1 Manhattan Beach Unified School District Page 1

2 TABLE OF CONTENTS 1. Executive Summary Overview Summary of Progress Schedule Overview Financials Overview Change Orders & Potential Change Orders Field Directives Application for Payment Summary Financial Summary Design Status Overview Submittals Requests for Information (RFI) Construction Change Document (CCD) Issues, Disputes, Claims & Safety Issues Claims and Disputes Safety Miscellaneous Project Logs Page 1 of 8

3 1. Executive Summary 1.1 Overview The Mira Costa High School Project is the phase IV Field Modernization to the northwest existing ball field. The project consists of resurfacing the existing grass field with turf, reconfiguration of the fire lane around the new field, new light poles illuminating the path to the new field, retaining wall and concrete curb perimeter, perimeter fencing, storm drain improvements, and the rerouting of Fire, Potable, and Reclaimed Irrigation mains for the establishment of a new modernized turf field. The field modernization will be constructed from November 2016 through September Bernards scope of work will consist of completing the field modernization to a turf Ready condition for turnover to the Manhattan Beach Unified School District anticipated by April The new field sub drainage and turf installations will be completed by others. Mira Costa High School is located in the beach community of Manhattan Beach, CA along Artesia Blvd, between Peck Blvd. and Meadows Ave in the County of Los Angeles. The new field is scheduled to be utilized by the Mira Costa High School campus in the Fall of Page 2 of 8

4 Manhattan Beach Unified School District Fe b ru a r y Summary of Progress Current Construction Activities Recent Construction Activities Include: Remove and re-compact existing fill at field Form and Pour 1st section of wall foundations 330 yards! Continue excavations, form and set up footings for next pour All offsite storm drainage improvements complete! 3 Page 3 of 8

5 2. Schedule 2.1 Overview The Mira Costa High School Field Modernization project under Lease Lease Back terms is being constructed over a three hundred and six (306) calendar day contract duration. The Notice to Proceed was issued to Bernards November 8, 2016 for a November 17, 2016 mobilization. The project s final completion date is scheduled for September 17, Project Schedule Status Field Modernization Bernards issued the 19OCT16 Master Construction Schedule prior to mobilization consisting of our full contract duration of 306 calendar days with the actual mobilization date of November 17, Pre planning for an early finish date, Bernards issued an updated master schedule November 8, 2017 which reflects the actual start date and current status of the project. This early finish schedule has been executed and issued to all subcontractors for an early completion date of May 31, We continue on track for an April 2017 turnover of field turf ready. Our focus in is field grading and placement of new retaining wall foundations. We lost a few weeks in February due to the inclement rains. The rains brought our soils optimum moisture levels to more than double levels which halted our grading and backfill until dry. However our excavated footings remained below optimum and allowed us to pour the first 330 yards of wall foundation, which was a big milestone due to the rains. We are expecting big results in March March activities will include completion of retaining wall foundation placement, stem wall construction, retaining wall construction, field power, retaining wall waterproofing, French drains, Fence post placement, and soils export. All offsite contract requirements are completed and signed off by the City of Manhattan Beach. Below find a summary of the completion milestone dates per the attached updated scheduled as compared to the contract duration schedule: Project Milestones Master Schedule ScheduleACTUALS Completion of all Water Mains 3/7/ /15/16 Reroute gas and new meter 1/17/ /15/16 Concrete Footings and Stem walls 4/14/2017 3/29/2017 CMU retaining walls 6/6/2017 4/24/17 Fencing 7/28/2017 6/2/2017 Fire Lane Paving (base coat) 6/23/2017 4/28/ Financials 3.1 Overview 4 Page 4 of 8

6 The current GMP budget includes a total construction cost of $4,037,426. The GMP includes six (6) allowances; 1) Spoils Removal $357,500, 2) Remove and Replace ADA ramp $4,500, 3) Provide additional rebar and footing enlargement for added CMU pilasters at CMU walls $28,350, 4) Provide concrete footings and CMU at north field $46,200, 5) Add gas shut off valve $2,500, and 6) Repair landscape and irrigation disturbed by new construction $15,000. The GMP also includes a construction contingency fund in the amount of $367,039. Allowances and contingency funds are processed upon agreement by the project team and signed by MBUSD as an Allowance or Contingency allocation requests. All unused construction funds will return to the District as a savings credit. 3.2 Allowances, Contingency, Change Orders & Potential Change Orders The project construction budget includes project allowances contained within the GMP described above. At present, with approval of MBUSD, we have authorized the use of $53,999 from the allowance funds. Refer to the following Tables for description of monies utilized: Allowance1 Spoils Removal Allowance Amount Requested Allocation Amount Authorized Original Balance $357,500 Total Remaining 357,500 Allowance 2 R&R ADA Ramp Allowance Amount Requested Allocation Amount Authorized Original Balance $4,500 Total Remaining $4,500 Allowance 3 CMU Pilasters ALL3.2 CCD 1 Enlarge Pilaster Concrete and rebar per DSA for fence posts at retaining wall Allowance Amount Amount Original Balance Requested Authorized $28,350 $28,350 $28,350 -$28,350 Total Remaining $0.00 Allowance 4 Ftgs/CMU North ALL4.2 - Allocation to Masonry contract for northern CMU wall footings Allowance Amount Allocation Amount Original Balance Requested Authorized $46,200 $9,475 $9,475 -$9,475 5 Page 5 of 8

7 ALL4.3 Provide tan block in lieu of precision gray Allowance 5 Gas Valve ALL New gas line installation & meter $13,674 $13,674 -$13,674 Total Remaining $23,051 Allowance Amount Allocation Amount Original Balance Requested Authorized $2,500 $2,500 $2,500 -$2,500 Total Remaining $0.00 Allowance 6 Repair Landscape Allowance Amount Requested Allocation Amount Authorized Original Balance $15,000 Total Remaining $15,000 The project construction budget includes a project contingency contained within the GMP. At present, with approval of MBUSD, we have authorized the use of $226,799 from the contingency funds. Refer to the following Table for description of monies utilized: Contingency ALL5.2 Balance of cost for new gas line and meter install (total cost $19,360 less allowance 5) CON1.1 Allocate monies for waterproofing scope at new CMU walls not shown per plans CON1.2 - Reroute conduit and wire for existing water pump CON1.3 Install 4 reclaimed piping to ball field CON1.4 Extend 6 C900 Fire Line PVC near pool to safe for new wall CON1.5 Install two(2) backflow devices at field wash Amount Requested Allocation Amount Authorized Original Balance $367,039 $16,860 $16,860 -$16,860 deduct $35,750 $35,750 -$35,750 deduct $7,551 $7,551 -$7,551 deduct $28,107 $28,107 -$28,107 deduct $15,809 $15,809 -$15,809 deduct $8,087 $8,087 -$8,087 deduct 6 Page 6 of 8

8 per local water authority CON1.5 Delete northern retaining wall, delete ADA ramp, add curbs, ad new fire lane low wall and fencing - credit CON1.7 Install one 1 ½ conduit for future field lighting CON1.8 Provide powder coated fence posts, rails, fittings, gates CON1.9 Remove landscape chemical barrels from field CON1.10 New Batting cage posts, footings, and netting $12,250 $12,250 $12,250 Add $39,340 $39,340 -$39,340 deduct $58,863 $58,863 -$58,863 deduct $1,505 $1,505 -$1,505 deduct $27,177 $27,177 -$27,177 deduct Total Remaining $140,240 At present, two (0) Potential Change Order(s) (PCO) are out for pricing with two (2) submitted as a COR to MBUSD for approval. The project team has requested that the subcontractor(s) submit PCOs within five (5) days of the issuance of any Construction Change Directive, Field Directive, or Request for Information having a cost associated. See attached PCO log. 3.3 Field Directives A total of one (1) Field Directives have been issued through. Field Directives are issued directing the contractor to proceed with added work scope in advance of CCD or Instruction Bulletin, if necessary to minimize project delays. The contractor will submit Potential Change Orders for review as they pertain to these Field Directives. Once Field Directive work is complete, Bernards will review and make change order recommendations to the District accordingly. Field Directives correspond to the Project Team Approved PCOs in the attached PCO Log. 1. Field Directive #01/CON1.10 Furnish and install new batting cage 3.4 Application for Payment Summary December 2016 Pay application #01 was issued to MBUSD on January 5, 2017 in the amount of $529,338 (Net). Payment received. January 2017 Pay application #02 was issued to MBUSD on February 1, 2017 in the amount of $372,626 (Net). Payment received 7 Page 7 of 8

9 Pay Application #03 was issued to MBUSD on March 1, 2017 in the amount of $244,911 (Net). Payment pending Application for Payment submitted by the Contractor will be reviewed, discussed and adjusted as necessary by discretion of the Project Inspector, and the Architect prior to being submitted to Manhattan Beach Unified School District for processing. 4. Design Status 4.1 Overview Field Modernization Drawings and Specifications received DSA approval on March 14, Submittals A total of eighteen (18) required submittal packages have been submitted. A total of seventeen (18) required submittals have been received to date, seventeen (17) have been returned from the Architect, with one (1) pending review and approval by the design team. Reference attached log for additional information. 4.3 Requests for Information (RFI) A total of twenty (20) construction RFI s have been submitted to date, with zero (0) pending response. Prompt review and return of RFI s by the Architect is crucial to the project schedule and is reviewed at the weekly construction meetings. Reference attached log for additional information. 4.4 Construction Change Document (CCD) A total of two (2) Construction Change Document(s) have been issued (including revisions) by the Architect, which may have an additive or deductive cost impact to the project. Of these CCD s, two (2) have been determined necessary to submit to DSA for approval. Pending CCDs include the following: a. Revision to ADA path of travel. Eliminate ADA ramp and utilize ADA ramp for accessibility. See CCD note below Division of the State Architect Documents The following are items being tracked for review and approval in DSA: Addenda: N/A Construction Change Documents: 8 Page 8 of 8

10 One (1) Construction Change Document (CCD s) have been issued by the Architect. CCDA-001 Add 16x16 CMU pilasters at all fence post locations Submitted 12/15/16. DSA approval received 2/27/17 CCDA-002 pending Utilization of the fire lane as an ADA accessible path in lieu of new concrete ramp. Revised plans were completed by The Prizm Group on 1/20/17 for DSA submittal. The project Architect, HED, submitted final package to DSA for final review and approval. Pending DSA approval. 5. Issues, Disputes, Claims & Safety 5.1 Issues No issues to report at this time 5.2 Claims and Disputes No formal claims or disputes have been received to date. 5.3 Safety No safety issues to report at this time 6. Miscellaneous 6.1 Project Logs Master Construction Scheduled (Data Date: 22DEC16) Submittals Under Designer Review Log RFI s Under Designer Review Log Change Order log/allowance/contingency/allocations 9 Page 9 of 8

SMMUSD LINCOLN MIDDLE SCHOOL ATHLETIC FIELD PROJECT

SMMUSD LINCOLN MIDDLE SCHOOL ATHLETIC FIELD PROJECT ADDENDUM 01 SMMUSD LINCOLN MIDDLE SCHOOL ATHLETIC FIELD PROJECT 06/08/2017 DSA NO. A03-117787/File No.19-96 Prepared By DLR Group Project No. 75-07256-24 SECTION 00 91 00 GENERAL ADDENDUM 01 1.01 The following

More information

Perimeter Site Improvements

Perimeter Site Improvements Perimeter Site Improvements Phase 1-5 Architect: W+W Architects and Planners Anticipated Milestone Activities: Phase 1, 2 & 3 Construction Manager: Bernards 08.08.13 Directional Signage Contractor: Woodcliff

More information

GENERAL NOTES KEYED NOTES OVERALL SITE PLAN. VSR Design Landscape Architecture-Planning-Sports-Recreation LAYOUT + MATERIALS

GENERAL NOTES KEYED NOTES OVERALL SITE PLAN. VSR Design Landscape Architecture-Planning-Sports-Recreation LAYOUT + MATERIALS GENERAL NOTES. ALL UTILITIES SHOWN ON PLANS ARE BASED ON ABOVE GROUND OBSERVATION AND MAY NOT INCLUDE ALL LINES PRESENT. VSRDESIGN ACCEPTS NO RESPONSIBILITY FOR THE ACCURACY OF THE UTILITY LOCATIONS AS

More information

Ohlone Community College District

Ohlone Community College District Bond Measure G March 2014 Prepared by: Contents Section 1 Section 2 Section 3 Section 4 Section 5 Executive Summary Project Summary Design Progress Construction Progress Quick Fix Projects Closeout Progress

More information

MINNESOTA AVENUE NE REVITALIZATION PHASE II CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

MINNESOTA AVENUE NE REVITALIZATION PHASE II CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT PROJECT OFFICE PARK 7, SUITE 112, 4020 MINNESOTA AVENUE NE, WASHINGTON, DC 20019 MINNESOTA AVENUE NE REVITALIZATION PHASE II CONSTRUCTION MANAGER S 12/11/2017 12/16/2017 12/14/2017 Minnesota Ave. NE Sta.

More information

ORANGE VISTA HIGH SCHOOL PHASE I

ORANGE VISTA HIGH SCHOOL PHASE I 975 W. Morgan Street Perris, CA 92571 ORANGE VISTA HIGH SCHOOL PHASE I Monthly Project Progress Report January 2015 Prepared by: 9339 Feron Blvd. Rancho Cucamonga, CA 91730 I. Project Location and Description

More information

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 18, 2016

SANTA ANA COLLEGE FACILITIES COMMITTEE MEETING OCTOBER 18, 2016 FACILITIES COMMITTEE MEETING OCTOBER 18, 2016 1 ACTIVE PROJECTS Santa Ana College Central Plant, Infrastructure and Mechanical Upgrades 2 COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements

More information

Addendum No. 1 Page 1 of 2

Addendum No. 1 Page 1 of 2 Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT

More information

WINTERHAVEN PUBLIC SAFETY FACILITY PROJECT

WINTERHAVEN PUBLIC SAFETY FACILITY PROJECT WINTERHAVEN PUBLIC SAFETY FACILITY PROJECT Funded by: California Department of Housing and Community Development (HCD) through its Community Development Block Grant (CDBG) Program and the County of Imperial.

More information

Capital Projects Progress Report. January Presented by

Capital Projects Progress Report. January Presented by Capital Projects Progress Report January 2019 Presented by February 8, 2018 Loretta Orologio District Superintendent Churchville-Chili Central School District 139 Fairbanks Road Churchville, New York 14428

More information

IMPROVEMENT PLANS FOR CITY OF RIO VISTA CONDITIONAL USE PERMIT NO

IMPROVEMENT PLANS FOR CITY OF RIO VISTA CONDITIONAL USE PERMIT NO IMPROVEMENT PLANS FOR CITY OF RIO VISTA CONDITIONAL USE PERMIT NO. 2016-002 AND LIFORNIA 94571 REVISIONS VICINITY MAP No. Description NTS CONTACTS SHEET INDEX SHEET NO. SITE MAP 1"=50' COVER SHEET R MLP

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 02210 - Site Grading C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 STRUCTURE PROTECTION... 2 1.03 JOB CONDITIONS... 3 PART 2 - PRODUCTS...

More information

Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017

Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017 Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017 Plumbing - 220000 Without limiting the application of all of the Contract Documents to the Subcontract,

More information

CONSENT CALENDAR 5 Agreement for Architectural Design Services for the COS Hanford Educational Center Student Quad

CONSENT CALENDAR 5 Agreement for Architectural Design Services for the COS Hanford Educational Center Student Quad COLLEGE OF THE SEQUOIAS COMMUNITY COLLEGE DISTRICT Board of Trustees Meeting December 14, 2015 CONSENT CALENDAR 5 Agreement for Architectural Design Services for the COS Hanford Educational Center Student

More information

ORANGE VISTA HIGH SCHOOL PHASE I

ORANGE VISTA HIGH SCHOOL PHASE I 975 W. Morgan Street Perris, CA 92571 ORANGE VISTA HIGH SCHOOL PHASE I Monthly Project Progress Report February 2015 Prepared by: 9339 Feron Blvd. Rancho Cucamonga, CA 91730 I. Project Location and Description

More information

DOCUMENT BID DOCUMENT

DOCUMENT BID DOCUMENT DOCUMENT 00 40 00 BID DOCUMENT 1 Submit bids in compliance with Document 00 21 00Instructions to Bidders. Fill in blanks which pertain to the project or indicate N/A. The Owner reserves the right to reject

More information

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements Table of Contents City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements General Requirements Application & Processing Procedures o Plan Requirements

More information

Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits.

Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits. Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits. All private construction and/or maintenance activities which take place within the City right-of-way are subject to oversight

More information

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report

BRIDGE DISTRICT. City of West Sacramento. Phase 1 Infrastructure Improvement Project. Monthly Status Report BRIDGE DISTRICT Phase 1 Infrastructure Improvement Project (for work completed thru November 2011) Cover Photo: Joint Utility Trench installation along Fifth Street just north of Bridge Street. Page 1

More information

**RESPONSES TO COMMENTS MUST BE RETURNED WITH REVISED PLANS FOR FINAL PLAN APPROVAL.** Approved as submitted X Needs attention N/A Non-Applicable

**RESPONSES TO COMMENTS MUST BE RETURNED WITH REVISED PLANS FOR FINAL PLAN APPROVAL.** Approved as submitted X Needs attention N/A Non-Applicable PLAN REVIEW CHECKLIST FOR WATER MAINS AND SANITARY SEWERS CITY OF ANDERSON / ELECTRIC CITY UTILITIES ************************************************************************************* Project Name:

More information

Phase 2 Exposition Metro Line Project

Phase 2 Exposition Metro Line Project Phase 2 Exposition Metro Line Project Monthly Project Status Report November 2014 TABLE OF CONTENTS PHASE 2 EXPO LINE PROJECT STATUS TABLE OF CONTENTS... 2 Phase 2 Exposition Metro Line Construction Authority

More information

DOCUMENT ADDENDA AND MODIFICATIONS

DOCUMENT ADDENDA AND MODIFICATIONS DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications

More information

AGENDA Board of Directors Special Board Meeting Monday, October 30, :30 AM 9300 Fanita Parkway, Santee, CA 92071

AGENDA Board of Directors Special Board Meeting Monday, October 30, :30 AM 9300 Fanita Parkway, Santee, CA 92071 CALL TO ORDER PLEDGE OF ALLEGIANCE AGENDA Board of Directors Special Board Meeting Monday, October 30, 2017 9:30 AM 9300 Fanita Parkway, Santee, CA 92071 OPPORTUNITY FOR PUBLIC COMMENT Opportunity for

More information

Beaumont Lot Grading Guidelines

Beaumont Lot Grading Guidelines Beaumont Lot Grading Guidelines Updated: 2019-01-14 CONTENTS LOT GRADING OVERVIEW... 3 INTRODUCTION... 3 PURPOSE... 3 DEFINITIONS... 3 LOT GRADING REQUIREMENTS... 3 DESIGN GRADES AND EXISTING GRADES...

More information

Scope of Work Bid Package C-4 - West Polished Concrete

Scope of Work Bid Package C-4 - West Polished Concrete Scope of Work Bid Package C-4 - West Polished Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,

More information

CITY OF TACOMA Department of Public Utilities Tacoma Power

CITY OF TACOMA Department of Public Utilities Tacoma Power CITY OF TACOMA Department of Public Utilities Tacoma Power ADDENDUM NO. 1 DATE: August 4, 2017 REVISIONS TO: Request for Bids Specification No. PG17-0130F TPU Eductor Waste Decant Facility NOTICE TO ALL

More information

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS*** 00005B *** *** BOLD ITALICIZED Item is bound within this specification manual. Regular non-italicized Item is not bound within this specification manual, however item is part of the contract. Contents

More information

BOARD OF TRUSTEES OCTOBER 13, 2014

BOARD OF TRUSTEES OCTOBER 13, 2014 Measure E BOARD OF TRUSTEES OCTOBER 13, 2014 FACILITIES UPDATE Measure Q 1 RECENTLY COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements Building G Renovation Artesia Street Improvements Property

More information

STANDARD IRRIGATION & LANDSCAPE PLAN NOTES FOR PRIVATELY CONSTRUCTED COMMUNITY FACILITIES DISTRICTS

STANDARD IRRIGATION & LANDSCAPE PLAN NOTES FOR PRIVATELY CONSTRUCTED COMMUNITY FACILITIES DISTRICTS STANDARD IRRIGATION & LANDSCAPE PLAN NOTES FOR PRIVATELY CONSTRUCTED COMMUNITY FACILITIES DISTRICTS NOTE TO DESIGNERS: The following standard notes shall be included on the respective irrigation and landscape

More information

Table Related Arlington County Standards, Specification and Policies

Table Related Arlington County Standards, Specification and Policies 2.1 GENERAL 2.1.1 DESCRIPTION SITE WORK V02000 2.1 GENERAL 2.1.1 Description This standard identifies minimum requirements that shall be met for all site work in the design and construction of elements

More information

City Of Mendota Construction Procedures

City Of Mendota Construction Procedures City Of Mendota Construction Procedures Building Permit Application: A permit shall be obtained prior to commencing work of any type. Failure to do so may result in doubling the permit fees. At the time

More information

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA

2010 IDC WATER AND SEWER CONSTRUCTION PACKAGE III 12/11/2009 SAWS WATER JOB. NO /SAWS SEWER JOB NO SOLICITATION #B RA BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of, a Partnership consisting of, an Individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1

1.01 GENERAL. l.02 PIPELINE TRENCH EXCAVATION PIPELINES AND STRUCTURES REVISION: SECTION 1 PAGE : 1-1 1.01 GENERAL A. The Contractor shall perform all excavation, backfilling, grubbing and grading required for construction and installation of pipelines, structures and appurtenances. Excavation shall include

More information

The following Specifications of the Special Provisions have been revised and/or added (in red):

The following Specifications of the Special Provisions have been revised and/or added (in red): RE: City of Monrovia Project MR-011 South Area Infrastructure Improvement Project Addendum #1 December 14, 2017 Dear Bidders: The attached information and clarifications constitutes Addendum #1 for the

More information

Scope of Work Bid Package C-8 - West Overhead Doors

Scope of Work Bid Package C-8 - West Overhead Doors Scope of Work Bid Package C-8 - West Overhead Doors CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

CITY OF ELKO BID TABULATION FOR Sports Complex

CITY OF ELKO BID TABULATION FOR Sports Complex CITY OF ELKO BID TABULATION FOR Sports Complex 2017-2018 NAME Granite Construction Great Basin Engineering Contractors Road & Highway Builders CLEARING EARTHWORK 1 33701200 Mobilization @ Per Lump Sum

More information

SP 1.02 SHEET INDEX 1 OF 2 SITE SURVEY 2 OF 2 SITE SURVEY OVERALL SITE PLAN FOOTBALL & TRACK LAYOUT AND MATERIALS PLAN

SP 1.02 SHEET INDEX 1 OF 2 SITE SURVEY 2 OF 2 SITE SURVEY OVERALL SITE PLAN FOOTBALL & TRACK LAYOUT AND MATERIALS PLAN P.O. Box 768 Overland Park, KS 6627 ph: (93) 484-52 47 W. 4th Terrace Lenexa, KS 6625 ph: (93) 894-55 SPOIL DISPOSAL SITE 255 Valley Parkway, Suite 2 Olathe, KS 666 ph: (93) 344-29 SHEET INDEX OF 2 SITE

More information

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater

More information

MATERIAL ALLOWANCES AND UNIT PRICES

MATERIAL ALLOWANCES AND UNIT PRICES PART 1 - GENERAL 1.1 SECTION INCLUDES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 SECTION 012200 MATERIAL ALLOWANCES AND UNIT PRICES A. Measurement and payment criteria applicable to

More information

COMBINED CONCRETE SIDEWALK AND RETAINING WALL. Comply with Division 1 - General Provisions and Covenants, as well as the following:

COMBINED CONCRETE SIDEWALK AND RETAINING WALL. Comply with Division 1 - General Provisions and Covenants, as well as the following: SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9072 - Combined Concrete Sidewalk and Retaining Wall PART 1 - GENERAL 1.01 SECTION INCLUDES COMBINED CONCRETE SIDEWALK AND RETAINING

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,

More information

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements. SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction

More information

LOT GRADING GUIDELINES FOR LOW DENSITY RESIDENTIAL PROPERTIES

LOT GRADING GUIDELINES FOR LOW DENSITY RESIDENTIAL PROPERTIES LOT GRADING GUIDELINES FOR LOW DENSITY RESIDENTIAL PROPERTIES Contents LOT GRADING GUIDELINES... 3 LOW DENSITY RESIDENTIAL PROPERTIES... 3 Introduction... 3 Definitions:... 3 Purpose... 3 LOT GRADING APPROVAL

More information

ARTICLE 700 LARGE SCALE DEVELOPMENTS

ARTICLE 700 LARGE SCALE DEVELOPMENTS ARTICLE 700 LARGE SCALE DEVELOPMENTS SEC. 700.1 APPLICABILITY A development plan shall be submitted to the Bentonville Planning Commission for all developments or building construction regardless of zone

More information

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested. Purpose 355 West Queens Road Single Family New Construction Required Inspection Stages Master Requirement GEN 110 Building Department: 604-990-2480, building@dnv.org, fax: 604-984-9683 The following procedure

More information

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL... 18-2 18-2 ROADWAY EXCAVATION... 18-2 18-2.01 General... 18-2 18-2.02 Unsuitable Roadway Excavation and Backfill... 18-2 18-2.03 Surplus

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

PROJECT COMPLETED. Bayside High School. Comprehensive Additions and Renovations

PROJECT COMPLETED. Bayside High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 November 6, 2009 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Ed Schwartz Project Budget Project

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01025 MEASUREMENT AND PAYMENT PART 1 -- GENERAL 1.1 SCOPE A. The Contractor shall receive and accept the compensation as provided in the Bid Form as full payment for furnishing all materials, labor,

More information

STORM SEWER TAP PERMIT REQUIREMENTS

STORM SEWER TAP PERMIT REQUIREMENTS STORM SEWER TAP PERMIT REQUIREMENTS The Fishers Construction Specifications discusses sump pump and storm sewer tap requirements per the following code under Chapter 4, Storm Sewer Design Standards and

More information

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018 155 Corey Avenue St. Pete Beach, FL 33706-1839 www.stpetebeach.org Addendum 1 Valve & Valve Vault Replacement Issued June 13, 2018 Note that this Addendum does not change the bid due date and time as stated

More information

Kaysville Parks and Recreation Department Request For Bids Pioneer Park Phase I RFB 10-17

Kaysville Parks and Recreation Department Request For Bids Pioneer Park Phase I RFB 10-17 The total construction s shall be broken down into the categories indicated below to provide the Owner with a comparable analysis of each proposal submitted and a method for determining value engineering

More information

SECTION SUPPLEMENTARY GENERAL CONDITIONS

SECTION SUPPLEMENTARY GENERAL CONDITIONS SECTION 00800 SUPPLEMENTARY GENERAL CONDITIONS PART 1 - GENERAL 1.1 SCOPE OF WORK In general, the Work consists of application of a fluid applied membrane, installation of new tapered insulation, installation

More information

CITY OF EL CERRITO PUBLIC WORKS DEPARTMENT

CITY OF EL CERRITO PUBLIC WORKS DEPARTMENT CITY OF EL CERRITO PUBLIC WORKS DEPARTMENT OHLONE GREENWAY BART STATION AREA ACCESS, SAFETY, AND PLACEMAKING IMPROVEMENTS City Project No. C3076 Federal Project No. CML-5239 (025) ADDENDUM NO. 1 TO: All

More information

Project # 570-CSI-001. Expand Mental Health Center, Building 27 SCOPE OF WORK

Project # 570-CSI-001. Expand Mental Health Center, Building 27 SCOPE OF WORK DEPARTMENT OF VETERANS AFFAIRS VA Central California Healthcare System Project # 570-CSI-001 Expand Mental Health Center, Building 27 SCOPE OF WORK 1. GENERAL DESCRIPTION The awarded contractor shall provide

More information

Ohlone Community College District

Ohlone Community College District Bond Measure G February 2014 Prepared by: Contents Section 1 Section 2 Section 3 Section 4 Section 5 Executive Summary Project Summary Design Progress Construction Progress Quick Fix Projects Schedule

More information

ADDENDUM NO. 2 PUBLIC WORKS CONSTRUCTION PROJECT NO

ADDENDUM NO. 2 PUBLIC WORKS CONSTRUCTION PROJECT NO ADDENDUM NO. 2 LANCASTER BOULEVARD AND 15 th STREET WEST ROUNDABOUT This addendum forms a part of the contract documents for the above identified project and modifies the original specifications, plans,

More information

Project Manual Index of Specifications Shenandoah Schools Concession Building

Project Manual Index of Specifications Shenandoah Schools Concession Building INDEX OF SPECIFICATIONS Division 0..BIDDING AND CONTRACT REQUIREMENTS 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 41 00 Bid Forms 00 43 13 Bid Security Form 00 72 00 General Conditions

More information

Centennial School District Business Office Extension: 11011

Centennial School District Business Office Extension: 11011 Centennial School District Business Office Extension: 11011 INTEROFFICE MEMORANDUM TO: Board of Directors FROM: Christopher M. Berdnik DATE: March 5, 2014 RE: McDonald Change Orders Additional electrical

More information

Construction Documents Checklist

Construction Documents Checklist Construction Documents Checklist The following must be completed prior to final approval of site development plans (Construction Documents) by the Town: Final Drainage Report signed by engineer-of-record

More information

Project Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial

Project Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial Planning Commission Staff Report Planning Commission Hearing November 14, 2016 Project Title: Major Site Review (SR16-06) for Ripon Gardens II Commercial Request: A request to develop a 15,996 square foot

More information

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES City of Bullhead City Development Services/Public Works Permit Submittal Requirements FENCES Contact Information: Building Division (928) 763-0124 Planning & Zoning Division (928) 763-0123 Engineering

More information

Owner s Meeting Minutes /27/11

Owner s Meeting Minutes /27/11 Owner s Meeting Minutes 329 Attendees: M. Martinez A. Tomlinson A. Patterson C. Muldoon B. Englert L. Rosas L. McKinsey M. Wood T. Johns M. Schoeppner J. Baez N. Malone S. McMurray E. Colocho B. Young

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following

More information

Questions & Responses RFP No Design-Build Services, Twin Brooks Golf Course Renovations

Questions & Responses RFP No Design-Build Services, Twin Brooks Golf Course Renovations Q1. LASCO Fittings, Inc. is a manufacturer of PVC fittings and specialized irrigation components such as Swing Joints. I noticed in the specifications shown below that Toro Company is listed as the lead

More information

MINIMUM REQUIREMENTS FOR CONSTRUCTION PLANS, GRADING AND/OR DRAINAGE PLANS, LOW IMPACT DEVELOPMENT PLANS, AND WATER EFFICIENT LANDSCAPE PLANS

MINIMUM REQUIREMENTS FOR CONSTRUCTION PLANS, GRADING AND/OR DRAINAGE PLANS, LOW IMPACT DEVELOPMENT PLANS, AND WATER EFFICIENT LANDSCAPE PLANS Planning and Community Preservation Department Public Works Department 232 West Sierra Madre Boulevard Sierra Madre, CA 91024 (626)355-7135 MINIMUM REQUIREMENTS FOR CONSTRUCTION PLANS, GRADING AND/OR DRAINAGE

More information

GENERAL CONSTRUCTION

GENERAL CONSTRUCTION GENERAL CONSTRUCTION 1. All construction work shall be done in accordance with the current version of the Idaho Standards for Public Works Construction (ISPWC), the City of Meridian Supplemental Specifications

More information

Completed projects. Projects in progress. Program developments

Completed projects. Projects in progress. Program developments 1 Completed projects Projects in progress Program developments 2 Relocation of District administrative offices Interim housing (classrooms and PE facilities) at Cupertino and Lawson Middle Schools Site

More information

Schedule Guidance Document

Schedule Guidance Document Schedule Guidance Document Version: 1.2 Effective Date: August 20, 2013 Contents 1. Purpose... 1 2. Applicability and Basic Requirements... 2 3. Baseline Schedule... 3 3.1. General... 3 3.2. Schedule Work

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH CHAPTER 2 201 ROADS 201.1 General This section is to assist the designer in determining what is needed for the design of roads in public rights-of-way. For these standards, the terms used are: Restricted

More information

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM Each applicant needs to thoroughly review the conditions of development issued by the Planning Division in the format of a Resolution approving your project

More information

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX BID PACKAGE #1 SITE WORK

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX BID PACKAGE #1 SITE WORK HOSKINS ARCHITECTURE, LLC 1827 1 ST AVENUE NORTH, SUITE 104 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 1 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX BID PACKAGE #1 SITE WORK

More information

Index to Technical Specifications

Index to Technical Specifications Index to Technical Specifications Item Number Subject I II EXCAVATION 1.01 Trenching and Excavation Regulations 1.02 Site Grading or General Excavation 1.03 Structural Excavation 1.04 Trench Excavation

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

CWRP WEEKLY CONSTRUCTION PROGRESS REPORT Week ending April 20, 2013

CWRP WEEKLY CONSTRUCTION PROGRESS REPORT Week ending April 20, 2013 CWRP WEEKLY CONSTRUCTION PROGRESS REPORT Week ending April 20, 2013 RIVER DIVERSION SEGMENT This week on the River Diversion, Ducworks completed the steel pipe installation below the waterline elevation.

More information

SPRINKLER SYSTEM Job Ready Checklist

SPRINKLER SYSTEM Job Ready Checklist Job Ready Checklist This list is to be reviewed by the Builder/Superintendent to verify that the job site is ready for the Trade Contractor to arrive and begin work. Permit card is clearly posted. Readable

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

South Parking Lot Montecito Unified School District Santa Barbara, California

South Parking Lot Montecito Unified School District Santa Barbara, California South Parking Lot Montecito Unified School District Santa Barbara, California 100% Schematic Design Statement of Probable Cost December 6, 2016 Cumming Project No. 16-00673.00 Prepared for Roesling Nakamura

More information

REQUEST FOR SEALED BIDS No

REQUEST FOR SEALED BIDS No REQUEST FOR SEALED BIDS No. 2018-013 Project: Granger Site Development Phase 2 Issued: December 19, 2018 CONTENTS Section 1. Bid Announcement and General Information Section 2. Bid Specifications and Bid

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

EXHIBIT F STUDIO GC DRAWINGS

EXHIBIT F STUDIO GC DRAWINGS STUDIO GC DRAWINGS GENERAL NOTES 4700 S Ravinia Ave, Orland Park, IL 6046 DRAWING INDEX. BEFORE BEGINNING WORK AT THE SITE AND THROUGHOUT THE COURSE OF THE WORK, INSPECT AND VERIFY THE LOCATION AND CONDITION

More information

We will need to keep a minimum of 6-0 wide pathway.

We will need to keep a minimum of 6-0 wide pathway. 2 April 16, 2018 FRESNO CHAFFEE ZOO WARTHOG EXHIBIT 894 West Belmont Avenue Fresno, CA 93728 Architect Project Number: 1616 FCZ Project Number: 0192 To: Prospective Bidders ADDENDUM NO. 2 The following

More information

PROPOSED CONSTRUCTION BUILDING CODES FOR TURF AND LANDSCAPE IRRIGATION SYSTEMS

PROPOSED CONSTRUCTION BUILDING CODES FOR TURF AND LANDSCAPE IRRIGATION SYSTEMS APPENDIX F Adopted: March 15, 2012 Effective: March 15, 2012 PROPOSED CONSTRUCTION BUILDING CODES FOR TURF AND LANDSCAPE IRRIGATION SYSTEMS PART 1: GENERAL A. Description. 1. Purpose. To establish uniform

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT 2006 PROPOSITION A BOND PROGRAM 300 SENECA NEW ACADEMIC CAMPUS ADDENDUM NO. 1 PROJECT: 300 Seneca New Academic Campus DATE: September 23, 2013 300 Seneca Ave., S.F.,

More information

Incorporated Village of Lawrence

Incorporated Village of Lawrence Incorporated 196 Central Ave Lawrence NY 11559 516-239-3987 Fax 516-239-9657 Building Department Permit Application Instructions Application must be complete Application must be accompanied by a filing

More information

SECTION NETWORK ANALYSIS SCHEDULES (NAS) FOR DESIGN-BUILD 8/10

SECTION NETWORK ANALYSIS SCHEDULES (NAS) FOR DESIGN-BUILD 8/10 SECTION 01 32 17.05 20 NETWORK ANALYSIS SCHEDULES (NAS) FOR DESIGN-BUILD 8/10 PART 1 GENERAL 1.1 DESCRIPTION The Contractor is responsible for scheduling all design, procurement and construction. A single

More information

GENERAL NOTES REQUIRED NOTES ON ALL PLANS

GENERAL NOTES REQUIRED NOTES ON ALL PLANS GENERAL NOTES REQUIRED NOTES ON ALL PLANS ALL MATERIALS, WORKMANSHIP AND CONSTRUCTION SHALL CONFORM TO THE CURRENT CITY OF SANTA ROSA DESIGN AND CONSTRICTIOIN STANDARDS AND CONSTRUCTION SPECIFICATIONS

More information

Chino Valley Unified School District Monthly Construction Update

Chino Valley Unified School District Monthly Construction Update h Construction of One Classroom Wing Cattle Elementary School Architect: WLC Architects, Inc. Contractor: Pacwest Corporation Construction Manager: Bernards Contract Amount: $2,974,000 Contract Start:

More information

BONDING REQUIREMENTS AND PROCEDURES

BONDING REQUIREMENTS AND PROCEDURES Town of Apex Development Services 73 Hunter Street, 3 rd Floor Apex, NC 27502 (919) 249-3394 BONDING REQUIREMENTS AND PROCEDURES ORDINANCE RATIFYING THE REQUIREMENT FOR BONDING: (From the Unified Development

More information

ATTACHMENT 8 STIPULATED UNIT PRICES

ATTACHMENT 8 STIPULATED UNIT PRICES ATTACHMENT 8 STIPULATED UNIT PRICES 1. Work Package Item Prices (2 pages) 2. General Description of Work Items (3 pages) PQOC SMALL SIDEWALK CONTRACTORS LIST STIPULATED UNIT PRICES City of Los Angeles

More information

PROJECT: GROVECENTER ELEMENTARY SCHOOL RELOCATION OF 1-24x40 AND 1-36x40 RELOCATABLE BLDG. AND PLAY EQUIPMENT.

PROJECT: GROVECENTER ELEMENTARY SCHOOL RELOCATION OF 1-24x40 AND 1-36x40 RELOCATABLE BLDG. AND PLAY EQUIPMENT. October 23, 2017 PROJECT: GROVECENTER ELEMENTARY SCHOOL RELOCATION OF 1-24x40 AND 1-36x40 RELOCATABLE BLDG. AND PLAY EQUIPMENT. PROJECT ADDRESS: 775 N. LARK ELLEN AVENUE, WEST COVINA, CA 91791 DSA A#:

More information

DIVISION 1 - GENERAL CONDITIONS TOTAL:

DIVISION 1 - GENERAL CONDITIONS TOTAL: ITB 39-08/09 UNIT PRICE BID BREAKDOWN CONSTRUCTION OF THE 35th STREET RESTROOM FACILITIES & STREET END IMPROVEMENTS The following unit quantity breakdown is provided FOR INFORMATIONAL PURPOSES ONLY. Bidders

More information

1/24/2014. Schedules Schedule of Values Submittals Payment Applications Requests for Information Change Order Requests Change Orders

1/24/2014. Schedules Schedule of Values Submittals Payment Applications Requests for Information Change Order Requests Change Orders 1 1 Construction Management Schedules Schedule of Values Submittals Payment Applications Requests for Information Change Order Requests Change Orders Budget Forecasting Substantial Completion Close out

More information

Small Site Stormwater Quality Permit Application

Small Site Stormwater Quality Permit Application Small Site Stormwater Quality Permit Application PUBLIC WORKS ADMINISTRATION BUILDING (PWA) STORMWATER DIVISION 2525 WEST FIRST STREET LOVELAND, CO 80537 GENERAL INFORMATION (970) 962-2772 www.cityofloveland.org/stormwater

More information

EXHIBIT 2-2-C SCHEDULES

EXHIBIT 2-2-C SCHEDULES EXHIBIT 2-2-C SCHEDULES PART 1 GENERAL 1.01 SUMMARY A. The Work specified in this section consists of furnishing transportation, labor, materials, equipment, and incidentals necessary for preparation,

More information