Pre-Bid Request for Information Log

Size: px
Start display at page:

Download "Pre-Bid Request for Information Log"

Transcription

1 Page: 1 of 5 PB-001 PB #001 When will the bid be due? Bids are due April 29, 2016 at 3pm, hard copies as indicated in specification section page 1. CD WA HRCG PB-002 PB #002 Is it lump sum bid? This is a GMP project. PB-003 PB #003 Bid Due Date? Due April 29. PB-004 PB #004 Abatement? This scope of work will be handled separately by the Owner. CD JKC LPC PB-005 PB #005 NEW 4/8/2016 4/14/2016 4/15/ Bid Due Date? 2. Tax Exempt or Capital Improvement project? 3. Contractor Walk-Thru with Demolition Subs? 4. How is the assumed Asbestos/Lead paint being addressed? 1. Due April be confirmed. 3. Pre-Bid meeting scheduled for April 19 at 10AM. Meet in Fitzpatrick building 2nd floor conference room. The location will be updated in specification section. 4. By Owner, under separate contract. PB-006 PB #006 4/8/2016 4/14/2016 4/15/2016 Is this a public bid? This project will be awarded to the most qualified bidder and not automatically be awarded to the lowest bid. Due to the estimated cost of the project the Owner is required to display/ publish this project openly on their website. CD WA HRCG PB-007 PB #007 4/11/2016 4/14/2016 4/18/2016 Can you let us know if the proposal required is lump sum? This is a GMP project. CD JC STI PB-008 PB #008 We would like to bring along a few of the subcontractors looking at the demolition and MEP relocations. Please confirm that we will be able to bring the additional people for the walk thru? CD GVV LL PB-009 PB #009 Please confirm if we are allowed to respond with qualifications on the Contract and still be considered responsive with respect to the Bid Security requirement. 4/11/2016 4/14/2016 4/18/2016 The 10AM meeting room is limited in size, however for the walkthrough, subs are encouraged to attend. 4/15/2016 4/25/2016 4/22/2016 In order to abide to the provisions in AIA Form A701, Instructions Bidders, Article 4, Para by Addendum 1, qualifications are not allowed. This will allow for even bids across the board for comparison. Refer to below excerpts. 1. AIA Form A701, Instructions Bidders, Article 4, Para The last sentence explicitly states that The Bidder shall make no additional stipulations on the bid form nor qualify the Bid in any other manner. 2. AIA Form A701, Instructions Bidders, Article 4, Para. 4.2 and Supplementary Instructions Bidders, Article 9, Paragraph C These references define the purpose of the Bid Security (ensure the bidder will enter the contract if awarded the bid). I cannot see a connection between Bid Security and qualifications to the bid. CD CS LL PB-010 PB #010 Please advise if there will be a bid extension due to the addendum #1 issuance? Specifically regarding the contract change and GMP bid requirement. Also, will the bid form be further adjusted due to the project being bid as an GMP. 4/15/2016 4/21/2016 4/22/2016 The bid form has been extended to meet RUMC requirements and no further adjustments are planned for this specification section. The bid due date was addressed at the Pre-Bid meeting and will be extended to May 4th, All other requirements listed in the specification will apply concerning hard copies and time of day to be received. All of the pre-bid s are required to be posted by April 27th and will be responded to by April 29th. Copy Gary Van Vliet and ya Ash on all s ( gvanvliet@cannondesign.com, tash@cannondesign.com )

2 Page: 2 of 5 CD GVV PB-011 PB #011 1.) Will the bid opening be public? 2.) Will we be responsible for abatement? 3.) Was the existing manhole surveyed for adequacy to receive the 33kv feed? Has this scope been coordinated with ConED? 4.) Will we be responsible for the fuel for the temporary generator? 5.) Will the temporary generator be rented or bought? 6.) Is there an allocated location for the generator? This is important to understand where cables need to be connected to. Will there be poles for running these cables? 7.) Will there be an independent fuel tank located next to the generator? 8.) What will the temporary generator be serving within the existing hospital? Request for narrative and sketch to define and clarify the needs for the temporary generator. 9.) Will any of the existing woodwork or fixtures need to be saved from the Villa building? 10.) It is possible that the generator might have to be moved at some point during construction. Will there be an allowance for this relocation or should this be submitted as a change order? 11.) What are the hours we can work? 12.) Is this a Union or a non-union job? 13.) Is all the replacement or relocation of low voltage wiring in the Villa basement part of this scope of work? 4/19/2016 4/25/2016 4/26/ ) No, but all sealed bids will be open at the same time and documentation will record each bid as they are opened. 2.) No, that work is being handled separate from this project. 3.) The scope of work you referring to is not part of this project but all bidders should be aware that there are multiple construction and site improvement efforts happening simultaneously and contractors will need to coordinate together to keep all efforts moving forward. 4.) No, that will be the responsibility of the hospital. 5.) This will be a long term rental and would need to remain on site for approximately 2 years before the larger permanent generator is up and running. Provide the cost as a separate line item in case the Owner decides to take responsibility for this rental. 6.) Locate trailer, mounted temporary generator, 50 diagonally from the southeast corner of the Fitzpatrick building, beyond the construction fence. Refer to drawing DM No poles, contractor to provide protected uni-strut frame structure. Reference drawing E , key note 1. 7.) No, the 500 gallon fuel tank should be included with the trailer mounted generator per drawing E ) The generator will be 250kW, per drawing DM , key note 20. The generator will remain on the site throughout the construction of the new ED. This generator will provide power to locations as indicated on schedule 2 of sheet E ) Upon review with the Owner, there are two stained glass windows at the south elevation that are to be removed and turned over to the Owner prior to demolition. 10.) It is expected that generator will need to be moved at least once. Bidders should include an allowance for the effort to relocate if this is required during construction. This relocation must be coordinated with RUMC. 11.) The hours of work are to be within the DOB guidelines. 7am-7pm shifts are acceptable and Saturdays are acceptable to the Owner. 12.) This is to be bid as a Union job, otherwise all contractors that work at RUMC are required to abide with NYS and NYC prevailing wages and comply with state regulations. 13.) The I.T. Data center is being relocated currently as a separate effort and whatever is left of the data center will need to be removed and not relocated. CD MB PM PB-012 PB #012 1.) Please clarify who is the BMS / Controls contact for this project. 2.) What are the insulation requirements for the above & below grade steam pipes. 3.) Please clarify the joint methodology for the below grade braided stainless steel pipe. 4.) Has it been decided if this is a "union" project. 4/25/2016 4/29/2016 5/2/ The single analog input flow meter control point shall be an extension of the existing Andover controls system. 2. Provide 5 thick fiberglass for indoor applications; 3 thick cellular glass with Pittcote 300 coating for exposed outdoor piping for applications within trench, temporary enclosure and exposed piping. 3. be flanges and flange fittings and joints. 4. This is to be bid as a Union job, otherwise all contractors that work at RUMC are required to abide with NYS and NYC prevailing wages and comply with state regulations. CD MB PM PB-013 PB #013 Could you provide a list of manufacturers for the braided stainless steel pipe Flexcraft/ Hosecraft USA or approved equal.

3 Page: 3 of 5 PB-014 PB #014 1-On drawing # d/d 4/5/16 ---Detail # 6 calls for the following items. Please provide additional details and information: A-Temp steel supports are shown-- what size, how much weight are they supporting, what is the on center spacing, and where do they go exactly? B-There calls for prefabricated housing vertical above grade who makes this, what is the material, are there more specific details and how many locations? I am not certain looking at the documents. C-Is all the work in the existing tunnel OK to be performed on regular time hours, 7AM till 4 PM? If not please define the hours and times we can work. D-How long is the existing tunnel? Do we need new tunnel construction drawings? I am not certain whether a new tunnel length is needed; or what is that length and connection details? E-How does the new manufactured housing tie into the new curb and tunnel construction I assume we are cutting the top of the existing tunnel off; and the housing is the new protection? How do these all tie in and are supported? F- Does the tunnel work stay as shown or until the demo contract is completed? We are not restoring or completing the existing tunnel on this contract. Please confirm all work is TEMP and stays in place. 1A. The provision of temporary steel posts here is to secure the top of the tunnel along the CMU curb during construction and this support is considered means and methods to be developed by the awarded bidder. 1B. This is only indicated in a single location. See Keynote F4 on sheet DM-303 for location. Basis of design is indicated on view 3/ M001. 1C. Refer to schedule 1/ DM-805 for the initial survey of electrical related services housed within the existing tunnel. Contractor is to confirm active versus inactive, and Services that are active or have been identified to be re-fed are to be scheduled with RUMC and contractor should assume Off-Hours for these services only. For the identified and confirmed abandoned services these are to be removed during regular hours. 1D. The existing tunnel runs from the Fitzpatrick building to the sub basement of the main hospital which makes it approximately 60'-70'. The demolition of the actual tunnel and potential new construction of a new tunnel is NOT to be considered within the scope of this project. 1E. The piping above ground should be supported via stanchions or rails coordinated the with temporary steam pressure reducing station. The piping within the tunnel should be supported either via hangers from the roof of the tunnel or from wall supports. All of these supports are means and methods and should be decided by the contractor in the field. 1F. All temporary work will remain in place for the extent of this early demolition project as well as during the construction of the new Emergency Department. Removal of the temporary services is NOT considered within the scope of this project.

4 Page: 4 of 5 PB-015 PB-# Provide, a project directory noting the design team disciplines, the client, the people who attended the pre-bid meeting and walk through. 2. Provide more detail on the Villa Building demo repair on where the demo meets the Mansion so we can price accordingly. 3. Confirm the bid was extended to May 4th at 3PM. Is it possible to push the bid due date to May 6th, at 3PM. We just received addendums #1 & #2 last week; and per the walk through other info will be provided, please confirm. 4. VERY IMPORTANT-The main thing to be sent out to all bidders was a confirming project schedule with proper key milestones and durations. This is very important because the dates noted are extremely tight and we must have the project schedule to bid properly. 5. Please confirm a 10% Bid Bond is required with Bidder's submissions. Please confirm Performance & Payment Bonds will be required from the successful bidder once awarded? (this cost must be in our bid price when submitting). 6. Confirm, all work including demo & shut downs will be priced on regular time hours for this project? If not please detail the O/T required and for what scope of work? 7. A copy of S already submitted for the project are in the folder. Please provide the final s numbers dating from 4/22/ Confirm the client abatement program starts on August 23rd 2016, and actual demo and GC work is scheduled to start September 9th This can be covered in the overall project schedule to be submitted. (These are key dates for current s and bidding). 9. If a new foundation is required for the Mansion where the Villa building is being demoed due to possible rubble foundations will it will be addressed after the bid award? Is it correct that we should exclude new foundation work in this bid? 10. Please provide additional information for the new generator so that we may bid properly. Please advise as the scope it not clear. 11. Please let me know if we are to copy any other team members on requests? (Never received direction on this procedure as promised. Please forward if needed and copy me). 12. Parking on site is not available. It was mentioned there would be offsite parking and transportation for our manpower to get to the site. If this is the case, how far away is offsite parking, will there be any cost for this service? Also, please confirm site deliveries and rubbish pick-up can be made from the hours 1 AM till 4 PM? 1. For a project directory refer to section Summary within the project manual. A scanned in attendee list is included on the Box Account link within the folder labeled Pre-Bid Meeting Materials. 2. Detail is included for repair at existing wall penetrations, and there is detail for the temporary partition that is to be constructed at the existing corridor that connects Garner Mansion with the Villa Building. Refer to demolition plans in the DM-300 series and architectural details on A-400 for additional information. 3. Bid due date has been extended to May 6th at 3PM. Addendum 3 was posted to the public link as of 4/21/2016, and responses to Pre-Bid Meeting s were posted in the public link as of 4/25/ Intended project schedule was discussed during the Pre-Bid Meeting and dates will need to shift with the Bid Due Date as follows: May 6, 2016: Bid Due Date, 3PM May 20, 2016: Bid Awarded May 20-June 7: Awarded Bidder coordinate with Bohler Engineers to Finalize DOB Submission August 31: Anticipated DOB Approval Aug. 15-Sept. 9: Abatement Scope of Work (Not In Contract) Sept. 9-Nov. 18: Make Ready, Fitzpatrick Demolition, Villa Demolition Scope of Work 2018, 2nd Quarter: EMS Demolition Scope of Work to Occur, duration to be proposed by Bidders 5. Follow specifications. 6. Price shut downs to occur during off hours. Some may be able to occur during regular hours, but bids should assume O/T. 7. tal s issued to CannonDesign through April 27th is 16, note that all of the Pre-Bid Meeting questions were recapped as Refer to response to question Contractor shall ensure safety and maintain structural soundness of the adjacent building during construction. There is no new foundation required otherwise. 10. Information was include within 11 response. 11. Per form within the project manual, ya Ash of CannonDesign should have been issued the, and distribution would occur to owner and Bohler as required for input. 12. For bidding purposes, assume that Owner would provide area off site for parking, Contractor would provide shuttle.

5 Page: 5 of 5 PB-016 PB # Addendum #2 DWG #X d/d 5/13 is to be worked in with the MEP drawings specifically DWG #M d/d 4/5/16. It is our understanding certain details are superseded from M-002 by Addendum DG X-001. The route for running the new TEMP services for steam and electric runs through the main roadway, and ER & Ambulance's main road. What is the plan and direction for us to conduct this work. Roadways may be workable; the ambulance ER entrance is not clear or workable without shutting down for a duration of time. What is the hospital's overall logistic plan for access and relocation? We need the guidelines so we can bid properly and also develop our logistic process for construction and demo work. Right now we do not see how the work can be completed while the ER is running and ambulances are moving throughout. Also, the sidewalk bridge cannot be erected because we need to excavate, install and fill the bridge would be in the way. Solution bridge goes up after new temp work, does not work overall with the projected schedule. 2. Please advise do we cover with all steel plates; or after specified back-fill process do we cover with temp asphalt? 3. Does the sidewalk bridge stay after our demo contract is completed? Please advise. We are renting. Does rental cost turnover to RU? Please advise because we are just costing for the duration of our work and plan on removing it as soon as the building is low enough to avoid pedestrian risk please. 4. The info on a notes we should carry one R & R of the TEMP generator? Is the R & R within the demo contract time frame or expected later down the road? Should it be alternate price? NEW 4/27/2016 4/29/2016 5/3/ Follow M002 for suggested temp utility route. Intent of pathway shown on M-002 is to avoid ambulance traffic as well as new E.D. retaining walls and building construction. Sidewalk Bridge to be installed following temporary trench work. 2. Bidders to price asphalt at temporary trench. 3. Remove sidewalk at suggested time once demolished building is low enough. 4. This allowance to relocate once is reserved to occur during this project. 5. Site element demolition is not in contract and will occur as part of a separate scope of work. 6. Bohler to respond. 7. Refer to Detail 3/M001 for housing to be basis of design. 8. All MEP services within EMS cottage are to be cut and capped and do not affect remainder of campus services. 9. Stained glass will be returned to Owner. 10. Price shut downs to occur during off-hours. 11. Extension to 5/6/2016 Bid Date has been approved. Refer to 15 Question 4 for milestone dates. 5. Do the existing parking lots, sidewalks, curbs ETC within the construction fence foot print off of Fitzpatrick & Villa get demolished and removed, it is not clear? Please advise there is 24x 50 space calling for 8 of gravel and the "payment(pavement?)" below is demolished? (We plan on using this for our truck was stations and deliveries). 6. Should we assume we can use fire hydrant water for dust control? Please advise that will be a RU cost, and we will run hoses and pipe as needed and overhead for roadways in our prices. 7. Drawing M-002 note 2, calls for a lockable waterproof enclosure is there a specified product or is it to be made of plywood? What size is needed? Provide more detail and specs on this. Please advise whether you need stand up sheds for service? 8. We do not see MEP demo info for the EMS cottage? Is this a self-contained building for MEP S? Please advise. 9. We are planning on saving the 2 stained glass units (with professional stained glass companies). Where is it to be delivered? Does it need to be crated? We cannot guarantee removal in one piece at this time? TBD after award, other logistics and "how." 10. What is the shut off plan for MEP R & R work for the main building / Fitzpatrick & Villa? Are they on REG time or off hours? Please advise. 11. A client / project schedule was to be sent out 4/20 showing the dates and milestones. Please provide, the information is critical to our bid pricing. CAN BID TIME FRAME BE EXTENDED TILL 5/6 /16 Friday?

ADDENDUM #3 NWIT Front Street Parkade Demolition and Rehabilitation New Westminster, BC

ADDENDUM #3 NWIT Front Street Parkade Demolition and Rehabilitation New Westminster, BC March 26, 2015 ADDENDUM #3 NWIT-15-01 Front Street Parkade Demolition and Rehabilitation New Westminster, BC This addendum modifies the Invitation to Tender only as noted: ADDITIONAL INFORMATION Please

More information

Addendum #4 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018

Addendum #4 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018 ` Division of Finance and Business Operations Procurement & Strategic Sourcing 5700 Cass Avenue, suite 4200 Detroit, Michigan 48202 (313) 577-3734 FAX (313) 577-3747 January 11, 2019 Addendum #4 To Request

More information

COUNTY OF SAN JOAQUIN

COUNTY OF SAN JOAQUIN August 1, 2012 COUNTY OF SAN JOAQUIN General Services Department 44 North San Joaquin Street, Suite 590 Stockton, California 95202-2778 (209) 468-3357, Fax (209) 468-2186 GABRIEL E. KARAM Director Capital

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

ADDENDUM NO. ONE TO THE CONSTRUCTION DOCUMENTS September 19, 2017

ADDENDUM NO. ONE TO THE CONSTRUCTION DOCUMENTS September 19, 2017 General: ADDENDUM NO. ONE TO THE CONSTRUCTION DOCUMENTS September 19, 2017 The following changes, additions, or deletions shall be made to the following documents; all other conditions shall remain the

More information

This addendum is being issued to answer questions submitted by the question deadline and to distribute a revised bid price form.

This addendum is being issued to answer questions submitted by the question deadline and to distribute a revised bid price form. INVITATION TO BID (ITB) FOR POOL CONSTRUCTION AT THE FORD WOODS PARK CONTROL No. 122972 ADDENDUM No. 5 City of Dearborn ISSUE DATE: 12/4/17 DUE DATE: 12/13/17 AT 3:00 p.m. Local Time This addendum is being

More information

CITY OF TACOMA Department of Public Utilities Tacoma Power

CITY OF TACOMA Department of Public Utilities Tacoma Power CITY OF TACOMA Department of Public Utilities Tacoma Power ADDENDUM NO. 1 DATE: August 4, 2017 REVISIONS TO: Request for Bids Specification No. PG17-0130F TPU Eductor Waste Decant Facility NOTICE TO ALL

More information

Cattaraugus County Little Valley County Center Court Renovations Second Floor Little Valley, NY

Cattaraugus County Little Valley County Center Court Renovations Second Floor Little Valley, NY 140 John James Audubon Parkway, Suite 201, Amherst, New York 14228 P 716.688.0766 F 716.625.6825 ADDENDUM NO. 1 Cattaraugus County Little Valley County Center Court Renovations Second Floor Little Valley,

More information

Port KC RFP NORTHLAND PARK BUILDING V

Port KC RFP NORTHLAND PARK BUILDING V Port KC RFP NORTHLAND PARK BUILDING V 1. The RFP refers to landscaping plans. However, it does not appear that the landscaping plans were issued with the rest of the RFP. Will these be issued with an addendum?

More information

This Addendum forms a part of the Contract Documents and modifies the Drawings and Project Manual as hereinafter indicated.

This Addendum forms a part of the Contract Documents and modifies the Drawings and Project Manual as hereinafter indicated. BIDDER RESPONSES RIARNG P-6 ADDITION TO ALL BIDDERS OF RECORD: This Addendum forms a part of the Contract Documents and modifies the Drawings and Project Manual as hereinafter indicated. ADDENDUM 001 2/14/2019

More information

Q&A: The Block/Parsons Alley Construction RFP

Q&A: The Block/Parsons Alley Construction RFP Q&A: The Block/Parsons Alley Construction RFP 1. Is there a Geotechnical Report available? 2. Would it be possible to extend the bid date to a day other than a Monday? 3. Is it possible to extend the date

More information

SAFEGUARDS DURING CONSTRUCTION

SAFEGUARDS DURING CONSTRUCTION CHAPTER 14 SAFEGUARDS DURING CONSTRUCTION SECTION 1401 GENERAL [B] 1401.1 Scope. The provisions of this chapter shall govern safety during construction that is under the jurisdiction of this code and the

More information

TRIAD ENGINEERING CONSULTANTS, INC.

TRIAD ENGINEERING CONSULTANTS, INC. TRIAD ENGINEERING CONSULTANTS, INC. 2638 Willard Dairy Rd Providing High Point, NC Suite 100 Plumbing, Mechanical and 27265 (336) 454-0225 Electrical Engineering Services Since 1984 admin@triadengmep.com

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

Section XXV Preconstruction Assessments and Damage Mitigation Procedures Section XXV Preconstruction Assessments and Damage Mitigation Procedures A. Introduction - In recent years, HRSD has received an increasing number of complaints from residents and locality staff regarding

More information

ADDENDUM NO. 1. PROJECT: Lowell High School DATE: January 28, Eucalyptus Drive, SF, CA 94132

ADDENDUM NO. 1. PROJECT: Lowell High School DATE: January 28, Eucalyptus Drive, SF, CA 94132 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2011 PROPOSITION A BOND PROGRAM LOWELL HIGH SCHOOL PROJECT #11493 INTERIM HOUSING for VOLUNTARY SEISMIC STRENTHENING ADDENDUM NO. 1 PROJECT: Lowell High School DATE:

More information

Solicitation Number: FA B-A001 Project Numbers: RKMF Demo Base Gymnasium & RKMF Demo Pool Facilities.

Solicitation Number: FA B-A001 Project Numbers: RKMF Demo Base Gymnasium & RKMF Demo Pool Facilities. Solicitation Number: FA4861-14-B-A001 Project Numbers: RKMF 13-0134 Demo Base Gymnasium & RKMF 130135 Demo Pool Facilities Responses to RFIs 1. Does all the building material get hauled off base? Response:

More information

RFB # ADDENDUM NO. 1 ISSUED APRIL 23, 2018 PRE-BID MEETING MINUTES NEW HANOVER COUNTY LANDFILL GAS COLLECTION AND CONTROL SYSTEM CONSTRUCTION

RFB # ADDENDUM NO. 1 ISSUED APRIL 23, 2018 PRE-BID MEETING MINUTES NEW HANOVER COUNTY LANDFILL GAS COLLECTION AND CONTROL SYSTEM CONSTRUCTION RFB # 18-0197 ADDENDUM NO. 1 ISSUED APRIL 23, 2018 PRE-BID MEETING MINUTES NEW HANOVER COUNTY LANDFILL GAS COLLECTION AND CONTROL SYSTEM CONSTRUCTION The following information was conveyed and discussed

More information

We will need to keep a minimum of 6-0 wide pathway.

We will need to keep a minimum of 6-0 wide pathway. 2 April 16, 2018 FRESNO CHAFFEE ZOO WARTHOG EXHIBIT 894 West Belmont Avenue Fresno, CA 93728 Architect Project Number: 1616 FCZ Project Number: 0192 To: Prospective Bidders ADDENDUM NO. 2 The following

More information

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 2-1 Issue date: September 2012 1. General SITEWORK OVERVIEW This Directive outlines the Fund s requirements for the Consultant relative to the development, design and presentation of documents

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 PROJECT: 300 Seneca New Academic Campus DATE: September 23, 2013 300 Seneca Ave., S.F.,

More information

Addendum #1. January 22, 2018

Addendum #1. January 22, 2018 Addendum #1 January 22, 2018 Building B 8500 Public Works Drive Renovation for City of Manassas Water & Sewer Department 8500 Public Works Drive Manassas, VA 20110 Job Description Renovation of the existing

More information

The Tender Documents shall be amended and will become part of the Contract Documents.

The Tender Documents shall be amended and will become part of the Contract Documents. Tender No. MET17-103 Mulgrave Park Exterior Upgrades: Repairs to Retaining Walls, Stairs, and Rail ADDENDUM NO. 04 11 October 2017 The Tender Documents shall be amended and will become part of the Contract

More information

ADDENDUM # 1 To: File RFP for: New Affordable Home Construction Services

ADDENDUM # 1 To: File RFP for: New Affordable Home Construction Services Procurement Department ADDENDUM # 1 To: File 1605-909-23-4532 RFP for: New Affordable Home Construction Services Please note the following change: Change #1 RFP closing date and time is changed to July

More information

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk

More information

See attached answers to questions and requests for clarification received.

See attached answers to questions and requests for clarification received. Office of the Vice President 971 Elmore Drive and Chief Financial Officer PO Box 115250 Procurement Services Gainesville, FL 32611-5250 http://procurement.ufl.edu/ (352) 392-1331 Fax 352-392-8837 June

More information

ADDENDUM NO. 1. GOODWYN, MILLS AND CAWOOD, INC st Avenue South Suite 100 Birmingham, Alabama Ph: Fax:

ADDENDUM NO. 1. GOODWYN, MILLS AND CAWOOD, INC st Avenue South Suite 100 Birmingham, Alabama Ph: Fax: ADDENDUM NO. 1 GOODWYN, MILLS AND CAWOOD, INC. 2701 1 st Avenue South Suite 100 Birmingham, Alabama Ph: 205-879-4462 Fax: 205-879-4493 To: ALL PLAN HOLDERS Date: March 24, 2017 Fax #: Pages: 10, including

More information

ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV

ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION IN THE TOWN OF MALTA AND A PORTION OF THE 115KV LUTHER FOREST STATION IN THE TOWN OF STILLWATER SARATOGA

More information

ALL BIDDERS shall acknowledge receipt of this Addendum No. 1 on the BID FORM or the BID will be deemed to be invalid for the purposes of this project.

ALL BIDDERS shall acknowledge receipt of this Addendum No. 1 on the BID FORM or the BID will be deemed to be invalid for the purposes of this project. LOS ANGELES COMMUNITY COLLEGES 770 Wilshire Boulevard, Los Angeles, CA 90017 Telephone: 213/891-2000 CITY EAST HARBOR MISSION PIERCE SOUTHWEST TRADE TECHNICAL VALLEY WEST ADMINISTRATIVE OFFICES Date: October

More information

BUREAU Joe Iuviene, AIA January 20, 2017

BUREAU Joe Iuviene, AIA January 20, 2017 architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends

More information

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...

More information

Tech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey

Tech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey Tech Assignment 1 University Medical Center of Princeton Plainsboro Road, Township of Plainsboro, New Jersey David Bodnar CM Chris Maget 10/5/2009 Table of Contents Executive Summary...3 Project Schedule

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

JANUARY 25, 2016 ADDENDUM NO. 3 FOR. ORD Baggage Service Road Retaining Wall Repair

JANUARY 25, 2016 ADDENDUM NO. 3 FOR. ORD Baggage Service Road Retaining Wall Repair JANUARY 25, 2016 ADDENDUM NO. 3 FOR ORD Baggage Service Road Retaining Wall Repair Specifications and Contract Documents Number: 132110 CDA Project Number: H6163.15-02 For which bids are scheduled to be

More information

TRIAD ENGINEERING CONSULTANTS, INC.

TRIAD ENGINEERING CONSULTANTS, INC. TRIAD ENGINEERING CONSULTANTS, INC. 2638 Willard Dairy Rd Providing High Point, NC Suite 100 Plumbing, Mechanical and 27265 (336) 454-0225 Electrical Engineering Services Since 1984 admin@triadengmep.com

More information

Question 2: Regarding Section VII, part 10, which jurisdiction issues permits for work performed at Ronald Reagan Washington National Airport?

Question 2: Regarding Section VII, part 10, which jurisdiction issues permits for work performed at Ronald Reagan Washington National Airport? RONALD REAGAN WASHINGTON NATIONAL AIRPORT METROPOLITAN WASHINGTON AIRPORTS AUTHORITY SOLICITATION RFP 1-11-C138 TERMINAL B/C PRE-SECURITY RESTROOM RENOVATIONS RESPONSES TO CONTRACTOR QUESTIONS Question

More information

ADDENDUM NO. 1 PRE-BID CONFERENCE: GENERAL: Great West Engineering, Inc N. Lakeharbor Lane Boise, Idaho (208)

ADDENDUM NO. 1 PRE-BID CONFERENCE: GENERAL: Great West Engineering, Inc N. Lakeharbor Lane Boise, Idaho (208) Great West Engineering, Inc. 3363 N. Lakeharbor Lane Boise, Idaho 83703 (208) 576-6671 April 7, 2017 Whitman County Department of Public Works Carothers Road Solid Waste Facility Contact Water and Fire

More information

Phoenix Building Construction Code Updated Amendments to the Administrative Provisions

Phoenix Building Construction Code Updated Amendments to the Administrative Provisions Phoenix Building Construction Code Updated Amendments to the Administrative Provisions CHAPTER 1 ADMINISTRATION Section 101.2 Change to read as shown: 101.2 Scope. The provisions of this Code shall apply

More information

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES. For the renovation of existing apartment buildings. August 15, 2016

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES. For the renovation of existing apartment buildings. August 15, 2016 REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES For the renovation of existing apartment buildings August 15, 2016 INVITATION Bath Housing Development Corporation is soliciting proposals for

More information

ST. GABRIEL OF THE SORROWFUL MOTHER CHURCH

ST. GABRIEL OF THE SORROWFUL MOTHER CHURCH ADDENDUM NO. 1 TO CONTRACT DOCUMENTS DATED FEBRUARY 12, 2015 FOR ADDITION TO ST. GABRIEL OF THE SORROWFUL MOTHER CHURCH Located at 8910 Gap Newport Pike Avondale, PA 19311 ARCHITECT 270 South Main Street,

More information

ADDENDUM NO. 3 REQUEST FOR PROPOSALS HANGAR 1610/1612 FIRE SUPPRESSION RETROFIT PROJECT

ADDENDUM NO. 3 REQUEST FOR PROPOSALS HANGAR 1610/1612 FIRE SUPPRESSION RETROFIT PROJECT ADDENDUM NO. 3 REQUEST FOR PROPOSALS HANGAR 1610/1612 FIRE SUPPRESSION RETROFIT PROJECT Effective September 6, 2018, Addendum No. 3 (THREE), {Pages 1-7 and the applicable attachment(s)}, is associated

More information

MPA Project No. L1429-C1 Project Title: Terminal C Enhancements Location: Logan International Airport

MPA Project No. L1429-C1 Project Title: Terminal C Enhancements Location: Logan International Airport MPA Project No. L1429-C1 Project Title: Terminal C Enhancements Location: Logan International Airport RESPONSES TO QUESTIONS and/or RFI s Date: 6/1/2018 The attention of Contractors submitting Filed Sub-Bids

More information

A: No. Contractors are to submit their best pricing based on the RFP Documents.

A: No. Contractors are to submit their best pricing based on the RFP Documents. Pier 26 Upland Construction Multiple RFPs: C4981A General Construction C4981B Sitework, Demolition & Concrete C4981C Electrical Construction C4981D Landscaping & Irrigation Questions & Answers November

More information

REBECCA LG BOSTICK, ARCHITECTS, INC

REBECCA LG BOSTICK, ARCHITECTS, INC REBECCA LG BOSTICK, ARCHITECTS, INC 703-768-2250 ADDENDUM NO. 3 Page 1 of 4 (plus attachments -2 pages) SILVERBROOK ELEMENTARY SCHOOL RENOVATION Fairfax County Public Schools 9350 Crosspointe Drive, Fairfax

More information

legend. #1 is a gas relief valve? If so does Enbridge supply with station?

legend. #1 is a gas relief valve? If so does Enbridge supply with station? Michael Pacholok, Director Purchasing and Materials Management Division City Hall, 8 th Floor, West Tower 00 Queen Street West Toronto, Ontario M5H N Joanne Kehoe Manager Construction Services May 4, 06

More information

Project Status Update & Progress Report

Project Status Update & Progress Report UCSD Board of Education Project Status Update & Progress Report March 27, 2018 Capital Project Presentation March 2018 1. Kernan Elementary School Addition & Renovations Part 1 Construction Progress Update

More information

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.

More information

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE,

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE, CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE FOR THE CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS RQ# 41677 BIDS DUE ON: May 1, 2018, at 2:00 p.m. ADDENDUM NUMBER 1, April 25, 2018, Page

More information

ADDENDUM 1. Request for Proposals City of Minot, North Dakota Structure Demolition and Site Restoration Project, # Round 3.

ADDENDUM 1. Request for Proposals City of Minot, North Dakota Structure Demolition and Site Restoration Project, # Round 3. ADDENDUM 1 Request for Proposals City of Minot, North Dakota Structure Demolition and Site Restoration Project, #3755.2 Round 3 April 14, 2016 Proposals Due: 11:00 A.M., Tuesday, April 19, 2016, Minot

More information

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201 Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING 1727 Oak Avenue Evanston, IL 60201 General Contractor Owner Architect Construction Management Plan Phase 1 3 October

More information

ADDENDUM 2 KODIAK ISLAND BOROUGH CHINIAK TSUNAMI CENTER AND LIBRARY Kodiak, AK

ADDENDUM 2 KODIAK ISLAND BOROUGH CHINIAK TSUNAMI CENTER AND LIBRARY Kodiak, AK ADDENDUM 2 KODIAK ISLAND BOROUGH LIBRARY Kodiak, AK March 7, 2018 TO ALL PLAN HOLDERS OF RECORD: This addendum forms part of and modifies the contract documents as noted below. Bidders must acknowledge

More information

ADDENDUM #9 DATE: 1/12/17 TO:

ADDENDUM #9 DATE: 1/12/17 TO: ADDENDUM #9 DATE: 1/12/17 TO: Vince O Brien (Anne Arundel County Public Schools) FROM: Andy Locke (Jacobs Engineering) RE: Arnold Elementary School Replacement, All Bid Packages ADDENDUM #9: Revisions

More information

ADDENDUM #4 FOR THE WEST VALLEY FACILITIES INCREMENT 2 REPLACEMENT PROJECT WEST VALLEY COLLEGE

ADDENDUM #4 FOR THE WEST VALLEY FACILITIES INCREMENT 2 REPLACEMENT PROJECT WEST VALLEY COLLEGE ADDENDUM #4 FOR THE WEST VALLEY FACILITIES INCREMENT 2 REPLACEMENT PROJECT AT WEST VALLEY COLLEGE Owner West Valley-Mission Community College District Saratoga, California Bid #01-1516 12-22-15 WEST VALLEY-MISSION

More information

RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number:

RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number: RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number: 13-146 A D D E N D U M NO. 1 The following shall form part of the tender documents

More information

Addendum No. 3 Borough of Manhattan Community College Roof Replacement Project No: MC

Addendum No. 3 Borough of Manhattan Community College Roof Replacement Project No: MC Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 11 th Floor New York, New York 10019 CUNY.Builds@mail.cuny.edu July 19 th, 2012

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 024116 - STRUCTURE DEMOLITION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL

More information

TENDER ADDENDUM NO. TWO (2)

TENDER ADDENDUM NO. TWO (2) TENDER ADDENDUM NO. TWO () : PROJECT: PROJECT NO.: CONTRACTOR: PREPARED BY: Oct 04, 08 Pickering 7th Floor IT Meeting Rooms Interior Alterations RFQ-0049-08 TBD Anitha Rasuratnam We are informing you of

More information

DISTRICT OF TOFINO BARRS MOUNTIAN RESERVOIR REPLACEMENT PROJECT. Attached, please find Addendum # 1 for the above noted project.

DISTRICT OF TOFINO BARRS MOUNTIAN RESERVOIR REPLACEMENT PROJECT. Attached, please find Addendum # 1 for the above noted project. DATE DESTINATION EMAIL NO OF PAGES (INCL THIS PAGE) FILE January 13, 2017 n/a 11 2231-35306-02 TO FROM ALL DOCUMENT HOLDERS C. Pogson COMPANY CITY ORIGINALS TO BE: Filed Mailed Couriered OTHER (SPECIFY)

More information

5/15/2013. Approved Course Title 2010 Existing Building Code Chapters Florida Building Code, Existing Building. Chapters

5/15/2013. Approved Course Title 2010 Existing Building Code Chapters Florida Building Code, Existing Building. Chapters 2010 Florida Building Code, Existing Building A Code for Existing Buildings Approved Course Title 2010 Existing Building Code Chapters 10-14 Chapters 10-14 Module Objectives Chapter 1 Administration Chapter

More information

REQUEST FOR BIDS METROPOLITAN PARK DISTRICT OF TACOMA Northwest Trek Core Area Fence Upgrade SWR BID NO. T Request for Bids

REQUEST FOR BIDS METROPOLITAN PARK DISTRICT OF TACOMA Northwest Trek Core Area Fence Upgrade SWR BID NO. T Request for Bids REQUEST FOR BIDS METROPOLITAN PARK DISTRICT OF TACOMA Northwest Trek Core Area Fence Upgrade SWR BID NO. T-2016-0210-05410910 Request for Bids The Metropolitan Park District of Tacoma will receive sealed

More information

Addendum No. 1 For HART COUNTY HIGH SCHOOL PHASE 1. Munfordville, Kentucky

Addendum No. 1 For HART COUNTY HIGH SCHOOL PHASE 1. Munfordville, Kentucky Addendum No. 1 For HART COUNTY HIGH SCHOOL PHASE 1 Munfordville, Kentucky TO: FROM: All Plan Holders Sherman-Carter-Barnhart Architects 2405 Harrodsburg Road Lexington, Kentucky 40504 DATE: October 28,

More information

MEMPHIS-SHELBY COUNTY AIRPORT AUTHORITY MEMPHIS, TENNESSEE

MEMPHIS-SHELBY COUNTY AIRPORT AUTHORITY MEMPHIS, TENNESSEE QUESTIONS AND ANSWERS REGARDING MSCAA PROJECT 14-1374-03/04 CONCOURSE MODERNIZATION PASSENGER BOARDING BRIDGES 05/23/2018 1. Project timing for accurate pricing of the equipment (Walkways, PCA, GPU and

More information

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO:

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO: ISSUE DATE: MARCH 21, 2012 (REVISION 2-08/31/12) PROJECT: CNB BUILDINGS 2 AND 3 CATOOSA, OKLAHOMA OWNER: BID TO: (Mail & Fax) CHEROKEE NATION BUSINESSES 777 WEST CHEROKEE STREET CATOOSA, OKLAHOMA 74015

More information

5/9/ Florida Building Code, Existing Building. Chapters Approved Course Title 2010 Existing Building Code Chapters

5/9/ Florida Building Code, Existing Building. Chapters Approved Course Title 2010 Existing Building Code Chapters 2010 Florida Building Code, Existing Building A Code for Existing Buildings This slide is being narrated. If you do not hear a voice, check your speakers or return to the Main Menu and click on System

More information

Mueller Laboratory Renovation. Technical Report #2 By Mark Jackson Construction Management Option 10/17/14

Mueller Laboratory Renovation. Technical Report #2 By Mark Jackson Construction Management Option 10/17/14 Mueller Laboratory Renovation Technical Report #2 By Mark Jackson Construction Management Option 10/17/14 1 Table of contents Executive Summary 3 Project Schedule 5 Detailed Estimate 8 Site Layout Planning

More information

REQUEST FOR SEALED BIDS No

REQUEST FOR SEALED BIDS No REQUEST FOR SEALED BIDS No. 2018-013 Project: Granger Site Development Phase 2 Issued: December 19, 2018 CONTENTS Section 1. Bid Announcement and General Information Section 2. Bid Specifications and Bid

More information

Addendum #2 Bid Opportunity RFP to Replace the Township of Wellesley s Fire Station #2. Closing Date: Friday, January 25, :00 hrs.

Addendum #2 Bid Opportunity RFP to Replace the Township of Wellesley s Fire Station #2. Closing Date: Friday, January 25, :00 hrs. Addendum #2 Bid Opportunity 2018-08 RFP to Replace the Township of Wellesley s Fire Station #2 Closing Date: Friday, January 25, 2019 09:00 hrs. Question 1: How close to the property line can the septic

More information

1. Division 1 Section "Temporary Facilities and Controls" for limitations and procedures governing temporary use of Owner's facilities.

1. Division 1 Section Temporary Facilities and Controls for limitations and procedures governing temporary use of Owner's facilities. CFA A HVAC PROJECT SECTION 01100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

STATE OF NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF COASTAL ENGINEERING

STATE OF NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF COASTAL ENGINEERING INDEX OF DRAWINGS SHEET NO. DESCRIPTION 1 TITLE SHEET AND LOCATION PLAN 2 GENERAL NOTES AND SITE ACCESS AND STAGING AREA LAYOUT 3 EXISTING CONDITIONS AND DEMOLITION PLAN 4 CONSTRUCTION PLAN AND PROFILE

More information

INVITATION TO BID (ITB) FOR Comfort Station at Ford Field. CONTROL No A ADDENDUM No. 2 ISSUE DATE: 03/31/17

INVITATION TO BID (ITB) FOR Comfort Station at Ford Field. CONTROL No A ADDENDUM No. 2 ISSUE DATE: 03/31/17 INVITATION TO BID (ITB) FOR Comfort Station at Ford Field CONTROL No. 123560A ADDENDUM No. 2 ISSUE DATE: 03/31/17 City of Dearborn DUE DATE: 04/12/17 AT 3:00 p.m. Local Time This addendum is being issued

More information

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of: 02070 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.1 STIPULATIONS A. The specifications sections " General Conditions of the Construction Contract ", "Special Conditions", and "Division 1 - General Requirements"

More information

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016

HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 HAWTHORNE AND THAD WATER & WASTEWATER IMPROVEMENTS ITB #124D 16F CITY OF IRVING ADDENDUM # 1 MAY 10, 2016 1. THIS ADDENDUM IS HEREBY MADE AS PART OF THIS CONTRACT SPECIFICATION. THIS ADDENDUM IS ISSUED

More information

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

Pre-construction and Construction services for the construction of the Grand Street Settlement

Pre-construction and Construction services for the construction of the Grand Street Settlement Pre-construction and Construction services for the construction of the Grand Street Settlement Table of Contents Part A I. Introduction and Background II. Owner Goals and Objectives III. Key Dates, Contract

More information

APPENDIX 1 PROJECT REQUIREMENTS

APPENDIX 1 PROJECT REQUIREMENTS APPENDIX 1 PROJECT REQUIREMENTS I) Scope of Work This section contains a general summary of the work the Contractor shall perform under this contract. If any conflict exists between the work described

More information

Scope of Work. Invitation to Bid Interior Renovation Works for the United Nations University, Macau (Phase 1) (UNUCS-ITB/001/2015)

Scope of Work. Invitation to Bid Interior Renovation Works for the United Nations University, Macau (Phase 1) (UNUCS-ITB/001/2015) Scope of Work Invitation to Bid Interior Renovation Works for the United Nations University, Macau (Phase 1) (UNUCS-ITB/001/2015) 1. Technical Specifications 1.1 The United Nations University Computing

More information

Issued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS

Issued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS 669.7403.001 West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS Page C-111 Advertisement for Bids 1-2 C-200 Instruction to Bidders 1-10 C-410 Bid Form for Construction Projects

More information

DIVISION 2- EXISTING CONDITIONS

DIVISION 2- EXISTING CONDITIONS DIVISION 2- EXISTING CONDITIONS 024100- SELECTIVE DEMOLITION PART 1 - GENERAL: 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

ADDENDUM NO 1. TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP B)

ADDENDUM NO 1. TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP B) Office of the Capital Planning, Design & Construction Phone: 973-720-2352 Fax: 973-720-2829 WWW.WPUNJ.EDU ADDENDUM NO 1 TO: All Prospective Bidders DATE: 8/17/17 PROJECT: New Residence Hall (WP-16-01-99-B)

More information

ADDENDUM #2 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR. The University of Texas Health Science Center at San Antonio

ADDENDUM #2 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR. The University of Texas Health Science Center at San Antonio ADDENDUM #2 REQUEST FOR COMPETITIVE SEALED PROPOSALS FOR A GENERAL CONTRACTOR The University of Texas Health Science Center at San Antonio Renovate Floor 1 and Floor 2 of the PARC Bldg. RFP No.: 745-16-9935

More information

2. Question: Could not find a detail for Type A3 Expansion Joints? Answer: A Type A3 Expansion Joint detail has been added to sheet C4.7.

2. Question: Could not find a detail for Type A3 Expansion Joints? Answer: A Type A3 Expansion Joint detail has been added to sheet C4.7. February 3, 207 Office of the Director of Purchasing: Shelly Albert Purchasing Officer ADDENDUM NO. 3 RECONSTRUCTION OF SEVEN PARKING LOTS AT THE SCHOOL OF DENTAL MEDICINE LOCATED ON THE ALTON CAMPUS OF

More information

186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS ADDENDUM #1 PERFORMANCE WORK STATEMENT

186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS ADDENDUM #1 PERFORMANCE WORK STATEMENT 186 TH AIR REFUELING WING KEY FIELD, MERIDIAN, MS PROJECT NUMBER MDVL092051 Renovate Vehicle Maintenance Facility Bldg 200 23 June 2017 ADDENDUM #1 PERFORMANCE WORK STATEMENT 1.0 SCOPE. This addendum to

More information

PROJECT MANUAL BID DOCUMENT 95% REVIEW CHECKLIST PROJECT BID NO EPWU PEM. CONSULTANT SUBMITTED ON / / as a 95% (A) original

PROJECT MANUAL BID DOCUMENT 95% REVIEW CHECKLIST PROJECT BID NO EPWU PEM. CONSULTANT SUBMITTED ON / / as a 95% (A) original PROJECT BID NO EPWU PEM CONSULTANT SUBMITTED ON / / as a 95% (A) original RESUBMITTED ON / / as a 95% (B) revision 1.0 FRONT COVER 1.1 1.2 1.3 1.4 Title begins with location key words, otherwise with program/project

More information

ADDENDUM # 3 DATE: February 16, 2018

ADDENDUM # 3 DATE: February 16, 2018 ADDENDUM # 3 DATE: February 16, 2018 REFERENCE: Invitation for Bid No.: S-LB-18607 IFB Issue Date: January 25, 2018 Title: Stonewall Middle School Addition and Renovations Architect/Engineer: Architecture

More information

Requests for Information pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 2018

Requests for Information pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 2018 Requests for Information - 05.0.1 5pm Draft for Request for Proposals Sprouts - Shell/Civil Issued on April 25, 201 RFI 01 Is the RFP due at 4pm or 5pm on May 16th? Response: RFI 02 Do you have an anticipated

More information

REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA

REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA REQUEST FOR QUALIFICATIONS STATEMENT (RFQ) CONSTRUCTION MANAGEMENT AT RISK SERVICES FOR THE GREENWOOD HIGH SCHOOL GYMNASIUM GREENWOOD, SOUTH CAROLINA GENERAL INFORMATION Greenwood School District 50 is

More information

Sewer Capital Improvement Program Wastewater Treatment Plant No. 3 Generator Banking Sealed Bid No A/E Project No. 2282

Sewer Capital Improvement Program Wastewater Treatment Plant No. 3 Generator Banking Sealed Bid No A/E Project No. 2282 CITY OF KENNER WASTEWATER TREATMENT PLANT NO. 3 GENERATOR BANKING IMC#2282 ADDENDUM NO. 1 DATE: September 28, 2017 PROJECT: City of Kenner Sewer Capital Improvement Program Wastewater Treatment Plant No.

More information

Addendum! Project No: HFX A0 Client Project No: MISC Project: MacAulay Sports Field Project Date: March 23, 2015 Addendum No: 2

Addendum! Project No: HFX A0 Client Project No: MISC Project: MacAulay Sports Field Project Date: March 23, 2015 Addendum No: 2 Addendum! Project No: HFX-00222868-A0 Client Project No: MISC-14-06 Project: MacAulay Sports Field Project Date: March 23, 2015 Addendum No: 2 The following information supplements and/or supersedes the

More information

Dilley ISD 2013 Bond Program Project Update Report March 11, 2015

Dilley ISD 2013 Bond Program Project Update Report March 11, 2015 Dilley ISD 2013 Bond Program Project Update Report March 11, 2015 Professional Services Contracts o Program Management - TASB/SE: Executed 5/5/13 Work on-going o Architect BWA: Executed 2/20/13 Work on-going

More information

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION

CITY OF ALBANY Public Works Department ADDENDUM #1 ST , MAIN STREET REHABILITATION CITY OF ALBANY Public Works Department ADDENDUM #1 ST-13-04-2014, MAIN STREET REHABILITATION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and

More information

Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA TMWA Capital Project No.: October 3, 2018

Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA TMWA Capital Project No.: October 3, 2018 Addendum No. 1 GORDON WATER MAIN REPLACEMENT PWP Bid No.: WA-2019-004 TMWA Capital Project No.: 10-0001.053 October 3, 2018 The following information, clarifications, changes and modifications are by reference

More information

Notice: Request for Proposals. RFP Question & Answers #1-35

Notice: Request for Proposals. RFP Question & Answers #1-35 Notice: Request for Proposals for Construction Manager At Risk RFP Question & Answers #1-35 Publication of Proposal December 31, 2012 Submission of Proposal Deadline January 28, 2013 workforceconnections

More information

ADDENDUM 1 August 28, Construction & Facility Management Office 1636 Gold Star Drive Raleigh, NC 27607

ADDENDUM 1 August 28, Construction & Facility Management Office 1636 Gold Star Drive Raleigh, NC 27607 Nashville Readiness Center Building Renovation Smith Sinnett / 2013024 North Carolina National Guard SCO ID#: 130999902-E ADDENDUM 1 August 28, 2017 NASHVILLE READINESS CENTER BUILDING RENOVATION SCO#:

More information

Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School

Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School A D D E N D U M # 1 DATE: TO: FROM: PROJECT: All Bidders Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School CBI JOB NO.: 11063 The following items shall modify

More information

MUSC Psychiatric Hospital CRI Air-Cooled Chiller Replacement Project

MUSC Psychiatric Hospital CRI Air-Cooled Chiller Replacement Project MUSC Psychiatric Hospital CRI Air-Cooled Chiller Replacement Project H51-9832-FW-A ADDENDUM NO. 01 The following items shall take precedence over the drawings and specifications for the above named project

More information

ADDENDUM NO. 2 PUBLIC WORKS CONSTRUCTION PROJECT NO

ADDENDUM NO. 2 PUBLIC WORKS CONSTRUCTION PROJECT NO ADDENDUM NO. 2 LANCASTER BOULEVARD AND 15 th STREET WEST ROUNDABOUT This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans,

More information

Addendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications

Addendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications Addendum No. 2 Project No. 2016-01EL West Barbour Street 12kV Underground Reconductoring Revisions to Drawings and Specifications Pre-Bid Meeting Notes and Scope of Work Clarifications Replace Section

More information

PLEASE NOTE: Questions are presented below in italics, with answers from the Trust in bold. Similar questions are answered only once.

PLEASE NOTE: Questions are presented below in italics, with answers from the Trust in bold. Similar questions are answered only once. Design and Consultant Services for Façade Restoration Project at Pier 40 Request for Proposal (RFP) Project/Contract #A5029 Questions & Answers December 19, 2018 PLEASE NOTE: Questions are presented below

More information