Mr SAJI ABRAHAM (Category B2)

Size: px
Start display at page:

Download "Mr SAJI ABRAHAM (Category B2)"

Transcription

1 APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE FORM IM & PRE-FEASIBILITY REPORT FOR BUILDING STONE QUARRY OF Mr SAJI ABRAHAM (Category B2) AT KALLOORKKAD VILLAGE MUVATTUPUZHA TALUK, ERNAKULAM DISTRICT KERALA STATE QL Area: Ha Proposed production: 40,000 TPA Proponent K K Abdul Rahman, Karukunnath house, Peringala P O, Ernakulam. Kerala Mobile No abrahamsaji1994@gmail.com Prepared by HAREESH G THAMPY 905 D, 9th Street, Sankar Nagar, KAIMANAM PO Thiruvananthapuram RQP/BNG/2296/2013/A gt.hareesh@gmail.com 0

2 PRE FEASIBILITY REPORT 1. EXECUTIVE SUMMARY Mr Saji Abraham, Thekkevattakunnel house, Nagapuzha P O, Ernakulam, Kerala is granted a Letterof Intent for quarry permit over an area 0.911Ha situated in Survey No 910/1-1,917/3B2,917/4-1 of Kalloorkkad Village, Muvattupuzha Taluk, Ernakulam District, Kerala vide Order No.DOE/2594/E2/16 dated 19/10/16 from The District Geologist, Ernakulam 2. INTRODUCTION OF THE PROJECT / BACK GROUND INFORMATION The quarry permit land under application for Environmental Clearance, for quarrying of Granite building stone, situated in Sy.Nos: 910/1-1,917/3B2, 917/4-1 in Kalloorkkad Village, Muvattupuzha Taluk, Ernakulam District, Kerala State. The subject area is owned by the proponent it self. The subject land does not belong to government or is not reserved for any other public purpose. The area is not fit for agriculture as the granite rock outcrops here with the elevated crust of the hilly formation and is devoid of sufficient top soil to facilitate plantation. The area lies away from public properties. The Quarrying plan is being prepared under 3(1) and 9 of rule Kerala Minor Mineral Concession Rule 2015 & the same is approved by the office of the Department of Mining and Geology, Ernakulam. The applicant has to obtain Environmental clearance in accordance with EIA Notification 2006 and its amendments thereafter, from DEIAA, constituted in accordance with the notification dated January 15 th 2016 by Ministry of Environment &Forest, Govt. of India. The area is found to have prominent exposure of granite covering the entire lease area. The proponent now strives to obtain Environment Clearance for systematic, scientific and eco-friendly development and production of building stone, with a maximum capacity of 40,000 TPA by carrying out medium scale quarrying by engaging semi mechanized Open cast method of quarrying. The quarrying plan is prepared for an extent of Ha.. This application for Environmental clearance covers the whole area and this report is herewith submitted to DEIAA constituted by MOEF for obtaining Environmental clearance. Present Proposal: The present proposal is submitted to the District Level Environmental Impact Assessment Authority, constituted by Ministry of Environment & Forest under the EIA Notification 2006 as per the orders dated of the Honourable Supreme Court directing that leases of Minor 1

3 Minerals including their renewal for an area of less than 5.0 ha be granted/renewed after getting Environmental Clearance from MOEF and recent Notification of January 15, 2016 of MoEF, Govt of India. Need for the project: Rapid growth in infrastructure developments like highways, metros, Technology parks, shopping malls, residential complexes etc has increasingly contributed to exponential domestic demand for building stones & metals. Hence a number of building stone quarries & crushing units with manufactured-sand Units (industries) are coming up in this sector. Building stone is the chief raw material in this sector, for building constructions & road formations. The size & quality parameters for supply of the mineral will be as per the requirements of the user industry. Based on the demand, the applicant intends to mine granite building stone for the developmental projects. As per EIA notification 2006 project proponent is submitting the proposal to get clearance for production capacity of 40,000 tons /annum from District Level Environmental Appraisal committee / District level Environmental Impact Assessment Authority of Kerala constituted by MOEF, GOI for the purpose of operation of mines on grant of quarry permit. The extent of the area under the current proposal is small and the mine shall be worked by semi mechanized method. Employment potential: The Manpower to be employed is around 10 including Mines Manager, Mining Mate & competent staff experienced in operation of excavators, drills, jack hammers in quarrying & allied activities. The employees will be assigned job relating to drilling, blasting, loading, breaking of the building stone and removal of waste & other routine works in the quarry. The working hours at the quarry will be 8 hours/day for 300 days/year 3. PROJECT DESCRIPTION The site is geographically located between North Latitude to and East longitude to The project site and buffer zone falls in the Survey of India Toposheet No. C 43Q/9 (Old 58 C/9). In the field studies it is clear that the quarry lease area is falling in uncultivable waste lands, non forest. The area wholly consists of stone / rocky mount. The highest elevation is 125 M and lowest elevation is 80 M above MSL. Other details : Toposheet No. C 43Q/9 (Old 58 C/9) Quarry Plan approval DOE/159/E2/2017 dated 19/04/2017 details Latitudes to Longitudes to Elevation of lease area Highest elevation is 125m and lowest elevation is 80 m above MSL 2

4 Survey No.&Villages Taluk&District Extent Area Type of Land Road Connectivity Nearest Railway Station Method of Quarrying 910/1-1, 917/3B2, 917/4-1 in Kalloorkkad Village Muvattupuzha Taluk & Ernakulam District Ha Private Patta Land SH KM NH KM The nearest rail head on Broad Gauge is Aluva railway station, which is at a distance of 51 KM approximately on the NW. Semi mechanized method of open cast quarrying(category-b2) Geology of the Area Most of the area is covered by Charnockite, (commercially known as Granite). Charnockite is well exposed in the area. The country rock in the lease area is mainly composed of Charnockite. Occasionally Biotite Gneiss patches are also observed. Dolerite and Gabbro dikes cutting across the country rock is observed in the area. Country rock is folded along the foliation planes and the foliation varies from 60 0 to Strike of the foliation plane in the lease area is along NW- SE and moderately dipping towards East. (Source: Exploration & Reserves The quarry lease area is exposed with Charnockite outcrop, a quarry was working for a couple of years and exposes the formation. On the north & south sides of the plot also, there are worked out pits which exposes the geological cross section. Hence the deposit in the plot is well proven. No explorations in the form of bore holes are carried out as it is in the proposed area. Moreover, Charnockite is a Plutonic Igneous Rock which is deep seated, and hence no further exploration is required. The reserve is calculated for 3 categories 1. Geological reserves, ie, total reserves available in the entire area 2. Minable reserves available with the ultimate pit limit after leaving the bench width and height 3. Blocked reserves, reserves are blocked due to bench formation and boundary constraints and in buffer zone area. In minable reserves 95% is saleable and rest 5% will be waste. Method of Estimation Of Reserves The estimation of ore reserves is made by conventional parallel cross section method using geological cross section. The geological cross section is prepared at a interval of 30 m across the the ore body. The area of individual litho units in cross section is calculated separately. The volume between the cross section is arrived on the basis of the average area of parallel cross 3

5 section i.e. ((S1 + S2) / 2) and multiplying sectional interval. And tonnage is arrived at by multiplying by bulk density. Note : Following are the parameters considered for reserve estimation: Category of ore Bulk density Recovery % Charnockite / Granite Waste rock Accordingly the reserves have been estimated and the details of the same are given below The granite /building stone exposures are clearly revealed in and around the lease boundaries. The mineable reserves are arrived after deducting the reserves locked in mines barrier along the boundary. Mineable Reserves 1,36,350 Blocked Reserves 1,38,713 Geological Reserves (Mineable + Blocked) 3,01,563 Production & Development The System or method of working shall be performed as stipulated under Rule 69(1) by formation of benches as per the Metalliferous Mines Regulations, 1961, issued under the Mines Act, Part of the lease hold area is covered with top soil of scanty thickness. Projected production from the quarry is 133 t/day i.e. around 40,000 tones per year. Benches and Production The topmost horizontal granite bench will be termed as G 1 and benches are numbered as G2, G3,... G10 etc downwards as depicted below. The topmost bench G 1 above 115 m level holds a mineable reserve of 7375 tonnes where as G 2 locks , G The reserves from these three levels / benches along with 14,787 tonnes from G4 will give the production requirement of 40,000/- tonnes for the first year. 4

6 Second year production of 40,000 tonnes shall be met from the remaining reserve of 2600 ton in G4 and 22,125 in G5 along with 15,275 tonnes from the G6 bench. Third year production Like wise the balance reserve of 2,225 tonnes in G6 along with 26,750 tonnes from G7 and 11,025 tonnes from G8 will meet the production for third year. BENCH RL QUANTITY G G G ,000 G G G ,000 G G G ,000 G G G TOTAL Method of Quarrying The quarry will be working with conventional open cast mechanized method. Based on the mode and method so adopted and taking into the consideration of geological parameters of the granite / Charnockite body, the quarry pit is so designed such that the height of the bench is kept about 5.0 m and the width is also kept min. 5.0 m, maintaining 45 o pit slope. Mode of operation (quarrying) will be semi mechanized open cast Drilling will be done by using Jack hammer drills of 32 mm dia holes For blasting, Nitrate Mixture type of explosives (Class 2) will be used Initial bench height will be 2.5 m, at the final (ultimate) stage bench height, it will be maintained 5.0 m and bench width will be narrowed to absolute necessity At final stage the slope of the bench will be maintaining 65 o slope. (Since granite is hard rock) 5

7 Boulders so generated subsequent to the blasting, this will be broken with the help of the rock breakers Loading of fragmented material into the Tippers with the help of Excavators. Drilling & Blasting: Since the bench height needs to be maintained 5.0 m, blast hole will be by jack hammer where the diameter is normally 32 mm and the depth of the hole is 2.5 to 2.6 m. Blasting pattern is generally square or staggered with burden ranging from 0.75 to 1.00 meters and spacing of 1.0 to1.2 meters. Usually single / double row of holes is blasted along free face to achieve optimum powder factor, best fragmentation and minimized adverse impacts on account of blasting. Maximum holes blasted per day are 30 to 40 with normal delay detonators to mitigate adverse impacts such as air blast, throw and the ground vibration. Holes are electrically detonated using electric detonators. Nitrate mixture (Class-2) types of explosives are used for blasting with 20 to 25 percent, proportion of primer/ booster cartridges and rest as column charge. About 2 to 3 kg of explosives are loaded in 32 mm diameter holes. And powder factor ranging between 7 to 8 tons per kg of explosives is achieved Lessee is having the Explosive license. A copy of the explosive license is enclosed as Annexure 9 in the Approved Mining Plan. Loading and Hauling: Loading of the building stone blocks will be done mechanically to tippers of 10 tons capacity and transported from the quarry to the stockyard and mineral rejection/waste will also be handled mechanically. In the quarry the road will be maintained with 1 in 16 gradients. Sufficient number of bunds and parapet walls will be made all along the quarry haulage roads wherever necessary in order to maintain safe working conditions by using the waste generated during the course of quarry operations. Solid waste Management: Over burden and Intercalated waste is to be handled during the quarrying operations is less as the entire area is almost a rocky terrain. An estimated quantity of around 2150 MT is required to be handled during the proposed plan period. The recovery loss constitutes the waste generated and is due to the incidental to quarrying and the intercalated waste material, if any. This will be stacked outside the boundary of lease area for sale for construction of compound wall etc. Hence a zero waste management of mineral is proposed. The dust generated will be suppressed by water spraying and removed as slime collected in de-silting pits. Hydrology: 6

8 The general ground water table in this area is m below the general ground level during the summer and around 8-15 m during monsoon. Since the quarry falls on the hillock, and the ground water table is m below the general ground level, none of the quarry workings will touch the water table. The workings are very much above the ground water tab le. Water resources in this area are ground water and rainwater or from kaliyar river. The area receives copious amount of rainfall about 3200 mm annually on an average. The level of water table in the open wells is shallow i.e. about m depth during the summer and 8 15 m during monsoon from the general ground level. The kaliyar river that flows at a distance of 4.7 KM is a perennial water course. The entire storm water flows through the minor watercourses and joins the river. The drainage pattern in this area is dendritic in nature. 4. SITE ANALYSIS Connectivity The quarry lease area is easily accessible in all seasonal conditions. The quarry lease area is around 51 KM from Aluva railway station, 17 KM from MC road.nedumbassery International Air Port (Cochin) is at 50 KM on the west. The permit area of Ha consists of Sheet rock, Non forest lands with massive granite out crop forming a hillock. The proposed land use pattern of the core zone is given below: Present land use pattern: The present land use and terrain patterns of the study area can be observed as follows: Present land use pattern (Area in Hectares) Type of Land Use Area put on use at start of the plan Area under quarry pit 0.30 Overburden/waste dump - Infrastructure(Workshop, Admin and Bldg) - Roads - Greenbelt - Undisturbed area Total Ha The proposed area to be worked during the three year is shown in the year wise Production & Development plan. The future proposed reclamation is by suitably sloping the quarry benches 7

9 at the end of quarry lease period of the quarry and by way of afforestation on the dumps and open places outside the working and lease areas. Existing Infrastructure: The construction of temporary structures for quarry office, Rest shelter, First aid station, sanitation & etc., are proposed to be provided out side the Quarry lease on the south on way to the quarry. The details are collected for the core and buffer zone of the quarry lease. The drinking water, electricity and primary education facilities are available in almost all the villages. The police station, post offices, dispensary facilities, phones, educational facilities etc are available in the village itself. There is good approachable weather roads present in the buffer zone of the area.. There are no sensitive areas for ecological reasons. Necessary precautionary measures in the form of infrastructure shall be provided during the course of quarry operations. A parapet/retaining wall as a fence shall be constructed all along the lease boundary to avoid trespassing of men & animals. 6. PLANNING BRIEF Conceptual Quarry Plan: As per guidelines, the conceptual plan period is to be prepared only up to the end of permit period in case of B category quarry. Manpower Projection: The man power of quarry includes Quarry manager/foreman, Mine mate supervisors, skilled and unskilled labours and other staff etc. As far the socio-economic is concerned from the quarry activity nearby villagers shall get 7 direct employments. The proposed quarry activities also shall bring the positive change in the villages as the quarry shall provide socioeconomic activities in the region. Land use planning: The Land use and land cover for the ensuing plan period and conceptual period. Description As on date Lease Period Ha End of Conceptual period Ha Area under Quarrying Buffer zone (Green Belt) Area for future use/undisturbed Total

10 Green Belt Development : It is proposed to develop a green belt outside the lease area. The existing rubber plantations on way up the lease hold in the Lands of the lessee will be nursed further. In addition, both sides of the haul road outside the lease area will be planted with suitable avenue trees. It is proposed to carry out afforestation by planting saplings of fruit yielding / flowering trees. Proper care will be taken for protection & growth of these saplings. The afforestation to be taken up will provide requisite floral biodiversity. At the end of the plan period non rocky area if any will be afforested and wherever possible and along roadsides afforestation will be proposed of area is earmarked for afforestation during the proposed plan period. During the afforestation work, the combination of different species shall be planted. This selection shall be made on the basis of the local plant growth in this surrounding area. It is always better to plant mixed species together. Guidance from the local forest department shall be taken in the selection of species and their maintenance. The plantation work requires considerable quantities of seeds, seedlings and saplings of different species: Nursery stock for this plantation will be available from the local forest and Horticulture department. Plantation crops like Rubber, Pepper, Arecanut, Coconut, fruit bearing trees like Mango, other plants such as Mahagoni, Rain tree, Bougainvillea, Red Palm and local species with thick foliage to arrest dust dispersion due to movement of vehicles will be planted Assessment of Infrastructure Demand: The existing road network will be sufficient to meet the proposed capacity; however required infrastructure for transport within the leasehold area will be further strengthened and improved. No new routes or alternations are required in this regard. Amenities/Facilities Applicant proposes to employ about 10 persons. This along with non-direct employment will have a positive impact on the socio-economic conditions of the surroundings as most of the work force employed will be from the nearby areas. Local persons will be hired for meeting the requirement of truck loading, plantation, construction of check dams, retaining walls etc. The benefits due to quarry to the local population will be in the form of Direct and indirect employment opportunities. 6. PROPOSED INFRASTRUCTURE The quarry permit area of Ha is Private Patta land. The proposed method of quarry operation will be semi mechanized with jackhammer drilling & blasting with tipper/tractors for 9

11 internal transport. The lease area does not have any public roads, railway lines, telephone lines, public buildings etc. Present infrastructure will meet the requirement of the project. The conditions of the roads in the buffer zone are unlikely to be impacted due to the proposed minor scale operation. The project authorities in association with the district administration will also contribute to development & maintenance of roads. Social Infrastructure: The quarry lease area is easily accessible in all seasonal conditions. The nearest rail head on Broad Gauge is Aluva railway station, which is at a distance of 51 KM approximately on the north west and the MC road leading to Aluva is only 17 KM from the quarry site. The nearest Air port is Nedumbassery International Air Port (Cochin) and is at a distance of 50 km. Drinking Water Management : The Right canal of Muvattupuzha valley irrigation project that flows at a distance of 0.65 KM on the SW is a water course. The entire storm water flows through the minor watercourses and joins the river. There is no possibility of disturbance of water shed. Rain water will continue to flow in the same direction as it is in existence. Since the water is not withdrawn (from any source outside the lease area) for quarry purposes for quarrying operations no adverse impact is foreseen on the existing water regime. The rainwater stored in the pits shall be utilized for mitigating dust and other activities. The surface water in the buffer zone is in the form of seasonal rainfall and the ground water bodies encountered below depth in the area from the surface level. The area is small; so far no report on hydrological studies has been carried out in the area under question. There is no potential of acid mine drainage. The drinking water is available from nearby bore wells and water can be stored into sintex tanks. During the course of quarry operation no diversion of water course is considered as it doesn t exists. Sewage System : The existing watercourses shall not be disturbed and rain water will continue to flow in the same direction. Check dams shall be constructed in the nallahs of the buffer zone and retain walls constructed by the side of the O.B. Dumps, water will percolate in the premises of the quarry area. There is no generation of domestic sewage. Industrial Waste Management : There is no generation of affluent/toxic substance; hence treatment of quarry water doesn t arise. 10

12 Solid Waste management : Over burden and Intercalated waste is to be handled during the quarrying operations is less as the entire area is almost a rocky terrain. An estimated quantity of around 1300 m 3 top soil and 6,817 MT ( 5 % 0f 1,36,350 ) is required to be handled during the proposed plan period this waste material will be temporarily accommodated in the adjacent area outside the lease hold, owned by the lessee on the southern part of the lease hold. Power requirement and supply : There will not be any requirement of power supply to the project site. The quarry activities like drilling, loading, unloading by excavators and transportation shall be carried out with diesel as motive power only during day time. As such for operation of the quarry no power supply is required as the HEMMs will be operated by HSD. The power supply for office will be met through Kerala State Electricity Board. 7. REHABILITATION AND RESETTLEMENT PLAN The primary objectives of reclamation are to restore the affected area to the original state as near as possible. Quarrying will alter the surface profile in the area by way of excavation and surface dumps. This may lead to water pollution, silting of agricultural lands; air pollution etc if proper care is not taken. The various reclamation proposals planned during the plan period and further will include proper formation of roads, working of benches with safe angle of slope, installation of effective drainage system, prevention of erosion and excessive run off & re-vegetation or afforestation. ENVIRONMENTAL PROTECTIVE MEASURES The proposed QL area is totally barren except sporadic retarded seasonal growths of grass and bushes. No tree grows in the lease hold as the area outcrops granite. Programme of plantation Casuarinas Misc. 1 st year nd Year rd Year th Year th Year

13 8.PROJECT SCHEDULE AND COST ESTIMATE The estimated total cost of the project is Rs.2.5 Crores including the cost of the machinery and additional preliminary works and working capital i.e. for the application and processing fee, etc. The land is Private Patta land owned by the lesse and coowners. The return on the investment is by way of sale of mineral(building stone). All the minerals shall be marketed. The machinery shall be arranged on hire basis as per the requirement for production. The proposed production of Building Stones: 40,000 MT ENVIRONMENT MANAGEMENT PLAN Sl. No. Description Capital Cost (Rs in lakhs) Annual recurring cost (Rs in Lakhs) 1 Air pollution Control-Dust suppression on haul roads : pumps pipe 3 Water pollution Control - Preparation of garland drains, settling tanks, check dams, gully plugs etc 4 Noise Pollution controls- acoustic installations Plantation & green belt development Manuring & Man power Fencing CSR 1.65 Total CORPORATE SOCIASL REAPONSIBILITY As part of meeting the CSR, the proponent proposes implementation of the following benevolent activities. Scholarship for school children 20,000/- 12

14 Books & educational aids to School children 25,000/- Medical camp with involvemeny of panchayat 40,000/- Women Empowerment 95,000/- Total 1,65,000/- Cost of Production The maximum proposed production of Building Stone during the four year plan is 40,000 tonnes per annum. The cost of the production includes the following components. Parameters: Mineable reserves Nature of Mineral Production Building Stone : 1,36,350 MT : Granite Building Stone : 40,000 tons/annum Total pit head realization per ton of Building Stone : 350/- Profit/ton : 74/- Gross profit/annum for 40,000 MT Net profit after taxation@35% :Rs lakhs : Rs lakhs Net Profit/Ton : Rs

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT GRANITE BUILDING STONE QUARRY MINING PROJECT STATE : KERALA DISTRICT : KANNUR THALUK : THALASSERY VILLAGE : THRIPPANGOTTUR BLOCK NO. : NIL SURVEY NO. : 275/1A MINERAL : GRANITE BUILDING

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name

More information

1. PRE-FEASIBILITY REPORT

1. PRE-FEASIBILITY REPORT 1. PRE-FEASIBILITY REPORT 1.1 Executive Summary Sri. T. Thimmegowda, has applies quarry lisence for extracting of Building Stone Quarry in Sy No. 33/2, Kurodbore Kaval village, Hassan Taluk, Hassan District,

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Smt. J N Rukmini, has applied for extracting of Building stone in Sy No. 40, Kuroda Bore Kavala village, Hassan Taluk & District, Karnataka over an extent

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVESUMMARY 1.1 Introduction Road Metal of M/s. Venkata Ramana Stone Crusher covering an extent of 0.89 Ac is located at Sy.No.379/1 of Perecherla Village, Medikonduru Mandal, Guntur District,

More information

PRE-FEASIBILIY REPORT

PRE-FEASIBILIY REPORT BENDRI LIMESTONE QUARRY NO. - 4 3 (Quarry No. 1) (Quarry No. 1)MINERALS - DOLOMITE (LEASE PERIOD 20.05.2002 TO 19. 05.2022) LEASE AREA - 42.754 HECTARES MINING PROJECT - CATEGORY- B PRE-FEASIBILIY REPORT

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

(A govt. of Kerala Undertaking)

(A govt. of Kerala Undertaking) Annexure - 1 Basic Information Important Note: Please send the information by e-mail in word format and a signed & scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy

More information

Pre-Feasibility Report for Granite Building stone Quarry

Pre-Feasibility Report for Granite Building stone Quarry Pre-Feasibility Report for Granite Building stone Quarry SURVEY NO. : 53/6 & 53/8-1, 53/8-2 & 53/13 VILLAGE TALUK DISTRICT STATE EXTENT : AYYAMPUZHA : ALUVA : ERNAKULAM : KERALA : 0.9842 HA LAND STATUS

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

Pramod S. Kambli. Page 1

Pramod S. Kambli. Page 1 PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major

More information

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS

More information

BRIEF SUMMARY OF THE PROJECT

BRIEF SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT This proposal of Nuagaon Iron ore mines of M/s K.J.S.Ahluwalia is for expansion of Iron ore production capacity from 5.62 MTPA to 7.99MTPA of ROM along with existing beneficiation

More information

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R. WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey

More information

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE

APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE FORM IM & PRE-FEASIBILITY REPORT FOR BUILDING STONE QUARRY OF M/s. MADAPARAMBIL QUARRY (Category B2) AT MAZHUVANNUR VILLAGE KUNNATHUNAD TALUK, ERNAKULAM DISTRICT

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For M/s. Shah Shah Mines & Minerals, SY. NO. 206/1, Gangireddipalli Village, Thamballapalli Mandal, Chittoor District, Andhra Pradesh. INDEX ITEM PAGE NO. 1. EXECUTIVE SUMMARY 3

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

GRAVEL & ROUGH STONE QUARRY

GRAVEL & ROUGH STONE QUARRY ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL & ROUGH STONE QUARRY Sy. No. 211 (Carved out of Sy.No.1) Tarluwada Village & Anandapuram Mandal, Visakhapatnam District, Andhra Pradesh. AREA OF MINING LEASE 23.760

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village,

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Palakurthy Mandal, Peddapally District, Telangana State Applicant Sri

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KATIKELA RIVER SAND BED OVER 15.00 ACRES OR 6.070 HA IN VILLAGE KATIKELA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20)

More information

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara PROJECT PARTICULARS Name of the project - Sand mining Lease address - Village panchayat - Nara, Tahsil -Kanker, Dist Kanker (C.G.) Khasra No. - 1025 Sand mining area - 5.00 Hectares Name of the mineral

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT EXCUTIVE SUMMARY Project : Mining Lease of Iron Ore (Ari Dongri Iron Ore Mine) Name of Company / Mine Owner : Godawari Power and Ispat Limited Location Village : Tehsil : District

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

Environmental Management Plan. For Mining of. Building Stone & Road Metal

Environmental Management Plan. For Mining of. Building Stone & Road Metal Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 5.65 Ha at Survey No. 427,428 & 429 Alladurg Village, Alladurg Mandal, Medak District, Telangana State Lessee M/s

More information

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd.

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd. SEIAA KARTAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd. Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report

More information

EXECUTIVE SUMMARY. 1.1 Executive Summary

EXECUTIVE SUMMARY. 1.1 Executive Summary 1.1 Executive Summary EXECUTIVE SUMMARY Chobe ki Guwari Sand Stone Mining Project (M.L. No- 26-R-01/2001) is situated near village Chobe ki Guwari, Tehsil Sapotra, District Karoli, State Rajasthan over

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Building Stone Quarry of Sri. B. Narendra Kumar

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Building Stone Quarry of Sri. B. Narendra Kumar SEIAA KARTAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project : Building Stone Quarry of Sri. B. Narendra Kumar Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report [PFR] in the format

More information

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent

PRE FEASIBILITY REPORT. PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent PRE FEASIBILITY REPORT PROJECT Maharkund Manganese Ore Mine (10.62 ha) Village Maharkund; Tehsil Ramtek; District-Nagpur (MS) Project Proponent M/s Veet Rag Homes Pvt. Ltd. 267, Ganesh Phadnavis Bhavan,

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT Aug 2018 PRE-FEASIBILTY REPORT OF M/S. J.M.R.MINES (MINING OF FELDSPAR, QUARTZ & MICA MINE) Lease Area : 5.78 Hectares(14.29 Acres) Sy.No.941,942,943 &947 Giddalur (V), Sydapuram (M), SPSR Nellore District

More information

PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.

PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P. PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.O, Ernakulam (Dist.) Survey No. 129/1-4,129/2-1, Arakuzha Village,

More information

PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF

PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF 0.80.0Ha IN ANAIMALLUR VILLAGE, ARCOT TALUK, VELLORE DISTRICT, TAMILNADU OF THIRU.R.VINOTHKUMAR, (Under

More information

SHRI.LAKSHMAN NAMDEV KOLI

SHRI.LAKSHMAN NAMDEV KOLI PRE-FEASIBILITY REPORT (PFR) FOR PROPOSED STONE QUARRY BY SHRI.LAKSHMAN NAMDEV KOLI AREA. 1.00 HA., GAT. NO. 811/2 PART, VILLAGE BASTAWADE, TAL.: TASGAON, DIST.: SANGLI PREPARED BY EQUINOX ENVIRONMENTS

More information

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Siddapur Natural Sand Mining in Patta land

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Siddapur Natural Sand Mining in Patta land SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project : Siddapur Natural Sand Mining in Patta land Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report [PFR] 3 Environmental

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU PRE-FEASIBILTY REPORT OF SUNATHAR STONE QUARRY VILLAGE: Sunathar TAHASIL: Purushottampur DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU Vill/Po- Gandala, P.S.- Hinjili, Dist.-Ganjam Odisha. CONTENTS CHAPTER

More information

Period of Compliance Report : April, 2017 to September, 2017

Period of Compliance Report : April, 2017 to September, 2017 Name of the Project Project Code Clearance Letter No. with date : OSTAPAL CHROMITE MINES, M/S. FACOR LTD. : Mining (Non-Coal) : No. J-11015/183/2007-IA-II (M) dt.13-05-09 Period of Compliance Report :

More information

INDEX S.NO ITEM PAGE NO 1. INTRODUCTION 3 2. DETAILS ABOUT THE MINE LEASE AREA 4 3. MINING ACTIVITY 5 4. ENVIRONMENTAL MANAGEMENT PLAN 8

INDEX S.NO ITEM PAGE NO 1. INTRODUCTION 3 2. DETAILS ABOUT THE MINE LEASE AREA 4 3. MINING ACTIVITY 5 4. ENVIRONMENTAL MANAGEMENT PLAN 8 M/s. Nandini Mineral Industries (Mine Lease Area 4.120 Ha.) Sy. Nos. 105, 105/1, 2 & 113/1A Kolumulapali Village, Bethamcherla Mandal, Kurnool District, ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY ISO 9001:

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA)

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) PRE FEASIBILITY REPORT ON GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) Lease Area: 18.687 acres or 7.562 Ha. of Sri Rama chandra Dash Polasara CHAPTER 1 EXECUTIVE SUMMARY Ghodapalana sand Quarry

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

M/s. Bharat Clays Private Limited Pre-Feasibility Report

M/s. Bharat Clays Private Limited Pre-Feasibility Report 1. EXECUTIVE SUMMARY 1.1 Introduction is a private partnership firm. They applied for a mining lease for China Clay over an extent of 2.023 Hectares in Sy. No: 102/3 & 102/4P of Jaggampeta Village, Jaggampeta

More information

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 Executive Summary The Mining lease was granted in favour of Shri Mukesh Kumar S/o Shri Harish Chandra, R/o Tatol vaya Bagra, Tehsil - Bhinmal, Dist.-Jalore

More information

PRE FEASIBILITY REPORT OF R.PUDUPATTI ROUGH STONE QUARRY UNDER EIA NOTIFICATION 2006

PRE FEASIBILITY REPORT OF R.PUDUPATTI ROUGH STONE QUARRY UNDER EIA NOTIFICATION 2006 LEASE APPLIED AREA FOR OVER AN EXTENT OF 1.49.0Ha IN R.PUDUPATTI VILLAGE, RASIPURAM TALUK, NAMAKKAL DISTRICT, TAMILNADU OF THIRU.K.K.PERUMAL, (Under the Guidelines of Ministry of Environment and Forest

More information

INDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND

INDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND PRE-FEASIBILITY REPORT PREPARED FOR D. SESHA REDDY [Mine Lease Area 3.253 Ha.] Sy. No. 12/D Nagarur Village, Yadiki Mandal, Ananthapur District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified Accredited

More information

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE ENVIRONMENTAL MANAGEMENT REPORT Of COLOUR GRANITE MINE Sy. No.Old: 52/2B1 (New 52/2B1) of Peddavelagatur Village, Peddapanjani Mandal,Chittor District, Andhra Pradesh AREA OF MINING LEASE 5.70 Ha. For

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY S.No Particulars Details 1 Name of Project 2 Project Proponent 3 Village Proposed Granite Building Stone Quarry of Mr. Saji Sebastian Mr. Saji Sebastian Madeckal House, Kizhakkambalam

More information

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P SITUATED AT KAKKUR VILLAGE KOZHIKODE TALUK KOZHIKODE DISTRICT KERALA STATE EXTENT: 2.0437 Ha STANDARD TERMS OF REFERENCE (TOR)

More information

Chapter- V MANAGEMENT PLAN (EMP)

Chapter- V MANAGEMENT PLAN (EMP) Chapter- V MANAGEMENT PLAN (EMP) The Environment Management Plan (EMP) for a development project prescribes the mitigation measures to be adopted to nullify or to minimize various anticipated environment

More information

Scrutiny comments on examination of FMCP ( lease expiring on 31/03/2020 )of Teherai Iron and Manganese Mine of M/s Bonai Industrial Co.

Scrutiny comments on examination of FMCP ( lease expiring on 31/03/2020 )of Teherai Iron and Manganese Mine of M/s Bonai Industrial Co. Scrutiny comments on examination of FMCP ( lease expiring on 31/03/2020 )of Teherai Iron and Manganese Mine of M/s Bonai Industrial Co. Limited GENERAL: 1. Lease number and lease period since execution

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION An Environmental Management Plan (EMP) is a site-specific plan developed to ensure that all necessary measures are identified and implemented in order to protect

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For Proposed Colour Granite Mine over an Extent of 10.00 Hectares, in Un-surveyed area of Surjini Village, Meliaputti Mandal, Srikakulam District, Andhra Pradesh Submitted To Ministry

More information

M/s.NEERAJ KUMAR JAIN

M/s.NEERAJ KUMAR JAIN EXECUTIVE SUMMARY OF DARSHANI LATERITE AND RED OCHRE DEPOSIT Area : 15.00 Ha. Village Budhanwara, Tahsil Bohriband, Dist. Katni MADHYA PRADESH For M/s.NEERAJ KUMAR JAIN KATNI 1 BUDHANWARA LATERITE AND

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT BANDOL CRUSHER STONE QUARRY OF SHRI TULSIRAM SAHU AT Khasra No. 15/2,23/2 Village Bandol Tehsil District State Madhya Pradesh Production Capacity 45030 M3/Year Area 3.150 Hectare

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

DHANWADA CRUSHER STONE QUARRY

DHANWADA CRUSHER STONE QUARRY ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Pathari Basouda : Basouda : Vidisha (M.P.) : 2.00 Hectare : Stone KHASRA No : 177/1/2 PRODUCTION CAP : 10000 Cu.mt/year Stone APPLICANT

More information

PRE FEASIBILITY REPORT (PFR)

PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 27 PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 28 INDEX S. No. Contents Page No. 1.0 EXECUTIVE SUMMARY 30 2.0 INTRODUCTION OF THE PROJECT / BACKGROUND

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Krishna Construction Company AT Khasra No.1046 Vill.-Pipalya Hamir, Tehsil-Barod, District-Agar Malwa (M.P.) Production Capacity: 40000 Cu.mt Crusher Stone for 18 Months

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN BANKUCHIA STONE DEPOSIT VILLAGE POLICE STATION DISTRICT STATE AREA PRODUCTION RATE BANKUCHIA PATAMDA EAST SINGHBHUM JHARKHAND 29.00 ACRES (11.74 HA) 854755 TPA PROJECT PROPONENT

More information

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD

EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD EXECUTIVE SUMMARY 1.0 MADHYA PRADESH STATE MINING CORPORATION LTD Madhya Pradesh State Mining Corporation Ltd (MPSMCL), a company of Government of Madhya Pradesh has been allotted Amelia (North) Coal Mining

More information

Environment Management Plan

Environment Management Plan Environment Management Plan Environmental Impact Assessment Statement describing the impact of mining and beneficiation on environment on the following: i) Land area indicating the area likely to be degraded

More information

PRE-FEASIBILITY REPORT &

PRE-FEASIBILITY REPORT & & ENVIRONMENTAL MANAGEMENT PLAN Of MINING OF COLOUR GRANITE 1.983 HA SY.NO: 61/4A & 4B, POLAVARAM VILLAGE, SANKAVARAM MANDAL, EAST GODAVARI DISTRICT, ANDHRA PRADESH By M/s. SILICON ROCS, MANAGING PARTNER:

More information

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY PRE FEASIBILITY REPORT OF AZHAGAPPAPURAM EARTH FOR OVER AN EXTENT OF 0.61.0HA IN AZHAGAPPAPURAM VILLAGE, AGASTEESWARAM TALUK, KANNIYAKUMARI DISTRICT, TAMIL NADU OF, (Under the Guidelines of Ministry of

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation

More information

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT This is an existing mine, proposal for obtaining Environmental Clearance for Masonry Stone with production capacity 37,300 TPA Near Village: Velangri, Tehsil-Sirohi,

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

Granite (Building Stone) Quarry owned by Biju. V.T at Aryanad Village, Nedumangad Taluk, Thiruvananthapuram District, Kerala

Granite (Building Stone) Quarry owned by Biju. V.T at Aryanad Village, Nedumangad Taluk, Thiruvananthapuram District, Kerala ENVIRONMENTAL MANAGEMENT PLAN BASELINE ENVIRONMENT The baseline environment quality represents the background environmental scenario of various environmental components such as air, noise, land, ecological

More information

Risk Assessment Nagla

Risk Assessment Nagla Risk and Hazards HAZARD Major Risks involved in River Bed Mining are following: 1. River Bed Inundation 2. Soil Erosion 3. Disturbance of Ground water Level 4. Damage of River bank due to access of Ramps

More information

ENVIRONMENTAL MANAGEMENT

ENVIRONMENTAL MANAGEMENT ENVIRONMENTAL MANAGEMENT PLAN RAJBANDH STONE DEPOSIT VILLAGE Rajbandh POLICE STATION MALPAHARI DISTRICT PAKUR STATE JHARKHAND AREA 9.00 ACRES (3.64 HA) PRODUCTION RATE 338850 TPA PROJECT PROPONENT M/S

More information

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details:

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details: 2015 PRE-FEASIBILITY REPORT (FOR TOR) OF GADABAVALASA MANGANESE ORE MINES, AT: GADABAVALASA, GARIVIDI MANDAL, DIST: VIZIANAGRAM FOR PRODUCTION OF 12,000TPA OF MANGANESE ORE OVER AN AREA OF 12.691 HA. OF

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

Salient Features of Mining Mining is proposed by opencast manual method. Estimated Mineable Reserves: Hard/Lumps Iron ore = 5, 33,940 tonnes.

Salient Features of Mining Mining is proposed by opencast manual method. Estimated Mineable Reserves: Hard/Lumps Iron ore = 5, 33,940 tonnes. EXECUTIVE SUMMARY INTRODUCTION Agaria Iron Ore mine is situated in village Agaria, Tehsil- Sihora, District Jabalpur of Madhya Pradesh State. The mining lease period was for 20 years w.e.f 06.03.1987 to

More information

Granite (Building Stone) Quarry owned by Kunhi Muhammed at Melmuri Village, Eranad Taluk, Malappuram District, Kerala

Granite (Building Stone) Quarry owned by Kunhi Muhammed at Melmuri Village, Eranad Taluk, Malappuram District, Kerala Granite (Building Stone) Quarry owned by Kunhi Muhammed at Melmuri Village, ENVIRONMENTAL MANAGEMENT PLAN BASELINE ENVIRONMENT The baseline environment quality represents the background environmental scenario

More information

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

PREFEASIBILITY REPORT FOR BRICK EARTH MINE Page 1 PREFEASIBILITY REPORT FOR BRICK EARTH MINE Developed By- Village-Chandauhan, Tehsil-Phulpur, District-Allhabaad, Uttar Pradesh. RAI ENVIROMENTAL SERVICES PVT. LTD. Website: www.raienviro.com Email

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH

More information

ENVIRONMENT MANAGMENT PLAN

ENVIRONMENT MANAGMENT PLAN ENVIRONMENT MANAGMENT PLAN DETAIL OF MINE- NAME OF MINERAL SANDSTONE (FURSHI PATTHAR) MINING LEASE FOR FINISHED SANDSTONE VILLAGE PARASWAHA, TEHSEEL JABERA DISTRICT - DAMOH KHASRA NO. 22/1, AREA 1.0 HECTARE

More information

State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests)

State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests) State Environment Impact Assessment Authority, M.P. (Government of India, Ministry of Environment & Forests) To, Shri Pradeep Jain C/o Jain Medical store, Main Market,Tendukheda, District Narsingpur M.P.

More information

EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bh

EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bh EMP ENVIRONMENTAL MANAGEMENT PLAN FOR BUILDING STONE QUARRY M/S. SIDDARTHA STONE CRUSHING INDUSTRIES Sy.No. 1118/4, Bangaramakki Bengre II Village, Bhatkal Taluk, Uttara Kannada District PREPARED BY SMS

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY S.No Particulars Details 1 Name of Project Project Proponent 3 Village Proposed Granite Building Stone Quarry of M/s. St Mary s Quarry Biju P Sebastian, (Managing Partner- St Mary

More information

For Ornamental Stone/ Black Granite Quarry

For Ornamental Stone/ Black Granite Quarry ENVIRONMENTAL MANAGEMENT PLAN For Ornamental Stone/ Black Granite Quarry Of Sri. Jameel Ahmed At Sy No: 353/7 Gumballi Village, Yelandur Taluk, Chamarajanagar District, Karnataka. (Extent- 1-03 Acres)

More information

Piplyakamil Murrum Quarry located at Khasra No 90/2, near Village Piplyakamil, Tehsil- Dharampuri, District Dhar M.P

Piplyakamil Murrum Quarry located at Khasra No 90/2, near Village Piplyakamil, Tehsil- Dharampuri, District Dhar M.P 1. INTRODUCTION The project namely Piplyakamil Murrum Quarry having an area of 2.0 ha at Khasra No.- 90/2 near Village- Piplyakamil Tehsil- Dharampuri, District-Dhar, State-Madhya Pradesh belongs to Shree

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Parsen : Gwalior : Gwalior (M.P.) : 3.345 Hectare : Stone KHASRA No : 4154 PRODUCTION CAP : 50,000 Cu.mt/year (avg.) Stone APPLICANT

More information