3 Bowie Ice Arena: Executive Summary Council Meeting Objectives and Methodology At the request of the City of Bowie HG Architects conducted a Due Diligence Evaluation of the existing Ice Arena in Bowie Maryland to assess the current condition of the facility and provide probable facility overhaul and renovation cost to continue to operate the facility for a period of 40 years. In addition to providing an assessment of existing conditions a comparison between the ice program proposed for the Indoor Sports Facility (ISF) and the existing Bowie Ice Arena has been generated. To assess existing conditions a team of Architects and Engineers visited the facility August 3, 2017 to assess existing conditions and review operations with building staff. During this visit the potential existence of mold growth was observed resulting in follow up testing conducted by ECS August 31 st which confirmed the existence of mold growth. The report findings are based on site observations, survey data analysis, existing drawings, discussions with ice arena facility personnel, and HG team s experience with similar projects. We have endeavored to obtain reliable data but are not responsible for the accuracy of information or documentation provided by others. Probable Construction Costs Probable construction costs were evaluated based extending the facility operations 40 years through Items outlined within the scope represent renovations needed to overhaul the facility to extend service life for an additional 40 years. The scope focuses on replacing components and systems to maintain the current program and does not include program upgrades to address changes in market demand. Summary of Findings The facility is located adjacent to Patrick Murtagh Soccer fields and shares the site and parking with Allen Pond Park. The original structure constructed in the early 1970 s consisted of a refrigerated slab located under large pavilion with open sides. Since opening the facility has been modified several times including enclosing the ice rink and expansions to provide locker room space and mechanical rooms. The most recent construction in 2002 added retail space and renovated the main entry area of the facility. The overall condition of the facility was found to be better than would be expected for a facility of this age however many of the facility s components and systems are near or past the end of their Bowie Ice Arena Executive Summary Council Meeting Due Diligence Evaluation

4 expected service life - maintaining operations at the facility will require a substantial capital investment to overhaul the facility. The primary areas of concern are as follows: Existing Program to Indoor Sports Facility Program Comparison: Program Comparison provides a space by space comparison between the proposed Ice Program of approximately 83,700 SF included in the Indoor Sports Facility and the existing 39,900 SF Bowie Ice Arena. The proposed program includes provisions for two ice rinks while the existing facility only includes one resulting in approximately 29,000 SF difference in building area. In addition to the absence a second sheet of ice the existing Ice Arena lacks the appropriate number and size locker room and restroom facilities when compared to the proposed program and what is typically provided for a one rink facility. Additionally spectator seating capacity accommodates approximately 350, less than the 500 indicated in the proposed program and the public or common zone is approximately 2200 sf (40%) less than proposed. Site and Parking: Grading along the north side of the building results in water infiltrating the building with each heavy rain. Installation of a storm water drainage system and regrading is recommended to prevent additional damage to the building. Accessible parking spaces and marked pathways are provided onsite; however, cross slopes for both are not in compliance with accessibility requirements. Additionally the parking lot is not configured to provide a 20 Fire Lane and the Fire Department Connection (FDC) is visually obscured and located more than 150 away from the nearest fire hydrant. Building Envelope: Exterior wall systems are primarily clad with EIFS or Metal Panels and are in fair condition with service life remaining, however, in the case of the metal panel areas provide little to no insulation. Roofing systems are past their service life and staff indicated there are several active leaks. Roofing needs to be replaced in the near term. Structural System: Columns and trusses for the volume enclosing the ice rink are wood and date to the original construction. They show signs of strain and shifting as evidenced by cracked web members and misaligned members and are in need of near term repairs. Structural design requirements have become more stringent in the years since the structural system has been designed. It is believed the existing system has a design capacity well short of current requirements, specifically with regard to snow loading, and long range plans should consider complete reconstruction. Mold growth is evident on the wood trusses and roof deck, air quality testing is recommended to determine the level of hazard to building users and establish remediation requirements. Bowie Ice Arena Executive Summary Council Meeting Due Diligence Evaluation

5 Ice Rink: The existing refrigeration slab has heaved, likely the result of permafrost below. Without mitigating efforts the slab will continue to deform which will result in damage to the refrigeration piping. Both the existing refrigeration plant and dehumidification system are at the end of their respective service life, increased equipment failures placing the facility out of service should be expected as should escalating repair costs. Long range plans should consider replacement of the refrigeration slab and extensive overhaul or replacement to the mechanical systems. Locker Rooms and Restrooms: Locker Rooms are undersized for this size facility and lack sufficient mechanical systems to deliver an adequate quantity of outside air. Restroom water closet and lavatory quantities are also well short of the quantity required by code to serve the calculated occupancy. Accessibility: Accessible elements and pathways have been accommodated within the facility however in numerous instances the existing configuration and clearances are not in accordance with current accessibility requirements. Accessible access to the building entry is accommodated via a mechanical lift requiring assistance from facility staff to operate which is not permitted by current regulations. Additionally required clearances are not provided at several doors and mounting heights for counters, restroom fixtures and many accessories are not in accordance with current regulations. Fire Suppression Systems: Sprinkler piping exhibits signs of rust and corrosion throughout the ice rink venue. Replacement should be considered. Mechanical and Electrical Systems: Mechanical and Electrical Systems including HVAC, Electrical Service, and Lighting are aged with many components at the end of their services life. These systems do not operate as efficient as modern equipment and are lacking automated control systems resulting in increased operating cost. As a result of their age, increased maintenance and repair cost should be expected. Long range plans should consider system replacement and upgrade. Bowie Ice Arena Executive Summary Council Meeting Due Diligence Evaluation

6 Probable Construction Cost Facility Overhaul & Renovation - Extended Life Span (40 Year) Site $1,301,000 Building Envelope $2,927,000 Structural Systems $968,000 Architectural Systems $3,353,000 Mechanical Systems $4,657,000 Subtotal $13,207,000 Design Contingency 10% $1,321,000 $14,528,000 Escalation to % $1,453,000 Probable Construction Cost $15,981,000 Owner Carried Soft Cost 40% $6,392,000 Total Project Cost $22,373,000 Facility Overhaul & Renovation Extended Life Span (40 year) Facility Overhaul and Renovation to extend operations through 2057 (40 years), this scope represent renovations needed to overhaul the facility to extend service life for an additional 40 years. The scope does not include program upgrades to address changes in market demand. A full facility shutdown is required to complete the overhaul. A construction duration of months is anticipated. Probable Construction Cost figures above capture cost of construction only and do not include project management, design and permitting expenses or owner contingency funds. Total Project Cost do not include revenue impact associated with closing the facility during construction. Escalation has been calculated to the estimated midpoint of construction based construction starting in the 2nd quarter of 2019 and lasting approximately 18 months. Bowie Existing Ice Rink 9/13/ of 1

7 M E M O R A N D U M TO: FROM: SUBJECT: City Council Alfred D. Lott, CPM City Manager Special City Election Indoor Sports Facility Referendum Question DATE: September 12, 2017 At the City Council meeting held on June 19, 2017 Council instructed staff to provide information on the process and cost of a Special City Election for the Indoor Sports Facility Referendum question. Staff has prepared the information which is contained in this memo. Per Section 32 of the City Charter all special city elections shall be conducted by the Board of Supervisors of Elections in the same manner and with the same personnel, as far as practicable, as regular city elections. With that said the Board and the City Clerk would require at least a minimum of 6 months to prepare for the special election. If Council decides to proceed with the special election, it is recommended that it be held on April 10, The City uses eight polling locations throughout the City, two per district. As of this date, all polling locations will be available to be used on April 10, 2018 except for Christian Community Presbyterian Church (District 2A). The Board will have to locate another suitable location in close proximity, which might be difficult. The estimated cost of the special election would be about $48,000. Below is the breakdown of expenses: Voting Machines & Ballot Preparation $22,000 Mailing of Voter Notification Cards (40,439) & Support from $19,000 County BOE (2) Compensation for Election Judges (40) and SBE (7) $7,000 The vendor the City currently uses for the equipment is not able to do a ranked choice method of voting, so the question on the ballot can be either a simple yes or no question or it could provide an array of questions for the voter.

8 Bowie Indoor Sports Facility Program & Cost: PEMB Construction-Reduced Program Option 3: Single Ice Sheet Only Description Reduced Program-Option 3 Conceptual Cost: PEMB Construction Common Zone Unit Area (SF) Quantity Total Area (SF) Unit Cost Total Cost Lobby / Welcome / Social Areas 1, ,600 $167 $267,200 Café Serving Counter $167 $16,700 Preparation/Warming Kitchen $511 $153,300 Pantry/Storage $167 $33,400 Seating Area 2, ,000 $167 $334,000 Community Area $167 Community/Party Rooms ,200 $167 $200,400 Storage $157 $15,700 Public Toilet Men's Toilet $167 $83,500 Women's Toilet $167 $83,500 Universal Toilet $167 $20,040 Administration Control/Info/Membership Desk $167 $41,750 Facility Manager Office $167 $20,040 Asst Manager Office $167 $16,700 Business Office $167 $0 Program Office $167 $16,700 Open Work Stations $167 $21,376 Work Room $167 $25,050 Conference Room $167 $0 Subtotal Community Zone 7,468 $1,349,356 Indoor Ice Zone Unit Area (SF) Quantity Total Area (SF) Unit Cost Total Cost Service Desk $167 $0 Lobby / Welcome Area $167 $0 Ice Offices $167 $16,700 Skate & Equipment Rental $167 $83,500 Proshop/Retail $167 $83,500 Skate Changing Area 0 0 $167 $0 DJ Area $167 $10,688 Ice Ice Rink # 1: NHL Size 85' W X 200' L (includes 800 spectator seating, team boxes and circulation) 27, $333 $0 Ice Rink # 2: NHL Size 85' W X 200' L (includes 200 spectator seating, team boxes and circulation) 26, ,000 $333 $8,658,000 Zamboni and Equipment Storage 1, ,500 $157 $235,500 General Toilet Men's Toilet $167 $104,375 Women's Toilet $167 $104,375 Locker Areas Team Locker Rooms ,000 $197 $394,000 Alternate Girls Locker Rooms ,000 $197 $197,000 Coaches & Referee Rooms $197 $88,650 Ice Area Storage $167 $100,200 Subtotal Indoor Ice 33,964 $10,076,488 Indoor Court Zone Unit Area (SF) Quantity Total Area (SF) Unit Cost Total Cost Service Desk $167 $0 Court Offices $167 $0 Gymnasium/s 4- Basketball Court Area (Tournament Area) w/ 4 overlaid volleyball courts 21, $267 $0 4-Court Storage $157 $0 1-Basketball Court Area (Multipurpose court) w/ 2 overlaid volleyball courts 12, $267 $0 1-Court Storage $157 $0 Fitness Zone Fitness & Weights (Sports Performance Training) 2, $196 $0 Group Exercise Room (Group X Room) 1, $196 $0 Multipurpose Rooms 1, $196 $0 Locker Rooms Men's Locker Room $208 $0 Women's Locker Room $208 $0 Universal Locker Room $208 $0 Elevated Track at 3-court area (1/10 mile) 6, $112 $0 Elevator & Stairs associated with Track $312 $0 Subtotal Indoor Court 0 $0 Support Zone Unit Area (SF) Quantity Total Area (SF) Unit Cost Total Cost Maintenance Office $157 $15,700 General Building Storage $157 $62,800 Electrical Room $157 $70,650 Mechanical Room 2, ,000 $157 $314,000 Sprinkler Room $157 $62,800 Data & IT $157 $37,680 Vending Areas $157 $31,400 Janitor Closets $157 $23,550 Subtotal Support 3,940 $618,580 Total Net Area 45,372 Unit Cost $12,044,424 Unassigned Area (Circulation & Walls) 10% 4,991 $167 $833,484 Total Building Area 50,363 $256 $12,877,908 Total Site Cost $3,449,850 Probable Costruction Cost $16,327,758 Owner Carried Soft Cost (40%) $6,531,103 Total Project Cost $22,858,861

9 MEMORANDUM To: From: Subject: City Council Alfred D. Lott Indoor Sports Facility Date: June 14, 2017 The purpose of this communication is to brief you on a very significant turn of events related to the construction of the Bowie Indoor Sports Facility (BISF). Problem: Hughes Group Architects have informed the City s BISF Planning Team that the potential cost of the new facility is estimated between $36,145,000 and $38,856,000 depending on the type of construction used. The budget approved in the FY 2018 budgeted was $23,700,000 for the construction portion of this project. Background: a. In May of 2013, Sports Facility Advisory (SFA) completed and presented a Feasibility Study regarding the Bowie Indoor Sports Facility to City Council. From this data, the City concluded that the total cost would be approximately $28,000,000 minus construction inflation. b. In September of 2016, the City selected and hired Hill International as project manager of the BISF construction project. c. In February of 2017, the City selected and hired Hughes Group Architect to perform architectural, engineering and design service to the City regarding the BISF. d. On April 25, 2017, Hughes Group s senior architect, Amado Fernandez, informed the City s BISF Planning Team that in their professional opinion, the City s construction cost estimates were very low. They estimate that the construction will cost between $36,145,000 and $38,856,000 depending on the type of construction used. The budget approved in the FY 2018 budget proposes $23,700,000 for the construction portion of this project. Options: The City s BISF Planning Team developed some options for the City Council to consider. A quick listing is presented below. The same list, which includes a more detailed analysis, is attached (see Attachment 1). They are as follows: a. Project can be cancelled altogether and a professional engineer hired to determine how much it would cost to upgrade the existing City Ice Rink. b. Project proceeds with original program of five courts and two ice rinks. Cost - $36,145,000 to $38,856,000 depending on type of construction.

10 2 c. Reduce program to three courts and one ice rink. Cost - $23,072,000 d. Reduce program to two ice rinks and no courts. Cost - $24,401,000. e. Reduce program to five courts and no ice rinks. Cost - $16,500,000 f. Select one of the reduced options offered above and move the location of the facility to a location more central in the City (e.g. Glen Allen Park, other). g. Project can be referred to referendum. Council Questions Since becoming aware of this issue, City Council has raised a number of questions as follows: a. What is the return on the current ice rink and projection for the new ice rink? Attachment 2 provides information on the Facility Cost Recovery Analysis for the past three fiscal years. This does not include capital costs. Attachment 3 provides the projections from SFA for cost recovery for future year operations for the gymnasium and ice rink. This does not include debt service costs. b. Can the new facility be self-sufficient/self-standing? If yes, when? Attachment 3 from the SFA study shows the expected cost recovery for future operations. It shows that the cost recovery for the gymnasium would be 39% to 60% over a five year period and the cost recovery for the ice rink would be 70% to 84% over a five year period. The SFA study also indicates that rates would need to be raised at each facility to achieve these cost recovery projections, particularly at the gymnasium. Under the SFA projections, both the gymnasium and the ice rink would receive a subsidy from the City. c. What is the cost to renovate the current ice facility with an Olympic sheet of ice versus an NHL sheet of ice? Without an analysis by a professional engineer, staff is unable to provide this information. If Council is interested in obtaining this information, it would cost approximately $105,000 to perform this analysis and take approximately four weeks to do this analysis. d. Provide a breakdown showing which facilities cover their expenses and the percentage they do including the ice rink, gymnasium, senior center, mansion and museums, golf course and the turf and ball fields. See attachment 2 that provides this breakdown. The City has leased the golf course and has not incurred operating costs for the operation of this facility, so the golf course is not shown on this analysis. e. When was the plan to expand the original rink originally discussed? Attachment 4 provides a summary of the history of the ice rink development. Community Notification Staff provided detailed background information regarding this matter to the Community Recreation Council (CRC) and the Bowie based users of both the gymnasium and the ice rink. Furthermore this meeting has been extensively advertised through the various mechanisms the City uses to advertise important events.

11 3 Staff Recommendation Given the options presented above and on Attachment A, staff recommends that City Council choose Option F to construct three courts and one ice rink on Glen Allen Park for an estimated construction cost of $23,072,000. If Council does not wish to pursue this option, staff then recommends that this matter be referred to referendum. ADL/JLF/adf Attachments

12

13

14

15

16

17

18

Long Bridge Park County Board Work Session

Long Bridge Park County Board Work Session Long Bridge Park County Board Work Session April 12, 2016 Long Bridge Park April 12 th Agenda 1. Long Bridge Park Location and Context 2. Long Bridge Park History and Phases 3. Recap of March 2015 Board

More information

ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015

ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015 ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015 TABLE OF CONTENTS PROGRAM SUMMARY DESIGN EXPLORATION EXISTING SITE PLAN - ANALYSIS DEMOLITION SITE PLAN PROPOSED SITE PLAN PROPOSED FLOOR PLANS DEMOLITION

More information

Architect and Engineer: Friar Associates inc.

Architect and Engineer: Friar Associates inc. Architect and Engineer: Friar Associates inc. BACKGROUND In June, after soliciting and interviewing several professional firms, Friar Associates was hired to perform an Existing Conditions Survey and Facilities

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 Y DATE: December 6-8, 2016 ****************************************************************************** SUBJECT: SDSU Student Wellness

More information

LANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent

LANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent RENOVATION PRELIMINARY DESIGN PRESENTATION The Board of Education of Baltimore County Verletta White, Interim Superintendent AGENDA 2 Project Location General Information Existing Conditions Structural

More information

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 X DATE: December 6-8, 2016 ****************************************************************************** SUBJECT: South Dakota State University

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 I DATE: May 9-11, 2017 ****************************************************************************** SUBJECT: SDSU Harding Hall Renovation

More information

SUDBURY COMMUNITY ARENA

SUDBURY COMMUNITY ARENA SUDBURY COMMUNITY ARENA Presentation March 31 st, 2015 SUDBURY COMMUNITY ARENA Presentation March 31 st, 2015 PREPARED FOR PREPARED FOR Executive Summary In order to compare a new build OHL arena with

More information

Field House Proposal

Field House Proposal Field House Proposal For Experienced Dependable Resourceful 5802 Akron Cleveland Rd. Hudson, OH 44236 Table Of Contents Cost Projection 3 Funding Summary 4 Site Plan 5 Field House Layout 6 Field House

More information

KETTERING ICE ARENA STRUCTURAL & MEP STUDY

KETTERING ICE ARENA STRUCTURAL & MEP STUDY KETTERING ICE ARENA STRUCTURAL & MEP STUDY PREPARED BY: HEAPY ENGINEERING MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY 1400 WEST DOROTHY LANE DAYTON, OHIO 45409-1310 HEAPY PROJECT NO. 2013-07046 MARCH,

More information

Yardmen Arena Expansion & Renovation Project Update

Yardmen Arena Expansion & Renovation Project Update For Immediate Release 25, September,2017 Yardmen Arena Expansion & Renovation Project Update BELLEVILLE ON With 33 days until puck drop of the home opening game of the American Hockey League s Belleville

More information

MAINTENANCE & OPERATIONS

MAINTENANCE & OPERATIONS MAINTENANCE & OPERATIONS Department Goal The goal of the Maintenance & Operations Department for the - Capital Improvement Budget/Program is to maintain, refurbish or upgrade municipal facilities to maximize

More information

Health Life Safety Survey and Master Facilities Plan

Health Life Safety Survey and Master Facilities Plan Health Life Safety Survey and Master Facilities Plan Community Presentation Board Meeting June 22, 2015 June 22, 2014 Board Presentation Overview and Summary of the Health Life Safety Survey and Master

More information

Assessment Report Burgess Park Gymnasium. Summary

Assessment Report Burgess Park Gymnasium. Summary Assessment Report Burgess Park Gymnasium Summary The existing Burgess Park Gymnasium is an approximately 17,460 gross square feet singlestory structure built of concrete, wood and steel. The building,

More information

55 Bishop Long Log Cabin Planning Zone 3

55 Bishop Long Log Cabin Planning Zone 3 55 Bishop Long Log Cabin Planning Zone 3 9385 Pardee Road Visit Date: September 2016 St. Louis County Parks Master Plan Page 1 Description: The Bishop Long Log Cabin site is 2.19 acres of woodlands with

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

CITY OF NOVI. Police Department

CITY OF NOVI. Police Department CITY OF NOVI Police Department Indoor Gun Range and Training Facility Assessment Analysis with Master Plan for Novi Police Department at Community Build Out Field Services Complex Facility Needs Master

More information

College of the Desert Athletics Facilities

College of the Desert Athletics Facilities College of the Desert Athletics Facilities C13-005-PID-01 The LEED Gold project will include a new gymnasium, new tennis courts, renovation of an existing shower and locker building, and an upgrade of

More information

11 - Bissell House. St. Louis County Parks Master Plan. Planning Zone 2

11 - Bissell House. St. Louis County Parks Master Plan. Planning Zone 2 11 - Bissell House 10255 Bellefontaine Road St. Louis County Parks Master Plan Planning Zone 2 Visit Date: July 2016 Page 1 Description: Bissell House is located a mile south of Highway 270 on Bellefontaine

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking

More information

School Assessment Report

School Assessment Report School Assessment Report School: Carver High School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:23 AM FOR OFFICIAL USE ONLY Final School Assessment Report

More information

Facility Improvements

Facility Improvements CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation

More information

Superintendent Proposed Capital Improvements Program. Fiscal Years

Superintendent Proposed Capital Improvements Program. Fiscal Years Superintendent Proposed Capital Improvements Program Fiscal Years 2019-2024 TABLE OF CONTENTS Summary Page 1 Capital Projects Pages 2-7 Capital Projects Description Pages 8-12 SUPERINTENDENT PROPOSED CAPITAL

More information

Piping system (steam, hot water, chilled water system) including pipe and duct insulation needs replacement.

Piping system (steam, hot water, chilled water system) including pipe and duct insulation needs replacement. NW Corridor Transit Planning Union Station Existing Conditions Technical Memorandum (Physical and Operational Assessments) Executive Summary Capitol Region Council of Governments Prepared in cooperation

More information

SHEPHERD ELEMENTARY SCHOOL

SHEPHERD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1932 BUILDING AREA 79,700 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 355 WARD 4 PROPOSED PROGRAM CAPACITY 400 Site Plan SHEPHERD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Corsicana High School

Corsicana High School Contents Corsicana High School...2 General comments, campus capacity, and student demographics...2 1.0 School Site...4 2.0 Building Systems and Components...6 3.0 Building Safety and Security...19 4.0

More information

Timberglen Recreation Center Summary

Timberglen Recreation Center Summary Timberglen Recreation Center Summary Address Building Purpose 3810 Timberglen Road Dallas, TX 75287 Recreation Center Original Year of Construction 2003 Building Area 15,000 SF Inspection Date August 2,

More information

FACILITY ASSESSMENT PRESENTATION 11 October SCHRADERGROUP architecture

FACILITY ASSESSMENT PRESENTATION 11 October SCHRADERGROUP architecture FACILITY ASSESSMENT PRESENTATION 11 October 2017 SCHRADERGROUP architecture AGENDA 1. 1 Facility Assessment Review 2. 2 Prioritizing the Scope of Work with Associated Costs 3 Timeline of Work 3. 4 Procurement

More information

Memorandum. Table 1 Trip Generation for Revised Plan. ITE Average A.M. Peak Hour P.M. Peak Hour

Memorandum. Table 1 Trip Generation for Revised Plan. ITE Average A.M. Peak Hour P.M. Peak Hour Memorandum 2400 Pershing Road Suite 400 Kansas City, MO 64108 Tel 816 329 8600 Fax 816 329 8601 www.transystems.com To: Mr. Scott Buescher Price Brothers Realty 12721 Metcalf Ave., Suite 200 Overland Park,

More information

Facility Assessment Report, Montgomery Independent School District

Facility Assessment Report, Montgomery Independent School District NATATORIUM CAMPUS DATA NATATORIUM 22628 Hwy 105 West, Montgomery TX 77356 Year Built 2009 Approx. Total Square Footage Grades Served 30,420 n/a Current Enrollment n/a Building Levels 1 1 MASTER PLAN 2

More information

Lake Highlands North Recreation Center Summary

Lake Highlands North Recreation Center Summary Lake Highlands North Recreation Center Summary Address Building Purpose 9940 White Rock Trail Dallas, TX 75238 Recreation Center Original Year of Construction 1971 Building Area 33,036 SF Inspection Date

More information

BUILDING FOR OUR FUTURE

BUILDING FOR OUR FUTURE MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE ADDRESSING THE DISTRICT S CRITICAL FACILITY AND SITE NEEDS CURRENTLY THE BAND-AID APPROACH COSTS MONEY

More information

Civil District Court Parish of New Orleans. Image Courtesy of EDR MA. Renovation & Utilization Feasibility

Civil District Court Parish of New Orleans. Image Courtesy of EDR MA. Renovation & Utilization Feasibility Civil District Court Parish of New Orleans Image Courtesy of EDR MA Renovation & Utilization Feasibility Challenges with Courthouse Design Courthouse Space Standards and Requirements Charity Hospital Building

More information

BENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY

BENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY BENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY Prepared for the City of Benson, Minnesota by Widseth Smith Nolting May 2016 City of Benson, Minnesota CITY HALL/POLICE STATION

More information

Space Program & Concept Design

Space Program & Concept Design Rossmoor&Del&Valle&Aqua/cs,&Sports&&&Fitness&Complex& Space Program & Concept Design Presentation to FCAC & AAC July 8, 2015 Programming Allocation of available square footage Programming Considerations:

More information

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades $300,000 C. Tilden Entrance Upgrades $50,000 D. Door and Glass Improvements $500,000 E. Alert Systems $800,000

More information

3 Sylvan Springs Park

3 Sylvan Springs Park 3 Sylvan Springs Park 300 Halsey Road Parks Master Plan Planning Zone 3 Visit Date: September 2016 Page 1 Located in close proximity to Jefferson Barracks National Cemetery in south, the 70 acres of park

More information

buildings. design of post-frame gyms and multipurpose

buildings. design of post-frame gyms and multipurpose Research + Technology Xxxxx design of post-frame gyms and multipurpose buildings by Timothy Royer, PE, and Amanda Stauffer Post-frame construction is ideal for non-code-exempt buildings of many shapes

More information

DENNIS TOWNSHIP FEASIBILITY STUDY

DENNIS TOWNSHIP FEASIBILITY STUDY DENNIS TOWNSHIP FEASIBILITY STUDY October 29, 2015 TABLE OF CONTENTS I. INTRODUCTION II. EXECUTIVE SUMMARY III. GENERAL FACILITY DATA A. Primary School B. Elementary / Middle School IV. FACILITIES ASSESSMENT

More information

Project Information. Nominations of Artists. University of Houston

Project Information. Nominations of Artists. University of Houston UNIVERSITY OF HOUSTON SYSTEM SYSTEM WIDE ART ACQUISTION COMMITTEE AGENDA ITEM ITEM: UH University Center Transformation Project Artwork-Artists Nominations DATE PREVIOUSLY SUBMITTED: NA SUMMARY: Nominations

More information

ARCH 5901 A02 Office Building Program FALL 2015

ARCH 5901 A02 Office Building Program FALL 2015 Assignment A02: Office Building Program ARCH 5901 Instructor: Glenn Hill TASK: Develop a program for your Office Building. Include diagrams and images on the Tectonic, Cultural, Social and Aesthetic of

More information

General Objectives of Phase. Phase Task Checklist Integral Consulting Page 1 Schematic Design Checklist. Action

General Objectives of Phase. Phase Task Checklist Integral Consulting Page 1 Schematic Design Checklist. Action Project Number: Prepared By: Action General Objectives of Phase Drawings and other documents indicating the scale and relationships of Project components in conformance with program Building areas and

More information

Laker Hall Program Study Intercollegiate Athletics. Preferred Concept & Project Phasing SUCF Project No

Laker Hall Program Study Intercollegiate Athletics. Preferred Concept & Project Phasing SUCF Project No Laker Hall Program Study Intercollegiate Athletics Preferred Concept & Project Phasing SUCF Project No. 101009 26 January 2017 Agenda Preferred Concept - Existing Site Plan - Existing Floor Plans - Space

More information

HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014

HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014 HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014 1. Upgrade Video Security and Surveillance Systems - Replace with New a. Existing

More information

BRUCE-MONROE ELEMENTARY SCHOOL AT PARK VIEW MODERNIZATION HISTORIC PRESERVATION REVIEW

BRUCE-MONROE ELEMENTARY SCHOOL AT PARK VIEW MODERNIZATION HISTORIC PRESERVATION REVIEW HISTORIC PRESERVATION REVIEW submitted to: DC Historic Preservation Office Office of Planning ARCHITECTS ARCHITECTURAL NARRATIVE Bruce Monroe Elementary School at Park View is among the schools included

More information

FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY

FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY DATE: November 20, 2012 SDSU requests approval of this Facility Design Plan to continue planning the

More information

MADISON HIGH SCHOOL // Executive Summary

MADISON HIGH SCHOOL // Executive Summary MADISON HIGH SCHOOL // Executive Summary community + wrap-around services arts courtyard arts commons courtyard commons entry Construction Cost $95,000,000 Student Design Capacity 1,700 Project Cost $145,909,717*

More information

Civic Center Renovation News

Civic Center Renovation News Civic Center Renovation News February 15, 2015 Virginia Avery of Wells, ME was the first guest to enter the newly renovated Civic Center at the Maine Home, Remodeling and Garden Show! She was presented

More information

Moonlight Architecture, Inc. Architecture Interior Design Site Planning

Moonlight Architecture, Inc. Architecture Interior Design Site Planning Moonlight Architecture, Inc. Architecture Interior Design Site Planning 22 May 2018 18057 Mr. Michael J. Petit de Mange, County Administrator Kent County Levy Court 555 Bay Road Dover, DE 19901 RE: Facilities

More information

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment Summary of Findings The Matthew A. Henson ES Facility located at 1600 N. Payson Street in Baltimore, Maryland, was built in 1964. It comprises 75,228 gross square feet. The total current deficiencies for

More information

Mills Elementary School Site Summary

Mills Elementary School Site Summary 1 Mills Elementary School Site Summary Address 6201 Davis Lane Austin, TX 78749 Number of Permanent Campus Facilities 1 Original Year of Construction 1998 Total Campus Building Area (combined) 81,368 SF

More information

DAVIS ELEMENTARY SCHOOL

DAVIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1943 BUILDING AREA 71,100 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 227 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan DAVIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-

More information

Cazenovia Central Schools Proposed Building Project Information Session December 17, 2013

Cazenovia Central Schools Proposed Building Project Information Session December 17, 2013 Cazenovia Central Schools Proposed Building Project Information Session December 17, 2013 Information Session Agenda Background. Scope of work and why these renovations are important. Project cost. How

More information

Montague DPW Facility Planning Committee Public Works Facility Public Information Session. April 4, Photo Credit: Recorder

Montague DPW Facility Planning Committee Public Works Facility Public Information Session. April 4, Photo Credit: Recorder Montague DPW Facility Planning Committee Public Works Facility Public Information Session April 4, 2017 Photo Credit: Recorder 500 Avenue A Tour Agenda Meet the Committee and Engineer Presentation of Project

More information

Edmonton Public School District No. 7

Edmonton Public School District No. 7 EXECUTIVE SUMMARY 1. Overall Impressions The 1966 non-core school has actively pursued an ongoing maintenance and upgrade program to improve a number of past problem areas within the school. Extensive

More information

NYC Department of Education

NYC Department of Education Building Assessment Survey 2017-2018 Asset: SAINT FRANCIS COLLEGE - BROOKLYN, 180 REMSEN STREET, New York, 11201 Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior 2018-02-05

More information

Over the succeeding meetings there was discussion concerning the performing arts center options presented in the report.

Over the succeeding meetings there was discussion concerning the performing arts center options presented in the report. The Board of Directors of the Central Springs Community School District approved proceeding to construct an auditorium at the high school site at their regular June, 2018 meeting. Over the past few years

More information

MCER Study for Little Powder K-8

MCER Study for Little Powder K-8 MCER Study for Little Powder K-8 CCSD #1 Little Powder K-8 Weston, WY Wyoming School Facilities Department Cheyenne, WY TSP, Inc. Sheridan, WY May 16, 2016 Table of Contents Introduction 3 Goals and Objectives

More information

KILLARNEY SENIORS CENTRE

KILLARNEY SENIORS CENTRE KILLARNEY SENIORS CENTRE DESIGN-BUILD CONTRACT AWARD February 22, 2016 Recommendation THAT the Vancouver Park Board approve the award of a contract with Ventana Construction Company as the Design-Builder

More information

Architectural Inspection Site Structures

Architectural Inspection Site Structures 0141 Freestanding Shelters Open air shelters not attached to the building Covered play structure consisting of concrete foundations, concrete slab on grade floor, concrete columns, plywood surfaced wood

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls

More information

LUFacilities Policy Service Level Agreement v1.1

LUFacilities Policy Service Level Agreement v1.1 PURPOSE The Service Level Agreement (SLA) for University provides a detailed list of services offered by the LU Department. The SLA identifies which services are funded by the approved Lehigh University

More information

Delco Activity Center Site Summary

Delco Activity Center Site Summary 1 Site Summary Address 4601 Pecan Brook Austin, TX 78724 Number of Permanent Campus Facilities 1 Original Year of Construction 2003 Total Campus Building Area (combined) 60,294 SF Introduction The is located

More information

NAGLE HARTRAY ARCHITECTURE GILBANE BUILDING. MANAGEMENT BOE Business Meeting September 15, Comprehensive Study. North Shore School District 112

NAGLE HARTRAY ARCHITECTURE GILBANE BUILDING. MANAGEMENT BOE Business Meeting September 15, Comprehensive Study. North Shore School District 112 NAGLE HARTRAY ARCHITECTURE GILBANE BUILDING C O M P A N Y P R O J E C T MANAGEMENT A D V I S O R S BOE Business Meeting September 15, 2015 Comprehensive Study North Shore School District 112 2 Middle School

More information

STILLWATER COUNTY COURTHOUSE ALTERNATE 1

STILLWATER COUNTY COURTHOUSE ALTERNATE 1 STILLWATER COUNTY COURTHOUSE ALTERNATE 1 ALTERNATE 1: The current plan developed for the Old Hospital will bring all County services into this facility except for the following: 1. Sheriff, 2. County Attorney,

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 6 O DATE: December 5-7, 2017 ****************************************************************************** SUBJECT USD Dakota Dome Renovation

More information

CLASS A OFFICE BUILDING

CLASS A OFFICE BUILDING Century Management Company 1 E n t e r p ri s e Wa y, Ro s e v i l le, CA V I N E YA R D P O I N T E B U S I N E S S P A R K SF, - ±6 e, ±2 abl Avail TWO-STORY CLASS A OFFICE BUILDING Ro s e v i lle, CA

More information

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School HILLSIDE ELEMENTARY SCHOOL Overview: The is located at 98 Belmont Drive and consists of a two-story building which has had a number of additions added to it over the years, the latest of which was a two-story

More information

Administration Building Needs Assessment

Administration Building Needs Assessment Town Hall Meeting with the Habersham County Board of Commissioners Administration Building Needs Assessment JUNE 13, 2016 Detailed Evaluation Performed in 2015 Engineering Evaluation Site/Civil Architectural

More information

Section 1: Choose Your Center Type

Section 1: Choose Your Center Type Section 1: Choose Your Center Type The business of bowling is comprised of four types of business models. It is critical in today s business to understand the business models in the industry and what the

More information

PLUMBING FIXTURES. I. The following guideline shall be used when determining the minimum required number of the plumbing fixtures:

PLUMBING FIXTURES. I. The following guideline shall be used when determining the minimum required number of the plumbing fixtures: INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LABC Sec. 2901 Effective: 7-21-03 DOCUMENT NO. P/BC 2002-095 Revised: Previously Issued As: none PLUMBING FIXTURES Section 2901 of the Building

More information

ROD Grant Round 4 Presentation June 9, 2014

ROD Grant Round 4 Presentation June 9, 2014 ROD rant Round 4 Presentation June 9, 2014 713 Creek Road Bellmawr, NJ 08031 Telephone (856) 396-6200 Facsimile (856) 396-6205 Please visit us on the web at www.garrisonarch.com 2 Agenda NJDOE Application

More information

RAYMOND EDUCATION CAMPUS

RAYMOND EDUCATION CAMPUS INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Paulsboro Public Schools

Paulsboro Public Schools BOND REFERENDUM PRESENTATION January 27, 2015 713 Creek Road Bellmawr, NJ 08031 Telephone (856) 396-6200 Facsimile (856) 396-6205 Please visit us on the web at www.garrisonarch.com 1 05-12-14 AGENDA NJDOE

More information

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director of Planning and Capital Division

Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director of Planning and Capital Division Date November 1, 2017 To: Through: From: Recreation and Park Commission Capital Committee Philip A. Ginsburg, General Manager Dawn Kamalanathan, Director of Planning and Capital Division Brett Desmarais,

More information

Facility Study Update

Facility Study Update Facility Study Update January 18, 2016 Providing a Client Oriented Approach to Architecture Crabtree, Rohrbaugh & Associates, Architects Focus Groups Forums Surveys Revise / Refine Engagement Strategic

More information

PROPOSITION R Citizen s Bond Oversight Committee

PROPOSITION R Citizen s Bond Oversight Committee PROPOSITION R Citizen s Bond Oversight Committee June 15, 2011 Southwestern Community College District 900 Otay Lakes Road, Room L246 Chula Vista, CA 91910 Proposition R AGENDA 1. Call to Order / Roll

More information

Structural Inspection

Structural Inspection General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

Pre-schematic Considerations. Who. What. Where

Pre-schematic Considerations. Who. What. Where Who What Where Who, What & Where Who are the users? Church School Manufacturers Researchers Who, What & Where What is the purpose? Fellowship Teaching Manufacturing Production Who, What & Where Location,

More information

County of Santa Cruz %

County of Santa Cruz % County of Santa Cruz % PROBATION DEPARTMENT P.O. BOX 1812, SANTA CRUZ, CA 95061-1812 (831) 454-2150 FAX: (831) 454-3035 JOHN P. RHOADS CHIEF PROBATION OFFICER December 3,1999 Agenda: December 14, 1999

More information

A Summary of the Four Options Under Consideration for Colorado State University s Football Stadium

A Summary of the Four Options Under Consideration for Colorado State University s Football Stadium A Summary of the Four Options Under Consideration for Colorado State University s Football Stadium October 2014 Preamble This summary booklet is provided by Colorado State University to enable decision

More information

NEW FOUR STORY MIXED USE RESTAURANT, RETAIL, LODGING, AND OFFICE BUILDING OWNER S PROJECT REQUIREMENTS

NEW FOUR STORY MIXED USE RESTAURANT, RETAIL, LODGING, AND OFFICE BUILDING OWNER S PROJECT REQUIREMENTS NEW FOUR STORY MIXED USE RESTAURANT, RETAIL, LODGING, AND OFFICE BUILDING OWNER S PROJECT REQUIREMENTS TABLE OF CONTENTS Introduction Page 2 Project Description Page 2 Owner s Directives Page 4 Design

More information

Our Students. Our Schools. Our Future.

Our Students. Our Schools. Our Future. HARRISON CENTRAL SCHOOL DISTRICT PROPOSED CAPITAL IMPROVEMENTS Our Students. Our Schools. Our Future. VOTE OCTOBER 18, 2016 At your local elementary school WHAT IS THE NEED FOR A BOND REFERENDUM? Bonding

More information

Board Work Session Feasibility Study. January 9, 2017

Board Work Session Feasibility Study. January 9, 2017 Board Work Session Feasibility Study January 9, 2017 1 Process Staff Input Sessions at all schools What can you tell us about your building, your site, your space? Group collaboration exercise looking

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Status of Fire Station Upgrade. December 8, 2016

Status of Fire Station Upgrade. December 8, 2016 Status of Fire Station Upgrade December 8, 2016 Division Street until 1971 Current Facility since fall of 1971 Starting Construction - 1970 Proposed Facility - 2018 Motivation 1994 Facility Report on Safety

More information

43 Faust Park. St. Louis County Parks Master Plan. Planning Zone 5

43 Faust Park. St. Louis County Parks Master Plan. Planning Zone 5 43 Faust Park 15185 Olive Boulevard Master Plan Planning Zone 5 Visit Date: August 2016 Page 1 43 Faust Park 15185 Olive Boulevard Master Plan Planning Zone 5 Visit Date: August 2016 Page 2 Description:

More information

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

Facilities Feasibility Study Frederick Douglass HS Condition Assessment Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies

More information

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING

More information

Expanding Your Development & Investment Perspectives 159,000 SF Building Profile

Expanding Your Development & Investment Perspectives 159,000 SF Building Profile Expanding Your Development & Investment Perspectives 159,000 SF Building Profile Metal & EIFS Exterior Finish 150,000 SF Production/Warehouse 4,500 SF Office & 4,500 SF Mezzanine 50 x 50 Bays, 24 Clear

More information

LOS ANGELES UNIFIED SCHOOL DISTRICT Policy Bulletin

LOS ANGELES UNIFIED SCHOOL DISTRICT Policy Bulletin TITLE: NUMBER: ENERGY AND RESOURCE CONSERVATION POLICY ROUTING All Employees All Locations ISSUER: DATE: June 8, 2015 Mark Hovatter, Chief Facilities Executive Facilities Services Division POLICY: The

More information

6 Upper Buder Park. St. Louis County Parks Master Plan. Planning Zone 4

6 Upper Buder Park. St. Louis County Parks Master Plan. Planning Zone 4 6 Upper Buder Park 215 Valley Park Road Planning Zone 4 Visit Date: August 2016 Page 1 Upper Buder Park is located at 215 Valley Park Road in mid-south St. Louis County on approximately 24 acres of land.

More information

GUILDERLAND PUBLIC LIBRARY PLAN - PROPOSED FLOOR PLAN 1 NOT TO SCALE

GUILDERLAND PUBLIC LIBRARY PLAN - PROPOSED FLOOR PLAN 1 NOT TO SCALE IV. Master Plan 60' - 0" BENCH PPS TREASURER LOUNGE 1285 SF ASSIST. DIR. DROP-IN PLAY AREA 647 SF ACS & TECH SERVICES ADMIN. PROGRAM DIR. OFFICE 1080 SF BREAST FEEDING AREA STAFF IT CHILDREN'S HELP JANITOR

More information

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS

INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS INFORMATION GUIDE SECOND DWELLING UNITS BUILDING CODE BASICS November 2018 Contents 1. Introduction... 1 2. Ontario Building Code and Second Dwelling Units... 1 3. How Do I Make My Secondary Dwelling Unit

More information

Business School Program Plan Revision 2

Business School Program Plan Revision 2 UNIVERSITY OF COLORADO DENVER Business School Program Plan 2 August 18, 2009 Business School Program Plan 2 Business School Program Plan 2 University of Colorado Denver I. Executive Summary The Business

More information

PRESCRIPTIVE COMPLIANCE METHOD

PRESCRIPTIVE COMPLIANCE METHOD CHAPTER PRESCRIPTIVE COMPLIANCE METHOD 3 SECTION 301 GENERAL 301.2 Building materials. Building materials shall comply with the requirements of this section. 301.2.1 Existing materials. Materials already

More information

Site Bldg Fiscal Yr System Sub-System. Verde Valley Site site 2014/15 Parking Paving. Verde Valley Site site 2014/15 Sidewalks

Site Bldg Fiscal Yr System Sub-System. Verde Valley Site site 2014/15 Parking Paving. Verde Valley Site site 2014/15 Sidewalks Site Bldg Fiscal Yr System Sub-System Site site 2014/15 Parking Paving Site site 2014/15 Sidewalks Skill Center L 2015/16 Architectural Partitions Site Site 2015/16 Parking Striping Arc Center M 2014/15

More information