1 ML Area ha., Near Village: Gundoj, Tehsil- Pali, District- Pali Index INDEX 1 EXECUTIVE SUMMARY INTRODUCTION OF THE OBJECT/ BACKGROUND INFORMATION IDENTIFICATION OF PROJECT AND PROJECT PROPONENT NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY/ REGION DEMAND SUPPLY GAP IMPORTS VS. INDIGENOUS PRODUCTION EXPORT POSSIBILITY DOMESTIC/EXPORT MARKETS EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT PROJECT DESCRIPTION TYPE OF PROJECT LOCATION OF PROPOSED PROJECT; DETAILS OF ALTERNATE SITES CONSIDERED SIZE OR MAGNITUDE OF OPERATION REGIONAL GEOLOGY Table No3.2: REGIONAL GEOLOGY... Error! Bookmark not defined LOCAL GEOLOGY: MINERAL RESERVES Table No3.3:MINERAL RESERVES PROJECT DESCRIPTION YEARWISE PRODUCTION DETAILS PROPOSED METHOD OF MINING: EXTENT OF MECHANIZATION CONCEPTUAL MINING PLAN DRILLING BLASTING... 32

2 ML Area ha., Near Village: Gundoj, Tehsil- Pali, District- Pali Index 3.6 RAW MATERIAL REQUIRMNET RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED AVAILABILITY OF WATER& ITS SOURCE ENERGY /POWER REQUIREMENT: QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR MANAGEMENT/DISPOSAL SITE ANALYSIS CONNECTIVITY (Mine Site) LAND FORM, LAND USE AND LAND OWNERSHIP LAND OWNERSHIP TOPOGRAPHY EXISTING LAND USE PATTERN EXISTING INFRASTRUCTURE WATER BASIC AMENITIES SOIL CLASSIFICATION CLIMATE SOCIAL INFRASTRUCTURE AVAILABLE PLANNING BRIEF PLANNING CONCEPT PROJECTPOPULATION PROJECTION LAND USE PLANNING ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL AND SOCIAL) AMENITIES/FACILITIES PROPOSED INFRASTRUCTURE INDUSTRIAL AREA RESIDENTIAL AREA (NON PROCESSING AREA)... 46

3 ML Area ha., Near Village: Gundoj, Tehsil- Pali, District- Pali Index 6.3 GREEN BELT SOCIAL INFRASTRUCTURE CONNECTIVITY DRINKING WATER MANAGEMENT (SOURCE& SUPPLY OF WATER) SEWAGE SYSTEM INDUSTRIAL WASTE MANAGEMENT SOLID WASTE MANAGEMENT POWER REQUIREMENT & SUPPLY/SOURCE REHABILITATION AND RESETTLEMENT (R& R PLAN) POLICY TO BE ADOPTED PROJECT SCHEDULE AND COST ESTIMATES TIME SCHEDULE FOR THE PROJECT ESTIMATED PROJECT COST ANALYSIS OF PROPOSAL ENVIRONMENT MANAGEMENT PLAN... 52

4 ML Area ha., Near Village: Gundoj, Tehsil- Pali, District- Pali Index List of Tables TABLE 1-1: SALIENT FEATURES OF THE PROJECT SITE TABLE 2-1:MANPOWER REQUIREMENT LIST OF FIGURES FIGURE 3-1 LOCATION MAP FIGURE 4-1: KEY PLAN... 39

5 1 EXECUTIVE SUMMARY 2.0 Introduction Of The Object The Proposed Gundoj Granite (Minor Mineral) Mine Project of R.K. Stones Granite is situated Near Village Gundoj, Tehsil - Pali, District - Pali (Rajasthan) over an area of ha. in Khasra No.. The letter of intent has been issued in favour of R.K. Stones Granite vide letter No. ME/Sojat/Min./M.L.13/2014/1629 dated Copy of LOI is enclosed as NNEXURE-V. The Mining Plan has been approved by S.M.E. Jodhpur, Department of Mines and Geology, Rajasthan vide letter No. SME/JO/CC/SOJAT/MINOR/13/2014 dated 28/12/2017. Copy is enclosed as ANNEXURE VI. The mining will be carried out by open-cast mechanized method as per the approved Mining Plan only. The entire lease area is classified as Private Land (Badani2) with no forest land involved. The proposed rate of production is 1,19,952 TPA. The estimated project cost is Rs. 1.0 Crore. The validity of lease is 50 years from the date of registration. Granite is one of the most sought- building materials for the construction purpose. Since granite has hard texture and durability. It is used chiefly for flooring, pavement of roads and imperviousness to moisture and acid, granite is a perfect countertop material. It is also used as decorative stone. This will also generate plenty of employment opportunity for local people. Economy and socio economic level of the area will also improve and there will the opportunity for education, health and & sanitation, transport and other development. The living standards of the area will alsoup- lift on the positive side Table 1-1: Salient Features of the project site S. No. Particulars Details A. Nature of the Project Proposed Gundoj Granite (Minor Mineral) Mine B. Size of the Project 1. Mine Area ha 2. Proposed Production capacity 1,19,952 TPA C Location Details 1. Village Gundoj 2. Tehsil Pali 3. District Pali 4. State Rajasthan

6 2.0 Introduction Of The Object 5. Latitude & Longitude Pillar Latitude (N) Longitude (E) A '42.03'' '3.06'' B '39.91'' '3.99'' C '40.56'' '4.79'' D '38.63'' '7.4'' E '36.79'' '5.12'' F '35.76'' '5.58'' G '35.24'' '5.15'' H '37.49'' '1.64'' I '40.19'' '59.51'' 6. Toposheet No. 45 G/2,G/6 D Environmental Settings of the Area 1. Ecological Sensitive Areas otected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration located within the 15 km radius of the mining lease. NAME DISTANCE DIRECTIONS R.F 10.0 KM West/South 2. River / water body Water bodies and rivers which falls within 15 Km radius Buffer zone are as follows: NAME DISTANCE DIRECTIONS Jawai Canal 4.5 KM East Bevta Canal 8.5 KM North Khari Nadi 7.0 KM North Bandi Nadi KM East Sumesar Nadi 10.0 KM North/East Jawai Nadi 5.50 KM East/South Sukri River 14.0 KM West/South Bandi Canal 12.0 KM West/North 3. Nearest Town / City Pali at a distance of 23.0 Km in North West direction of the Mining area. 4. Nearest Railway Station The nearest railway station is Pali located on 23.0 Km North From mine site

7 2.0 Introduction Of The Object 5. Nearest Airport Jodhpur Airport is located at a distance of 85.0 Km in North direction 6. State Boundary No State boundary passes through the project site.. 7. Seismic Zone Zone II [as per IS 1893 (Part-I): 2002] D Cost Details 1. Total Project Cost E Requirements of The Project 1. Proposed Water Requirement 5.6KLD The proposed project cost will be Rs 1.0 Cr. Capital Cost: Rs Lac Recurring Cost: Rs 12.3Lac 2. Fuel requirement 150 KVA, Which will be sourced from JVVNL. 3. Man Power Requirement 16(skilled, semi-skilled, unskilled & technical persons ) 2 INTRODUCTION OF THE OBJECT/ BACKGROUND INFORMATION 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT The proposed Granite Mine (Minor Mineral) is situated at Village - Gundoj, Tehsil - Pali, District Pali, State- Rajasthan. The Mining lease of hectare for Gundoj Granite Mine of ML.NO.13/14,Near Village Gundoj,Tehsil-Pali,District- Pali,State-Rajasthan L.O.I was sanctioned in favour of M/s R.K.STONE Partner Sh Hariram S/o Sh Gordhan Ram Jat,V/o-Gundoj,Tehsil-Pali,State Rajasthan. The proposed mine site is (Private Land) Badani 2. The targeted production of mineral will be 1,19,952 TPA. The estimated project cost will be Rs. 1.0 Crore. The expected life of mine will be = 13 years Copy of transfer deed is enclosed as ANNEXURE - I. 2.2 BRIEF DESCRIPTION OF THE NATURE OF PROJECT This is a proposed Granitemining project. As per EIA Notification dated 14 th Sep, 2006 and its subsequent amendments and as per S.O 2269 (A) dated , the project will be appraised as, Category B2 at DEAC. It has been proposed to excavate approximately 1,19,952 TPA of Granite from M.L. No. 13/14, by open - cast, semi - mechanized method. The lease area is 1.0 ha. Total mineable

8 2.0 Introduction Of The Object reserve available is 1,19,952 MT of Granite mineral. The expected life of mine is 13years. The waste generated will be used in making haul roads and building works. The Granite will be transported through by hired trucks. At the end of life of mine, at the end of life of mine, total excavated area will be ha which will be converted as water reservoir and proposed plantation is outside the lease area.. The daily water demand during the operation phase will be 5.6 KLD. The daily water demand during operation phase will be 5.6 KLD water demand will be met from the nearby village pond (desolation and impoundment will be carried out by P.P.). On one hand this will recharge the ground water table on the other will act as a water source for nearby habitants. Only water for drinking purposes i.e. 0.6 KLD will be brought from nearby dug well/phed. However, rain water stored in the pit during the rainy season will be used for plantation and dust suppression. The depth of water table is 75m (Pre-Monsoon) to 70 m (Post-Monsoon) below the general ground level. Thus ground water table will not be encountered during working in the mine. 2.2 NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY/ REGION The Graniteis a basic building construction material for constructing houses, bridges and roads. It is cheaper than the RCC construction material due to its easy in workability. Thus, keeping in mind this requirement, mining of Graniteis necessary for durability and to beautify by carving as per the requirement of the consumer. Total of 16 people will be employed for the mining activity which will create direct & indirect opportunity for employment to local people. By mineral production the applicant will pay royalty & other taxes which will be an additional source of revenue for the government. The proposed Granite mining project will cater to the needs of individual and local market of construction, in turn benefiting in the socio - economic development of the region.

9 2.3 DEMAND SUPPLY GAP 2.0 Introduction Of The Object Granite is one of the essential components for building and infrastructural development projects. It has high demand in the market due to increased domestic, industrial and other infrastructural activities. 2.4 IMPORTS VS. INDIGENOUS PRODUCTION In the current business scenario of Granite, import of Graniteis not envisaged. It is for Captive use only no import is proposed. 2.5 EXPORT POSSIBILITY Not applicable as proposed mine is for captive use only. 2.6 DOMESTIC/EXPORT MARKETS Domestic demand is one of the main reasons for the rapid growth of Granite business in India. Thus, domestic market for Granite as industrial material is well established. Granite produced from the proposed Granite mine will be used in building and infrastructural development projects. No export will be done. 2.7 EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT The total manpower requirement for the mining activity is 16 Priority for employment will be given to local workers. Following staff & workers are proposed to be employed:- Table 2-1: Manpower requirement S. No. Particulars Number(s) 1. Mining Engineer (part time) cum 1 Mines Manager 2. Mines Foreman 1 3. Skilled labors 7 4. Un skilled Labors 7 Total 16

10 3.0Project Description 3 PROJECT DESCRIPTION 3.1 TYPE OF PROJECT The mining of Granite is carried out by open-cast semi - mechanized method. This is an independent project. No interlinked project is proposed. 3.2 LOCATION OF PROPOSED PROJECT; The proposed Granite mine area falls in M.L. No. 13/14 of, Village- Gundoj, Tehsil Pali, District - Pali, in the State of Rajasthan over an area of ha. The project site falls in Survey of India Toposheet No. 45 G/2, G/6. The geographical location with respect to boundary pillars of the proposed Granite area are:- The location map is given below as Figure 1 the coordinated of proposed mining lease are given in Table 3.1 Table 3.1: Coordinates of Mining Lease Pillars Latitude (N) Longitude ( E ) A 25 37'42.03" 73 17'3.06" B 25 37'39.91" 73 17'3.99" C 25 37'40.56" 73 17'4.79" D 25 37'38.63" 73 17'7.4" E 25 37'36.79" 73 17'5.12" F 25 37'35.76" 73 17'5.58" G 25 37'35.24" 73 17'5.15" H 25 37'37.49" 73 17'1.64" I 25 37'40.19" 73 16'59.51" X 25 37'40.19" 73 16'59.51"

11 3.0Project Description

12 3.0Project Description Figure 3-1Location Map DETAILS OF ALTERNATE SITES CONSIDERED Mining activity is site specific hence no alternative sites examined. 3.3 SIZE OR MAGNITUDE OF OPERATION TPA. Proposed Granite mine is ha and proposed production capacity is 1,19, REGIONAL GEOLOGY Geologically, the district belongs to Delhi Super Group and Marwar Super Group. The Delhi Super Group comprises of Kumbhalgarh, Phulad Ophiolite sute, Sendra-Ambaji granite, Sirohi and Punagarh Group. The DelhiSuper Groupisoverlaid by a sequence of unmetamorphosed sedimentary rocks consisting of sandstone, limestone, siltstone and gypsum beds. The MarwarSuper Group is divided into Jodhpur and Bilara Group which consistsof sandstone, shale and limestone rocks. The DelhiSuper Grouprocks are intruded by granites and rhyolite. The predominant intrusive is the Erinpura Granite. The Delhi Super Group is mainly exposed in NNE parts of the district while Marwar Super Group is exposed in northern part in Jaitaran and Sojat blocks. Erinpura granite & gneiss occupied almost 50 % area of the district and exposed mainly in central, southern and southeastern parts of the district. Super Group Age Lithology Recent to sub recent Alluvium & wind blown Marwar Bilara Limestone Jodhpur Sandstone,Shale,boulder and chert Intrusive(Post Delhi) Malani Igneous Suite Granite (Jolor type),rhyolite & pyroclastics with dykes of granophyre

13 3.0Project Description Erinpura Granite Granite and gneiss Delhi Punagarh Basic volcanic with pillow lava,met tuff,quartzite,shale,slate,phyllite,bedded chert Sirohi Sendra- Ambaji Granite Phulad Ophiolite Suite Kumbhalgarh Phyllite,mica-schist,biotite schist,dolomitic marble,migmatite & gneisses epidiorite,hornablende Granite and gneiss Hornblends schist,amphibolite,pyroxene granulite,gabbro & ultramafics Calc schist,marble,granite schist/amphibolite,biotite schist,quartzite,mica schist and migmatite LOCAL GEOLOGY:- The blockable nature of Granite present in the area that belongs to Malani Igneous Suite of- Erinpura Granite.The granite of the area geologically belong to the Erinpura Granite Alluvium Weathered Granite Granite Alluvium Geologically this unit of recent to sub-recent age is exposed.the average thickness 0.15 Weathered Granite A weathered Granite bed is observed in nearby areas having height 2m

14 3.0Project Description Granite Granite bed is observed in nearby well and old pits upto 50m below the weathered granite MINERAL RESERVES Table No3.3: MINERAL RESERVES Reserves UNFC Rec. Mineral 95% (MT) Proved 111 8,59,382 Probable 121 4,24,655 Posisible &122 2,25,237 Total 15,09,274 Life of Mine: Life of mine Mineable Reserve / Average annual production 15,09,274/1,20, years 3.4 PROJECT DESCRIPTION YEARWISE PRODUCTION DETAILS In this area the mining of Granite involves small blasting to remove the overburden and loosen the mineral body. The Applicant has proposed to produce Granite working for a period of 5 years with a production of 1,19,952 TPA as per the mine plan. The details of year wise production for the five years period are given below. Table 3.4: Year wise Production of Granitefor the five years period Year 1st Year ( ) 2nd Year ( ) 3rd Year ( ) Khanda GRANITE Block Year Passed Year Passed Year Passed Year Passed Year Passed Year Passed 4th year( ) th year( ) Total

15 3.0Project Description PROPOSED METHOD OF MINING: The proposed Granite Mine shall be developed by semi - mechanized open cast mining which includes drilling, blasting, loading, transport and dispatch of mineral to end users OPEN CAST MINING The mining will be done by open- cast, semi - mechanized method of mining. The bench height will be maintained 9m and the width will be maintained more than 6m. The ultimate depth of the workings is estimated to reach up to 45 m from the surface level SALIENT FEATURES OF MINING METHOD The salient features of proposed mining method are:- The mining will be done from top to bottom. There is no overburden in the mining lease area, however the thin top scree material will be removed and stacked in the statutory boundary barrier. The benches will be formed by drilling holes of 6 m depth and then blasting in a row. Blasting will be done to achieve the required size of stone. Loading of the Granitewill be done by Loader/JCB. Transportation of mineral will be done by hired trucks EXTENT OF MECHANIZATION The mining machineries to be used in proposed mining operation are as below:- Table-3.5: List of Machineries S. No. Machine No. Make Capacity 1 Wire saw 2 Local 30 hp 2 Hydraulic Jack 1 Local 30 Tonner 3 Crane 2 Local 30 Tonner 4 D G Set 1 Local 160 kva 5 Compressor 1 CPT 360 cfm 6 Excavator 2 L & T 1.2 m 3 7 Rock Breaker 2 L & T 1.2 m 3

16 3.0Project Description 8 Drill Machine 2 Atlas Copco 100mm dia The detail of transport equipment is as follow: S. No. Type No. of machine Size capacity in Tonne Make Motive Power 1. Dumper 2 12 Tata Diesel engine The detail of water pump equipment is as follow: S. No. Type No. of machine Size in inch Make Motive Power 1. Water Pump 1 3 to 4 Crompton Diesel engine CONCEPTUAL MINING PLAN The Graniteo ccurs throughout the area. The mineable reserves are estimated to be MT. The annual Production is proposed to be 1,19,952 TPA. Life of the mine is 13 Years LAND USE PATTERN The land use for mining and allied purposes is given below:- Table3.6: LAND: STAGE WISE LAND USE AND RECLAMATION AREA (Ha.) S. No. Particulates Present After 5 th year At the end of life of mine Land - Use land- Use land- Use 1. Top soil Excavated area & Road (total excavated area will be converted into water reservoir) 3. Waste Dumps NIL NIL NIL 4 Infrastructure Plantation -- --

17 3.0Project Description 6. Crusher NIL NIL NIL 7. Undisturbed area Total * Plantation. Will be planted Outside the lease area. Mineral Reject will be used in haul road & other building construction. Table: 3.7: POST MINING LAND USE OF CORE ZONE WITH ENVIRONMENT MANAGEMENT S. No. Description Land Use (In Ha.) Plantation Water Body Public Undisturbed Other Use Total Use 1 Top Soil Dump Nil Nil Nil Nil Nil Nil 2 External Waste Nil Nil Nil Nil Nil Nil Dump 3 (a)excavation Nil Nil Nil Nil (Voids) (b)excavation Nil Nil Nil Nil Nil Nil (backfilled) 4 Road Nil Nil Nil Nil Nil Nil 5 Built Up Area Nil Nil Nil Nil Township Area Nil Nil Nil Nil Nil Nil 7 Afforestation Nil Nil Nil Nil Nil Nil 8 Mineral Storage Nil Nil Nil Nil Nil Nil 9 Crusher Nil Nil Nil Nil Nil Nil 10 Undisturbed Nil Nil Nil Nil Nil Nil Area Total Nil Nil Nil Nil * Plantation. Will be planted Outside the lease area. Mineral Reject will be used in haul road & other building construction. The conceptual plan is enclosed as Plate No.II DRILLING Drilling will be done prior to blasting BLASTING Blasting operations will be performed by competent person. Spacing and burden may change depending upon the field condition based on experience. In case of deep hole blasting, prior permission will be taken from DGMS. Table No: 3.8: The Broad blasting parameters will be as under: - The Broad blasting parameters will be as under: -

18 1. Spacing : 1.20 m. 2. Burden : m. 3.0Project Description 3. Depth of hole : 1.6 m.. (In two stages) 4. Tonnage of each hole : 4.77 m 5. Charge per hole ANFO : 0.40 Kg 6. No. of Cartridge : 1 7. No. of hole per round : No. of round per day : 2 to 3 9. No. of row : Wt. Of Cartridge : 125 gm 11. Powder Factor : 6.05 tonnes / Kg TYPE OF EXPLOSIVES 1 ANFO (AN 95%, FO 5%) 2. Slurry Explosive 3. Detonating Fuse 4. Ordinary Detonator /Electric detonator 5. Safety Fuse STORAGE OF EXPLOSIVE The mining Operation will require explosives for blasting. But blasting will be done on a small scale, therefore, requirement of explosives will be very less and no explosive will be stored at the mine site. Explosive required for blasting will be transported from nearby magazine in an approved explosive van. There is no infrastructure within 50 Mtr. radius of lease area. Blasting operation will be done by blaster / mines manager appointed by the applicant. The controlled blasting will be adopted with all the safety measures as per MMR 1961 and permission of DGMS

19 3.4.7 MINERAL TRANSPORTATION 3.0Project Description The mineral produced will be loaded into trucks/dumpers, for onward transport to the consumer as well as to the crusher unit nearby the allotted area. Loading of Granitewill be done by Crane and be sent directly to the end users by hired trucks whereas dumpers of 12 T capacity will be used for transportation of mineral outside lease area. 3.5 RAW MATERIAL REQUIRMNET No raw material will be required. The final product will be sent to consumer industries based on their demand. The mode of transportation of final product will be road. Dumpers will be used for transportation of Granite. 3.6 RESOURCES OPTIMIZATION/ RECYCLING AND REUSE ENVISAGED The Granite will be mined in the form of boulders so there will be no recycling and reuse envisaged. 3.7 AVAILABILITY OF WATER& ITS SOURCE The daily water demand for the proposed project is 4.06 KLD. It will be procured from the PHED supply source of Village- Gundoj. The detailed breakup of the water requirement is given below. Table 3.9: Water Demand S. No. Particulars Quantity (KLD) 1. Domestic Purpose Dust Suppression / Water Sprinkling Green belt / Plantation 1.0 Total ENERGY /POWER REQUIREMENT: Power Supply: Power Supply: Power requirement for proposed Granite mine will be about 150 kva, which will be sourced from JVVNL.

20 3.0Project Description QUANTITY OF WASTE TO BE GENERATED (LIQUID AND SOLID) AND SCHEME FOR THEIR MANAGEMENT/DISPOSAL About m 3 of mineral reject will be generated at the end of five years period. This will be dumped in the statutory barrier and plantation will be done over it. At the conceptual phase no dump will be left. TABLE 3.10: QUANTITY OF WASTE TO BE GENERATED PARTICULARS Topsoil Overburden MANAGEMENT Thin cover of scree is available in the lease area which will be stacked separately and simultaneously used for plantation of saplings within the lease area. The mineral rejects will be generated m 3 in five years of mining of Granitewhich is produced by40% mining loss. The mineral rejects will be used by lessee for making haul roads etc.

21 4.0 SITE ANALYSIS 4 SITE ANALYSIS 4.1 CONNECTIVITY (Mine Site) The site is well connected by road as the study area is already well explored having many mines. The connectivity details are given in Table & below. Table No.4.1: Connectivity PARTICULARS Nearest Railway Station Nearest Airport Nearest Highway DISTANCE & DIRECTION Pali Railway Station at a distance of ~~23.00 km. in West direction from Mining Lease area. Jodhpur Air Port at a distance of around ~85.00 km. in North direction from Mining Lease area. 4.2 LAND FORM, LAND USE AND LAND OWNERSHIP LAND FORM Topographically, the lease area is Flat Land of 223 mrl and lowest elevation of 22mRL. The drainage pattern follows the general trend of the topography and is towards South Eastern side of the lease area. LAND USE The present land use pattern is as below:- NH-14 is ~3.5 km in South-East direction from the mine site. Table 4.2: Land Use Pattern S. No. Particulars Present Land-use (ha.) 1. Excavation Pit (Voids Only) Waste Dump (External) Infrastructure including office Road Afforestation Undisturbed Area Green Belt Development Minerals Stack Yard Undisturbed area Total

22 4.0 SITE ANALYSIS LAND OWNERSHIP The land as per revenue records is Private land (Badani2) of hectare. The Surface Plan is enclosed as Plate No.-III 4.3 TOPOGRAPHY Topographically, the lease area is hilly, highest elevation of 223 mrl and lowest elevation of 222 mrl. 4.4 EXISTING LAND USE PATTERN Mining lease falls in government waste land, the existing land use pattern of the mining lease is given in table below. S. No. Particulars Forest Land Table 4.3: Existing Land Use Pattern (In Ha.) Govt. Grazing Land Govt./ Private waste land Private land Total Ag. Non Ag. 1. Excavation Pit (Voids Only) Waste Dump (External) Infrastructure including office Road 4. Afforestation Undisturbed Area Minerals Stack Yard Crusher Total As mentioned the mining lease is in government waste land and study area is devoid of any National Park, Wild Life Sanctuary, Biosphere Reserve, Tiger Reserve, Wildlife Corridor, Reserved Forest the environmental settings of the study area are given in Table No.16 below and also shown in Figure II.

23 4.0 SITE ANALYSIS Table No.-4.4: Environmental Settings S. No. Particulars Details 1. National Park, Wild Life Sanctuary, Biosphere Reserve, Tiger Reserve, Wildlife Corridor, Reserved Forest otected & Reserve forest falls within 15.0 Km radius of the lease area are as follows: NAME DISTANCE DIRECTIONS R.F 10.0 KM West/South 2. River / water body Water bodies and rivers within 15 Km radius Buffer zone as follows: - River/ water Distance Direction body Jawai Canal 4.5 KM East Bevta Canal 8.5 KM North Khari Nadi 7.0 KM North Bandi Nadi KM East Sumesar Nadi 10.0 KM North/East Jawai Nadi 5.50 KM East/South Sukri River 14.0 KM West/South Bandi Canal 12.0 KM West/North

24 4.0 SITE ANALYSIS

25 4.0 SITE ANALYSIS Figure 4-1:KEY Plan

26 4.5 EXISTING INFRASTRUCTURE Refer the para no. 4.1 of section Site Analysis WATER The total water demand will be as follows: Daily Water Demand 4.6 KLD Domestic KLD Dust Suppression 2.0 KLD Plantation 2.0 KLD BASIC AMENITIES a. School:- The primary school facility is available at village Gundoj whereas, Higher Secondary School is at Pali. b. Hospital:- Hospital facilities are available at Pali. 4.6 SOIL CLASSIFICATION Soils of the district are classified as: Loamy sand to sandy loam Sandy clay loam Sandy clay 4.7 CLIMATE The area is characterized by semi-arid type with an average annual rainfall of about mm. which is mainly received during July to September. Average Annual Rainfall 530 mm Average Humidity % Prominent wind direction North East Minimum Temperature 1 0 C

27 4.0 Site Analysis Maximum Temperature 44 0 C 4.8 SOCIAL INFRASTRUCTURE AVAILABLE The social infrastructure available in the study area is given in Table below. TABLE 5.6: SOCIAL INFRASTRUCTURE Particulars Name tance (Km) Direction (From Mining Lease Area) Nearest Habitation Gundoj 5.0 Km South Nearest Town Pali 23.0 Km North Nearest Airport Jodhpur Airport 85.0 Km North Nearest Highway NH Km SE Nearest Railway Station Pali 23.0 Km North Nearest Hospital Pali 23.0 Km North Educational Facility Gundoj 5.0 Km SE

28 5.0 Planning Brief 7 PLANNING BRIEF 4.9 PLANNING CONCEPT Type of Industry: Mining of Granite Facilities: Drinking water, first aid, mine office, rest shelter Transportation: Granite will be transported by means of Dumpers Town and Country Planning Development Authority Classification: not applicable, since this is a mining 4.10 PROJECTPOPULATION PROJECTION In the Buffer zone, total household is Total population is out of which 12,212 are males and 11,962 are females. The total literate person in the surrounding area is 5298 and total worker s population is 1,0771. The detailed demographic profile of villages located in the study area is given below:- Table No. 5.1 Demographic Profile S.No. Human Settlement House Hold Total Population Total Male Total Female Total Literates Total Illiterates Total worker Non worker 1. Baldo Ki Dhani Gurdai Kandra Hathlai Gundoj Sodawas Thakurla Guru Bichchhu Gura Sonigara Dingai Kanlao Denda Madri Godawas

29 5.0 Planning Brief 15. Jaitpura Total (Source: Census Data, 2011) 4.11 LAND USE PLANNING The sapling for plantation will be selected in consultation with the local forest department. It is proposed to plant 132 saplings in the lease area. The plantation will be done at the lease boundary. Year- wise programme of green-belt development for first five years, about saplings 150 will be planted in an area of ha. Up to the conceptual phase 132 saplings will be planted. By the green belt development it will improve the eco-system and aesthetic beauty of the area. Post plantation cares including provisions for watering, soil mulching & manuring the plants will be done. The list of the species to be planted in the green area is provided below:- Table 5.2: Green belt Programme Year Area (ha.) No. of Saplings Species Place of Plantation I Babool, Vilayati Outside the lease II babool, Khejari, area. Neem, Amal Tas, III Perkin Sonia IV V After V th Year At the end of Lease period 4.12 ASSESSMENT OF INFRASTRUCTURE DEMAND (PHYSICAL AND SOCIAL) The mine lease area is easily accessible from the state highway, NH-14 (3.5 Km,SE) & from the mining lease area. It will be helpful to approach workers to the mine site as well as transportation of mineral to the nearby areas and end user. Pali railway station is 23.0 Km, far towards North from the mine site. The infrastructure demand in the villages will be evaluate on the basis of necessity and priority. Job opportunities are inadequate and new possibility for income generation is required.

30 5.0 Planning Brief 4.13 AMENITIES/FACILITIES Mine Office: It is proposed for technical & clerical staff and keeping the records. Rest Shelter: Temporary Rest Shelter will be made available. Drinking Water Facility: The drinking water will be made available from the nearby open well as well as from the PHED supply of Pali village by water tankers. It will be stored in earthen pots and tanks at the site. Toilets: The toilet facility is proposed for the better sanitary condition of the workers employed in Mining area. Other facilities will be developed as per recumbent of the local people of the local of the nearby area under corporate social responsibilities programs. BREAK-UP OF BUGETARY PROVISION FOR THE FACILITIES PROVIDED FOR THE LABOURS S.No. PARTICULARS CAPITAL COST RECURRING COST (P.A.) (IN RS.) 1. Shelter, Safe Drinking water, Sanitation Facility 40,000 (One Time) Sanitation 30,000 (One Time) 2. Health facility -- 20, Fuel for cooking (LPG -- 20,000 cylinder) 4. Education for Children -- 15, Safety shoes, goggles, -- 10,000 helmet etc. Total 70, ,000 Drinking water, 30,000

31 . 6.0 Proposed Infrastructure 5 PROPOSED INFRASTRUCTURE 5.1 INDUSTRIAL AREA The area is well connected by road network to the mines, District headquarter etc. The area is self-sufficient to supply the needs of the project. Hence no, infrastructure is proposed. 5.2 RESIDENTIAL AREA (NON PROCESSING AREA) The local people will be employed, hence no residential area/ housing is proposed. 5.3 GREEN BELT Refer point no SOCIAL INFRASTRUCTURE The proposed project is situated at Village - Gundoj, Tehsil - Pali, District Pali (Rajasthan). As local people will be employed for excavation activities, no permanent infrastructure is required. The workers will come to the site by company s vehicle. By this project, indirect means of earnings in the area will be developed, which will bring a positive impact on the adjacent habitation. 5.5 CONNECTIVITY Given in Para No DRINKING WATER MANAGEMENT (SOURCE& SUPPLY OF WATER) The total water requirement for the proposed activity is 5.6 KLD out of which 5.6 KLD will be met from the nearby village pond (desolation and impoundment will be carried out by P.P.). On one hand this will recharge the ground water table on the other will act as a water source nearby habitants. Only water for drinking purposes i.e. 0.6 KLD will be brought from nearby dug well/phed. However, rain water stored in the pit during the rainy season will be used for plantation and dust suppression. The proposed indigenous water source created by the project proponent will fulfill the water demand of local habitants.

32 . 6.0 Proposed Infrastructure 5.7 SEWAGE SYSTEM Not Applicable. 5.8 INDUSTRIAL WASTE MANAGEMENT No industrial waste will be generated. 5.9 SOLID WASTE MANAGEMENT Given in point no POWER REQUIREMENT & SUPPLY/SOURCE Power requirement for proposed Granite mine will be about 150 kva.

33 . 7.0 Rehabilitation And Resettlement (R & R Plan) 6 REHABILITATION AND RESETTLEMENT (R& R PLAN) 6.1 POLICY TO BE ADOPTED No rehabilitation and resettlement is either required or proposed for the project as mining will be carried out entirely on Private Land (Birani 2).

34 . 8.0 Project Schedule And Cost Estimates 7 PROJECT SCHEDULE AND COST ESTIMATES 7.1 TIME SCHEDULE FOR THE PROJECT The leasee will commence work as possible after getting the environmental clearance as the mine lease is working site of the company. The proposed mining plan for 5 years is given in Table 8.1 below. Figure 7-1 Production figure for 5 year Year 1st Year ( ) 2nd Year ( ) 3rd Year ( ) Khanda GRANITE Block Year Passed Year Passed Year Passed Year Passed Year Passed Year Passed 4th year( ) th year( ) Total ESTIMATED PROJECT COST Project cost The proposed project cost will be Rs.1.0 Crore Capital Cost: Rs Lac Recurring Cost: Rs Lac Expenditure Proposed for Environmental protection activities: It is proposed to invest an amount of Rs Lac towards environmental action plan. The details of the same are given below:- Table 12: Expenditure Proposed for Environmental Protection Activities S. No. Description of Item Recurring Cost (Rs) 1 Air Pollution Control - Water Sprinkling 55,000 2 Environmental Monitoring and Management 90,000 3 Green Belt Development 55,000 Total 2,00,000/-

35 . 8.0 Project Schedule And Cost Estimates CSR (Cooperate Social Responsibility S.No. CSR Activity Proposed Budget( in Lacs) 1. Proposed rain water harvesting Social Forestry (At Gram Panchayat, Schools, Hospital) Common Vocational training centre Health check - up Camps for villagers as well as mine workers Occupation health Surveillance program for worker and 0.30 habitants Total 1.15

36 Environment Management Plan 8 ANALYSIS OF PROPOSAL Proposed Granite mine project will result in growth of the surrounding areas. Direct and indirect employment will be created for local people in nearby villages. Special emphasis on Financial and Social benefits will be given to the local People. No major adverse effect on environment is envisaged as the required mitigation measures are inbuilt in the project.

37 Environment Management Plan 9 ENVIRONMENT MANAGEMENT PLAN Table 10.1 below gives the environment management plan for the proposed mining project. Table No: 10.1ENVIRONMENT MANAGEMENT PLAN PARTICULARS MANAGEMENT Air Quality Excavation, Loading Dust generated due to drilling, blasting and and Transportation vehicular movements will be suppressed by water spraying on haul road. To avoid the dust generation from the drilling operations wet drilling method will be practiced. Drill machines will be fitted with dust collectors. Use of appropriate explosives for blasting. Controlled blasting techniques will be practiced. Dust mask will be provided to the workers. Proper maintenance of vehicles & machineries will be done. Water sprinkling on the haul road and other road at regular intervals will be done. Speed of the vehicles will be kept within the prescribed limits. Dumpers will not be over loaded. Sewage will be generated by employing 26 workers in the mine which will be diverted into a septic tank followed by soak pit. Garland drains will be made around the mining area Water Quality to channelize surface run off into natural drainage pit so that it can be utilized for dust suppression. Mining operations will be at higher levels; therefore there will be no effect on ground water condition due to mining. Noise Quality Drilling, Blasting, Adequate silencers in all the diesel operated

38 Environment Management Plan Loading and vehicles will be used. unloading of Mineral Personnel protective equipment will be provided to and movement of the workers/employed persons. Trucks. Proper maintenance of machines at regular intervals will be done. Green belt development and plantation. Waste generated during mining operation will be Solid Waste stacked separately in the boundary barrier and will be stabilized by plantation. Small amount of domestic waste will be generated for which dustbin will be kept at proper place and it will be disposed properly and regularly. At the end of life of mine, total excavated area will be Land Reclamation ha which will be converted as water reservoir and proposed plantation Outside the lease area. Environmental Management plan is enclosed as Plate No.-III.

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT

Masonry Stone Mining Project, M. L. No. 27/09, M. L. Area 1.0 ha. Near Village: Velangri, Tehsil & District-Sirohi (Rajasthan) PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT This is an existing mine, proposal for obtaining Environmental Clearance for Masonry Stone with production capacity 37,300 TPA Near Village: Velangri, Tehsil-Sirohi,

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 Executive Summary The Mining lease was granted in favour of Shri Mukesh Kumar S/o Shri Harish Chandra, R/o Tatol vaya Bagra, Tehsil - Bhinmal, Dist.-Jalore

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

EXECUTIVE SUMMARY. 1.1 Executive Summary

EXECUTIVE SUMMARY. 1.1 Executive Summary 1.1 Executive Summary EXECUTIVE SUMMARY Chobe ki Guwari Sand Stone Mining Project (M.L. No- 26-R-01/2001) is situated near village Chobe ki Guwari, Tehsil Sapotra, District Karoli, State Rajasthan over

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

INDEX 1 EXECUTIVE SUMMARY INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION PROJECT DESCRIPTION... 32

INDEX 1 EXECUTIVE SUMMARY INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION PROJECT DESCRIPTION... 32 M.L. Area- 4.0580ha., Near Village- Indawar, Tehsil Merta, District - Nagaur (Raj.) Index INDEX 1 EXECUTIVE SUMMARY... 28 2 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION... 30 2.1 IDENTIFICATION

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

1/1, Index INDEX ANY, SHOULD

1/1, Index INDEX ANY, SHOULD River Sand (Minor Mineral) Mining Project for River Yamuna in Gata No. 1/1, Production (9, 47,368 TPA), M.L Area 52.63 ha, near village: Index 1 2 INDEX EXECUTIVE SUMMARY... 2 INTRODUCTION OF THE OBJECT/

More information

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.)

Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) Pre-Feasibility Report for Girgita Limestone Mine of M/s KJS Cements Ltd.) 1) Executive Summary Project Name of Company / Mine Owner Location Village Taluka District State Girgita Limestone Mine M/s KJS

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Smt. J N Rukmini, has applied for extracting of Building stone in Sy No. 40, Kuroda Bore Kavala village, Hassan Taluk & District, Karnataka over an extent

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area.

PROJECT BRIEF. Noise environment: No Entrant noise generation sources exist in and around project area. PROJECT BRIEF PROJECT LOCATION: - Pahar Kua Marble Range Mining Project Q L No 235 is located near village Pahar Kua, Tehsil Makrana., District Nagaur Rajasthan. Project is approachable from national highway.

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT GRANITE BUILDING STONE QUARRY MINING PROJECT STATE : KERALA DISTRICT : KANNUR THALUK : THALASSERY VILLAGE : THRIPPANGOTTUR BLOCK NO. : NIL SURVEY NO. : 275/1A MINERAL : GRANITE BUILDING

More information

1. PRE-FEASIBILITY REPORT

1. PRE-FEASIBILITY REPORT 1. PRE-FEASIBILITY REPORT 1.1 Executive Summary Sri. T. Thimmegowda, has applies quarry lisence for extracting of Building Stone Quarry in Sy No. 33/2, Kurodbore Kaval village, Hassan Taluk, Hassan District,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT The proposal for obtaining Environmental Clearance for Marble Mining Project M. L. No. 56/02, Area 4.0 ha with production capacity 40,000 TPA Near Village:

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT Aug 2018 PRE-FEASIBILTY REPORT OF M/S. J.M.R.MINES (MINING OF FELDSPAR, QUARTZ & MICA MINE) Lease Area : 5.78 Hectares(14.29 Acres) Sy.No.941,942,943 &947 Giddalur (V), Sydapuram (M), SPSR Nellore District

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN VILLAGE - KUNDLA TEHSIL - NAGDA DISTRICT - UJJAIN STATE - MADHYA PRADESH KHASRA NO. - 574 AREA - 8.00 Hectare PRODUCTION - 98800 cu.m/ Year PREPARED UNDER RULE 42 C OF MP MINOR

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH

More information

INDEX 1 EXECUTIVE SUMMARY INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION PROJECT DESCRIPTION... 9

INDEX 1 EXECUTIVE SUMMARY INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION PROJECT DESCRIPTION... 9 Index INDEX 1 EXECUTIVE SUMMARY... 4 2 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION... 7 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 7 2.2 NEED FOR THE PROJECT & ITS IMPORTANCE TO THE

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVESUMMARY 1.1 Introduction Road Metal of M/s. Venkata Ramana Stone Crusher covering an extent of 0.89 Ac is located at Sy.No.379/1 of Perecherla Village, Medikonduru Mandal, Guntur District,

More information

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

PREFEASIBILITY REPORT FOR BRICK EARTH MINE Page 1 PREFEASIBILITY REPORT FOR BRICK EARTH MINE Developed By- Village-Chandauhan, Tehsil-Phulpur, District-Allhabaad, Uttar Pradesh. RAI ENVIROMENTAL SERVICES PVT. LTD. Website: www.raienviro.com Email

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY PRE FEASIBILITY REPORT This is an existing mine. Proposal for obtaining Environmental Clearance for marble with production capacity 72860 TPA Near Village: Sankotra, Tehsil-Jamwa

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN At Narmada River Mining Project:-Category B2 Lease Area: 20.000 Hect. Khasra No. 735 Vill.-Boras, Tehsil- Udaipura District- Raisen (M.P) Project Proponent M/s Shiva Corporation

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT BANDOL CRUSHER STONE QUARRY OF SHRI TULSIRAM SAHU AT Khasra No. 15/2,23/2 Village Bandol Tehsil District State Madhya Pradesh Production Capacity 45030 M3/Year Area 3.150 Hectare

More information

Pramod S. Kambli. Page 1

Pramod S. Kambli. Page 1 PREFEASIBILITY STUDY FOR SHREE. PRAMOD S. KAMBLI Page 1 Executive summary Shree.., has laterite stone quarry in an area 2.61 Ha in the survey No. 1091 With quarrying capacity of 10259.31 TPA. The major

More information

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name

More information

ME/JALORE/MM/ML/13/13/4059 Dated 13/01/2014.

ME/JALORE/MM/ML/13/13/4059 Dated 13/01/2014. 1.0 EXECUTIVE SUMMARY This is an fresh mining lease of mineral Granite located near Village-Valdara, Tehsil Ahore, District Jalore, Rajasthan. over an area of 3.0 hectares. LOI has been issued in favor

More information

BRIEF SUMMARY OF THE PROJECT

BRIEF SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT This proposal of Nuagaon Iron ore mines of M/s K.J.S.Ahluwalia is for expansion of Iron ore production capacity from 5.62 MTPA to 7.99MTPA of ROM along with existing beneficiation

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KATIKELA RIVER SAND BED OVER 15.00 ACRES OR 6.070 HA IN VILLAGE KATIKELA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20)

More information

(A govt. of Kerala Undertaking)

(A govt. of Kerala Undertaking) Annexure - 1 Basic Information Important Note: Please send the information by e-mail in word format and a signed & scanned copy to the Member Secretary prior to the EAC meeting. Please also provide a copy

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

PRE-FEASIBILIY REPORT

PRE-FEASIBILIY REPORT BENDRI LIMESTONE QUARRY NO. - 4 3 (Quarry No. 1) (Quarry No. 1)MINERALS - DOLOMITE (LEASE PERIOD 20.05.2002 TO 19. 05.2022) LEASE AREA - 42.754 HECTARES MINING PROJECT - CATEGORY- B PRE-FEASIBILIY REPORT

More information

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE ENVIRONMENTAL MANAGEMENT REPORT Of COLOUR GRANITE MINE Sy. No.Old: 52/2B1 (New 52/2B1) of Peddavelagatur Village, Peddapanjani Mandal,Chittor District, Andhra Pradesh AREA OF MINING LEASE 5.70 Ha. For

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF Shri Krishna Construction Company AT Khasra No.1046 Vill.-Pipalya Hamir, Tehsil-Barod, District-Agar Malwa (M.P.) Production Capacity: 40000 Cu.mt Crusher Stone for 18 Months

More information

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For M/s. Shah Shah Mines & Minerals, SY. NO. 206/1, Gangireddipalli Village, Thamballapalli Mandal, Chittoor District, Andhra Pradesh. INDEX ITEM PAGE NO. 1. EXECUTIVE SUMMARY 3

More information

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT FOR ORDINARY SAND PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS

More information

M/S Overseas Min-Tech Consultants, Jaipur. Pre-Feasibility Report Index INDEX 1 EXECUTIVE SUMMARY... 1

M/S Overseas Min-Tech Consultants, Jaipur. Pre-Feasibility Report Index INDEX 1 EXECUTIVE SUMMARY... 1 White Clay/China Clay Mining Project (3,250 TPA), M.L. No.3/01, ML Area 4.80 ha, Index INDEX 1 EXECUTIVE SUMMARY... 1 2 INTRODUCTION OF THE OBJECT/ BACKGROUND INFORMATION... 4 2.1 IDENTIFICATION OF PROJECT

More information

PRE-FEASIBILITY REPORT OF SAND QUARRY

PRE-FEASIBILITY REPORT OF SAND QUARRY PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL

More information

S. No Parameter Details 1 Name & Address of the Applicant

S. No Parameter Details 1 Name & Address of the Applicant 1. EXECUTIVE SUMMARY S. No Parameter Details 1 Name & Address of the Applicant M/s AMULYA GRANITES Prop: Smt CH.SARALA H. No. FLAT NO.207 Roja Kishore Residency, Chenchupet, Tenali, AP-522 202 Guntur District,

More information

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village,

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Palakurthy Mandal, Peddapally District, Telangana State Applicant Sri

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure

More information

Environment Management Plan

Environment Management Plan Environment Management Plan Environmental Impact Assessment Statement describing the impact of mining and beneficiation on environment on the following: i) Land area indicating the area likely to be degraded

More information

Prepared by M/s Udaipur Min-Tech. Pvt.Ltd PRE FEASIBILITY REPORT

Prepared by M/s Udaipur Min-Tech. Pvt.Ltd PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 21 TABLE OF CONTENT Prepared by M/s Udaipur Min-Tech. Pvt.Ltd Sr. No. Content Page No. 1.0 Executive Summary 24 2.0 Introduction of Project and Background 25 Information 3.0 Project

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For EXISTING BLACK TRAP MINING ACTIVITY CATEGARY B2 UNDER THE EIA NOTIFICATION 2006 AMENDED ON 15/01/2016 TO REKHABEN YOGESHKUMAR JOSHI

More information

Environmental Management Plan. For Mining of. Building Stone & Road Metal

Environmental Management Plan. For Mining of. Building Stone & Road Metal Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 5.65 Ha at Survey No. 427,428 & 429 Alladurg Village, Alladurg Mandal, Medak District, Telangana State Lessee M/s

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT TABLE OF CONTENTS Sr. No. Content Page No. 1.0 Executive Summary 23 2.0 Introduction of Project and Background Information 24 3.0 Project Description 26 4.0 Site Analysis 33 5.0

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU

PRE-FEASIBILTY REPORT SUNATHAR STONE QUARRY. VILLAGE: Sunathar. TAHASIL: Purushottampur. DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU PRE-FEASIBILTY REPORT OF SUNATHAR STONE QUARRY VILLAGE: Sunathar TAHASIL: Purushottampur DIST: Ganjam LESSEE SRI KAPILA CHANDRA SAHU Vill/Po- Gandala, P.S.- Hinjili, Dist.-Ganjam Odisha. CONTENTS CHAPTER

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Pathari Basouda : Basouda : Vidisha (M.P.) : 2.00 Hectare : Stone KHASRA No : 177/1/2 PRODUCTION CAP : 10000 Cu.mt/year Stone APPLICANT

More information

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R. WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey

More information

INDEX 1.0 EXECUTIVE SUMMARY INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION IDENTIFICATION OF PROJECT AND PROJECT PROPONENT.

INDEX 1.0 EXECUTIVE SUMMARY INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION IDENTIFICATION OF PROJECT AND PROJECT PROPONENT. Index INDEX 1.0 EXECUTIVE SUMMARY... 25 2 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION... 27 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 27 2.2 BRIEF DESCRIPTION OF THE NATURE OF PROJECT...

More information

GRAVEL & ROUGH STONE QUARRY

GRAVEL & ROUGH STONE QUARRY ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL & ROUGH STONE QUARRY Sy. No. 211 (Carved out of Sy.No.1) Tarluwada Village & Anandapuram Mandal, Visakhapatnam District, Andhra Pradesh. AREA OF MINING LEASE 23.760

More information

ENVIRONMENT MANAGMENT PLAN

ENVIRONMENT MANAGMENT PLAN ENVIRONMENT MANAGMENT PLAN DETAIL OF MINE- NAME OF MINERAL SANDSTONE (FURSHI PATTHAR) MINING LEASE FOR FINISHED SANDSTONE VILLAGE PARASWAHA, TEHSEEL JABERA DISTRICT - DAMOH KHASRA NO. 22/1, AREA 1.0 HECTARE

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN 1.0. INTRODUCTION: The proposed M/s. Ordinary sand Mine of Shree Ramjibhai samjibhai Gujarati Area at near village Survey No.Bhadar River Bed, Vill.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR AMJHAR LATERITE DEPOSIT M. L. Area 4.897 ha. In Village - Amjhar Tehsil - Amarpatan, District- Satna State - Madhya Pradesh Proposed Capacity 32256 TPA Lessee - Shri Vikram Singh

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION An Environmental Management Plan (EMP) is a site-specific plan developed to ensure that all necessary measures are identified and implemented in order to protect

More information

Pre-Feasibility Report for Granite Building stone Quarry

Pre-Feasibility Report for Granite Building stone Quarry Pre-Feasibility Report for Granite Building stone Quarry SURVEY NO. : 53/6 & 53/8-1, 53/8-2 & 53/13 VILLAGE TALUK DISTRICT STATE EXTENT : AYYAMPUZHA : ALUVA : ERNAKULAM : KERALA : 0.9842 HA LAND STATUS

More information

PRE- FEASIBILITY REPORT INDAWAR CHINA CLAY MINE

PRE- FEASIBILITY REPORT INDAWAR CHINA CLAY MINE PRE FEASIBILITY REPORT FOR INDAWAR CHINA CLAY MINE (M.L. NO. 17/2006) PROJECT At VILLAGE INDAWAR TEHSIL MERTA, DISTRICT NAGAUR STATE RAJASTHAN Lease Area : 4.150Hect. Category of Project : B1 (Total LOI

More information

Scrutiny comments on examination of FMCP ( lease expiring on 31/03/2020 )of Teherai Iron and Manganese Mine of M/s Bonai Industrial Co.

Scrutiny comments on examination of FMCP ( lease expiring on 31/03/2020 )of Teherai Iron and Manganese Mine of M/s Bonai Industrial Co. Scrutiny comments on examination of FMCP ( lease expiring on 31/03/2020 )of Teherai Iron and Manganese Mine of M/s Bonai Industrial Co. Limited GENERAL: 1. Lease number and lease period since execution

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Parsen : Gwalior : Gwalior (M.P.) : 3.345 Hectare : Stone KHASRA No : 4154 PRODUCTION CAP : 50,000 Cu.mt/year (avg.) Stone APPLICANT

More information

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY

PRE FEASIBILITY REPORT OF KANIYAKULAM EARTH QUARRY PRE FEASIBILITY REPORT OF AZHAGAPPAPURAM EARTH FOR OVER AN EXTENT OF 0.61.0HA IN AZHAGAPPAPURAM VILLAGE, AGASTEESWARAM TALUK, KANNIYAKUMARI DISTRICT, TAMIL NADU OF, (Under the Guidelines of Ministry of

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

DHANWADA CRUSHER STONE QUARRY

DHANWADA CRUSHER STONE QUARRY ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-

More information

Tehsil: Bap, District: Jodhpur, Rajasthan by RIICO Limited

Tehsil: Bap, District: Jodhpur, Rajasthan by RIICO Limited 1.0 Executive Summary PRE-FEASIBILITY REPORT Rajasthan State Industrial Development and Investment Corporation, known as RIICO, is a premier agency of Government of Rajasthan that has played an important

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT EXCUTIVE SUMMARY Project : Mining Lease of Iron Ore (Ari Dongri Iron Ore Mine) Name of Company / Mine Owner : Godawari Power and Ispat Limited Location Village : Tehsil : District

More information

INDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND

INDEX. S. No. Item Page No. 1 EXECUTIVE SUMMARY 3 2 INTRODUCTION OF THE PROJECT / BACKGROUND PRE-FEASIBILITY REPORT PREPARED FOR D. SESHA REDDY [Mine Lease Area 3.253 Ha.] Sy. No. 12/D Nagarur Village, Yadiki Mandal, Ananthapur District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified Accredited

More information

Riverbed Sand/Morrum Mining at Gata No. 747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P. Area: 22 Acres (8.

Riverbed Sand/Morrum Mining at Gata No. 747/16, Village- Patharehta, Tehsil- Kalpi, District- Jalaun, U.P. Area: 22 Acres (8. PRE-FEASIBILITY EXECUTIVE SUMMARY Shri Vishwas Parmani S/o Shri H. Parmani is the lessee for the RBM (River Betwa) for an area of 22 Acres (8.90 Ha) in Gata No. 747/16,Village- Patharehta, Tehsil- Kalpi,

More information

LIST OF TABLES LIST OF FIGURES ANNEXURES LIST

LIST OF TABLES LIST OF FIGURES ANNEXURES LIST CONTENT LIST S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF DESCRIPTION OF NATURE

More information

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details:

EXECUTIVE SUMMARY. 1.2 SALIENT FEATURES OF THE PROJECT The mine lease area falls under the Toposheet No. 65 N/11 bearing following Toposheet details: 2015 PRE-FEASIBILITY REPORT (FOR TOR) OF GADABAVALASA MANGANESE ORE MINES, AT: GADABAVALASA, GARIVIDI MANDAL, DIST: VIZIANAGRAM FOR PRODUCTION OF 12,000TPA OF MANGANESE ORE OVER AN AREA OF 12.691 HA. OF

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

PRE FEASIBILITY REPORT (PFR)

PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 27 PRE FEASIBILITY REPORT (PFR) APPLICANT : M/s PLANTERS AGGREGATES 28 INDEX S. No. Contents Page No. 1.0 EXECUTIVE SUMMARY 30 2.0 INTRODUCTION OF THE PROJECT / BACKGROUND

More information

M/s. Bharat Clays Private Limited Pre-Feasibility Report

M/s. Bharat Clays Private Limited Pre-Feasibility Report 1. EXECUTIVE SUMMARY 1.1 Introduction is a private partnership firm. They applied for a mining lease for China Clay over an extent of 2.023 Hectares in Sy. No: 102/3 & 102/4P of Jaggampeta Village, Jaggampeta

More information

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA)

GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) PRE FEASIBILITY REPORT ON GHODAPALANA SAND QUARRY (IN GANJAM DISTRICT OF ODISHA) Lease Area: 18.687 acres or 7.562 Ha. of Sri Rama chandra Dash Polasara CHAPTER 1 EXECUTIVE SUMMARY Ghodapalana sand Quarry

More information

INDEX 1 EXECUTIVE SUMMARY INTRODUCTION OF THE PROJECT/ BACKGROUNDINFORMATION IDENTIFICATION OF PROJECT AND PROJECT PROPONENT 11

INDEX 1 EXECUTIVE SUMMARY INTRODUCTION OF THE PROJECT/ BACKGROUNDINFORMATION IDENTIFICATION OF PROJECT AND PROJECT PROPONENT 11 Gypsum Permit, Ref No-201730530,Production Capacity -18975.0 TPA, Area- 5.0 ha Village -Barsalpur, Tehsil-Kolayat, District - Bikaner (Raj.) INDEX 1 EXECUTIVE SUMMARY........................... 06 2 INTRODUCTION

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT Page 0 of 14 EXECUTIVE SUMMARY The proposed project of 24.0 Ha or 59.28 Acre area is of stream bed sand mining and falls under Category- B1 as per EIA Notification 2006 amended till

More information

CONTENT LIST 3.0 PROJECT DESCRIPTION 7 TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY

CONTENT LIST 3.0 PROJECT DESCRIPTION 7 TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IF ANY CONTENT LIST S. NO. CONTENTS PAGE NO. 1.0 EXECUTIVE SUMMARY 1 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION 3 (i) IDENTIFICATION OF PROJECT & PROJECT PROPONENT 3 (ii) BRIEF DESCRIPTION OF NATURE

More information

PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF

PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF PRE FEASIBILITY REPORT OF ANAIMALLUR ROUGH STONE QUARRY LEASE APPLIED AREA FOR OVER AN EXTENT OF 0.80.0Ha IN ANAIMALLUR VILLAGE, ARCOT TALUK, VELLORE DISTRICT, TAMILNADU OF THIRU.R.VINOTHKUMAR, (Under

More information