1 PRE-FEASIBILITY REPORT FOR M/S HIMALAYA ALKALIES & CHEMICALS LTD (Formerly SNJ Chemex (P) Limited) Mauza Johron, Kala Amb, Tehsil Nahan, District Sirmaur, Himanchal Pradesh 1

2 INDEX Chapters Page No. Form-I PROJECT AT A GLANCE 4 1. INTRODUCTION 6 2. PROFILE OF THE COMPANY & PROMOTERS 8 3. BASELINE ENVIRONMENTAL SETTING State District Project Site Climate Cloudiness Winds Drainage Land Use Forest Flora & Fauna Demography & Socio-economics Environment Study Area PROJECT DESCIRPTION General Raw Material Finished Products Installed Capacity Manufacturing Process Facilities at the Plant Power Water Supply Manpower Waste Handling Pollution Control Measures ENVIRONMENT IMPACT ASSESSMENT 29 2

3 5.1 Present Environment Probable Impact on Environment Development Stage Operational State ENVIRONMENT MANAGEMENT PLAN General Air Environment Water Environment Land Environment Solid Waste Noise Environment Green Belt EXPENDITURE ON ENVIRONMENTAL MEASURES 36 LIST OF FIGURES: 3.1 Key Plan Location on Google Water Balance 25 LIST OF TABLES: 3.1 Demographic Statistics Plant Site & Location 20 3

4 PROJECT AT A GLANCE Name of Project Type of Project Location Product By-product Capacity (MTA) : Himalaya Alkalies & Chemicals Ltd. ( Formerly SNJ Chemex (P) Limited) : Chlor Alkali (Chemical Manufacturing) : Mauza Johran,Kala Amb, Tehsil Nahan, District- Sirmaur (HP) : Caustic Soda, Chlorine, Hydrogen gas : Hydrochloric Acid, CPW, SBP, Sodium Hypo chloride) : Product: CAUSTIC SODA CHLORINE HYDROGEN GAS (NM 3 ) By Products: CHLORINATED PARAFFIN WAX STABLE BLEACHING POWDER HYDROCHLORIC ACID (SYN) 32% HYDROCHLORIC ACID ( CPW) 32% SODIUM HYPO 1,40,000 MTPA 1,26,000 MTPA 39,34,0000 MTPA MTPA 5250 MTPA 1,25,000 MTPA 70,000 MTPA 12,600 MTPA Cost of the Project Total Land Power Requirement Source of power Source of Water Supply : 300 Cr. : 1, 15,000 sqm : 42 MW : From HPSPCL : Own Tube-well Consumption of Water : Domestic = 20.0 KLD Cooling = KLD Boiler = KLD Process = KLD Total = KLD 4

5 Effluent Quantity : Domestic = 15 m 3 /day Cooling = Recirculation Boiler Blow down = 20 KLD Process = 200 KLD (Reuse) Effluent treatment : Domestic, Boiler blow down, cooling tower rejection- Treated through STP and used on land for plantation & landscaping With-in the premises. Process- Ultra filtration (reuse) Air Pollution Control : Hypo Tower: Caustic Scrubber Boiler : Cyclone, wet Scrubber Solid Waste : 18.0 ton/day 5

6 1.0 INTRODUCTION Human environment can be defined as the interaction of the surroundings in which he lives. Thus, the air he breathes, the water he drinks, the temperature in which he survives and in fact all other items which have a direct bearing on human existence can be classified as environment. Usually the most important and universally accepted components of this complex system are the land, which gives him food, the water bodies which satisfy his thirst and the atmosphere which provides him air to breath. Any imbalance in any of these has a direct detrimental effect on the physical and mental health of man. Today one hears of contamination of the atmosphere due to nuclear mishaps, pollution of land due to nuclear fallout and fouling natural waters by indiscriminate waste discharge by industries. The rapid deterioration of environment has not only jolted the developed and developing countries in action, but sounded a clear warning bell for the underdeveloped countries as well. The message is clear Either preserve the environment and prosper or pollute it and perish. Earlier, the assessment of the projects was done on Technical feasibility reports and Cost-Benefit-Ratio which mainly considered financial & technical resources. But no consideration was given to the environment protection in this evaluation and these flaws became apparent with continuous deterioration of environment. Thus in order to have more realistic evaluation, and keeping in view the deteriorating conditions, another dimension was added which is now called as Environmental Impact Assessment (E.I.A.). This forms an integral part of the project and is taken into account while appraising the project at different stages. Thus in the new comprehensive approach all considerations like, Technical, Financial & Environmental are given due weightage. 6

7 M/S HIMALAYA ALKALIES & CHEMICALS LTD (Formerly SNJ Chemex (P) Limited) have its corporate office at 314, PP Tower, Netaji Subhash Place, Pitampura, New Delhi, is formed to setup its new unit in Himachal Pradesh. The promoters with its group companies are engaged in the area of manufacturing and marketing of chemicals. The company started some 25 years back with the manufacturing of CPW and gradually developed to become the leading company for the production of CPW in the country. Their group is one of the biggest consumers of chlorine in its manufacturing facilities at various locations at Haryana, Punjab & West Bengal. To keep pace with growth of the company, the management has planned to further diversify the business into manufacturing of basic chemicals i.e. Caustic soda. This will not only reduce their dependency on other suppliers of Chlorine but it will also help to consolidate its production centres at one place. The company proposes to set up 400 MT per day capacity plant The plant will be located in village Johran, Kala Amb, Tehsil Nahan in Dist. Sirmaur in the state of Himanchal Pradesh. The availability of uninterrupted power supply at competitive rate comparatively with its neighboring states to make an edge over other manufacturers in the northern India. The company will use environment friendly, fuel efficient and state of the art technology for the production of caustic soda. The project will take approximately 18 months to complete, after the approval from statutory authorities for necessary environmental clearance. 7

8 2. PROFILE OF THE COMPANY & PROMOTORS M/S HIMALAYA ALKALIES & CHEMICALS LTD (Formerly SNJ Chemex (P) Limited) is a Limited Company. The Directors of the company are as under: 1. Sh. S.S. Dahiya 2. Mr. J.S. Ahlawat 3. Mr. S.C. Chopra 4. Mr. A.K. Upadhyay Sh. S.S. Dahiya: He is the Director of the Company. He is a Graduate in Civil Engineer and having vast experience of over 20 years in chemical industries and trades including chemicals. Mr. J.S. Ahlawat: He is also Director of the Company. He is also a Graduate in Civil Engineer and having experience of about 20 years in chemical industries. Mr. S.C. Chopra: Ex. Bank official, good exposure to financial matter. Mr. A.K. Upadhyay: He is chemical engineer, Ex Managing Director Durgapur Chemicals Limited (Govt. West Bengal Enterprises) from He has about 35 year experience in Chlor Alkalies Industries. 8

9 3.0 BASELINE ENVIRONMENTAL SETTING 3.1 The State Himachal Pradesh having world s mightiest mountain ranges is one of the hilly States situated in the Northern part of India. It is blessed with some of the most spectacular and beautiful landscapes. It came into being in November, 1966 after the re-organization of States. Earlier, it was part of the combined State of Punjab. The various hill towns in the State not only provide visitors reprieve from the sultring heat of the planes, but offer beautiful scenic sites which are real treat to the eyes. Kulu and Kangra valleys offer natural beauty which is no less than Kashmir Valley. Valleys and streams, snow clad mountains and temperate forests offer tourists and sportsmen all they want. The total area of the State is about 55,700 sq. km., with a population of more than 60lac. The literacy rate is about 63%. The main fruits / crops in the State are apple, plum, ginger, peach, potato, forest produce, rice and wheat. The State has good deposits of minerals like gypsum, lime stone and slate etc. Earlier the economy of the State mostly depended on tourism and a large number of tourist sites had been developed by the State. However, after the re-organization, the State has made big strides in the field of industrialization also. Industries like Cement, Electronics, Fertilizers, Pharmaceuticals and Liquor can be found in good number at different places in the State. Hydel Power in the State has given a big boost to the Industries. A number of Industrial areas have been developed in the State, where all facilities are provided to the entrepreneurs. Parwanoo, Barotiwala, Baddi, Paonta Sahib and Raja Ka Bag are some of the important industrial areas developed by the State in the last two decades. 9

10 3.2 District Sirmaur District Sirmaur is located in outer Himalayas which is commonly known as Shivalik range. The district is bounded by district Shimla in North, Uttaranchal in East, Haryana in South and Distt. Solan in North- West. Like other parts of Himachal Pradesh, it has beautiful landscapes, bracing climate, big and small game and legendry temples which hold abiding attraction for the tourists. Head quarter of the district is Nahan which is connected by metalled roads with Shimla, Chandigarh, Solan and Yamuna Nagar. Population and area details of the districts are as under:- Population Total Male Female Rural Urban 5,30,164 No. 2,76,801 No. 2,53,363 No. 472,926 No. 57,238 No. According to Census 2011 Male 246,599 Female 226,327 Male 30,202 Female 27,036 Sex Ratio 918 Density of Population Geographical Area Total Area Area under Forest Total Cultivated Area Net Cultivated Area Net Irrigated Area 188 per sq. km Source: Census Hect Hect Hect Hect Hect 10

11 3.3 Project Site The Plant site is situated in Village Johran, Kala Amb, Tehsil Nahan, District Sirmaur, Himachal Pradesh. It is about 2 KM from National Highway-73 (Chandigarh-Sirmaur) at kala Amb,Tehsil Nahan. The soil of the block is sandy to sandy loam. It lies near Long 77 12' 44.48" East and Lat: 30 31' 41.33" North and is at an Altitude of about 425 m. above mean sea level. It is well connected with Kala Amb & Nahan through well maintained metalled roads. It is about 1 K.M. from Kala Amb. The nearest rail head is Ambala, which is at a distance of about 40 km from the site. Key Plan, Google Map of the unit is given in Fig 3.1, 3.2 respectively. 11

12 FIGURE 3.1 KEY PLAN Project site 12

13 FIGURE 3.2 LOCATION ON GOOGEL IMAGE 13

14 3.4 Climate: The climate of the district is sub-tropical to temperate depending upon the elevation. Four major a season that is the winter season extends from Nov to February; summer season from March to June followed by the monsoon period extending from July to September end. Maximum precipitation in the form of rain occurs during July to September. Average annual rainfall in the district is about 982 mm with average of 60 rainy days. In the non monsoon season precipitation as snowfall also occurs in the higher reaches above 1500 m amsl, the peaks of Chaur dhar remains covered by snow. During winter period rainfall also occurs in lower hills and valleys parts. Mean maximum and minimum temperature of 30 C and -0 C respectively. 3.5 Cloudiness During monsoon season skies are over cast with moderate to heavy clouds. During rest of the year, the sky is mostly clear. It is lightly clouded occasionally during winter season. 3.6 Winds The Wind direction in the area is mostly from North-West to South- East. During January to May the winds are quite strong while July to October is calm months. 3.7 Drainage The entire area is near the Shivalik foot hills and has good slope from North-East to South-West. The area is well drained and is frequented with seasonal choes which take the entire rain water flows to river Yamuna. 14

15 3.8 Land Use Land use pattern means how the land is being used for various purposes. It highlights the environmental quality of a particular area. It is an important indicator of environmental health, intensity of human activity and degree of interaction between the two. Land use pattern is significantly influenced by the nature of soil, water availability and climatic conditions of the area. Data on land use pattern of Sirmaur District have been collected to present baseline status of the study area which falls in this District and is given below:. Land use pattern Total Area - 2, 82,500 Ha Cultivated Area - 74,700 Ha (26.4%) Forest area - 1, 74,820 Ha (62%) Non agriculture use - 72,980 Ha (11.6%) 3.9 Forest A number of reserved forests exist in the study area. Species like in these forests are Sal, Chil, Oaks, Deodar, Khair, Firand Spurce are found. On the north side the dense forests are at a distance of 3-5 km. Reserve Forest Jamunwala exists at a distance about 2.5 km & Garib Nath at about 1.5 km North, Rampur Beli exists at a distance 1.5 km on the South side, Danda RF exists at a distance 5 km on the North-East side from the site. Reserve Forest along the Shivalik range like Khulhal, Dhaula & Aduwala are at a distance of about 4-5 km on the South side. It is worth mentioning here that the promoters plan to plant about 200 trees in the unit area. 15

16 3.10 Flora and Fauna Ecological system consists of varieties of interrelationship between both biotic and abiotic components. Biotic components comprise of both plant and animal communities, which interact not only within and between them but also within the abiotic physical. Animal plant communities in their natural habitat exist in a well organized manner. The project does not disturb any natural setting and is coming up in an already existing Industrial area. Generally the plants of species like Simbal, Mango, Tun, Several species of acacia and albizia, Salambra, Termnalia, Jamun, Larger tour, Bamboo. The most common shrub at the higher elevation is Barberis, Indigopera and Desmodium and following other shrubs are also found: Vitex, Munj, Ber, Ipomea, Dodonea. Animals like Smooth Indian Otter, Jungle Cat, Leopard Cat, Hare, Hog Deer, Wild Boar, Flying Fox, Flying squirrel, Wildcat, Fruit bat, Jungle cat and Common Mongoose are found in the area Demography And Socio-Economic Scenario The socio-economic profile has been studied through random sample primary surveys and secondary data. The significant demographic and socio economic statistics of the district are summarized and given in Table- 3.1 TABLE-3.1 Description Dist. Sirmaur Himachal Pradesh Censes Male Population 2,76,801 6,856,509 Female Population 2,53,363 3,473,892 Total Population 521,173 3,382,617 Sex Ratio 976/ /1000 Density of Population/Km Literacy Rate: Total (%) Ref: Census of India

17 3.12 Environmental Study Area The Status of existing Environmental parameters like Ambient Air Quality, Ground water, Surface Water, Noise Level and Soil quality of the project site have been monitored for the month of Jan-Feb

18 4.0 PROJECT DESCRIPTION 4.1 General HIMALAYA ALKALIES & CHEMICALS LTD(Formerly SNJ Chemex (P) Limited), is located at Village Johran, Kala Amb,Tehsil Nahan, District Sirmaur in the state of Himanchal Pradesh is about 2 Kms from Kala Amb Bus Stand and about 10 Kms from Nahan. The unit has 1, 50,000 sqm land. Location details are given in Table 4.1. The total cost of the project is 300 crores. 4.2 Raw Materials & Quantities S. No. NAME OF RAW MATERIAL 1 INDUSTRIAL SALT 2 BARIUM CARBONATE 3 CAUSTIC SODA 4 SULPHURIC ACID 5 SODA ASH 6 SODIUM BI SULPHITE 7 HCL ACID 8 FLOCCULANTS 9 NORMAL PARAFFIN WAX Raw materials are listed as hazardous materials in part II of the schedule of the rules. Precaution as listed into rules shall be taken for their storage & handling. 18

19 4.3 Finished Product & By-product The unit will manufacture following: PRODUCT: S.NO. NAME 1 CAUSTIC SODA 2 CHLORINE 3 HYDROGEN GAS BY-PRODUCT: S.NO. NAME 1 CHLORINATED PARAFFIN WAX 2 STABLE BLEACHING POWDER 3 HYDROCHLORIC ACID (SYN) 32% 4 HYDROCHLORIC ACID ( CPW) 32% 5 SODIUM HYPO 19

20 Plant Site and Location TABLE 4.1 S.No Particulars Details 1 Location a Village/ Town/Plot No. Johran b Tehsil Nahan c District Sirmaur d State Himachal Pradesh e Latitude 30º North d Longitude 77º East 2 Elevation 425 mts. 3 Land use at the project site Industrial 4 Climatic Conditions Temperature Rainfall Relative Humidity, % Wind speed, Kms/hour Min: -0 o C, Max:45 o C 982 mm (average) Min: 45%, Max:98% 10 Km (approx.) 5 Nearest highway National-Highway 73 (Chandigarh-Sirmour 2 km) 6 Nearest railhead Ambala (about 40 km) 7 Nearest airport Chandigarh (about 40 km) 8 Nearest major city Ambala (about 40 km) 9 Nearest major settlement Kala Amb (about 2 km) 10 Features with 10 km : i) Defence installations Nil ii) Archaeological important places iii) Wild life sanctuaries Iv) Reserved/Protected forest Nil Nil v) Industries Mixed type vi) Rivers vii) Hill ranges viii) State Boundary Mein river (about 4 km) Shivalik Hills Haryana State (3 KM) 20

21 4.4 Installed Capacity: The total installed capacity of the plant for the product will be as per details given below:- PRODUCT: S.NO. NAME CAPACITY (MTPA) 1 CAUSTIC SODA 1,40,000 2 CHLORINE 1,26,000 3 HYDROGEN GAS NM3 39,34,0000 BY-PRODUCT: S.NO. NAME CAPACITY (MTPA) 1 CHLORINATED PARAFFIN WAX STABLE BLEACHING POWDER HYDROCHLORIC ACID (SYN) 32% 4 HYDROCHLORIC ACID ( CPW) 32% 1,25,000 70,000 5 SODIUM HYPO 12,600 The unit will operate for an effective period of 350 days in a year on three shift basis of 8 hrs. 21

22 4.5 Manufacturing Process Caustic soda manufacturing process improved significantly due to upgradation of technology from Diaphragm technology to the latest state of the art technology ie the Membrane cell technology. The technology is an Environmental friendly and fuel efficient. Power is the main raw material used for the production of caustic, which alone cost 60% of the cost of production, this technology save 35% energy than the earlier process. The following schematic diagram shows the difference in the technologies. PROCESS FLOW CHART 22

23 MEMBRANE CELL TECHNOLOGY: The most common chlor-alkali process involves the electrolysis of aqueous sodium chloride (a brine) in a membrane cell. In the membrane cell, the anode and cathode are separated by an ionpermeable membrane. Saturated brine is fed to the compartment with the anode (the anolyte). A DC current is passed through the cell and the NaCl splits into its constituent components. The membrane passes Na + ions to the cathode compartment (catholyte), where it forms sodium hydroxide in solution. The membrane allows only positive ions to pass through to prevent the chlorine from mixing with the sodium hydroxide. The chloride ions are oxidised to chlorine gas at the anode, which is collected, purified and stored. Hydrogen gas and hydroxide ions are formed at the cathode. 23

24 4.6 Facilities at the Plant The firm has 1, 50,000 sqm of land where factory building, boundary wall and some other ancillary structures are proposed to be constructed. It provides adequate space for the following areas of working:- 1. Storage for raw material and finished goods. 2. Plant and Machinery 3. Storage 4. Offices 5. Toilets 6. Water storage tanks Open space will be landscaped and trees will be planted in due course of time. 4.7 Power The requirement of Power for the unit is 42 MW which will be supplied by HPSPCL. 4.8 Water Supply The water requirement of the unit will be met from own tube-well. The daily requirement of water is about 2950 m 3. About 2760 m 3 water will be required in the process and make up water required for cooling purpose will be 50 KLD. For domestic purpose 20 KLD and 120 m 3 water required for boiler. The capacity of storage tank for cooling purpose is about m 3. Another tank of about 100 m 3 has also been provided for fire fighting which shall be kept always full. Flow chart of water use is given in fig Manpower Unit will work on single shift basis and manpower requirement will be about 150 persons. 24

25 Figure: 4.1 WATER BALANCE FLOW DIAGRAM (KLD) Storage Tank Domestic 20.0 Process 2760 Boiler 120 Cooling 600 Consumption 5.0 Ultra-Filtration 300 Evaporation 50 STP Reuse in process 300 Blow down 20 Reuse 550 Irrigation 35 Total Consumptive use: = 2950 KLD 25

26 4.10 Waste Handling Liquid waste Liquid waste: is treated for ph control and collected in a tank. The water is thus passed through the RO plant to control its TDS contents and brought it down below 100ppm and will be recycle back into the plant. Part of this water will be utilized in gardening and other part of the factory. The effluent treatment plant is designed such that there will not be any liquid discharge from the factory Solid waste About 4% solid waste will be generated from the process. The solid waste is non hazardous. It will be sent to filling low lying area or as per norms of State Pollution Control Board Hazardous waste The industry will install two no. DG sets of 500KVA capacity each. The Hazardous wastes generated from the unit, such as used oil from DG Set shall be sold to recyclers. There are no other hazardous wastes Pollution Control Measures The main sources of pollution from the unit are discussed as under: Air Pollution Emergency Chlorine Scrubber (ECS) System The emergency chlorine scrubber (ECS) uses extraction fans to collect gas from all the chlorine-containing plant vents. The gas is then scrubbed with caustic soda to remove chlorine producing sodium hypochlorite. The reaction is as follows: 26

27 The ECS is a safety critical system designed to accommodate chlorine surges during plant upsets for 10 minutes minimum of full chlorine production. All vents containing chlorine pass to the ECS system. The concentration of chlorine in the exit gas from the ECS is monitored and alarmed. Electrical power to the circulation pumps and extraction fans is backed up by emergency power from a stand-by emergency diesel generator. A nitrogen ejector that does not require power for operation further backs up the fans. A caustic gravity head tank that does not require power for its operation, further backs up the caustic pumps. Hypo Tower: The gases come out of the hypo tower and HCl plant. Well designed scrubbers keeps the vents prevents any hazardous gases escaping into the atmosphere. Chlorine and HCl vapors concentration s are kept below the permissible limit ie 5 ppm. Similarly the boiler chimney is designed to prevent the to be in compliance of pollution norms. Installation Of Chlorine Sensing Alarm System: Chlorine alarm system which will sense above 3 mg/nm 3 in air will be installed in CP complex for early warning on action of chlorine control will be received. Neutralization System: Industry will install a neutralization system where in un-reacted chlorine gas will be sucked from 08 Nos CP reactors through pressure regulated valve and neutralized with caustic soda to from sodium hypo-chloride. Initially chlorine will be supplied in toners but at later it is to be supplied through pipeline. Boiler: Industry will install steam boiler of 14TPH capacity. The wood briquette/pet coke will use as fuel for boiler. APCD cyclone fallowed by wet scrubber will be installing with boiler to control emission. 27

28 Water Pollution There will be no generation of waste water from process. The waste water generation from domestic, cooling and boiler blow down shall be used for plantation after treatment Noise Pollution There is no noise producing machineries in the unit. All machines are spread at different places within the covered sheds. Thus no noise of significant level shall go out side the working area which may disturb the general noise environment. DG set installed shall be noise free & with canopy. 28

29 5.0 ENVIRONMENT IMPACT ASSESSMENT: 5.1 Present Environment: Various Environment factors as existing in the project area which possibly could be affected by the activities have been assessed & identified as below: (i) Ambient Air (ii) Water Quality (iii) Noise (iv) Land use pattern (v) Soil and Agricultural (vi) Demography and socio-economic pattern. 5.2 Probable Impact on Environment: The above factors will be checked after the implementation of the project to cross check the probable impact discussed hereunder and remedial measures taken wherever necessary. Broadly the impacts may be classified in two categories as under:- i) Short term - during construction/development stage ii) Long term - during operational stage. Both these categories have been considered while predicting and evaluating the impacts as given herein after:- 5.3 DEVELOPMENT STAGE: - (SHORT TERM) This is a construction phase of the project and the impacts are temporary due to construction related activities which are as under:- i) Air Environment: There is no point source of air pollution. The only source will be due to construction and plying of vehicles within unit. Some 29

30 emission may be expected from vehicles plying in the area for transportation of material etc. Kerosene oil shall be provided to the labour so that they do not burn wood for cooking etc. ii) Water Environment : Requirement of water during construction & machinery foundations will be about 1.0 m 3 /day and there will be no waste discharge as the same will be used completely. However, during monsoon some malba etc may get washed due to run off from the site. There is a natural nallah near the land which takes the entire run off from the area. Labour during construction is not very large. Hardly about 50 persons may be working daily on an average who may be using water for drinking and bathing etc. Toilet facilities with septic tank will be provided to 1 toilet for 20 persons who will be used by the labour. In view of this there is no likelihood of any significant impact on the general environment of water in the area. iii) iv) Noise Environment: Some noise may be expected from the working of the machinery repair purposes and movement of vehicles. Steps will be taken to reduce its effect by resorting to staggering of various operations. Even otherwise since there will not be any large scale machinery, the activity is not likely to have any significant effect on the over all noise environment. Land Environment: The total land area of the project is 1, 50,000 sqm. Natural drainage will not be disturbed. Solid waste from construction activities will be used within the premises under roads & 30

31 refilling. There will not be any significant impact on land in general. v) Socio Economic: The project does not involve any displacement of population or rehabilitation of any kind. Rather it will provide employment to local people in the shape of additional man power required for the units, & will and boost the economy of the area. It will have some positive impact, although not to a large extent. 5.4 OPERATIONAL STAGE: - (LONG TERM) After completion, when the unit starts production, the operational impacts on the various parameters are considered as under:- i) Ambient Air Environment: There is only one source of likely pollution which is vapours of Acid/alkali mist from the manufacturing process. All the processes are closed circuits as such emissions to the open atmosphere will be minimum, however, APCD, Alkali Scrubber will be provided at the exit point to neutralize the acid mist. ii) Water Environment: Alkaline Effluent System: Effluent from alkaline process area catchments drains to trenches which channel effluent to the alkaline effluent sump. From here, alkaline effluent is transferred to the alkaline effluent tank where it is mixed and neutralized using HCl and NaOH to achieve a ph in the range of 6.5 and As these neutralization reactions have the potential to liberate chlorine gas under certain conditions, the alkaline effluent tank is operated under light suction, venting to the emergency chlorine scrubber (ECS) where any chlorine gas present is removed. 31

32 Acidic Effluent System: The acid effluent system is quite similar to the alkaline effluent system discussed above. Effluent from acid process areas drains to the acid effluent trench, then to the acid effluent pit from where it is pumped to the acid effluent tank. The acid effluent tank is used to mix and neutralize effluent using HCl and NaOH to achieve a ph in the range of 6.5 and Rainfall data shows that the area is having adequate rainfall. The guidelines for Rain Water Harvesting and Artificial Recharge of Ground Water issued by the Central Ground Water Authority will be followed. iii) Land Environment: The Project is coming in the agriculture land. Thus there will not be any significant adverse effect on the existing general land environment with the coming up of the project. iv) Noise Environment: There will be no noise producing machinery or equipment except DG Set which will be placed in acoustic room, causing least disturbance in the area. There is no likelihood of any significant change in noise environment. v) Socio Economic Pattern The project will provide employment to local people in the field of running plants and maintenance of machinery, APCD & security etc. Thus it will have positive effect on the employment potential in the area. 32

33 6.0 ENVIRONMENTAL MANAGEMENT PLAN: 6.1 General Environment Management Plan (E.M.P) in a project is prepared to mitigate the possible adverse effect of various activities on the existing environmental factors, during construction as well as in operational stages, to avoid their deterioration, if any. It is desirable that necessary steps are taken right from the beginning of the project to be more effective. As a social and moral obligation on the part of every body it becomes our bounden duty to leave our environment to the next generation in a state at least what we inherited from our ancestors, if not in a better condition. E.M.P. for this project has been prepared keeping in view the existing conditions and likely changes which may occur due to the proposed project. The implementation and monitoring of different control measures have also been covered. These are discussed as under:- 6.2 Air Environment During construction stage water will be sprinkled on the soil to avoid dust generation, if any. The debris and unused construction malba shall be removed immediately for recycling, if any, or for land fill. All vehicles for service activities at the project site shall be checked for vehicular emission. The agencies will be asked to keep them within prescribed limits. They will also be asked to maintain them properly. During operation phase alkali scrubber shall be provided to neutralize acid mist from process, to keep it within permissible limits. Cyclone will be provided with boiler to mitigate air environment. Tree plantation shall be resorted to for further improving the air environment in general and minimize noise levels, if any. 33

34 6.3 Water Environment: Source of water will be own tube-well. During construction toilet facilities shall be provided to labour with septic tank. Finally, waste water from the toilets shall be taken to septic tank through underground delivery system. It will not be thrown outside either on land or in any water body. Roof top rain water shall be harvested and used for ground water recharge to minimize effect of withdrawal of water from the underground. 6.4 Land Environment: To avoid erosion of the top soil the development is planned in the shortest possible time and land-clearing activity shall be kept to the absolute minimum by working at the specific sites one by one where construction is to take place so as to increase detention and infiltration. Natural waterways/drainage pattern shall be maintained by providing culverts where needed. The requirements of sand and aggregates for the construction works will be met through venders. The land use is thus so planned that there is minimum adverse impact. 6.5 Solid Waste The solid waste generated from the construction activities shall be effectively recycled within the project. The solid waste generation from the process the process will non toxic/non hazardous. The disposal of solid waste will be as per norms of State Pollution control Board. 6.6 Noise Environment During Construction stage NO HORN signs will be displayed at prominent places. The drivers shall be directed not to blow horn unnecessarily. Vehicle owners will be asked to maintain them in proper condition. During operational stage noise creating machinery such as 34

35 blower, ID Fans etc will be housed different places within closed sheds so as not to disturb the noise level in the area. The DG set shall be noise free. 6.7 Green Belt: The main objective of the green belt is to provide a barrier between the source of pollution and the surrounding areas. The green belt helps to capture the fugitive emission and to attenuate the noise generated, apart from improving the aesthetics. Development of green belt and other forms of greenery shall also prevent soil erosion and washing away of topsoil besides helping in stabilizing the functional ecosystem and further, to make the climate more conducive and to restore water balance. It is planned that the selected plants will be grown as per normal horticultural (or forestry) practice and authorities responsible for plantation will also make sure that adequate provision for watering and protection of the saplings exists at site. Species of trees shall be selected in consultation with the forest Department officers. In all about 500 trees & shrubs are proposed to be planted within the unit premises. 35

36 7.0 EXPENDITURE ON ENVIRONMENTAL MEASURES S.No Title Capital Cost Lacs Recurring Cost - Lacs (Annum) 1 Air Pollution Control Noise Pollution Control (Including cost of Landscaping, Green Belt) 4. Environment Monitoring and Management (Including Establishment of Laboratory) CSR Total

INTRODUCTION. Installed Capacity: The total installed capacity of the plant for the product will be as per details given below:- PRODUCT:

INTRODUCTION. Installed Capacity: The total installed capacity of the plant for the product will be as per details given below:- PRODUCT: INTRODUCTION Himalaya Alkalies& Chemicals ltd will setup Caustic soda Plant of 400 MTPD. The Plant site is situated in Village Johron, Kala Amb, Tehsil Nahan, District Sirmaur, Himachal Pradesh. It is

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

Action taken (NGT Order dated 07 th August vide OA No. 138, 139/2018)

Action taken (NGT Order dated 07 th August vide OA No. 138, 139/2018) Action taken (NGT Order dated 07 th August vide OA No. 138, 139/2018) Till date, eight meetings of the Executing Committee have been conducted i.e. one at Shimla and seven at Chandigarh where HPPCB participated

More information

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.) 1. PROJECT DESCRIPTION: Ambuja Cement Eastern Ltd. (ACEL) has the cement

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA O/O PUNJAB POLLUTION CONTROL BOARD, VATAVARAN BHAWAN, NABHA ROAD, PATIALA 147 001 Telefax:- 0175-2215802

More information

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

M/S. HETERO INFRASTRUCTURE SEZ LIMITED

M/S. HETERO INFRASTRUCTURE SEZ LIMITED ENVIRONMENTAL STATEMENT (FORM - V) FOR THE FINANCIAL YEAR ENDING MARCH-2016. M/S. HETERO INFRASTRUCTURE SEZ LIMITED N.NARASAPURAM(V),NAKKAPALLI(M) VISAKHAPATNAM DISTRICT. SUBMITTED TO : ANDHRA PRADESH

More information

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala-147001. No. SEAC/80/37967 Dated 15/10/2008 Speed Post To M/s Green Planet Energy Pvt.

More information

Forest Resources. Unit III Population & Natural Resources

Forest Resources. Unit III Population & Natural Resources Forest Resources Unit III Population & Natural Resources Topics Forest resources Forest resources-indian Scenario Functions of forests Importance of forests Ecological and Economical Importance Types of

More information

UNSATURATED POLYESTER RESIN

UNSATURATED POLYESTER RESIN PROJECT REPORT ON UNSATURATED POLYESTER RESIN BY AQUA CHEM INDUSTRIES Survey No. 50/2, Jodhpar (Nadi), Morbi - 363641, Gujarat. I N D E X Sr. No. Contents Page No. 1 Introduction 3 2 Project Description

More information

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Project Proposal: Expansion of Cement Plant capacity from 1.5 to 2.20 MTPA of Clinker and

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Six Monthly Compliance Report June-2015 M/s Mahagun Real Estate Pvt. Ltd SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex Mahagunpuram AT VILLAGE Mehrauli, Dasna, Ghaziabad, U.P. Being developed

More information

SREE RAYALASEEMA ALKALIES AND ALLIED CHEMICALS LIMITED SY. NO

SREE RAYALASEEMA ALKALIES AND ALLIED CHEMICALS LIMITED SY. NO SREE RAYALASEEMA ALKALIES AND ALLIED CHEMICALS LIMITED SY. NO. 51/1, 2A, 2B, 2C1, 2C2, 2C3, 56/1, 58/1, 59/1, 60, 62/3/2D2, 2C1/A2, 2C1/A3, 2C2/C, 2G/1, 2E, 2F, 1A, 1B, 62A, 62 B, 63, 64, 70/C2, 72/P,

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

ANNEXURE A DETAILS OF PRODUCTS

ANNEXURE A DETAILS OF PRODUCTS Annexures to Form 1 & Pre Feasibility Report Proposed Project for manufacturing of Dyes Intermediates of M/s Jay Dyechem, Narol-Vatva Road,Ta : City, District : Ahmedabad, Gujarat. ANNEXURE A DETAILS OF

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION Page 1 of 8 Environmental Statement for Clinker Grinding Unit of M/s Bihar Cement Plant (A Unit of Shree Cement Ltd.), situated at Jasoia Mor, BIADA, Industrial Growth Centre, Aurangabad, Tehsil & Dist.

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2215802

More information

Annexure-I List of Products

Annexure-I List of Products Annexure-I List of Products Sr. No. Name of Products Quantity (MT/Month) 1. Mono Chloro Acetic Acid (MCA) 300 2. Chloro Acetyl Chloride (CAC) 150 3. Tri Chloro Acetyl Chloride (TCAC) 150 4. Aluminum Chloroide

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

JAYPEE NIGRIE SUPER THERMAL POWER PLANT

JAYPEE NIGRIE SUPER THERMAL POWER PLANT JAYPEE NIGRIE SUPER THERMAL POWER PLANT (A Division of M/s Jaiprakash Power Ventures Limited) Village: Nigrie, Tehsil: Sarai District: Singrauli 2015 2016 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

12.0 Predicted Environmental - Impact & Mitigation measures

12.0 Predicted Environmental - Impact & Mitigation measures 12.0 Predicted Environmental - Impact & Mitigation measures 12.1 The Assessment of the Impact on Environment by The High Vacuum Atomic Molecular Distillation Process: There are Positive impacts of the

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.

More information

PROJECT PRE-FEASIBILITY REPORT. For

PROJECT PRE-FEASIBILITY REPORT. For PROJECT PRE-FEASIBILITY REPORT For THE PROPOSED ORGANIC CHEMICALS MANUFACTURING IN EXISTING IN FORMULATION OF PESTICIDE, AGROCHEMICAL AND BIO FERTILIZERS MANUFACTURING UNIT AT M/S. SULPHUR MILLS LTD. PLOT

More information

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN EMP 1 INTRODUCTION In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts and where these are beneficial in nature, such impacts are to be enhanced/

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

BRIEF DESCRIPTION OF THE PROJECT

BRIEF DESCRIPTION OF THE PROJECT BRIEF DESCRIPTION OF THE PROJECT. Introduction M/s Indorama Industries Limited is proposing to expand their project known as Indorama Spandex for manufacture of manmade textile fibre using petro chemical

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

5. ENVIRONMENT MANAGEMENT PLAN

5. ENVIRONMENT MANAGEMENT PLAN 5. ENVIRONMENT MANAGEMENT PLAN The environmental management plan consist of the set of mitigation measures, management and, monitoring measures to be taken during construction and operation phase to eliminate

More information

2. The expected cost of the project is Rs.50 crores.

2. The expected cost of the project is Rs.50 crores. Subject Application for obtaining Environmental Clearance for development of an "Integrated Municipal Solid Waste Management System for Pathankot Cluster" by Municipal Council, Pathankot at Village Kalanaur,

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola 0 1.0 INTRODUCTION M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola Village, Kotma Tehsil, Annupur District, Madhya Pradesh. 10.29 Acres of land is envisaged for

More information

DHANWADA CRUSHER STONE QUARRY

DHANWADA CRUSHER STONE QUARRY ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-

More information

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative) Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in

More information

Mars Power & Steel Ltd.

Mars Power & Steel Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE PROPOSED TERMS OF REFERENCE For PROPOSED RESIDENTIAL AND COMMERCIAL DEVELOPMENT AT Plot bearing survey no. 86/1, 86/2, 86/3 (pt), 86/4 (pt), 86/5 (pt), 115/1 (pt), 115/2 (pt), 115/3 (pt), 115/4 (pt), 115/5

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

CLASSIFICATION OF NATURAL RESOURCES

CLASSIFICATION OF NATURAL RESOURCES Natural Resources CLASSIFICATION OF NATURAL RESOURCES NATURAL RESOURCES Exhaustible natural resources Inexhaustible natural resources Renewable Partly renewable Nonrenewable Inexhaustible Conditionally

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

Dheeru Powergen Private Limited.

Dheeru Powergen Private Limited. Executive Summary Of The Proposed 2 x 300 MW Dhanras Thermal Power Station At Dhanras Village Katgora Taluk, Korba District, Chhattisgarh. Implemented By Dheeru Powergen Private Limited. Submitted to CHHATTISGARH

More information

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers

More information

DRAFT TERMS OF REFERENCE FOR EIA STUDY

DRAFT TERMS OF REFERENCE FOR EIA STUDY Four laning of Balaghat - Gondia Section of NH 54 from km 0.000 to km 48.070 (Package-1A & Package-1B) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra DRAFT TERMS OF REFERENCE

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A

ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A 1. Name and address of the Owner / Occupier of the Industry

More information

CHLOR-ALKALI INDUSTRY

CHLOR-ALKALI INDUSTRY CHLOR-ALKALI INDUSTRY The chlor-alkali industry represents of three major industrial chemicals: Soda ash (sodium carbonate-na 2 CO 3 ) Caustic soda (sodium hydroxide-naoh) Chlorine (Cl 2 ) These chemicals

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

PRE-FEASIBILITY REPORT OF SAND QUARRY

PRE-FEASIBILITY REPORT OF SAND QUARRY PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL

More information

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600 Annexure A Product Profile Sr. No. 1 Product Crude OBA AND/ OR Standardized OBA liquid/ powder MT/ M Consented Ultimate 525 190 AND/ OR 2600-23 - Annexure - B Details of Raw Materials Qty (Kg/ Kg) Qty/

More information

Dated: 22 nd June, To The Director, Mjs Vulcan Waste Management Pvt. Ltd., 1046, Sector-31, Gurgaon, Haryana

Dated: 22 nd June, To The Director, Mjs Vulcan Waste Management Pvt. Ltd., 1046, Sector-31, Gurgaon, Haryana F.No.10-12/201S-IA.III Government of India Ministry of Environment, Forest & Climate Change (IA.IIISection) Indira Paryavaran Bhawan, Jor Bagh Road, New Delhi - 110 003. To The Director, Mjs Vulcan Waste

More information

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017

Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017 Shriram Vinyl & Chemical Industries, : Kota Compliance Report of Environmental Clearance dated 12 th July 2017 and amended on 23 rd November 2017 PART A : SPECIFIC CONDITIONS 1. CONSTRUCTION PHASE S. 1

More information

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan Report on 1. PROJECT LOCATION & LAND USE The Ganesh Park 3 is a residential building project constructed on plot 608 to 613/5 Vil: GIDC Ankleshwar in Bharuch district of Gujarat state. The project land

More information

Module: 5. Lecture: 28

Module: 5. Lecture: 28 Module: 5 Lecture: 28 Chlorine (continued) 4. Diaphragm cell process Raw material Basis: 1000kg of Chlorine Salt Sodium carbonate Sulfuric acid Steam Electricity Refrigeration Direct labour 1820kg 35kg

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT 01-07-2018/R3 PRE-FEASIBILITY REPORT FOR EXPANSION OF STEEL MANUFACTURING UNIT BY REPLACING EXISTING INDUCTION FURNACE CAPACITY Steel Billets/ Ingots- 28,800 TPA to 75,240 TPA By M/S TRISHALA ALLOYS PVT.

More information

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Chandu Cattle Feeds 10 KLPD Ethanol & 50 TPD Cattle Feed Unit Plot no. 31 & 30 B of Sy. No. 432/2 P, APIIC Industrial park, Kakuturu village, Venkatachalam

More information

Environmental statement for the financial year ending the 31 st March 2014

Environmental statement for the financial year ending the 31 st March 2014 FORM V (See rule 14) Environmental statement for the ending the 31 st March 2014 1. Name and address of the Owner/Occupier of the Industry, operation of the process. PART A : BINANI CEMENT LIMITED, 2.

More information

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management ANNEXURES Annexure No. Description 1 Google image showing proposed project site 2 Plant Lay-Out 3 Manufacturing process details 4 Details of hazardous waste management 5 Details of Effluent Treatment Plant

More information

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL

More information

Environmental statement for the financial year ending the 31 st March 2012

Environmental statement for the financial year ending the 31 st March 2012 FORM V (See rule 14) Environmental statement for the ending the 31 st March 2012 1. Name and address of the Owner/Occupier of the Industry, operation of the process. PART A : BINANI CEMENT LIMITED, VILLAGE:

More information

ENVIRONMENT MANAGEMENT PLAN. For Excavation of Brick Earth (Total Mining Area Ha.) (for Manufacturing of Bricks)

ENVIRONMENT MANAGEMENT PLAN. For Excavation of Brick Earth (Total Mining Area Ha.) (for Manufacturing of Bricks) ENVIRONMENT MANAGEMENT PLAN For Excavation of Brick Earth (Total Mining Area 2.121 Ha.) (for Manufacturing of Bricks) By M/s Bhagwati Eth (bzv) Udyog Village Shokanangla, Pargana & Tehsil Bazpur, District-

More information

Research Article. Abdul Rauf 1 *, S. A. Saraf 1, P. A. Khan 2, and Q. J. A. Peer 3

Research Article. Abdul Rauf 1 *, S. A. Saraf 1, P. A. Khan 2, and Q. J. A. Peer 3 Research Article A Comparative Analysis of Managerial Approach in Small and Large Apple Orchards of Himachal Pradesh and Jammu & Kashmir States of India an Economic Perspective Abdul Rauf 1 *, S. A. Saraf

More information

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

CHAPTER 6 PROFILE OF URBAN PUNJAB WITH SPECIAL REFERENCE TO LUDHIANA CITY

CHAPTER 6 PROFILE OF URBAN PUNJAB WITH SPECIAL REFERENCE TO LUDHIANA CITY CHAPTER 6 PROFILE OF URBAN PUNJAB WITH SPECIAL REFERENCE TO LUDHIANA CITY Access to clean drinking water is a fundamental right in India as cited in right to life under Article 21 of the Constitution of

More information

TABLE OF CONTENTS. Para No. Contents Page No

TABLE OF CONTENTS. Para No. Contents Page No TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report

More information

PROPOSED TERMS OF REFERENCE FOR THE FOR EIA STUDIES

PROPOSED TERMS OF REFERENCE FOR THE FOR EIA STUDIES Project Category Project Proponent Location Expansion of Lucknow Airport in Respect of Construction of New Integrated Terminal Building at Amausi, Lucknow, Uttar Pradesh. A [7 (a): Development of an Airport]