Riverbed Sand/Morrum Mining at Gata No. 747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P. Area: 22 Acres (8.

Size: px
Start display at page:

Download "Riverbed Sand/Morrum Mining at Gata No. 747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P. Area: 22 Acres (8."

Transcription

1 PRE-FEASIBILITY EXECUTIVE SUMMARY Shri Vishwas Parmani S/o Shri H. Parmani is the lessee for the RBM (River Betwa) for an area of 22 Acres (8.90 Ha) in Gata No. 747/16,Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P. Study reveals that in recent years, rapid development has led to an increased demand for river minor mineral as a source of construction material. This has resulted in a mushrooming of river sand/morrum mining activities which have given rise to various ecological problems that require urgent action. These include adverse impact on lakes, groundwater, river bank erosion, river bed degradation, river buffer zone encroachment, change in natural water course, loss of biodiversity and deterioration of river water quality due to quarrying/mining of minor minerals. To meet out the challenges of unsustainable mining of Minor Mineral, the state Govt. of UP under the provision of Mines & Mineral Development and Regulation Act, 1957 under rule 15 framed UPMMCR Act guided for the systematic and scientific mining of Minor Mineral. Likewise MoEF, GoI made prior Environmental Clearance mandatory under the notification, Sep 2006, as amended in 2009 & 2016, mining projects with lease area of 5 ha and above require prior Environment Clearance and thereof. The proposed project falls under item 1(a), Category B (Sub-Category B 2 ) as it does not attract General Condition as specified in Environment Notification, Project Proponent M/s ASSOCIATED COMMERCE, Partner Shri Vishwas Parmani S/o Shri H. Parmani, R/o Associated Commerce, Pipriya, District- Hoshangabad (M.P.) took active part and is on the list of successful bidders in the process of e- tendering as per U.P Govt. order No. 715/ (s)/2017 dated 22 April, 2017 in compliance of the order of Hon ble High Court dated as an interim arrangement to mitigate the demand of sand/morram in the state in the interest of Mineral development & Public interest. Under Rule 68 of U.P Minor Mineral (concession) Rules 1963 the Govt. made a policy to auction the river bed sand/morram (except, the areas where Hon High court has issued stay orders ) through e-tendering by the District Magistrate Jalaun for Mining Permit for a period of 06 months including monsoon session from to without further extension. After successful Page 1 of 17

2 bidding District Magistrate, Jalaun has issued Letter of Intent in favor of M/s Associated Commerce, Partner Shri Vishwas Parmani S/o Shri H. Parmani, R/o Associated Commerce, Pipriya, District- Hoshangabad (M.P). for extraction of Sand/ Morrum, from the Riverbed of Betwa River over an area of Acres ( 8.90 Ha) in Village- Patharehta, Gata No. 747/16, Tehsil- Kalpi, District- Jalaun U.P. vide letter no. 89/Khanij-MMC-30/e-Tender-17 dated 15 May 2017 (attached as Annexure I). Table 1: An overview of project S.No. Item Details 1. Name of the Applicant Shri Vishwas Parmani S/o Shri H. Parmani 2. Mining Lease Area 22 Acres (8.90 Ha) 3. Land Use River Bed of Betwa River 4. Land Ownership Government Land 5. Lapse period None 6. River Betwa River 7. Name of RF, PF, Wildlife Sanctuary, Eco-sensitive area No, there are no protected areas notified under the Wildlife (Protection) Act, 1972, Wildlife Sanctuary, notified Eco sensitive area falling in whole or in part within 05 km radius of the proposed project. 8. Site Coordinates Pillars Latitude (N) Longitude (E) A 25 52' 35.08" 79 48' 27.87" B 25 52'58.57" 79 48'37.16" C 25 53'18.99" 79 48' 33.86" D 25 53'37.61" 79 48' 29.71" E 25 53'37.76" 79 48' 31.52" F 25 53'19.26" 79 48' 35.36" G 25 52' 58.53" 79 48' 38.92" H 25 52' 34.44" 79 48' 29.04" 9. Location Gata No.747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P 10. Topography River bed of Betwa with minor slope towards main stream 11. Minerals of mine Sand/Morrum Page 2 of 16

3 12. Proposed production of mine Proposed Production: 2,20,000 cubic meter within 06 months of permit period. 13. Method of mining Opencast & manual 14. Drilling/Blasting No drilling and blasting is proposed. 15. Estimated cost Approx. 7.5 crores (excluding royalty) for permit period. 16. Water demand Sl. No. Purpose Water demand (KLD) 1 Dust Suppression Plantation Domestic (drinking) 6.70 Total Sources of water Total water requirement for the project is 19.3 KLD, it shall be supplied from the nearby villages 18. Ultimate depth of Mining 3 m 19. Man power Approximately 200 workers 20. Solid Waste Temporary laborers from nearby villages will be hired; no generation of solid waste is anticipated due to proposed project activity. 21. Nearest railway station Kalpi Railway Station 25.5 km* (NW) 22. Nearest state highway SH km* (NE) Haulage route (Mine Site to Metalled Road)- 900 m (W) 23. Nearest Airport Kanpur Airport- 79 km* (NE) 24. Nearest city Jalaun : 54.0 km*(nw) *aerial distances in approximation 2. INTRODUCTION 2.1 Identification of Project and Project Proponent Name of the Project: Sand/Morrum mining from the river bed of Betwa River Location: Gata No /16, Village- Patharehta, Tehsil - Kalpi, District- Jalaun, U.P. Mining lease Page 3 of 16

4 Name and address of project proponent: Shri Vishwas Parmani S/o Shri H. Parmani, R/o Associated Commerce, Pipriya, District- Hoshangabad (M.P.) 2.2 Brief description of the nature of the project Following geo -scientific methods are proposed to carry out the activity: Mining will be confined to extraction of sand from the centre of river bed only. Mining of sand from the river bed will be restricted to a maximum depth of 3m from the surface. No drilling and blasting is proposed. Approximately 2,20,000 cum minor mineral will be extracted within sanctioned permit period of 06 months. No mining activity will be undertaken during the monsoon season. So the river bed material will be replenished during the monsoon season every year. The mining activity will be restricted to daytime only in order to avoid environmental pollution or any accidental hazards. The operation will remain manual, using tools like shovel, spade, sieve etc. 2.3 Need for the project and its importance to the country and region Sand and morrum are very important minerals found in abundance in the riverbeds as major sediment. These minor minerals have become very essential for the society for their many uses, they can be used for making concretes, filling roads and buildings, brick making and reclamation Page 4 of 16

5 etc. They play very important role in the protection of coastal environment where they take part as a buffer between the high tides and the coastal line. These minor minerals are replenished able during the heavy rains of monsoon season. The sediment in the form of river bed material (RBM) deposited in the last many years had changed the shape of the river bed from a valley to a raised land. Because of this, every year during monsoon season, heavy and devastating floods damage large tracts of land lying on both the banks of the river. Hence, it is necessary to remove the materials so that the river gets channelized. The production of sand/morrum will benefit to the state in the form of revenue from mining lease. Apart from this project operation will provide employment directly and indirectly to the people residing in vicinity, thus improving the Socio-economic status of the area. 2.4 Demands-Supply Gap In India sand is extensively used in construction for infrastructure developments. Hence with the advent of growth and development of infrastructural projects in the state of Uttar Pradesh the demand of sand is on a high-rise. The local region demand is increasing; hence newer areas for sand reserves are approached. Hence the proposed project aims to fill the demand supply gap through optimum allocation and excavation of natural resources required to meet the demand effectively in the local region. Sand has become a very important mineral for the expansion of society. With the increase of urbanization the demand for sand is growing in infrastructure sector in our country. The mineral is used for making concrete, filling roads, building sites, brick making, making glass, sandpapers, reclamations etc. Individual and private companies are increasingly demanding sand for construction purposes and this has immense pressure on sand resources. This increasing demand makes this an environmental issue. Sand is one of the most plentiful natural resource having the ability to replenish itself. The demand of sand is directly proportional to the supply Imports vs Indigenous production Page 5 of 16

6 District has a number of sand mines in the state. There is abundance of sand in the area; it had become a major source of economy in the area/region Export Possibility The sand that will be produced from mine will be used for construction of buildings & making of roads. Stone can be used in different form of different construction jobs and road projects. The sand will be used in buildings, bridges & infrastructure etc. The sand of lease area is medium to fine grained brown in color. Sand is an essential minor mineral used extensively across the country for construction purposes. Sand is used in building construction activities. The mineral is being used in making Hume Pipe. The sand can be used as die-casting and molding material. There is large demand of sand for construction activities in the region. Demand of the sand if fulfilled by this project of the desired grade will be used for various end users in the open market. 2.7 Domestic/ Export Markets Achieving a huge infrastructure demand, as being envisaged by Government of India and state governments particularly in road and housing sector, requires basic building materials. The sand/morrum, bajri and stone are primary building material required for the purpose. The mining activities are the backbone of all construction and infrastructure projects as such raw material for construction is available only from mining of this nature. Due to the increased industrial and infrastructural growth of the rural and urban areas demand of sand is very high. Construction companies and local vendors in the nearby town and cities are the potential market for the minerals. 2.6 Employment Generation The proposed project will generate direct /indirect employment to the local labours residing in nearby villages. During the period almost 200 people will be working in almost 156 days. Taking into account 156 working days period, Management & supervisory personnel considered under Reg. 34 (2) (C) of MMR, 1961 would be as follows: No. of mandays (Approx.) = 200 personnel X 156 days = 31,200 mandays Page 6 of 16

7 3.0 PROJECT DESCRIPTION 3.1 Type of project including interlinked and interdependent projects, if any This is an independent new mining project. The proposed project is for the extraction of sand/morrum form the riverbed manually using hand tools. The flowchart showing different steps involved in project is given below: 3.2 Location (map showing general location and project boundary and project site specific layout) with coordinates. The mining lease area is located in Village- Patharehta, Tehsil- Kalpi, District- Jalaun, Uttar Pradesh. Google maps of 500 m & 5 km radius buffer zone showing project location are attached as Annexure IV & Annexure V. Toposheet of 05 km radius buffer zone showing project location is also attached as Annexure VI. Location map showing project location is given as figure 1.2 below: Page 7 of 16

8 Proposed project at Gata No.-747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P 3.3 Details of alternate sites considered No, alternative sites considered. Figure 1.2: Location of the project 3.4 Size or magnitude of operation The proposed mine has lease agreement over an area of 22 acres (8.90 ha). Approximately 2,20,000 cum minor mineral will be extracted within 06 months. Page 8 of 16

9 3.4.1 The River morphology Cross section of Mine Area Figure 1.3: Cross Section of Mine Area 3.5 Project description with process details Following geo-scientific methods are proposed to carry out the activity which is shown in Fig 1.3. Mining will be confined to extraction of sand from river bed only. Mining of sand/morrum from the river bed will be restricted to a maximum depth of 3m from the surface. No drilling and blasting is proposed. Only sand/morrum will be extracted, approximately 2,20,000 cum minor mineral will be extracted within 6 months. No mining activity will be undertaken during the monsoon season. So the river bed material will be replenished during the monsoon season every year. The mining activity will be restricted to daytime only in order to avoid environmental pollution or any accidental hazards. The operation will remain manual, using tools like shovel, spade, sieve etc. Page 9 of 16

10 Figure 1.4: River Bed Mining 3.6 Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area of Final Product/S, Mode of Transport of Raw Material and Finished Product The operation involves the extraction of sand in its existing form the river bed and loaded into trucks/trolleys and will transport the material to the local market directly. The existing roads will be utilized for the transport of sand from mine site to market. 3.8 Availability of water its source, energy/ power requirement and source There will be very little requirement of water is anticipated to carry out operations as it will be done manually. The water will be required either for drinking purposes or for dust suppression and plantation. It is projected that approx 200 laborers will be required for the proposed project. Considering the fresh water requirement for site laborers it is estimated that 6.0 KLD water will be required. Apart from this 12.6 KLD water will be required for Dust Suppression on roads & plantation. Thus, total water requirement of 19.3 KLD will be met through nearby villages. Page 10 of 16

11 All the activities will be carried out in a manual manner. The operation will be done in day time; hence there is no power requirement for the project at site. Although water sprinkler will be used for dust suppression will consume the fuel (4.5 liter/hr) 3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their management/ disposal. The entire mineral extracted is saleable. The laborers from nearby villages will be hired to carry out work in day time only, hence there will be no or very less waste is expected to be generated. No liquid effluents will be generated at site. 4. SITE ANALYSIS 4.1 Connectivity Nearest Railway Station Nearest Railway Station -Kalpi Railway Station which is about 25.5 km* (NW) from the mine site Nearest Airport Nearest Airport is Kanpur Airport which is about 79.0 km* (NE) from the mine site Nearest Highway SH 91(Hamirpur-Kalpi Marg) km* ( NW) Haulage route (Mine Site to Metalled Road)- 900 m (W) 4.2 Land form, land use and land ownership Land Form: The mine lease area in non forest land. Land Use: Betwa river bed plain Land Ownership: Govt. Revenue Land The proposed activity is to take place in the centre of the River bed of Betwa River and hence there will be no change in land use. 4.3 Topography The applied area is situated on the left flank of the Betwa River, one of the major rivers of the Page 11 of 16

12 State, originating from Barkheda village in Raisen district, M.P. Rising at an elevation of about 576 m, it flows in a north easterly direction and joins the Yamuna river near Hamirpur in U.P. at an elevation of 106 m. Survey of India Toposheet on 5 km radius showing project site and general features around site is attached as Annexure VI. 4.4 Existing land use pattern There is no forest or agricultural land in the mine lease area. The mine lease area is undulating river bed and banks. The Land profile adjoining the river bank is slightly undulating 4.5 Existing Infrastructure a) Water Supply: The people of the area are dependent on Wells for water. They use the well water both for agriculture and household purpose. The average water table level in the region is 97 mrl. The mining staff/workers use water from bore well supplied by water tankers to the leasehold. b) Electrification: The village Patharehta has electricity connection while lease area is not connected with electricity. Surrounding 5 km villages from the lease area are electrified. c) Educational Facilities: The village Patharehta has a primary school. However, Secondary, Higher Secondary & College educations are at Kadaura town, which is 12 km away. d) Health Service: The primary Medical Centre, Govt. Hospital & Nursing homes are at Kadaura town. e) Postal Facilities: The post office is at Bheri Khurd. f) Transport: Page 12 of 16

13 The area is well connected by local bus services up to village & taxies are operated through this road. The nearest Railway Station is Kalpi at 39 km and nearest Airport is in Kanpur at 79 km. 4.6 Soil classification The river bed is of Sand/Morrumy type. 4.7 Climatic data from secondary sources Rainfall & Climate (Jalaun District) The climate of the region is characterized as arid to semi-arid with average annual rainfall less than 520 mm annually with an average of 35 rainy days. Out of which about 85 percent is received during the monsoon season from July to September. The area receives very less rainfall in the winter season. Temperature ranges from as high as 49 0 C in the May-June to as low as 4 0 C during December-January. The trend of rainfall is highly erratic and maximum 62% water goes as runoff. 4.8 Social Infrastructure Nearest railway station is Kalpi which is about 25.5 km in NW direction. Nearest Airport is Kanpur Airport which is about 79 km in NE direction from the mine site. SH 91 : 10.5 km (W) Haulage route (Mine Site to Metalled Road)- 900 m (W) 5. PLANNING BRIEF 5.1 Planning concept Mining plan is not required for the river bed sand mine. The mineral will be directly transported to the nearby markets in towns and cities. No mining activity will be undertaken during the monsoon season. So the river bed material will be replenished during the monsoon season every year. 5.2 Population projection There is no permanent influx of the population is anticipated, as the workers will be hired locally Page 13 of 16

14 from nearby villages. 5.3 Land use planning The land use of the mine lease area is the river bed of River Betwa and there will be no change in land use after operation as the Sand/Morrum will be replenished every year during the monsoon season. The ultimate land use of the mine lease area will not be change. Extracted mineral will be transported directly to the local markets, there will be no stock yard required for storage, also the workers will be hired locally and temporarily, no housing facility will be required. 5.4 Assessment of Infrastructure Demand Extracted mineral will be transported directly to the local markets, there will be no stock yard required for storage, also the workers will be hired locally and temporarily, no housing facility will be required. 5.5 Amenities/facilities Temporary rest shelters, drinking water and first aid facility will be made available to the mine workers. 6.0 PROPOSED INFRASTRUCTURE 6.1 Industrial area (Processing Area) No industrial area is proposed. 6.2 Residential area (Non Processing Area) The mine workers will be hired from nearby villages, no housing facility is required. 6.3 Green belt Plantation of trees along the bank of the rivers will be taken care in consultation with the Government agencies. Page 14 of 16

15 6.4 Connectivity SH 91(Hamirpur-Kalpi Marg) km (NE) Haulage route (Mine Site to Metalled Road)- 900 m (W) 6.5 Social Infrastructure Temporary rest shelters, drinking water and first aid facility will be made available to the mine workers. 6.6 Drinking Water Management Total water requirement for the project is 19.3 KLD, it shall be supplied from the nearby villages & its breakup is as under: Sl. No. Purpose Water Requirement (KLD) 1. Dust Suppression Plantation Domestic(drinking) 6.0 Total Sewerage System No sewerage system is proposed at the mine site. 6.8 Industrial Waste Management Not applicable 6.9 Solid Waste management No solid waste generation is expected from the mining operation Power Requirement & Supply/ Source All the activities will be carried out in a manual manner. The operation will be restricted to day time only; hence there is no power requirement for the project at site. 7.0 REHABILITATION AND RESETTLEMENT (R&R) PLAN Not Applicable Page 15 of 16

16 8.0 PROJECT SCHEDULE & COST ESTIMATES a) Likely date of start of construction and likely date of completion (Time schedule for the project to be given). No major constructions are required, except, rest-shelter. The activity will be started soon after obtaining the Environmental Clearance. b) Estimated project cost along with analysis in terms of economic viability of the project. Table 2: Estimated cost of the project S. No. Particular Cost (Rs. in lakhs) / month 1. Cost of excavation (labour charges) 2. Rent of Trucks/Trolleys Fuel and others 2.00 (Assuming Market to and fro 10 km) 4. EMP (water sprinkling) & 8.00 Plantation 5. Occupational Health Measures Miscellaneous (Site development/ site services/ manual equipments) Total lakhs / Month 9.0 ANALYSIS OF PROPOSAL (FINAL RECOMMENDATION) Overall the project will have positive and long term impact on environment. The project will also bring positive changes in terms of socio economic development by way of generating direct and indirect employment opportunities to the people of vicinity. The project will also help to clear the sediment in the form of river bed material (RBM) deposited may otherwise lead to change the shape of the river bed from a valley to a raised land making area vulnerable to flooding or other natural hazards. Because of the proposed sand mining, removal of sediments/sand will be possible will help the river to get channelized and restore the main river course of the water. Also the project will bring economical benefit to the state in terms of revenue generation. *********** Page 16 of 16

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

PREFEASIBILITY REPORT FOR BRICK EARTH MINE Page 1 PREFEASIBILITY REPORT FOR BRICK EARTH MINE Developed By- Village-Chandauhan, Tehsil-Phulpur, District-Allhabaad, Uttar Pradesh. RAI ENVIROMENTAL SERVICES PVT. LTD. Website: www.raienviro.com Email

More information

2. INTRODUCTION 2.1 Identification of Project and Project Proponent

2. INTRODUCTION 2.1 Identification of Project and Project Proponent PRE - FEASIBILITY REPORT 1. EXECUTIVE SUMMARY M/s J K S Mining Services private Limited through its Director Sri Jay Kumar Singh S/o Shivpal Singh R/o Gadhi, Mawaiya, District Fatehpur, Uttar Pradesh is

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PRE - FEASIBILITY REPORT. Sri Anand Kumar Gupta S/o Sri Laxminarayan Gupta R/o Maharajpur, Kanpur Nagar,

PRE - FEASIBILITY REPORT. Sri Anand Kumar Gupta S/o Sri Laxminarayan Gupta R/o Maharajpur, Kanpur Nagar, 1. EXECUTIVE SUMMARY PRE - FEASIBILITY REPORT Sri Anand Kumar Gupta S/o Sri Laxminarayan Gupta R/o Maharajpur, Kanpur Nagar, Uttar Pradesh is the lessee for the RBM for an area of 20.242 ha (50.01 acre)

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

is the lessee for the RBM for an area of ha (37.06 acre) along River Virma in Gata No.

is the lessee for the RBM for an area of ha (37.06 acre) along River Virma in Gata No. PRE - FEASIBILITY REPORT 1. EXECUTIVE SUMMARY M/s Thakur Construction Company of Sri Samar Singh Tomar S/o Sri Sangram Singh Tomar R/O Ward 16, Civil Line, Kalika Nagar, Babai Road, Hoshangabad, Madhya

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT Aug 2018 PRE-FEASIBILTY REPORT OF M/S. J.M.R.MINES (MINING OF FELDSPAR, QUARTZ & MICA MINE) Lease Area : 5.78 Hectares(14.29 Acres) Sy.No.941,942,943 &947 Giddalur (V), Sydapuram (M), SPSR Nellore District

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KATIKELA RIVER SAND BED OVER 15.00 ACRES OR 6.070 HA IN VILLAGE KATIKELA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20)

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation

More information

PRE-FEASIBILITY REPORT OF SAND QUARRY

PRE-FEASIBILITY REPORT OF SAND QUARRY PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL

More information

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT FOR ORDINARY SAND PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT Page 0 of 14 EXECUTIVE SUMMARY The proposed project of 24.0 Ha or 59.28 Acre area is of stream bed sand mining and falls under Category- B1 as per EIA Notification 2006 amended till

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT BANDOL CRUSHER STONE QUARRY OF SHRI TULSIRAM SAHU AT Khasra No. 15/2,23/2 Village Bandol Tehsil District State Madhya Pradesh Production Capacity 45030 M3/Year Area 3.150 Hectare

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 Executive Summary The Mining lease was granted in favour of Shri Mukesh Kumar S/o Shri Harish Chandra, R/o Tatol vaya Bagra, Tehsil - Bhinmal, Dist.-Jalore

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

(I) Basic Information:

(I) Basic Information: (I) Basic Information: Item Details 1 Name of the project Proposed River Bed Ordinary Sand Mining At River Sharda, Village- Mudi, Gata - 443, Tehsil- Dhaurahra, District-Khiri, State-Uttar Pradesh. (Leased

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,

More information

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU PRE-FEASIBILTY REPORT OF SUNATHAR STONE QUARRY VILLAGE: Sunathar TAHASIL: Purushottampur DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU Vill/Po- Gandala, P.S.- Hinjili, Dist.-Ganjam Odisha. CONTENTS CHAPTER

More information

Application for Prior Environmental Clearance (EC)

Application for Prior Environmental Clearance (EC) Application for Prior Environmental Clearance (EC) (See Paragraph 6 tification dated14 th September 2006) as amended to EIA tification, 2006 issued vide S.O. 3067(E) on dt.01.12.2009. Basic Information

More information

EXECUTIVE SUMMARY. 1.1 Executive Summary

EXECUTIVE SUMMARY. 1.1 Executive Summary 1.1 Executive Summary EXECUTIVE SUMMARY Chobe ki Guwari Sand Stone Mining Project (M.L. No- 26-R-01/2001) is situated near village Chobe ki Guwari, Tehsil Sapotra, District Karoli, State Rajasthan over

More information

S. No Parameter Details 1 Name & Address of the Applicant

S. No Parameter Details 1 Name & Address of the Applicant 1. EXECUTIVE SUMMARY S. No Parameter Details 1 Name & Address of the Applicant M/s AMULYA GRANITES Prop: Smt CH.SARALA H. No. FLAT NO.207 Roja Kishore Residency, Chenchupet, Tenali, AP-522 202 Guntur District,

More information

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR

More information

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd.

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd. SEIAA KARTAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd. Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Smt. J N Rukmini, has applied for extracting of Building stone in Sy No. 40, Kuroda Bore Kavala village, Hassan Taluk & District, Karnataka over an extent

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

1. PRE-FEASIBILITY REPORT

1. PRE-FEASIBILITY REPORT 1. PRE-FEASIBILITY REPORT 1.1 Executive Summary Sri. T. Thimmegowda, has applies quarry lisence for extracting of Building Stone Quarry in Sy No. 33/2, Kurodbore Kaval village, Hassan Taluk, Hassan District,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT Consultant-Ascenso Enviro Pvt. Ltd. Page 19 of 31 1.0 EXECUTIVE SUMMARY S.No. Information Details 1. Project name Sand Mining Project at Hatidah Ghat on River Ganga, District Patna,

More information

Proposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1

Proposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1 Proposed Ordinary Sand Mining Project at Gata.- 8Ka/195, Village- Ratauli, (I) Basic Information: Sl. Item Details. 1 Name of the project Proposed Ordinary Sand Mining Project in Sharda River at Gata.-

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

1. EXECUTIVE SUMMARY. Brief outline stating name of river bed, proposed project area, location, method of mining, period etc. to be mentioned.

1. EXECUTIVE SUMMARY. Brief outline stating name of river bed, proposed project area, location, method of mining, period etc. to be mentioned. Pre-Feasibility Report for Mining of River Sand in the Kangsabati River at Mouza Rerapal, J.L. No.132, Plot 1. EXECUTIVE SUMMARY Brief outline stating name of river bed, proposed project area, location,

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVESUMMARY 1.1 Introduction Road Metal of M/s. Venkata Ramana Stone Crusher covering an extent of 0.89 Ac is located at Sy.No.379/1 of Perecherla Village, Medikonduru Mandal, Guntur District,

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY PRE FEASIBILITY REPORT OF AZHAGAPPAPURAM EARTH FOR OVER AN EXTENT OF 0.61.0HA IN AZHAGAPPAPURAM VILLAGE, AGASTEESWARAM TALUK, KANNIYAKUMARI DISTRICT, TAMIL NADU OF, (Under the Guidelines of Ministry of

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

M/s Maa Raktdantika Contractors and Suppliers Pvt.Ltd.

M/s Maa Raktdantika Contractors and Suppliers Pvt.Ltd. M/s Maa Raktdantika Contractors and Suppliers Pvt.Ltd. Proposed Riverbed Sand/Morrum Mining Project from Yamuna River Located at Khand. 2, Village- Daulatpur Kachhar, Tehsil Bhognipur, ; Sanctioned Lease

More information

PRE FEASIBILITY REPORT FOR. Mining of Riverbed Sand. From Darakeswar River. Area : 8.09 Ha ( 20 Acres )

PRE FEASIBILITY REPORT FOR. Mining of Riverbed Sand. From Darakeswar River. Area : 8.09 Ha ( 20 Acres ) PRE FEASIBILITY REPORT FOR Mining of Riverbed Sand From Darakeswar River Area : 8.09 Ha ( 20 Acres ) AT Mouza: Kunjapur, Plot No: 2227 (P), 2269 (P), 2603 (P),JL: 112, Village: Kunjapur, Block : Indus,,

More information

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Building Stone Quarry of Sri. B. Narendra Kumar

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Building Stone Quarry of Sri. B. Narendra Kumar SEIAA KARTAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project : Building Stone Quarry of Sri. B. Narendra Kumar Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report [PFR] in the format

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT GRANITE BUILDING STONE QUARRY MINING PROJECT STATE : KERALA DISTRICT : KANNUR THALUK : THALASSERY VILLAGE : THRIPPANGOTTUR BLOCK NO. : NIL SURVEY NO. : 275/1A MINERAL : GRANITE BUILDING

More information

M/s Jai Ambe Construction Company

M/s Jai Ambe Construction Company M/s Jai Ambe Construction Company Proposed Riverbed Sand Mining Project from YamunaRiver Locatedat Gata. 93/1 ka, 95/2, 96/8, 97, 98, Village- Sadimadanpur, Tehsil- Pailani, District- Banda, U.P.; Area:

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Krishna Construction Company AT Khasra No.1046 Vill.-Pipalya Hamir, Tehsil-Barod, District-Agar Malwa (M.P.) Production Capacity: 40000 Cu.mt Crusher Stone for 18 Months

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT OF MINING PROJECT LOCATED AT TIKKA/ MOHAL SACHUHI, MAUJA JANGAL RAJGIR TEHSIL SUJANPUR, DISTRICT HAMIRPUR IN KHASRA NO 6, 7, 8 AND 9 MEASURING 04-84-35 HACTARES (126 03 KANALS) FOR

More information

PRE-FEASIBILIY REPORT

PRE-FEASIBILIY REPORT BENDRI LIMESTONE QUARRY NO. - 4 3 (Quarry No. 1) (Quarry No. 1)MINERALS - DOLOMITE (LEASE PERIOD 20.05.2002 TO 19. 05.2022) LEASE AREA - 42.754 HECTARES MINING PROJECT - CATEGORY- B PRE-FEASIBILIY REPORT

More information

Grey Granite (Paradiso) Mine

Grey Granite (Paradiso) Mine Grey Granite (Paradiso) Mine PROJECT PROPONENT M/s. Karunai Granites Private Limited., Jagadevipalayam Village & Post, Krishnagiri Taluk, Krishnagiri District 635 203. Extent : 11.59.0 Hectares S.F. No.

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

INDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND

INDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND PRE-FEASIBILITY REPORT PREPARED FOR D. SESHA REDDY [Mine Lease Area 3.253 Ha.] Sy. No. 12/D Nagarur Village, Yadiki Mandal, Ananthapur District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified Accredited

More information

Pre- Feasibility Report

Pre- Feasibility Report 1. EXECUTIVE SUMMARY Application of mining for soil used in Brick Kiln -M/S M D Bricks Field from Khasra/Gata Nos 1229,1233,1161,1044, -2.292 Hectare at Village-Katka Manapur,Tehsil-Sadar,District- Pratapgarh,Uttar

More information

1/1, Index INDEX ANY, SHOULD

1/1, Index INDEX ANY, SHOULD River Sand (Minor Mineral) Mining Project for River Yamuna in Gata No. 1/1, Production (9, 47,368 TPA), M.L Area 52.63 ha, near village: Index 1 2 INDEX EXECUTIVE SUMMARY... 2 INTRODUCTION OF THE OBJECT/

More information

A. PROOF OF CLAY MINING FOR BRICK KILN

A. PROOF OF CLAY MINING FOR BRICK KILN A. PROOF OF CLAY MINING FOR BRICK KILN Documents related to Brick Kiln 1. NOC /CTO of PCB for Brick Kiln 2. Paid Advance Royalty receipts, Panchayat, TIN number of Kiln and paid TT B. IDENTIFICATION OF

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Siddapur Natural Sand Mining in Patta land

SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Siddapur Natural Sand Mining in Patta land SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project : Siddapur Natural Sand Mining in Patta land Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report [PFR] 3 Environmental

More information

DHANWADA CRUSHER STONE QUARRY

DHANWADA CRUSHER STONE QUARRY ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-

More information

M/s.NEERAJ KUMAR JAIN

M/s.NEERAJ KUMAR JAIN EXECUTIVE SUMMARY OF DARSHANI LATERITE AND RED OCHRE DEPOSIT Area : 15.00 Ha. Village Budhanwara, Tahsil Bohriband, Dist. Katni MADHYA PRADESH For M/s.NEERAJ KUMAR JAIN KATNI 1 BUDHANWARA LATERITE AND

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Parsen : Gwalior : Gwalior (M.P.) : 3.345 Hectare : Stone KHASRA No : 4154 PRODUCTION CAP : 50,000 Cu.mt/year (avg.) Stone APPLICANT

More information

PRE FEASIBILITY REPORT For SILICA SAND MINE. At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh ha.

PRE FEASIBILITY REPORT For SILICA SAND MINE. At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh ha. PRE FEASIBILITY REPORT For SILICA SAND MINE At Village- Karlapudi, Tehsil- Kota, Nellore, Andhra Pradesh 11.797 ha. Project Proponent Sri Yashpal Mendon 1 st Floor Mineral House, Hampankatta, Mangalore

More information

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details:

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details: 2015 PRE-FEASIBILITY REPORT (FOR TOR) OF GADABAVALASA MANGANESE ORE MINES, AT: GADABAVALASA, GARIVIDI MANDAL, DIST: VIZIANAGRAM FOR PRODUCTION OF 12,000TPA OF MANGANESE ORE OVER AN AREA OF 12.691 HA. OF

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Pathari Basouda : Basouda : Vidisha (M.P.) : 2.00 Hectare : Stone KHASRA No : 177/1/2 PRODUCTION CAP : 10000 Cu.mt/year Stone APPLICANT

More information

(A govt. of Kerala Undertaking)

(A govt. of Kerala Undertaking) Annexure - 1 Basic Information Important Note: Please send the information by e-mail in word format and a signed & scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy

More information

BRIEF SUMMARY OF THE PROJECT

BRIEF SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT This proposal of Nuagaon Iron ore mines of M/s K.J.S.Ahluwalia is for expansion of Iron ore production capacity from 5.62 MTPA to 7.99MTPA of ROM along with existing beneficiation

More information

Pramod S. Kambli. Page 1

Pramod S. Kambli. Page 1 PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major

More information

Environment Management Plan

Environment Management Plan Environment Management Plan FOR Mining of Metal Stone Area 2.000 Hectare, Khasra No. 1127/1 Village Tehsil District State AT KHILCHIPUR KHILCHIPUR RAJGARH MADHYA PRADESH Proponent SHRI ALTAF KHA S/O SHRI

More information

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I FORM- I Page 0 of 14 APPENDIX I (See paragraph 6) FORM 1 (I) Basic Information S.. Item Details 1. Name of the project/s Bhidauni Khadar Ordinary Sand Mining Project 2. S.. in the schedule 1(a) mining

More information

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant PRE FEASIBILITY REPORT FOR Silica Sand Beneficiation Plant BY Shree Silicaam Minerals LLP VILLAGE : CHOKI TALUKA : JAGADIA DIST : BHARUCH GUJARAT (INDIA) PRE-FEASIBILITY REPORT: SILICA SAND BENIFICIATION

More information

M/s Tiffin s Barytes Asbestos and Paints Ltd (VIGNESHWARA BARYTES MINE) Near Ramalayam, Velpula (V&P) Y.S.R. Disrict.

M/s Tiffin s Barytes Asbestos and Paints Ltd (VIGNESHWARA BARYTES MINE) Near Ramalayam, Velpula (V&P) Y.S.R. Disrict. PRE FEASIBILITY REPORT FOR Proposed Barytes Mine over an Extent of 49.46 Ha, In Sy. No. 1021/15, 1021/3, 1021/5 of Vemula Village, Vemula Mandal, Y.S.R.Kadapa District, Andhra Pradesh. Submitted To Ministry

More information

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara

PROJECT PARTICULARS. Lease address - Village panchayat - Nara, Tahsil -Kanker, Name of the proponent - Village panvhayat Nara PROJECT PARTICULARS Name of the project - Sand mining Lease address - Village panchayat - Nara, Tahsil -Kanker, Dist Kanker (C.G.) Khasra No. - 1025 Sand mining area - 5.00 Hectares Name of the mineral

More information

PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.

PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P. PRE- FEASIBILITY REPORT FOR PROPOSED ORDINARY EARTH EXCAVATION PROJECT (94.59 ARES) of Shri Saji Sebastian, Madeckal House, Kizhakambalam P.O, Ernakulam (Dist.) Survey No. 129/1-4,129/2-1, Arakuzha Village,

More information

Table 1-1:- Salient Features of the Project

Table 1-1:- Salient Features of the Project PRE FEASIBILITY REPORT OF LAMBA & BHATIA BAUXITE MINE MINERALS - BAUXITE LAMBA SURVEY. NO. 30/P, 415/A, 949, BHATIA-358 (LEASE PERIOD 14.06.2000 TO 13. 06.2020) LEASE AREA 54.0861 HECTARE MINING PROJECT

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN EMP 1 INTRODUCTION In each of the areas of impact, measures have to be taken to reduce potentially significant adverse impacts and where these are beneficial in nature, such impacts are to be enhanced/

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0. INTRODUCTION: The proposed M/s. Ordinary sand Mine of Shree Ramjibhai samjibhai Gujarati Area at near village Survey No.Bhadar River Bed, Vill.

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA)

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) PRE FEASIBILITY REPORT ON GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) Lease Area: 18.687 acres or 7.562 Ha. of Sri Rama chandra Dash Polasara CHAPTER 1 EXECUTIVE SUMMARY Ghodapalana sand Quarry

More information

PRE-FEASIBILITY REPORT GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS)

PRE-FEASIBILITY REPORT GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS) 20 PRE-FEASIBILITY REPORT OF GHODACH SOAPSTONE & DOLOMITE MINES (APPLICANT: M/S KASTURI MINERALS) 1. EXECUTIVE SUMMARY: The project is for mining of Ghodach soapstone & Dolomite Mine M.L. No. 69/2010 Near

More information

PRE-FEASIBILITY REPORT. 5.0 Hectare sand mine under bhu-jal

PRE-FEASIBILITY REPORT. 5.0 Hectare sand mine under bhu-jal 1.0 SUMMARY OF THE PROJECT PRE-FEASIBILITY REPORT Project Name of Company / Mine Location Village Taluka District State Sand mine Gram Panchayat Tarrighat, Sand mine Tarrighat Tarrighat Patan Durg Chhattisgarh

More information

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P

Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P Terms of Reference (ToR) for EIA BUILDING STONE QUARRY OWNED BY LINEJ T.P SITUATED AT KAKKUR VILLAGE KOZHIKODE TALUK KOZHIKODE DISTRICT KERALA STATE EXTENT: 2.0437 Ha STANDARD TERMS OF REFERENCE (TOR)

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR AMJHAR LATERITE DEPOSIT M. L. Area 4.897 ha. In Village - Amjhar Tehsil - Amarpatan, District- Satna State - Madhya Pradesh Proposed Capacity 32256 TPA Lessee - Shri Vikram Singh

More information