1 NORTHSIDE INDEPENDENT SCHOOL DISTRICT 2010 BOND Facilities Construction October 2013 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Ceasar Ponce, A.I.A. EXECUTIVE DIRECTOR CONSTRUCTION & ENGINEERING Paul Megerle DIRECTOR OF FACILITIES CONSTRUCTION Richard De La Cruz, P.E. ASSISTANT DIRECTOR OF ENGINEERING Bernal Middle School
2 BERNAL MIDDLE SCHOOL (Formerly STEVENS RANCH AREA MIDDLE SCHOOL) Architect Alamo Architects Project Architect Jerry Lammers NISD Project Manager Jim Berg Contractor Bartlett Cocke, Inc. Construction Budget - $41,408, Construction Period - January 2013 May 2014 Project Scope New 1200 Student Middle School Site work package issued September 9, 2012 NTP issued October 20, 2012 (54% Complete) Site work in progress. Concrete floor framing and columns complete. Roofing, exterior CMU walls and brick in progress. MEP infrastructure in progress. Structural steel erection in progress. Interior walls in progress. Interior painting (block fill) in progress. Site work and fields in progress.
3 BERNAL MIDDLE SCHOOL (Aerial September 6, 2013)
4 BERNAL MIDDLE SCHOOL (Perspective of Front Entrance)
5 BERNAL MIDDLE SCHOOL (September 30, 2013)
6 ELLISON ELEMENTARY SCHOOL (Formerly CIELO VISTA SOUTH ELEMENTARY) Architect Garza Bomberger Architects Project Architect Roy Lewis, AIA NISD Project Manager Marilyn Sevedge Risk Contractor Joeris General Contractor Construction Budget - $19,877, Construction Period - February 2013 May 19, 2014 (62% Complete) Project Scope 800 Student Elementary School Exterior Brick, Site Fencing, Lighting and Detention Pond in progress. Continuing MEP, Roof System Dried in. Installing Windows, continuing Off-Site Utilities and some Drywall Tape and Floating, Painting and Ceramic Tile.
7 ELLISON ELEMENTARY SCHOOL (Aerial Sept. 23, 2013)
8 ELLISON ELEMENTARY SCHOOL (Perspective of Front Entrance)
9 ELLISON ELEMENTARY SCHOOL (September 30, 2013)
10 NISD ANNEMARIE TENNIS CENTER Engineer MTR Project Engineer Ron Ramirez NISD Project Manager Christopher Parker Contractor Journeyman Construction Cost - $3,665, Construction Period - July 2013 January 2014 (35% Complete) Project Scope Replacement of existing courts, addition of new courts and renovations at existing restrooms. Site preparation in progress. Demolition complete. Light Pole bases set; Base has been processed; Final Grading complete and Concrete Beams being executed.
11 NISD ANNEMARIE TENNIS CENTER (September 30, 2013)
12 NISD ANNEMARIE TENNIS CENTER (Existing Site Plan)
13 NISD ANNEMARIE TENNIS CENTER (Proposed Site Plan)
14 NISD ANNEMARIE TENNIS CENTER (Proposed Site Plan Aerial)
15 NISD ANNEMARIE TENNIS CENTER (Main Street View)
16 LOCKE HILL ELEMENTARY (Bus Loop Improvement) Engineer MTR Project Engineer Ron Ramirez NISD Project Manager Thomas Curiel Contractor Suburban Construction Co. Construction Cost - $1,332, Construction Period - June 2013 November 2013 (29% Complete) Project Scope New Bus Loop and Paving; Rock removal completed. Utility installation, Bus Loop Concrete, Asphalt, Retaining Walls and Canopy Structure complete. Roof Panels have started.
17 LOCKE HILL ELEMENTARY (Bus Loop Improvement) (Oct. 1, 2013)
18 LOCKE HILL ELEMENTARY (Bus Loop Improvement Aerial Exhibit)
19 LOCKE HILL ELEMENTARY (Bus Loop Improvement Site Plan)
20 CABLE ELEMENTARY SCHOOL (Window Replacement) Architect Garza Architects Project Architect Jesse Garza, AIA NISD Project Manager Christopher Parker Contractor DL Bandy Construction Budget - $750, Construction Period June 10, 2013 October 7, 2013 (99% Complete) Project Scope Window Replacement Close Out in progress.
21 CABLE ELEMENTARY SCHOOL North Elevation A Wing (Window Replacement)
22 CABLE ELEMENTARY SCHOOL (Window Replacement) April 11, 2013
23 CABLE ELEMENTARY SCHOOL (Window Replacement) (Sept. 9, 2013)
24 MARY HULL ELEMENTARY SCHOOL (Window Replacement/ADA Improvements) Architect Garza Architects Project Architect Jesse Garza, AIA NISD Project Manager Christopher Parker Contractor DL Bandy Construction Cost - $1,150, Construction Period June 10, 2013 October 7, 2013 (99% Complete) Project Scope Window Replacement TCO in place. Closeout in progress. Final CO in process.
25 MARY HULL ELEMENTARY SCHOOL (Window Replace/ADA Improvements) (Sept. 9, 2013)
26 WESTWOOD TERRACE ELEMENTARY (Window Replacement/ADA Improvements) Architect Garza Architects Project Architect Jesse Garza, AIA NISD Project Manager Christopher Parker Contractor DL Bandy Construction Cost - $1,030, Construction Period June 10, 2013 October 7, 2013 (95% Complete) Project Scope Window Replacement TCO in place. Closeout in progress. Final CO in process.
27 WESTWOOD TERRACE ELEMENTARY Site Plan (Window Replacement/ADA Improvements)
28 WESTWOOD TERRACE ELEMENTARY (Window Replace/ADA Improvements) Feb. 26, 2013
29 WESTWOOD TERRACE ELEMENTARY (Window Replace/ADA Improvements) (Sept. 9, 2013)
30 REDDIX CENTER (ADA Improvements) Architect Garza Architects Project Architect Jesse Garza, AIA NISD Project Manager Christopher Parker Contractor DL Bandy Construction Cost - $365, Construction Period June 10, 2013 October 7, 2013 (99% Complete) Project Scope Accessibility Improvements Sitework Complete. Railing Adjustments and Finalization of Punch List items in Progress.
31 REDDIX CENTER (ADA Improvements) (October 1, 2013)
32 THORNTON ELEMENTARY ROOFING PROJECT Roof Consultant Hollon+Cannon Contractor Cram Roofing Construction Budget - $1,271, Construction Period - June 2013 October 2013 (99% Complete) Project Scope Roof Repair & Replacement. Notice to Proceed in June. Contractor mobilized; tear off has begun.
33 THORNTON ELEMENTARY ROOFING PROJECT (September 6, 2013)
34 McDERMOTT ELEMENTARY ROOFING PROJECT Roof Consultant Hollon+Cannon Contractor Dean Contracting Co. Construction Budget - $1,415, Construction Period - June 2013 October 2013 (97% Complete) Project Scope Roof Repair & Replacement. Notice to Proceed in June. Contractor mobilized; tear off has begun.
35 MYERS ELEMENTARY ROOFING PROJECT Roof Consultant Hollon+Cannon Contractor Port Enterprises Construction Budget - $1,583, Construction Period - June 2013 October 2013 (99% Complete) Project Scope Roof Repair & Replacement. Notice to Proceed in June.
36 INSELMANN BASEBALL FIELD (Replacement of Existing Facilities) Architect Garza Bomberger & Assoc. Project Architect Roy Lewis, AIA Contractor TBD Construction Budget - $2,700, Construction Period May 2014 October 2014 (% Complete) Project Scope Replacement of Existing Field and associated Facilities.
37 INSELMANN BASEBALL FIELD (Bird s Eye View)
38 KALLISON RANCH HIGH SCHOOL Architect Garza Bomberger & Associates Project Architect Roy Lewis NISD Project Manager Jim Berg Contractor TBD Construction Cost - TBD Construction Period - TBD Project Scope New 2800 Student High School Design only project at this time.
39 KALLISON RANCH HIGH SCHOOL Schematic Design Site Plan
40 REDBIRD RANCH ELEMENTARY SCHOOL Architect NoonanRittimann Project Architect John Rittimann NISD Project Manager Thomas Curiel Contractor Joeris General Contractor Construction Budget - $20,000, Construction Period - TBD Project Scope New 800 Student Elementary School Departmental Reviews in progress.
41 REDBIRD RANCH ELEMENTARY SCHOOL Site Plan
42 REDBIRD RANCH ELEMENTARY SCHOOL Front Entrance Perspective
43 REDBIRD RANCH ELEMENTARY SCHOOL Floor Plan
Facilities Construction
NORTHSIDE INDEPENDENT SCHOOL DISTRICT 2010 BOND Facilities Construction December 2013 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Ceasar Ponce, A.I.A. EXECUTIVE DIRECTOR CONSTRUCTION
More informationFacilities Construction
NORTHSIDE INDEPENDENT SCHOOL DISTRICT 2010 BOND Facilities Construction August 2013 Leroy San Miguel Dr. Folks Middle School ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Ceasar Ponce, A.I.A. EXECUTIVE
More informationFacilities Construction
NORTHSIDE INDEPENDENT SCHOOL DISTRICT 2010 BOND Facilities Construction September 2015 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Ceasar Ponce, A.I.A. EXECUTIVE DIRECTOR CONSTRUCTION
More informationFacilities Construction
NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction March 2017 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR CONSTRUCTION & ENGINEERING Jim
More informationFacilities Construction
NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction January 2016 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR CONSTRUCTION & ENGINEERING
More informationFacilities Construction
NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction January 2017 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR CONSTRUCTION & ENGINEERING
More informationFacilities Construction
NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction December 2017 Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR OF CONSTRUCTION & ENGINEERING
More informationFacilities Construction
NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction May 2017 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR CONSTRUCTION & ENGINEERING Jim
More informationFacilities Construction
NORTHSIDE INDEPENDENT SCHOOL DISTRICT Facilities Construction July 2016 Leroy San Miguel ASSIST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta EXECUTIVE DIRECTOR CONSTRUCTION & ENGINEERING Paul
More informationEngineering Services
NORTHSIDE INDEPENDENT SCHOOL DISTRICT 2014 CITIZENS BOND ADVISORY COMMITTEE Engineering Services 2014 Bond March 2017 Update Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta
More informationUpdate on FCPS Construction/Renovation Projects. June 2016
Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000
More informationLemm Elementary. Restoring the Heart of the Community. Klein Independent School District
Lemm Elementary Restoring the Heart of the Community Target Date: August 2018 June Work Update - Project is on schedule Exterior brick is ongoing in Area A addition Area A walls have been covered Main
More informationUpdate on FCPS Construction/Renovation Projects. July 2016
Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000
More informationBOND CONSTRUCTION UPDATE
BOND CONSTRUCTION UPDATE March 31, 2015 PROJECTS: 1. CIBOLO VALLEY ELEMENTARY SCHOOL BOND 2013 2. STEELE HIGH SCHOOL ADDITIONS & RENOVATIONS BOND 2013 3. DOBIE MIDDLE SCHOOL ADDITIONS & RENOVATIONS BOND
More informationFacilities Construction
NORTHSIDE INDEPENDENT SCHOOL DISTRICT 2014 CITIZENS BOND ADVISORY COMMITTEE Facilities Construction 2014 Bond March 2018 Update Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry Acosta
More informationFacilities Construction
NORTHSIDE INDEPENDENT SCHOOL DISTRICT 2014 CITIZENS BOND ADVISORY COMMITTEE Facilities Construction 2014 Bond September 2018 Update Leroy San Miguel ASST. SUPERINTENDENT FOR FACILITIES & OPERATIONS Henry
More informationChino Valley Unified School District Monthly Construction Update
h Construction of One Classroom Wing Cattle Elementary School Architect: WLC Architects, Inc. Contractor: Pacwest Corporation Construction Manager: Bernards Contract Amount: $2,974,000 Contract Start:
More informationGREENVILLE ISD BID PACKAGES AND UPDATES 2014 Bond Program OCTOBER 2015
GREENVILLE ISD BID PACKAGES AND UPDATES 2014 Bond Program OCTOBER 2015 TABLE OF CONTENTS Bid Package 1 Crockett Elementary School Additions and Renovations 3 L.P. Waters Early Childhood Center Renovations
More informationMARCH BOND & TIF PROJECT UPDATE. Grapevine-Colleyville ISD
MARCH 2018 2016 BOND & TIF PROJECT UPDATE Grapevine-Colleyville ISD GHS Agricultural Sciences Building Renovation Multipurpose Activity Centers Additions and Renovations to TES and GMS Cannon Elementary
More informationUpdate on FCPS Construction/Renovation Projects. December 2015
Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000
More informationCompleted. Project. Melbourne High School. Comprehensive Additions and Renovations
Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project
More informationCapital Projects Update
Issaquah School District Issaquah High School Reconstruction December 2009 West side of the site: North classroom building is being sheet-rocked, taped, and primed. Data and electrical wiring is being
More informationLLANO ISD SCHOOL BOARD MEETING. January 2016
LLANO ISD SCHOOL BOARD MEETING January 2016 LLANO ELEMENTARY AREAS A & C STUCTURAL STEEL AND EXTERIOR WALLS ARE IN PLACE INSTALLATION OF HVAC DUCT WORK IS ON- GOING ELECTRICAL AND PLUMBING ROUGH-IN IS
More informationPROJECT UPDATE SEPTEMBER 11, 2014
PROJECT UPDATE SEPTEMBER 11, 2014 Information shown above was provided to district tax payers and stakeholders prior to May bond election. ELEMENTARY SCHOOL #8 $ 34,000,000 Bond Allocation BOND 2013 PROJECT
More informationUpdate on FCPS Construction/Renovation Projects. August 2015
Update on FCPS Construction/Renovation Projects Jessie Clark Middle -- Renovation Architect: General Contractor: Tate Hill Jacobs Architects Alliance Corporation GC Contract Sum: $18,041,500 Total Project
More informationLa Porte Independent School District 2014 Bond Program Status Report August 11, 2015
La Porte Independent School District 2014 Bond Program Status Report August 11, 2015 La Porte ISD 2014 Bond Program ADMINISTRATION: Superintendent: Lloyd Graham Deputy Superintendent: Dr. Linda Wadleigh
More informationUpdate on FCPS Construction/Renovation Projects. September 2015
Update on FCPS Construction/Renovation Projects Jessie Clark Middle -- Renovation Architect: General Contractor: Tate Hill Jacobs Architects Alliance Corporation GC Contract Sum: $18,041,500 Total Project
More informationUpdate on FCPS Construction/Renovation Projects. August 2016
Update on FCPS Construction/Renovation Projects New High at Winchester Road Architect: General Contractor: Tate Hill Jacobs: Architects D.W. Wilburn, Inc. GC Contract Sum: $62,044,000 Total Project Cost:
More informationSAMUEL CLEMENS ADDITIONS & RENOVATIONS ( )
SAMUEL CLEMENS ADDITIONS & RENOVATIONS (02-05-2018) BUDGET - $ 72,000,000 2020 PROJECTED COMPLETION DATE ARCHITECT MARMON MOK GENERAL CONTRACTOR Bartlett Cocke CONSTRUCTION MGMT. AG CM 33% COMPLETE As
More informationUpdate on FCPS Construction/Renovation Projects. November 2015
Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000
More informationSAMUEL CLEMENS ADDITIONS & RENOVATIONS ( )
SAMUEL CLEMENS ADDITIONS & RENOVATIONS (01-22-2018) BUDGET - $ 72,000,000 2020 PROJECTED COMPLETION DATE ARCHITECT MARMON MOK GENERAL CONTRACTOR Bartlett Cocke CONSTRUCTION MGMT. AG CM 29% COMPLETE SAMUEL
More information2007 Projects: MEDFORD SCHOOL DISTRICT 549C Bond Funded Construction Projects Updated: September 4, North Medford High School:
MEDFORD SCHOOL DISTRICT 549C Bond Funded Construction Projects Updated: September 4, 2007 North Medford High School: Project Summary: Renovate and add new addition based on facility evaluation and design.
More informationLemm Elementary. Restoring the Heart of the Community. Klein Independent School District
Lemm Elementary Restoring the Heart of the Community Target Dat e: August 2018 March Update Lemm restoration contract awarded to ICI Construction on March 2nd Contractor began mobilization on March 5th
More informationFOR SALE. BHSMiami.com Miller Dr (SW 56 Street) Miami, FL 33156
FOR SALE 8800 Miller Dr (SW 56 Street) Miami, FL 33156 Completely 12,820 SF 1.87 Acres Presented exclusively by Dimitri Kiosseff of Brown Harris Stevens BHSMiami.com NEW YORK CITY THE HAMPTONS PALM BEA
More informationMONTHLY PROGRESS REPORT
MONTHLY PROGRESS REPORT Through May 2018 Strong Schools Bond Capital Improvement Projects Prepared by fs3 Hodges 1 TABLE OF CONTENTS Executive Summary page 3 Attachment 1 Consolidated Expenditure Report
More informationPROJECT UPDATE August 28, 2014
PROJECT UPDATE August 28, 2014 Information shown above was provided to district tax payers and stakeholders prior to May bond election. ELEMENTARY SCHOOL #8 $ 34,000,000 Bond Allocation BOND 2013 PROJECT
More informationBuilding Excellence IV Capital Levy Projects Under Construction
Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary
More informationOconomowoc Area School District Facility Construction Update June 29, 2018
Oconomowoc Area School District Facility Construction Update June 29, 2018 IXONIA ELEMENTARY SCHOOL Finishing touches and final cleaning has begun inside the new addition at Ixonia Elementary, and major
More informationBuilding Excellence IV Capital Levy Projects Under Construction
Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary
More informationSAMUEL CLEMENS ADDITIONS & RENOVATIONS ( )
SAMUEL CLEMENS ADDITIONS & RENOVATIONS (02-26-2018) BUDGET - $ 72,000,000 2020 PROJECTED COMPLETION DATE ARCHITECT MARMON MOK GENERAL CONTRACTOR Bartlett Cocke CONSTRUCTION MGMT. AG CM 39% COMPLETE As
More informationPRESENTATION JANUARY 24, 2017
4918 HOVENKAMP DRIVE DALLAS, TEXAS 75227 PRESENTATION JANUARY 24, 2017 RGM ARCHITECTS OCTOBER 25, 2016 1 2 COMMUNITY INPUT DESIGN DOCUMENT PROCUREMENT CONSTRUCTION PD SD DD CD BD CA PROJECT PROCESS 3 Construction
More informationa collaborative process
2017 Referendum Belleville Public Schools July 26, 2017 a collaborative process Introduction Di Cara Rubino Architects Jerry Rubino, AIA Firm Principal Allen Barnett, AIA, LEED AP Senior Project Manager
More informationSeattle Public Schools Building Excellence IV Projects Under Construction
Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee
More informationSAMUEL CLEMENS ADDITIONS & RENOVATIONS ( )
SAMUEL CLEMENS ADDITIONS & RENOVATIONS (06-05-2018) BUDGET - $ 72,000,000 2020 PROJECTED COMPLETION DATE ARCHITECT MARMON MOK GENERAL CONTRACTOR Bartlett Cocke CONSTRUCTION MGMT. AG CM 63% COMPLETE As
More informationOconomowoc Area School District Facility Construction Update July 27, 2018
Oconomowoc Area School District Facility Construction Update July 27, 2018 IXONIA ELEMENTARY SCHOOL The exterior of Ixonia Elementary School looks more complete every day! Concrete work for the exterior
More informationGEORGETOWN ISD 2010 BOND PROGRAM UPDATE. Huckabee APRIL 2012
GEORGETOWN ISD 2010 BOND PROGRAM UPDATE APRIL 2012 TABLE OF CONTENTS East View High School Phase 2 Additions, Package 2 3 Georgetown High School Additions and Renovations 7 Completed Projects 12 Georgetown
More informationHeritage High School
Project Update April 10, 2010 Project Manager Dennis Bonny Field Coordinator Halsey Chandler Project Budget $64,665,000 - GMP $80,000,000 Total Budget Design Criteria Professional Schenkel Shultz Delivery
More informationDrexel Hill Middle School
150004 Drexel Hill Middle School Site Plan for Drexel Hill Middle School Floor Plan for Drexel Hill Middle School 2 150004; Drexel Hill Middle School. This school is located at 3001 State Road, Drexel
More informationSouthwest Health System Construction Newsletter October 7, 2017
Southwest Health System A Week in Review Patient Wing Interior sheetrock is 99% complete in the Patient Wing proper Taping and finishing is following behind sheetrock, and Nunn is preparing rooms for paint
More informationProject Status Update & Progress Report
UCSD Board of Education Project Status Update & Progress Report March 27, 2018 Capital Project Presentation March 2018 1. Kernan Elementary School Addition & Renovations Part 1 Construction Progress Update
More informationMAKE THE FOLLOWING ADDITIONS, MODIFICATIONS OR DELETIONS TO THE DRAWINGS AND SPECIFICATIONS:
ADDENDUM NO. 1 CITY OF PORT ARANSAS ELLIS MEMORIAL EXISTING LIBRARY RENOVATIONS AND REPAIRS CSP #2016-22 700 W. AVE A PORT ARANSAS, TX 78373 Issue Date: 01/07/2019 The following additions, deletions, modifications,
More informationSTRATTON CENTENNIAL ARTS ACADEMY PROGRESS REPORT SEPTEMBER 7, 2016 CARROLL DANIEL CONSTRUCTION 509 CROWE DRIVE HIGHLANDS, NC
CARROLL DANIEL CONSTRUCTION CENTENNIAL ARTS ACADEMY PROGRESS REPORT SEPTEMBER 7, 2016 STRATTON CONSTRUCTION SCHEDULING & SEQUENCING 509 CROWE DRIVE HIGHLANDS, NC 28741 404.944.5298 (f CARROLL DANIEL CONSTRUCTION
More informationOwen County School District
Owen County School District Maintenance Board Report 02/20/2012 District Maintenance Projects or Requests: Working with the architects and engineers to develop a temporary support system for the main electrical
More informationCEFPI Monthly Meeting
CEFPI Monthly Meeting LISD School Construction Cost Information Background Information School Cost Information How Does LISD Compare? Other District Comparisons Background Information Cost Discussion Type
More informationBuilding Excellence IV Capital Levy Projects Under Construction
Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee Hill Elementary
More informationAuburn University Construction Project Update March 2010
New Basketball Arena: Construction Cost: $68.5 million. The Arena is currently 91% complete. Contract completion is July 25, 2010, but the project is on schedule to complete by May 2010. Interior finish
More informationPROJECT STATUS REPORT De Anza High School - Replacement Campus Period Ending: 2/10/2011 Scope: Replacement Campus Construction Status: Architect: DLM Architects Project Manager: Jose Chapa, SGI Construction
More information2016 BOND INFORMATION
2016 BOND INFORMATION This publication is provided as a public service by the offices of Operations and Maintenance, Communications and Financial Services. www.svvsd.org @svvsd 395 South Pratt Parkway,
More informationCONSTRUCTION REPORT. Zionsville Community Schools Zionsville, Indiana. October 2014 TSC NO
CONSTRUCTION REPORT TSC NO. 21319.1 October 2014 Zionsville Community Schools Zionsville, Indiana The SKILLMAN Corporation Project Administration Construction Management Zionsville Community Schools 2005
More informationCollins Middle School
Contents Collins Middle School...2 General comments, campus capacity, and student demographics:...2 1.0 School Site...4 2.0 Building Systems and Components...5 3.0 Building Safety and Security...19 4.0
More informationPart I: Summary PHA Name/Number WV004 The Huntington WV Housing Authority
Part I: Summary PHA Name/Number WV004 The Huntington WV Housing Authority A. Development Number and Name Statement for Year 1 FFY 2013 Locality (City/County & State) Huntington, Cabell Co., West Virginia
More information*Additional Projects were not part of the voter-approved 2006 Bond. They were able to be completed due to savings from other projects.
SECONDARY SCHOOLS Kirby Middle School Demolish 300, 400, and 500 buildings partial Change in total rebuild design New academic building - 33 classrooms *Rent portables for temporary classrooms partial
More informationCupertino Union School District
Cupertino Union School District Update For Citizens Bond Oversight Committee September 21, 2016 WORK IN PROGRESS 1 STEVENS CREEK KINDERGARTEN CLASSROOM STEVENS CREEK KINDERGARTEN CLASSROOM 2 STEVENS CREEK
More informationStructural Condition Assessment
108 6 th Street, Garland, Texas Engineering Report Date: September 29, 2016 RLG No. : 16729 Prepared for: Mr. Jeff D. Bulls III AIA 3030 LBJ Freeway, Suite 1220 Dallas, TX 75234 PM: Harold F. Phillips
More informationJanuary 2017 Project Update
January 2017 Project Update Overall Referendum Project Status: ON SCHEDULE/ON BUDGET All elements of the project completed to date have been completed on or ahead of schedule and final costs were under
More informationPRELIMINARY STRUCTURAL INVESTIGATION REPORT
124 E. Broadway Tucson, AZ Prepared for: CBRE Brokerage Services 3719 N. Campbell Ave. Tucson, AZ 85719 BACKGROUND: The Tucson Veterans of Foreign Wars building, located at 124 E. Broadway, Tucson, AZ
More informationRevised Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Three Story Academic Additi
Original Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 75% Three Story Academic Addition with CTE Gymnasium Addition: Multi-court gym 3 courts
More informationN o v e m b e r
WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE N o v e m b e r 2 0 1 7 Agenda Overview of the Bond 2017 Update 2018 Work 2 Agenda Overview of the Bond 2017 Update 2018 Work 3 Overview of Bond Why
More informationFacilities Feasibility Study Frederick Douglass HS Condition Assessment
Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies
More informationATHLETIC FACILITIES. High School Football Stadium 1 Dragon Drive, Swartz Creek, Michigan. Cage Fieldhouse 4110 Morrish Road, Swartz Creek, Michigan
ATHLETIC FACILITIES High School Football Stadium 1 Dragon Drive, Swartz Creek, Michigan Cage Fieldhouse 4110 Morrish Road, Swartz Creek, Michigan SWARTZ CREEK HIGH SCHOOL STADIUM 1 Dragon Drive, Swartz
More information2014 MASTER PLANNING PORT ARTHUR INDEPENDENT SCHOOL DISTRICT Revised, August 5, 2014
2014 MASTER PLANNING PORT ARTHUR INDEPENDENT SCHOOL DISTRICT Revised, August 5, 2014 PROPOSED IMPROVEMENTS A. Replace Sam Houston Elementary School with a new facility to house 750 students. (Included
More informationTown of Enfield. Parks & Recreation P.O. Box 699 Enfield NC (252) telephone (252) fax
Town of Enfield Parks & Recreation P.O. Box 699 Enfield NC 27823 (252) 445-3146-telephone (252) 445-1019-fax www.enfieldnc.org Request for Proposals for the Renovation and/or Construction of the Recreation
More informationFleet Elementary School
Fleet Elementary School Community Newsletter (January 2019) This is the January update on the status and progress of construction for the project. All monthly updates will also be posted to the project
More informationPROJECT COMPLETED. Bayside High School. Comprehensive Additions and Renovations
Project Update Project Update September 8, 2006 November 6, 2009 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Ed Schwartz Project Budget Project
More informationAuburn University Construction Project April
Small Animal Teaching Hospital Phase I: Construction Cost: $8.8 million. Phase I consists of (1) constructing an addition to the Overton-Rudd Auditorium to expand classroom and lecture hall capacity, (2)
More informationThis addendum will be part of the construction documents. All bidders must acknowledge the receipt of this addendum on the bid form.
Project: Ben Steele Middle School Addendum #: 2 Date Issued: January 11, 2016 Description of Addendum & Attachments: 1. A Pre Bid Meeting is scheduled for January 18 th, 2016. Attendance is strongly encouraged,
More informationWARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE M a y
WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE M a y 2 0 1 8 Agenda Overview of the Bond 2018 Work 2 Agenda Overview of the Bond 2018 Work 3 Overview of Bond Why Now? Interest rates remain at historic
More informationAugust 2018 PROGRESS REPORT. Cobb County PARKS 2011 SPLOST Program
August 2018 Cobb County PARKS 2011 SPLOST Program September 11, 2018 Mr. Tom Bills Senior Project Manager, Construction Cobb County PARKS 1772 County Services Parkway Marietta, Ga.30008-4026 RE: 2011 PARKS
More informationChenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017
Chenango Bridge Elementary School Phase 1 Asphalt Pavement Reconstruction Reconstruct asphalt parking located on west side of building including access drive. Sidewalk Replacement Replace cracked sections
More informationDENNIS TOWNSHIP FEASIBILITY STUDY
DENNIS TOWNSHIP FEASIBILITY STUDY October 29, 2015 TABLE OF CONTENTS I. INTRODUCTION II. EXECUTIVE SUMMARY III. GENERAL FACILITY DATA A. Primary School B. Elementary / Middle School IV. FACILITIES ASSESSMENT
More informationTechnical Assignment 2
Chris Glinski Construction Management Faculty Advisor: Dr. Messner Columbia Heights Community Center 1480 Girard St. NW Washington, DC 20009 10-31-2005 Technical Assignment 2 Table of Contents A. Executive
More informationMONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #07. Latrobe Elementary School. Greater Latrobe School District
MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #07 Latrobe Elementary School Greater Latrobe School District 08 January 2018 PROJECT SUMMARY Work Completed to date: Ductwork sealed off. Slab Prep in Main
More informationFACILITIES Summer Projects. September 8, 2015 Board Meeting
FACILITIES 2015 Summer Projects September 8, 2015 Board Meeting On January 27, 2015 the Laguna Beach Unified School District Board of Education approved a 10-year facilities plan. The plan identified numerous
More informationCorsicana High School
Contents Corsicana High School...2 General comments, campus capacity, and student demographics...2 1.0 School Site...4 2.0 Building Systems and Components...6 3.0 Building Safety and Security...19 4.0
More informationFees and Permit requirements are regulated by the Township s Building By-law
Frequently Asked Questions This is a guide only and is intended to help you, the homeowner/builder, to better understand the steps to follow in obtaining a Building Permit; it is not a substitute for the
More informationBiddeford School Department
Biddeford School Department 5 Plan Buildings, Grounds & Equipment Table of Contents: John F Kennedy Memorial School Page: 1-2 Biddeford Primary School Page: 3-4 Biddeford Intermediate School Page: 5-6
More informationSYLVAN. inspire MIDDLE SCHOOL. which is to. instruction and programs. in a safe, caring, and. collaborative learning community.
SYLVAN MIDDLE SCHOOL The mission of Sylvan Middle School is consistent with that of the San Juan Unified School District, which is to inspire each student tosucceed and responsibly contribute to a radically
More informationFleet Elementary School
Fleet Elementary School Community Newsletter (August 2018) This is the August update on the status and progress of construction for the project. All monthly updates will also be posted to the project website
More informationMoonlight Architecture, Inc. Architecture Interior Design Site Planning
Moonlight Architecture, Inc. Architecture Interior Design Site Planning 22 May 2018 18057 Mr. Michael J. Petit de Mange, County Administrator Kent County Levy Court 555 Bay Road Dover, DE 19901 RE: Facilities
More informationWINNER. Orange County Public Schools. 100% Design Complete/Construction Kickoff Community Meeting Ivey Lane Elementary School May 18, 2016
Welcome! Please sign in on your mobile device: http://communitymeeting.ocps.net/ WINNER 100% Design Complete/Construction Kickoff Community Meeting Ivey Lane Elementary School May 18, 2016 Ivey Lane Elementary
More informationManufacturing Facilities Proposal
Manufacturing Facilities Proposal Construction proposal To assist business owners with expansion projects, Wisconsin Public Service has compiled information and renderings of common building types in business
More informationBOYERTOWN AREA SCHOOL DISTRICT February 28, Boyertown West Middle School Renovation Project
BOYERTOWN AREA SCHOOL DISTRICT February 28, 2017 Junior High West Project Overview On June 16, 2015 the board of school directors authorized KCBA Architects to begin the design development stage of the
More informationJMU Capital Projects SWaM Outreach Event Presentations
JMU Capital Projects SWaM Outreach Event Presentations Kjellstrom + Lee Contact: Jessica Marcus jmarcus@kjellstromandlee.com Project: College of Business Renovation/Expansion Please contact Kjellstrom
More informationKRISTOPHER J. BRICE Construction Management Faculty Consultant: Dr. Christopher Magent
KRISTOPHER J. BRICE Construction Management Faculty Consultant: Dr. Christopher Magent 8353 University Boulevard, Moon Township, PA 15108 Thesis Proposal THIRD REVISION 3/19/2010 Table of Contents Executive
More informationRichard L. Johnson Associates, Inc. Architects Interior designers. ARCHITECT S FIELD REPORT No. 13
Richard L. Johnson Associates, Inc. Architects Interior designers ARCHITECT S FIELD REPORT No. 13 Project: Addition and Renovation to Millikin Elementary School Architect s Project No.: 15-032 Date: 9-29-16
More informationBLIND BROOK-RYE UFSD SCHOOL FACILITIES PLANNING SECOND UPDATE ON RECOMMENDED PROJECTS
BLIND BROOK-RYE UFSD SCHOOL FACILITIES PLANNING SECOND UPDATE ON RECOMMENDED PROJECTS January 9, 2017 SUMMARY OF OCTOBER 17 TH PRESENTATION 1. Five-Year Capital Facilities Plans & 15-year History 2. 2016-2020
More informationPROJECT STATUS REPORT Collins Elementary School - Fire Alarm Upgrade Period Ending: 10/31/2012 Scope: Construction Status: Architect: AE3 Architects U
PROJECT STATUS REPORT Collins Elementary School - Fire Alarm Upgrade Period Ending: 10/31/2012 Scope: Construction Status: Architect: AE3 Architects Upgrade of Fire Alarm System in existing buildings Project
More informationRR Program Summary: Complete renovation with addition and code upgrades for a historic academic building
Program Summary: Complete renovation with addition and code upgrades for a historic academic building Program Statement: Damaged in Hurricane Katrina, the circa-1929 former high school in historic Marigny
More informationAl Behrman Elementary School
Mulberry Street Al Behrman Elementary School Relocate reception and principal s office to be adjacent to main entrance doors; provide secure entrance sequence and increase transparency to the exterior
More informationDeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016
DeKalb County School District/Elementary Schools Clifton Elementary Final School Assessment Report May 19, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition
More information