BIHAR STATE POLLUTION CONTROL BOARD PATNA
|
|
- Octavia Williamson
- 5 years ago
- Views:
Transcription
1 Application No: ER326N BIHAR STATE POLLUTION CONTROL BOARD PATNA (TO BE SUBMITTED IN DUPLICATE) APPLICATION CONTAINING INFORMATION FOR OBTAINING CONSENT TO ESTABLISH (NOC) U/S 25 & 26 OF THE WATER (PREVENTION AND CONTROL OF POLLUTION ACT,1974 & U/S 21 OF THE AIR(PREVENTION AND CONTROL OF POLLUTION)ACT, General Name of Industry : SHIVSHIVA STEEL PRIVATE LIMITED (a) Name & Address (with Pin code) of applicant: RAMESH CHANDRA GUPTA Address:502,SANTOSHA COMPLEX FRAZER ROAD PATNA District:PATNA Block:PATNA SADAR (b) Telephone No.(with code) (c) Mobile No.: Location of the Project (attach location map): (See enclosure) Place: MAUZA-RAIPURA,FATUHA,PATNA,PATNA CITY P.O.: FATUHA District: PATNA (Information is also required if industry is located outside the Industrial Area) Mauza: Khata No. : Khesra No. : RAIPURA,THANA NO ,177,46,Detail attached 912,894,Detail attached (iv) At what distance (in metre) following are located from battery limit of the plant.
2 (v) (vi) (vii) (viii) Name of Surrounding Distance(in meters) Description National Highway 1500 NH-30 Human Settlements 1000 RAIPURA Industrial 500 FATUHA Fisheries 0 0 National Park/Santury/Hill/Mount ain 0 0 Ancient Monument 0 0 Commercial 1500 FATUHA Railway line 1500 PAT-HOW School 1500 FATUHA River 1500 GANGA Hospital 1500 FATUHA Present land use: Agriculture Tropography: Plane prevalent wind directions: NORTH - EAST Speed : 15KM/hour(in KM/hr) Yearly average rainfal: 900MM 2 BREAKUP OF PROPOSED LAND AT THE SITE (iv) Area for Plant= (Sq. Metre) Area of Infrastructure= 1000 (Sq.Metre) Area of Treatment= 0 (Sq.Metre) Proposed width of plantation all around the plot in metre North= 1.5 Mtrs South= 1.5 Mtrs East= 1.5 Mtrs West= 1.5 Mtrs 2.1 Whether proposed to build captative colony: NO 3 (RAW MATERIALS) Distance of the captative colony form plant site (in Km/hr): Number of dwellers: List of raw Materials(MT/d) List of Raw Materials M.S.BILLET, 2575 MT List of Processing Chemicals (MT/d): 0 4 SOLID WASTES Solid wastes in (MT/d)
3 Type of Solid Waste Description Quantity(MT/d) other End Cuttings 77.5 Composition of wastes Type of Solid Waste other Description/Composition End Cuttings Enclosed a writeup on Solid Waste Management (See enclosure) 5 PROCESS AND PRODUCTION Enclose a copy of the Project Report with flow sheet: (See Enclosure) List of Products with daily capacity:(mt/d) List of Products Quantity(MT/d) Unit TMT TOR Metric Tonnes/Year List of By-products with daily capacity (MT/d) By-Products and Quantity End Cuttings, 3.1MT/day State briefly the technology: (See Enclosure) 6 WATER REQUIREMENT Source of water supply: Source Type Source Name Quantity(KL/ Ground Water (within premises) Ground Water (within premises) Borewell 5.0 Borewell 5.0 Water requirements(kl/d):- Type of Quantity of (Kl/d) Domestic WASTE WATER Quantity of Waste Water (KL/d): Type of Domestic 0.2 Quantity of (KL/d) Trade quality(kl/d): Quality Parameters Before Treatment After Treatment Suspended solids(total mg/l ) 7 n/a Final discharge to:(land/river/lake/municiple Drain/Industrial Area Drain)
4 Type of Maximum Generation Quantity of (KL/ Recycle(KL/ Mode of Disposal Disposal/Disc harge Quantity (KL/ Domestic Disposed in own soak Pit 0.2 (iv) Quality of treatment effluent to be recycled Type of Maximum Generation Quantity of (KL/ Recycle(KL/ Mode of Disposal Disposal/Disc harge Quantity (KL/ Domestic Disposed in own soak Pit 0.2 (v) Enclosed a short write up on sludge management (See Enclosure) 8 ATMOSHPHERIC EMISSIONS Stacks details Total no. of stacks: 1 Attached to: HEATING CHAMBER, Height above ground level(in metres): Height above factory room(in metres): Construction Material: 35, 27, M.S.SHEET, Mandatory provision of Porthole and Platforms in Stack(s) :(See Enclosure) Enclosed a short write up on air pollution control: (See Enclosure) 9 ENERGY Source of Energy : Source of energy HEATING CHAMBER Fuel Consumption (MT/d) Fuel Name Fuel Comsumption(MT/d) COAL /FURNACE OIL OTHER POLLUTION Noise:
5 (a) Sound level: 55 (in db(a)) (b) Abatement measures: High Boundary wall,silent DG set & Tree Plantation & Odour Abatement measures Thermal Pollution Adopting Latest Technology & Periodical maintenance 11 PROJECT COST IN LACS Total capital investment is (in lakhs) and total capital investment of Plant and Machinary is 760.0(in lakhs) payable to 'Bihar State Pollution Control Board' at Patna Accompaniments- 1. Location map (Attached) 2. Affidavit* (Attached) 3. Land document/lease document* (Attached) 4. Project Report* (Attached) 5. Brief Description of Manufacturing Process, Process Flow Chart (Attached) 6. Name, Address, Period of Tenures in Respective Office and Telephone Number of Owner, Partners, Persons, Chairman(Full time/part time), Managing Directors, Managing Partners/Directors (Full time/part time) etc (Attached) 7. Copy of Memorandum and Articles of Association (Attached) 8. Water Balance Chart (Attached) 9. Revenue Department Khasara & Naksha (Attached) 10. Land Ownership Documents (Registration) (Attached) 11. Copy of Registration in Trade and Industries Department or copy of Industrial Entrepreneur Memorandum (IEM) (Attached) 12. Treatment Plant Scheme along with Flow Chart (Attached) 13. Material and Energy Balance Chart (Attached) 14. Copy of Partnership Deed (Attached) 15. Copy of Environmental Clearance (if any) (Attached) Place:PATNA CITY Date:07/12/2016 RAMESH CHANDRA GUPTA (Signature of Applicant) (Official Seal) NOTE: (a) (b) In case of Major Pollution Industries,listed in Annexure III of related Guidelines,E.I.A and E.M.P are essential. In case of Modernisation/expansion activity the project proponent shall submit a separate writeup indicating there is in exsiting and proposed pollution load.
6 (c) (d) (e) Application shall be submitted to member secretary, Bihar State Pollution Control Board,Beltron Bhawan,Lal bahadur Shastrinagar,Patna NOC Fee (in the shape of bank draft in favour of 'Bihar State Pollution Control Board',Payable at Patna ) shall be payable in following manner:- (1) Investment of 1 Rs. To 25,00,000 Rs 2500/- (2) Investment of More then 25,00,000 but upto 5 crores 10,000/- (3) Investment of More then 5 crores but upto 10 crores 25,000/- (4) Investment of More then 10 crores but upto 50 crores 50,000/- (5) Investment of More then 50 crores 1,00,000/- For information relating to establishment of an industrial unit,guildlines for siting may be obtained from the board.
31. POLLUTION CONTROL COMMITTEE
31. POLLUTION CONTROL COMMITTEE 90 31.1 Consent to A Duly filled in application Form Establish XIII under Water Act. * days an Industry B Duly filled in application FORM 1 under Air Act * C Consent fee
More informationCHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.
CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF
More informationPre-Feasibility Report For
Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,
More informationKERALA STATE POLLUTION CONTROL BOARD
FORM IV C / I C KERALA STATE POLLUTION CONTROL BOARD APPLICATION FOR CONSENT/AUTHORISATION/REGISTRATION (HOTELS/OFFICES/COMMERCIAL ESTABLISHMENTS / RESIDENTIAL APARTMENTS) PART I NAME AND ADDRESS OF ESTABLISHMENT:
More informationSTONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)
Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL
More information2 x 300 MW (STAGE-I)
ENVIRONMENTAL STATEMENT OF Rosa Power Supply Company Ltd. Shahjahanpur (U.P.) 2 x 300 MW (STAGE-I) FINANCIAL YEAR ENDING THE 31 st MARCH, 2017 Prepared by: Rosa Power Supply Company Ltd. Shahjahanpur (U.P.)
More informationPre-Feasibility Report
Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &
More informationProposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad
1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon
More informationForm I. Application for consent for emission/continuation of emission under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981.
1 Form I Application for consent for emission/continuation of emission under Section 21 of the Air (Prevention and Control of Pollution) Act, 1981. To, The Member Secretary, State Pollution Control Board
More information4. The ambient air quality monitoring stations We are monitoring the ambient air quality
GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions
More informationHimachal Pradesh State Pollution Control Board,
Cost of Form Rs.15/ (To be paid along with Consent Fee) Himachal Pradesh State Pollution Control Board Him Parivesh, Phase III, New Shimla 171009, HP. Form I [See Rule 27] Application for Consent to Establish/Operate/Renewal
More informationPART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION
Page 1 of 8 Environmental Statement for Clinker Grinding Unit of M/s Bihar Cement Plant (A Unit of Shree Cement Ltd.), situated at Jasoia Mor, BIADA, Industrial Growth Centre, Aurangabad, Tehsil & Dist.
More informationPREFEASIBILITY REPORT
PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,
More informationPART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan
Page 1 of 9 Environmental Statement for Clinker Grinding Unit of M/s Shree Cement Limited, situated at village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan for the Period from: 10
More informationChecklist of Authorization for handling Hazardous and Other Wastes
Checklist of Authorization for handling Hazardous and Other Wastes 1. Form No. 1 2. Form No. 10 3. Industry Data Sheet. 4. Consent to Operate/Renewal under Water Act, 1974 and Air Act, 1981. 5. Copy of
More informationSTANDARD OPERATING PROCEDURE
STANDARD OPERATING PROCEDURE Consent to Established/Operate Procedural Guidelines Consent to Establish NOC Check List Consent to Operate NOC Check List Renewal to Consent to Operate Check List Time Frame
More informationConsent For Operation (CFO-Air,Water)
Combined Consent Order No. AWH-302072 PCB ID: 10041 Date: 15/02/2017 Combined consent for discharge of effluents under the Water (Prevention and Control of Pollution) Act, 1974 and emission under the Air
More informationKARNATAKA STATE POLLUTION CONTROL BOARD
KARNATAKA STATE POLLUTION CONTROL BOARD FORM - XIII (To be submitted in triplicate) Application for consent for establishment or taking any step for establishment of industries, operation, or any process
More informationTAMIL NADU POLLUTION CONTROL BOARD FORM II FORM FOR INDUSTRIES
TAMIL NADU POLLUTION CONTROL BOARD FORM II FORM FOR INDUSTRIES Application for consent under Section 25/26 of the Water (Prevention and Control of Pollution) Act, 1974 as amended (Central Act, 6 of 1974)
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,
More informationConsent For Operation (CFO-Air,Water)
Combined Consent Order No. AWH-300547 PCB ID: 10365 Date: 01/07/2016 Combined consent for discharge of effluents under the Water (Prevention and Control of Pollution) Act, 1974 and emission under the Air
More informationShilpa Sathi COMMON APPLICATION FORM FOR SETTING UP AN INDUSTRY IN WEST BENGAL
COMMON APPLICATION FORM FOR SETTING UP AN INDUSTRY IN WEST BENGAL 1. of the Applicant: SWS IDENTIFICATION NUMBER General Information [Please see Instructions before filling up the Application] Residential
More information(A govt. of Kerala Undertaking)
Annexure - 1 Basic Information Important Note: Please send the information by e-mail in word format and a signed & scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy
More information20/09/2016. ,held on 25/04/2017
Combined Consent Order No. AW-302979 PCB ID: 10688 Date: 03/07/2017 Combined consent for discharge of effluents under the Water (Prevention and Control of Pollution) Act, 1974 and emission under the Air
More informationCheck list for construction Project of EC [Category 8(a)]:
Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist
More informationPRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:
PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.
More informationCOMPLIANCE STATUS REPORT
COMPLIANCE STATUS REPORT Sona Alloys Pvt. Ltd. Additional Director (IA) Ministry of Environment & Forests, Paryavaran Bhavan, CGO Complex, Lodhi Road, New Delhi 11003 Date: 08.02.2014 Sub: Compliance Status
More informationApplication of Low and Non Waste Technology in the production process;
9.0 ENVIRONMENT MANAGEMENT PLAN (EMP) 9.1 INTRODUCTION Environment Management Plan is required for ensuring sustainable development. It should not affect the surrounding environment adversely. The management
More informationENVIRONMENTAL STATEMENT FOR THE YEAR
ENVIRONMENTAL STATEMENT FOR THE YEAR 2016-17 6 MTPA STEEL PLANT OF TATA STEEL AT KLAINGANAGAR INDUSTRIAL COMPLEX, ODISHA ENVIRONMENTAL DEPARTMENT TATA STEEL KALINGANAGAR Kalinga Nagar Industrial Complex,
More informationORANGE From : Dated :
DELHI POLLUTION CONTROL COMMITTEE 4 TH FLOOR, ISBT BUILDING, KASHMERE GATE, DELHI-06 visit us at http//dpcc.delhigovt.nic.in FORM NO..... Received by....... Date of issue. Common Application for Consent
More informationSEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Siddapur Natural Sand Mining in Patta land
SEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project : Siddapur Natural Sand Mining in Patta land Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report [PFR] 3 Environmental
More informationSCHEDULE - I. D. No. :.; Date:. Explanatory note for filling in application form for Consent/ Authorization
vameku rék fudks ckj iz' kklu ANDAMAN & NICOBAR ADMINISTRATION iznw"k.k fu;a=.k lfef r POLLUTION CONTROL COMMITTEE DEPARTMENT OF SCIENCE AND TECHNOLOGY Dolly Gunj, Port Blair Ph. No.250370 Tel. Fax 250370
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,
More informationRajasthan State Pollution Control Board
M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and under
More informationDetail Tender Notice (Second Call)
MUMBAI HOUSING & AREA DEVELOPMENT BOARD (MHADB) (A Regional Unit of MHADA) Detail Tender Notice (Second Call) Request for Proposal (RFP) for selection as a Consultant for Providing Planning, Designing
More informationFORM 1 [See Rule 3(2), 5(2)(3)]
FORM 1 [See Rule 3(2), 5(2)(3)] APPLICATION FOR OBTAINING AUTHORISATION FOR COLLECTION/RECEPTION/TREATMENT/TRANSPORT/STORATE/ DISPOSAL OF HAZARDOUS WASTES* From :... To, Sir,......... The Member Secretary,
More informationENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A
ENVIRONMENTAL STATEMENT FORM-V SYNTHETIC GYPSUM MANUFACTURING PLANT M/S SHREE CEMENT LIMITED, BEAWAR, (RAJASTHAN) APRIL, 2010 to MARCH 2011 PART A 1. Name and address of the Owner / Occupier of the Industry
More informationCalcom Cement India Limited
Calcom Cement India Limited (Subsidiary of DALMIA BHARAT CEMENT LIMITED) 2 No. Pipalpukhuri, Lanka, Dist. Nagaon, Assam 782446 Ref: MOEF, New Delhi Environment Clearance F. No. J-1101/312/2006-IA.II (I)
More informationSEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd.
SEIAA KARTAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project Building Stone (Basalt) Quarry of M/s. Sharada Construction Pvt. Ltd. Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report
More informationSEIAA KARNATAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS. Name of the Project : Building Stone Quarry of Sri. B. Narendra Kumar
SEIAA KARTAKA CHECK LIST FOR MINING/ QUARRYING PROJECTS Name of the Project : Building Stone Quarry of Sri. B. Narendra Kumar Sl. No DOCUMENTS / X 1 Form -1 2 Pre-Feasibility Report [PFR] in the format
More informationPRE FEASIBILITY REPORT
Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT
More informationForm V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A. Company Information
Form V is to be filled before 30th September annually; for the period from 1st April to 31st March PART A Company Information Company Name : Facility Name : Person Name * : Designation * : Premise Name
More informationSTATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA
OPERATING GUIDELINES FOR PROCESSING OF CONSENT TO ESTABLISH APPLICATION FOR ESTABLISHMENT OF COAL WASHERIES IN THE STATE OF ORISSA STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII,
More informationANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management
ANNEXURES Annexure No. Description 1 Google image showing proposed project site 2 Plant Lay-Out 3 Manufacturing process details 4 Details of hazardous waste management 5 Details of Effluent Treatment Plant
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS
More informationINSPIRE INDUSTRIES PVT. LTD.
For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory
More informationFORM-I (See Rule 11) APPLICATION FOR REGULARISATION OF UN-UNAUTHORISED DEVELOPMENT
FORM-I (See Rule 11) In Yellow Colour APPLICATION FOR REGULARISATION OF UN-UNAUTHORISED DEVELOPMENT (Under Section 76-FF of the Karnataka Town and Country Planning Act, Section 321-A of Karnataka Municipal
More informationANNEXURE-II CONSENT TO OPERATE AND ITS COMPLIANCE
AII-1 AII-2 AII-3 AII-4 FERRO MANGANESE PLANT, JODA CONSENT FOR EXISTING/NEW OPERATION OF THE PLANT (Under Sec.21 of the Air (Prevention and Control of Pollution) Act, 1981 Consent Details of the Consent
More informationM/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA
1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which
More informationTHE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2
THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2.6 MILLION TPA CEMENT & THERMAL POWER PLANT 36 MW EC Lr. No. : J-11011/403/2006-IA-II
More informationNational Workshop Cum Conference
In Collaboration with Presents National Workshop Cum Conference On Capacity Building Programme on Environment Impact Assessment with renowned Speakers & Experts recognized by Quality Council of India,
More informationOCMMS. Model Filled in application from Columnwise-screenshots. Name of the Industry: Test Industry 2
OCMMS Model Filled in application from Columnwise-screenshots Name of the Industry: Test Industry 2 The model screen shots of Industry and Occupier screens are as follows. S.NO Document Name
More informationHALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS
HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private
More informationPUNJAB POLLUTION CONTROL BOARD
PUNJAB POLLUTION CONTROL BOARD ZONAL OFFICE JALANDHAR Website:- www.ppcb.gov.in Office Dispatch No : Registered/Speed Post Date: Industry Registration ID: R17JAL5664016 Application No : 6243101 To, Subject:
More informationRajasthan State Pollution Control Board
M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and
More informationEnvironmental Clearance Compliance Half Yearly Report
Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated
More informationM/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.
Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,
More informationEXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION
EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,
More informationNORTHERN POWER DISTRIBUTION COMPANY OF TELANAGANA LIMITED WARANGAL, TELANAGANA Appendix I APPLICATION FOR SUPPLY OF ELECTRICITY AT LOW TENSION
NORTHERN POWER DISTRIBUTION COMPANY OF TELANAGANA LIMITED WARANGAL, TELANAGANA Appendix I APPLICATION FOR SUPPLY OF ELECTRICITY AT LOW TENSION To, The Asst. Engineer / Operation Photo of the Customer I/
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.
More informationExplanatory note for filling in application form for Consent/Authorisation
FORM Common Application for Consent under Water (Prevention and Control of Pollution) Act, 1974, Air (Prevention and Control of Pollution) Act, 1981) and Authorisation under Hazardous Wastes (Management
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name
More informationProposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous
Proposed Terms of reference for EIA studies ToR for EIA studies in respect of the isolated storages, which are involved in handling of hazardous chemicals may include, but not limited to the following
More informationSIA/PB/NCP/53462/2016)
Item No.148.08: Application for environmental clearance under EIA notification dated 14.09.2006 for the development of group housing project namely SSL Highway Towers at Chandigarh-AmbalaHighway, Dera
More informationPROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT
PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure
More informationForm-I APPLICATION FOR CONSENT FOR EMISSION UNDER SECTION(21) OF THE ACT (SEE CHAPTER-11)
Form-I APPLICATION FOR CONSENT FOR EMISSION UNDER SECTION(21) OF THE ACT (SEE CHAPTER-11) To THE MEMBER SECRETARY T.S. Pollution Control Board, Paryavaran Bhavan, A3, IE, Sanathnagar, Hyderabad. Sir, I/We
More information(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF
(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY
More informationSEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS
Annexure No - 13 SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS File No : Name of the Project: Proposed Commercial project called Bagmane Tech Park RIO Campus of M/s. Bagmane Developers
More informationSIX MONTHLY COMPLIANCE REPORT JUNE- 2015
SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For ToR of Proposed Project Of MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS of 850 MT/Month By PASHUPATI INDUSTRIES 169/1/A2, Phase 1, Opposite Telephone Exchange, GIDC Naroda, Ahmedabad-382330
More informationEXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT
EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT For CHHATTISGARH ENVIRONMENT CONSERVATION BOARD CHHATTISGARH 0 P a g e 1.0 INTRODUCTION SUMIT ISPAT PVT. LTD. has proposed to establish Submerged
More informationRED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE
ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION
More informationPRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR
PRESENTATION FOR ADDITIONAL DETAILS FOR ENVIRONMENTAL CLEARANCE TO STATE LEVEL EXPERT APPRASIAL COMMITTEE FOR PROPOSED CONSTRUCTION BUILDING PROJECT OF NILA INFRASTRUCTURES LTD (25988.59 m 2 Built up Area)
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT FOR Conversion of Existing Product Storage Tanks TK-16(HSD) of 6000 KL to MS and TK-6(MS) of 1000 KL to Ethanol AT HPCL Bulk POL Depot, Mansa Road, Phoos Mandi, Bhatinda-151001.
More informationAction taken (NGT Order dated 07 th August vide OA No. 138, 139/2018)
Action taken (NGT Order dated 07 th August vide OA No. 138, 139/2018) Till date, eight meetings of the Executing Committee have been conducted i.e. one at Shimla and seven at Chandigarh where HPPCB participated
More informationENVIRONMENTAL STATEMENT FOR D.G.SETS OF M/s SHREE CEMENT LIMITED, BEAWAR (RAJASTHAN) FOR THE PERIOD FROM, APRIL 2009 TO MARCH 2010 PART A
Page 1 of 9 ENVIRONMENTAL STATEMENT FOR D.G.SETS OF M/s SHREE CEMENT LIMITED, BEAWAR (RAJASTHAN) FOR THE PERIOD FROM, APRIL 2009 TO MARCH 2010 PART A 1. Name and address of the Owner / Occupier of the
More informationEnvironmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated
Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers
More informationSERIES & NO. SMI SUBJECT: GUIDELINES FOR CONDUCTING ENVIRONMENTAL NOISE MEASUREMENT SURVEYS
1 of 5 SUBJECT: GUIDELINES FOR CONDUCTING ENVIRONMENTAL NOISE I. PURPOSE This Instruction is issued to establish a uniform practice for conducting plant environmental noise surveys and to instruct plant
More informationEnvironmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated
Environmental Clearance; Letter No J-11011 / 152 / 2006-IA-II (I) Dt. 21.05.2007 and corrigendum dated 18.09.2007 For Revamping of Ammonia and Urea Plant at Gadepan, Kota; Rajasthan by M/S Chambal Fertilisers
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh
More informationFORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A
(I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process
More informationKana Aroma Industries. Pre-Feasibility Report
Pre-Feasibility Report 1. INTRODUCTION M/s. is a proposed unit to be located at Shed no. C1-41/B/1 & 2, GIDC Industrial Estate, Nandesari, Vadodara, Gujarat and proposes to manufacture Allyl Iso Thiocynate,
More informationEXISTING PROJECT FOR ORDINARY SAND MINING
(C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY
More informationM/S. Dain Colour Chem
PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS
More informationVENDOR APPRAISAL FORM PROJECTS & DEVELOPMENT INDIA LIMITED
VENDOR APPRAISAL FORM PROJECTS & DEVELOPMENT INDIA LIMITED POST BOX NO. 125, A-14, SECTOR -1, NOIDA - 201301, DIST - GAUTAM BUDH NAGAR, UP, INDIA PHONE: 91-120-2529842, 843, 854 FAX: 91-120-2529801/2541493
More informationPre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath
Pre-Feasibility Report for Educational Institute Allen Career Institute-Supath at Plot No. 1, Educational Scheme, Naya Nohra & Hanuwantkhera, Kota, Rajasthan-324001 By M/s. Allen Career Institute Registered
More information1.0 EXECUTIVE SUMMARY
1.0 EXECUTIVE SUMMARY M/s Merino Industries Limited has proposed for manufacturing Phenol Formaldehyde Resin, Melamine Formaldehyde Resin at Plot No D2 CH 36, Dahej Phase II, Dist. Bharuch, Gujarat. The
More informationPREFEASIBILITY REPORT
(B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY
More information1. Full Name of the applicant: 2. Nationality of the applicant:
FORM I Application for consent for establishment or taking any steps for establishment of Industry operation process or any treatment disposal system for discharge continuation of discharge under section
More informationSIX MONTHLY COMPLIANCE REPORT JUNE- 2015
Six Monthly Compliance Report June-2015 M/s Mahagun Real Estate Pvt. Ltd SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex Mahagunpuram AT VILLAGE Mehrauli, Dasna, Ghaziabad, U.P. Being developed
More informationDuring the discussions, the Committee finalized the following additional TOR for further study:
Finalization of ToR for development of Visakhapatnam?Kakinada Corridor for the Establishment of Petroleum, Chemicals and Petrochemicals Investment Region (VK- PCPIR), Andhra Pradesh by M/s VK- PCPIR Special
More informationTable 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others
1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines
More informationMax. building height (m)
Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project
More informationMONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I
MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I DATA SHEET 01 Project type : Cement Date: 24.11.2015 02
More informationPRE FEASIBILITY REPORT
PRE FEASIBILITY REPORT For EXPANSION IN EXISTING MANUFACTURING PLANT Of M/s. SHIVA DYE STUFF PVT. LTD Plot no. A2-11/6104,G.I.D.C. Industrial Estate, Ankleshwar-393002, Gujarat. 1 CONTENTS Sr. No. Description
More informationFor TOR New Projects. Mo. no. : Contact no. and ID of the Applicant
SEAC, Gujarat : Page 1 of 6 For TOR New Projects 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot /Survey, Landmark etc. ) M/s. Perstorp Industries
More informationPRE-FEASIBILITY REPORT
M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,
More informationSynthetic Organic Chemicals 5(f)
SEAC, Gujarat Page 1 of 14 Synthetic Organic Chemicals 5(f) For Terms of Reference [ToR] New Project 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot
More information