1 AMELIA (NORTH) COAL MINE -Expansion Project Lease Area Ha. Capacity 4.20 MTPA At Village Amelia Teshil Deosar District - Singrauli State Madhya Pradesh Proponent Jaiprakash Power Ventures Limited Prepared By M/s Crystal Consultants Ranchi (Jharkhand)

2 A. Contents CHAPTER PARTICULARS Page No. I. EXECUTIVE SUMMARY I-1 To I-2 II. INTRODUCTION II-1 To II-3 III. PROJECT DESCRIPTION III-1 To III-14 IV. SITE ANALYSIS IV-1 To IV-2 V. PLANNING BRIEF V-1 To V-1 VI. PROPOSED INFRASTRUCTURE VI-1 To VI-2 VII. REHABILITATION & RESETTLEMENT VII-1 To VII-1 VIII. PROJECT SCHEDULE & COST ESTIMATES VIII-1 To VIII-2 IX. ANALYSIS OF PROPOSAL IX-1 To IX-1 B. Plates Sl. No. Particular Plate No. 1. Index Plan I 2. Study Area Plan II 3. Topographical Plan III 4. Mine Site Layout. IV

3 AMELIA (NORTH) COAL MINE -Expansion Project 2015 CHAPTER I EXECUTIVE SUMMARY 1.1 Amelia (North) Coal Block was allotted to M/s Madhya Pradesh State Mining Corporation Limited. Later the allotment was cancelled in pursuance to Hon ble Supreme Court s order. The block has now been vested to M/s Jaiprakash Power Ventures Limited, a limited company. The mine has been developed to produce 2.8MTPA of coal by opencast method of mining. Environmental Clearance has been obtained. 1.2 The mine is captive linked to Jaypee Nigrie Super Thermal Power Plant (1320MW) owned by M/s Jaiprakash Power Ventures Limited. The coal required for the power station is 5.2 MTPA. 1.3 In view of the fact that presently there is shortage in supply of coal to power station, the proponent proposes to enhance the capacity of mine from 2.8 MTPA to 4.2 MTPA. There is no change in lease area and mining technology. 1.4 As per provision of EIA Notification 2006, Expansion Projects need Environmental Clearance. Accordingly proponent is filing Form I & Pre- Feasibility Report for determination of ToR for Environmental Studies. 1.5 The Mining Plan for expansion project (4.2MTPA) has been prepared with a life of 23years. As per Revised Mining Plan Peak Capacity is 4.2MTPA & Normative Capacity 2.80MTPA. 1.6 Coal is proposed to be mined by opencast method of mining by using Surface Miner & Shovel Dumper combination with blasting. 1.7 In course of mining a total of Mm 3 of overburden (including 2.38Mm 3 of topsoil) would be generated. Out of this 95.91Mm 3 would be stacked in external dump & balance Mm 3 is to be used to backfill decoaled quarry. 1.8 Total land (728.75Ha.) in lease area form part of Reserved Forest. Approval has been obtained for diversion of forest land for the project. Page I-1

4 AMELIA (NORTH) COAL MINE -Expansion Project At the end of mining operation land degraded on account of quarrying, overburden dumping, etc. will be biologically reclaimed. This includes ha. external dump & ha. of internal dump. Plantation would be raised over reclaimed area Total water demand for mine site & township has been assessed as 477KLD. This includes 110KLD for potable purpose & 367KLD for industrial purposes. Ground water will be used for potable purposes & mine water will be used for industrial purposes. Effluent treatment plant has been constructed to treat industrial waste water & sewage treatments plant to treat municipal waste water in township Run of mine coal would be crushed & sized in coal handling plant located at mine site as per requirement of the power station Processed coal would be transported to the power station by rail A township is constructed for the mine project As stated earlier lease area is forest land. There is no human habitation within the lease area. No R & R issues are associated with the project. Page I-2

5 CHAPTER II INTRODUCTION 2.1 IDENTIFICATION OF PROJECT The proposal relates to obtaining environmental clearance for expansion of Amelia (N) Coal Mine. Presently it is working under approved mining plan for rated capacity of 2.8 MTPA. The mine has been mining coal by opencast method of mining for last two years. Project has obtained environmental clearance from MoEF. Lease Area is Ha. The mine produces power grade coal. Detail of lease area Village - Amelia District - Singrauli State - Madhya Pradesh Type of Land - Forest Land Plot No. - Refer to Table No. 2.1 TABLE 2.1 DETAILS OF ML AREA Forest compartment No. Area Ha Total IDENTIFICATION OF PROJECT PROPONENT M/s Jaiprakash Power Ventures Limited has been vested with the coal block by Ministry of Coal, Govt. of India. M/s JPVI is a limited company having Page II-1

6 registered Office at JUIT Complex, Waknaghat, P.O. Dumahar Bani, Kandaghat Dist-Solan, Himachal Pradesh, India. JPVL presently operates three Hydro-Power Plants. I. 300MW Jaypee Baspa-II Hydro-Power Plant in HP. II. 400Mw Jaypee Vishnupreyag Hydro-Power Plant in Uttrakhand. III. 1091MW Jaypee Karcham Wangloo Hydro-Power Plant in HP. Besides above the company is operating two Thermal Power Plants I. 500MW Jaypee Bina Thermal Power Plant is Sagar (M.P.). II. 1320MW Jaypee Nigri S.T.P. Plant in District-Singrauli (M.P.). 2.3 NEED OF THE PROJECT & IMPORTANCE TO COUNTRY The project under consideration i.e. Amelia (N) Expansion Coal Project is captive to Jaypee Nigri Thermal Plant that needs 5.2 MTPA of Power grade coal. This mine will satisfy a part of coal demand of the Super Thermal Plant Station. The demand for commercial energy is growing. In the present scenario, Coal is abundantly available, affordable in the form of indigenous source for commercial energy. In the above context project is important for the nation. The coal project & the Super Thermal Power Station offers source of employment & source of income generation for local people. This project contribute to socio-economic development of the region & nation. The project will also contributes to state exchequer by way of cess, royalty, sales tax and Additional levy. 2.4 DEMAND & SUPPLY GAP In present Indian context coal is prime source for commercial energy. Coal is also important raw material for other core industries particularly cement & steel. For achieving projected growth is core sectors, coal mining sector has to achieve matching growth rate to meet the growing demand of coal. In absence of sufficient indigenous production, Country had to import coal in order to bridge the gap between demand & supply. For reducing the dependence on imported coal, country has to produce more coal by way of expansion & opening of new coal projects. In this context capacity of the mine is being enhanced. Page II-2

7 This project will meet part demand of coal linked to power plant (5.2 MTPA). Balance coal will be sourced from other sources. Though the effort will be made to secure other coal block so that gap between demand & supply can be met by opening new mine. 2.5 IMPORTED AS INDIGENOUS In the past country had to import coal of various grades to bridge the gap between demand & supply. In order to avoid import of coal for thermal Power Station, the proponent proposes to expand the capacity of the mine. 2.6 EXPORT POSSIBILITY The coal produced from this mine will be consumed by linked Thermal Power Station of the proponent. So there is no possibility of export of coal produced by the mine. 2.7 DOMESTIC/EXPORT MARKET As stated above coal produced from this project is for internal consumption. It is not for sale in the open market. 2.8 EMPLOYMENT GENERATION The project is to offer employment to 829 persons. In addition to above the project would generate employment in secondary (ancillary) & tertiary sectors (service). Page II-3

8 CHAPTER III PROJECT DESCRIPTION 3.1 TYPE OF PROJECT The project under consideration relates to a proposal obtaining Environmental Clearance for expanding the capacity of production of existing Amelia (N) Opencast Coal Mine from present capacity of 2.8 MTPA to 4.2 MTPA. The existing mine is operating under an approved mining plan and environmental clearance. The coal produced from this mine is supplied to linked Jaypee Nigrie Super Thermal Power Plant which is located about 70km away. The thermal power station has already been granted Environmental Clearance by MoEF. 3.2 LOCATION The location of mine is given below: Village - Amelia Tehsil - Deosar District - Singrauli State - Madhya Pradesh Geographical co-ordinates are given below Latitude To N Longitude To E The general location of the mine is shown in Index Plan (Plate I). Specific location of mine is shown in Study Area Plan on Toposheet (Plate II). 3.3 SELECTION OF ALTERNATE SITE This is an existing mining project having sufficient coal reserve. Many of proposed infrastructures have already been developed. In view of this no alternate site has been explored. 3.4 SIZE OF PROJECT The lease area of the project measures ha. The mine is currently operating at a capacity of 2.8 MTPA. It is proposed to expand the capacity to 4.2 MTPA. Page III-1

9 3.5 PROJECT DESCRIPTION Project has been planned to mine coal from two top coal seams namely seam VII & seam VIII. A brief description of coal reserve, method of mining, disposal of waste, blasting are given below: Reserve and grade of coal The exploration has revealed the presence of total of seven correlatable coal seams in the Barakar formation. These coal seams in descending order are seams VIII, VII, VI, V, IV, III (top) & III (bottom) occurring in the Barakars. Seam-V is split into two sections, designated as V (top) and V (bottom). The seam V (bottom) and III (top), though correlatable, are uneconomical. A. Details of Reserve Estimation Seam wise and grade wise reserve for the entire Amelia (north) coal mine has been estimated and is provided in table 3.1. Page III-2

10 Table 3.1 Summarised reserves of coal seams (Mil. Tonnes) Seam Proved (Grade Wise) Indicated (Grade Wise) OC / Subtotal Sub- OC / UG B C D E F G B C D E F G Total UG Total VIII OC OC VII OC OC VI UG UG V(Top) UG UG V(Comb) UG UG IV UG UG III(Bot) UG UG Total OC : Opencast UG : Underground Page III-3

11 II. Overburden Nature of Overburden : Overburden consists of predominantly sandstone with minor amount of shale, carbonaceous shale and thin coal bands. Besides, the overburden also includes sandy soil, weathered rocks and obvious/dirt bands > 1m thickness. a) Coal Overburden Ratio The mining of seam VIII and VII has been considered fully in this mining plan for which O.B. coal ratio (SR) comes to 8.44:1 (cum: tonne). b) Stripping Ratio Stripping ratio is obtained after dividing total volume of overburden by tonnage of coal available in the same area. Volume of overburden and stripping ratio for different coal: overburden ratio and depth range is given in tables 3.2 & 3.3 below Table 3.2 Coal to overburden upto seam VII Sl. No. Description Coal, MT O.B., mcum (b) 1 Gross geological reserve of seam VII & VIII vertically within the ML area Net geological reserves 2 vertically within the ML area (90%) as per CMPDI Blocked in barrier (7.5 m in 0.92 west, east & south) Net geological reserves excluding barriers Blocked in batter of O.C. pit Mineable reserves Recoverable reserves (95%) O.B.: coal (cum : te) Page III-4

12 Depth Table 3.3 Depth-wise stripping ratio Overburden (in cub. M.) Coal (Mil. Te.) <50 m m to 100 m m to 265 m Total Stripping ratio III. Recoverable Reserves & Targeted Capacity The recoverable, coal reserves covering seam VII & VIII by O.C. method is estimated at MT. The estimation is given below in table 3.4: Table 3.4 Estimation of Extractable Coal Upto Seam VII Sl. No. Description Coal( MT) Gross geological reserve of seam VII & VIII vertically within the ML area Net geological reserves vertically within the ML area (90% gross) Blocked in barrier (7.5 m in. West, North & South) Reserves excluding barriers Blocked in batter of O.C. pit Mineable reserves Extractable reserves (5% mining loss) Coal by highwall miner 3.2 Total extraction Mining I. External waste disposal sites There are three waste disposal external sites, detail of which has been presented below: Page III-5

13 Table 3.4 Waste Disposal Sites Within Lease Area Dump No. Location Area Ha Dump Height Meter Capacity Mm 3 D1 North-East D2 South-East Topsoil South-East (i) D1 dump will be spread over ha area on the north-eastern part of the ML as the mining operation has been started from eastern side & is advancing towards west. O.B. excavated from the mine from 1st year of mine operation (-2 year) till the 5th year of mine operation( +3 year) (46.39 mcum) will be accommodated in D1 including top soil for afforestation. (ii) The surface dump D2 located on south-east side of ML will be utilized from 5th year of mine operation (+3 year) upto 7th year of mine operation ( +5 year) during which about mcum O.B. will be dumped. (iii) Top soil dump The total topsoil generated (2.38 m cum) during the mining period will be stacked separately in a soil stack pile. About mm 3 will be stacked as surface dump over an area of ha. It will be used for growing plants along the fringes of the site roads and reclamation of external dump and backfilled area. The top soil stockpiles in ha will be low height not exceeding 6m and will be grassed to retain fertility. Besides this topsoil will be stacked as temporary stacks near the excavation area and area to be reclaimed which will be made use of concurrently for progressive reclamation of sterile dump areas. II. Internal Dump Backfilling will start from 6th year of the mine operation ( +4 year) with a meager quantity of 1.40 mcum. During 6th to 7th year (+4 year & +5 year), partial backfilling (7.88 mcum) will take place whereas part of the excavated overburden will be deposited at the external dump (36.12 mcum). With the Page III-6

14 advance of mining operations from east to west, the internal backfill quantities will progressively increase and full-scale backfilling will be achieved from 8th year of mine operation ( +6 th year) onwards. III. Drilling And Blasting Drilling & blasting would be required only in overburden benches before excavation by shovel. Two surface miners have been deployed to achieve coal production. No drilling and blasting will be required to obtain the said quantity of coal. Top O.B. benches would be developed in horizontal slicing pattern, hence 3 cum and 10 cum hyd. Shovels along with matching dumpers would be deployed, whereas parting between the coal seams would be excavated parallel to coal seams to avoid intermixing of stone with coal. Coal will also be worked by inclined slicing. a) Blasting After shot holes are drilled into the horizontal bench cut by the shovel, the faces are blasted using explosives and detonators. The uppermost layer of soil ranges from 0.5 m (MSAN-7, 17 & 26) to 7.5 m (MSAN-11) and weathered mantle upto 7.5 m (MSAN-11) and is soft and will not require drilling. Hence it has been assumed that 85% of the O.B. may require blasting. b) Broad Blasting Parameters As experienced earlier, coal mining will be done generally by surface miner. Blasting in coal will be occasionally required. In such case blast holes are drilled down to the floor of the seam, the length of hole ranging between 8 and 10 m. In the blasting operations shaking blast practices are proposed using low powder factor. This method will generate a set of cracks in the blasted strata with material movement reduced to minimum. Page III-7

15 Holes will be drilled in order to excavate on an average of 19 MBCM (million bank cubic metre of O.B.) per year at pick production of 4.2 MTY. A powder factor of 0.30 to 0.35 kg per BCM has been adopted for overburden. Short delay detonators shall be used. The control technique to be adopted at the time of blasting to reduce noise, ground vibrations and fly rocks are given under environmental management plan. c) Type of Explosives to Be Used Suggested pattern for O.B. is given below : Average annual O.B. including top and parting at 8.44 m 3 /t stripping ratio : 19 mcum Weekly O.B. Removal : 3,65,000 cum Type of Explosives : site mixed slurry Powder Factor Assumed : 0.3kg/cum(3.33 cum/kg) Weekly Explosive Required For O.B. : 109 tonnes. Blast Hole Spacing : 7 to 9 m Blast Hole Burden : 6 to 7 m Blast holes will be suitably drilled to provide sufficient overburden to each shovel unit. There will not be any blasting for coal extraction as coal extraction has been proposed by surface miner. However, flexibility may have to be provided for usage of suitable alternative/available explosives. d) The Ground Vibrations Due To Blasting Would be Controlled by (i). (ii). (iii). (iv). (v). Reducing the amount of explosives charge per delay. Reducing spacing and burden of blast holes per blast. Reducing the amount of explosives charge per blast. Proper controlled rock movement during blasting by using suitable initiating sequence and delay. Proper strata movement during blasting by using suitable firing sequence. Since above parameters are site specific, the exact blasting pattern will be designed after conducting field trials. Page III-8

16 e) Storage of Explosive The blasting operation is carried out by SMS (site mixed Slurry) and will be transported to the mine site by the explosives agency. Existing 10t capacity magazine will be required only for storage of detonators, detonating fuse, cast boosters, cord-relays, etc. IV Haulage/Transport The O.B. will be transported by 100 t R.D. trucks to surface dumps and later on, as soon as decoaled area is available suitable for backfilling, to the site of backfilling. Loading machines with 4.5 cum capacity coal bucket will load the coal into trucks. This system will offer mobility or flexibility. The coal will be transported by 35 t R.D. trucks to the coal handling plant and this will be transported by railway from Majhauli railway station to Nigrie thermal power plant. The coal will be transported from the CSM and will not require any crushing. A coal stack facility has also been provided for accommodating one week s production. The production from each seam will be mined in the ratio s of thickness to ensure near consistency of quality over the life of the mine. It is to mention that at present the mined out coal is being transported to feeder breaker by coal dumpers, but it has also been envisaged to get a study done from the consultants for installation of conveyor for the transport of the same coal. If found techno commercially viable, the owner may go for necessary switch over to conveyor from road transport Land I. LAND REQUIREMENT The lease area of Amelia (North) Cola Mine covers area of ha and entire area is covered under seven compartments of Mohanban reserve forest. Pre-Mining Land use is all forest land. The proposed Land uses for Mining is given below in Table 3.5 Please refer Plate-IV for Mine Site Layout. Page III-9

17 Table 3.5 PROPOSED LAND USES Particulars of land Use Area (in ha.) Mining Area Barrier Zone Proposed Road on North Side 5.50 Area under Kanchan Nala 7.00 External Dumps Top Soil Dump Settling Ponds Infrastructure & Facility Area Space for Underground Incline 4.00 Rationalisation Area Total II. STAGE WISE CHANGES OF LAND USES During mining & allied operations, changes in land status will be taking place. The envisaged changes at different stage of mine life is given below in Table 3.6 Page III-10

18 Table 3.6 STAGE WISE LAND USE & BACKFILLING AREA (HA.) Particulars of Land Use 5 th year 10th year Conceptual (End of mine Life) Mining Area Barrier Zone Proposed for Road Area under Kanchan Nala External Dumps Top Soil Dump Settling Ponds Infrastructure & Facility Area Space for Underground Incline Undistributed/Rationalisation Area Total Backfilling Area III. LAND USES IN POST MINING SCENARIO On completion of mine closure activities as described in Mine Closure Plan, the resulting Post Mining Land use pattern will be as depicted in table 3.7 below. It is proposed to mine coal from lower seams by Underground method of mining on completion of opencast mining operations. As such some of the infrastructures that are required for operation of the underground mine will be dismantled & surface dozed and leveled. Page III-11

19 Table 3.7 LAND USE IN POST MINING SCENARIO Sl. No. Envisaged Land Uses at end of Mine Life Uses Area in ha. Plantation Envisaged Land Uses in post mining Scenario (Area in ha.) Water Body For U/G Mine Total 1. Excavated Area Barrier Zone Proposed 30m Road Area under Kanchan Nala External Dumps Top Soil Dump Settling Ponds Infra Areas Underground Entry Rationalisation Area Total It is seen from the post mining scenario that out of ha. of forest land in lease area, reclaimed plantation & water body comes to ha. The water body will be useful for eco sustainability. Therefore, it is seen that more than 97% of the area has been subjected to eco-friendly reclamation in that forest area. 3.6 RAW MATERIAL Proposal relates to mining of coal by opencast method of mining. Mining activity involves blasting of coal & overburden. After blasting, overburden material is either to be stacked in external dump or to be used for backfilling. Coal is to be crushed & transported. Thus project activities require explosives for blasting, diesel for transportation, natural resources including land & water. All these elements have been dealt at appropriate place in this report. 3.7 RESOURCE OPTIMIZATION This mine has been planned laying stress on optimal use of resources. Elements considered in this direction are briefed below: Page III-12

20 a) Land (i) (ii) (iii) Minimize use of land by careful planning of the lease area. Minimum land for external dumping. Efforts have been made to maximize internal dumping & minimize external dumping. Reclaim the degraded land physically & biologically to render it suitable for plantation. b) Water (i) (ii) (iii) Minimize use of fresh water by using treated water for industrial & horticultural purpose. For installing rainwater harvesting desiltattion pond will be provided which will also serve as spread tank. Water collected in this tank can be used for industrial purpose & also aid in artificial recharge of ground water. Treat the waste water to prescribed standard before discharging it. c) Explosives Powder Factor for explosive has been determined based on field trials. For every round of blasting quantity of explosive will be determined on basis of Powder Factor. By this way use of explosives would be optimised. 3.8 WATER DEMAND Demand for water for the project has been estimated under two heads namely. Mine Site water demand & township water requirement. Water Demand Potable Water Domstic-90 KLD Peripheral Village-20KLD Source Ground Water Industrial Water Green Belt-100 KLD Dust Suppresion-191 KLD Workshop-76 KLD Source Mine Water Total KLD Power Requirement Estimated Electrical Power Requirement Source M.P.S.E.B. Grid Page III-13

21 3.9 WASTE MANAGEMENT Solid Waste (i) Overburden Removed in course of mining Total Quantity Mm 3 Top Soil Mm 3 Total Mm 3 Top soil (2.38Mm 3 ) to be used for bio-reclamation. Balance overburden (590.76Mm 3 ) to be managed as below: External Dump (2 in No.) Mm 3 Internal Dump Mm3 (In Deoaled Quarry) (ii) Sludge from STP Sludge from STP are to be digested & used as manure. (iii) Sludge from ETP Sludge from ETP to be digested & disposed in secured landfill. Page III-14

22 CHAPTER IV SITE ANALYSIS 4.1 CONNECTIVITY Road Connectivity The Waidhan-Rewa National Highway (NH-75) traverses in the North-West and runs almost along the boundary of Moher Sub-Basin & Main Basin. Bargawan town is located at a distance of 33 km North-West of Waidhan on NH-75. A metalled road takes off from Bargawan towards Mine site covering 17 km distance. Waidhan is district HQ and is about 50 km from Mine site. The nearest big township is Waidhan (24 04' : 82 38') located at a distance of 50 km from the Coal Mine which is also the District Headquarter with the facility of market, post office and telecommunication, health centre, workshop, petrol pump, road transport etc. Railway Connectivity The nearest railway station, Majhauli, on Chopan Singrauli-Katni line of Central Railway is at a distance of 4.5 km from the mine. One siding has been constructed at the mine by drawing railway line branching from Majhauli station. The coal dispatches are by railways. Nearest airport is about 250Km at Varanasi. 4.2 LAND FORM Dealt in Para 4.3. Land Use Lease Area measures Ha. Entire lease area is part of Reserved Forest. Land is owned by State Govt. 4.3 TOPOGRAPHY The topography of Amelia (North) Coal Mine is undulating. The general ground elevation of the mine varies between 430m to 468m above MSL with some scattered mounds. The maximum ground elevation of 489m above MSL is located in the southern part of the mine, while the minimum ground level is Page IV-1

23 382m to the east of borehole MJAN-8 near eastern boundary. The eastern part of the mine exhibits steep slope towards east with a number of valleys. The drainage of the mine is mainly controlled by the northerly flowing Kanchan Nala and its rivulets and small nalas. These nalas are mostly seasonal. Kanchan nala joins Mahan River in the north-east which maintains a perennial flow in the area. Topographical Plan of the lease area is given in Plate III. 4.4 EXISTING LAND USE PATTERN The lease area falls in Reserved Forest. Distance from periphery of project to Forest Falls in Forest Land. National Park No National Park within 15 Km. Wildlife Sanctuary No Wildlife Sanctuary within 15Km. Notified Eco-Sensitive Area No Notified eco-sensitive area within 15Km. Water Body Kanchan Nala flows through lease area. CRZ Project does not fall in CRZ. 4.5 EXISTING INFRASTRUCTURE Link Road - Existing Power Network - Existing Water Supply - Potable Water Source Developed Railway Siding - Completed 4.6 SOCIAL INFRASTRUCTURE List of School List of Hospital/Health Care Centre Christ Jyoti School Dr. Alok Pathak Clinic De Paul School Om Dental Care Delhi Public School N.C.L. Hospital Jyoti Eng. Med. High School Nehru Hospital St. Joseph's Higher Secondary School Central Hospital Page IV-2

24 AMELIA NORTH COAL MINE-Expansion Project 2015 CHAPTER V PLANNING BRIEF 5.1 PLANNING BRIEF The project relate to enhancing capacity of existing Amelia (N) Opencast Coal Project. The existing mine is presently operating under an approved Mining plan with a capacity of 2.8MTPA of coal to be mined by opencast method of mining. A revised mining plan with a peak capacity of 4.2MTPA & normative capacity of 2.80MTPA has been planned & submitted to Ministry of Coal for approval. The revised mining plan has been prepared keeping in view the existing infrastructures in terms of workshop, store, railway siding, equipments & machineries already procured. The coal mined from the project would be dispatched to linked Thermal Power Station by rail. Mine has been planned with due regards to safety rules prescribed by DGMS. 5.2 POPULATION PROJECTION The mine is to employ 829 persons including highly skilled, semi skilled & unskilled workes. Only executives & highly skilled manpower will be sourced from outside. Semi-skilled & unskilled workers will be sourced from local area. However in ancillary & secondary sector, people from outside may come to this area. Since already a number of Thermal Power Plant and Coal mines have been working in this area, the area has been developed considerably. In view of above even highly skilled people may be available locally. People coming in ancillary & secondary sector are also likely to come from neighboring area. 5.3 LAND USE PATTERN This has been dealt in detail at Para in chapter III. 5.4 INFRASTRUCTURE This aspect has been covered in Para 4.5 & 4.6 in chapter IV. 5.5 FACILITIES / AMITIES A dedicated township has been developed for the project. In this township, it is proposed to provide facilities including school, water supply, health care facilities, power supply, etc have been provided. Page V-1

25 AMELIA NORTH COAL MINE-Expansion Project 2015 CHAPTER VI PROPOSED INFRASTRUCTURE 6.1 INDUSTRIAL AREA Mine lease area measures ha. Within this lease area apart from mining quarry, following mine operation related facilities are located Internal Road Overburden Dump and Settling Pond Infrastructure facilities. 6.2 RESIDENTIAL AREA (NON PROCESSING AREA) A township for providing residential quarters for employees. A site for township is being searched. 6.3 GREEN BELT Plantation & Green Belt is being provided in the lease area over an area of Ha. Also green belt is to be provided in township which will be equivalent to about 1/3 rd of township area. Developing green barrier around infra areas, avenue plantation along road & plantation in rationalization area, Infra Area, Avenue Plantation will get covered under this head. The area involved is as follows: I. Rationalization Area ha. II. Infra Area - 5 ha. III. Avenue Plantation on proposed 30 m road - 2 ha. Total ha. 0.4 Lakhs/ha Lakhs This plantation/greening will be completed by 3rd year of the present mine life. 6.4 SOCIAL INFRASTRUCTURE Educational institute & health care centre & culture centre in the township have been provided. 6.5 CONNECTIVITY Road The mine site is connected to NH-75 by a black topped road. Railway Nearest railway station is Majhauli about 5km away. The mine site has been provided with a dedicated railway siding for transport of coal. Air Nearest Civil Airport is at Varanasi about 300km away. Page VI-1

26 AMELIA NORTH COAL MINE-Expansion Project DRINKING WATER MANAGEMENT Mine Site Potable Water Source Ground Water 6.7 SEWAGE SYSTEM Proposed arrangement for management of waste water are given below: Mine Site a) Municipal Waste Water - Septic Tank b) Industrial Waste Water - E.T.P. & Desilting Tank Township Municipal Waste Water - S.T.P. 6.8 SOLID WASTE MANAGEMENT a) Mine Solid Waste Management A total of Mm 3 of overbur den waste will be generated. This includes 2.38Mm 3 of topsoil out of this 95.91Mm 3 will be stacked in external dump. Balance Mm 3 would be backfilled into quarry. b) Sludge from E.T.P. Sludge from E.T.P. will be digested & it will be disposed into a secured land fill. c) Sludge from S.T.P. Sludge from S.T.P. will be digested. Processed sludge will be used as manure for horticulture purposes. 6.9 POWER SUPPLY Project is connected to Madhya Pradesh Electricity Board Grid to Procure electrical power. Page VI-2

27 AMELIA NORTH COAL MINE-Expansion Project 2015 CHAPTER VII REHABILITATION & RESETTLEMENT PLAN 7.1 INTRODUCTION The mine lease area measure ha. The entire land is forest land. There is no tenancy land involved. Presently there is no human habitation within the lease area. There is no family losing land & also there is no issue related to displacement of family. Within the lease area there is no economic activity involved in form of shop, agriculture, etc. Hence there is no issue related to family losing source of livelihood. In view of above situation issues related to R & R is not involved. Page VII-1

28 AMELIA NORTH COAL MINE-Expansion Project 2015 CHAPTER VIII PROJECT SCHEDULE & COST ESTIMATES 8.1 PROJECT SCHEDULES Amelia (N) opencast (2.8 MTPA) is an operational mine. The Status of Proposed schedule of project related statutory approvals is listed below: TABLE -8.1 STATUTORY CLEARANCES S. No. Approval/Clearance Status 1. Mining Plan with Mine Closure Plan Available 2. Environmental Clearance Available 3. Forestry Clearance Available 4. Consent to Establish Available 5. Grant of Lease Available 6. Consent to Operation Available 7. Approval for Water Uses Available 8. Approval for Explosive Uses Available 9. Approval from Coal Controller for mine Available opening 10. Permission from DGMS to start mine Available 8.2 COST ESTIMATE Details are given in Table 8.2 TABLE -8.2 COST ESTIMATE S. Particulars No. Amount (In Cr.) 1 Land - Freehold & Leasehold 21 2 Building 52 3 P&M Railway Siding 57 5 Vehicles 4 6 Furnitures & Fixtures 1 7 Mining Development Office Equipment 1 Page VIII-1

29 AMELIA NORTH COAL MINE-Expansion Project Railway Operational Charges Upfront Amount Mining Lease CWIP Expansion Capacity (2.8 MTPA to 4.2 MTPA) 72 TOTAL (A) 750 Page VIII-2

30 AMELIA (NORTH) COAL MINE 2015 CHAPTER IX ANALYSIS OF PROPOSAL 9.1 FINANCIAL BENEFIT This project is linked to Jaypee Nigri Super thermal Power Plant. Coal mined from this mine would be supplied to the Power plant. The project would pay to the state in terms of cess & royalty and to central Govt. as additional levy. Indigenously produced coal will save foreign exchange required for import coal needed for power station. 9.2 SOCIAL BENEFIT (i) The project offers employment opportunity to local people. (ii) Employment opportunity will be generated in secondary & tertiary sector also. (iii) Opportunity for income generation will be generated in ancillary & support sector. The proponent has taken up schemes for socio-economic development of the area. These schemes will cover areas including development, education, health, hygiene & water supply. There is shortage in supply of coal in required quantity to the linked power Plant. In View of the facts stated above, it is established that the project needs enhancement in production capacity. Page IX-1

31

32

33

34

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

Research Compendium. Coal Sector in India 2013 A comprehensive data and information update

Research Compendium. Coal Sector in India 2013 A comprehensive data and information update Research Compendium Coal Sector in India 2013 A comprehensive data and information update Release Date : August 2013 Background About the report Coal is the only major conventional source of energy that

More information

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited

Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Naubasta Lime Stone Mine ML - I Jaypee Rewa Plant Jaiprakash Associates Limited Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The Groups cement facilities are located in

More information

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited)

Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Jaypee Lime Stone Mine Jaypee Bela Plant (A Unit of Jaiprakash Associates Limited) Introduction: Jaypee Group is the 3 rd largest cement producer in the country. The groups cement facilities are located

More information

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P)

HINAUTI LIMESTONE MINE Mine Lease area ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) HINAUTI LIMESTONE MINE Mine Lease area 378.261 ha. (A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

PRE FEASIBILITY REPORT (PFR)

PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 27 PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 28 INDEX S. No. Contents Page No. 1.0 EXECUTIVE SUMMARY 30 2.0 INTRODUCTION OF THE PROJECT / BACKGROUND

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT 1 MCDR INSPECTION REPORT General SN Particulars Details Date of Inspection 18.10.2016 1 Name of the Mine Dhobitola Titaniferous Iron Ore Mine 2 Total Lease Area (Ha) 2.61 Ha (Entire Forest Land) with breakup

More information

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.

CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For EXISTING MINING ACTIVITY CATEGARY B2 UNDER THE EIA NOTIFICATION 2006 AMENDED ON 31/05/2012 TO PIRABHAI VALABHAI NANDASANIYA LOCATED

More information

RECLAMATION OF COAL MINE VOID

RECLAMATION OF COAL MINE VOID RECLAMATION OF COAL MINE VOID Reclamation of Coal Mine Void with Fly Ash Filling of mine voids with fly ash in an environmental sound process is the most viable option of bulk utilisation. This not only

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

CMPDI. 4.6 Mine Closure Plan

CMPDI. 4.6 Mine Closure Plan 4.6 Mine Closure Plan Post-mining Land Use Planning The mine closure planning with regard to for Lekhapani OCP will broadly involve the following aspects: 1. Technical Aspects 2 Environmental Aspects 2.

More information

EXECUTIVE SUMMARY. FOR CHORMARI - DEGARHAT LIMESTONE DEPOSIT AT VILLAGES CHORMARI AND DEGARHAT DISTRICT SATNA, MADHYA PRADESH (EXTENT: 102.

EXECUTIVE SUMMARY. FOR CHORMARI - DEGARHAT LIMESTONE DEPOSIT AT VILLAGES CHORMARI AND DEGARHAT DISTRICT SATNA, MADHYA PRADESH (EXTENT: 102. JAIPRAKASH ASSOCIATES LTD. (CEMENT DIVISION) EXECUTIVE SUMMARY FOR CHORMARI - DEGARHAT LIMESTONE DEPOSIT AT VILLAGES CHORMARI AND DEGARHAT DISTRICT SATNA, MADHYA PRADESH (EXTENT: 102.983 Ha) APRIL, 2008

More information

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.

MAJHIGAWAN LIMESTONE MINE Mine Lease area ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M. MAJHIGAWAN LIMESTONE MINE Mine Lease area 362.68 ha. ( A UNIT OF JAIPRAKASH ASSOCIATES LIMITED) JAYPEE VIHAR, SIDHI (M.P) 2012-2013 SUBMITTED TO M.P.POLLUTION CONTROL BOARD BHOPAL (M.P.) Jaypee Sidhi Cement

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

Infrastructure Development and Environment

Infrastructure Development and Environment Infrastructure Development and Environment Few Stories Lift irrigation from Chambal River No Development Zone around Numaligarh Refinery NH - 31 C passing through Jaldapara, Mahananda and Buxa Nh-72 cutting

More information

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests

No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhavan, C.G.O. Complex, Lodi Road, New Delhi-110 003. Dated the 28th June, 2013 To, M/ s Arbind Kumar Singh

More information

Sr.No Condition Status A. SPECIFIC CONDITIONS:

Sr.No Condition Status A. SPECIFIC CONDITIONS: J.K. CEMENT WORKS, MANGROL (RAJ.) Compliance report of Mangrol Lime stone mine (For the period from April 2011 to September 2011) Sub:- Conditions of Environment Clearance from MOEF, New Delhi Letter No.

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004 Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Optimisation of Overburden Blasts at Glencore Ulan Surface Coal Operations

Optimisation of Overburden Blasts at Glencore Ulan Surface Coal Operations University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2014 Optimisation of Overburden Blasts at Glencore Ulan Surface Coal Operations Daniel

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH FORM I (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri K. Ravi Shankar Door No. 39/49/39, Krishnadevaraya

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

THE RAMCO CEMENTS LIMITED

THE RAMCO CEMENTS LIMITED 1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE JAYANTHIPURAM NORTH BAND MINING LEASE 2.0 MILLION TPA CAPACITY EC Lr. No. : J-11015/377/2006-IA.II

More information

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India SUMMARY: Coal will be transported to the power plant by belt conveyors in case of pit head power plants. In case of power plants located far away from the mines, coal will be transported by rail. In some

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

Welcomes. H.E. Milan Hovorka, Ambassador, The Czech Republic to India & Czech Business Delegation. 09 th Nov 2017 CIL HQ, Kolkata

Welcomes. H.E. Milan Hovorka, Ambassador, The Czech Republic to India & Czech Business Delegation. 09 th Nov 2017 CIL HQ, Kolkata Welcomes H.E. Milan Hovorka, Ambassador, The Czech Republic to India & Czech Business Delegation 09 th Nov 2017 CIL HQ, Kolkata A Presentation on Coal India Limited & Business Opportunities Coal Industry

More information

ENVIRONMENT DIVISION COAL INDIA LTD HEADQUARTERS

ENVIRONMENT DIVISION COAL INDIA LTD HEADQUARTERS ENVIRONMENT DIVISION COAL INDIA LTD HEADQUARTERS LAND RECLAMATION Opencast mining method necessitates excavation of land. This initially leads to degradation of land. Coal India, tries to bring back the

More information

(this cover page left intentionally blank)

(this cover page left intentionally blank) 4. Siting the Well (this cover page left intentionally blank) 4. Siting the Well Chapter Table of Contents Chapter Table of Contents Chapter Description... 4 Regulatory Requirements Well Siting... 4 Relevant

More information

CASE STUDIES EPC NTPC LIMITED. Mandsaur, Madhya Pradesh CASE STUDY

CASE STUDIES EPC NTPC LIMITED. Mandsaur, Madhya Pradesh CASE STUDY CASE STUDIES NTPC LIMITED Mandsaur, Madhya Pradesh CASE STUDY NTPC LIMITED Mandsaur, Madhya Pradesh PROJECT OVERVIEW R Site Co-ordinates 24.1N, 75.8E R Plant capacity 50 MW R Connection Type & Connected

More information

EXECUTIVE SUMMARY INTRODUCTION : Jayaswal Neco Industries Limited

EXECUTIVE SUMMARY INTRODUCTION : Jayaswal Neco Industries Limited EXECUTIVE SUMMARY A. INTRODUCTION : M/s Jayaswal Neco Industries Limited (JNIL) belongs to the wellknown industrial group of Central India viz. NECO GROUP having annual turnover exceeding Rs. 3500 Crores.

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd

Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd Particulate Emission Monitoring HN Pathak Supdtg Engr Madhya Pradesh Power Generation Co. Ltd MADHYA PRADESH POWER GENERATING Co. Ltd. INTRODUCTION Satpura Thermal Power Station is an oldest running plant

More information

INTERNATIONAL O&M CONFERENCE

INTERNATIONAL O&M CONFERENCE INTERNATIONAL O&M CONFERENCE COAL SUPPLY CHALLENGES & WAY FORWARD 14 TH FEB 2012 - BY DK SAHA, DGM(FM) & JANARTHAN C. DGM(FM) Electricity Per Capita consumption India Egypt China Brazil World Average Russia

More information

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON 09.08.2016 Ecological Impact of Mining *334. SHRI JANARDAN SINGH SIGRIWAL state:

More information

PRE FEASIBILITY REPORT FOR. Mining of Riverbed Sand. From Darakeswar River. Area : 8.09 Ha ( 20 Acres )

PRE FEASIBILITY REPORT FOR. Mining of Riverbed Sand. From Darakeswar River. Area : 8.09 Ha ( 20 Acres ) PRE FEASIBILITY REPORT FOR Mining of Riverbed Sand From Darakeswar River Area : 8.09 Ha ( 20 Acres ) AT Mouza: Kunjapur, Plot No: 2227 (P), 2269 (P), 2603 (P),JL: 112, Village: Kunjapur, Block : Indus,,

More information

PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD

PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD Presentation By N.K.Srivastava General Manager (Engg. Services & R&M) 20.04.2012 PROJECT DEVELOPMENT AT NTPC PROJECT IS DEVELOPED

More information

Pre-Feasibility Report. for. Proposed Construction project of Santnagari

Pre-Feasibility Report. for. Proposed Construction project of Santnagari Pre-Feasibility Report for Proposed Construction project of Santnagari at Survey No. 1439, Near Dharoi Dam, Village Mahor, Taluka Vadali, District Sabarkantha, Gujarat By Gujarat Pavitra Yatradham Vikas

More information

Coal Sub committee meeting at Cagliari, Italy April Strategies for promoting CMM project development in India

Coal Sub committee meeting at Cagliari, Italy April Strategies for promoting CMM project development in India Coal Sub committee meeting at Cagliari, Italy 29-30 April 2008 Strategies for promoting CMM project development in India 1. Broad National Initiative: India is vigorously pursuing clean coal technologies

More information

PRE-FEASIBILITY REPORT. 5.0 Hectare sand mine under bhu-jal

PRE-FEASIBILITY REPORT. 5.0 Hectare sand mine under bhu-jal 1.0 SUMMARY OF THE PROJECT PRE-FEASIBILITY REPORT Project Name of Company / Mine Location Village Taluka District State Sand mine Gram Panchayat Tarrighat, Sand mine Tarrighat Tarrighat Patan Durg Chhattisgarh

More information

Section 2 Proposal Description

Section 2 Proposal Description Section 2 Proposal Description 2. PROPOSAL DESCRIPTION 2.1 Overview The Proposal comprises the construction, operation and closure of mining at the J5 and Bungalbin East iron ore deposits and associated

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR Near Village Tehsil District State Capacity Lease Area Category of Project Project Cost KANTBARA BIJOLIYA Bhilwara Rajasthan 36561 TPA of

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

AGENDA ITEM NO. F. No. 8-20/2015-FC

AGENDA ITEM NO. F. No. 8-20/2015-FC AGENDA ITEM NO. F. 8-20/2015-FC Sub: Proposal for according permission for use of 2.0001 ha of forest land within total forest land of 400 ha (out of total prospecting lease area of 816 ha) in Meenakshi

More information

Application for Gas Exploration and Production

Application for Gas Exploration and Production 1800 Washington Blvd. Suite 655 Baltimore Maryland 21230 Application for Gas Exploration and Production This application is to be used to obtain a permit to Drill and Operate a well, within the State for

More information

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No Serial Number FORM 1 (Application for Environment Clearance Certificate) Item 1. Name of the project/s 2. S. No. in the schedule 3. Proposed capacity/ area/ length/ tonnage to be handled/ command area/lease

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY S.No Particulars Details 1 Name of Project 2 Project Proponent 3 Village Proposed Granite Building Stone Quarry of Mr. Saji Sebastian Mr. Saji Sebastian Madeckal House, Kizhakkambalam

More information

Rajasthan State Pollution Control Board

Rajasthan State Pollution Control Board M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and

More information

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary TABLE OF CONTENTS Title page Table of contents List of tables List of figures Non- technical summary Page i ii vii viii ix CHAPTER 1: INTRODUCTION 1 1.1 Project Background 1 1.2 Aims and Objectives 3 1.3

More information

Bishunpur Small Hydro Power Project

Bishunpur Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

34011/2/2004-CRC CPAM Ministry of Coal CPAM Section ORDER

34011/2/2004-CRC CPAM Ministry of Coal CPAM Section ORDER File No.34011/2/2004-CRC/CPAM 34011/2/2004-CRC CPAM Ministry of Coal CPAM Section ORDER Shastri Bhawan, New Delhi Date: 09 th May 2017 Subject: POLICY DECISION IN REGARD TO MMDR ACT-1957 GRANTING GOVT

More information

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX VIII. Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE APPENDIX VIII Form 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE (I) Basic Information S.No. Particulates Details 1. Name of the Mining Lease site

More information

FEASIBILITY REPORT FOR NARAYANPOSHI IRON & MN ORE MINE-AMTC (EXPANSION OF MINE CAPACITY FROM 3.0 MTPA TO 6.0 MTPA (ROM) FOR IRON ORE & EXISTING 0.

FEASIBILITY REPORT FOR NARAYANPOSHI IRON & MN ORE MINE-AMTC (EXPANSION OF MINE CAPACITY FROM 3.0 MTPA TO 6.0 MTPA (ROM) FOR IRON ORE & EXISTING 0. 1 CHAPTER I EXECUTIVE SUMMARY 1.0 INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION 1.1 BACKGROUND INFORMATION OF PROJECT: Narayanposhi Iron & Manganese Ore Mines of Aryan Mining & Trading Corporation

More information

Ecoengineering 3 PROJECT DESCRIPTION

Ecoengineering 3 PROJECT DESCRIPTION BESTCRETE AGGREGATES LIMITED EIA FOR MINING OF SAND AND GRAVEL AT PINE POAD, MATURA 3 PROJECT DESCRIPTION This chapter describes the proposed mining of sand and gravel (pitrun) by Bestcrete Aggregates

More information

www.sindhcoal.gos.pk Vision To position Sindh as the power house of the region Mission To develop Thar Coal as a major source of power generation for Energy & Economic Security of the country and as a

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF HPCL, LPG BOTTLING PLANT Capacity: 3 X 500 MT At Plot No.499 Kota-Jhalawar Road (NH-12) Village- Mandana, Tehsil-

More information

STANDARD TEMPLATE & FORM-1 FOR KODIDRA LIMESTONE MINE AREA= 4.70 HECT. PROPOSED PRODUCTION: - 28,000 TPA OF LIMESTONE PROJECT COST: - 17.

STANDARD TEMPLATE & FORM-1 FOR KODIDRA LIMESTONE MINE AREA= 4.70 HECT. PROPOSED PRODUCTION: - 28,000 TPA OF LIMESTONE PROJECT COST: - 17. STANDARD TEMPLATE & FORM-1 FOR KODIDRA LIMESTONE MINE AREA= 4.70 HECT. SURVEY NO.81/2, NEAR VILLAGE - KODIDRA, TALUKA- VERVAL, DISTRICT GIRSOMANATH, (GUJARAT) PROPOSED PRODUCTION: - 28,000 TPA OF LIMESTONE

More information

Quarry, Mobile asphalt plant, Equipment Yard and Storage Garage

Quarry, Mobile asphalt plant, Equipment Yard and Storage Garage Quarry, Mobile asphalt plant, Equipment Yard and Storage Garage Trans Canada Highway, 8.5 KM west of Springdale Jct, NL. Department of Environment and Conservation File Ref No. 200.20.2475 Prepared for.

More information

Pre-Feasibility Report For Khargone STPP Stage-I (2X660 MW) District- Khargone, Madhya Pradesh

Pre-Feasibility Report For Khargone STPP Stage-I (2X660 MW) District- Khargone, Madhya Pradesh 1.0 Executive Summary Name of Project: Name of Project Proponent: Location of the Project: Capacity & Unit Configurations: Land Requirement, Current Land Use and Availability: Water Requirement and Availability:

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT TATA CONSULTING ENGINEERS LIMITED PRE FEASIBILITY REPORT FOR 4000 MW COAL BASED ULTRA MEGA POWER PLANT AT HUSAINABAD, DEOGHAR DISTRICT, JHARKHAND, INDIA Project Proponent: Deoghar Mega Power Limited A

More information

Operations Mine Site, Tote Road and Railway

Operations Mine Site, Tote Road and Railway Operations Mine Site, Tote Road and Railway 2 Panel Members Michael Anderson Richard Cook John Binns Fernand Beaulac Steve Walker Mike Lepage Michael Sheahan 3 The Panel will address: FEIS Volumes 3, 5,

More information

Executive Summary for Dang Sarkar Metal Stone Quarry (42.63 Ha) EXECUTIVE SUMMARY

Executive Summary for Dang Sarkar Metal Stone Quarry (42.63 Ha) EXECUTIVE SUMMARY EXECUTIVE SUMMARY 1. PREAMBLE Minerals are the chief source of present phase of industrialization, and play an important role in the present phase of the national economy and overall development of the

More information

PRESENTATION ON MANGANESE ORE DEPOSITS OF SMIORE FOR THE WORK SHOP ON REVISION OF THRESHOLD VALUES OF MINERALS AT GOA

PRESENTATION ON MANGANESE ORE DEPOSITS OF SMIORE FOR THE WORK SHOP ON REVISION OF THRESHOLD VALUES OF MINERALS AT GOA PRESENTATION ON MANGANESE ORE DEPOSITS OF SMIORE FOR THE WORK SHOP ON REVISION OF THRESHOLD VALUES OF MINERALS AT GOA 21-07-2107 INTRODUCTION The Sandur Manganese & Iron Ores Ltd. (SMIORE) are operating

More information

Project Proponent: Shri Kuldeep Pratap Singh Bhati Page - 11

Project Proponent: Shri Kuldeep Pratap Singh Bhati Page - 11 1.0 EXECUTIVE SUMMARY This is a new mining lease of Ball Clay Silica Sand, M.L. No.- 48/2011, located near Village- Indo Ka Bala, Tehsil-Kolayati, District Bikaner (Rajasthan) over an area of 4.2464 hectares.

More information

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects. (I) Basic Information FORM-1 Item Details 1 Name of the Project Harbour Heights 2 S.. in the Schedule 8(b) Townships and Area Development projects. 3 Proposed capacity/area /length/tonnage to be Total

More information

Strategic mine planning of surface mining projects incorporating sustainability concepts

Strategic mine planning of surface mining projects incorporating sustainability concepts 6th International Conference on Sustainable Development in the 645 Strategic mine planning of surface mining projects incorporating sustainability concepts C. Roumpos and E. Papacosta Public Power Corporation

More information

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Chapter MINERAL EXTRACTION AND MINING OPERATIONS Chapter 17.31 MINERAL EXTRACTION AND MINING OPERATIONS Sections: 17.31.010 Purpose 17.31.020 Procedure for Extraction and Rehabilitation Requests 17.31.030 Operation and Rehabilitation Standards for all

More information

Schedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer

Schedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer Schedule Of Works 35 Konkan Railway Corporation Limited Signature of Tenderer Schedule of Works (Package II, Chainage 5/400 to 7/800 = 2400 mtrs SCHEDULE - A (CUTTING) Name of work: Limited tender for

More information

PRECAST CEMENT PRODUCTS

PRECAST CEMENT PRODUCTS Profile No.: 30 NIC Code: 23959 PRECAST CEMENT PRODUCTS 1. INTRODCUTION: Reinforced cement concrete products are becoming popular as modular house and apartment buildings are based on standard designs.

More information

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite

More information

STONE CRUSHER. Profile No.: 60 NIC Code: INTRODUCTION: 2. PRODUCT & ITS APPLICATION:

STONE CRUSHER. Profile No.: 60 NIC Code: INTRODUCTION: 2. PRODUCT & ITS APPLICATION: Profile No.: 60 NIC Code: 08106 STONE CRUSHER 1. INTRODUCTION: Crushed stone is also known as metal jelly. Crushed stone is segregated into various sizes viz. 35mm, 20mm, 12mm etc. for different uses.

More information

Towards Sustainable Mining Industries in India Challenges

Towards Sustainable Mining Industries in India Challenges Towards Sustainable Mining Industries in India Challenges 1. Introduction Dr. Sukumar Devotta Director National Environmental Engineering Research Institute Nagpur 440020 director@neeri.res.in The mining

More information

Development Potential of the Wara Coal Deposit to meet Indonesia s Future Power Requirements

Development Potential of the Wara Coal Deposit to meet Indonesia s Future Power Requirements 1 Development Potential of the Wara Coal Deposit to meet Indonesia s Future Power Requirements 2 COAL RESOURCE Indonesia has large resources of lower heating value subbituminous coal the resources are

More information

Torpa Small Hydro Power Project

Torpa Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

(18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002

(18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002 (18 April 2011 to date) MINERAL AND PETROLEUM RESOURCES DEVELOPMENT ACT 28 OF 2002 (Gazette No. 23922, Notice No. 1273 dated 10 October 2002. Commencement date: 1 May 2004 [Proc. No. R25, Gazette No. 26264])

More information

JINDAL STEEL & POWER LTD.

JINDAL STEEL & POWER LTD. EXECUTIVE SUMMARY OF DRAFT ENVIRONMENTAL IMPACT ASSESSMENT AND ENVIRONMENTAL MANAGEMENT PLAN FOR PROPOSED GARE IV/6 COAL MINE PROJECT (OC and UG) OF 4MTPA IN AN AREA OF 381.420 HA AND COAL WASHERY 4MTPA

More information

COMPLEX PROJECT FOR THE DEVELOPMENT OF BROWN COAL DEPOSITS KARA-KECHE AND MIN- KUSH (AK-ULAK SECTION)

COMPLEX PROJECT FOR THE DEVELOPMENT OF BROWN COAL DEPOSITS KARA-KECHE AND MIN- KUSH (AK-ULAK SECTION) COMPLEX PROJECT FOR THE DEVELOPMENT OF BROWN COAL DEPOSITS KARA-KECHE AND MIN- KUSH (AK-ULAK SECTION) Project Summary Project on development of brown coal Kara-Keche and Min-Kush (section Akulak) deposits;

More information

An indicative program for works to be conducted within the Sydney Park construction compound is provided in Table 6-20.

An indicative program for works to be conducted within the Sydney Park construction compound is provided in Table 6-20. The land required for the Sydney Park construction compound would be used temporarily throughout construction only. The construction compound site would be rehabilitated at the completion of construction,

More information

SECTION A1 EXCAVATION AND BACKFILL GENERAL

SECTION A1 EXCAVATION AND BACKFILL GENERAL SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such

More information

Cut and fill productivity. Operating procedures. Introduction. 1. Approach of the model

Cut and fill productivity. Operating procedures. Introduction. 1. Approach of the model Model: Level: Cut and fill productivity Micro Operating procedures Introduction The goal of the model is to calculate realistic productivity from data collected on site and to estimate the effect when

More information

Thethaitangar Small Hydro Power Project

Thethaitangar Small Hydro Power Project 1.0 INTRODUCTION 1.1 General The state of Jharkhand almost comprises hilly terrain mostly of Chhotanagpur plateau and 30% of total area (79,714 sq km) is covered with forest. The normal annual rainfall

More information

CBM AND CMM DEVELOPMENT IN MONGOLIA NEW POLICIES TO STIMULATE CLEAN ENERGY PROJECTS

CBM AND CMM DEVELOPMENT IN MONGOLIA NEW POLICIES TO STIMULATE CLEAN ENERGY PROJECTS CBM AND CMM DEVELOPMENT IN MONGOLIA NEW POLICIES TO STIMULATE CLEAN ENERGY PROJECTS Dr. Badarch Mendbayar, Director Mongolia Nature and Environment Consortium Global Methane Forum Washington, DC 29 30

More information

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU

ENVIRONMENTAL IMPACT ASSESSMENT AND YOU ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity

More information

PRE FEASIBILITY REPORT JOJOBERA CEMENT PLANT

PRE FEASIBILITY REPORT JOJOBERA CEMENT PLANT PRE FEASIBILITY REPORT Of JOJOBERA CEMENT PLANT (STAND-ALONE CEMENT GRINDING UNIT) FOR ENVIRONMENTAL CLEARANCE FOR CHANGE IN PRODUCT MIX OF 4.6 MILLION TONNES PER ANNUM CEMENT PRODUCTION (NO INCREASE IN

More information

MANGANESE ORE, CHROME ORE, FERRO ALLOYS

MANGANESE ORE, CHROME ORE, FERRO ALLOYS MANGANESE ORE, CHROME ORE, FERRO ALLOYS GLOBAL STEEL PRODUCTION In 2011 World Crude Steel Production reached 1527 million tonnes and showed a growth of 6.8% over 2010 and China remained the World s largest

More information