1 Public Disclosure Authorized Public Disclosure Copy LATIN AMERICA AND CARIBBEAN Mexico Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 17 ARCHIVED on 30-Oct-2015 ISR21191 Implementing Agencies: Secretaría de Energía Public Disclosure Authorized Key Dates Key Project Dates Board Approval date:17-jan-2008 Planned Mid Term Review Date:-- Original Closing Date:30-Jun-2013 Project Development Objectives Effectiveness Date:16-Jul-2009 Actual Mid-Term Review Date:25-Mar-2011 Revised Closing Date:30-Oct-2015 Public Disclosure Authorized Project Development Objective (from Project Appraisal Document) Increase access to efficient and sustainable integrated energy services in predominantly indigenous rural areas of Mexico Has the Project Development Objective been changed since Board Approval of the Project Objective? No MX-GEF Integrated Energy Services (P095038) Global Environmental Objective (from Project Appraisal Document) To achieve reduction of greenhouse gas emissions through the use of renewable energy in rural areas for the provision of electricity. Public Disclosure Authorized Has the Global Environmental Objective been changed since Board Approval of the Project Objective? No Components Name Part 1. Policy, Regulation and Strategy:(Cost $4.10 M) Part 2. Rural Energy Subprojects:(Cost $ M) Technical Assistance for Rural Energy (Previously Part 3) - DROPPED Part 3. Promotion and Technical Assistance to Increase Productive Uses of Electricity:(Cost $6.00 M) Page 1 of 10

2 Part 4. Project Management:(Cost $1.64 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Progress towards achievement of GEO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions The project contributed to the rural electrification agenda of the Mexican Government, specifically for off-grid electrification efforts. The project contributed to increase access to efficient and sustainable integrated energy services in 40 extremely isolated rural communities of Mexico, and it is on track to meet its Global Environment Objective, GEO (To achieve reduction of greenhouse emissions through the use of renewable energy in rural areas for the provision of electricity), as the 40 solar farms (35 in test or operation and 5 expected to be completed by October 30, 2015) will be able to mitigate approximately 99,000 tonsco2e per year during their lifecycle. Key Decisions The team is maintaining the PDO, GEO and IP indicators as Moderately Satisfactory (MS) as a result of sustained progress. Page 2 of 10

3 Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Moderate Moderate Macroeconomic -- Moderate Moderate Sector Strategies and Policies -- Moderate Moderate Technical Design of Project or Program -- Low Low Institutional Capacity for Implementation and Sustainability -- Moderate Moderate Fiduciary -- Moderate Moderate Environment and Social -- Substantial Moderate Stakeholders -- Moderate Moderate Other -- Substantial Moderate Overall -- Moderate Moderate Results Project Development Objective Indicators Number of HH electrified with RET. (Text, Custom) Value ,432 The target for this indicator (4,432) corresponds to the entire Government s electrification program i.e., 86 locations (Bank and GEF funds will support approximately 40 locations). CFE has reported that the federal electrification program has only recently started with three locations outside the PSIE project. However, it is unlikely that the locations outside the PSIE project will be electrified by the current closing date of October 2015, and thus the indicator is updated based on the locations financed by PSIE only. In the previous ISR the team estimated the target as 1,800 (on the assumption of 35 communities). Now that the project has been extended to electrify another 5 communities, the target is revised as 2060 HH (for 40 communities). As such, the project has met 89.6% of the revised target (1846 out of 2060, considering 40 farms corresponding to bids 1 to 7). The team has been advised to keep the current results framework and take the opportunity to explain the discrepancy between project targets versus program targets in the ICR. The team will gather additional Page 3 of 10

4 information on other electrification actions by CFE (including pilot projects and projects after PSIE) to fully assess the impact of this intervention on the Government's rural electrification agenda. Costs per New Connection (USD/HH). (Text, Custom) Value 1, ,097 The target of 1,097 USD/HH corresponds to the original results framework, where it was assumed that each HH would have a 100-W panel installed on its rooftop. Consequently, 1,097 USD/HH is equivalent to 1,097 USD / 100 W. For bids 1 to 7 CFE reported an average cost of connection of 14,925 USD/kW which translates into USD/100 W, or USD/HH using the original metrics. Such cost represents an overprice of 36%, which can be explained mainly by two facts: (i) the farms are equipped with a very advanced telecommunication system that allows CFE to operate them remotely, and (ii) the farms are expected to provide electricity to the communities at a service quality that is comparable to the grid. The team has been advised to keep the current results framework and explain the discrepancies between the original indicator (in USD/HH, equivalent to USD/100W) and the two independent indicators of the restructured project, i.e. USD/HH and USD/kW. Notice that the actual cost per connection is given in Mexican pesos (as the currency of contract commitment) and the estimation in USD is highly affected by the exchange rate, which has been particularly volatile during Installed capacity (Text, Custom) Value ,205 The target of 6,205 kw installed capacity corresponds to the entire electrification program, i.e., 86 locations (Bank and GEF funds will support approximately 40 locations). CFE has reported that the federal electrification program has recently started with three locations outside the PSIE project in addition to the two pilot projects. However, it is unlikely that the locations outside the PSIE project will be electrified by the current closing date of October 2015 and thus the indicator is updated based on the locations financed by PSIE. In the last ISR the team estimated the target as 2500 kw (on the assumption of 35 communities). Now that the project has been extended to electrify another 5 communities, the target is revised as 2,880 kw (for 40 communities). As such, the project has achieved 70.7% of the revised target (2037 out of 2880, considering 40 farms corresponding to bids 1 to 7). It should be noted that the requirements for all seven bids were specified in terms of energy (kwh), rather than capacity (kw). The team has been advised to keep the current results framework and take the opportunity to explain the discrepancy between project targets versus program targets in the ICR. Page 4 of 10

5 Incremental increase in MWh/year of electricity consumed for productive uses in targeted communities (MWh/year). (Text, Custom) Value ,768 To the date of this ISR, CFE did not provide an update for this indicator, as most the farms have been in operation only for a relatively small period of time (less than a year) and as such, beneficiaries are using the electricity mostly for residential loads. However, each of the solar farms has included a provision of approximately 30% of its capacity to accommodate productive uses in the future. The estimation of 526 MWh/year accounts for such capacity in all 40 localities. As the project closes on October 30, 2015, the team has agreed to support the Government for carrying out a consultancy with the purpose of estimating energy consumption during the ICR period. The team is currently preparing the ToRs for such consultancy, which is expected to be launched in November As with the other indicators, the target of 5,768 MWh/year corresponds to the entire electrification program, i.e., 86 locations (Bank and GEF funds will support approximately 40 locations). The target should be adjusted when preparing the ICR to account only for the 40 farms benefited from PSIE. Number of new social/productive activities and micro-businesses developed. (Text, Custom) Value The target of 2179 (revised from 1308 in the previous ISR, as 2179 is the correct number according to the restructured project) corresponds to the entire electrification program, i.e., 86 locations (Bank and GEF funds will support approximately 40 locations). CFE has reported that the federal electrification program has recently started with three locations outside the PSIE project in addition to the two pilot projects. However, it is unlikely that the locations outside the PSIE project will be electrified by the current closing date of October 2015 and thus the indicator is updated based on the locations financed by PSIE. In this ISR, the team is estimating the target to 1,013 new social/productive uses and micro-business developed only for the 40 communities benefited from PSIE. As such, the project could achieve in the very short term (within one year from commissioning) 18% of the revised target (185 out of 1013, considering 40 farms corresponding to bids 1 to 7). It should be noted that these are not actual new social/productive activities and micro-business developed. Instead, these are prospective productive activities that were mentioned by the beneficiaries in the initial consultations (prior to the farm construction). Examples of these prospective activities are: (i) greenhouses, (ii) rural grocery stores, (iii) poultry breeding facilities, (iv) bakeries, (v) carpentries, (vi) sewing shops, (vii) mechanical service stations, (viii) livestock breeding facilities, (ix) dairy farms, (x) internet in schools, etc. The team has been advised to keep the current results framework and take the opportunity to explain the discrepancy between project targets versus program targets in the ICR. Total RET energy consumption per household in MWh/year (Text, Custom) Value 0 0 1,370 2,077 Page 5 of 10

6 PHINDGEOTBL Public Disclosure Copy Date 08-Nov Jun Oct Oct-2015 According to the updated framework from the project restructuring of October 2012, each HH would have an output of 1.18 kwp, at a capacity factor of 20%. Translated into energy consumption/year per HH, the target should have been (1.18 kwp/hh) x (24 hrs./day) x (365 days/year) x 20% = 2,067 kwh/year per HH. Therefore, the units of the target should be revised from MWh/year to kwh/year. As with other targets, the target of 2,077 kwh/year corresponds to the entire program, as opposed to the project. Using information from CFE, the team estimated the potential energy consumption per household in kwh/year, which could reach 1,370 kwh/year per household at full load, thus potentially meeting and passing the adjusted project target (estimated at 966 kwh/year per HH for 40 localities). The achievement would thus be 142% at full load (1,370 / 966). People provided with access to electricity by hold connections-other RE: Off-grid (Number, Core) Value Date Jun Oct Oct-2015 The target for this indicator (17,578 people) corresponds to the entire Government s electrification program i.e., 86 locations (Bank and GEF funds will support approximately 40 locations). CFE has reported that the federal electrification program has only recently started with three locations outside the PSIE project. However, it is unlikely that the locations outside the PSIE project will be electrified by the current closing date of October 2015, and thus the indicator is updated based on the locations financed by PSIE. In the previous ISR the team estimated the project target as 8,176 people (for 40 communities). As such, the project has achieved 90% of the revised target (7384 out of 8176, considering the 40 farms for bids 1 to 7). The team has been advised to keep the current results framework and take the opportunity to explain the discrepancy between project targets versus program targets in the ICR. Overall Global Environmental Objective Indicators Emissions Reduction (thousand tones CO2e) (Text, Custom) Value The target of 241,000 tons CO2e per year is estimated on the assumption that rural electrification actions would mitigate CO2 emissions by displacing (i) small gasoline engines for productive uses and (ii) kerosene lamps for lighting purposes. Following the same assumptions and methodology, the team estimated that PSIE will mitigate approximately 99,000 tonsco2e/year. As with other indicators, the target of 241,000 Page 6 of 10

7 PHINDIRITBL PHINDIRITBL Public Disclosure Copy tonsco2/year corresponds to the entire Government program (86 localities). A revised, proportional target of 112,000 tonsco2e/year is proposed by the team. Under this assumption, the project is on track of substantially meeting its GEO (approximately 88% of the target of tonsco2e per year, over the life of the project). Overall Intermediate Results Indicators PPMT/SPICs/PAC/PC/TSMG operational. (Text, Custom) Value None No longer applicable No longer applicable No longer applicable The project was restructured in October 2012 to address complex technical constraints and institutional arrangements that delayed implementation and disbursements. Since the national utility CFE is executing the rural energy subprojects, the following operational agencies are no longer relevant under the restructured arrangements: - PPMT (Program Planning and Management Team). Instead, a Project Administrative Unit within SENER has been established and is in operation. - SPIE (State Project Implementation Committee) - PAC (Project Advisory Committee) - PMC (Project Monitoring Committee) - TSMG (Technical Supervision and Monitoring Group) Design bidding documents. (Text, Custom) Value None Seven bidding documents have been designed. Seven bidding documents have been designed. Four bidding documents. Seven bidding documents were been designed, achieving 175% of target. Bids 1-7 have been successfully completed Page 7 of 10

8 PHINDIRITBL PHINDIRITBL PHINDIRITBL Public Disclosure Copy Issuance of technical guidelines. (Text, Custom) Value None Seven bidding processes (including technical specifications) have been launched. Seven bidding processes (including technical specifications) have been launched. Technical specifications for four bidding documents Seven bidding documents (including technical specifications) were designed, achieving 175% of target. Bids 1-7 have been successfully completed. Baseline Impact Evaluation. (Text, Custom) Value None Three assessments Three assessments Three assessments Three consulting services were completed to carry out social safeguards assessment in several rural communities (100% of target). The assessed communities were: San José de la Cruz, Curachitos, San Buenaventura, El Zancudo Uno, Ojos Azules, Ceja de Cebolleta, Tepalcates, Canoitas-Canoas Dos, la Cieneguita and la Sierrita (Durango), and San José de Carranza (Coahuila). Deliverables have been accepted by SENER and shared with the Bank. CFE is completing an impact evaluation in selected communities using TA resources using the information derived from these three assessments. Medium Term Impact Evaluation Assessment. (Text, Custom) Value None CFE is carrying out two impact evaluation assessments (financed with TA resources) in the same communities where the baseline impact evaluation was conducted and are expected to be completed by the closing date. Upon acceptance, SENER will share the deliverables with the Bank. Therefore the project is on track of achieving 200% of target. Page 8 of 10

9 Overall Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed Disbursed P IBRD Effective USD % P TF Effective USD % Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P IBRD Effective 17-Jan Dec Jul Jun Oct-2015 P TF Effective 05-Dec Dec Oct Jun Oct-2015 Cumulative Disbursements Restructuring History Level Approved on 06-Nov-2012,Level 2 Approved on 04-Jun-2014,Level 2 Approved on 07-Jul-2015 Page 9 of 10

10 Related Project(s) P MX-GEF Integrated Energy Services Page 10 of 10

The World Bank Mexico (CRL) Integrated Energy Services (P088996)

The World Bank Mexico (CRL) Integrated Energy Services (P088996) Public Disclosure Authorized Public Disclosure Copy LATIN AMERICA AND CARIBBEAN Mexico Energy and Mining Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 15 ARCHIVED on 30-Dec-2014 ISR17230

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Mexico Agriculture and Rural Development Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 13 ARCHIVED on 11-Feb-2015 ISR18140 Implementing

More information

The World Bank Geothermal Clean Energy Investment Project (P113078)

The World Bank Geothermal Clean Energy Investment Project (P113078) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 11 ARCHIVED on 05-Nov-2017 ISR29890 Implementing

More information

The World Bank Geothermal Clean Energy Investment Project (P113078)

The World Bank Geothermal Clean Energy Investment Project (P113078) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Energy and Mining Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 6 ARCHIVED on 17-Jun-2015 ISR18126 Implementing Agencies:

More information

Public Disclosure Copy. Implementation Status & Results Report Second Sustainable and Participatory Energy Management (PROGEDE II) (P120629)

Public Disclosure Copy. Implementation Status & Results Report Second Sustainable and Participatory Energy Management (PROGEDE II) (P120629) Public Disclosure Authorized AFRICA Senegal Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2010 Seq No: 13 ARCHIVED on 12-Jan-2018 ISR31048 Implementing Agencies: Government

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy EUROPE AND CENTRAL ASIA Croatia Water Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 15 ARCHIVED on 24-Dec-2015 ISR22041 Implementing

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 14 ARCHIVED on 21-Dec-2016 ISR25946 Implementing Agencies:

More information

The World Bank Vietnam Renewable Energy Development Project (P103238)

The World Bank Vietnam Renewable Energy Development Project (P103238) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2009 Seq No: 15 ARCHIVED on 14-Feb-2018 ISR29615 Implementing Agencies:

More information

RUSSIA FOREST FIRE RESPONSE PROJECT (P123923)

RUSSIA FOREST FIRE RESPONSE PROJECT (P123923) EUROPE AND CENTRAL ASIA Russian Federation Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 14 ARCHIVED on 28-Dec-2018 ISR35669 Implementing Agencies:

More information

Key Dates. Global Development Objectives. Components. Overall Ratings

Key Dates. Global Development Objectives. Components. Overall Ratings Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Colombia Agriculture Global Practice Global Environment Project Specific Investment Loan FY 2010 Seq No: 15 ARCHIVED on 13-Jun-2017 ISR28422 Implementing

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy EUROPE AND CENTRAL ASIA Kazakhstan Agriculture and Rural Development Global Practice IBRD/IDA Specific Investment Loan FY 2006 Seq No: 20 ARCHIVED on

More information

The World Bank AO-Market Oriented Smallholder Agriculture Project (P093699)

The World Bank AO-Market Oriented Smallholder Agriculture Project (P093699) Public Disclosure Authorized AFRICA Angola Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 06-Nov-2015 ISR21246 Implementing Agencies: Ministry of Agriculture

More information

Key Dates. Global Development Objectives. Components. Overall Ratings

Key Dates. Global Development Objectives. Components. Overall Ratings Public Disclosure Authorized EAST ASIA AND PACIFIC Philippines Environment & Natural Resources Global Practice Global Environment Project Specific Investment Loan FY 2010 Seq No: 11 ARCHIVED on 18-Sep-2016

More information

The World Bank Samoa Agriculture & Fisheries Cyclone Response Project (P145938)

The World Bank Samoa Agriculture & Fisheries Cyclone Response Project (P145938) Public Disclosure Authorized EAST ASIA AND PACIFIC Samoa Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 15-Jun-2016 ISR23304 Implementing Agencies: Ministry

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Transport Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 13 ARCHIVED on 17-Jun-2015 ISR19767 Implementing Agencies: Hanoi Urban

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Brazil Transport Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 12 ARCHIVED on 15-Jun-2015 ISR18540 Implementing Agencies: Rio

More information

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Governance Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 9 ARCHIVED on 05-Jan-2016 ISR22346 Implementing Agencies: BAPPENAS,

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural Development Project (P088799)

Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural Development Project (P088799) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Paraguay Paraguay Sustainable Agriculture & Rural

More information

Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384)

Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384) Public Disclosure Authorized Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384) EAST ASIA AND PACIFIC Indonesia Governance Global Practice IBRD/IDA

More information

Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384)

Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384) Public Disclosure Authorized Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384) EAST ASIA AND PACIFIC Indonesia Governance Global Practice IBRD/IDA

More information

The World Bank MZ PROIRRI Sustainable Irrigation Development (P107598)

The World Bank MZ PROIRRI Sustainable Irrigation Development (P107598) Public Disclosure Authorized AFRICA Mozambique Water Global Practice IBRD/IDA Investment Project Financing FY 2011 Seq No: 12 ARCHIVED on 04-Jan-2018 ISR30926 Implementing Agencies: Ministry of Economy

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy AFRICA Malawi Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 13 ARCHIVED on 04-Nov-2015 ISR21002 Implementing Agencies:

More information

Public Disclosure Copy. Implementation Status & Results Report BD: Leveraging ICT Growth, Employment and Governance Project (P122201)

Public Disclosure Copy. Implementation Status & Results Report BD: Leveraging ICT Growth, Employment and Governance Project (P122201) Public Disclosure Authorized SOUTH ASIA Bangladesh Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 06-Nov-2017 ISR30072 Implementing Agencies: Bangladesh

More information

Name Previous Rating Current Rating

Name Previous Rating Current Rating Public Disclosure Authorized Public Disclosure Copy MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Environment & Natural Resources Global Practice Global Environment Project Investment Project Financing

More information

Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384)

Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384) Public Disclosure Authorized Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384) EAST ASIA AND PACIFIC Indonesia Economic Policy Global Practice

More information

INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU)

INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU) Public Disclosure Authorized INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU) (P159191) EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global

More information

The World Bank Bangladesh Weather and Climate Services Regional Project (P150220)

The World Bank Bangladesh Weather and Climate Services Regional Project (P150220) Public Disclosure Authorized SOUTH ASIA Bangladesh Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 4 ARCHIVED on 15-Jun-2018 ISR32873

More information

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report Public Disclosure Authorized Public Disclosure Copy AFRICA Malawi Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 14 ARCHIVED on 30-Jun-2016 ISR23059 Implementing Agencies:

More information

The World Bank Vietnam Livestock Competitiveness and Food Safety (P090723)

The World Bank Vietnam Livestock Competitiveness and Food Safety (P090723) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 10 ARCHIVED on 12-May-2016 ISR23483 Implementing Agencies: LIFSAP

More information

The World Bank Stormwater Mgt. and Climate Change Adaptation Project (P122841)

The World Bank Stormwater Mgt. and Climate Change Adaptation Project (P122841) Public Disclosure Authorized AFRICA Senegal Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 9 ARCHIVED on 30-Jun-2017 ISR26846 Implementing

More information

Public Disclosure Copy

Public Disclosure Copy MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Environment & Natural Resources Global Practice Global Environment Project Investment Project Financing FY 2014 Seq No: 9 ARCHIVED on 14-Nov-2018 ISR34575

More information

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Public Sector Governance Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 8 ARCHIVED on 22-May-2015 ISR18498 Implementing Agencies:

More information

The World Bank Stormwater Mgt. and Climate Change Adaptation Project (P122841)

The World Bank Stormwater Mgt. and Climate Change Adaptation Project (P122841) Public Disclosure Authorized AFRICA Senegal Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2012 Seq No: 10 ARCHIVED on 26-Dec-2017 ISR30717

More information

Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384)

Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384) Public Disclosure Authorized Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384) EAST ASIA AND PACIFIC Indonesia Governance Global Practice IBRD/IDA

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Lao People's Democratic Republic Trade & Competitiveness Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 11 ARCHIVED on 08-Sep-2015

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469)

Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Second National Environmental Project - Phase II (P099469) Operation Name: Second National

More information

The World Bank Lesotho Smallholder Agriculture Development Project (P119432)

The World Bank Lesotho Smallholder Agriculture Development Project (P119432) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFRICA Lesotho Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2012

More information

The World Bank Nigeria - Public/Private Partnership Program (P115386)

The World Bank Nigeria - Public/Private Partnership Program (P115386) Public Disclosure Authorized AFRICA Nigeria Trade & Competitiveness Global Practice IBRD/IDA Adaptable Program Loan FY 2011 Seq No: 9 ARCHIVED on 31-Dec-2015 ISR22159 Implementing Agencies: Coordinating

More information

The World Bank Vietnam Industrial Pollution Management Project (P113151)

The World Bank Vietnam Industrial Pollution Management Project (P113151) Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 20-Apr-2018 ISR31553 Implementing

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Africa Global Information/Communications Technology Global Practice IBRD/IDA Adaptable Program Loan FY 2011 Seq No: 7 ARCHIVED on 09-Jun-2015 ISR19619 Implementing Agencies:

More information

Implementation Status & Results Honduras HN Rural Infrastructure Project (P086775)

Implementation Status & Results Honduras HN Rural Infrastructure Project (P086775) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras HN Rural Infrastructure Project (P086775) Operation Name: HN Rural Infrastructure Project

More information

Public Disclosure Copy. Implementation Status & Results Report Pastoralism & Stability in the Sahel and Horn of Africa (PASSHA) (P153713)

Public Disclosure Copy. Implementation Status & Results Report Pastoralism & Stability in the Sahel and Horn of Africa (PASSHA) (P153713) AFRICA Africa Agriculture Global Practice Recipient Executed Activities Investment Project Financing FY 2016 Seq No: 1 ARCHIVED on 30-Nov-2016 ISR26014 Implementing Agencies: Permanent Interstate Committee

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EUROPE AND CENTRAL ASIA Armenia Governance Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 12 ARCHIVED on 27-Jan-2017 ISR26786 Implementing Agencies: Public

More information

Implementation Status & Results Haiti Disaster Risk Management and Reconstruction (P126346)

Implementation Status & Results Haiti Disaster Risk Management and Reconstruction (P126346) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Disaster Risk Management and Reconstruction

More information

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Governance Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 12 ARCHIVED on 29-Jun-2017 ISR28621 Implementing Agencies: Republic

More information

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)

Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation

More information

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)

Public Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150) Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Governance Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 10 ARCHIVED on 12-Aug-2016 ISR24464 Implementing Agencies: BAPPENAS,

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC China Environment & Natural Resources Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 11 ARCHIVED on 21-Dec-2016 ISR26363 Implementing

More information

Environmentally Sustainable Cacao Production for small-scale Indigenous Peoples and Afro-descendant Farmers in Honduras

Environmentally Sustainable Cacao Production for small-scale Indigenous Peoples and Afro-descendant Farmers in Honduras Public Disclosure Authorized Environmentally Sustainable Cacao Production for small-scale Indigenous Peoples and Afro-descendant Farmers in LATIN AMERICA AND CARIBBEAN Agriculture Global Practice Recipient

More information

The World Bank Sustainable Land Management Project (P133133)

The World Bank Sustainable Land Management Project (P133133) Public Disclosure Authorized AFRICA Ethiopia Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 9 ARCHIVED on 04-Dec-2017 ISR28418 Implementing Agencies:

More information

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045)

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Operation Name: Rural Productivity Project (GEF)

More information

The World Bank Liberia: Public Sector Modernization Project (P143064)

The World Bank Liberia: Public Sector Modernization Project (P143064) Public Disclosure Authorized AFRICA Liberia Governance Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 6 ARCHIVED on 06-Feb-2018 ISR30162 Implementing Agencies: Republic of Liberia,

More information

Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523)

Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Haiti Haiti Transport and Territorial Development Project (P095523) Operation Name: Haiti Transport

More information

Public Disclosure Copy. Public Disclosure Copy. The World Bank

Public Disclosure Copy. Public Disclosure Copy. The World Bank Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Sustainable Integrated Ecosystem

More information

The World Bank Nepal Agriculture and Food Security Project (P128905)

The World Bank Nepal Agriculture and Food Security Project (P128905) Public Disclosure Authorized SOUTH ASIA Nepal Agriculture Global Practice Recipient Executed Activities Investment Project Financing FY 2013 Seq No: 11 ARCHIVED on 09-Feb-2018 ISR31347 Implementing Agencies:

More information

The World Bank KI: Telecommunications and ICT Development Project (P126324)

The World Bank KI: Telecommunications and ICT Development Project (P126324) Public Disclosure Authorized EAST ASIA AND PACIFIC Kiribati Transport & ICT Global Practice IBRD/IDA Technical Assistance Loan FY 2013 Seq No: 7 ARCHIVED on 15-Jun-2016 ISR23726 Implementing Agencies:

More information

The World Bank Zambia: Livestock Development and Animal Health Project (P122123)

The World Bank Zambia: Livestock Development and Animal Health Project (P122123) Public Disclosure Authorized AFRICA Zambia Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 12 ARCHIVED on 04-Apr-2017 ISR27399 Implementing Agencies: Public Disclosure Authorized

More information

Public Disclosure Copy

Public Disclosure Copy EAST ASIA AND PACIFIC Lao People's Democratic Republic Trade & Competitiveness Global Practice IBRD/IDA Technical Assistance Loan FY 2013 Seq No: 5 DRAFT ISR20743 Implementing Agencies: Ministry of Industry

More information

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996)

Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996) Operation Name: Rio de Janeiro Mass Transit

More information

Implementation Status & Results Honduras Barrio-Ciudad Project (P088319)

Implementation Status & Results Honduras Barrio-Ciudad Project (P088319) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras Barrio-Ciudad Project (P88319) Operation

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA Bangladesh Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2009 Seq No: 19 ARCHIVED on 20-Dec-2017 ISR30643 Implementing Agencies:

More information

Public Disclosure Copy. Implementation Status & Results Report Carbon Asset Development - Methane Recovery from Waste Mgmt Project (P152805)

Public Disclosure Copy. Implementation Status & Results Report Carbon Asset Development - Methane Recovery from Waste Mgmt Project (P152805) Public Disclosure Authorized EAST ASIA AND PACIFIC Philippines Environment & Natural Resources Global Practice Recipient Executed Activities Investment Project Financing FY 2016 Seq No: 3 ARCHIVED on 07-Feb-2018

More information

Public Disclosure Copy

Public Disclosure Copy MIDDLE EAST AND NORTH AFRICA West Bank and Gaza Water Global Practice Special Financing Emergency Recovery Loan FY 2005 Seq No: 26 ARCHIVED on 24-May-2016 ISR23293 Implementing Agencies: Key Dates Key

More information

AR B.A.URB.TSP (P039584)

AR B.A.URB.TSP (P039584) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR B.A.URB.TSP (P39584) Operation Name: AR B.A.URB.TSP (P39584) Project Stage: Implementation

More information

The World Bank Kenya Agricultural Productivity and Agribusiness Project (P109683)

The World Bank Kenya Agricultural Productivity and Agribusiness Project (P109683) Public Disclosure Authorized AFRICA Kenya Agriculture Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 12 ARCHIVED on 02-May-2016 ISR22925 Implementing Agencies: Ministry of Agriculture,

More information

Implementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038)

Implementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR São Paulo Trains and Signalling (P106038) Operation Name: BR São Paulo Trains and Signalling

More information

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045)

Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Panama Rural Productivity Project (GEF) (P083045) Operation Name: Rural Productivity Project (GEF)

More information

Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077)

Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam URBAN WATER SUPPLY AND WASTEWATER (P119077) Operation Name: URBAN WATER SUPPLY AND WASTEWATER

More information

Implementation Status & Results Jordan Promotion of a Wind Power Market (P093201)

Implementation Status & Results Jordan Promotion of a Wind Power Market (P093201) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Jordan Promotion of a Wind Power Market (P9321) Operation Name: Promotion of a Wind Power Market

More information

Seq No: 1 ARCHIVED on 02-May-2018 ISR31900 Created by: Meng Ying Soo on 19-Mar-2018 Modified by: Johannes Georges Pius Jansen on 19-Apr- 2018

Seq No: 1 ARCHIVED on 02-May-2018 ISR31900 Created by: Meng Ying Soo on 19-Mar-2018 Modified by: Johannes Georges Pius Jansen on 19-Apr- 2018 Public Disclosure Authorized The World Bank SOUTH ASIA Pakistan Agriculture Global Practice Requesting Unit: SACPK Responsible Unit: GFA12 IBRD/IDA Program-for-Results FY 2018 Team Leader(s): Johannes

More information

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)

Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Operation Name: Bahia Integrated

More information

Implementation Status & Results Report MONSTAT: Strengthening the National Statistical System of Mongolia (P113160)

Implementation Status & Results Report MONSTAT: Strengthening the National Statistical System of Mongolia (P113160) Public Disclosure Authorized Public Disclosure Copy EAST ASIA AND PACIFIC Mongolia Economic Policy Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 7 ARCHIVED on 28-Jan-2015 ISR17757 Implementing

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized SOUTH ASIA Nepal Social, Urban, Rural and Resilience Global Practice Global Practice Recipient Executed Activities Investment Project Financing FY 2013 Seq No: 10 ARCHIVED

More information

KENYA: NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (P126321)

KENYA: NATIONAL URBAN TRANSPORT IMPROVEMENT PROJECT (P126321) Public Disclosure Authorized AFRICA Kenya Transport & Digital Development Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 07-Sep-2018 ISR33423 Implementing Agencies:

More information

Implementation Status & Results Argentina AR-GEF Sustainable and Transport and Air Quality Project (P114008)

Implementation Status & Results Argentina AR-GEF Sustainable and Transport and Air Quality Project (P114008) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Argentina AR-GEF Sustainable and Transport and Air Quality Project (P114008) Operation Name: AR-GEF

More information

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165)

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Operation Name: Market

More information

Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966)

Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966)

More information

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Geothermal Power Generation Development

More information

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429)

Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase APL (P082429) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Colombia Disaster Vulnerability Reduction First Phase

More information

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757)

Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Indonesia Geothermal Power Generation Development (P099757) Operation

More information

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Report : ISR1437 Operation Name: CORRIDOR X HIGHWAY

More information

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Key Dates. Project Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions The World Bank LATIN AMERICA AND CARIBBEAN Chile Governance Global Practice Institutional Development Fund FY 2013 Seq No: 3 ARCHIVED on 13-Nov-2015 ISR21160 Implementing Agencies: Dirección Nacional de

More information

Key Dates. Global Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions

Key Dates. Global Development Objectives. Components. Overall Ratings. Implementation Status and Key Decisions Public Disclosure Authorized MIDDLE EAST AND NORTH AFRICA Tunisia Environment & Natural Resources Global Practice Global Environment Project Investment Project Financing FY 2014 Seq No: 9 ARCHIVED on 22-May-2018

More information

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165)

Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Mozambique Market led Smallholder Development in the Zambezi Valley (P093165) Operation Name: Market

More information

Implementation Status & Results Philippines ARMM Social Fund Project (P073488)

Implementation Status & Results Philippines ARMM Social Fund Project (P073488) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Philippines ARMM Social Fund Project (P073488) Operation Name: ARMM Social Fund Project (P073488)

More information

Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989)

Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Nicaragua Nicaragua Rural Telecom (P089989) Operation Name: Nicaragua

More information

Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931)

Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931) Operation Name: Ministry

More information

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005)

Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Serbia CORRIDOR X HIGHWAY PROJECT (P108005) Operation Name: CORRIDOR X HIGHWAY PROJECT (P108005) Project Stage:

More information

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991)

Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Urban Water Supply and Sanitation (P090991) Operation Name: ID-Urban Water Supply and

More information

Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384)

Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS) (P106384) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Statistical Capacity Building-Change and Reform for the Development of Statistics (STATCAP-CERDAS)

More information

Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152)

Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152) Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized Implementation Status & Results Georgia Kakheti Regional Roads Improvement Project (P117152) Operation

More information

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719)

Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Uzbekistan Uzbekistan Bukhara and Samarkand Sewerage Project (P112719) Operation Name: Uzbekistan

More information

Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414)

Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa NELSAP Regional Agricultural Trade and Productivity TA (Phase II) (P115414) Operation Name:

More information

Implementation Status & Results Benin Support to Protected Areas Management (P122419)

Implementation Status & Results Benin Support to Protected Areas Management (P122419) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Support to Protected Areas Management (P122419) Operation Name: Support to Protected Areas

More information

Implementation Status & Results Honduras HN Rural Infrastructure Project (P086775)

Implementation Status & Results Honduras HN Rural Infrastructure Project (P086775) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Honduras HN Rural Infrastructure Project (P086775) Operation Name: HN Rural Infrastructure Project

More information

The World Bank Lesotho Smallholder Agriculture Development Project (P119432)

The World Bank Lesotho Smallholder Agriculture Development Project (P119432) Public Disclosure Authorized AFRICA Lesotho Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 11 ARCHIVED on 03-Apr-2017 ISR26829 Implementing Agencies: Public Disclosure Authorized

More information

Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635)

Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635) o C Operation

More information

Implementation Status & Results Indonesia Barefoot Engineers III (P131387)

Implementation Status & Results Indonesia Barefoot Engineers III (P131387) losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Barefoot Engineers III (P131387) Operation

More information