIFICIATION

More information

Details of the proposed project as presented before the committee are tabulated below:

Details of the proposed project as presented before the committee are tabulated below: Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated

More information

PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR

PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR PROPOSED CONSTRUCTION BUILDING PROJECT OF NILA INFRASTRUCTURES LTD (25988.59 m 2 Built up Area)

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KATIKELA RIVER SAND BED OVER 15.00 ACRES OR 6.070 HA IN VILLAGE KATIKELA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20)

More information

Bishunpur Small Hydro Power Project

Bishunpur Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT FOR ORDINARY SAND PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

M/S. Ever Shine Décor P. Ltd.

M/S. Ever Shine Décor P. Ltd. PRE FEASIBILITY REPORT OF M/S. Ever Shine Décor P. Ltd. Survey No. : 40, Village Indrad, Taluka Kadi, District Mehsana, Gujarat. Mob No.: 09898186603 Email: bhupeshgopani@gmail.com Prepared By: T. R. ASSOCIATES

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT PREPARED FOR SHIV SHANTHI CEMENT PRIVATE LIMITED Sy. Nos. 92, 93 & 94, Tatiguda Village, Garividi Mandal, Vizianagaram District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra

More information

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE ADDITIONAL ATTACHMENTS TO FORM-1 FOR OBTAINING ENVIRONMENT CLEARANCE For Proposed Commercial Complex Surat Diamond Bourse M/S. SDB DIAMOND BOURSE Block No. 177/P, Moje- Khajod, Taluka- Surat City, District

More information

PRE-FEASIBILITY REPORT OF SAND QUARRY

PRE-FEASIBILITY REPORT OF SAND QUARRY PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (BUILT UP AREA: 77420.15 SQ. M) BY AMC EWS HOUSING PROJECT RESIDENTIAL BUILDING & COMMERCIAL PROJECT F. P. NO. 174, T.P. NO. 32, GOTA,

More information

PRE FEASIBILTY REPORT

PRE FEASIBILTY REPORT PRE FEASIBILTY REPORT FOR ENVIRONMENT CLEARANCE OF PROPOSED NEW PROJECT S. O. CHEMICALS (5 f Category) Proposed By: COREL PHARMA CHEM PVT. LTD. SURVEY NO. 473 & 481, BORISANA, KADI THOL ROAD, KADI, DIST

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project Of MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS of 850 MT/Month By PASHUPATI INDUSTRIES 169/1/A2, Phase 1, Opposite Telephone Exchange, GIDC Naroda, Ahmedabad-382330

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

Thethaitangar Small Hydro Power Project

Thethaitangar Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

PREFEASIBILITY REPORT FOR BRICK EARTH MINE Page 1 PREFEASIBILITY REPORT FOR BRICK EARTH MINE Developed By- Village-Chandauhan, Tehsil-Phulpur, District-Allhabaad, Uttar Pradesh. RAI ENVIROMENTAL SERVICES PVT. LTD. Website: www.raienviro.com Email

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR Conversion of Existing Product Storage Tanks TK-16(HSD) of 6000 KL to MS and TK-6(MS) of 1000 KL to Ethanol AT HPCL Bulk POL Depot, Mansa Road, Phoos Mandi, Bhatinda-151001.

More information

PROJECT PRE-FEASIBILITY REPORT. For

PROJECT PRE-FEASIBILITY REPORT. For PROJECT PRE-FEASIBILITY REPORT For THE PROPOSED ORGANIC CHEMICALS MANUFACTURING IN EXISTING IN FORMULATION OF PESTICIDE, AGROCHEMICAL AND BIO FERTILIZERS MANUFACTURING UNIT AT M/S. SULPHUR MILLS LTD. PLOT

More information

Sugabandh Small Hydro Power Project

Sugabandh Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED 1. SUMMARY Kacari Silica Sand,Khanda,Stone And Moram Project at Khsara No.-144,145,146,147, 148,150, 309, 310, 311,312,313,314,315,316,317,318,320,399,403,404,405,

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For EXISTING MINING ACTIVITY CATEGARY B2 UNDER THE EIA NOTIFICATION 2006 AMENDED ON 31/05/2012 TO PIRABHAI VALABHAI NANDASANIYA LOCATED

More information

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT LG Polymers India Pvt. Ltd. Sy. No.s

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY M/s Merino Industries Limited has proposed for manufacturing Phenol Formaldehyde Resin, Melamine Formaldehyde Resin at Plot No D2 CH 36, Dahej Phase II, Dist. Bharuch, Gujarat. The

More information

M/S. Dain Colour Chem

M/S. Dain Colour Chem PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS

More information

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

For TOR New Projects. Mo. no. : Contact no. and  ID of the Applicant SEAC, Gujarat : Page 1 of 6 For TOR New Projects 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot /Survey, Landmark etc. ) M/s. Perstorp Industries

More information

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS Annexure No - 13 SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS File No : Name of the Project: Proposed Commercial project called Bagmane Tech Park RIO Campus of M/s. Bagmane Developers

More information

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone

More information

No construction activity started

No construction activity started Sr. Particulars Details No. 1. Proposal is for New Project 2. Type of Project Residential Flats and Shops 3. Project / Activity No. 8(a) [8(a) or 8(b)] 4. Name of the project Kaveri Soham Vistara 5. Name

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT GRANITE BUILDING STONE QUARRY MINING PROJECT STATE : KERALA DISTRICT : KANNUR THALUK : THALASSERY VILLAGE : THRIPPANGOTTUR BLOCK NO. : NIL SURVEY NO. : 275/1A MINERAL : GRANITE BUILDING

More information

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED

PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED PRE-FEASIBILITY REPORT FOR M/s FIXEM CEMENT PRIVATE LIMITED 1. SUMMARY Kacari Silica Sand,Khanda,Geeti And Moram Project at Khasra No.-10,11,12,13,101, 102,122, 126, 127,128,129,130,131, 167,568,570,571,572,

More information

Information Memorandum

Information Memorandum Integrated Development of No Frill Airstrip & Provision of Airline Connectivity at Chikkamagaluru on Design, Finance, Build, Operate and Transfer (DFBOT) Framework June 2018 Information CONTENTS CONTENTS...

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016

CONECPTUAL PLAN. w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire. M/s Kalpataru Limited December, 2016 CONECPTUAL PLAN w.r.t. Amendment (Expansion) Project of Kalpataru Solitaire at of J.V.P.D scheme of Vile Parle (W), by December, 2016 GRASS ROOTS RESEARCH & CREATION INDIA (P) LTD. (An ISO 9001:2008 Certified

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information

PRE FEASIBILITY REPORT PROPOSED EXPANSION OF COMMON EFFLUENT TREATMENT PLANT (CETP) (0.8 MLD TO 3 MLD)

PRE FEASIBILITY REPORT PROPOSED EXPANSION OF COMMON EFFLUENT TREATMENT PLANT (CETP) (0.8 MLD TO 3 MLD) PRE FEASIBILITY REPORT FOR PROPOSED EXPANSION OF COMMON EFFLUENT TREATMENT PLANT (CETP) (0.8 MLD TO 3 MLD) AT SURVEY NO. 467, PHARMEZ- SPECIAL ECONOMIC ZONE, SARKHEJ-BAVLA ROAD, NH-8, VILLAGE MATODA, TALUKA

More information

Torpa Small Hydro Power Project

Torpa Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name

More information

PRE FEASIBILITY REPORT. M/s. Riddhi Dyechem Industries

PRE FEASIBILITY REPORT. M/s. Riddhi Dyechem Industries PRE FEASIBILITY REPORT FOR OBTAINING ENVIRONMENTAL CLEARANCE For the Proposed Dye Manufacturing Unit of M/s. Riddhi Dyechem Industries Block No.: 680/p, 681/p, 682/p Village: Pariej, Taluka: Matar, District:

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 Executive Summary The Mining lease was granted in favour of Shri Mukesh Kumar S/o Shri Harish Chandra, R/o Tatol vaya Bagra, Tehsil - Bhinmal, Dist.-Jalore

More information

Village Development Strategies: An approach towards Rurbanisation..

Village Development Strategies: An approach towards Rurbanisation.. Village Development Strategies: An approach towards Rurbanisation.. Presented By: GAURANG DESAI URBAN PLANNER Orientation Program Government Engineering College, Rajkot 6 th April 2013 Can you identify

More information

Pre-Feasibility Report for Construction of Additional Tankage at POL Terminal Partapur, Meerut, M/s IOCL PRE-FEASIBILITY REPORT

Pre-Feasibility Report for Construction of Additional Tankage at POL Terminal Partapur, Meerut, M/s IOCL PRE-FEASIBILITY REPORT PREAMBLE Pre-Feasibility Report for Construction of Additional PRE-FEASIBILITY REPORT Indian Oil Corporation Limited (IOCL) is India's largest commercial enterprise, with a sales turnover of Rs. 4,38,710

More information

PRECAST CEMENT PRODUCTS

PRECAST CEMENT PRODUCTS Profile No.: 30 NIC Code: 23959 PRECAST CEMENT PRODUCTS 1. INTRODCUTION: Reinforced cement concrete products are becoming popular as modular house and apartment buildings are based on standard designs.

More information

CONSEPTUAL PLAN FOR PROPOSED CONSTRUCTION OF

CONSEPTUAL PLAN FOR PROPOSED CONSTRUCTION OF CONSEPTUAL PLAN FOR PROPOSED CONSTRUCTION OF AARYA EMPIRE AT Block No. 255, B/h. Akshar Paradise, Opp. Deeps Party Plot, B/h. Narayan Kathiyawadi Hotel, Near Atladara, Kalali Village, VADODARA 390 012

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

Skill Development Initiative of Maharashtra

Skill Development Initiative of Maharashtra Skill Development Initiative of Maharashtra Date: 26 th March 2012 Regional Conference on Skill Development Mission, Ahmedabad, Gujarat Table of Contents 1. Vision Government of Maharashtra 2. Implementation

More information

Pre-Feasibility Study Report

Pre-Feasibility Study Report Pre-Feasibility Study Report Of to be set-up at Survey No.: 1905/1, Village: Gangad, Taluka: Bavla District: Ahmedabad - 382 240, Gujarat INDEX S.N. 1. Executive Summary 2. Introduction of Project (ii)

More information

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara PROJECT PARTICULARS Name of the project - Sand mining Lease address - Village panchayat - Nara, Tahsil -Kanker, Dist Kanker (C.G.) Khasra No. - 1025 Sand mining area - 5.00 Hectares Name of the mineral

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVESUMMARY 1.1 Introduction Road Metal of M/s. Venkata Ramana Stone Crusher covering an extent of 0.89 Ac is located at Sy.No.379/1 of Perecherla Village, Medikonduru Mandal, Guntur District,

More information

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU PRE-FEASIBILTY REPORT OF SUNATHAR STONE QUARRY VILLAGE: Sunathar TAHASIL: Purushottampur DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU Vill/Po- Gandala, P.S.- Hinjili, Dist.-Ganjam Odisha. CONTENTS CHAPTER

More information

S. No Parameter Details 1 Name & Address of the Applicant

S. No Parameter Details 1 Name & Address of the Applicant 1. EXECUTIVE SUMMARY S. No Parameter Details 1 Name & Address of the Applicant M/s AMULYA GRANITES Prop: Smt CH.SARALA H. No. FLAT NO.207 Roja Kishore Residency, Chenchupet, Tenali, AP-522 202 Guntur District,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT Consultant-Ascenso Enviro Pvt. Ltd. Page 19 of 31 1.0 EXECUTIVE SUMMARY S.No. Information Details 1. Project name Sand Mining Project at Hatidah Ghat on River Ganga, District Patna,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF HPCL, LPG BOTTLING PLANT Capacity: 3 X 500 MT At Plot No.499 Kota-Jhalawar Road (NH-12) Village- Mandana, Tehsil-

More information

Pre-feasibility Report

Pre-feasibility Report Pre-feasibility Report for expansion of production capacity of Fluoropolymers including Poly Tetrafluoro Ethylene (PTFE), manufacturing of new age refrigerant gas Difluoromethane (HFC 32) and related products,

More information

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra FORM 1 & 1 A Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT At Palladium Grand II, S. 17/1A/2, Dhanori, Pune, Maharashtra By M/s. Raojee Constructions FORM 1 Palladium Grand II RESIDENTIAL & COMMERCIAL

More information

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State.

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State. ON Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District 561 205, Karnataka State. Table of Contents 1. EXECUTIVE SUMMARY 2. INTRODUCTION OF THE PROJECT/

More information

This project does not attract EIA Notification and provisions in CRZ Notification [Clause no. 4.2 (i) (b)] also exempt preparation of EIA report.

This project does not attract EIA Notification and provisions in CRZ Notification [Clause no. 4.2 (i) (b)] also exempt preparation of EIA report. The proposal under consideration, Regularization of Existing Resort at Sidheshwarwadi, Village Ubhadanda, Taluka Vengurla, Dist. Sindhudurg is located in CRZ III area having total plot area of 4000 m 2,

More information

STONE CRUSHER. Profile No.: 60 NIC Code: INTRODUCTION: 2. PRODUCT & ITS APPLICATION:

STONE CRUSHER. Profile No.: 60 NIC Code: INTRODUCTION: 2. PRODUCT & ITS APPLICATION: Profile No.: 60 NIC Code: 08106 STONE CRUSHER 1. INTRODUCTION: Crushed stone is also known as metal jelly. Crushed stone is segregated into various sizes viz. 35mm, 20mm, 12mm etc. for different uses.

More information

CABINET DECISIONS. ETEN Enlightens-Daily current capsules (Prelims Prominence) 21 st Feb 2018

CABINET DECISIONS. ETEN Enlightens-Daily current capsules (Prelims Prominence) 21 st Feb 2018 ETEN Enlightens-Daily current capsules (Prelims Prominence) 21 st Feb 2018 CABINET DECISIONS Cabinet approves proposal for Mahanadi Water Disputes Constitution of a Tribunal under Inter-State River Disputes

More information

Pramod S. Kambli. Page 1

Pramod S. Kambli. Page 1 PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information