DESIGN OF THE ADVANCED HIGH KINETIC ENERGY LAUNCH SYSTEM. W. V. Hill Black & Veatch Kansas City, Missouri
|
|
- Roberta Flynn
- 5 years ago
- Views:
Transcription
1 DESIGN F THE ADVANCED HIGH KINETIC ENERGY LAUNCH SYSTEM W. V. Hill Black & Veatch Kansas City, Missuri 0> 4/ ABSTRACT This reprt describes the design f a facility t prvide fr de- structive testing f U.S. and freign munitins, up t and including 155 mm. The facility cnsists f a Range Tunnel designed t resist the mule blast f an artillery weapn and a large steel dme structure designed t cntain the blast effects f 64 punds f TNT. 4 INTRDUCTIN The Advanced High Kinetic Energy Launch System is t prvide the Ballistic Research Labratry (BRL) a facility fr the destructive testing f U.P. and freign munitins, up t and including 155 mm. Munitins t be tested include kinetic energy prjectiles (KE), advanced chemical energy (CE), self-frging fragment (SFF), and reactive armrs (RA). The facility cnsists f a Range Tunnel, 25 feet wide, 21 feet 3 inches high, and 280 feet lng (See Figure 1). There is a suppressive dr at the entrance t the tunnel t trap missiles and fragments shuld an accidental explsin ccur in the tunnel. The Target Rm is a steel dme-shaped structure 60 feet in diameter, designed t cntain the blast effects f 64 punds f TNT. The equipment dr is 14 feet wide by 18 feet high. The Instrumentatin Building is 16 feet by 33 feet and is cnstructed f cncrete blck. The well prvides 30 gallns per minute f water fr washdwn f the Range Tunnel and Target Rm. The Hlding Tank cntains the cntaminated washwater and the exhaust filter system remves radiactive dust frm the Target Rm. Site wrk includes access rads, parking area, electrical pwer service, area lighting, undergrund telephne cable, and a cable trench frm the Instrumentatin Building t an existing Cntrl and Firing Building. At the present time, the t 571
2 facility is under cnstructin at Aberdeen Prving Grund, Maryland and is scheduled t be cmpleted early in RANGE TUNNEL The Range Tunnel is designed t resist the dynamic lads frm the mule blast f an artillery weapn. The mule blast lads, at varius angles f incident, were prvided by Dr. Charles Kingery f BRL. Frm the blast data received, we develped the idealied r ressure-time curves fr an angle f incident f 0, 30, and 45 degrees. The idealied pressure-time curves were develped by the use f methds given in Reference N. 1. The maximum lad ccurs at an angle f incident f 45 degrees where the peak reflected pressure is 57 psi, duratin f the psitive phase is 4.5 millisecnds, and the psitive reflective impulse is 128 psi-millisecnds (see Figures 2 and 3). The riginal criteria and cncepts called fr the Range Tunnel t be cnstructed f existing armr plate. When the actual design f the Advanced High Kinetic Energy Launch System started, the armr plate had been used in anther prject. Bth steel plate and reinfrced cncrete were investigated fr use in the cnstructin f the Range Tunnel. The reinfrced cncrete had the lwer cst. An ecnmic study n varius thicknesses f cncrete and the amunt f reinfrcing required was als made. Fr the design f the Range Tunnel, we used a dynamic lad factr calculated using Reference 2. The design f the rf slab was then checked by using the Acceleratin-Pulse Extraplatin Methd f Numerical Integratin given in Reference 3. As yu can see frm Figure 4, fr the rf slab design the values fr bth the dynamic lad factr methd and numerical integratin are identical, except fr the time f maximum deflectin. The 6.30 millisecnds was the increment f time nearest t the 6.21 millisecnds. The clear span f the walls are 16 feet and the rf slab spins 20 feet. The elastic unit resistance is 73.0 psi fr the walls and 46.7 psi fr the rf slab. The natural perid f vibratin fr the walls is 11.9 millisecnds and 18.6 millisecnds fr the rf slab. The dynamic lad»,* 572 n
3 I H" 1 factr fr the walls is 1.03 and fr the rf slab 0.71 millisecnds. The equivalent elastic deflectin is inches and inches. The maximum deflectin is inches and inches. The maximum deflectin ccurs at 4.32 Jiillisecnds fr the walls and 6.21 milli- secnds fr the rf slab. Dividing the elastic deflectin int the maximum deflectin gives a ductility rati f 0.80 fr the walls and 0.87 fr the rf slab. Using a thickness f 2 feet 6 inches, with N. 9's at 12 inches fr the psitive reinfrcing steel and N. ll's at 12 inches fr the negative reinfrcing bars prved t be the mst ecnmical sectin (see Figure 5). Temperature reinfrcing is N. 8 at 14 inches each face. The direct tensin bars are N. 10's at 12 inches and N. 4 stirrups were used at 12 r 14 inches, as required. The reinfrcement used was ASTM A615, Grade 60 except fr the stirrups fr which Grade 40 was used. Tw 7/8-inch blts were installed n the centerline f the rf fr a future 5-tn mnrail t be installed when funds becme available. TARGET RM Figure 6 shws the flr plan f the Target Rm. The structure is designed fr repeated blast lads f 64 punds f TNT equivalency. Sme f the ammunitin t be tested will cntain heavy metal and it was necessary t design the Target Rm t cntain the explsin, except fr leakage thrugh the sht hle int the Range Tunnel and thrugh the vents int the filter system. n each side f the drs yu can see the structural tee stiffeners. The pening thrugh the mat fundatin in the center is fr placement f the targets. The upper part f the Target Rm is designed as a dme with a radius f 29 feet 6 inches (see Figure 7). The dme is supprted by a ring beam cnstructed f ne-inch plates. The lwer prtin f the Target Rm, belw the ring beam, is a sectin f a cne. The diameter f the tp f the cne, where it is attached t the ring beam, is 46 feet 9 inches and the diameter f the base f the cne is 59 feet. The height f the sectin f the cne, belw the ring beam, is 18 feet ne inch and the rise f the dne is 11 feet 6 inches. 573
4 The Target Rm was designed by the trial-and-errr methd. We first assumed the structural members then we reviewed the structure t determine the stress in the members. The blast ladings n the interir f the Target Rm frm 64 punds f TNT were als received frm BRL. Frm these, we develped the idealied pressure-time curve (see Figure 8). The peak gas pressure is 15 psi. Even thugh there is sme decaying f the gas pressure, we assumed a er rate f decay and cnsidered the 15 psi gas pressure t be cnstant. The peak psitive reflected pressure was calculated t be 75 psi, giving a ttal peak psitive pressure f 90 psi. The psitive reflected impulse is 60 psimillisecnds and the duratin f the psitive phase is 1.6 millisecnds. T btain the natural perid f vibratin f the varius members f the Target Rm, we used a cmputer prgram called the "Finite Element Methd fr the Dynamic Analysis f Structures Subject t any Dynamic Lading" (Reference N. 4). The dynamic lad factr was then calculated. Fr the gas pressure, a dynamic lad factr f 1 was used and the gas pressure was cnsidered cnstant. An equivalent static lad was then calculated and STRUDL was used t find the stresses in the varius members (Reference 5). Fr ur first trial, we used vertical stiffeners between the ring beam and fundatin n 4-ft 2-inch centers cmpletely arund the structure. The analysis shwed that the side wall plates were carrying the lads in ring tensin and the stiffeners near the dr were the nly nes being stressed. The next step was t keep eliminating stiffeners. The final design has three stiffeners n each side f the equipment dr and ne n each side f the persnnel dr (see Figure 6). Additinal steel plates were welded arund the ther penings. Everything was designed with a ductility factr less than 1 s all elements wuld remain in the elastic range. Bth the side walls and dme were cnstructed f ne-inch plate. Fr the dme and ring beam, we used ASTM A516 steel. Grade 70, which has a minimum yield stress f 38,000 psi, and using a dynamic increase factr f 1.1 resulted in a dynamic yield stress f 41,800 psi. ASTM 574
5 A516 steel was used fr the dme because it is easy t shape and is readily weldable. ASTM A572, Grade 60 is classified as a high strength, lw ally structural steel and was used fr its availability, high strength, and weldability fr the rest f the structure. The minimum yield stress is 60,000 psi and it has a dynamic yield stress f 66,000 psi. The maximum circumferential stress in the dme is 7,560 psi and the maximum meridinal stress is 9,050 psi (see Figure 9). The maximum stress in the ring beam, which ccurs at the equipment dr jambs, is 16,800 psi. Using ASTM A516 steel the dynamic yield stress was 41,800 psi. Fr the side walls the maximum circumferential stress is 14,780 psi and the maximum meridinal stress is 7,410 psi. The maximum stress was in the dr jambs which were subject t tensin and bending in tw directins. The stress was 45,700 psi. The stress in the dr stiffeners alng each side f the equipment dr was 49,380 psi and the maximum stress in the equipment dr itself was 51,300 psi. Fr the side walls, dr jamb, dr stiffeners, and dr, the dynamic yield stress f the steel used is 66,000 psi. Sme f the armr piercing ammunitin t be tested cntains heavy metal which has a lw grade f radiactivity. Upn striking the target, the prjectile expldes and the dust frmed cannt be discharged int the atmsphere. The air evacuatin and filtratin system cnsists f a fan which pulls 24,000 cubic feet per minute f air thrugh the suppressive dr (see Figure 10). The dr is cnstructed f interlcking wide flange beams. This allws air t pass thrugh the dr but will trap missiles and fragments shuld an accidental explsin ccur in the tunnel. Air is pulled frm the tunnel int the Target Rm thrugh the 36 inch diameter sht hle. The cntaminated air leaves the Target Rm thrugh tw 36 inch diameter ducts t the attenuatrs. The attenuatrs are used t prtect the filters frm excessive blast pressures. The attenuatrs were existing and furnished by BRL. They are 10 feet in diameter and 50 feet lng, made up f ne-inch plate. N attempt was made t determine hw effective the c 575 mmm
6 ««i».,,1, attenuatrs will be in reducing the blast pressure t the filters. Three sets f filters are used in series: prefliters, secndary filters, and high efficiency particulate air filters which have an efficiency f nt less than percent when tested with 0.3 micrn smke. The persnnel dr and the equipment dr are sealed by using cmpressed air seals. Prvisins have been made t wash dwn the dust that gets int the Range Tunnel thrugh the sht hle. Miscellaneus items in the Range Tunnel and Target Rm include view prts fr cameras and lighting, tie dwns fr the weapn, unistruts fr attaching equipment t the walls, PA system, telephne, pwer receptacles, and lighting. 576
7 REFERENCES 1. TM , Structures t Resist the Effects f Accidental Explsins, June 1969 and Change N. 1, dated March TM , Principles f Dynamic Analysis and Design, March 1957 and Change N. 2, dated Nvember C. H. Mrris, R. J. Hansen, M. J. Hlley, J. M. Biggs, S. Manyet, and J. K. Minami, Structural Design fr Dynamic Lads, Cmputer Prgram S73, Dynamic Stress Analysis Axisymmetric Structures, Black & Veatch, February 1976, Revised January Cmputer Prgram S50, Structural Design Language (Univac 1100 ICES/ STRUDL), Black & Veatch, September 1975, Revised Nvember t 577
8 * / * r 578 0
9 CVJ -I n «
10 E i t E l 0 «l r LLl c l M ID it E a. II 1 LÜ -J > cr 3 2 (A h- E in e ^ (T ii K> 3 i 1 (0 C/) cr Ul N (A ^mm E m e II Ul 1 a -i i SS 0
11 i Z ü H ac a: CD 2 3 K ?l if) ca ex M E 00 m 00 E r» (0 r- K> 00 ( 3 2 Ü CM a. E _ (0 00 If» 5 M 00 E r~ «0 K CM 00 (0 3 l CD Z QC 1 il «m a, E E I m CM m 0> K» «p t I. - b d d K ^^ c ac 2 > 2 0 T ^ K I- E - uj? Q. -J * Si 5 5 h- ^ - ^?; t uj S 2 g U " _ U 9 w _l _ I- -I U. 2 U. 3 flc 2 2 2»" «y 3 $ J «- uj ; X «u J - 3 W 2 H I
12 u (9 i ( 8 -I CM i I TTD CM CM ^ J^: >t. H- s C I CM (0 -J ^ * S2 a 5 7 ^F^ 1^«^ Bat 3^" jf? 582 0
13 ^^IM^^^f,,^.;,.^ ~::K-^^. t-. I I u 583
14 Wi ^^m^m^j^s!s^^&^^ %:'m^::-s ill a. 5 - cctn Ü t 584
15 -la^ks* ^-^. 00 m n ii E (A. in II > 8 tr n 3 5 w H E i cr II 3 (/> (0 QC Q. Ul N j Q c 585
16 VM hi % >" (0 C ( Q. m in 00 h.^- i^ r r f^) x- ^r J^ in (Ji * * i» H LÜ Q: G 2 HI 2 -J QC Z ^2 Ü a Q: u Q CD CD Z -J a: C -J u. 39 ^ c S C CD 2 a a: u. u. I- C cc a Q «^ 586
17 ÜJ er i- > V) I- > I ^-...r*»a.rfT^
Version 4.0 LineDesign Engineering 11/1/04
Ple Lading Prgram (Transverse, Vertical, Guying & Buckling) User's Guide Versin 4.0 LineDesign Engineering 11/1/04 Cntents Intrductin 3 Descriptin f Tabs 4-7 Ple Data 7 Wire Data 8-9 Inputs, Drives & Flders.....
More informationBROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING?
BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING? Overview Building cnstructin has becme increasingly cmplex during the last tw decades. Buildings are larger and use new materials and cnstructin
More informationWith the computer program BISAR the stresses and strains are determined.
Sil Piling Mats With a large number f prjects in the UK requiring the cnstructin f piling mats and requests fr RadCem stabilised sil design infrmatin, we have made a general table fr the thickness f this
More informationSTRUCTURAL PROBLEMS IN THE DESIGN OF LARGE MASONRY HALLS
1488 STRUCTURAL PROBLEMS IN THE DESIGN OF LARGE MASONRY HALLS PROF. K.-J. SCHNEIDER Fachhchschule Bielefeld I Abteilung Minden ArtilleriestraBe 9, D-4950 Minden, Germany ABSTRACT lhe paper deals with sme
More information[Note to Engineer: Choose one below. Confirm with your geotech if you need further compaction.]
2-06 SUBGRADE PREPARATION (******) 2-06.3 Cnstructin Requirements 2-6.3(1) Subgrade fr Surfacing This sectin is supplemented with the fllwing: The subgrade must be suitable, as determined by the Engineer,
More informationLecture # 15 Long Run Equilibrium
I. Lng Run Equilibrium Lecture # 15 Lng Run Equilibrium We began class reviewing the cncept f lng run equilibrium. Nte that, t d the analysis, we typically use tw graphs: an industry supply and demand
More informationM. Conner Name: A 1/60 scale model truss bridge is to be designed and built using standard file folders.
M. Cnner Name: Date: Perid: Prblem Statement: A 1/60 scale mdel truss bridge is t be designed and built using standard file flders. Design Requirements: The scale mdel must be a truss with a ttal span
More informationM. Conner Name: A 1/60 scale model truss bridge is to be designed and built using standard file folders.
M. Cnner Name: EA2: Truss Design Assignment Date: Perid: Prblem Statement: A 1/60 scale mdel truss bridge is t be designed and built using standard file flders. Design Requirements: The scale mdel must
More informationBuilding Project Design & Construction Using the ECI Approach. Simon Xiberras Design Manager Strongbuild
Building Prject Design & Cnstructin Using the ECI Apprach Simn Xiberras Design Manager Strngbuild What We Build Hme Building Streamlined Hmes Hme Building Custm Hmes What We Build Cmmunity & Cmmercial
More informationPremium-6 Hexagonal Wire Netting for roofing applications
CONTENTS SUMMARY OF FEATURES... 2 TECHNICAL INFORMATION... 2 Prduct Descriptin... 2 Applicatins... 2 Prduct Infrmatin... 2 Handling & Strage... 4 Technical Data... 4 Installatin infrmatin... 4 Size Range
More informationBSc (Hons) Civil Engineering Part-time Course content
BSc (Hns) Civil Engineering Part-time Curse cntent This part-time degree curses expses yu further t this exciting and expanding wrld f cnstructin, with a blending f thery, design wrk, prject planning and
More informationEXPERIMENTAL RESEARCH ON STEEL COLUMN TO INCREASE STRENGTH BY RESTRAIN BARS
EXPERIMENTAL RESEARCH ON STEEL COLUMN TO INCREASE STRENGTH BY RESTRAIN BARS M.MhanaRam 1, R.AmuthaSelvaKumar 2, S.ShanmugaPriya 3 S.RajendraPrasad 1, R.Swathika 1 1 PG Schlar, Civil Department, Sri Vidya
More informationMemo. Background. South Rochford Road Type recipient(s) here HDR, Inc. Roadway Options for Protection of Iron Fen Wetlands. Rochford Cemetery Fen
Mem Date: Mnday, January 05, 2015 Prject: T: Frm: Subject: Suth Rchfrd Rad Type recipient(s) here HDR, Inc. Radway Optins fr Prtectin f Irn Fen Wetlands Backgrund Sphagnum angustiflium a U.S. Frest Service
More informationQuoting Website User Manual. Diamond Plastics Corporation 2/24/2012
P a g e 1 Quting Website User Manual Diamnd Plastics Crpratin 2/24/2012 P a g e 2 Cntents Intrductin... 3 Lgin... 4 Hme Page... 5 Accepted Qutes... 5 Rejected Qutes... 5 Prvisinally Submitted Check Failed...
More informationLecture # 8 -- Subsidies/Consumer Behavior: An Introduction to the Concept of Utility
Lecture # 8 -- Subsidies/Cnsumer Behavir: An Intrductin t the Cncept f Utility I. Subsidies In the case f a subsidy, we shift the demand r supply ut by the amunt f the subsidy The example belw shifts demand
More informationFire resistance of Blazebrake 201 Sealant Applied to Pipe Penetrations in Concrete Floors. R. W. Causer Fire Testing Engineer
FAR 3318 Fire resistance f Blazebrake 201 Sealant Applied t Pipe Penetratins in Cncrete Flrs Authr: R. W. Causer Fire Testing Engineer Reviewer: P. Ban-Chapman Senir Fire Testing Engineer Cntact: BRANZ
More informationHow it works. The following pages provide step by step instructions on the main stages of the MYOB Integration Module.
Integrating MYOB with TimePr With TimePr s MYOB Integratin Mdule, yu can imprt TimePr time recrds int MYOB fr invice prcessing r payrll integratin. These recrds are then used t generate: Sales Invices,
More informationAnalyses of Composite Beams and Frames at Elevated Temperature
Analyses f Cmpsite Beams and Frames at Elevated Temperature T. MORTA Cnstructin Engineering Research Department, nstitute f Technlgy Shimizu Crpratin 3-4-17, Etchujima Kt-ku, Tky 135, Japan T. WAKAMATSU
More informationLRFD Bridge Design Manual. Bridge Office MINNESOTA DEPARTMENT OF TRANSPORTATION MANUAL
MANUAL 5-392 MINNESOTA DEPARTMENT OF TRANSPORTATION Bridge Office LRFD Bridge Design Manual MnDOT BRIDGE OFFICE LRFD Bridge Design Manual Minnesta Department f Transprtatin 3485 Hadley Avenue Nrth Mail
More informationSOIL CONSULTANTS, ENGINEERS & GEOLOGISTS. Since P.O. Drawer 698 Charleston, South Carolina / Fax
SOL COSULTATS, C. EGEERS & GEOLOGSTS Cnstructin Malerlals n Destructive Getechnical Envirnmental Since 95 P.O. Drawer 698 Charlestn, Suth Carlina 29402 843/723-4539 Fax 843723-3648 Palmett Gunite Cnstructin
More informationBuilding Permit Application Accessory Buildings/ Detached Garages
Parkland Cunty 53109A Hwy 779 Parkland Cunty, Alberta T7Z 1R1 Phne: (780) 968-8888 Fax: (780) 968-3225 Tll Free: 1-888-880-0858 Email: safetycdest@parklandcunty.cm Building Permit Applicatin Accessry Buildings/
More informationADDENDUM 1. RFP# , Local and Long Distance Service for Coin and Coin less (Inmate) Telephones
Cunty f El Pas Purchasing Department 500 East San Antni, Rm 500 El Pas, Texas 79901 (915) 546-2048 / Fax: (915) 546-8180 ADDENDUM 1 T: Frm: All Interested Prpsers Linda Gnzalez Date: August 3, 2007 Subject:
More informationFiber Reinforced Polymer Upgrades for Large Pipelines. Anna Pridmore, PhD Vice President- Pipeline Solutions Structural Technologies
Fiber Reinfrced Plymer Upgrades fr Large Pipelines Anna Pridmre, PhD Vice President- Pipeline Slutins Structural Technlgies Agenda Inspectin Methds evlutin Repair Optins analysis Carbn Fiber technical
More informationThe purpose of IPRO 304 is to create a software package to assist A. Finkl & Sons in tracking of parts in heat treatment furnaces.
Prject Plan Reprt: Heat Treat Subgrup 1.0 Objective The purpse f IPRO 304 is t create a sftware package t assist A. Finkl & Sns in tracking f parts in heat treatment furnaces. Objective fr Spring 2008:
More informationRevised: To: Gabe Sevigny El Paso County Project Planner I
T: Gabe Sevigny El Pas Cunty Prject Planner I 11.24.17 Revised: 12.02.17 Purpse: Letter f intent fr a Rural Hme Occupatin El Pas Cunty Land Develpment Cde: 5.2.30 (B) File: EA-17-126 Chin 20270 Beacn Lite
More informationTroubleshooting TAC GradeBook Averages
The Department f Student Infrmatin Trubleshting TAC GradeBk Averages Teacher Access center v2.5 The fllwing prcedures steps yu thrugh checking student averages, lading t the grade bk, and verriding grade
More informationMONOPOUR PREFAB SYSTEM
Enter Prject Name Enter Prject Number (Nte t Specifier: This dcument has been prepared fr Fab-Frm Industries Ltd. (Fastft prduct) in accrdance with the Cnstructin Specificatins Institute (CSI) Sectin Frmat.
More informationCleves Pump Station Stabilization, Project ID Date Issued: August 6, 2012
Cleves Pump Statin Stabilizatin, Prject ID 10210020 Date Issued: August 6, 2012 ADDENDUM NO. 2 This addendum will nly be distributed via e-mail, but will remain available fr viewing n the MSDGC website
More informationFacilities Study Report
Wellhead Pwer Cltn, LLC Facilities Study Reprt Revised May 15, 2014 Prepared by: Edgar Ramirez Rger Salas, P.E. Distributin Field Engineering Apprved by: Rger Salas Distributin Field Engineering Manager
More informationNEW APPROACHES TO CONTROL WALNUT BLIGHT. Milton Schroth, Joe osgood, Bill Olson, Art McCain, Mavis Chong, John Bahme, and Yang-An Lee.
NEW APPROACHES TO CONTROL WALNUT BLIGHT December, 1988 Miltn Schrth, Je sgd, Bill Olsn, Art McCain, Mavis Chng, Jhn Bahme, and Yang-An Lee. ABSTRACT Last year's research prpsal presented a three year prgram
More informationPersonal Computing Services FAQ s
What s cvered under the PCS cntract? PCS will generally cver all f the Break/Fix services n the Cre Hardware that is lcated at the schls. Cre Hardware cnsists f: DESKTOPS, LAPTOPS, SERVERS, and PRINTERS.
More informationDESIGN STEPS USING ADAPT FLOOR-PRO 1
Technical Nte Structural Cncrete Sftware System TN230_PT_design_prcedure_FP_12 053007 DESIGN STEPS USING ADAPT FLOOR-PRO 1 Bijan O Aalami 2 This Technical Nte utlines the steps that yu have t fllw in designing
More informationInsulated Conductor Rails/Bars English
HRD WORK TQCSI JS-NZ ISO 900 Insulated Cnductr Rails/ars English -Ple Cntinuus Type (50/75/00/50) 4-Ple Cntinuus Type (50/75/00/50) 6-Ple Cntinuus Type (50/75) I-Single Ple Cntinuus Type (00) W-Single
More informationREMI - Outline performance and technical specifications
REfurbishment as Manufacturing Industry REMI Prject 24 May 2016 REMI - Outline perfrmance and technical specificatins WP2.2 - WP3.1 Deliverable Intrductin The cncept f deep retrfit is nt new. The main
More informationSOURCE INSPECTION QUALITY MANAGEMENT PLAN
SOURCE INSPECTION QUALITY MANAGEMENT PLAN Campus Parkway / State Rute 140 Prject BAR REINFORCEMENT APPENDIX I Table f Cntents 1 GENERAL... 3 1.1 Certificatins... 3 1.1.1 Black Bar Reinfrcement... 3 1.1.2
More informationABC OF... PHYSICAL RESOURCES
M ABC OF... PHYSICAL RESOURCES O D U L E 14 Published by the Department f Basic Educatin 222 Struben Street Private Bag X 895, Pretria, 0001 Website: www.educatin.gv.za r Thuthng Department f Basic Educatin
More informationNEW LAWS REGARDING BUILDING PRODUCTS (QLD)
BUILDING SERVICES Ref: LEG 17-05 Current at Nvember 2017 NEW LAWS REGARDING BUILDING PRODUCTS (QLD) Frm 1 Nvember new laws regarding nn-cnfrming building prducts apply t all building prjects in Queensland.
More informationBelgian Building Research Institute. Lightweight self-compacting concrete with Argex aggregates
Belgian Building Research Institute Lightweight self-cmpacting cncrete with Argex aggregates 1. Intrductin and prject bjective: This dcument is a shrt verview f the research prject entitled Lightweight
More informationECNG Energy Group. Performance Review Plan
ECNG Energy Grup Perfrmance Review Plan Cntents Overview 3 Summary 3 Purpse 3 Key Phases and Timelines 4 1) Perfrmance Planning: Start f Q1 4 Setting Individual Objectives 5 2) Onging Caching and Mid-year
More informationGrain Storage: Considerations
Grain Strage: Cnsideratins Intrductin Grain strage is essential t any grain peratin in Alberta. Since the cmmercial grain handling system in western Canada cannt stre the entire crp harvested each fall.
More informationExtended Inventory Items
Extended Inventry Items Using the Item Number SmartFinder buttn Extended Inventry Items Extended Inventry Items is an enhanced replacement fr the Sage I/C Items screen. It prvides yu with mre functinality
More informationBrainQuest 2011 Darul Arqam North
BrainQuest 2011 Darul Arqam Nrth The Tthpick Bridge Challenge The cmpetitin is pen t all students in grades 4 thrugh 12. Students are invited t build a structure using nly rund wden tthpicks and glue that:
More informationPSI Cementitious Patching Guide
PSI Cementitius Patching Guide Material Use TuffPatch VOH fr Vertical and Overhead Repairs and TuffPatch DOT fr any Hrizntal r frm and pur applicatins. Use neat materials fr applicatins up t 2 inches thick.
More informationSummary of Nelson City Land Demand and Capacity June 2017
Summary f Nelsn City Land Demand and Capacity June 2017 NATIONAL POLICY STATEMENT ON URBAN DEVELOPMENT CAPACITY (NPS-UDC) The Natinal Plicy Statement n Urban Develpment Capacity requires cuncils t ensure
More informationEvaluation of Auditor V1.0 By the HERS BESTEST Software Simulation Testing Protocol
Evaluatin f Auditr V1.0 By the HERS BESTEST Sftware Simulatin Testing Prtcl Prepared by: Clif Payne Piedmnt Assciates, LLC. 514 Avnwd Rad Haverfrd, PA 19041 (610) 642-3085 piedmntassciates@verizn.net September
More informationTube Bundle General Configuration
Tube Bundle General Cnfiguratin Length B Inlet Tube Supprt Tubes Outlet Head Rib Gasket Tube Sheet Tank lange Ring Gasket Tank Tank Lining Please Cmplete The llwing Infrmatin: 1 Tube Sheet Data Outside
More informationMILITARY MARKING (MIL-STD-129P)
Prject Cde Shelf-life MILITARY MARKING (MIL-STD-129P) Marking permits ready identificatin f military supplies and equipment fr shipment and strage. Marking is required t assist ur dept persnnel srt shipments
More informationEnergy Management Program. Durez Canada Company Ltd By Anyssa Mohammed & Mandy Wychreschuk
Energy Management Prgram Durez Canada Cmpany Ltd By Anyssa Mhammed & Mandy Wychreschuk Agenda 1. Intrductin 2. Energy Management Relatinship t Safety 3. Site Utility Csts 4. Energy Prgram Initiative 5.
More information5. EXAMPLE OF A DEGREE DAY MODEL: HINTEREISFERNER, AUSTRIA
Glacial Gelgy 5. Example f a Degree Day Mdel 5. EXAMPLE OF A DEGREE DAY MODEL: HINTEREISFERNER, AUSTRIA 30 + 25 = 55 Pints Objective: t create a psitive degree-day mdel f glacial mass balance. Yu shuld
More informationReport on Test work conducted on the Fisher Air Separator
Reprt n Test wrk cnducted n the Fisher Air Separatr Cnsidering the water limitatins at Leqhbng, and previus expsure t the Fisher Air Separatr a trial was undertaken in Lephalale (Ellisras) t cnsider the
More informationFamily Support Service Provider Quick Reference Guide to CYBER
Welcme Page: Family Supprt Service Prvider Quick Reference Guide t CYBER Links t Mnitr Regularly: Authrizatin Current: Will list all currently pen authrizatins; shuld include nly thse yuth currently receiving
More informationINVENTION DISCLOSURE
1. Inventin Title. efridge: The smart kitchen s hub 2. Inventin Summary. This inventin describes a smart refrigeratr (r efridge ) that acts as the hub f a smart kitchen ec-system, a methd fr prviding infrmatin
More informationEID POLICY MANUAL. ADMIN Increases in Irrigation Acres, Criteria and Guidelines Revised Feb [supersedes Jan ]
Plicy Guidelines: The District has established criteria and guidelines t assist staff in evaluating and administering, and the directrs in apprving and/r rejecting, applicatins fr increases in irrigatin
More informationNatural and Recycled Materials
1 BY KEYSTONE The chice t build green has revlutinized the cnstructin industry. Chsing prducts and prcesses with a lwer impact n the envirnment nt nly increases efficiency; but, als guides design decisins
More informationSTRUCTURAL TESTING OF BRICK POCKET-TYPE RETAlNING WALLS
STRUCTURAL TESTNG OF BRCK -TYPE RETAlNNG WALLS K Fisher 1, B A Haseltine 2 and P Watt 1. ABSTRACT The aesthetic and structural prperties f brickwrk prvide a highly acceptable material fr the cnstructin
More information5.2 RPM Auction Timeline
5.2 RPM Auctin Timeline The fllwing Auctin timeline prvides the deadline fr key RPM activities: RPM Activity Submittal f preliminary request t remve resurce frm Capacity Resurce status and preliminary
More information5.2 RPM Auction Timeline
5.2 RPM Auctin Timeline The fllwing Auctin timeline prvides the deadline fr key RPM activities: RPM Activity Submittal f preliminary request t remve resurce frm Capacity Resurce status and preliminary
More informationMonitoring and. Prof. Jay Aronson
Mnitring and Evaluatin Prf. Jay Arnsn Mnitring Mnitring Gal: assess prgress f prject/prgram at regular intervals; find ut what s ging n (budget, persnnel, deadlines, prgress, areas needing mre wrk, etc.)
More informationCHAPTER ELEVEN LIQUID AND EMULSIFIED ASPHALT ITEMS
CHAPTER ELEVEN LIQUID AND EMULSIFIED ASPHALT ITEMS 11 LIQUID AND EMULSIFIED ASPHALT ITEMS 1 1 OVERV IEW All Liquid and emulsified asphalt items have a unit f measure (UOM) f tns r square yards. All liquid
More informationShear-bond Strength of Studded Steel Deck Slabs
Missuri University f Science and Technlgy Schlars' Mine Internatinal Specialty Cnference n Cld- Frmed Steel Structures (1984) - 7th Internatinal Specialty Cnference n Cld-Frmed Steel Structures Nv 13th
More informationEnergy Storage Ontario Submission to the Standing Committee on General Government Bill 172, Climate Change Mitigation and Low-Carbon Economy Act
April 4, 2016 Energy Strage Ontari Submissin t the Standing Cmmittee n General Gvernment Bill 172, Climate Change Mitigatin and Lw-Carbn Ecnmy Act Intrductin Gd afternn members f the Standing Cmmittee
More informationActivity Insight User Guide
Cntents: Overview Wh is Required t Reprt Accessing System Reasns fr Cllecting Data Entering Activity Infrmatin Manual Data Entry Selecting Activities fr Web Prfile Running Reprts Custmized Reprts Ad Hc
More informationIn 1961 a new Lift Station was constructed, the trickling filter was repaired and some minor modifications were made to the treatment plant.
WITH TIME COMES CHANGE This is true with everything, Yes even in the wnderful wrld f wastewater treatment. In the 1920 s we were knwn as the Sanitary Sewage Department, in 1951 Plant City Sewage Treatment
More informationABLE Commission Q&A Q&A Regarding Licensing and Application
ABLE Cmmissin Q&A Q&A Regarding Licensing and Applicatin When can the interim licenses applicatins be submitted? They can be submitted between nw and September 30, 2018, hwever; the Able Cmmissin wuld
More informationEnergy Consumption, Transformation and Sources
Energy Cnsumptin, Transfrmatin and Surces Lecture #3 HNRS 228 Energy and the Envirnment iclicker Questin Fssil fuels are derived frm bilgical material prduced A at the time f the industrial revlutin B
More informationVerification Summary Report (VSR) Instructions
Verificatin Summary Reprt (VSR) Instructins The verificatin prcess must be dne at the spnsr (district) level. Accessing the VSR Lg int IWAS; Click n System Listing n the left side f the screen; Click n
More informationSPRS V3.2.8 SPRS Reports
SPRS V3.2.8 SPRS Reprts Slide 1: Welcme Slide Welcme t SPRS Overview Training (DD Only), Supplier Perfrmance Risk System Reprts, Online Resurces, and Pints f Cntact Slide 2: Agenda - Navigatin & Reprts
More informationAn Introductory Acceptance Test
4 An Intrductry Acceptance Test "If yu dn't knw where yu are ging, yu will wind up smewhere else." Ygi Berra The Triad Tm, Debbie, and Cathy are in their secnd meeting tgether. Debbie describes an example
More informationWeb InfoPLU$ Account Transfer USER GUIDE
Web InfPLU$ Accunt Transfer USER GUIDE Fr infrmatinal purpses nly, nt cnsidered an advertisement. Web InfPLU$ Accunt Transfer USER GUIDE TABLE OF CONTENTS ACCOUNT TRANSFER... 2 ACCOUNT TRANSFER SUMMARY...
More informationResource Tracker User Guide
Revisin: 05 Effective Date: 02/22/2019 Prepared By: PJM Client Management [Type text] PJM User Guide: Resurce Tracker Table f Cntents Apprval... 2 Current Revisin... Errr! Bkmark nt defined. Intrductin...
More informationTUSCARAWAS COUNTY HEALTH DEPARTMENT ATTACHMENT XII: RESOURCE MANAGEMENT STANDARD OPERATING PROCEDURE
TUSCARAWAS COUNTY HEALTH DEPARTMENT ATTACHMENT XII: RESOURCE MANAGEMENT STANDARD OPERATING PROCEDURE Versin:2017.11 Date Originally Adpted: 12/22/16 Date f Last Revisin: 11/6/2017 Date f Last Review: 11/6/2017
More informationManual 11: Energy & Ancillary Services Market Operations Revision History
2.3.4 Minimum Generatr Operating Parameters Parameter Limited Schedules Belw is the list f business rules t require units t submit schedules that meet minimum accepted parameters. Market Sellers are required
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership
EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directrate B Grwth and Innvatin Circular Ecnmy and Industrial Leadership Seville, 6 th April 2018 Level(s) testing phase Guidance and rules
More informationMxRib Elegant Yet Strong Steel Profile. Ideal For Roofing & Wall Cladding DIMENSIONS. Specification. MxRib1010 Steel Profile - Mass Table
Elegant-Prfile MxRib 1010 Elegant Yet Strng Steel Prfile Ideal Fr Rfing & Wall Cladding MxRib1010 is a curvaceus rf prfile sheet. The curvaceus design nt nly adds strength t the rf prfiles but als gives
More informationEnergy Savings A District Perspective
Energy Savings A District Perspective Ohi Schl Bards Assciatin Capital Cnference 2012 9:00 AM 10:15 AM 1 Energy Optimizers, USA Greg Smith, President, CEM, LEED AP, BD+C, CLEP, CEA Ohi K-12 Schl Fcus (Energy
More informationCM-10/PT SP1 Screw Pile Specification
Piletech Supplementary Prcedure CM-10/PT SP1 CM-10/PT SP1 Screw Pile Specificatin Screw Pile Specificatin 1.0 INTRODUCTION 1.1 PURPOSE/SCOPE This specificatin cvers the prcurement, design, installatin
More informationYou can also click Jobs in the left hand navigation bar and then select Create Job toward the right hand corner.
T pst a jb n Handshake: 1. Start by clicking Pst a Jb frm yur hme dashbard: Yu can als click Jbs in the left hand navigatin bar and then select Create Jb tward the right hand crner. Yu will nw be asked
More informationOPTIMIZATION AND VALUE ANALYSIS OF A PRESSURE VESSEL SHELL
PERODCA POLYTECHNCA SER. MECH. ENG. VOL. 38, NOS. JH, PP. 165-177 (199.. ; OPTMZATON AND VALUE ANALYSS OF A PRESSURE VESSEL SHELL Pat REUSS Dept. f Chemical and Fd Engineering Technical University f Budapest
More informationOLIVENHAIN MUNICIPAL WATER DISTRICT DCMWTP SEWER MANHOLE REHAB PROJECT Pre-Bid Meeting Minutes (All changes/updates are shown in italics)
RHB Cpl OLIVENHAIN MUNICIPAL WATER DISTRICT DCMWTP SEWER MANHOLE REHAB PROJECT Pre-Bid Meeting Minutes (All changes/updates are shwn in italics) Date and Time: Tuesday June 19, 2018 10:00 AM Lcatin: DCMWTP
More informationChecklist for Automatic Guided Vehicle (AGV) Systems
Registered trade mark f PMH Checklist fr Autmatic Guided Vehicle (AGV) Systems Cmpany: Street: Pstcde/twn: Cunty/state: _ Department: Respnsibility f: Telephne: Fax: Email: 1. General infrmatin 1.1. In
More informationHIGHWAYS AGENCY. Safe roads, reliable journeys, informed travellers
RWS Strategic Target N.1: achieve a substantial reductin in the need fr rad wrkers t crss live carriageways n ft by the end f December 2011. RWS Strategic Target N.2: aim t eliminate the need fr rad wrkers
More informationInformation Visualization
Tracking Air Quality Trends with SASIGRAPH David Mintz, U.S. EPA, Research Triangle Park, NC Terence Fitz-Simns, U.S. EPA, Research Triangle Park, NC Michelle Wayland, U.S. EPA, Research Triangle Park,
More informationFigure 1: The Process of Extrusion.
Experiment (4) Extrusin Operatins Dr. Mhammad Al-tahat Department f Industrial Engineering. University f Jrdan. Lab. Of Manufacturing Prcesses. Curse N: 90641, 090641 1. Objective: The main bjective f
More informationTransportation and Infrastructure Working Group Meeting #3. April 28, 2016; 10:00 am 12:00 pm. Meeting Summary 1
Transprtatin and Infrastructure Wrking Grup Meeting #3 April 28, 2016; 10:00 am 12:00 pm Meeting Summary 1 I. Meeting Objectives T present t wrking grup members results frm the SWOT analysis prepared by
More informationMaking your self build self sufficient with ground source heat pumps
Making yur self build self sufficient with grund surce heat pumps Natinal Hme Building and Renvating Shw, March 2015 Kensa Heat Pumps Our jurney www.kensaengineering.cm Intrducing grund surce heat pumps
More informationWorking Families Success Network in Community Colleges Definitions and Expected Design Elements
Wrking Families Success Netwrk in Cmmunity Clleges Definitins and Expected Design Elements Cre Prgram and Service Delivery Elements Clleges shuld prvide services in each f the three WFSNCC cre pillars:
More informationCustomer best practices
Custmer dcument Custmer best practices Recmmendatins fr new Basware transactin services custmers Basware Crpratin Cpyright Basware Crpratin All rights reserved 1 (11) 1 Intrductin Our best advice This
More informationWeb Financial Office How to Setup a New HR User and Security Specialized Data Systems, Inc Revised Last:
Specialized Data Systems, Inc. Web Financial Office Specialized Data Systems, Inc. 2017 Revised Last: 2.22.2017 Table f Cntents... 3 Adding & Setting Up a New Emplyee...3 Input New Emplyee Basic Demgraphics...
More informationUCF Financials Xpansion Meeting Contracts Module Fit/Gap Design Meeting MINUTES
UCF Financials Xpansin Meeting Cntracts Mdule Fit/Gap Design Meeting MINUTES Date: April 9, 2012 Time: Lcatin: Facilitatr: Attendees: Minutes: 09:00 a.m. RP-302 Parker Madden Mullins, Nimmathta, Wray,
More informationFLOOD CONTROL DETENTION PLAN REVIEW CHECKLIST November, 2008
FLOOD CONTROL DETENTION PLAN REVIEW CHECKLIST Office Use: Case N: Review Date: Reviewer: Detentin Plan Review Checklist This Plan Review Checklist is designed as a tl t assist the design engineer and review
More informationFLOOD HAZARD ZONE DEVELOPMENT PERMIT
COUNTY OF MENDOCINO DEPARTMENT OF PLANNING AND BUILDING SERVICES 860 NORTH BUSH STREET UKIAH CALIFORNIA 95482 120 WEST FIR STREET FORT BRAGG CALIFORNIA 95437 STEVE DUNNICLIFF, DIRECTOR PHONE: 707-234-6650
More informationReregistration of voluntarily deregistered CDM project activities
Paragraph 4 f the anntated agenda, Annex 1 Reregistratin f vluntarily deregistered CDM prject activities CDM EB 87 Paris, France, 23 27 Nvember 2015 UNFCCC Secretariat SDM prgramme Prcedural backgrund
More informationResource Adequacy in the Pacific Northwest: Serving Load Reliably under a Changing Resource Mix
Resurce Adequacy in the Pacific Nrthwest: Serving Lad Reliably under a Changing Resurce Mix Significant greenhuse gas emissin reductins leading t a deeply decarbnized grid can be achieved as lng as sufficient
More informationFrequently asked questions:
Frequently asked questins: Standardized pre/pst surveys fr grw grant results Versin 2.0 May 10, 2017 Cntents HelpDesk Cntact Infrmatin... 2 General Questins... 2 Why is OTF using these surveys?... 2 Wh
More informationINTEC-High Pressure Steam Generator for closed circuits Series inook
INTEC-High Pressure Steam Generatr fr clsed circuits Series inook 1. Functinality The ink is a High Pressure Steam generatr f vertical design especially develped fr clsed circuits. He is installed directly
More information5th Annual Model Water Tower Competition
5th Annual Instructins General Challenge: The challenge is t build a structurally efficient mdel water twer that hlds water that can be filled and drained quickly, while als being aesthetically pleasing.
More informationAvoiding Microbiological Media Related Failures
Micrrite, Inc. brings yu this unique learning experience in Aviding Micrbilgical Media Related Failures; Part f Micrrite s step-by-step webinar series. Aviding Micrbilgical Media Related Failures Reprting
More informationJOINT REPORT ON THE CASE FOR A SECOND NORTH SOUTH INTERCONNECTOR
Reprt n the Case fr Cnstructin f a Secnd Nrth-Suth intercnnectr. JOINT REPORT ON THE CASE FOR A SECOND NORTH SOUTH INTERCONNECTOR EXECUTIVE SUMMARY This reprt prvides the assessment and evaluatin carried
More informationDECK PERMIT INFORMATION
DECK PERMIT INFORMATION REQUIRED INFORMATION: 1) A Plt Plan shwing the prpsed deck with the distances t the side rear and frnt f prperty lines. Als, shw lcatins f existing structures and septic system
More informationGreenhouse Gas Reduction Plan
Greenhuse Gas Reductin Plan Executive Summary July 18, 2017 Wrcester Plytechnic Institute Greenhuse Gas Reductin Plan Executive Summary Intrductin: WPI s Cmmitment t Sustainability The missin f WPI includes
More information