KALYAN DOMBIVLI MUNICIPAL CORPORATION PRE FEASIBILITY REPORT

Size: px
Start display at page:

Download "KALYAN DOMBIVLI MUNICIPAL CORPORATION PRE FEASIBILITY REPORT"

Transcription

1 KALYAN DOMBIVLI MUNICIPAL CORPORATION PRE FEASIBILITY REPORT For Proposed Integrated Solid Waste Management Facility at Barave, Kalyan Prepared By ABC Techno Labs India Pvt. Ltd. QCI NABET Accredited (Certificate No. NABET / EIA / 1316 / RA001) Corporate Office: No.2, 2nd Street, Thangam Colony, Anna Nagar West, Chennai Tamil Nadu, India. Tel: / 24 / 25 Mumbai Office: A/355, Balaji Bhavan, Plot No. 42 A, Sector 11, CBD Belapur, Navi Mumbai , Maharashtra. India Tel: / 44 mumbai@abctechnolab.com ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 1

2 Contents CHAPTER 1-EXECUTIVE SUMMARY... 4 CHAPTER 2-IDENTIFICATION OF THE PROJECT AND PROJECT PROPONENT IDENTIFICATION OF THE PROJECT Details of the Project Proponent... 6 Table 2. 1 Details of Project Proponent DEMOGRAPHIC DETAILS OF KDMC City Profile BRIEF DESCRIPTION OF NATURE OF THE PROJECT NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY OR REGION EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT... 8 Table 2. 2 Employment generation details... 8 CHAPTER 3-PROJECT DESCRIPTION TYPE OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECTS, IF ANY LOCATION... 9 Table 3. 1 Land use break up details... 9 Table 3. 2 Environmental Settings of the project site DETAILS OF ALTERNATIVE SITE NO ALTERNATIVE SITES WERE CONSIDERED FOR DEVELOPMENT OF THE INTEGRATED MSW FACILITY. THE PROPOSED SITE BASED IN KALYAN TOWN PROVES TO BE THE BEST LOCATION CONSIDERING BOTH THE ENVIRONMENTAL AND ECONOMICAL FACTORS SIZE AND MAGNITUDE OF PROJECT PROJECT DESCRIPTION WITH PROCESS DETAILS Table 3. 3 Treatment units RAW MATERIAL REQUIREMENT: Table Raw Material Requirement RESOURCE OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED IN THE PROJECT, IF ANY, AVAILABILITY OF WATER ITS SOURCE, ENERGY/ POWER REQUIREMENT AND SOURCE Water requirement Table Fresh Water Requirement Power Requirement Table Power Requirement Table DG sets details ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 2

3 CHAPTER 4-SITE ANALYSIS SITE CONNECTIVITY Table 4.1-Connectivity details Figure 4. 1 Site connectivity Map LANDFORM, LAND USE AND LAND OWNERSHIP TOPOGRAPHY EXISTING LAND USE PATTERN CLIMATE AND RAINFALL SOCIAL INFRASTRUCTURE AVAILABLE CHAPTER 5-PLANNING BRIEF PLANNING CONCEPT (TYPE OF INDUSTRIES, FACILITIES, TRANSPORTATION ETC.) TOWN AND COUNTRY PLANNING/DEVELOPMENT AUTHORITY CLASSIFICATION POPULATION PROJECTION LAND USE PLANNING ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL & SOCIAL) CHAPTER 6-PROPOSED INFRASTRUCTURE PLANNING BRIEF GREEN BELT CONNECTIVITY (TRAFFIC AND TRANSPORTATION ROAD / RAIL / METRO / WATER WAYS ETC.) DRINKING WATER MANAGEMENT SEWERAGE SYSTEM POWER REQUIREMENT & SUPPLY/SOURCE CHAPTER 7-REHABILITATION AND RESETTLEMENT (R&R) PLAN CHAPTER 8-PROJECT SCHEDULE & COST ESTIMATES Table no Cost estimates CHAPTER 9-ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 3

4 CHAPTER 1-EXECUTIVE SUMMARY Salient Features Of The Project Location 19 15'53.32"N 73 8'51.53"E Land Area Total area: 22,300 m 2 Screening Category Project Profile Cost Of The Project 7 (i) Common Municipal Solid Waste Management Facility Kalyan Dombivli is an important township of Mumbai City. Being close to Mumbai, the demographic profile of the city reveals that the population has increased continuously. Due to which, quantities of Municipal Solid Waste generated in Kalyan and Dombivli measured by in house survey team under the Solid Waste Management Department in year 2006, showed generation of 510 TPD MSW from population base of 12,62,936. It comes to gm/capita/day. With population base of in 2011, MSW quantity was found to be 600 TPD. This comes to gm/capita/day. At the end of 2013, Kalyan Dombivli Municipal Corporation had 650 MT/day/ of MSW. In the view of which Barave Municipal Waste Management Facility is being proposed. Rs Cr. (Approx) Resource Requirement Source & Quantity Of Water Sr. Phase Quantity Source 1. Construction 20 m 3 /day KDMC 2. Operational 10 m 3 /day Recycled water from STP Power Sr. Power Capacity Source Fuel type & requirement (kva) Quantity ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 4

5 1. Construction Phase 50 MSEDCL - 2. Operation Phase HSD Man Power Construction Phase: 50 nos. Operation phase: 15 nos. Environmental Management System Municipal Waste Treatment Scheme Flue Gas Emission MSW receiving and treatment for biostabilization/inertisation followed by disposal of remnants/ inerts in the sanitary land fill. From 1x 125 kva DG set ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 5

6 CHAPTER 2-IDENTIFICATION OF THE PROJECT AND PROJECT PROPONENT 2.1 Identification Of The Project Municipal Solid Waste management, to reduce the impact on the environment, requires an integrated approach involving components such as collection from various generators, segregation at source, recycling of the waste, reuse and disposal, etc. Healthy environment demands an integrated approach that involves complementary use of a variety of practices to handle the Municipal Solid Waste, stream safely and effectively with the least adverse impact on human health and the environment. Integrated approach would be adopted to dispose the Municipal Solid Waste generated in the city as the approach amalgamates three stages of Municipal Solid Waste Management. The adoption of this approach would streamline the collection of Municipal Solid Waste from diverse generating points in the city and transporting them to the treatment facilities where it would be separated and disposed accordingly. The integrated approach is critically important for the Municipal Solid Waste management to work efficiently. A well integrated approach captures the primary collection, secondary collection, treatment and disposal. In addition to all this, an integrated approach would reduce the littering on streets, enhance the cleanliness of the city, and increase the viability, profitability and sustainability of Municipal Solid Waste systems through their impact on increasing incomes, employment while reducing pollution levels. Barave facility is part of one of such integrated system. The facility includes a Bio-stabilization facility and a 200 TPD Sanitary landfill with a leachate treatment plant Details of the Project Proponent The details of the project proponent are given below: Table 2. 1 Details of Project Proponent Name Of The Applicant Name & Address Kalyan Dombivli Municipal Corporation Kalyan Dombivli Municipal Corporation Shankerrao Chowk, Kalyan (west) Status Of The Project A Municipal waste facility of 200 TPD is proposed to curb the growing demand of waste disposal of growing Kalyan Dombivli population. ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 6

7 2.2 Demographic Details of KDMC City Profile Kalyan Dombivli is an important satellite township of Mumbai city. It is an important railway junction. The city of Kalyan Dombivli forms one of the important urban agglomerations of Maharashtra state. Owing to large urbanizable zone and its proximity to greater Mumbai, Kalyan- Dombivli is trying to enhance the quality of services, expand the infrastructure and accelerate its economic growth. The Table provides salient feature of Kalyan Dombivli city as on Today. City Area Kalyan Dombivli Total area: sq. kmts. Developable Area: sq.kmts Undeveloped Area: sq.kmts. District Geographical location Thane Latitude: 19 o N Longitude: 73 o E Connectivity Road: City is well connected by a road network with the capital city (Mumbai) & the urban centre of the state and neighbouring states. Rail: Kalyan is an important Railway Junction on the central railway. And is well connected by rail network with Mumbai & other important cities of the nation. Due to an efficient local train network, the city has gained importance of being a suburb of Mumbai. Climate City administration Moderately humid tropical climate with max. temp of 41 0 C & minimum temp of 17 0 C. Annual rainfall-ranges between 1900 mm to 2700 mm Kalyan Dombivli Municipal Corporation The city has been functioning with sustained growth in territory economic activities. Major economic activities of the city are trade and commerce. ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 7

8 2.3 Brief Description of Nature Of The Project Municipal Solid Waste as such cannot be disposed off due to pollution problems and also due to land area exhaustion, the project has been planned for appropriate biological stabilization of bio degradable contents, separation and conditioning of dry recyclable materials and disposal of volume reduced inertised/ remnants in Sanitary Landfills. 2.4 Need For The Project And Its Importance To The Country Or Region Indiscriminate and open burning of wastes results in air pollution. Dumping of waste and leachate from waste dumpsites, and contaminated lands leads to land pollution, surface water contamination, and ground water contamination. Also, a significant delay between waste generation and final disposal results in odour nuisance, environmental degradation, fly and rodent infestation etc. It is highly necessary to establish an Integrated MSW Management Facility with provisions such as recovery of organics (Composting), recovery of recyclables (Materials Recovery Facility, MRF), recovery of high calorific value waste (Refuse Derived Fuel, RDF), and disposal of inerts (Secured Landfill). 2.5 Employment Generation (Direct And Indirect) Due To The Project About 15 full time employees and 50 contractual employees will be employed for project operation. About 100 indirect employment will be generated for primary/secondary collection, transportation etc. Table 2. 2 Employment generation details Sr. No. Particulars Skilled Labour Unskilled Labour Supervisors Total No. 1 Construction Phase Operation Phase ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 8

9 CHAPTER 3-PROJECT DESCRIPTION 3.1 Type Of Project Including Interlinked And Interdependent Projects, If Any The project is an Integrated Solid Waste Management Facility with a Bio-Stabilization facility and 200 TPD Sanitary Landfill with Leachate Treatment Plant at Barave by Kalyan Dombivli Municipal Corporation, for the treatment Municipal Solid Waste generated by Kalyan Dombivli. 3.2 Location Location map is given in Figure 3.1 & land use break up details given in Table 3.2 Table 3. 1 Land use break up details S. No. Particulars Proposed Land Area (Sq.m) % of Total Area 1 Process Area 12, Admin block Internal roads Utility area Storage area Parking Green belt Total 22, ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 9

10 Figure 3. 1: Project location ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 10

11 Figure m & 10 km Radius Satellite Image ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 11

12 Table 3. 2 Environmental Settings of the project site Sl. No. Particulars Details 1 Latitude 19 15'53.32"N 2 Longitude 73 8'51.53"E 3 Site Elevation above MSL Elevation above MSL is 4 meter 4 Topography Kalyan has an Undulated topography with ground levels ranging from 5 m to 50 m above the MSL. 5 Climate Has moderately humid tropical climate due to nearness to Ulhas creek, Bhatsa and Ulhas rivers. Hot summer with max. Temperature of 41 degree Celsius with minimum temperature of 17 degree Celsius. 5 Present land use at the site Land is vacant. 6 Nearest highway Kalyan-Murbad Highway 7 Nearest railway station Kalyan railway station: 3.5 km 8 Nearest airport Chhatrapati Shivaji International Airport: 50 km (approx) 9 Nearest town / city Kalyan: 3.4 km 10 Water body Ulhas River: 12 Hills / valleys None in 5 km radius 13 Archaeologically important places 14 National parks / Wildlife Sanctuaries None in 5 km radius None in 5 km radius 15 Reserved / Protected Forests None in 5 km radius 16 Seismicity Seismic zone III 17 Defense Installations None in 5 km radius ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 12

13 3.4 Details Of Alternative Site No alternative sites were considered for development of the Integrated MSW facility. The proposed site based in Kalyan Town proves to be the best location considering both the environmental and economical factors. 3.5 Size And Magnitude Of Project To accommodate the ever increasing Municipal Solid Waste, this Integrated Solid Waste Management Facility is proposed to be established at Barave with a Bio-Stabilization facility and 200 TPD Sanitary Landfill with a leachate treatment plant on 22,300 m 2 of land. 3.6 Project Description With Process Details The Municipal Solid Waste consists of many components. Hence after collection when the waste is brought to treatment facility it is first segregated. In a Municipal solid waste there is around 50% Biodegradable waste, 30% Recyclables and 20% inert waste. During segregation the Biodegradable waste is sent for Bio-stabilization, the recyclables are sent for recycling and inert waste is landfilled. (i) Bio-Stabilization: It is a treatment of aerobic bioconversion applied to Municipal Solid Waste (MSW) as is, to MSW residual of selective collection, or to contaminated organic fractions (under-sieve from mechanical selection, etc.) with the aim of generating a stabilized organic fraction suitable to be landfilled or used for capping operations during the cultivation of the sanitary landfill (ii) Sanitary Landfill: The Sanitary Landfill will be designed with HDPE geomembrane at bottom & sides to avoid percolation of leachate into ground water. Leachate collection system with full-fledged ETP with RO system is proposed for the treatment of leachates. Following is the detailed description about the components of the Integrated Solid Waste Management Facility: Life Of The Landfill: The primary factor that determines the design and life of the SLF is the volume of the waste to be land filled. The new landfill site with treatment facility at Barave, Kalyan would cover an area of about 22,300 m 2. As per estimates the total capacity of the landfill will be around 200 TPD. The total volume of waste to be placed in the landfill will be computed for the active period of the landfill taking into account, (a) the current generation of waste per annum and (b) the anticipated increase in rate of waste generation on the basis of past records or population growth rate. The required landfill ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 13

14 capacity works out significantly greater than the waste volume it accommodates. The actual capacity of the landfill will depend upon the volume occupied by the liner system and the cover material (daily, intermediate and final cover) as well as the compacted density of the waste. In addition, the amount of settlement a waste will undergo due to overburden stress and due to bio-degradation will also be taken into account. The proposed landfill design life comprises of an active period and a closure and a post closure period. The active period or the design life will be the 1 st phase of land fill process (proposed project). The closure and post-closure period for which proposed landfill will be monitored and maintained after the active period is completed. Basic Design Component The landfill will be operated in phases because it allows progressive use of the landfill area, such that at any given time a part of the site may have a final cover, a part being actively filled, a part being prepared to receive waste and a part undisturbed. Each phase will be designed for a period of one year and will consist of daily cells, daily cover, lifts, intermediate cover, liner, leachate collection facility, gas control facility and final cover. Each phase will be filled from the base to the final/intermediate cover and capped within this period. The waste subjected to landfilling shall be compacted in thin layers with the help of Bulldozers/ landfill compactors and the wastes shall be covered immediately or at the end of each working day with cm of soil. Liner System : Protection of the surrounding environment of an SLF can be effectively achieved by using an impermeable liner on the base and sides to prevent migration of gas and leachates into the soil and groundwater. The liner system for the proposed SLF has been designed based on recommendation of the Ministry of Environment and Forests for construction of a non-permeable lining system at the base and wall of waste disposal site area. For SLF receiving residues of waste processing facilities or mixed waste or waste having contamination of hazardous material (such as aerosol, bleaches, polishes, batteries, waste oils, paint products and pesticides), the liner will have, at a minimum, a composite barrier having 1.5 mm High Density Polyethylene (HDPE) geo-membrane or equivalent overlying 90 cm of soil (clay/amended soil) having permeability coefficient not greater than 1X10-7 cm/sec. Leachate Generation, Collection and Treatment: Water that percolates through the solid waste placed in the landfill is known as leachate. During its downward progress through the waste, the water entrains suspended solids, extracts soluble constituents of the waste and soluble products of the waste degradation process. The quantity of leachate generated in a landfill is dependent on the quantity of infiltrating water. This, in turn, is ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 14

15 dependent on the local precipitation, active area of the landfill and the operational practices. The quality is dependent on the characteristic of the wastes. Since primarily inert MSW will be deposited in the SLF, the generated leachate is not expected to have contaminants such as heavy metals. However, considering accidental scenarios when small quantity of bio-degradable material may enter the landfill as part of the processing rejects, the leachate will be treated and disposed with adequate safeguards for the environment. HDPE Geomembrane Layer 300mm - Silty Sand Layer Leachate Collection System: The primary function of leachate collection system is to collect and to convey the leachate out of the landfill and to control the depth of the leachate above the liner. Leachate collection network will comprise of header pipe and feeder pipes. The feeder pipes will consist of HDPE pipes of 150 mm diameter constructed at a spacing of 50 m and at a slope of 2 per cent. Pipe spacing is governed by the requirement that the leachate head will not be greater than the drainage layer thickness. The feeder pipes will be connected to header pipe. The header pipe will be constructed at a slope of 2 per cent and connected to leachate collection tank. The feeder and header pipes will have sufficient strength and will be safe from particulate and biological clogging and deflections. Leachate collection chamber/s will be installed to collect the leachate through the header pipe. The leachate collection chambers will be built up with successive lifts of waste. Submersible pumps or adductor pumps will be used to remove leachate from the chambers and carried through permanent pipe work for treatment and disposal. Landfill gas generation, control and management: Gas generation Landfill gas is generated due to the degradation of the organic matter in the wastes. As per CEEPHO manual, the principal components of typical landfill gas are methane (CH 4 ), and carbon dioxide (CO 2 ) whose typical concentrations are 30-60% and 34-60% respectively. However, considering accidental scenarios when bio-degradable material may enter the landfill as part of the processing, adequate gas control and management systems will be provided. Control and management: Adequate measures will be taken to restrict uncontrolled migration of landfill gas from the SLF. These measures include, Gas drainage blanket provided over the solid waste as part of the final cover of a completed phase; and Vertical gas vents in the gas-drainage blanket for controlled passive venting of the landfill gas. The gas venting layer will be 300 mm thick and made of granular soil. The gas will get accumulated in this layer and will be vented through gas vent pipes. These gas vent pipes will perforated HDPE pipes be of 150 mm diameter. Blowers will convey the gas collected in the ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 15

16 pipes to the flaring unit. The flaring unit will consist of collection chamber, blower, ignition mechanism, control valves and sensors. Since the anticipated volume of landfill gas is low, utilization of the gas for either direct internal consumption or power generation is not considered viable Final cover The final cover system for the proposed SLF will be based on the recommendations of MoEF and CPHHEO and will be a composite structure comprising of four layers of an engineered seal designed to prevent water ingress and egress of landfill gas and an agricultural cap comprising of subsoil drainage layer. The final cover system will consist of the following components: Vegetative layer thick with good vegetation supporting soil Drainage layer of thick granular material with permeability greater than 10-2 cm /sec Barrier layer of thick clay/amended soil with permeability less than 10-7cm/sec Gas venting layer of thick granular material with permeability greater than 10-2 cm/sec A suitable vegetative cover will have to be established on the closed site to ensure slow surface runoff, promote evapo-transpiration of rainfall, and retain moisture in the cap and enhance the formation of a soil structure in the agriculture soil. In accordance with the requirements of the MSW 2000 Rules the selected plants will be locally adopted non-edible perennial plants that are resistant to drought and extreme temperatures, and have ability to thrive on low-nutrient soil with minimum nutrient addition. Root penetration will not exceed 30 cm. Plantation will be made in sufficient density to minimize soil erosion. As each phase is completed and as the final cover level is reached in successive phases, interconnectivities in the leachate collection system, surface water drainage system at the cover of each phase and the gas collection system will be established. Temporary surface water drainage system constructed at the base of each completed phase is dismantled. Upon completion of all phases a final check will be made of the proper functioning of all inter connected systems. An access road will be provided on the landfill cover to enable easy approach for routine inspection of the landfill cover Other Infrastructural Facilities Besides the compost plant and landfill, other infrastructural facilities have been proposed to be developed as an integral part of the waste management facility. This would include access road, internal roads, drainage system, boundary walls, administrative building, Leachate Treatment Facility, buffer zone for plantation of trees etc. As per norms, total landfill area will be approximately 15% more than the area required for land filling to accommodate all infrastructure and support facilities as ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 16

17 well as to allow the formation of a green belt around the landfill. Management of Surface Runoff Surface water management is required to ensure that rainwater does not drain into the waste from surrounding areas and that there is no water logging or ponding on covers of landfills. The following measures will be taken for ensuring adequate surface water drainage: (iii) Rainwater running off the slopes above and outside the landfill area will be intercepted and channelled to a storm water reservoir, thus preventing the operational area of the site. The diversion channel will be provided with low permeability lining to prevent leakage into the landfill. Rainfall on active tipping areas will be collected separately and managed as leachate via the leachate collection drain and leachate collection sumps to the leachate treatment and disposal system. Rainfall on areas within the landfill site but on final covers of phases which have been completed are not actively being used for waste disposal will be diverted away in drainage channels from active tipping areas, and directed to the storm water reservoir. Drainage channels or drains constructed on the restored landfill surface will be constructed so that they are able to accommodate settlement, resist erosion and cope with localised storm conditions. The final cover will be provided a slope of 3 to 5% for proper surface water drainage. Leachate Treatment The leachate will be treated in a leachate treatment plant. A part of the treated leachate will be recirculated in the compost plant to increase the rate of waste stabilization during the aerobic composting. Site fencing a compound wall or rigid fencing all round the land fill site to a height will to be constructed to totally seclude site from outside activities. Lockable gates will be provided to prevent unauthorized access full time security guard at the site. A cattle grid will also be placed at the entrance to the waste reception area. Site entrance a permanent, wide, entrance road with separate entry and exit lanes and gates will be provided. Sufficient length/parking space will be provided inside the entrance gate till the weighbridge to prevent queuing of vehicles outside the entrance gate. The entrance area will be properly landscaped with a green belt containing tree plantation for good visual impact. Proper direction signs and lighting will be placed at the entrance gate. Access roads, the approach way to the facility will be upgraded or paved sufficiently to a width for movement of two way traffic. Secondary arterial roads and temporary roads within the site will of lesser standards, as the locations of these roads will be changing following the landfill development. ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 17

18 Table 3. 3 Treatment units Sr.no. Description Size/area/volume/capacity Unit 1. Waste receiving floor 150 m 2 2. Concreted Composting pad 4000 m 2 3. Compost Processing Shed 4500 m 2 4. Recycling Shed 300 m 2 5. Stores/ Godown 415 m 2 6. Drying and Storage area 400 m 2 7. Monsoon Shed over comp. pad 2000 m Raw Material Requirement: Table Raw Material Requirement Sr. No. Raw material Quantity 1. Metal 10,900m 3 2. Bricks nos. 3. Steel 3.70 MT 4. HDP Geo membrane m 2 5. HDP Pipe (150 mm) 116 Rmt 6. HDP Pipe (125 mm) 250 Rmt 7. Geo Textile 545 m 2 8. Metal (10 mm) 600 m 3 9. Cement Concrete-1:4:8 Metal: 45 m 3, Cement: 163 bags, Sand: 22 m Resource Optimization/ Recycling And Reuse Envisaged In The Project, If Any, Not applicable ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 18

19 3.9 Availability Of Water Its Source, Energy/ Power Requirement And Source Water requirement Fresh water requirement for proposed project is given below Table Fresh Water Requirement S. No Details Proposed water consumption (m 3 /day) A Domestic purpose 5 B Operation purpose 20 Water will be sourced through KDMC. There will be a requirement of 5 m 3 / day of fresh water. 20 m 3 / day of recycled water will be used for operation purpose Power Requirement Power requirement and source of power for proposed project is given below in table 3.7. Details of DG sets given in table 3.8 Table Power Requirement S. No. Particulars(kVA) Source MSEDCL Table DG sets details No. of DG Sets Capacity of DG Set Height of Stack Fuel Used & Quantity m above the roof of highest establishment HSD ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 19

20 CHAPTER 4-SITE ANALYSIS 4.1 Site Connectivity Table 4.1-Connectivity details Connectivity Nearest Railway Station Kalyan Railway station (3.5 Km) Nearest Airport Chhatrapati Shivaji International Airport, Mumbai (50 Km) Nearest Highway Kalyan Murbad Highway ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 20

21 Figure 4. 1 Site connectivity Map ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 21

22 4.2 Landform, Land Use And Land Ownership The Kalyan Dombivli Municipal Corporation has acquired around 22,300 m 2 land area at Barve site for waste processing. 4.3 Topography Kalyan has undulated topography with ground levels ranging from 5m to 50 m above the mean sea level. However areas near Ulhas creek on the North side are relatively flat. The river Ulhas, Kalu and also Waldhuni flow in this region. The city mainly divided into East and West with the central railway forming this division. 4.4 Existing Land Use Pattern It is a vacant land reserved for Integrated Municipal Solid Waste Management Facility 4.5 Climate And Rainfall Kalyan has a moderately humid tropical climate due to nearness to Ulhas creek, Bhatsa and Ulhas Rivers. Hot summer with maximum temperature of 41 C and moderate hot summer with minimum temperature of 17 C are experienced by the people in area. The monsoon is predominant during months of June, July, August and September. Rainfall ranges between 1900 mm to 2700 mm. whereas 75% rainfall is received during July and August. 4.6 Social Infrastructure Available At the Barve site, development of basic infrastructure like approach road, power line, levelling of land plantation, site office, gate control and education awareness cum training centre are proposed to be taken up by the Kalyan Dombivli Municipal corporation. ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 22

23 CHAPTER 5-PLANNING BRIEF 5.1 Planning Concept (Type Of Industries, Facilities, Transportation Etc.) Town And Country Planning/Development Authority Classification The project is an Integrated Solid Waste Management Facility with a Bio-Stabilization facility and 200 TPD Sanitary Landfill with Leachate Treatment Plant at Barave by Kalyan Dombivli Municipal Corporation, for the treatment Municipal Solid Waste generated by Kalyan Dombivli. 5.2 Population Projection Sr. No. Year Population ,47, ,16, ,60, ,12, ,67, ,47, ,67, ,52, ,78, ,91, ,45, ,95,129 ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 23

24 5.3 Land Use Planning The land use break up is as given below: S. No. Particulars Proposed Land Area (Sq.m) % of Total Area 1 Process Area 12, Admin block Internal roads Utility area Storage area Parking Green belt Total 22, Assessment Of Infrastructure Demand (Physical & Social) All facilities / amenities like medical, educational, housing, transportation, communication, shopping etc are available nearby places. Since, local workers will be employed for this purpose therefore; no long term infrastructure will be required. ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 24

25 CHAPTER 6-PROPOSED INFRASTRUCTURE 6.1 Planning Brief The proposed project will be facilitated in the 22,300 m 2 of land at Barave in the Kalyan, Thane District. The land use break-up showing the proposed activities is given in Table 3.1. All required amenities and facilities will be made available in the plant itself. 6.2 Green Belt Green belt around the boundary wall is being planned. Approximately 7359 m 2 of area will be provided for green belt development. Following Native plant species will be planted in the MSW treatment plant. Sr. no. Local Name Scientific Name 1.. Amba Mangifera Indica 2. Apta Bauhimia Racemosa 3. Arjun Terminalia Arjun 4. Bahara Cassia Fistula 5. Bakul Mimusops Elengi 6. Chinch Tarmarindus Indica 7. Gulmohar Delonix Regia 8. Jambhul Syzygium Cumini 9. Kadamb Neolamarkina Cadamba 10. Kaduneem Azadirachta Indica 11. Kashid Cassia Siamea 12. Katesavar Bombax Cieba 13. Naral Cocos Nucifera 14. Nilgiri Eucalyptus Globulus 15. Pangara Butea Monosperma 16. Kanchan Bauhinia Purpurea 17. Pimpal Ficus Religiosa ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 25

26 6.3 Connectivity (Traffic And Transportation Road / Rail / Metro / Water Ways Etc.) Barave is well connected by a road network with the capital city (Mumbai) & the urban centre of the state and neighbouring states. Kalyan is an important Railway Junction on the central railway and is well connected by rail network with Mumbai & other important cities of the nation. Due to an efficient local train network, the city has gained importance of being a suburb of Mumbai 6.4 Drinking Water Management Around 5 m 3 /day of fresh water will be required during operation phase 6.5 Sewerage System The negligible amount of sewage generated will be treated in the proposed leachate treatment plant. 6.6 Power Requirement & Supply/Source The power requirement will be 100 kva during operation phase and 1x 125 KVA D.G. set will be provided for power back up. ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 26

27 CHAPTER 7-REHABILITATION AND RESETTLEMENT (R&R) PLAN Kalyan Dombivli Municipal Corporation has acquired a vacant 22,300 m 2 of land in Barave for the proposed Municipal Solid Waste Treatment plant. Hence no rehabilitation & resettlement issues are envisaged & do not apply. ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 27

28 CHAPTER 8-PROJECT SCHEDULE & COST ESTIMATES The total cost of project is estimated about Rs Lakhs Table no Cost estimates Sr. No. Description Amount in Lakhs 1 Bio-stabilization facility Sanitary landfill with leachate treatment facility Total ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 28

29 CHAPTER 9-ANALYSIS OF PROPOSAL (FINAL RECOMMENDATIONS) Considering the various project related attributes such as availability of necessary infrastructure viz. connectivity, water & electric supply, man power etc. the project can be executed in a very comfortable way. With commissioning of the integrated Municipal Solid Waste Management Facility, KDMC will be able to focus its attention on other measures for waste recycling. ABC TECHNO LABS INDIA PVT. LTD., MUMBAI 29

PRE FEASIABILITY REPORT FOR ENVIRONMENTAL IMPACT ASSESSMENT OF COMPOSTING UNIT AND SANITARY LANDFILL PROJECT By NAGAR PALIKA PARISHAD, RAMNAGAR,

PRE FEASIABILITY REPORT FOR ENVIRONMENTAL IMPACT ASSESSMENT OF COMPOSTING UNIT AND SANITARY LANDFILL PROJECT By NAGAR PALIKA PARISHAD, RAMNAGAR, PRE FEASIABILITY REPORT FOR ENVIRONMENTAL IMPACT ASSESSMENT OF COMPOSTING UNIT AND SANITARY LANDFILL PROJECT By NAGAR PALIKA PARISHAD, RAMNAGAR, UTTARAKHAND Contents Contents... 2 List of Figures... 4

More information

State Expert Appraisal Committee, Punjab Ministry of Environment and Forests, Government of India

State Expert Appraisal Committee, Punjab Ministry of Environment and Forests, Government of India State Expert Appraisal Committee, Punjab Ministry of Environment and Forests, Government of India O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala 147 001 Telefax:- 0175-2215802

More information

To reduce the environmental impact we should ISOLATE or CONTAIN the waste in an IMPERMEABLE BARRIER

To reduce the environmental impact we should ISOLATE or CONTAIN the waste in an IMPERMEABLE BARRIER To reduce the environmental impact we should ISOLATE or CONTAIN the waste in an IMPERMEABLE BARRIER 1 COMPONENTS OF ENGINEERED LANDFILL a) A Liner System b) A Leachate Collection Facility c) A Gas Control

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

01 Name of Project Gorai Landfill closure and Gas Capture Project, Mumbai, India 02 Location of Project (Village/District/St ate)

01 Name of Project Gorai Landfill closure and Gas Capture Project, Mumbai, India 02 Location of Project (Village/District/St ate) 01 Name of Project Gorai Landfill closure and Gas Capture Project, Mumbai, India 02 Location of Project (Village/District/St ate) The project is located at the existing Gorai dumpsite in the western suburbs

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

Partnership (PPP) mode over an area of approximate Acres at Bhuasuni.

Partnership (PPP) mode over an area of approximate Acres at Bhuasuni. CHAPTER-1 Introduction Human activities create waste, and the ways that waste is handled, stored, collected, and disposed of can pose risks to the environment and to public health. Municipality Solid Waste

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

sqm. 123 kld (Landscaping - 31 kld, Dual Flushing 73 kld Car Washing - 19 kld) Quantity Of Wastewater Discharge

sqm. 123 kld (Landscaping - 31 kld, Dual Flushing 73 kld Car Washing - 19 kld) Quantity Of Wastewater Discharge DETAILS OF PROJECT The project proponent wants to develop a Residential Building with all modern amenities Premises No. 116, Roy Bahadur Road (previously known as 352, Roy Bahadur Road), Kolkata - 700053

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

Geotechnical aspects of landfill design

Geotechnical aspects of landfill design Geotechnical aspects of landfill design Dr.-Ing. B.V.S. Viswanadham Associate Professor, Department of Civil Engineering IIT Bombay Email: viswam@civil.iitb.ac.in Introduction Up to 75 % the solid waste

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

PREFEASIBILITY REPORT FOR BRICK EARTH MINE Page 1 PREFEASIBILITY REPORT FOR BRICK EARTH MINE Developed By- Village-Chandauhan, Tehsil-Phulpur, District-Allhabaad, Uttar Pradesh. RAI ENVIROMENTAL SERVICES PVT. LTD. Website: www.raienviro.com Email

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Total Built Up Area. Quantum Of Water Required Quantity Of Wastewater Generation 332kld

Total Built Up Area. Quantum Of Water Required Quantity Of Wastewater Generation 332kld DETAILS OF PROJECT The project proponent, P N Memorial Neurocentre & Research Institute Limited, is developing a Hospital Building at Premises No.-720, Anandapur, Ward. Kolkata- 700 107, KMC, Ward No.

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

Draft - Smart City Proposal. Kalyan Dombivli Municipal Corporation

Draft - Smart City Proposal. Kalyan Dombivli Municipal Corporation Draft - Smart City Proposal Kalyan Dombivli Municipal Corporation 1 1. Kalyan-Dombivli Introduction 2 Kalyan Dombivli Kalyan Dombivli and Titwala cities form KDMC jurisdiction; Population increased from

More information

Details of Project. Underground source

Details of Project. Underground source Details of Project The project proponent wants to develop a Residential complex with all modern amenities at R.S./L.R. Dag No - (442,447,453,454, 443,444), J.LNo-29 Of Khamar Mouja & R.S./L.R. Dag No-(99(P),101,102(P),103,105,106,107,108,109,110,111,112,113(P),114(P),115,125,126,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

Landfill Gas Recovery and Power Generation in Ghabawi Landfill. Amman, Jordan

Landfill Gas Recovery and Power Generation in Ghabawi Landfill. Amman, Jordan Landfill Gas Recovery and Power Generation in Ghabawi Landfill Amman, Jordan Municipal Solid Waste Management Elements in Greater Amman Municipality (GAM) and Size of Operations Sweeping (1000 km main

More information

SHRI.LAKSHMAN NAMDEV KOLI

SHRI.LAKSHMAN NAMDEV KOLI PRE-FEASIBILITY REPORT (PFR) FOR PROPOSED STONE QUARRY BY SHRI.LAKSHMAN NAMDEV KOLI AREA. 1.00 HA., GAT. NO. 811/2 PART, VILLAGE BASTAWADE, TAL.: TASGAON, DIST.: SANGLI PREPARED BY EQUINOX ENVIRONMENTS

More information

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT FOR ORDINARY SAND PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

A Case Study of a Secured Landfill

A Case Study of a Secured Landfill 2018 IJSRST Volume 4 Issue 2 Print ISSN: 2395-6011 Online ISSN: 2395-602X Themed Section: Science and Technology A Case Study of a Secured Landfill Sandhya Rani R Department of Civil Engineering, MVSR

More information

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath Pre-Feasibility Report for Educational Institute Allen Career Institute-Supath at Plot No. 1, Educational Scheme, Naya Nohra & Hanuwantkhera, Kota, Rajasthan-324001 By M/s. Allen Career Institute Registered

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

GIZ Support to Ministry of Urban Development Training on Preparation of City Sanitation Plan Part III State of Telangana

GIZ Support to Ministry of Urban Development Training on Preparation of City Sanitation Plan Part III State of Telangana GIZ Support to Ministry of Urban Development Training on Preparation of City Sanitation Plan Part III State of Telangana Session 3B: Technical Options for CSPs Hyderabad, 20-22 April 2016 Slide 1 Technological

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

Craig Dufficy U.S. EPA Office of Resource Conservation and Recovery

Craig Dufficy U.S. EPA Office of Resource Conservation and Recovery Craig Dufficy U.S. EPA Office of Resource Conservation and Recovery Overview What is a Landfill? Basic waste properties. Area and Volume calculations. What is allowed in a landfill and what is not. How

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

Limited Purpose Landfill Solid Waste Permit Application per WAC

Limited Purpose Landfill Solid Waste Permit Application per WAC Limited Purpose Landfill Solid Waste Permit Application per WAC 173-350-400 Name of Applicant: Name of Facility: Permit # assigned by Health Department: Date Received: Lead Agency Reviewer Name: Phone:

More information

GUIDELINES ON THE MANAGEMENT OF WASTE DISPOSAL SITE (LANDFILL)

GUIDELINES ON THE MANAGEMENT OF WASTE DISPOSAL SITE (LANDFILL) 1 REPUBLIC OF RWANDA RWANDA UTILITIES REGULATORY AGENCY P.O BOX 7289 KIGALI, Tel: +250 252 584562, Fax: +250 252 584563 Email: arms@rwanda1.com Website: www.rura.gov.rw GUIDELINES ON THE MANAGEMENT OF

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS

More information

2. The expected cost of the project is Rs.50 crores.

2. The expected cost of the project is Rs.50 crores. Subject Application for obtaining Environmental Clearance for development of an "Integrated Municipal Solid Waste Management System for Pathankot Cluster" by Municipal Council, Pathankot at Village Kalanaur,

More information

V: PROJECT SCOPING & METHODOLOGY

V: PROJECT SCOPING & METHODOLOGY V: PROJECT SCOPING & METHODOLOGY 5.0 INTRODUCTION The scoping exercise is carried out to define the focus and scope of the EIA Study. The scoping exercise is required to understand the type of activities

More information

Consolidated Statement on various Environmental Aspects for Construction Project

Consolidated Statement on various Environmental Aspects for Construction Project Consolidated Statement on various Environmental Aspects for Construction Project S.N. Particular 1 Name of Project Development of IKEA Store in Navi Mumbai, India 2 Name, contact number & address of proponent

More information

India s First MSW Treatment Facility

India s First MSW Treatment Facility India s First MSW Treatment Facility Fully Compliant with SWM 2016 guidelines OREX powered Mechanical Biological Treatment Presentation SFC Environmental Technology Pvt. Ltd, India We all agree Urgent

More information

Expansion of Calcutta Riverside (An Integrated Township)

Expansion of Calcutta Riverside (An Integrated Township) CONCEPTUAL PLAN Expansion of Calcutta Riverside (An Integrated Township) Project of Riverbank Developers Private Limited at Maheshtala, Batanagar, West Bengal. Project Proponent: Riverbank Developers Private

More information

SOLID WASTE ENGINEERING COORDINATOR CE485. V. Wesley Sherman. P.E. State of Michigan DEQ. Waste and Hazardous Materials Division

SOLID WASTE ENGINEERING COORDINATOR CE485. V. Wesley Sherman. P.E. State of Michigan DEQ. Waste and Hazardous Materials Division CE485 olid & Haz Waste Management Rm 2243 Engineering Building 4 Feb (Wed) 2004 V. Wesley Sherman. P.E. State of Michigan DEQ Waste and Hazardous Materials Division Storage Tank and Solid Waste Section

More information

The Impact of Elevated Leachate Levels on LFG Generation and Recovery at MSW Landfills in Asia

The Impact of Elevated Leachate Levels on LFG Generation and Recovery at MSW Landfills in Asia The Impact of Elevated Leachate Levels on LFG Generation and Recovery at MSW Landfills in Asia Methane to Markets Partnership Expo New Delhi, India 2-55 March 2010 Bryce Lloyd Organic Waste Technologies

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

Preparation of City Sanitation Plan Part III. Session 2: Technical Options for CSPs

Preparation of City Sanitation Plan Part III. Session 2: Technical Options for CSPs Preparation of City Sanitation Plan Part III Session 2: Technical Options for CSPs Slide 1 Technological options for On-site Sanitation systems Septic Tank with Soak pit Twin-Pit Latrine Bio-Digester DRDO

More information

TABLE-1 PROJECT AT A GLANCE. Location S. F. Nos. 442/1, 442/3, 442/5, 443/1, 443/2, 443/3, 443/4, 443/5, 434/7, 434/8, 434/9 of Kolappalur Village

TABLE-1 PROJECT AT A GLANCE. Location S. F. Nos. 442/1, 442/3, 442/5, 443/1, 443/2, 443/3, 443/4, 443/5, 434/7, 434/8, 434/9 of Kolappalur Village TABLE-1 PROJECT AT A GLANCE Registered Address M/s. Pallavada Technical Textiles Park Private Limited, No. 78, Greams Road, Thousand Lights, Chennai-600006. Communication Address of M/s. Pallavada Technical

More information

REGIONAL TRAINING WORKSHOP ON HUMAN SETTLEMENT INDICATORS. Module 5: Solid Waste Management

REGIONAL TRAINING WORKSHOP ON HUMAN SETTLEMENT INDICATORS. Module 5: Solid Waste Management REGIONAL TRAINING WORKSHOP ON HUMAN SETTLEMENT INDICATORS Module 5: Solid Waste Management Esther Njiru & Nao Takeuchi 26 th 29 th March 2018 Bangkok, Thailand 26 th 29 th March 2018 Outline 1) Background

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT The Proposed Th Proposed Food Colours and Lake Colours Manufacturing Unit will be established on Plot 22/1 - B, Dhatav, MIDC

More information

TABLE OF CONTENTS. Para No. Contents Page No

TABLE OF CONTENTS. Para No. Contents Page No TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report

More information

SECURE Energy Services Inc. Proposed Conklin Class II Landfill Portions of: NE W4, SE W4 and NW W4

SECURE Energy Services Inc. Proposed Conklin Class II Landfill Portions of: NE W4, SE W4 and NW W4 26 February 2016 RE: SECURE Energy Services Inc. Proposed Conklin Class II Landfill Portions of: NE 23-76-8W4, SE 26-76-8W4 and NW-24-76-8W4 Dear Sir or Madam, SECURE Energy Services Inc. ( SECURE ) is

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT LG Polymers India Pvt. Ltd. Sy. No.s

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT

CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT ABOUT PROJECT M/s. DAR Housing Ltd. Proposed Group Housing Project ATS Rhapsody, At Plot No. GH-12/1, Sector-01, Greater Noida (U.P.), having Plot

More information

ECO MESH PIPE. ECO-Mesh Inc.

ECO MESH PIPE. ECO-Mesh Inc. ECO MESH PIPE ECO-Mesh Inc. http://www.eco-mesh.com ECO MESH PIPE - Manufacturing ECO Mesh Pipe is Made of Extruded Plastic Shape of ECO Mesh Pipe Square Mesh Pipe Arched Mesh Pipe Mesh Drainage Pipe v

More information

"INOGATE Technical Secretariat & Integrated Programme in support of the Baku Initiative and the Eastern Partnership energy objectives" Project

INOGATE Technical Secretariat & Integrated Programme in support of the Baku Initiative and the Eastern Partnership energy objectives Project "INOGATE Technical Secretariat & Integrated Programme in support of the Baku Initiative and the Eastern Partnership energy objectives" Project B U I L D I N G P A R T N E R S H I P S F O R E N E R G Y

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KATIKELA RIVER SAND BED OVER 15.00 ACRES OR 6.070 HA IN VILLAGE KATIKELA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20)

More information

The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT

The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT CONCEPTUAL PLAN PROJECT LAYOUT AND DEVELOPMENT CONTEXT ABOUT PROJECT The Proposed Expansion of Existing ARTEMIS HOSPITAL at Sector-51, Gurgaon (Haryana). In earlier project planning the total plot area

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information

Landfill design General principles

Landfill design General principles Landfill design General principles Average height of a landfill should be at least 15 m Each section (cell) should accommodate waste to be landfilled during 5 years period Sections/cells should be hydraulically

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

Application For Waste Regulation (Check all that apply)

Application For Waste Regulation (Check all that apply) Environmental Protection and Growth Management Department ENVIRONMENTAL ENGINEERING AND PERMITTING DIVISION 1 North University Drive, Mailbox #201 Plantation, Florida 33324 954-519-1483 FAX 954-519-1412

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY M/s Merino Industries Limited has proposed for manufacturing Phenol Formaldehyde Resin, Melamine Formaldehyde Resin at Plot No D2 CH 36, Dahej Phase II, Dist. Bharuch, Gujarat. The

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI

CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI INITIAL PREPARATION DATE: October 11, 2016 TABLE OF CONTENTS 1. CERTIFICATION

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

IX: HAZARDOUS WASTE MANAGEMENT

IX: HAZARDOUS WASTE MANAGEMENT IX: HAZARDOUS WASTE MANAGEMENT 9.0 INTRODUCTION The Government of India has promulgated the Hazardous Waste (Management and Handling) Rules, 1989 and the aegis of Environment (Protection) Act, 1886 through

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building... Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3

More information

5. ENVIRONMENT MANAGEMENT PLAN

5. ENVIRONMENT MANAGEMENT PLAN 5. ENVIRONMENT MANAGEMENT PLAN The environmental management plan consist of the set of mitigation measures, management and, monitoring measures to be taken during construction and operation phase to eliminate

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

Florida Department of Environmental Protection Inspection Checklist 1659 NORTHWEST 10TH STREET

Florida Department of Environmental Protection Inspection Checklist 1659 NORTHWEST 10TH STREET Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: GILCHRIST COUNTY CENTRAL WASTE MANAGEMENT FACILITY - On-Site Inspection Start Date: On-Site Inspection

More information

Appendix 9 - Engineering Performance Standards

Appendix 9 - Engineering Performance Standards Appendix 9 - Engineering Performance Standards A9.1 Introduction A9.1.1 This Appendix contains standards that apply to the subdivision of land. It is referred to in the Subdivision Rules for the Living,

More information

INDEX. I. Executive Summary 2. II. Introduction 2. III. Project Description 4. IV. Site Analysis 9. V. Proposed Infrastructure 10. VI.

INDEX. I. Executive Summary 2. II. Introduction 2. III. Project Description 4. IV. Site Analysis 9. V. Proposed Infrastructure 10. VI. INDEX SECTION PAGE NO. I. Executive Summary 2 II. Introduction 2 III. Project Description 4 IV. Site Analysis 9 V. Proposed Infrastructure 10 VI. R& R Plan 14 VII. Project Implementation Strategy and 14

More information

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative) Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in

More information

NC2 ASH DISPOSAL AREA

NC2 ASH DISPOSAL AREA POST-CLOSURE PLAN OPPD NEBRASKA CITY GENERATING STATION FOSSIL FUEL COMBUSTION ASH DISPOSAL AREA NC2 ASH DISPOSAL AREA Prepared for: OMAHA PUBLIC POWER DISTRICT NEBRASKA CITY GENERATING STATION OTOE COUNTY,

More information

Details of Project. 2 nos kva each & 2 nos. 500 kva each. Parking required 444 nos. (Car Parking 435, Bus Parking 9)

Details of Project. 2 nos kva each & 2 nos. 500 kva each. Parking required 444 nos. (Car Parking 435, Bus Parking 9) Details of Project The project proponent wants to develop a Office building at Plot No. CBD 4, Street MAR, AA II, New Town, P.S. Rajarhat, North 24 Parganas, West Bengal. The project site is a flat land

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

Upland Landfill Waste Discharge Application 7295 Gold River Highway Campbell River, British Columbia

Upland Landfill Waste Discharge Application 7295 Gold River Highway Campbell River, British Columbia Upland Landfill Waste Discharge Application 7295 Gold River Highway Campbell River, British Columbia Upland Excavating Ltd. Engineering Consultant: GHD Limited Presentation Agenda Project Background Site

More information

4.0 ENVIRONMENTAL IMPACT ANALYSIS 4.10 UTILITIES -- WASTEWATER

4.0 ENVIRONMENTAL IMPACT ANALYSIS 4.10 UTILITIES -- WASTEWATER 4.0 ENVIRONMENTAL IMPACT ANALYSIS 4.10 UTILITIES -- WASTEWATER ENVIRONMENTAL SETTING Existing Conditions The BLRC generates wastewater in two forms: the liquid that is produced when water percolates through

More information

PROPOSED TERMS OF REFERENCE

PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT FOR RESIDENTIAL TOWNSHIP WITH VACATION RESORTS PROJECT AT ALIBAUG, RAIGAD, MAHARASHTRA PROPOSED TERMS OF REFERENCE Submitted to State Level Environment Impact Assessment

More information

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani DESCRIPTION OF

More information

Bioreactor Landfill Design

Bioreactor Landfill Design Bioreactor Landfill Design Timothy Townsend, PhD, PE Department of Environmental Engineering Sciences University of Florida ttown@ufl.edu Bioreactor Landfill Design Modern landfill design entails many

More information

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION INSPECTION CHECKLIST

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION INSPECTION CHECKLIST Facility Information: Facility Name: On-Site Inspection Start Date: 06/05/2008 On-Site Inspection End Date: 06/05/2008 WACS : 73114 Facility Street Address: STOCKADE RD @ CR846 City: IMMOKALEE County Name:

More information

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS Annexure No - 13 SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS File No : Name of the Project: Proposed Commercial project called Bagmane Tech Park RIO Campus of M/s. Bagmane Developers

More information