1 HIGHLAND CITY ENGINEERING DESIGN REQUIREMENTS FOR PLAN REVIEW AND PRECONSTRUCTION INFORMATION OCTOBER 2008 HIGHLAND CITY PUBLIC WORKS AND ENGINEERING 5400 WEST CIVIC CENTER DRIVE, SUITE 1 HIGHLAND CITY, UTAH (OFFICE) (FAX)

2 TABLE OF CONTENTS SECTION I OVERALL REVIEW AND APPROVAL PROCESS SECTION II ENGINEERING REVIEW AND APPROVAL PROCESS SECTION III PRECONSTRUCTION PACKAGE SECTION IV CONSTRUCTION

3 SECTION I OVERALL APPROVAL & REVIEW PROCESS

4 OVERALL HIGHLAND CITY REVIEW AND APPROVAL PROCESS Cnceptual Strm Water Reprt Required Develpment Review Cmmittee (DRC) Preliminary Strm Water Reprt Required Planning Cmmissin - Preliminary Getechnical Reprt & Draft Strm Water Reprt Required Planning Cmmissin - Final Drinking Water Mdel & Pressurized Irrigatin Mdel Required City Cuncil Final Plat Apprval Final Strm Water Reprt Required Engineering Review Precnstructin Meeting Cnstructin Inspectins Final Inspectins

5 SECTION II ENGINEERING APPROVAL & REVIEW PROCESS

6 I) Designs And Cnstructin Specificatins: A) Highland City has adpted the fllwing manuals r addendums, and these shall be used and referenced in the design drawings 1) 2007 Editin f the American Public Wrks Assciatin, Manual f Standard Specificatins, r latest editin ( 2) 2007 Editin f the American Public Wrks Assciatin, Manual f Standard Plans, r latest editin ( 3) Latest Highland City addendums and/r substitutins t the APWA Plans and Specs 4) American Water Wrks Assciatin Standards 5) 2003 Editin f AASHTO s Manual f Unifrm Traffic Cntrl, r latest editin 6) Design and Cnstructin f Urban Strmwater Management Systems (ASCE Manuals and Reprts f Engineering Practice N. 77 r WEF Manual f Practice FD-20) 7) Urban Drainage Design Manual, Hydraulic Engineering Circular N. 22, Nvember 1996, Federal Highway Administratin, FHWA-SA , ( 8) Urban Strm Drainage Criteria Manual, June 2001, Urban Drainage and Fld Cntrl District ( 9) All applicable Lcal, Cunty, State, and Federal Regulatins and Ordinances 10) Highland City Drinking Water Master Plan 11) Highland City Strm Water Master Plan 12) Highland City Pressure Irrigatin Master Plan 13) Highland City Sanitary Sewer Master Plan

7 Engineering Review and Apprval Prcess Imprtant Nte t the Develpment Engineer: If any f the infrmatin required in this dcument is nt fund n the plans, the plans will be returned unchecked until the requirements are met. First Submittal Secnd Submittal Third Submittal Submit plans (ne 24 X 36 set) t Highland City Public Wrks First Redlines and new plan set are resubmitted * Secnd Redlines and new plan set are resubmitted * 1 st Review by City Engineer and/r Designee 2 nd Review by City Engineer and/r Designee 3 rd Review by City Engineer and/r Designee Red Lines are returned t the Develpment Engineer Red Lines are returned t the Develpment Engineer Plans Apprved if in cnfrmance with city design standards Once apprved, a set f five (5) large plans and five (5) 11 X 17 plans will be submitted t the Highland City Engineer fr stamped apprval Only the riginal plans stamped fr apprval by the City Engineer will be valid fr cnstructin An riginal stamped set must be n site at all times * Withut redlines, review prcess will start ver City Engineer maintains the right t as many reviews necessary t bring the plans int cmpliance with City Standards Review Perid - Allw 2 weeks per submittal Checking Status Please inquire with the Public Wrks Secretary (Due t call vlume the City engineer may nt be able t respnd t these calls)

8 I) Package rder Sheets Numbering Required Elements Cver CV1 - CVXX Name f Subdivisin Engineer Infrmatin Name Address Phne Surveyr Infrmatin Name Address Phne Develper Infrmatin Name Address Phne Plan drawing f subdivisin Vicinity Map Index f pages Ntes Plat P1-PXX Apprved cpy f the plat (crdinates fr rad mnuments) Grading Plan GP1-GPXX Grading Plan Strm Water SW1- Silt fence lcatins Pllutin SWXX Preventin Wash ut lcatins Plan (SWPPP) Overall Utilities Plan & Prfile Details OU1 - OUXX PP1 - PPXX D1 - DXX Single sheet plan view f the prject that includes the fllwing: Scale nt t exceed 1:60 Quantity Table with the fllwing: Linear feet f curb and gutter Linear feet f sidewalk (Fr each size) Square feet f asphalt Drinking Water (Linear feet, fr each size) Pressurized Irrigatin (Linear feet, fr each size) Sanitary Sewer (Linear feet, fr each size) Manhles Strm Sewer (Linear feet, fr each size) Sumps Curb inlets Pretreatments Street Lighting (Duble Head & Single Head) Include water, sewer, irrigatin, and strm drain in the prfile. Rad sectin, trenches, utility services, sumps, sidewalks, ADA ramps, waterways, transitins, curb and gutter, manhles, inlet bxes, thrust blcks. Fr Detentin Pnds include strage capacity and discharge table r curve As-Built Drawings will require GPS Crdinates and Elevatins fr utilities

9 Materials I) Materials fr Utilities Service Material Min Size Reinfrced Cncrete Pipe (RCP) Strm Drain Pressurized Irrigatin Drinking Water Sewer C-900 PVC (DR-18) Ductile Irn Pipe (Class 350) PVC (SDR-35) Clr Services Other 15 inches 8 inches 8 inches 8 inches Purple Purple Ply Tracer Wire and Lcatr Min Size: Depends n Cnnectin (3/4 inch typical) Tape (12 abve) Cpper Ply wrapped (AWWA C105) Min Size: NSF Lg 3/4 inch Lcatr Tape (12 abve) Fire Hydrants: Mueller r Green 4 inch minimum diameter Tie-ins dwnstream f manhles Waterus Lcatr Tape 24 abve pipe Minimum 5 diameter manhles Asphalt AC-20 (3/4 ) inch City Utility Cnduits PVC 4 inch Gray Bundles f three - Lcated at legs f intersectins, bulb f cul-de-sac and every 300 feet. Single cnduits fr lighting if cnduit bank is nt near. II) Street Lights (See Appendix fr Detail) Service Light Type Lcatin Cllectr and Duble Heads Intersectins Every 300 feet Arterials Residential Single Heads Intersectins Every 300 feet End f Cul-de-sacs

10 Plan and Prfile Requirements I) Elements that need t be shwn (Scale: Hrizntal 1:30, Vertical 1:5) Service Lcatin Min Depth Max Depth Services Valves Other Pressure Irrigatin Drinking Water Sewer 2 feet ff center line n the Suth and East 7 feet ff back f curb n the Nrth and West 10 feet ff pressurized irrigatin n the Suth and East Manhles at a maximum f 400 feet 24 inches t tp f pipe 48 inches t tp f pipe 10 feet t tp f pipe 30 inches t tp f pipe 60 inches t tp f pipe 12 feet t tp f pipe Lcated n the prperty lines Service is split between tw lts 10 ft minimum separatin between Sewer and ther services Slpe f tw (2%) percent 10 ft minimum separatin between drinking water services Lcated in intersectins at the extensin f the prperty lines Lcated as a cluster in the intersectins 4 inch drain lines Fire hydrants t be shrt side service. Minimum slpe f ne-half (0.5%) percent Minimum f five (5 ) ft diameter manhles Strm Drain Inlet spacing Determined by the Highland City Strm Water Design Criteria and at the directin r discretin f the CITY ENGINEER. Precipitatin and Frequency Data NOAA 14 ( Detentin Pnds Slpes 4:1 minimum Oil Water separatr required n inlet t pnd Snut used

11 Sumps are nt allwed within Zne 1 f Drinking Water Surces. Refer t the Highland City Strm Water Design Criteria fr the installatin f sumps in Zne 2. Streets Perclatin Tests: In accrdance with Utah Rule R Other test methd: ASTM D Rad Mnuments at intersectins, center f cul-de-sacs, and line f sight changes (prvide table with crdinates) 50 ft radius n cull-de-sacs 20 ft radius fr curves at intersectins and returns ut f cul-de-sacs. Addresses: Streets end in zer digits; huses end in nn-zer digits. Crner lts require bth addresses fr ptinal siting. Only use street names n the Plat n street numbers. Prvide bth street names and number n the design drawings. Use 6.6 feet per digit t determine huse address. Even number n Nrth and East side, dd number n Suth and West side. Stp sign and street signs n the same pst Center Line Statining Full and Half Alng Center Easements 10 ft Public Utility Easement (PUE) arund perimeter f prperty II) Other Drinking Water Line Elements that need t be shwn Item Hrizntal Separatin Descriptin Maintain a minimum 10-ft separatin between sewer and drinking water mainline - Measured frm edge f pipe. Try t achieve the 10-ft separatin between ther utilities - At n time will it be less than 8-ft frm edge f pipe. Water service laterals shall als cnfrm t the same requirements fr the separatin f water and sewer lines. Vertical Separatin 18-inches abve sewer lines (tp f sewer pipe t bttm f Drinking Water pipe) 12-inches separatin between ther utilities Water service laterals shall als cnfrm t the same requirements fr the separatin f water and sewer lines.

12 Fire hydrants Thrust Blcking Pressure Testing and Disinfectin Minimum f 500 feet spacing between hydrants Lcated within 250 feet frm all hmes Minimum spacing in cul-de-sacs and dead ends is 200 feet t frntage Cncrete pad t be pured arund hydrant barrel belw traffic flange frm curb t sidewalk and 18-inches t each side t match sidewalk cncrete depth. Highland City inspectrs will be present during installatin and will cllect batch ticket Shall be in cnfrmance with AWWA C (Disinfecting Water Mains) 1. Highland City inspectrs present t supervise filling f the pipe. 2. Highland City inspectrs t perfrm chlrine test. 3. Highland City inspectrs present fr flushing. 4. Highland City inspectrs present during pressure test. 5. Highland City inspectrs will cllect samples t ensure prper disinfectin III) Street Crss Sectin (refer t standard drawing in the Appendix) Asphalt Item Rad base Subgrade Descriptin Type: Three quarter (3/4 ) inch, AC-20 mix Minimum depths: Residential, three (3 ) inches Cllectrs, fur (4 ) inches Arterials, six (6 ) inches Minimum depth Residential, eight (8 ) inches Cllectrs, eight (8 ) inches Arterials, eight (8 ) inches Cmpactin Ninety-five (95%) percent mdified prctr Depth Determined by the getechnical Engineer (Refer t the Highland City Getechnical Guidelines) Nrthwest Area f Highland City Minimum f eighteen (18 ) inches

13 Mdificatins Utility Stamps in Curbing Parkway Details Use f Getextile fabric belw Subgrade meeting APWA Sectin requirements Table 1 Minimum 2-ft cut frm edge f gutter verlay thickness minimum f 2-inches All laterals shall be stamped n the curb at the lateral lcatin ( S fr sewer, W fr drinking water, I fr irrigatin). Plans are t be stamped by a licensed landscape architect. Sprinkler design Apprved materials Apprved plantings as utlined in City Ordinances, and Develpment Cdes.

14 Item Curb and Gutter Detail Sheet Standard Specificatin APWA Plan 205 Type E Minimum rad base depth, eight (8 ) inches Cmpact t ninety five (95%) percent mdified prctr Waterway Waterway (APWA Plan 211) Transitin (APWA Plan 213) Sidewalks APWA Plan 231 Minimum sidewalk thickness is fur (4 ) inches Minimum rad base depth f six (6 ) inches Sidewalk Ramps Catch Basin Cmbinatin Inlet/Cleanut Manhles Sumps Drinking Water Water Meter Fire Hydrant Pressurized Irrigatin Sanitary Sewer Street Lights and Signs Street Crss-Sectin Cmpact t ninety five (95%) percent mdified prctr APWA Plans 235 and 236, dependent upn applicatin Replace pattern detail with yellw truncated dme inserts APWA Plan 315 Type A (Single grate inlet) APWA Plan 315 Type B (Duble grate inlet) APWA Plan 316 City Specificatin See City Website City Specificatin See City Website City Specificatin See City Website City Specificatin See City Website City Specificatin See City Website City Specificatin See City Website City Specificatin See City Website City Specificatin See City Website City Specificatin Residential, Residential Cllectr, Arterial

15 Sectin III Precnstructin

16 HIGHLAND PUBLIC WORKS ENGINEERING DIVISION 5378 West Nrth Highland, Utah ext 115 Fax Precnstructin Agenda 1. Intrductins 2. Descriptin f Prject distributin f 5 set f large plans and 5 sets f 11x17 plans (stamped apprved fr cnstructin prir t the meeting). 3. Cnstructin Requirements Overview f Precnstructin Package Design Standards Required Inspectins 2 day prir ntice Water Lateral Installatin Prcedures Installed by Cntractr Pressurized Irrigatin Lateral Installatin Prcedures Sewer Lateral Recrd PI Lateral Recrd Plyethylene Encasement Rad Cut Permit ADA Ramp Requirements Dust and Mud Preventin Plan Sign Standard Lighting Standard Final Inspectin Frm Warranty Bnd Release Signature Understanding f Cnstructin Requirements 4. Questins

17 Precnstructin Ntes 1) General Ntes: A) Any ntes fund herein these precnstructin ntes shall be deemed an addendum t the American Public Wrks Assciatin (APWA) Manual Standard Specificatins. Highland City fllws the 2007 APWA Specificatins and Standard Plans (available at B) See Sectin IV fr all required Highland City inspectins. C) Tw (2) wrking days ntice request will be given t the public wrks secretary, either verbally (801) , written (5400 West Civic Center Drive, Suite 1, Highland, Utah 84003), r by (publicwrks@highlandcity.rg) fr all required inspectins. D) Highland City Engineering Inspectrs wrk Mnday thru Thursday (7:00 a.m. t 5:30 p.m.). Inspectins will be scheduled between 7:30 a.m. t 5:00 p.m. E) Any wrk perfrmed withut the prper inspectins taking place will be remved at the Cntractr s expense and redne with the prper inspectins. Material replacement may be required at discretin f the City Inspectr and at the expense f the Cntractr. F) All cnstructin shall be as shwn n the apprved cnstructin drawings stamped APPROVED FOR CONSTRUCTION, HIGHLAND PUBLIC WORKS with a date and signature. These plans are t be n site at all times and available t the City Inspectr fr review. If the plans are nt n site, then a stppage f wrk will be issued until the plans are available. G) Any changes t the apprved cnstructin drawings must be apprved by the City Engineer and the Design Engineer. This apprval will be given in writing by the City Engineer t the Cntractr and the Develper. Until such written authrizatin is received, there has been n apprval granted t change the plans. H) The Cntractr is respnsible t reprt any errrs fund n the APPROVED drawings, as sn as they are nticed, t the City Engineer and the Design Engineer. A written addendum, written by the City Engineer, will be issued t the Cntractr and the Develper ntifying them f the change t the plans. There will be n cst t the City fr these changes. I) The Cntractr shall take all necessary and prper precautins t prtect adjacent prperties frm any damage that may ccur frm the prject. J) The Cntractr is respnsible fr all safety requirements n the jb site and will ensure enfrcement f the necessary and gverning regulatins. 2) Utilities: A) Unless therwise nted n the plans, the existing utilities and their lcatins are taken frm research data f available recrds and nt actual field verificatins. B) Existing utilities lcated n the plans are fr the cnvenience f the Cntractr; neither the City Engineer, Design Engineer, nr the Develper will bear any respnsibility fr the accuracy f the data r fr utilities nt shwn n the plans. The Cntractr is respnsible fr field verificatin f these utilities. C) The Cntractr is respnsible t fllw all laws and regulatins regarding utility lcatins and excavating arund these utilities, including the required Rad Cut/Right f Way Permit. D) The Cntractr shall take all precautinary measures t prtect existing utilities which are t remain in place. Any damage dne by the Cntractr s peratin shall

18 be repaired and/r replaced satisfactry t the City Engineer and wning utility cmpany at the expense f the Cntractr. 3) Quality Cntrl and Testing (APWA Sectin , Quality Cntrl) A) Base i) All testing perfrmed will be at n cst t the City. ii) All cmpactin testing shall be submitted t the Public Wrks Department fr review and apprval befre mving t the next phase f cnstructin including but nt limited t asphalt, sidewalk, curb and gutter, etc iii) All testing will be perfrmed by a certified testing labratry and a certified tester. iv) Cmpactin shall meet the 95% mdified prctr requirements. v) The City Inspectr has the authrity t direct the lcatin f testing r t call fr additinal tests if deemed necessary. B) Sub Base i) All testing perfrmed will be at n cst t the City. ii) All subbase (r subgrade if n subbase is used) will have a prf rlling test with a City Inspectr n site. iii) Prf rlling tests will cnsist f driving ver the subbase (subgrade) with a fully laded fur (4) thusand galln water truck t check fr any type f deflectin in the material. iv) City Inspectr shall have the discretin t require the remval f material and the amunt at lcatins f failures. v) The failed material shall be remved and replaced at the expense f the Cntractr and retested. C) Trench Cmpactin (APWA Specificatins, Sectin and ) i) All testing perfrmed, will be at n cst t the City. ii) Testing results are required t be submitted t the Public Wrks fr review and apprval befre the next phase f cnstructin can begin. iii) Cmpactin tests are required every tw (200 ) linear feet f each utility and every tw (2 ) feet f vertical lift. iv) Maximum lift thickness is eight (8 ) inches. D) Sidewalks and Curb & Gutter (APWA Specificatins, Sectin ) i) All testing perfrmed, will be at n cst t the City. ii) Testing results are required t be submitted t the Public Wrks fr review and apprval befre the next phase f cnstructin can begin. iii) Sidewalks - cmpactin tests are required every fur (400 ) linear feet per lift. iv) Curb and gutter - cmpactin tests are required every tw (200 ) linear feet per lift. v) Maximum lift thickness is eight (8 ) inches. 4) Sanitary Sewer A) Sanitary Sewer cut sheets shall be submitted t the Public Wrks fr review and apprval by the City Engineer prir t start n sewer. B) An apprved stamped cpy shall be n site during the cnstructin. C) Timpangs Special Service District (TSSD) requires an applicatin and apprval fr cnnectin t their sewer lines applicatin submitted frm Highland City. D) Air and deflectin tests shall be perfrmed after cmplete installatin f the sewer mains and laterals and prir t installatin f any ther utility. E) Identificatin f Sewer Lines. A clearly labeled tracer lcatin tape shall be placed tw feet abve the tp f sewer lines less than r equal t 24 inch in diameter, alng its entire length [R317-3, 2.5(B)].

19 F) Deflectin test shall be perfrmed n all flexible pipes. The test shall be cnducted after the final backfill has been in place at least 30 days [R (C)(1)]. G) All sewer lines shall be flushed (flushing ball) and televised after final rad base has been installed and graded and befre the placement f asphalt. H) A cpy f the televised test shall be submitted t the Public Wrks fr review and apprval n DVD prir t placement f asphalt. I) All laterals shall be stamped with S n the curb at the lateral lcatin. J) The Sewer Lateral Recrd sheet shall be submitted t the Public Wrks befre the release f any sewer bnd mney and/r befre the final warranty perid can begin. K) Sewer Laterals shall be lcated n the prperty with a tw by fur (2 X 4) bard painted green r green PVC marker with the depth f the lateral clearly marked. 4) Drinking Water A) All laterals shall be stamped with W n the curb at the lateral lcatin. B) Main Water Lines i) The subgrade and/r subbase shall be at its final design elevatin befre the installatin f the water mains. ii) Alignment and elevatin (frm TBC) staking shall be prvided every twenty five (25 ) feet by a licensed surveyr in the State f Utah prir t the installatin f the water main. Any exceptins t this must be apprved in writing by the City Engineer r designee. iii) The ply wrap must be verlapped n all jints and fittings, and must be damage free. iv) Pipe shall be bedded and backfilled with ¾ minus gravel in the pipe zne. v) N rcks larger than three quarter (3/4 ) inch diameter shall be in cntact with the pipe. vi) FM Grease is required n all blts. C) Valves: i) All valves shall be flanged t the main, including fire hydrant branch lines. ii) Valve bxes and cvers shall be prperly aligned and fully serviceable. iii) Valves stands shall be cncrete cllared. iv) Valve lids shall be labeled WATER D) Fire Hydrants: i) All fire hydrants shall be Waterus r Mueller with a 5 bury and shall be installed s that the breakaway flange is level with the tp f curb grade. ii) A cncrete wash blck will be installed belw hydrant she. iii) Cncrete pad t be pured arund hydrant barrel belw traffic flange frm curb t sidewalk and 18-inches t each side t match sidewalk cncrete depth. E) Thrust Blcks: i) The cavity f the thrust blck shall be inspected prir t placement f cncrete. ii) The inspectr shall be n site fr the pur f the thrust blck. iii) Cncrete weigh ticket r batch ticket shall be required. F) Lading and Testing: i) Water line lading shall be dne under the direct supervisin f the Public Wrks Department. ii) All water lines will be disinfected as per State and Drinking water rules and regulatins under the directin f the Public Wrks Department. iii) All mains shall be flushed after the chlrine test and maintain a flw f 2.5 fps under the direct supervisin f the Public Wrks Department. iv) All waterlines must pass a hydrstatic pressure test f tw hundred (200 psi) punds per square inch r ne hundred twenty five (125%) percent f the wrking pressure, which ever is greater, fr a perid f tw (2) hurs. v) All waterlines must pass clifrm bacterilgical testing.

20 G) Meters and Service Taps: i) Water meter service cans will be placed in the park strips ii) Befre services are tapped, cut stakes must be installed within five (5 ) feet f final can placement. Cut stakes shall shw the tp back f curb lcatin and elevatin. Staking fr cul-de-sac and bulb/knuckle streets will require a radius pint t be staked. iii) CONTRACTOR will tap mains and set meter bxes t established grades. iv) CONTRACTOR will use ¾ inch type K cpper (distances exceeding fifty (50 ) feet in length will require ne (1 ) inch), excavatin, suitable backfill fr pipe zne, backfill, cmpactin, and surface restratin. v) Service lateral must be a minimum 10 ffset frm sewer laterals. vi) Public Wrks Department - Water Divisin will supply and install the water meters. 5) Pressurized Irrigatin A) All laterals shall be stamped with I n the curb at the lateral lcatin. B) Main Pressurized Irrigatin (PI) Lines i) The subgrade and/r subbase shall be at its final design elevatin befre the installatin f the water mains. ii) Alignment and elevatin (frm TBC) staking shall be prvided every twenty five (25 ) feet by a licensed surveyr in the State f Utah prir t the installatin f the water main. Any exceptins t this must be apprved in writing by the Water Superintendent. iii) The ply wrap must be verlapped n all fittings, and must be damage free. iv) Pipe shall be bedded and backfilled with ¾ minus gravel in the pipe zne. v) N rcks larger than three quarter (3/4 ) inch diameter shall be in cntact with the pipe. vi) FM Grease is required n all blts. C) Valves: i) All valves shall have mechanical jint (MJ) valves t the main. ii) Valve bxes and cvers shall be prperly aligned and fully serviceable. iii) Valves stands shall be cncrete cllared. iv) Valve lids shall be labeled IRRIGATION D) Thrust Blcks: i) The cavity f the thrust blck shall be inspected prir t placement f cncrete. ii) The inspectr shall be n site fr the pur f the thrust blck. iii) Cncrete weigh ticket r batch ticket shall be required. E) Lading and Testing: i) PI line lading shall be dne under the direct supervisin f the Public Wrks Department. ii) All mains shall be flushed and maintain a flw f 2.5 fps under the direct supervisin f the Public Wrks Department. iii) All PI lines must pass a hydrstatic pressure test after services are cnnected f tw hundred (200 psi) punds per square inch r ne hundred twenty five (125%) percent f the wrking pressure, which ever is greater, fr a perid f tw (2) hurs. F) Service Taps: i) Irrigatin bxes will be placed ne ft behind sidewalk. ii) Befre services are tapped, cut stakes must be installed at prperty line. Cut stakes shall shw the tp back f curb lcatin and elevatin. iii) All service fittings will be brass and installed by the CONTRACTOR. iv) All saddles will be tightened with a trque wrench and meet pipe manufactures recmmendatins. 6) Strm Drain

21 a) Manhle lids marked STORM DRAIN b) Snuts required in inlets fr pre-treatment. 7) Utility Cnduits a) 4-inch gray PVC in bundles f three lcated at legs f intersectin, bulb f cul-de-sacs and every 300-feet r as indicated n the plans. b) All lcatins shall be stamped with U n the curb at the cnduit crssing. 8) Street Lighting a) All street light wiring t be installed in cnduit per street Light Base Detail. b) All wiring t be run in cnduit. c) Seven (7) day burn tests required. 9) Traffic 10) Park Strip A) All cnstructin signing, barricading, and traffic delineatin shall cnfrm t the Manual n Unifrm Traffic Cntrl Devices (MUTCD), Latest Editin. B) Befre any wrk is started in the right-f-way, the Cntractr shall install all advance warning signs fr the cnstructin zne. C) The Cntractr shall install temprary stp signs at all new street encrachments int existing public right f ways where warranted immediately after first grading wrk is accmplished, and shall maintain said signs until permanent signs are installed. D) If it is determined by the Public Wrks Department that a schl zne is encrached upn by a cnstructin wrk zne and it is determined there is a need fr students t be assisted in the safe crssing thrugh that wrk zne, the schl shall be ntified and the Cntractr shall be required t prvide a qualified crssing guard. The guard shall be present fr the full duratin f time thse children are likely t be present and/r as requested by the schl. E) If the imprvements necessitate the bliteratin, temprary bstructin, temprary remval, r relcatin f any existing traffic pavement marking, such pavement marking shall be restred r replaced with like materials t the satisfactin f the City Engineer r designee. F) The Cntractr shall be respnsible fr prviding and installing all permanent signs shwn n the plans. Street name signs shall cnfrm in their entirety t current City Standards. All ther signs shall be standard size unless therwise specified n the plans. All sign psts shall be installed in accrdance with the current City Standards. G) All permanent traffic cntrl devices called fr heren shall be in place and in final psitin prir t allwing any public traffic nt the prtins f the rad(s) being imprved hereunder, regardless f the status f cmpletin. H) The Cntractr shall prvide barricades, signs, flashers, ther equipment, and flag persns necessary t insure safety f wrkers and visitrs. A) All cnstructin debris t be remved (i.e. n cncrete).

22 B) T be filled with native tp sil level with tp f curve (n rcks greater than 3- inchs). 11) Punch List Time A) Per APWA (1.1 A. 44) Highland City defines the time fr cmpletin f the punch list items t be 30 days.

23 Partial Bnd Release Fr the first release, it is recmmended that yu wrk with the public wrks secretary t ensure understanding and an expeditius prcess. Fr all releases, Public Wrks will accept s and faxes. I) Develper makes a request fr partial bnd release n the Highland City Draw Sheet. Fund in the precnstructin package and n the CD. Cntractr s invices must be submitted fr release. Escrw Infrmatin: Cmpany Escrw Cntact Address Office Phne Office Fax Develper Infrmatin: Cmpany Develper Cntact Address Office Phne Office Fax II) Cpies g t inspectrs t verify quality and quantity. Prblems and issues addressed befre partial release. III) Inspectr Apprval Release faxed t bank (escrw cmpany) fr release t cntractrs.

24 Highland City Final Inspectin Frm Date: / / Please cnsider this check list as a request fr final inspectin f the Subdivisin t begin the tw year warranty perid. In rder t expedite the prcess f final inspectin, the fllwing list has been created that shws many f the items lked fr in the final inspectin prcess. By signing this frm, yu are certifying that yu have persnally inspected the prject and that the fllwing items are cmpleted and that yu are ready fr a final inspectin f the prject. Yu als understd that this list is nt an all inclusive list and that these are nly items seen n a typical basis; therefre, yu acknwledge that there may be ther items that culd be added t a punch list that will need t be cmpleted befre the warranty perid begins. I) Sewer Air Tested Highland City Standard Results turned in t Highland City Public Wrks Deflectin tested Results turned in t Highland City Public Wrks Flushed Flushing Ball required Videed DVD turned in t Highland City Public Wrks fr review and acceptance Pipe inside f manhles gruted Manhles cleaned f all debris Manhles cncrete cllared APWA Specs Manhle lids marked SEWER Sewer Lateral Recrd (SLR) sheet turned in t Highland City Public Wrks Curb marks S fr all laterals 2 X 4 painted green at end f laterals II) Water All testing cmpleted Bacteria, Chlrine Residual, Pressure Water valves raised t grade and cllared APWA Specs Water valve stand cleaned f debris Water meter cans at grade Water meter cans cleared f all debris and cnduit accessible Water valve lids marked WATER Curb marks W at all services 2 X 4 painted blue at end f cnduit

25 III) Pressurized Irrigatin Irrigatin bxes raised t grade Water valve stands cleaned f debris Water valve lids marked IRRIGATION Pressurized Irrigatin Lateral Recrd (PILR) sheet turned in t Highland City Public Wrks Stp and Waste Valves straight in bx with tracer wire visible Curb marks I at all services Water valves raised t grade and cllared APWA Specs IV) Strm Drain Inlet bxes cleaned Sump verflws gruted and installed Bicycle safe grates n inlets Manhle lids marked STORM DRAIN Gruted Sumps and pretreatment Per Highland City Standards and Specificatins V) Rads and Surface Rads cleaned Sidewalks clear f all material Waste material cleared frm prject right f way Prperty brass pins in curb N brken r cracked curb and gutter N brken r cracked sidewalk Park strips filled with native tpsil t tp f curb (n rcks greater than 3-inch) All street mnuments installed and cllard All city required cnduits and curb duble ntched fr lcatin All utilities cncrete cllard APWA Specs I certify that I have reviewed the check list and that all f the items are cmpleted t the best f my knwledge; therefre, I request that Highland City Public Wrks d a final inspectin walk thru fr the purpses f generating a final punch list. Signature Date / / Printed Name Phne Number

26 Warranty Bnd Release Building plan reviews will nt begin until the final cmpletin f the prject including the punch list items. Fr pen space subdivisins, yu will be required t install all trails fr release. IV) Develper submits a Final Inspectin Request Frm fund in the Pre-Cn Package This ensures that the develper and the cntractr have visited the site prir t the City inspectin. All items n the frm need t be addressed befre City inspectin takes place. V) Public Wrks and Engineering will generate a punch list fr the subdivisin. This prcess will take place with Public Wrks Staff nly. Five (5) wrking days t cmplete Cpy t develper and t cntractr. VI) Cntractr t cmplete listed items Cntractr r develper resubmits. VII) Public Wrks and Engineering t verify cmpletin and cmpliance Three (3) wrking days t cmplete VIII) Apprval granted frm Highland City Engineer fr the warranty perid t begin. Letter f warranty perid sent t develper and t Highland City.

27 HIGHLAND PUBLIC WORKS ENGINEERING DIVISION 5378 West Nrth Highland, Utah ext 115 Fax Signature f Understanding It has been explained t me and I understand that n building plans may be submitted fr review until the final cmpletin and acceptance f the subdivisin (100% cmpletin) which includes the punch list items. Signature / / Date Printed name

28 SECTION IV CONSTRUCTION

29 I) Submittals and Tests Reprts Item Cmpactin Sewer Drinking Water Pressurized Irrigatin Water Mdels Rad cut permit Irrigatin Asphalt Engineering Submittals Descriptin Getechnical (submitted during review prcess) Strm Drain (submitted during review prcess) In trenches every 200 and every 2 f lift. Rad and sidewalk. Cut sheets Pressure Deflectin Vide (DVD) Thrust blcks batch tickets and apprval letters fr engineered blcks Pressure test Chlrine Residual Testing and Flushing Bacteria testing Thrust blcks Pressure test and flushing Drinking Water System Pressurized Irrigatin System Shw the prpsed subdivisins affects n the zne List mdel design criteria (i.e. c-factrs) Apprval by apprpriate ditch cmpanies Batch ticket

30 Engineering Inspectins II) Inspectins Perfrmed by City Inspectrs (schedule 2 days in advance) Item Descriptin Sewer laterals 2% slpe n laterals Thrust blcks PI and water befre and during t inspect the cavity, cllect batch ticket Pressure tests PI and water Disinfectin Cllected by the city (retests will be paid by the Cntractr) Prf rlling Rad, curb, and sidewalk. Water truck t be prvided by the cntractr. Sewer pressure tests Sewer deflectin 5% mandrel test Water cnnectins Ht taps r cut ins Curb and gutter Flw test perfrmed by Engineering Inspectrs befre asphalt Asphalt Batch ticket, verifying ambient, grund, and mix temperature

[Note to Engineer: Choose one below. Confirm with your geotech if you need further compaction.]

[Note to Engineer: Choose one below. Confirm with your geotech if you need further compaction.] 2-06 SUBGRADE PREPARATION (******) 2-06.3 Cnstructin Requirements 2-6.3(1) Subgrade fr Surfacing This sectin is supplemented with the fllwing: The subgrade must be suitable, as determined by the Engineer,

More information

Draper City SWPPP Checklist

Draper City SWPPP Checklist Draper City SWPPP Checklist FOR PROJECTS LESS THAN 1 ACRE AND NOT PART OF A COMMON PLAN OF DEVELOPMENT TABLE OF CONTENTS I. Submittal requirements II. Review/Prvide at time f initial SWPPP Inspectin: III.

More information

FLOOD CONTROL DETENTION PLAN REVIEW CHECKLIST November, 2008

FLOOD CONTROL DETENTION PLAN REVIEW CHECKLIST November, 2008 FLOOD CONTROL DETENTION PLAN REVIEW CHECKLIST Office Use: Case N: Review Date: Reviewer: Detentin Plan Review Checklist This Plan Review Checklist is designed as a tl t assist the design engineer and review

More information

Building Permit Application Accessory Buildings/ Detached Garages

Building Permit Application Accessory Buildings/ Detached Garages Parkland Cunty 53109A Hwy 779 Parkland Cunty, Alberta T7Z 1R1 Phne: (780) 968-8888 Fax: (780) 968-3225 Tll Free: 1-888-880-0858 Email: safetycdest@parklandcunty.cm Building Permit Applicatin Accessry Buildings/

More information

CITY OF MIAMI ENVIRONMENTAL RESOURCES Tree Permit Process and Checklist

CITY OF MIAMI ENVIRONMENTAL RESOURCES Tree Permit Process and Checklist Page 1 f 6 CITY OF MIAMI ENVIRONMENTAL RESOURCES Tree Permit Prcess and Checklist Submittals: Tree Permit Prcess 1. Cmpleted tree permit applicatins, alng with the required supprting dcumentatin, must

More information

TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE

TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE TOWN OF PAYSON WATER DEPARTMENT BACKFLOW PREVENTION PROGRAM CUSTOMER INFORMATION PACKAGE TOWN OF PAYSON Backflw Preventin Prgram Develpers, Cntractrs and Paysn Residents: An apprved backflw preventin assembly

More information

SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION

SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION SEWAGE SYSTEM PERMIT APPLICATION INSTRUCTIONS FOR COMPLETION Incmplete applicatins will nt be prcessed. Accepted applicatins must include the fllwing cmpleted frms: Prvincial Frms: Applicatin t Cnstruct

More information

TG 19 SOUTH AUSTRALIAN WATER CORPORATION

TG 19 SOUTH AUSTRALIAN WATER CORPORATION TG 19 SOUTH AUSTRALIAN WATER CORPORATION TECHNICAL GUIDELINE Checklist: Water Netwrk Requirements fr Land Develpment Applicatins Issued by: Principal Engineer Water & Wastewater Netwrks Issue Date: SA

More information

Cleves Pump Station Stabilization, Project ID Date Issued: August 6, 2012

Cleves Pump Station Stabilization, Project ID Date Issued: August 6, 2012 Cleves Pump Statin Stabilizatin, Prject ID 10210020 Date Issued: August 6, 2012 ADDENDUM NO. 2 This addendum will nly be distributed via e-mail, but will remain available fr viewing n the MSDGC website

More information

Instructions Fee Schedule

Instructions Fee Schedule City f Lndn Tree Prtectin By-Law C.P.-1515-228 Tree Prtectin Area Permit Applicatin Frestry Management Planning Services - Urban Frestry 267 Dundas Street, 3rd Flr Lndn, Ontari N6A 1H2 Telephne: 519-661-CITY

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Strmwater Pllutin Preventin Plan NUMBER: SPECIFIC SUBJECT: APPROVAL: Strmwater

More information

OLIVENHAIN MUNICIPAL WATER DISTRICT DCMWTP SEWER MANHOLE REHAB PROJECT Pre-Bid Meeting Minutes (All changes/updates are shown in italics)

OLIVENHAIN MUNICIPAL WATER DISTRICT DCMWTP SEWER MANHOLE REHAB PROJECT Pre-Bid Meeting Minutes (All changes/updates are shown in italics) RHB Cpl OLIVENHAIN MUNICIPAL WATER DISTRICT DCMWTP SEWER MANHOLE REHAB PROJECT Pre-Bid Meeting Minutes (All changes/updates are shwn in italics) Date and Time: Tuesday June 19, 2018 10:00 AM Lcatin: DCMWTP

More information

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority

Request for Proposals. Develop a New Personnel Policy Manual. for the. Red Wing Housing and Redevelopment Authority Request fr Prpsals t Develp a New Persnnel Plicy Manual fr the Red Wing Husing and Redevelpment Authrity March 20, 2015 Red Wing Husing and Redevelpment Authrity 428 West Fifth Street Red Wing, MN 55066

More information

WETLAND AND RIVER CROSSINGS: GENERIC CROSSING PROCEDURE

WETLAND AND RIVER CROSSINGS: GENERIC CROSSING PROCEDURE METHOD STATEMENT Wetland and River Crssings METHOD STATEMENT WETLAND AND RIVER CROSSINGS: GENERIC CROSSING PROCEDURE 0 02.07.2012 Issued fr Review Semane Jnes & Wagener Rev. Date Reasn fr Issue Prepared

More information

Table of Contents. London BRT Transit Project Assessment Process Draft Environmental Project Report

Table of Contents. London BRT Transit Project Assessment Process Draft Environmental Project Report Lndn BRT Transit Prject Assessment Prcess Draft Envirnmental Prject Reprt Table f Cntents 6 Permits and Apprvals... 6-1 Federal... 6-2 Prvincial... 6-2 Municipal... 6-3 Utilities... 6-3 Institutins...

More information

SOURCE INSPECTION QUALITY MANAGEMENT PLAN

SOURCE INSPECTION QUALITY MANAGEMENT PLAN SOURCE INSPECTION QUALITY MANAGEMENT PLAN Campus Parkway / State Rute 140 Prject BAR REINFORCEMENT APPENDIX I Table f Cntents 1 GENERAL... 3 1.1 Certificatins... 3 1.1.1 Black Bar Reinfrcement... 3 1.1.2

More information

May 10, Nathaniel N. Strosberg Town Planner/Director of Community Development Town of Ashland 101 Main Street Ashland, Massachusetts 01721

May 10, Nathaniel N. Strosberg Town Planner/Director of Community Development Town of Ashland 101 Main Street Ashland, Massachusetts 01721 Nathaniel N. Strsberg Twn Planner/Directr f Cmmunity Develpment Twn f Ashland 101 Main Street Ashland, Massachusetts 01721 Re: 73 Olive Street Definitive Subdivisin Plan Dear Mr. Strsberg and Members f

More information

DRAFT Sampling Protocol For the LEED Canada for Homes Program Applicable to production builders (Balloted Version)

DRAFT Sampling Protocol For the LEED Canada for Homes Program Applicable to production builders (Balloted Version) DRAFT Sampling Prtcl Fr the LEED Canada fr Hmes Prgram Applicable t prductin builders (Ballted Versin) This dcument prvides guidance n using the Sampling Prtcl t verify LEED Hmes. It includes infrmatin

More information

New Product Approval Process

New Product Approval Process New Prduct Apprval Prcess 1. Scpe T prvide an assessment f the suitability f a new prduct fr prcurement and use by Manitba Infrastructure (MI). Manitba Infrastructure may require updates, resubmissin f

More information

PERMIT REQUIREMENTS. City of West Park Permit Application (signed and notarized by the owner and contractor)

PERMIT REQUIREMENTS. City of West Park Permit Application (signed and notarized by the owner and contractor) CITY OF WEST PARK ROOF AND REROOF PERMIT PACKAGE PERMIT REQUIREMENTS City f West Park Permit Applicatin (signed and ntarized by the wner and cntractr) Cntract signed between wner and cntractr *All cntracts

More information

Project: Sydney Metro - Utility in stigations, Application Title:

Project: Sydney Metro - Utility in stigations, Application Title: Sydney Metr Integrated Management System (IMS) (Uncntrlled when printed) Iv' sydney METRO Pre-Cnstructin Minr Wrks Apprval Frm Minr Wrks are defined as any lw impact activities that are undertaken prir

More information

TOWN OF REGINA BEACH 218 Centre Street, Box 10, Regina Beach SK, S0G 4C0 Telephone: Fax:

TOWN OF REGINA BEACH 218 Centre Street, Box 10, Regina Beach SK, S0G 4C0 Telephone: Fax: TOWN OF REGINA BEACH 218 Centre Street, Bx 10, Regina Beach SK, S0G 4C0 Telephne: 729-2202 Fax: 729-3411 E-mail: twnfreginabeach@sasktel.net DEVELOPMENT/BUILDING PERMIT REQUIREMENTS AND INFORMATION FOR

More information

TOWN OF REGINA BEACH 218 Centre Street, Box 10, Regina Beach SK, S0G 4C0 Telephone: Fax:

TOWN OF REGINA BEACH 218 Centre Street, Box 10, Regina Beach SK, S0G 4C0 Telephone: Fax: TOWN OF REGINA BEACH 218 Centre Street, Bx 10, Regina Beach SK, S0G 4C0 Telephne: 729-2202 Fax: 729-3411 E-mail: twnfreginabeach@sasktel.net DEVELOPMENT/BUILDING PERMIT REQUIREMENTS AND INFORMATION FOR

More information

FLOOD HAZARD ZONE DEVELOPMENT PERMIT

FLOOD HAZARD ZONE DEVELOPMENT PERMIT COUNTY OF MENDOCINO DEPARTMENT OF PLANNING AND BUILDING SERVICES 860 NORTH BUSH STREET UKIAH CALIFORNIA 95482 120 WEST FIR STREET FORT BRAGG CALIFORNIA 95437 STEVE DUNNICLIFF, DIRECTOR PHONE: 707-234-6650

More information

Facilities Study Report

Facilities Study Report Wellhead Pwer Cltn, LLC Facilities Study Reprt Revised May 15, 2014 Prepared by: Edgar Ramirez Rger Salas, P.E. Distributin Field Engineering Apprved by: Rger Salas Distributin Field Engineering Manager

More information

DECK PERMIT INFORMATION

DECK PERMIT INFORMATION DECK PERMIT INFORMATION REQUIRED INFORMATION: 1) A Plt Plan shwing the prpsed deck with the distances t the side rear and frnt f prperty lines. Als, shw lcatins f existing structures and septic system

More information

DEPARTMENT OF WATERSHED MANAGEMENT SITE DEVELOPMENT PLAN REVIEW

DEPARTMENT OF WATERSHED MANAGEMENT SITE DEVELOPMENT PLAN REVIEW DEPARTMENT OF WATERSHED MANAGEMENT SITE DEVELOPMENT PLAN REVIEW SUBMITTAL REQUIREMENTS ONE & TWO FAMILY RESIDENTIAL I. General 1. Cmplete plans- All plans submitted fr permit review must be cmplete and

More information

CALL FOR ARTIST OR ARTIST TEAM Request for Qualifications

CALL FOR ARTIST OR ARTIST TEAM Request for Qualifications CALL FOR ARTIST OR ARTIST TEAM Request fr Qualificatins Artwrk Opprtunity The City f Bellingham is seeking an artist r artist team t design, fabricate and install artwrk at the Nrth End Reginal Pnd (NERP)

More information

Arkansas City Public Schools

Arkansas City Public Schools Arkansas City Public Schls 2545 Greenway, Arkansas City, KS 67005 Phne: 620-441-2000 Fax: 620-441-2009 www.usd470.cm Request fr Prpsal USD 470 Arkansas City Public Schls Career and Technical Educatin July

More information

VEHICLE MILES TRAVELED (VMT)

VEHICLE MILES TRAVELED (VMT) DATE: April 13, 2017 TO: FROM: RE: San Francisc Planning Department Transprtatin Cnsultants Wade Wietgrefe, Senir Planner In September 2016, a memrandum was sent t the transprtatin cnsultant pl regarding

More information

Commercial Tax Abatement

Commercial Tax Abatement A cnfirmatin letter is issued by the City upn receipt f this applicatin. This applicatin is nt effective and nt cnsidered filed until the cnfirmatin letter has been issued. Filing des nt assure the apprval

More information

Eagle Scout Notebook Golden Eagle District (October 22, 2012)

Eagle Scout Notebook Golden Eagle District (October 22, 2012) Eagle Scut Ntebk Glden Eagle District (Octber 22, 2012) Purpse The purpse f this dcument is guide the Eagle Scut candidate thugh the prcess f creating the Eagle Scut Ntebk that is t be submitted t the

More information

Memo. Background. South Rochford Road Type recipient(s) here HDR, Inc. Roadway Options for Protection of Iron Fen Wetlands. Rochford Cemetery Fen

Memo. Background. South Rochford Road Type recipient(s) here HDR, Inc. Roadway Options for Protection of Iron Fen Wetlands. Rochford Cemetery Fen Mem Date: Mnday, January 05, 2015 Prject: T: Frm: Subject: Suth Rchfrd Rad Type recipient(s) here HDR, Inc. Radway Optins fr Prtectin f Irn Fen Wetlands Backgrund Sphagnum angustiflium a U.S. Frest Service

More information

OWNER S MANUAL. MODEL FE (ALL) Serial number

OWNER S MANUAL. MODEL FE (ALL) Serial number VESTIL MANUFACTURING CORP. 2999 N. Wayne St., Angla, IN 46703 Ph: 260-665-7586 Fax: 260-665-1339 E-mail: sales@vestil.cm www.vestil.cm Rutine Maintenance & Safety Checks 2 Operatin Instructins... 2 10/05

More information

CHAPTER EIGHT ELECTRICAL ITEMS

CHAPTER EIGHT ELECTRICAL ITEMS CHAPTER EIGHT ELECTRICAL ITEMS 8 ELECTRICAL ITEMS 8 OVERV IEW Electrical items have different dcumentatin requirements fr each unit f measure (UOM). All electrical items must be cunted and measured. Dcumentatin

More information

MEVION SOURCING STRATEGY SUPPLIER CODE OF CONDUCT

MEVION SOURCING STRATEGY SUPPLIER CODE OF CONDUCT MEVION SOURCING STRATEGY The MEVION S250, while being the mst cmpact prtn therapy system in the wrld, is still a relatively large and cmplex prduct. As such, ur supply chain utilizes a high-mix, lw vlume

More information

CHAPTER ELEVEN LIQUID AND EMULSIFIED ASPHALT ITEMS

CHAPTER ELEVEN LIQUID AND EMULSIFIED ASPHALT ITEMS CHAPTER ELEVEN LIQUID AND EMULSIFIED ASPHALT ITEMS 11 LIQUID AND EMULSIFIED ASPHALT ITEMS 1 1 OVERV IEW All Liquid and emulsified asphalt items have a unit f measure (UOM) f tns r square yards. All liquid

More information

BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING?

BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING? BROCHURE # 50 DOES MY BUILDING DESIGN NEED ENGINEERING? Overview Building cnstructin has becme increasingly cmplex during the last tw decades. Buildings are larger and use new materials and cnstructin

More information

County Road 106 (271 st Street) Road & Utility Improvements HDR, all rights reserved.

County Road 106 (271 st Street) Road & Utility Improvements HDR, all rights reserved. 2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Cunty Rad 106 (271 st Street) Rad & Utility Imprvements 2014 HDR, all rights reserved. Prject Overview Traffic Vlumes Est. 29,500

More information

STAFF REPORT. Peter Zielsdorf

STAFF REPORT. Peter Zielsdorf STAFF REPORT Applicatin: Cnstruct a new septic drainfield t replace the existing drainfield apprximately 64 feet frm Mink Lake (min. 75 ft required). Applicant: Agenda Item: 4(a) Peter Zielsdrf Backgrund

More information

Residential Decks. Building Permit Information Guide

Residential Decks. Building Permit Information Guide Residential Decks Building Permit Infrmatin Guide Municipal Office Bx 70, 263 Main St. Odessa, Ontari K0H 2H0 Phne: 613-386-7351 www.lyalisttwnship.ca Office Hurs Winter September thrugh April Mn Fri 8:30

More information

CITY OF FATE COMMERCIAL BUILDING PERMIT PROCESS. Adopted Codes:

CITY OF FATE COMMERCIAL BUILDING PERMIT PROCESS. Adopted Codes: CITY OF FATE COMMERCIAL BUILDING PERMIT PROCESS Adpted Cdes: 2009 INTERNATIONAL BUILDING CODE 2009 INTERNATIONAL ENERGY CONSERVATION CODE 2009 INTERNATIONAL PLUMBING CODE 2009 INTERNATIONAL FIRE CODE 2009

More information

NJDEP PROPOSES TO CHANGE FLOOD HAZARD AREA CONTROL ACT RULES

NJDEP PROPOSES TO CHANGE FLOOD HAZARD AREA CONTROL ACT RULES NJDEP PROPOSES TO CHANGE FLOOD HAZARD AREA CONTROL ACT RULES NJDEP has prpsed far-reaching regulatins which culd effect stream encrachment wetlands and buffers alng streams and tidal areas. Key highlights

More information

ICP Linking and Fusing Service Enquiry Procedure

ICP Linking and Fusing Service Enquiry Procedure UK Pwer Netwrks ICP Linking and Fusing Service Enquiry Prcedure Owner Name Title Neil Clarke Head f Highway Services Signature Date 03 April 2018 Authriser Name Title Kevin Newnham Majr Prgrammes & ICP

More information

Erosion and Sediment Control Plan (ESCP) Review Checklist

Erosion and Sediment Control Plan (ESCP) Review Checklist Ersin and Sediment Cntrl Plan (ESCP) Review Checklist General Infrmatin: Review Date: Prject Name: Prject Address: Legal Respnsible Persn: Persn Perfrming the Review: Reviewer s Certificatin: QSD N. Wrking

More information

REQUEST FOR PROPOSAL KITCHEN FOOD SERVICE EQUIPMENT NEW ORANGEBURG COUNTY DETENTION CENTER ORANGEBURG, SOUTH CAROLINA REQUISITION NO: FY

REQUEST FOR PROPOSAL KITCHEN FOOD SERVICE EQUIPMENT NEW ORANGEBURG COUNTY DETENTION CENTER ORANGEBURG, SOUTH CAROLINA REQUISITION NO: FY REQUEST FOR PROPOSAL KITCHEN FOOD SERVICE EQUIPMENT FOR NEW ORANGEBURG COUNTY DETENTION CENTER ORANGEBURG, SOUTH CAROLINA REQUISITION NO: FY18-0424 ISSUED APRIL 9, 2018 RESPONSE DUE TUESDAY, APRIL 24,

More information

Extended Inventory Items

Extended Inventory Items Extended Inventry Items Using the Item Number SmartFinder buttn Extended Inventry Items Extended Inventry Items is an enhanced replacement fr the Sage I/C Items screen. It prvides yu with mre functinality

More information

Appendix A outlines what Bankline can offer to schools, in terms of online payments.

Appendix A outlines what Bankline can offer to schools, in terms of online payments. Access fr Schls t Make Online Payments by Bankline A number f maintained schls have requested that the LA makes a prcess fr undertaking nline payments available t them (currently they undertake payments

More information

EAGLE SCOUT CANDIDATE PREPARATION GUIDE. The Eagle Scout Service Project

EAGLE SCOUT CANDIDATE PREPARATION GUIDE. The Eagle Scout Service Project September 2018 ~ Previus versins nt valid Sufflk Cunty Cuncil By Scuts f America EAGLE SCOUT CANDIDATE PREPARATION GUIDE T maintain the high standards f excellence recgnized in thse wh have achieved the

More information

Activity Application Form

Activity Application Form Activity Applicatin Frm (Sectin 68 Lcal Gvernment Act 1993) Applicants details (wner s cnsent must be prvided if yu are nt the prperty wner) Applicant Name Address Pstcde Telephne ( ) Fax ( ) Email Signature

More information

Company Accounts are identified by a 4-5 digit account number and can be used in all company stores nationally.

Company Accounts are identified by a 4-5 digit account number and can be used in all company stores nationally. TRADE ACCOUNTS (This sectin is t be read in cnjunctin with Custmer Orders V2) POLICY Beacn Lighting seeks t fster custm with all relevant streams f the Building Industry. Team Members must carefully fllw

More information

Activity=>Sales Order and Invoice=>Create Invoices

Activity=>Sales Order and Invoice=>Create Invoices Create Invice Menu Path Functin Activity=>Sales Order and Invice=>Create Invices There are several different ways t create invices: 1. Custmers pick up the merchandise and create invice while the custmer

More information

Revision Date: May Paragraph Table of Contents Page. 1.0 Scope Purpose Overview of Steps Approving an MRA Document 5

Revision Date: May Paragraph Table of Contents Page. 1.0 Scope Purpose Overview of Steps Approving an MRA Document 5 f 6 Dcument Owner: Justin Lee Owners Department: Supply Chain Management Paragraph Table f Cntents Page.0 Scpe 3 2.0 Purpse 3 3.0 Respnsibilities 3 4.0 MRA Term Definitins 3 5.0 Overview f Steps Apprving

More information

3. Direct the Engineer to prepare a feasibility study that complies with the requirements of the USACE and BCWMC criteria.

3. Direct the Engineer to prepare a feasibility study that complies with the requirements of the USACE and BCWMC criteria. Memrandum T: Bassett Creek Watershed Management Cmmissin Frm: Barr Engineering C. Subject: Item 6Dii Cnsider Apprval f Prpsal t Prepare Feasibility Study fr Westwd Lake Water Quality Imprvement Prject

More information

City of Vancouver Planning By-law Administration Bulletins

City of Vancouver Planning By-law Administration Bulletins City f Vancuver Planning By-law Administratin Bulletins Planning, Urban Design and Sustainability Department 453 West 12th Avenue, Vancuver, BC V5Y 1V4 tel: 3-1-1, utside Vancuver 604.873.7000 fax: 604.873.7100

More information

(Base Bid Only) $ 1,891, $ 1,997, $ 2,100, $ 2,227, Budget Account Information

(Base Bid Only) $ 1,891, $ 1,997, $ 2,100, $ 2,227, Budget Account Information TO: Anna Mre, Interim Cunty Manager David Larsn, Assistant Cunty Manager FROM: W. F. White, Purchasing Directr DATE: May 6, 2013 SUBJECT: PURCHASE RECOMMENDATION: BID# 2120 Design-Build Delivery f a Fire

More information

ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL

ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL ALABAMA STATE PORT AUTHORITY REQUEST FOR PROPOSAL PROFESSIONAL SERVICE CONTRACT PIER B SOUTH REHABILITATION RFQ Number: ASPA-TS-2018-02 MARCH 2018 REQUEST FOR QUALIFICATIONS (RFQ) FOR ENGINEER DESIGN &

More information

PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2

PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2 PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2 ADDENDUM 2 des nt change the due date r time. STATEMENTS OF INTEREST are due by 4:30:00 p.m. (lcal time) Due Date: May 4, 2017 Successful Offerrs will be

More information

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap Digital Advisry Services Prfessinal Service Descriptin Sftware Defined Netwrking Strategy and Radmap 1. Descriptin f Services. 1.1 Sftware Defined Netwrking Strategy and Radmap. Verizn will prvide Sftware

More information

The BLOOM Performance Review Decision Guide

The BLOOM Performance Review Decision Guide The BLOOM Perfrmance Review Decisin Guide Intrductin Planning yur perfrmance review prcess needs careful cnsideratin. Sme questins yu might be cnsidering are: 1. Hw ften will the rganizatin cmplete frmal

More information

NEW LAWS REGARDING BUILDING PRODUCTS (QLD)

NEW LAWS REGARDING BUILDING PRODUCTS (QLD) BUILDING SERVICES Ref: LEG 17-05 Current at Nvember 2017 NEW LAWS REGARDING BUILDING PRODUCTS (QLD) Frm 1 Nvember new laws regarding nn-cnfrming building prducts apply t all building prjects in Queensland.

More information

The PennEast Pipeline Project. Delaware Township, New Jersey September 29, 2014

The PennEast Pipeline Project. Delaware Township, New Jersey September 29, 2014 The Prject Delaware Twnship, New Jersey September 29, 2014 Abut the Prject AGL Resurces; NJR Pipeline Cmpany; PSEG Pwer; Suth Jersey Industries; and UGI Energy Services (UGIES) cmprise Cmpany, LLC. Apprximately

More information

INTERCEPT SURVEY DATA GUIDE JUNE Visitor/Shopper Intercept Survey Data Guide

INTERCEPT SURVEY DATA GUIDE JUNE Visitor/Shopper Intercept Survey Data Guide Visitr/Shpper Intercept Survey Data Guide June 26, 2014 Table f Cntents 1 Intrductin... 3 1.1 Timeline... 3 1.2 Availability f Data... 3 2 Overview... 4 2.1 Summary f Cntents... 4 2.2 Data Dictinary...

More information

Los Angeles Unified School District Office of Environmental Health & Safety Tree Trimming and Removal Procedure

Los Angeles Unified School District Office of Environmental Health & Safety Tree Trimming and Removal Procedure Ls Angeles Unified Schl District Office f Envirnmental Health & Safety Tree Trimming and Remval Prcedure I. Purpse This Tree Trimming and Remval Prcedure (Prcedure) was develped t ensure the District is

More information

MARINE CONSENTS GUIDANCE

MARINE CONSENTS GUIDANCE MARINE CONSENTS GUIDANCE FEBRUARY 2008 CONTROLLED DOCUMENT STATUS PROJECT TITLE DOCUMENT TITLE DOCUMENT REF BR Marine Cnsents Guide.dc REVISION RECORD STATUS DATE SUMMARY OF CHANGES CHECKED APPROVED 0

More information

CDM Plan Submission and Review Criteria Rules

CDM Plan Submission and Review Criteria Rules Cnservatin First Framewrk LDC Tl Kit Final v4.0 January 17, 2018 CDM Plan Submissin and Review Rules 1) Purpse and definitins 1.1 These Rules set ut: a) the rles, respnsibilities and timing fr CDM Plan

More information

Guidelines for Designing Backflow Prevention Assembly Installations

Guidelines for Designing Backflow Prevention Assembly Installations Guidelines fr Designing Backflw Preventin Assembly Installatins Supplement t the 1981 Crss Cnnectin Cntrl Manual - January 1992 Purpse The purpse f these guidelines is t augment and/r clarify thse guidelines

More information

DIVISION 7 SEWER DESIGN STANDARDS

DIVISION 7 SEWER DESIGN STANDARDS DIVISION 7 SEWER DESIGN STANDARDS 7.1 Intrductin Design prcedures shall cnfrm t accepted engineering practices, and shall be certified by a registered prfessinal engineer, licensed by the State f Washingtn.

More information

FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP

FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP FREQUENTLY ASKED QUESTIONS REMEDIATION TECHNOLOGIES WORKSHOP Objectives Q1. What are the bjectives f the Remediatin Technlgies prjects? A1. Kuwait Oil Cmpany is cmmitted t a sustainable remediatin slutin

More information

Procurement Gateway & I Want Doc User Guide https://gateway.procurement.cornell.edu/

Procurement Gateway & I Want Doc User Guide https://gateway.procurement.cornell.edu/ Prcurement Gateway & I Want Dc User Guide https://gateway.prcurement.crnell.edu/ Prcurement Gateway Once yu lg int the Prcurement Gateway, the system will identify wh yu are and yur primary FTC/BSC yu

More information

In 1961 a new Lift Station was constructed, the trickling filter was repaired and some minor modifications were made to the treatment plant.

In 1961 a new Lift Station was constructed, the trickling filter was repaired and some minor modifications were made to the treatment plant. WITH TIME COMES CHANGE This is true with everything, Yes even in the wnderful wrld f wastewater treatment. In the 1920 s we were knwn as the Sanitary Sewage Department, in 1951 Plant City Sewage Treatment

More information

M. Conner Name: A 1/60 scale model truss bridge is to be designed and built using standard file folders.

M. Conner Name: A 1/60 scale model truss bridge is to be designed and built using standard file folders. M. Cnner Name: EA2: Truss Design Assignment Date: Perid: Prblem Statement: A 1/60 scale mdel truss bridge is t be designed and built using standard file flders. Design Requirements: The scale mdel must

More information

BUTLERiCONNECT Co-Marketing Program for Butler Builders Funds Use & Program Guidelines

BUTLERiCONNECT Co-Marketing Program for Butler Builders Funds Use & Program Guidelines BUTLERiCONNECT C-Marketing Prgram fr Butler Builders Funds Use & Prgram Guidelines Cngratulatins! As a Butler Builder, yu are eligible t participate in the BUTLERiCONNECT Marketing Prgram ( Prgram ). The

More information

MONOPOUR PREFAB SYSTEM

MONOPOUR PREFAB SYSTEM Enter Prject Name Enter Prject Number (Nte t Specifier: This dcument has been prepared fr Fab-Frm Industries Ltd. (Fastft prduct) in accrdance with the Cnstructin Specificatins Institute (CSI) Sectin Frmat.

More information

LRFD Bridge Design Manual. Bridge Office MINNESOTA DEPARTMENT OF TRANSPORTATION MANUAL

LRFD Bridge Design Manual. Bridge Office MINNESOTA DEPARTMENT OF TRANSPORTATION MANUAL MANUAL 5-392 MINNESOTA DEPARTMENT OF TRANSPORTATION Bridge Office LRFD Bridge Design Manual MnDOT BRIDGE OFFICE LRFD Bridge Design Manual Minnesta Department f Transprtatin 3485 Hadley Avenue Nrth Mail

More information

Appendix A Technical Specifications Panasonic Audio/Visual Conference Room Setup

Appendix A Technical Specifications Panasonic Audio/Visual Conference Room Setup Appendix A Technical Specificatins 96757 Panasnic Audi/Visual Cnference Rm Setup 1 Scpe f Wrk The purpse f this Invitatin t Negtiate (the "ITN") is t evaluate and select a vendr fr Audi Visual Cnference

More information

DINÉ COLLEGE Request for Proposals (RFP)

DINÉ COLLEGE Request for Proposals (RFP) DINÉ COLLEGE Request fr Prpsals (RFP) PROJECT NAME: Tsaile Security Department Mdular Stucc Prject PROJECT NUMBER: TS1819SDM1 RFP Submitted By: Hereinafter referred t as Cnstructin Cntractr : crpratin,

More information

1 INTRODUCTION AND SCOPE OF WORK

1 INTRODUCTION AND SCOPE OF WORK C & D Landfill 2 Landfill Rd Happy Valley Attentin: Christine Mrgan Dear Christine, RE: Review f Slpe Stability fr Resurce Cnsent, C & D Landfill, Happy Valley Our Reference: 09870.000.000 1 INTRODUCTION

More information

Quoting Website User Manual. Diamond Plastics Corporation 2/24/2012

Quoting Website User Manual. Diamond Plastics Corporation 2/24/2012 P a g e 1 Quting Website User Manual Diamnd Plastics Crpratin 2/24/2012 P a g e 2 Cntents Intrductin... 3 Lgin... 4 Hme Page... 5 Accepted Qutes... 5 Rejected Qutes... 5 Prvisinally Submitted Check Failed...

More information

Verification Summary Report (VSR) Instructions

Verification Summary Report (VSR) Instructions Verificatin Summary Reprt (VSR) Instructins The verificatin prcess must be dne at the spnsr (district) level. Accessing the VSR Lg int IWAS; Click n System Listing n the left side f the screen; Click n

More information

Nanogate Jay Systems

Nanogate Jay Systems Nangate Jay Systems Revisin: H Page 1 1.0 Purpse The purpse f this prcedure is t prvide fr a system and instructins t give each supplier the necessary tls t prvide prduct and services that meet the expectatins

More information

Sage 300 ERP Payroll Sage HRMS Link Integration Guide. April 2014

Sage 300 ERP Payroll Sage HRMS Link Integration Guide. April 2014 Sage 300 ERP Payrll Sage HRMS Link Integratin Guide April 2014 This is a publicatin f Sage Sftware, Inc. Dcument versin: April 16, 2014 Cpyright 2014. Sage Sftware, Inc. All rights reserved. Sage, the

More information

Draft Hazardous Substances and Spill Management Plan

Draft Hazardous Substances and Spill Management Plan Page 1 Draft Hazardus Substances and Spill Management Plan Cntents 1 Intrductin... 2 1.1 Purpse... 2 1.2 Scpe... 2 2 Hazardus Substances... 2 3 Persnnel and Respnsibilities... 3 4 Methdlgies... 3 4.1 Strage

More information

Michigan Local Public Health Accreditation Program Tool 2016 MPR Indicator Guide Section VI: Onsite Wastewater Treatment Management

Michigan Local Public Health Accreditation Program Tool 2016 MPR Indicator Guide Section VI: Onsite Wastewater Treatment Management MPR 1 The lcal health department shall have a wastewater treatment regulatin capable f prtecting the public health legally adpted under enabling state legislatin. The regulatin shall authrize an enfrcement

More information

Revised: To: Gabe Sevigny El Paso County Project Planner I

Revised: To: Gabe Sevigny El Paso County Project Planner I T: Gabe Sevigny El Pas Cunty Prject Planner I 11.24.17 Revised: 12.02.17 Purpse: Letter f intent fr a Rural Hme Occupatin El Pas Cunty Land Develpment Cde: 5.2.30 (B) File: EA-17-126 Chin 20270 Beacn Lite

More information

Secure Live Assessment and Administration Policy

Secure Live Assessment and Administration Policy Secure Live Assessment and Administratin Plicy Tests are an assessment f the learner s knwledge and understanding. The test papers and test items are Pearsn cpyright and shuld nt be reprduced r published

More information

2. Fill Out All the Fields Including: Account Number ( ) A) The Drop Down Menu (It holds the last 15 receivers you ve shipped to.

2. Fill Out All the Fields Including: Account Number ( ) A) The Drop Down Menu (It holds the last 15 receivers you ve shipped to. Find Webship 1. G t www.dhl.ca 2. Chse Ship Online > Ship Nw 3. Bkmark Page Register 1. Chse Register Yur User Prfile 2. Fill Out All the Fields Including: Accunt Number (970674553) Reference Field Yu

More information

ABLE Commission Q&A Q&A Regarding Licensing and Application

ABLE Commission Q&A Q&A Regarding Licensing and Application ABLE Cmmissin Q&A Q&A Regarding Licensing and Applicatin When can the interim licenses applicatins be submitted? They can be submitted between nw and September 30, 2018, hwever; the Able Cmmissin wuld

More information

Quality Hotel View is a full-service conference hotel located in Malmö, Sweden, and is a part of the hotel chain Nordic Choice Hotels.

Quality Hotel View is a full-service conference hotel located in Malmö, Sweden, and is a part of the hotel chain Nordic Choice Hotels. Privacy Plicy - Quality Htel View Quality Htel View is a full-service cnference htel lcated in Malmö, Sweden, and is a part f the htel chain Nrdic Chice Htels. This privacy plicy explains which persnal

More information

M. Conner Name: A 1/60 scale model truss bridge is to be designed and built using standard file folders.

M. Conner Name: A 1/60 scale model truss bridge is to be designed and built using standard file folders. M. Cnner Name: Date: Perid: Prblem Statement: A 1/60 scale mdel truss bridge is t be designed and built using standard file flders. Design Requirements: The scale mdel must be a truss with a ttal span

More information

Taleo Requisition Instructions

Taleo Requisition Instructions Tale Requisitin Instructins 3/27/18 Requisitin Explanatin and Instructins The requisitin is the manner in which a supervisr starts the hiring prcess fr a particular vacancy. Requests t fill vacant psitins

More information

LIFE SUPPORT INTERNATIONAL, INC. TERMS & CONDITIONS

LIFE SUPPORT INTERNATIONAL, INC. TERMS & CONDITIONS Rev 05.2018 LIFE SUPPORT INTERNATIONAL, INC. TERMS & CONDITIONS GENERAL Because f certain restrictins, (LSI) cannt ffer all prducts t all custmers. LSI Reserves the right t refuse sale f any prduct n ur

More information

Public Works Employee

Public Works Employee Psitin reprts t: Mayr and Cuncil Public Wrks Emplyee Psitin Functin: Test and mnitr all water and wastewater systems fr quality and prper peratin per DNR regulatins, maintain streets, curbs and sidewalks

More information

Managing Exceptions in Time & Labor A Guide for Approvers and Department Processors

Managing Exceptions in Time & Labor A Guide for Approvers and Department Processors Instructin Guide Managing Exceptins in Time & Labr A Guide fr Apprvers and Department Prcessrs Exceptins are prblems which prevent time and labr frm prcessing crrectly. It is imprtant that yu view exceptins

More information

2017 Co-Op Advertising Program

2017 Co-Op Advertising Program 2017 C-Op Advertising Prgram Applicatin Highlights: Designed t enhance marketing effrts with award amunts up t $3,000 in 50% matching funds Activities with a lcal fcus: May be apprved fr up t $1,000 i.e.,

More information

RE: ELLIOT LAKE Wastewater Treatment Plant Annual Performance Report

RE: ELLIOT LAKE Wastewater Treatment Plant Annual Performance Report March 6, 2018 Ministry f the Envirnment 70 Fster Drive, Suite 110 Sault Ste. Marie, ON P6A 6V4 ATTENTION: Safe Drinking Water Branch RE: ELLIOT LAKE Wastewater Treatment Plant Annual Perfrmance Reprt -

More information

Administrative Portal Data Management

Administrative Portal Data Management Administrative Prtal Data Management Reference Guide fr Prgram Managers, Prject Managers, and Supervisrs This guide is intended t supprt staff wh perfrm administrative tasks within the SAS system using

More information

Guidance notes for completing the International Start-up Form

Guidance notes for completing the International Start-up Form Guidance ntes fr cmpleting the Internatinal Start-up Frm These guidance ntes are designed t supprt yu in cmpleting the Internatinal start-up frm. Yu will als need t refer t a) yur Stage 2 applicatin frm

More information

PUBLIC WORKS DEPARTMENT Resource Recovery & Recycling Division CONSTRUCTION & DEMOLITION (C&D) WASTE MANAGEMENT PLAN

PUBLIC WORKS DEPARTMENT Resource Recovery & Recycling Division CONSTRUCTION & DEMOLITION (C&D) WASTE MANAGEMENT PLAN PUBLIC WORKS DEPARTMENT Resurce Recvery & Recycling Divisin CONSTRUCTION & DEMOLITION (C&D) WASTE MANAGEMENT PLAN Plan Check #: 1. GENERAL PROJECT INFORMATION: Over-the-Cunter Permit Yes N City-Spnsred

More information

The Basics of Polk County s Impervious Surface Regulations

The Basics of Polk County s Impervious Surface Regulations The Basics f Plk Cunty s Impervius Surface Regulatins Plk Cunty Land Infrmatin Department Plk Cunty Gvernment Center 100 Plk Cunty Plaza, Suite 130 Balsam Lake, WI 54810 715-485-9111 715-485-9246 Fax www.c.plk.wi.us/landinf/zning

More information