ACZC Summary Of Questions / Answers Addendum No. 4. 1) What is the anticipated date of a SEPTA site visit from SEPTA?

Size: px
Start display at page:

Download "ACZC Summary Of Questions / Answers Addendum No. 4. 1) What is the anticipated date of a SEPTA site visit from SEPTA?"

Transcription

1 ACZC Summary Of Questions / Answers Addendum No. 4 1) What is the anticipated date of a SEPTA site visit from SEPTA? Contractor responsibility is determined after lowest bidder is identified. 2) With reference to the Contract Drawings for each respective Interlocking location, the Vital and Non-Vital bit chart drawings include the note CONTRACTOR SHALL PROVIDE ALL I/O,S CARDS BASED ON NEW MICROLOK II. This note appears conflict with circuit sheets and rack layouts that show modifications to the existing MicroLok I processors. Please clarify whether the Contractor is required to replace all existing MicroLok I processors with new MicroLok II processors as part of this contract, and if so: Contractor shall research and provide all necessary engineering and design required to upgrade the old Microlok system in service in the to-be-retired locations and upgraded and to the new Microlok II system to facilitate the new track layouts and interlocking operation. For the design, furnish, and drop / ship locations, the Contractor shall provide new Microlok II systems with sufficient PCBoards, I/O capability, cabling and all other appurtenances, plus 20% spare capacity, for SEPTA field forces to tech refresh the existing physical plant of Hughes Park, Radnor, Bryn Mawr, and West Overbrook locations at a later date. a. Is the Contractor responsible for staging and cutover of the new processors, and if so, could SEPTA provide complete existing drawing packages for each respective interlocking so that the bidders may accurately estimate the staging effort? The contractor is responsible for the staging and cutover of the new Microprocessor system at new Ardmore Junction Interlocking and the modification required to the existing system at all other locations. SEPTA will provide complete existing drawing packages for each respective interlocking to the successful bidder. No support is to be provided for the drop / ship locations. b. Will SEPTA provide the Contractor with the as-in-service MicroLok I application programs for each respective interlocking? SEPTA will provide the successful bidder with the as-in-service MicroLok I application programs for each respective interlocking.

2 c. Is the Contractor responsible to provide any new or additional communications equipment to interface with the new MicroLok II processors as part of this contract? SEPTA forces will install a new Fiber Optic Communications Cable System (FOCS) backbone to all new locations. The Contractor shall provide all FOC equipment required to interface their new Microlok II equipment to the new FOCCS. 3) Specification Section D.7.a for CS57+00 County Line Road, CS Bryn Mawr Interlocking, CS Ardmore Interlocking and CS Wynnewood RD indicates that the contractor is to design, furnish and install cables at each respective location. In addition, Section A states The Contractor shall terminate all new cables and SEPTA Forces shall tie into the existing signal system and place into operational service the new signal modifications control devices with the support of the Contractor. These statements appear to conflict with the notes shown on the double line plan for each respective location that reads, ALL CABLES INSTALLED BY SEPTA. Please clarify whether the Contractor is required to furnish and install aerial and underground cables as part of this contract. All aerial and underground cables will be furnished and installed by SEPTA. Spec section to be deleted. See Spec section 01010A revised. 4) Specification Section D.7.a for CS Ardmore Interlocking states Provide new retaining wall to accommodate New CIL etc. This statement appears to be conflict with Note 2 on drawing NHSL-AJ03 which states RETAINING WALL PROVIDED BY SEPTA FIELD FORCES. Please clarify whether the Contractor is required to furnish and install a new retaining wall at Ardmore Interlocking as part of this contract? Retaining wall will be furnished and installed by SEPTA. See revised spec section 01010A 5) Specification Section B states, The Contractor shall furnish and install all cable and conduit, wither new or replacement, required for the complete signal system. Etc. This statement appears to conflict with the notes shown for on the double line plan for each respective location that reads, ALL CABLES INSTALLED BY SEPTA. Please clarify whether the Contractor is required to furnish and install all cable and conduit as part of this contract. All cables will be furnished and installed by SEPTA. 6) Local Control Panel Section A.2.a states The local control panel shall consist of etched phenolic or brushed aluminum in accordance with the Contract Drawings. With reference to drawings NHSL-86, NHSL-101, NHSL-AJ19, the LCP s for Radnor, Bryn Mawr and Ardmore Junction respectively, all existing and new local control panels appear to be Mosaic-Type control panels.

3 All new/modified Local control panels shall be Mosaic-Type. Is the contractor required to replace the existing panels with new etched phenolic or brushed aluminum LCP s at each of the aforementioned interlocking locations? No 7) Specification Section shows as DRAFT 06/24/16. Should the bidders assume that the version is revised. Provided for this section is indeed final? Spec section deleted 8) Specification Section shows as DRAFT 11/03/16. Should the bidders assume that the version provided for this section is indeed final? Spec section deleted 9) The Contract Bid Form (Schedule A page 12) lump sum description states Vendor shall design and furnish material for Norristown High Speed Line re-signalization project as listed in Exhibit V. Section D (Summary of Work in Exhibit V), however, indicates that the bidder must include all labor, material, equipment, supervision etc. Can you clarify the summary of work in section D that the installation is either to be included or not included by the bidder? All field work to be provided by in house SEPTA forces. See revised spec section 01010A 10) Unfortunately due to holiday vacation schedules it will be impossible to deliver a responsible and accurate bid for the Ridge Ave. Spur Signal Equipment bid by January 3 rd. A vendor requests an extension to January 31, 2017 in order to submit the level of response required by the RFP. See Addendum No. 4 for current bid opening deadline 11) Please clarify the Required Delivery Date as stated in Schedule A. It currently states 2/29/17. SEPTA will require all switch and electric lock hardware be delivered by end of May of All other contract deliverables shall be due in accordance with the Contractors, SEPTA approved project schedule.

4 12) Based on previous SEPTA projects, SEPTA C&S has used its in house construction forces for field installation of signal equipment and housings. Please confirm whether this project will be installed by SEPTA C&S construction forces or by a Contractor as specified. If installed by SEPTA C&S, what sections of the contract specifications are applicable? Installation of all new Signal Houses and signal equipment/cabling will be installed by SEPTA force account. New equipment and wiring modification in existing houses shall be furnished by Contractor and installed by SEPTA. 13) We respectfully requests a six (6) week extension to February 3, 2017 based on holiday vacation schedules that begin on December 19th through the first week of the year. See Addendum No. 4 for current bid opening deadline 14) ACZC CONTRACT INSTRUCTIONS TO BIDDERS Delivery Instructions 4. States Required Delivery Date 2/29/17 is in conflict with A which states Furnish the following not later than one year after contract notice to proceed. Please clarify delivery date. See question No ) During a review of the Contract Drawings and the Contract Specifications, it has been noted that there are conflicting statements as to the same equipment that is to be installed by the contractor in one section and the same equipment to be installed by SEPTA forces. Please clarify if the NHSL Re-Signalization Project equipment installation is to be performed by SEPTA in-house forces or a Contractor. If SEPTA inhouse forces, what specification section are applicable for this project? See response to question 12 16) Contract Specification section A.4 Installation Equipment States Each high-tension transformer assembly including foundation. Are high-tension transformers required? If so, please include a specification section for the transformer required. See Addendum No. 4 17) Contract Specification Section Internal Wire and Cable SEPTA Standard F- S-206 not included in Contract Documents. See Addendum No ) Contract Specification Section External Signal Cable SEPTA Standard Specification No. 126 section 1.04 and SEPTA Signal Instructions #27, Test 2 not included in Contract Documents.

5 SEPTA will furnish and install all external signal cables. 19) Contract Drawings NHSL-31A and NHSL-44A have been modified to show MLK II PCB I/O boards with the statement that Contractor shall provide all I/O cards based on new MLK II. Is its SEPTA intent to replace all the I/O PCB s with new MLK II I/O boards and cables? See response at question 2 and see revised section 01010A 20) If replacing existing system I/O with new MLK II I/O boards and cables, is it also SEPTA s intent to replace the existing system boards (CPU, Power Boards, etc.) and modules? See response at question 2 and see revised section 01010A 21) The standard bit layout shown on Hughes Park Contract Drawing NHSL-HP44A is not consistent with MLK II I/O board port count. If so, provide new contract drawing with the correct format. Board counts and bit assignments are the responsibility of the Contractor See Addendum No ) Hughes Park Contract Drawing NHSL-HP199 shows the MLK I/O module with a new PCB board in slot 10. Material reference sheet missing from the contract documents, please provide. See Addendum No ) Hughes Park Contract Drawing NHSL-HP199 I/O module board layout (Row 2) is in conflict with I/O board layout shown on Contract Drawing NHS-HP44A. If so, please provide new contract drawing. NHSL-199 I/O is for existing Microlok I system and NHSL-HP44A is for new Microlok II system 24) Hughes Park MicroLok 2 rack and Non-Vital MicroLok rack missing from contract drawings. Please provide. See typical Microlok II rack layout, which have been added in contract drawing. 25) Contract Drawing NHSL-RR35A and NHSL-RR55A have been modified to show MLK II PCB I/O boards with the statement that Contractor shall provide all I/O,s cards based on new MLK II. Is its SEPTA intent to replace all the I/O PCB s with new MLK II I/O boards and cables? Same response as question 2

6 26) The standard bit layout shown on Contract Drawing NHSL-RR55A is not consistent with MLK II I/O board port count. If so, provide new contract drawing with the correct format. Same response as question 21 27) Provide the mosaic panel supplier and the parts list for the LCP shown on Radnor Contract Drawing NHSL-86. See drawing NHSL-RR87 28) Contract Drawing NHSL-BM44A, NHSL-BM63A have been modified to show MLK II PCB I/O boards with the statement that Contractor shall provide all I/O,s cards based on new MLK II. Is its SEPTA intent to replace all the I/O PCB s with new MLK II I/O boards and cables? Same response as question 2 29) The standard bit layout shown on Contract Drawing NHSL-BM63A is not consistent with MLK II I/O board port count. If so, provide new contract drawing with the correct format. Same response as question 21 30) Bryn Mawr Local Control Panel Contract Drawing NHSL-101 has been designed with a Mosaic tile panel which is in conflict with Contract Specification A.2.a which states The local control panel shall consist of etched phenolic or brushed aluminum in accordance with the Contract Drawings. Which is correct? If Mosaic, provide the manufacturer and parts list for the existing panel. Same response as question 6, see drawing NHSL-BM101 for parts list. 31) Bryn Mawr MicroLok 1, MicroLok 2 racks and Non-Vital MicroLok rack missing from contract drawings. Please provide. Complete set of plans of Bryn Mawr will be provided to successful bidder. See typical Microlok II Rack layout which have been added to contract documents. 32) Contract Specification 1.01.D.7.a Base Bid CS Ardmore Interlocking States Provide new retaining wall.. is in conflict with Contract Drawing NHSL-AJ03, Note 2, which states Retaining wall provided by SEPTA field forces. Please clarify who is to provide retaining wall. Same response as question 4

7 33) Contract Specification B states that The Contractor shall furnish and install all cable and conduit, whether new or replacement, required for the complete signal system is in conflict with Contract Drawings NHS-CL03, NHSL-RR10, NHSL-BM10, NHSL-AJ03 and NHSL-WR03 which states that All cables installed by SEPTA. Please clarify who is installing cables? Who is providing cables and conduit? Same response as question 18 34) Ardmore Junction Typical MLK II Bit Assignment Contract Drawing NHSL-AJ12 and NHSL-AJ12A is in conflict with NHSL (Sheet 205) Typical MicroLok II Rack Layout? Please clarify MLK layout for Ardmore junction. NHSL-205 is typical drawing, Contractor is to provide detail MLK II rack layout of Ardmore Junction as part of final design. 35) Ardmore Junction Local Control Panel Contract Drawing NHSL-AJ19 has been designed with a Mosaic tile panel which is in conflict with Contract Specification A.2.a which states The local control panel shall consist of etched phenolic or brushed aluminum in accordance with the Contract Drawings. Which is correct? If Mosaic, provides manufacturer and typical parts list for existing panels on NHSL. Same response as question 6, see contract documents for existing panel layout and parts list. 36) Contract Drawing NHS-WO31A and NHS-WO44A have been modified to show MLK II PCB I/O boards with the statement that Contractor shall provide all I/O cards based on new MLK II. Is its SEPTA intent to replace all the I/O PCB s with new MLK II I/O boards and cables? Same response as question 2 37) West Overbrook MicroLok I, MicroLok II racks and Non-Vital MicroLok rack missing from contract drawings. Please provide. Complete set of plans of West OverBrook will be provided to successful bidder. See typical Microlok II Rack layout which have been added to contract documents. 38) Typical MicroLok II Rack Layout Contract Drawing NHSL (Sheet 205) is in conflict with Contract Specification D.6 which states Each VMIS unit shall be provided with:.. Please clarify typical MLK II system layout.

8 Vital and NV I/O Bit assignment must match the vital / NV MLK II Bit Assignment drawing for each respective locations. Revised spec section D.6 39) Per , Contractor shall terminate all new cables. Per , Contractor shall furnish and install all cable and conduit. Section on Excavation is mentioned but not provided in the contract documents. Can you confirm if contractor will be responsible for trenching cable to field devices and remote enclosures? Same response as question 5 40) What is the scope of work envisioned under Field engineering? None of the contract documents described in that section appear to be provided. See Addendum No ) The Due date for this project is It is impossible to design these locations, procure the material and equipment and shop wire these locations within this timeframe. Please confirm that the date is correct. See Addendum No. 4 for current bid opening deadline 42) This is a complex project and needs more time to formulate an accurate bid. A vendor is requesting a 3 week extension to the current bid due date of , (to January 13th, 2017). See Addendum No. 4 for current bid opening deadline. 43) A vendor requests that the bid due date be extended an additional 2 weeks See Addendum No ) Regarding Specification Section 13578, 1.2.C.2 and 1.3.G, Training: Is the Contractor to provide product training for MicroLok II and PF track circuits? Spec section is to be deleted 45) Regarding Specification Section Communications Cable, Part 1.0 General and Part 3 Installation There seems to be a conflict between the requirements described in these sections and our understanding that this is a Lump Sum Material bid. Please clarify.

9 Please see requirements listed in Addendum No. 4. Regarding Specification Section Fiber Optic Cable and Equipment, Part 1 General and Part Installation There seems to be a conflict between the requirements described in these sections and our understanding that this is a Lump Sum Material bid. Please clarify. Please see requirements listed in Addendum No ) We thank you for the extension to January 17 th, 2017; however many of our bid team members have already started their holiday vacation and therefore it is not possible to get questions collected and submitted by January 1 st. We respectfully request an extension to January 31, 2017 which would give us the time needed to collect and submit questions, and receive SEPTA responses. This will allow us to submit the level of response required by the RFP. See Addendum No. 4 for current bid opening deadline 47) Per , Contractor shall terminate all new cables. Per , Contractor shall furnish and install all cable and conduit. Section on Excavation is mentioned but not provided in the contract documents. Can you confirm if contractor will be responsible for trenching cable to field devices and remote enclosures? SEPTA will be responsible for furnishing and installing all cables and conduits. Spec section and is to be deleted. 48) What is the scope of work envisioned under Field engineering? None of the contract documents described in that section appear to be provided. Spec section is to be deleted. 49) Is installation of the new Trackwork in the scope of this contract? No 50) According to the contract specifications it states though out that the Signal Equipment will be installed by the contractor. We have heard that the Signal Equipment will be installed by SEPTA. Please clarify who is responsible for the installation of the equipment. Same response as question 12

CITY OF FERNDALE, WA PAGE 1

CITY OF FERNDALE, WA PAGE 1 CITY OF FERNDALE WASTEWATER TREATMENT PLANT PLC UPGRADE ADDENDUM NO. 1 (10 pages total) Issue Date: August 18, 2014 General: Recitations of each and every section of the bid documents impacted by this

More information

ADDENDUM NO. 3 TABLE OF CONTENTS NHSL SIGNAL MODERIZATION PROJECT

ADDENDUM NO. 3 TABLE OF CONTENTS NHSL SIGNAL MODERIZATION PROJECT ADDENDUM NO. 3 TABLE OF CONTENTS NHSL SIGNAL MODERIZATION PROJECT DIVISION 1-GENERAL REQUIREMENTS SECTION TITLE PAGE NO. 01010A SUMMARY OF WORK 01010-1 to 01010-4 01041A PROJECT COORDINATION 01041-1 to

More information

SECTION BASIC REQUIREMENTS FOR SYSTEMS

SECTION BASIC REQUIREMENTS FOR SYSTEMS SECTION 13570 BASIC REQUIREMENTS FOR SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. This Section describes the basic requirements and functionality for designing, furnishing, and installing the SEPTA Wayside System

More information

Enclosed is Addendum No. 2 to SEPTA's Sealed Bid No ATMM 5 & Market Station Enhancement Project.

Enclosed is Addendum No. 2 to SEPTA's Sealed Bid No ATMM 5 & Market Station Enhancement Project. February 23, 2018 Dear Sir/Madam Enclosed is Addendum No. 2 to SEPTA's Sealed Bid No. 17-00265-ATMM 5 & Market Station Enhancement Project. The bid opening date and time scheduled for Wednesday, February

More information

C o u n t y o f F a i r f a x, V i r g i n i a

C o u n t y o f F a i r f a x, V i r g i n i a 001961 Page 2 C o u n t y o f F a i r f a x, V i r g i n i a A D D E N D U M DATE: August 2, 2016 ADDENDUM NO. 4 TO: REFERENCE: FOR: DUE DATE/TIME: ALL PROSPECTIVE BIDDERS Government Center Generator System

More information

ORANGE COUNTY WATER DISTRICT Ward Street Fountain Valley, California ADDENDUM NO. 2 TO REQUEST FOR PROPOSALS FOR

ORANGE COUNTY WATER DISTRICT Ward Street Fountain Valley, California ADDENDUM NO. 2 TO REQUEST FOR PROPOSALS FOR ORANGE COUNTY WATER DISTRICT 18700 Ward Street Fountain Valley, California 92708-6930 ADDENDUM NO. 2 TO REQUEST FOR PROPOSALS FOR OCWD Physical Access Control System Replacement and Video Monitoring Upgrades

More information

SPITZER CONFERENCE CENTER BRIEFING SUITE REFRESH Addendum #2 02/22/2018 LCCC POJECT NO. SPBSR-17 BPA PROJECT NO

SPITZER CONFERENCE CENTER BRIEFING SUITE REFRESH Addendum #2 02/22/2018 LCCC POJECT NO. SPBSR-17 BPA PROJECT NO SPITZER CONFERENCE CENTER BRIEFING SUITE REFRESH Addendum #2 02/22/2018 LCCC POJECT NO. SPBSR-17 BPA PROJECT NO. 16-32 ADDENDUM NO. 2 SPITZER CONFERENCE CENTER BRIEFING SUITE REFRESH LORAIN COUNTY COMMUNITY

More information

Request for Proposal # Cane Creek Park Fiber Optic Cable Upfit

Request for Proposal # Cane Creek Park Fiber Optic Cable Upfit Request for Proposal # 2018-049 Cane Creek Park Fiber Optic Cable Upfit ADDENDUM NO. 1 ISSUE DATE: February 2, 2018 Bidders on this project are hereby notified that this Addendum shall be attached to and

More information

OPS WIFI UPGRADE REQUEST FOR PROPOSAL: ADDENDUM - 1

OPS WIFI UPGRADE REQUEST FOR PROPOSAL: ADDENDUM - 1 OPS WIFI UPGRADE RFP ADDENDUM 1 1 OPS WIFI UPGRADE REQUEST FOR PROPOSAL: ADDENDUM - 1 The following information is being provided to promote as equal, fair, and competitive bidding process as possible

More information

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202

Procurement Department Bid Office Customer Center 1 st Floor, Room W. Church Street Jacksonville, Florida 32202 Procurement Department Bid Office Customer Center 1 st Floor, Room 002 21 W. Church Street Jacksonville, Florida 32202 October 26, 2017 ADDENDUM NUMBER: ONE (1) TITLE: Arc-Resistant Metal-Clad Switchgear

More information

ADDENDUM #1 TO REQUEST FOR PROPOSALS FOR SCADA SYSTEM DESIGN/INSTALL

ADDENDUM #1 TO REQUEST FOR PROPOSALS FOR SCADA SYSTEM DESIGN/INSTALL ADDENDUM #1 TO REQUEST FOR PROPOSALS FOR SCADA SYSTEM DESIGN/INSTALL This addendum contains: A clarification to the RFP requirements Responses to Questions Received 02-18-10 through 03-11-10 The System

More information

EDS Upgrades and CBRA Improvements. Addendum No. 2 DATE OF ADDENDUM: 08/17/2016

EDS Upgrades and CBRA Improvements. Addendum No. 2 DATE OF ADDENDUM: 08/17/2016 EDS Upgrades and CBRA Improvements Addendum No. 2 DATE OF ADDENDUM: 08/17/2016 The following changes, additions, and/or deletions are considered as Addendum No. 1, and are hereby made a part of the contract

More information

ADDENDUM 2 I. QUESTIONS AND ANSWERS. TE1031: Outside Plant Dark Fiber Optic Infrastructure Construction

ADDENDUM 2 I. QUESTIONS AND ANSWERS. TE1031: Outside Plant Dark Fiber Optic Infrastructure Construction ADDENDUM 2 TE1031: Outside Plant Dark Fiber Optic Infrastructure Construction BID NUMBER: TE1031 ADDENDUM NUMBER: 2 ADDENDUM ISSUED: December 9, 2015 I. QUESTIONS AND ANSWERS The following questions are

More information

Addendum No. 3 Queens College TV Production Studio Renovation - System Integration Project No: QC SI

Addendum No. 3 Queens College TV Production Studio Renovation - System Integration Project No: QC SI Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 16 th Floor New York, New York 10019 CUNY.Builds@mail.cuny.edu October 27, 2015

More information

ADDENDUM #1 FEBRUARY 20, 2015 SANDUSKY COUNTY ENGINEERS OFFICE RE: F. HOEFLICH DITCH IMPROVEMENT PROJECT NO.142 ADDENDUM #1

ADDENDUM #1 FEBRUARY 20, 2015 SANDUSKY COUNTY ENGINEERS OFFICE RE: F. HOEFLICH DITCH IMPROVEMENT PROJECT NO.142 ADDENDUM #1 ADDENDUM #1 FEBRUARY 20, 2015 SANDUSKY COUNTY ENGINEERS OFFICE RE: F. HOEFLICH DITCH IMPROVEMENT PROJECT NO.142 ADDENDUM #1 Plan holders of the F. HOEFLICH DITCH PETITION PROJECT NO. 142 are hereby notified

More information

RFB for Fiber Optic Cabling Attachment A Project Scope October 6, 2016

RFB for Fiber Optic Cabling Attachment A Project Scope October 6, 2016 RFB for Fiber Optic Cabling Attachment A Project Scope October 6, 2016 1.0 Project Description 1.1 General 1.1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions,

More information

1. Are there plans and specs for this project? Yes, the plans and specs are within the RFP and can also be found at the RFP website.

1. Are there plans and specs for this project? Yes, the plans and specs are within the RFP and can also be found at the RFP website. Access Control and CCTV for 110 William Street Project #6622 / Contract #6622-0001 Questions & Answers August 8, 2016 1. Are there plans and specs for this project? Yes, the plans and specs are within

More information

FLORIDA DEPARTMENT OF TRANSPORTATION

FLORIDA DEPARTMENT OF TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 2 DATE: December 28, 2011 RE: RFP NUMBER: RFP TITLE: ITS Equipment Replacement in Broward County OPENING OF TECHNICAL PROPOSAL DATE: January 5, 2012 Notice

More information

Request for Bids. At The Greenville-Spartanburg International Airport

Request for Bids. At The Greenville-Spartanburg International Airport Request for Bids At The Greenville-Spartanburg International Airport Addendum No. 2 June 27, 2011 All Bidders shall include with their bid submittal a signed statement indicating they have reviewed and

More information

Community Clean Energy Resiliency Initiative PON-ENE BESS Request for Proposals Question and Answer Log

Community Clean Energy Resiliency Initiative PON-ENE BESS Request for Proposals Question and Answer Log Community Clean Energy Resiliency Initiative PON-ENE-2014-036 BESS Request for Proposals Question and Answer Log 03/09/16 Lead Time 1. The schedule included in the BESS RFP for the energy storage project

More information

legend. #1 is a gas relief valve? If so does Enbridge supply with station?

legend. #1 is a gas relief valve? If so does Enbridge supply with station? Michael Pacholok, Director Purchasing and Materials Management Division City Hall, 8 th Floor, West Tower 00 Queen Street West Toronto, Ontario M5H N Joanne Kehoe Manager Construction Services May 4, 06

More information

Addendum #2 T Lake Major Water Supply Plant New Standby Power System

Addendum #2 T Lake Major Water Supply Plant New Standby Power System Date: May 23, 207 Addendum #2 T22.207 Lake Major Water Supply Plant New Standby Power System To All Bidders of T22.207: Please note: the following addendum applies to T22.207 and shall be taken into consideration

More information

ADDENDUM NO. 2 HAMILTON MUNICIPAL AIRPORT THE VILLAGE OF HAMILTON, MADISON COUNTY, NEW YORK SECURITY SUBSTATION CONSTRUCTION

ADDENDUM NO. 2 HAMILTON MUNICIPAL AIRPORT THE VILLAGE OF HAMILTON, MADISON COUNTY, NEW YORK SECURITY SUBSTATION CONSTRUCTION to CONTRACT DOCUMENTS for HAMILTON MUNICIPAL AIRPORT THE VILLAGE OF HAMILTON, MADISON COUNTY, NEW YORK SECURITY SUBSTATION CONSTRUCTION P.I.N. # 2915.62 / 2915.63 /2915.65 M-J PROJECT NO. 16155.24 June

More information

HUNTINGTON STATION POWER FLOOR PLAN

HUNTINGTON STATION POWER FLOOR PLAN 0/09/5 ADDENDUM 0/09/5 ADDENDUM TIME CLOCK SWITCH KEYED NOTES: EXISTING PANEL "SS2" 2 PROVIDE 2 CIRCUIT ASTRONOMICAL TIME CLOCK SWITCH FOR CANOPY LIGHTING CONTROL. CONNECT CANOPY LIGHTING THROUGH TIME

More information

City of Bartlett. Request for Proposal. Nortel Phone System

City of Bartlett. Request for Proposal. Nortel Phone System City of Bartlett Request for Proposal Nortel Phone System November 6, 2009 Dear Vendor: November 6, 2009 The City of Bartlett is actively pursuing installation of a Nortel Phone System to be located at

More information

PROJECT NUMBER: PAGE 1

PROJECT NUMBER: PAGE 1 PROJECT NUMBER: 37-8573.00 PAGE 1 DATE: 07/01/2016 WHO: Registered List of Bidders HOW: ORIGINAL TO: COPIES TO: Via email Project File Todd Tipton Culver City BY: Jonathan Wicks PROJECT NAME: Culver City

More information

TO: Distribution. FROM: Marie E. Corbi. SUBJECT: Sealed Bid No AMGA Overhaul of EX54 Main Smoothing Reactor. DATE: November 17, 2015

TO: Distribution. FROM: Marie E. Corbi. SUBJECT: Sealed Bid No AMGA Overhaul of EX54 Main Smoothing Reactor. DATE: November 17, 2015 1234 Market St, 11 th Floor Philadelphia, PA 19107-3780 TO: Distribution FROM: Marie E. Corbi SUBJECT: Sealed Bid No. 15-00180-AMGA Overhaul of EX54 Main Smoothing Reactor DATE: November 17, 2015 Distribution:

More information

Public Works Audit Preliminary Findings: Temporary Inmate Housing & City Hall Elevator Overhaul

Public Works Audit Preliminary Findings: Temporary Inmate Housing & City Hall Elevator Overhaul Public Works Audit Preliminary Findings: Temporary Inmate Housing & City Hall Elevator Overhaul Presentation to City Council June 19, 2012 Audit Services Department City of Chesapeake, Virginia I. Background

More information

CITY OF TACOMA Tacoma Power & Public Works Engineering

CITY OF TACOMA Tacoma Power & Public Works Engineering CITY OF TACOMA Tacoma Power & Public Works Engineering ADDENDUM NO. 1 DATE: August 22, 2017 REVISIONS TO: Request for Bids Specification No. PE17-0235F Citywide LED Streetlight Installation NOTICE TO ALL

More information

ASHCROFT PUMP STATIONS 2 & 3 CAPACITY IMPROVEMENTS PROJECT ACSA Project No Addendum 1 June 20, 2018

ASHCROFT PUMP STATIONS 2 & 3 CAPACITY IMPROVEMENTS PROJECT ACSA Project No Addendum 1 June 20, 2018 ASHCROFT PUMP STATIONS 2 & 3 CAPACITY IMPROVEMENTS PROJECT ACSA Project No. 2014-10 Addendum 1 June 20, 2018 ALBEMARLE COUNTY SERVICE AUTHORITY ALBEMARLE COUNTY, VIRGINIA Prepared for: Albemarle County

More information

A D D E N D U M N O. 1

A D D E N D U M N O. 1 A D D E N D U M N O. 1 TO: PROJECT: All Prospective Bidders (LVJ) Signage, Gate and Pavement Marking Improvements TxDOT CSJ No. Project No. 007250 (0500.051.000) ISSUE DATE: October 25, 2017 The following

More information

CLARIFICATIONS, CHANGES AND ADDITIONS TO THE BID DOCUMENTS. 1. Division of Aviation Permit # T16-104, with James Jones Memo dated 9/23/16.

CLARIFICATIONS, CHANGES AND ADDITIONS TO THE BID DOCUMENTS. 1. Division of Aviation Permit # T16-104, with James Jones Memo dated 9/23/16. The Philadelphia Parking Authority Mellon Independence Center 701 Market Street, Suite 5400 Philadelphia, PA 19106 Bid No. 16-01 Fiber Optic Connectivity Philadelphia International Airport Addendum One

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Integration of Drop/Insert Multiplexor/Demultiplexor (D/I Muldem)

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Integration of Drop/Insert Multiplexor/Demultiplexor (D/I Muldem) 1993 Specifications CSJ 2374-05-047 SPECIAL SPECIFICATION ITEM 6436 Integration of Drop/Insert Multiplexor/Demultiplexor (D/I Muldem) 1.0 Description This Item shall govern for the integration of the Contractor

More information

SPECIAL SPECIFICATION 6664 Level (3) Communications System

SPECIAL SPECIFICATION 6664 Level (3) Communications System 2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6664 Level (3) Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Level (3) Communications,

More information

UMBC PAHB II AV Classroom Systems BID # BC R ADDENDUM #4

UMBC PAHB II AV Classroom Systems BID # BC R ADDENDUM #4 Department of Procurement University of Maryland, Baltimore County 1000 Hilltop Circle Baltimore, MD 21250 DATE: August 7, 2013 TO: All Prospective Bidders Cc: Procurement File PHONE: 410-455-2273 FAX:

More information

LIGHTING PROJECT SPECIFICATIONS

LIGHTING PROJECT SPECIFICATIONS Page 1 of 7 LIGHTING PROJECT SPECIFICATIONS 1. Clarification: The Scope of Work is provided in Outline Form only. Bidders finding discrepancies, ambiguities, or omissions in the Outline Scope of Work,

More information

Request for Proposal

Request for Proposal Request for Proposal Dillon School District Three Telecommunications Cabling for Latta Middle School Contact: Robert McIntyre, Director of Technology (843) 752-7101 office phone (843)752-2081 office fax

More information

SWITCH GEAR SERVICE AND MAINTAINNANCE SAFETY MEASURES AND REQUIREMENTS

SWITCH GEAR SERVICE AND MAINTAINNANCE SAFETY MEASURES AND REQUIREMENTS SWITCH GEAR SERVICE AND MAINTAINNANCE SAFETY MEASURES AND REQUIREMENTS i) A thorough site risk assessment to be done before commencement of work. ii) All personnel involved in the job to be taken through

More information

SPECIAL SPECIFICATION 6658 Time Warner Communications System

SPECIAL SPECIFICATION 6658 Time Warner Communications System 2004 Specifications CSJ 1200-05-014 1. Description. SPECIAL SPECIFICATION 6658 Time Warner Communications System A. This Item will govern the installation of all facilities belonging to Time Warner Cable

More information

Request for Quotations

Request for Quotations METRO EMERGENCY OPERATIONS CENTER OF KANAWHA COUNTY 200 Peyton Way Charleston, WV 25309 (304) 746-7911 7911 Request for Quotations Re: Dispatch Radio Console Equipment Date: March 5, 2018 Fiscal Year:

More information

This document shall become attached to and part of the Construction Documents for the aforementioned project.

This document shall become attached to and part of the Construction Documents for the aforementioned project. ADDENDUM Pre Bid Addendum No. 01 TO PLANS AND SPECIFICATIONS FOR Livonia Public Schools High School Press Boxes SHW Project No. 7113.059, 7113.060 & 7113.061 February 20, 2014 NOTE: If you have questions

More information

Jordan, Gilbert & Bain Landscape Architects, Inc. 459 North Ventura Avenue, Ventura, California (805) Phone; (805) Fax

Jordan, Gilbert & Bain Landscape Architects, Inc. 459 North Ventura Avenue, Ventura, California (805) Phone; (805) Fax ADDENDUM #2 Date: December 5, 2018 Issued By: Jordan, Gilbert & Bain Landscape Architects, Inc. 459 North Ventura Avenue, Ventura, California 93001 (805) 642-3641 Phone; (805) 653-7874 Fax Project: Freedom

More information

NO. 1 5/4/18 TO THE DRAWINGS AND THE PROJECT MANUAL. PROJECT NAME: District Wide Security Upgrades Phase 2. CLIENT NAME: San Angelo I.S.D.

NO. 1 5/4/18 TO THE DRAWINGS AND THE PROJECT MANUAL. PROJECT NAME: District Wide Security Upgrades Phase 2. CLIENT NAME: San Angelo I.S.D. NO. 1 TO THE DRAWINGS AND THE PROJECT MANUAL PROJECT NAME: District Wide Security Upgrades Phase 2 CLIENT NAME: San Angelo I.S.D. LOCATION: PROJECT NUMBER: PROPOSAL DATE: Tuesday, May 8, 2018, Time: 3:00

More information

September 23, 2016 ADDENDUM #2

September 23, 2016 ADDENDUM #2 September 23, 2016 ADDENDUM #2 To: From: Subject: Prospective Bidders St. Johns County Purchasing Department Bid No. 16-55 St. Johns County Building Services Renovation & Remodeling. This Addendum #2 is

More information

ADDENDUM NO. 2. Except as hereinafter specified, the work shall be in accordance with the drawings and specifications.

ADDENDUM NO. 2. Except as hereinafter specified, the work shall be in accordance with the drawings and specifications. ITB-CD-CM-14-03 Scoreboards for Indian Trails Sports Complex ISSUE DATE: January 15, 2014 DUE DATE: January 22, 2014 @ 2:00pm ADDENDUM NO. 2 SUBJECT: Bidder question and Clarifications INTENT: This addendum

More information

BUREAU Joe Iuviene, AIA January 20, 2017

BUREAU Joe Iuviene, AIA January 20, 2017 architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS USACE / NAVFAC / AFCEC / NASA UFGS-00 22 13.00 20 (February 2014) Change 2-05/16 ----------------------------------- Preparing Activity: NAVFAC Superseding UFGS-00 22 13 (May 2011) UNIFIED FACILITIES GUIDE

More information

ADDENDUM NO. 2 ITB-PW-U CITY OF PALM COAST WTP 3 ELECTRICAL DISTRIBUTION FACILITIES TO SERVE WELL SITES PH 2

ADDENDUM NO. 2 ITB-PW-U CITY OF PALM COAST WTP 3 ELECTRICAL DISTRIBUTION FACILITIES TO SERVE WELL SITES PH 2 ADDENDUM NO. 2 ITB-PW-U-12-09 CITY OF PALM COAST WTP 3 ELECTRICAL DISTRIBUTION FACILITIES TO SERVE WELL SITES PH 2 ISSUE DATE: August 20, 2012 BID DATE: August 28, 2012, at 2:00 PM This addendum is issued

More information

PROPOSAL OF, a corporation. an individual doing business as

PROPOSAL OF, a corporation. an individual doing business as PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to instructions and invitations to bidders, the undersigned proposes

More information

December 2, Enclosed is Addendum No. 1 to SEPTA's Sealed Bid No AMJP Frazer Shop & Yard Expansion Contract 2 (Re-Bid GC).

December 2, Enclosed is Addendum No. 1 to SEPTA's Sealed Bid No AMJP Frazer Shop & Yard Expansion Contract 2 (Re-Bid GC). December 2, 2016 Dear Sir/Madam Enclosed is Addendum No. 1 to SEPTA's Sealed Bid No. 16-00249-AMJP Frazer Shop & Yard Expansion Contract 2 (Re-Bid GC). The bid opening date and time scheduled for Wednesday,

More information

ADDENDUM No. 2 Request for Proposals (RFP) 19RFP033 Structured Network Cabling

ADDENDUM No. 2 Request for Proposals (RFP) 19RFP033 Structured Network Cabling December 19, 2018 ADDENDUM No. 2 Request for Proposals (RFP) 19RFP033 Structured Network Cabling Item 1: General Clarifications Item 2: Questions and Answers Item 1: General Clarifications for 19RFP033

More information

COMMUNICATIONS NETWORK UPGRADES AT VARIOUS LOCATIONS CITY OF SIOUX FALLS, SOUTH DAKOTA Bid Request No ADDENDUM NO.

COMMUNICATIONS NETWORK UPGRADES AT VARIOUS LOCATIONS CITY OF SIOUX FALLS, SOUTH DAKOTA Bid Request No ADDENDUM NO. COMMUNICATIONS NETWORK UPGRADES AT VARIOUS LOCATIONS CITY OF SIOUX FALLS, SOUTH DAKOTA Bid Request No. 15-1079 2015 CONTRACTOR S BID DATE: PLACE FOR CONTRACTOR S TO SUBMIT BIDS: Thursday, June 25th, 2015,

More information

ADDENDUM NO. 03 TO SPECIFICATIONS AND CONTRACT DOCUMENTS FOR JAXPORT CRUISE TERMINAL VIP ROOM RENOVATIONS JPA CONTRACT NO.

ADDENDUM NO. 03 TO SPECIFICATIONS AND CONTRACT DOCUMENTS FOR JAXPORT CRUISE TERMINAL VIP ROOM RENOVATIONS JPA CONTRACT NO. Post Office Box 3005 2831 Talleyrand Avenue Jacksonville, Florida 32206-0005 www.jaxport.com July 2, 2018 ADDENDUM NO. 03 TO SPECIFICATIONS AND CONTRACT DOCUMENTS FOR JAXPORT CRUISE TERMINAL VIP ROOM RENOVATIONS

More information

ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV

ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION IN THE TOWN OF MALTA AND A PORTION OF THE 115KV LUTHER FOREST STATION IN THE TOWN OF STILLWATER SARATOGA

More information

ADDENDUM NO. ONE TO THE CONSTRUCTION DOCUMENTS December 8, 2015

ADDENDUM NO. ONE TO THE CONSTRUCTION DOCUMENTS December 8, 2015 REVELLE ELECTRICAL SWITCH STATION EXPANSION UNIVERSITY OF CALIFORNIA, SAN DIEGO Project No.: 4892/A4L-398/966176 General: ADDENDUM NO. ONE TO THE CONSTRUCTION DOCUMENTS December 8, 2015 The following changes,

More information

1. Is it possible that each site will become divided into its own project contract? The projects will not be divided into separate contracts.

1. Is it possible that each site will become divided into its own project contract? The projects will not be divided into separate contracts. Ferry Landings Resilience Upgrades Project 6727 / Contract 67270001 Questions & Answers June 20, 2017 1. Is it possible that each site will become divided into its own project contract? The projects will

More information

Illinois Valley Regional Dispatch RFP Disclaimer Logging Recorder

Illinois Valley Regional Dispatch RFP Disclaimer Logging Recorder Illinois Valley Regional Dispatch RFP Disclaimer Logging Recorder To the extent any of the following requirements are propriety or vendor specific or in any way limits open and competitive proposals IVRD

More information

Tender #: Cisco Enterprise Licensing Agreement Release Date: February 15, 2018 Closing Deadline: March 1, :00pm Newfoundland Time

Tender #: Cisco Enterprise Licensing Agreement Release Date: February 15, 2018 Closing Deadline: March 1, :00pm Newfoundland Time Tender #: 2018-016 Cisco Enterprise Licensing Agreement Release Date: February 15, 2018 Closing Deadline: March 1, 2018 2:00pm Newfoundland Time Copyright Notice This document is fully copyright protected

More information

LIGHTING PROJECT SPECIFICATIONS

LIGHTING PROJECT SPECIFICATIONS Page 1 of 6 LIGHTING PROJECT SPECIFICATIONS 1. Clarification: The Scope of Work is provided in Outline Form only. Bidders finding discrepancies, ambiguities, or omissions in the Outline Scope of Work,

More information

ALL BIDDERS shall acknowledge receipt of this Addendum No. 1 on the BID FORM or the BID will be deemed to be invalid for the purposes of this project.

ALL BIDDERS shall acknowledge receipt of this Addendum No. 1 on the BID FORM or the BID will be deemed to be invalid for the purposes of this project. LOS ANGELES COMMUNITY COLLEGES 770 Wilshire Boulevard, Los Angeles, CA 90017 Telephone: 213/891-2000 CITY EAST HARBOR MISSION PIERCE SOUTHWEST TRADE TECHNICAL VALLEY WEST ADMINISTRATIVE OFFICES Date: October

More information

Scope of Work Bid Package C-8 - West Overhead Doors

Scope of Work Bid Package C-8 - West Overhead Doors Scope of Work Bid Package C-8 - West Overhead Doors CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,

More information

ADDENDUM NUMBER ONE BRISTOL WATER FILTRATION PLANT MCC UPGRADE CITY OF BRISTOL, TENNESSEE

ADDENDUM NUMBER ONE BRISTOL WATER FILTRATION PLANT MCC UPGRADE CITY OF BRISTOL, TENNESSEE ADDENDUM NUMBER ONE BRISTOL WATER FILTRATION PLANT MCC UPGRADE CITY OF BRISTOL, TENNESSEE Pre-bid Meeting minutes are attached to this Addendum. I. QUESTIONS 1. Can an allowance for Power Company costs

More information

STREET LIGHTING. Springville City Power standard street lights will be installed in accordance with Springville City Power's Line Extension Policy.

STREET LIGHTING. Springville City Power standard street lights will be installed in accordance with Springville City Power's Line Extension Policy. General The following general requirements shall apply to street lights installed in new underground residential subdivisions or developments located within the service area of Springville City Power (within

More information

METRO RESPONSE TO PROSPECTIVE BIDDERS QUESTIONS

METRO RESPONSE TO PROSPECTIVE BIDDERS QUESTIONS METRO RESPONSE TO PROSPECTIVE BIDDERS QUESTIONS Wednesday, October 31, 2018 Solicitation No. 4018000193 ROC / Redline Tie Replacement, Drainage & Subgrade Improvements 1. Will the Thickness of Sub ballast

More information

Bowman Outside Plant Splicing Project

Bowman Outside Plant Splicing Project Title and Summary Request for Best Value Bid ( RFB ): RFBVB Title: RFB Publication: RFB Composition: RFB Amendments: Contracting Entity: No. FY13 0116 Bowman Outside Plant Splicing Project As follows:

More information

Revised Drawings A, E, and M dated 11/13/18 (that include additional specifications)

Revised Drawings A, E, and M dated 11/13/18 (that include additional specifications) Addendum No. 1 To: All Prospective Bidders Description: Holocaust Resource Center Expansion Stockton University Galloway, New Jersey 08205 Bid Number: B190003 Date: November 19, 2018 Pursuant to N.J.S.A.

More information

ADDENDUM NO.2 REQUEST FOR PROPOSALS FOR CITY OF PALM COAST

ADDENDUM NO.2 REQUEST FOR PROPOSALS FOR CITY OF PALM COAST ADDENDUM NO.2 REQUEST FOR PROPOSALS FOR CITY OF PALM COAST WASTEWATER TREATMENT PLANT NO.2 MEMBRANE BIOREACTOR EQUIPMENT City Project No. RFP- U- 08-10 DATE: March 28, 2008 TO: Prospective Membrane Bioreactor

More information

REQUEST FOR PROPOSALS: Pelham City Schools Charlie Maison

REQUEST FOR PROPOSALS: Pelham City Schools Charlie Maison REQUEST FOR PROPOSALS: Requestor: RFP Contact: Pelham City Schools Charlie Maison BEN: 127527 IT Director 203 Mathewson Ave. Tel: 229.294.8715 Pelham, GA 31779 cmaison@pelham-city.k12.ga.us For: Pelham

More information

For Reference Only - Not For The Purpose Of Bidding BP-1 PROPOSAL. PROPOSAL OF, a corporation a. partnership consisting of

For Reference Only - Not For The Purpose Of Bidding BP-1 PROPOSAL. PROPOSAL OF, a corporation a. partnership consisting of PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned

More information

FLORIDA DEPARTMENT OF TRANSPORTATION

FLORIDA DEPARTMENT OF TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 DATE: May 16, 2017 RE: BID/RFP #: BID/RFP TITLE: Intelligent Transportation Systems (ITS) Field Device Replacement in Broward County OPENING DATE: May

More information

FLORIDA DEPARTMENT OF TRANSPORTATION

FLORIDA DEPARTMENT OF TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 2 May 12, 2016 RE: ITB#: ITB-DOT-15/16-9049-JP ITB TITLE: Furnish and Install FDOT Tower Replacement: FTE Site x Notice is hereby given of the following

More information

Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington

Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington Standards and Procedures Security Room Construction/Renovations At University of North Carolina Wilmington Rev 062017 Provided by UNCW Physical Security and Access OVERVIEW... 3 CABLE INSTALLATION... 3

More information

SARASOTA COUNTY GOVERNMENT PROCUREMENT 1660 Ringling Blvd., 3 rd Floor Sarasota, Florida Telephone Fax

SARASOTA COUNTY GOVERNMENT PROCUREMENT 1660 Ringling Blvd., 3 rd Floor Sarasota, Florida Telephone Fax SARASOTA COUNTY GOVERNMENT PROCUREMENT 1660 Ringling Blvd., 3 rd Floor Sarasota, Florida 34236 Telephone 941-861-5266 Fax 941-861-5129 ADDENDUM NO.1 BID # : #153025CS CCSWDC Leachate Lift Station Rehabilitation

More information

BID ADDENDUM NO. 3 FOR SOLANO COUNTY TRANSIT OPERATIONS & MAINTENANCE FACILITY COMPRESSED NATURAL GAS PROJECT

BID ADDENDUM NO. 3 FOR SOLANO COUNTY TRANSIT OPERATIONS & MAINTENANCE FACILITY COMPRESSED NATURAL GAS PROJECT 8-25-2016 BID ADDENDUM NO. 3 FOR SOLANO COUNTY TRANSIT OPERATIONS & MAINTENANCE FACILITY COMPRESSED NATURAL GAS PROJECT City of Vallejo Solano County, California 94589 Pre-Bid Meeting: 2:00 PM, Thursday,

More information

ADDENDUM NO. 2 MBR TREATMENT FACILITY UPGRADE REVISIONS TO CONTRACT DOCUMENTS

ADDENDUM NO. 2 MBR TREATMENT FACILITY UPGRADE REVISIONS TO CONTRACT DOCUMENTS ADDENDUM NO. 2 MBR TREATMENT FACILITY UPGRADE REVISIONS TO CONTRACT DOCUMENTS VOLUME 1 OF 3 BIDDING REQUIREMENTS, CONTRACT FORMS AND CONDITIONS OF CONTRACT 1. Instruction to Bidders a. Paragraph 1.1.7.4.1:

More information

TABLE OF CONTENTS ARTICLE NUMBER DESCRIPTION PAGE 1 PROJECT DESCRIPTION 2 2 PHYSICAL CONDITIONS/CONTRACT PLANS 2 3 PROJECT COORDINATION 3-5

TABLE OF CONTENTS ARTICLE NUMBER DESCRIPTION PAGE 1 PROJECT DESCRIPTION 2 2 PHYSICAL CONDITIONS/CONTRACT PLANS 2 3 PROJECT COORDINATION 3-5 TABLE OF CONTENTS ARTICLE NUMBER DESCRIPTION PAGE 1 PROJECT DESCRIPTION 2 2 PHYSICAL CONDITIONS/CONTRACT PLANS 2 3 PROJECT COORDINATION 3-5 3.1 Intent of Plans and Specifications 3.2 Interpretation of

More information

Addendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications

Addendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications Addendum No. 2 Project No. 2016-01EL West Barbour Street 12kV Underground Reconductoring Revisions to Drawings and Specifications Pre-Bid Meeting Notes and Scope of Work Clarifications Replace Section

More information

Addendum No. 1 Page 1 of 2

Addendum No. 1 Page 1 of 2 Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT

More information

Central Mississippi Regional Library System Notice to Bidders Cabling Switches E Rate Registration with USAC

Central Mississippi Regional Library System Notice to Bidders Cabling Switches E Rate Registration with USAC Notice to Bidders Bids must be received by April 5th, 2017 at the Central Mississippi Regional Library System (CMRLS) Administrative Office. Physical address - 100 Tamberline Street, Brandon, MS 39042

More information

Addendum #1. January 22, 2018

Addendum #1. January 22, 2018 Addendum #1 January 22, 2018 Building B 8500 Public Works Drive Renovation for City of Manassas Water & Sewer Department 8500 Public Works Drive Manassas, VA 20110 Job Description Renovation of the existing

More information

Tender #: SAP Business Objects Licenses and Support Release Date: February 26, 2018 Closing Deadline: March 9, :00pm Newfoundland Time

Tender #: SAP Business Objects Licenses and Support Release Date: February 26, 2018 Closing Deadline: March 9, :00pm Newfoundland Time Tender #: 2018-018 SAP Business Objects Licenses and Support Release Date: February 26, 2018 Closing Deadline: March 9, 2018 2:00pm Newfoundland Time Copyright Notice This document is fully copyright protected

More information

Doseo Pipeline Project Modularization Overview Advantages/Disadvantages & Drivers

Doseo Pipeline Project Modularization Overview Advantages/Disadvantages & Drivers PURPOSE Modularization will be evaluated herein as a cold eyes look into the potential construction technique to be applied to the Doseo Pipeline Project. This analysis will include a review of the drivers

More information

00900 ADDENDUM #1. All Document Holders of Record. Date: February 16, Bayfield Waterline Replacement Project

00900 ADDENDUM #1. All Document Holders of Record. Date: February 16, Bayfield Waterline Replacement Project 00900 ADDENDUM #1 Issued to: All Document Holders of Record Date: February 16, 2016 Project: Bayfield Waterline Replacement Project This Addendum forms a part of the Contract described above. The original

More information

ADDENDUM #2 RFQ Red Line BRT Design Services. All vendors are to accept the information contained herein as the official response of IPTC.

ADDENDUM #2 RFQ Red Line BRT Design Services. All vendors are to accept the information contained herein as the official response of IPTC. Page 1 of 8 ADDENDUM #2 RFQ 15-01-194 Red Line BRT Design Services. February 17, 2015 To: All Vendors of Record RE: Addendum #2 All vendors are to accept the information contained herein as the official

More information

BIDDING FOR A FIBER PROJECT

BIDDING FOR A FIBER PROJECT IMTFIBER NIGERIA BIDDING FOR A FIBER PROJECT PROJECT DOCUMENTATION TIPS 1/1/2016 ADEJOLA JOHNSON Msc. CEO Imt computers Nig. Ltd FOA Representative in Nigeria #718 www.imtfiber.com info@imtfiber.com 08039576767

More information

Scope of Work Bid Package C-4 - West Polished Concrete

Scope of Work Bid Package C-4 - West Polished Concrete Scope of Work Bid Package C-4 - West Polished Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,

More information

Addendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16

Addendum # 1 Perdue Stadium Seating Bowl Improvements Date of Addendum: 09/07/16 Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 1 Perdue Stadium Seating Bowl Improvements

More information

SAN ANTONIO WATER SYSTEM DOS RIOS WATER RECYCLING CENTER (DRWRC) DIGESTER MIXING AND SYSTEM ENHANCEMENTS - PHASE 1

SAN ANTONIO WATER SYSTEM DOS RIOS WATER RECYCLING CENTER (DRWRC) DIGESTER MIXING AND SYSTEM ENHANCEMENTS - PHASE 1 SAN ANTONIO WATER SYSTEM DOS RIOS WATER RECYCLING CENTER (DRWRC) DIGESTER MIXING AND SYSTEM ENHANCEMENTS - PHASE 1 SOLICITATION NO.: B-10-031-MF SAWS JOB NO. 07-6500 DESCRIPTION: DOS RIOS WATER RECYCLING

More information

Request for Proposal (RFP)

Request for Proposal (RFP) Request for Proposal (RFP) Intercom Replacement for OCPS 2016 Inquiries and requests regarding this RFP should be directed to: Michael Hale Technology Director Oconee County Schools PO Box 146 35 School

More information

This document becomes a fully incorporated part of the specifications, and this letter constitutes legal notice of this requirement.

This document becomes a fully incorporated part of the specifications, and this letter constitutes legal notice of this requirement. Board of County Commissioners Pete Gerken President Tina Skeldon Wozniak Ben Konop Office of Support Services John C. Zeitler Director Lynn DiPierro Manager Addendum #1 Issued on May 8, 2009 Regarding

More information

DESCRIPTION. S-PAPI-1.3. Contractor shall be present and make adjustments as necessary during the FAA Flight Check. EQUIPMENT AND MATERIALS

DESCRIPTION. S-PAPI-1.3. Contractor shall be present and make adjustments as necessary during the FAA Flight Check. EQUIPMENT AND MATERIALS Item S-PAPI Precision Approach Path Indicator DESCRIPTION S-PAPI-1.1. This item shall consist of providing, installing or relocating PAPI systems of all types, styles, classes and options furnished and

More information

We will require two copies each of your lump sum proposals, vendor qualification questionnaire and your bid bond documents.

We will require two copies each of your lump sum proposals, vendor qualification questionnaire and your bid bond documents. Division of Finance and Business Operations Procurement & Strategic Sourcing 5700 Cass Avenue, suite 4200 Detroit, Michigan 48202 (313) 577-3734 FAX (313) 577-3747 September 24, 2014 Addendum #3 Request

More information

دانساني مرستو د برابرولو اداره

دانساني مرستو د برابرولو اداره INVITATION TO BID (ITB) ITB No: Request Title: CHA Internal Network Infrastructure Upgrade Date Issued: 22 July 2018 Issued By: Coordination of Humanitarian Assistance (CHA) For Information Contact: 0798287944-0799085519

More information

MSA MOORE & SPENCE ARCHITECTS, P.A.

MSA MOORE & SPENCE ARCHITECTS, P.A. MSA MOORE & SPENCE ARCHITECTS, P.A. ADDENDUM NUMBER THREE (3): October 27, 2009 to the Construction Documents dated October 9, 2009 for: HACFM, Covington Meadows Apartments Lehigh Acres, Florida The following

More information

ADDENDUM NO. 2. Wilder Road Rehabilitation Project I-69 to Imlay City Road LCRC No DATE: August 31, 2017

ADDENDUM NO. 2. Wilder Road Rehabilitation Project I-69 to Imlay City Road LCRC No DATE: August 31, 2017 ADDENDUM NO. 2 Wilder Road Rehabilitation Project I-69 to Imlay City Road LCRC No. 459-012-179953 DATE: August 31, 2017 FROM: Patrick R. Phelan, P.E. BMJ Engineers and Surveyors 519 Huron Avenue Port Huron,

More information

301 Walnut Street Windsor, Colorado phone fax

301 Walnut Street Windsor, Colorado phone fax 301 Walnut Street Windsor, Colorado 80550 phone 970-674-2400 fax 970-674-2456 www.windsorgov.com Table of Contents... 2 SECTION 1 Questions & Requests for Clarification... 3 1.1 Question Deadline... 3

More information

PROJECT NAME: NAVAJO TRIBAL UTILITY AUTHORITY WASTEWATER TREATMENT PLANT UPGRADES

PROJECT NAME: NAVAJO TRIBAL UTILITY AUTHORITY WASTEWATER TREATMENT PLANT UPGRADES Solutions for Today Vision for Tomorrow ADDENDUM 5 DATE: June 16, 2016 PROJECT NAME: NAVAJO TRIBAL UTILITY AUTHORITY WASTEWATER TREATMENT PLANT UPGRADES PROJECT NO. 115111 TO: ALL PLAN HOLDERS OF RECORD

More information

Q: Can the Airport provide drawings identifying what communication is available? Q: Who is the current credit card processor?

Q: Can the Airport provide drawings identifying what communication is available? Q: Who is the current credit card processor? ADDENDUM #1 FORT WAYNE-ALLEN COUNTY AIRPORT AUTHORITY REQUEST FOR PROPOSALS INSTALLATION OF A TURNKEY PARCS AT FORT WAYNE INTERNATIONAL AIRPORT FORT WAYNE, IN The following addendum Items modify, change,

More information

FLORIDA ARMY NATIONAL GUARD, CBJTC CACTF FIBER OPTIC CABLE INSTALLATION, PN SCOPE OF WORK, 28 MARCH 2012

FLORIDA ARMY NATIONAL GUARD, CBJTC CACTF FIBER OPTIC CABLE INSTALLATION, PN SCOPE OF WORK, 28 MARCH 2012 1. General. 1.1 The project will require the provisioning and installation of conduits, hand holes, pull boxes and fiber optic cable extending several miles from a point of beginning to the Combined Arms

More information

The BCSD reserves option to purchase all or one or more items from one or more vendors.

The BCSD reserves option to purchase all or one or more items from one or more vendors. The Beaufort County School District (BCSD) is seeking audio equipment to be installed at the District Educational Support Center (DESC). The equipment is to be installed and tested by Wednesday, November

More information