Hence, the present proposal is classified under Schedule 6(b) & Category B according to EIA Notification 2006 & subsequent amendments.

Size: px
Start display at page:

Download "Hence, the present proposal is classified under Schedule 6(b) & Category B according to EIA Notification 2006 & subsequent amendments."

Transcription

1 1. INTRODUCTION 1.1BRIEF DESCRIPTION OF PROJECT M/s Indian Oil Corporation Limited has proposed to set up an LPG Bottling Plant at Khasra no: 3, Jodhpur District, Rajasthan State. LPG from M/s Indian Oil Corporation Limited (Rajasthan) will be received through tank trucks & stored in mounded bullets of capacity 3 x 600MT (Total 1800MT). LPG will be pumped from storage bullets to filling shed where cylinders will be filled prior to dispatch through road. The current proposal has been submitted to State Environmental Impact Assessment Authority for the proposed bulk LPG storage (1800MT) and the LPG throughput of 120 TMTPA through 2 Electronic Carousel having 48 LPG Filling Stations. NATURE OF PROJECT IOCL Bottling Plant will operate strictly as storage & Filling facility for LPG into 05 kg, 14.2 kg, 19 kg, 35 kg & 47.5 kg cylinders (Domestic/Commercial/BMCG). No byproducts / additional products are generated / manufactured during the operations. Hence, the present proposal is classified under Schedule 6(b) & Category B according to EIA Notification 2006 & subsequent amendments. PROFILE OF PROJECT PROPONENT Indian Oil Corporation Limited is an Indian state-owned oil and gas corporation with its headquarters in New Delhi, India. It is the world's 161 st largest corporation, according to the Fortune Global 500 list, and the largest public corporation in India when ranked by revenue. Indian Oil is the highest ranked Indian company in the latest Fortune Global 500 listings. The company is mainly controlled by Government of India which owns approximately 79% shares in the company. It is one of the seven Maharatna status companies of India, apart from Coal India Limited, NTPC Limited, Oil and Natural Gas Corporation, Steel Authority of India Limited, Bharat Heavy Electricals Limited and Gas Authority of India Limited. Page 1

2 1.2 NEED FOR THE PROJECT & ITS IMPORTANCE Oil marketing companies have projected an increase in demand of Liquefied Petroleum Gas (LPG) in future due to increase in its domestic use. The demand is likely to increase substantially over the years to come. Even in the present scenario it is very difficult to meet the market demand of Jodhpur and adjoining areas by Indian Oil Corporation Limited. As per directive of the Ministry of Petroleum and Natural Gas, Government of India, different Oil companies are required to augment / construct new facilities to meet the growing demand. Over the last five years, there has been continuous increase in capacity utilization of the bottling plant. In line with the requirement envisaged and to ensure fulfillment of demand, Indian Oil Corporation Limited proposes to construct new LPG Bottling Plant near Jodhpur with a storage capacity of 3 X 600 MT. This proposed plant shall meet the short supply of LPG Cylinders in and around Jodhpur. This will also meet the present and future house hold demands of people 1.3 DESCRIPTION OF CURRENT PROPOSAL The present proposal has been submitted to SEIAA Rajasthan for obtaining EC for the proposed bulk LPG storage capacity of 1800 MT to achieve the LPG bottling throughput of 120 TMTPA. The throughput will be achieved by installing an Electronic carousel having 2x 24 filling station within the Proposed Project site. 1.4 SITE ANALYSIS M/s Indian Oil Corporation Limited has proposed to set up a LPG Bottling Plant at Khasra no: 3, Village- Ujaliya Tehsil, Bewari, Jodhpur District, and Rajasthan State. The Google map showing the project site is given in Figure 1.1. The general location of the project area is shown in Figure 1.2. The Site Photo of vacant land is given in Annexure I. Page 2

3 FIGURE 1.1 GOOGLE IMAGE OF PROJECT SITE Page 3

4 FIGURE 1.2 LOCATION MAP OF PROJECT SITE Page 4

5 1.5 CONNECTIVITY The project site is well connected by road and rail network. The project site is located at the distance of 500m (SSE) from Ujaliya Road which connects SH 61 through Bayan mata Mandir Road. Ujaliya Road connects the project site with SH 58, which connects the site with NH 62. Marwar Mathanya Railway Station is located at the distance of 8.97 km (WNW). Jodhpur Airport is located at the distance of km (S). Map showing the road network around the site is given in Figure 1.3. PROJECT SITE Ujaliya Road FIGURE 1.3 CONNECTIVITY MAP 1.6 LANDUSE CLASSIFICATION & LANDUSE BREAKUP Rajasthan Government has recognized the location of this unit as Jodhpur Development Authority and encouraging entrepreneurs to come forward for setting up industries. The area is dominated by large scale industries and other medium scale industries. The total Land area of the facility is 50 Acres. The land use breakup of the project site is given in Table 1.7. The topo map of the project site and its surrounding area covering 10 km & 5 km radius are given in Figures 1.4. Map Showing the Water Body is given in Figure 1.5. Environmental settings are presented in Table 1.1. Page 5

6 Figure 1.4 Topo map (10km around project site) Page 6

7 Figure 1.5 Water body map (10km around project site) Page 7

8 1.7 SITE CHARACTERISTICS TABLE 1.1 ENVIRONMENTAL SETTINGS OF THE PROJECT SITE S. No. Particulars Details 1 Latitude 26 30'39.08"N 2 Longitude 73 3'51.70"E 3 Site Elevation above MSL 223 m 4 Topography Undulating Terrain 5 Present land use at the site Industrial- Jodhpur Development Authority 6 Nearest highway State Highway (SW) National Highway 62 Bikaner-Barmer Road-7.31(E) 7 Nearest railway station Marwar Mathanya Railway Station 8.97 km (WNW) 8 Nearest airport Jodhpur Airport km (S) 9 Nearest town / city Jodhpur City 29 km (S) 10 Water body Khari Nadi-7.0 km (NE) 11 Nearest Port Nil in 15km radius 12 Hills / valleys Nil in 15km radius 13 Archaeologically important places 14 National parks / Wildlife Sanctuaries/ Eco sensitive zones as per Wild Life Protection Act, 1972 Nil in 15km radius Nil in 15 Km radius 15 Reserved / Protected Forests Nil in 15 Km radius 16 Seismicity Seismic Zone II (Least Active) 17 Defense Installations Nil in 15km radius 1.8 CLIMATE The climate of the district is tropical with hot and dry summer and pleasant winter. The summer season extends from March to middle of June followed by the rainy season from June to September. Page 8

9 1.9 TEMPERATURE The climatic condition of this district is quite extreme. The Temperature rises high as 42 degrees Celsius in summer and falls to as low as 10 degrees Celsius in winter RAINFALL The south-west monsoon is the principal source of rainfall in the district. Average annual rainfall of the district is 314mm. About 80% of the total rainfall is received during the period from June-September. Droughts are quite common in the district. RELATIVE HUMIDITY The relative humidity is on an average between 19 and 64% GEOMORPHOLOGY Jodhpur district forms part of Great Thar Desert of Rajasthan. In this arid region, there are sand dunes, alluvial areas dotted with few hillocks and hill chains scattered in the area. In the eastern part of the district, the area between Bilara and Jodhpur is covered by alluvium deposited due to the fluvial action of Luni river system. The eastern part of the district exhibits gentle undulating topography interrupted by small ridges of hard rocks. The general elevation of plains varies from 300 m amsl in north to 150 m amsl in south. Regional slope is from north-east towards southwest direction. Orientation of alluvial plain area follows the Luni River and its tributaries. Sand dunes occupy a major part of the district north of Vindhyan escarpment in northern and northwestern part of the district. The sand dunes are transverse and longitudinal type formed due to aeolian action and overlies the denuded consolidated formations. Ridges composed of comparatively resistive rocks like granite, rhyolite and Jodhpur sandstone are found extending from Shergarh in the west to Bilara in the east. The alluvial and sand filled valleys are separated by the ridges whose crest elevation ranges from 325 to 460 m amsl. In the northern part of the district, highest peak of the hill is 284 m amsl. Presence of boulder bed exhibit striking plain topography around Bap and low lying outcrops of limestone, shale and sandstone layers are observed part of the district near Phalodi. Distribution of various geomorphic units in the district is shown in Table 1.2 Page 9

10 Table 1.2: Distribution of various geomorphic units in Jodhpur District Origin Landform Unit Occurrence Aeolian Sand Dunes North and Northwestern part of the District Sandy Plains North and Northwestern part of the District Fluvial Alluvial Plains Eastern part of the district along rivers- Luni, Mithri etc Interdunal Plains Scattered in entire district, mainly in north and western part of the district. Denudational Pediments Scattered in the district, mainly in east & west Hills Linear Ridges Occur in Bilara and Osian Blocks. Extended from Shergarh in the west to Bilara in the east Structural Hills In northwastern and eastern parts of the district and Jodhpur town Jodhpur district falls in the Luni and Barmer basins. Major River of the district is Luni, which flows in ENE WSW direction. It enters Jodhpur district near village Jakh in Bilara tehsil and leaves the district near village Dhundhara. Total length of the Luni River in Jodhpur district is 125 Km. Channel pattern of Luni is dendritic to sub- parallel. However, major part of the district, the drainage is essentially ephemeral and internal. Important tributaries of the Luni River are Mithri and Bandi. Other streams in the district are Jojri, Golasmi, Guniamata and Bastua, which are all ephemeral SOIL Soils of the Jodhpur district have been classified as follows: Red desertic soils: This type of soil is predominant in central, eastern and southern parts of the district. These are pale brown to reddish brown soils, loose and drained and texture varies from sandy loam to sandy clay loam. Desert soil: Desert soils occupy a considerable area covering northern and western part of the district, these are mainly windblown sand and soils of interdunal depressions. 9 Sand dunes: Sand dunes occupy a small part in northern and north- western margin of the district, these are sandy to loamy sand, loose, structure Page 10

11 less and well drained. Lithosoils and regosols of hills: These type of soils are found in hills and hill slopes of central and western parts of the district. These are shallow, light textured, fairly drained and reddish brown to grayish in colour 1.13 INFRASTRUCTURE INDUSTRIES Jodhpur Development Authority was established for the purposes of planning, coordinating and supervising the proper, orderly and rapid development of the Jodhpur Region and of executing plans, projects and schemes for such development and to provide for matters connected there with. There are no industries located in the vicinity of proposed IOCL LPG Bottling Plant PROJECT DESCRIPTION M/s Indian Oil Corporation Limited has proposed to set up a LPG Bottling Plant Installation at Khasra No.3, Village - Ujaliya Tehsil, Bawari, Jodhpur, and Rajasthan. The current proposal has been submitted to SEIAA Rajasthan for issuance of Environmental Clearance for the Proposed LPG Bottling Plant (1800MT) with the LPG throughput of 120TMTPA. The total area occupied by IOCL is approximately 50 acres the land documents enclosed as Annexure II The layout of the plant is shown in Figure 1.6 Page 11

12 FIGURE 1.6 SITE LAYOUT Page 12

13 1.15 DETAILS OF ALTERNATE SITES CONSIDERED No alternative site is considered, as Khasra no:3, Village- Ujaliya Tehsil, Jodhpur Block, Jodhpur District, Rajasthan State contains all infrastructure facilities necessary for the LPG bottling Plant. The reasons favorable to setting up the LPG bottling Plant at Ujaliya village are, 1. The Bottling plant is located in the Jodhpur Development Authority. (JDA). 2. Very good approach road from SH and NH to proposed site. 3. The Area is located near high demand area. 4. There is potential for future growth in demand and adequate availability of land within the existing industrial area for future expansion of the bottling plant SIZE & MAGNITUDE OF OPERATION The plant has proposed for the LPG bottling throughput of 120 TMTPA and bulk storage capacity of 1800 MT (3 mounded bullets x 600MT capacity). TABLE 1.3 DETAILS ON CURRENT PROPOSAL Bulk LPG storage facility 3 x 600MT (mounded bullets) LPG bottling throughput 120 TMTPA 1.17 PROCESS DESCRIPTION The Proposed LPG bottling Plant at Khasra no:3, Village- Ujaliya Tehsil, Jodhpur Block, Jodhpur District, Rajasthan State will be operated by M/s Indian Oil Corporation Limited. The LPG bottling Plant will function primarily as LPG receipt, storage & bottling unit for filling into cylinders. The LPG bottling Plant operations are categorized as, 1. Receipt of product a. Transfer of LPG from M/s Indian Oil Corporation Limited (M/s IOCL) through tank trucks duly approved by PESO b. Truck unloading c. LPG transfer to storage vessels duly approved by PESO 2. Receipt of empty LPG cylinders (conforming to IS 3196) & segregation Page 13

14 3. a. Bottling a. Pumping of LPG to filling shed b. Bottling of LPG cylinders c. Quality check on filled cylinders b. Loading into Trucks 4. Dispatch a. Loading of packed cylinders in trucks b. Supply & distribution to markets (through Authorized Vendors) RECEIPT OF PRODUCT LPG dosed with mercaptan will receive from M/s IOCL through tank trucks. There will be 8 Bay TLD gantry of size 24 M X 5.5 M for Unloading of tank lorry with MFM on common header to facilitate automation for the purpose of unloading tank trucks and the product will be stored in mounded vessels (3 x 600MT storage capacity). RECEIPT OF EMPTY LPG CYLINDERS & SEGREGATION Empty LPG cylinders will receive from vendor trucks & faulty cylinders are segregated at the point of receipt and diverted towards valve refitting section. BOTTLING LPG from storage vessel will be pumped to LPG Filling Shed (2 carousel having 24 filling machines each). Cylinder bottling will be the primary process carried out. After filling, each cylinder is subjected to quality check i.e. to check for leaks. DISPATCH Filled cylinders will be loaded into respective Authorized Vendor trucks and dispatched. Cylinders that are damaged will be stored separately and subsequently sold as scrap metal to Authorized Dealers. PROCESS DESCRIPTION Page 14

15 FIGURE 1.7 PROCESS FLOW CHART 1.18 RAW MATERIAL REQUIREMENT & MATERIAL BALANCE LPG will be the only input & output for the entire bottling process. LPG will receive from M/s IOCL through Tank trucks. The mass balance for the proposed bottling capacity has been detailed below, TABLE 1.4 MASS BALANCE FOR LPG BOTTLING THROUGHPUT (PROPOSED) Flowrate (cum/hr) Hours of operation (day -1 ) LPG bottling (Tons /day) Number of days working (month -1 ) Total throughput (TMTPA) Page 15

16 1.19 POWER REQUIREMENT & SOURCE Power required for the plant operations will be 400 KVA and it will be sourced from Rajasthan State Electricity Board (RSEB). D.G sets will be used in case power failure & their specifications are detailed below, TABLE 1.5 DETAILS ON D.G SETS S. No. Capacity Number Fuel used Stack height (m) Stack diameter (in) HSD S. No MANPOWER REQUIREMENT The total manpower requirement will be 133 persons which includes, 33Permanent staff and 100 contract labourers WATER REQUIREMENT, SOURCE & WASTEWATER GENERATION Total water requirement for the bottling plant will be around 15 KLD which is sourced through - Tube well/piped supply by JDA. Water balance table & diagram are given below Domestic water requirement (KLD) Industrial water requirement (KLD) TABLE 1.6 WATER BALANCE TABLE Domestic sewage generation (KLD) Gardening & Mock Drill Wastewater from process / cylinder washing (KLD)* Cylinder washing & Testing * Note Wastewater generated from cylinder washing will be primarily dirty water with suspended solids. After sedimentation, this water will be reused for cylinder washing. There will be no process / trade effluent generated during operations. Page 16

17 Total water requirement (15 KLD) Domestic requirement 5 KLD Greenery / Mock Drill 6 KLD Cylinder Washing & testing 4KLD Septic Tank/soak pit Reused for cylinder Washing FIGURE 1.8 WATER BALANCE CHART 1.22 INDUSTRIAL WASTE GENERATION & DISPOSAL METHODS No industrial solid waste will be generated during the bottling process. Damaged cylinders will be segregated & stored on site prior to disposal as scrap metal. Hazardous waste generated from D.G set operation will be disposed to RSPCB Authorized Recyclers INFRASTRUCTURE REQUIREMENTS The proposed land-use breakup of the project site is, TABLE 1.7 LAND-USE BREAKUP S. No. Land use parameter % Area 1. Process & Storage Area Building Area Roads Parking Green Belt Area Open Space 24 Total Area 100 Page 17

18 1.24 The list of equipments Proposed for the bottling plant are TABLE 1.8 LIST OF EQUIPMENTS / FACILITIES & NUMBER S. No EQUIPMENT TOTAL NUMBER CAPACITY 1 2 x 24 Station Electronic Carousel with Dynamic check scale, WCU, VLD & OLD 2-2 Automatic Valve Changing Machine 1-3 Purging unit cyls/hr 4 Chain / Roller conveyor system with drive units M/Min. 5 Hot Air Sealing System 1-6 Vapour Extraction System 1-7 CVT 1-8 Test Bath 1-9 air compressor CFM 10 blower 1-11 electronic weighing scale 1 50 kg 12 Ultrasonic cleaning and valve salvaging machines 1-13 Cylinder Washing Unit AIR POLLUTION CONTROL MEASURES No emissions will be generated during the operations as the entire bottling process will carried out through pipelines from Storage Area to Filling Shed. The only point sources of emissions will be D.G sets & Fire Engines. They have been fitted with stacks of adequate height to disperse the pollutants. S. No. TABLE 1.9 DETAILS ON APCS Source of emission Control measure Material of construction Top diameter (m) Height above GL (m) KVA Stack MS Pipe Page 18

19 1.26 WASTEWATER TREATMENT METHOD Sewage is disposed through septic tanks & soaks pits (2 nos.) of dimensions 12m x 8m& 30m x 15m. Washing water generated from cylinder washing will be diverted to sedimentation traps fitted with oil separator & clarified water will be reused for cylinder washing FIRE FIGHTING & DISASTER MANAGEMENT MEASURES 1. 3 Nos. of above ground vertical water tanks for fire water storage, each of capacity 3422 KL as per OISD requirement will be provided. (Actual FW calculation to be attached). 2. Fire water pump house (shed) : - Pump house of size 30M X 10M (300 M2) will be provided to accommodate 3. Fire hydrant system: - Fire hydrant ring main covering all facilities will be provided as per the OISD requirements. Double hydrants (with hose boxes, hoses & nozzles) and fire water monitors as per the stipulations in the OISD-144 will be provided. Long range Fire Monitors shall be provided in critical areas with remote operation. 4. MV Spray system: As per OISD norms for Fire Protection System. 5. Fire Extinguishers: Shall be provided as per OISD norms 6. Deluge Valves: Auto reset type deluge valves having manual quick bypass system as per OISD norms shall be provided with fire protection wall. Provision for activation of DV shall be for auto and manual modes (local & remote panel) as per OISD All the isolation valves used in Fire fighting system should be of rising stem type. 8. MCP: Manual Call Points at strategic locations as enumerated in OISD-144 shall be provided to raise alarm (siren) and also shut down LPG operations, in case of emergency with suitable hooter on annunciation panel at fire water pump house. Page 19

20 1.28 DESCRIPTION OF MOUNDED BULLETS LPG is normally stored in above ground storage mainly spheres and cylindrical tanks, namely, bullets & Horton spheres, the advantage being their accessibility for regular inspection and maintenance which is important for such storage for hazardous service. But these storages are susceptible to fire impingement and can give rise to Boiling Liquid Expanding Vapour Explosions (BLEVE). The reason for selecting mounded or buried bullets for LPG storage is to protect them from direct flame impingement caused by any eventual fire in the surroundings and thus prevent initiation of the sequence of events leading to an occurrence of BLEVE. The mounded storage concept basically originated from Europe and specialized codes exist in Germany such as: DIN 4681 Tl: Statutory Steel Pressure Vessels for Liquefied Petroleum Gases for Earth Covered Installations, Dimensions and Equipment. During construction phase, a slight increase in the ambient noise levels is anticipated. This impact will be temporary and limited to the construction phase. Hence no permanent impact on this account is expected. During the operational phase, no major social impact in the general area is expected. There will be no change in the occupational structure of the workforce. As there will be no emissions into air, no liquid effluents and no solid wastes no negative impact on the health of the inhabitants in and around the project site is expected SAFETY ASPECTS FOR SETTING UP MOUNDED BULLETS Mounded tanks are semi-conventional pressure vessels, covered by a layer of soil or sand. By mounding LPG tanks with an adequate layer of sand and earth, the possibility of fire engulfment and a BLEVE will be removed. Mounded vessel(s) placed on a firm foundation will not suffer from flotation. Thus mounded tanks have the advantage over underground LPG tanks, which require protection against possible floatation. Mounding allows safety distances around the facility to be considerably reduced, compared to an equivalent unprotected design. The extra cost associated with a mounded system is offset by the lower cost of the land required, and the virtual exclusion of fire fighting systems. Page 20

21 ENVIRONMENTAL ASPECTS Large volume of water required for the fire systems of conventional storage are eliminated thus reducing the demand on valuable water sources, and problems associated with the drainage and disposal of the water. Mounded LPG gas tanks can be landscaped to blend with the environment RAINWATER HARVESTING MEASURES Storm water drains will be developed to collect run-off water from paved areas. Recharge pits will set up at the site to harvest run-off water CORPORATE ENVIRONMENTAL RESPONSIBILITY As per MoEF&CC Notification F.No.22-65/2017-IA.III Dated: 01/05/2018 CER policy, 1.5% of the project cost will be used for CER for various activities PROJECT COST & IMPLEMENTATION SCHEDULE Cost for the proposed LPG Bottling Plant at Khasra No.3, Village - Ujaliya, Bawari, Jodhpur, Rajasthan is estimated to be around Crores. Page 21

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For PRIOR ENVIRONMENTAL CLEARANCE STORAGE CAPACITY ENHANCEMENT OF HPCL, LPG BOTTLING PLANT Capacity: 3 X 500 MT At Plot No.499 Kota-Jhalawar Road (NH-12) Village- Mandana, Tehsil-

More information

ANNEXURE. Annexure 1: Production Details. Annexure 2: Site Location Map. Annexure 3: Site Layout Map & Area breakup for Terminal

ANNEXURE. Annexure 1: Production Details. Annexure 2: Site Location Map. Annexure 3: Site Layout Map & Area breakup for Terminal ANNEXURE Annexure 1: Production Details Annexure 2: Site Location Map Annexure 3: Site Layout Map & Area breakup for Terminal Annexure 4: Operation Philosophy Annexure 5: Copy of Consent to Operate Annexure

More information

ANNEXURE. Annexure 1: Production Details. Annexure 2: Site Location Map. Annexure 3: Site Layout Map & Area breakup for Terminal

ANNEXURE. Annexure 1: Production Details. Annexure 2: Site Location Map. Annexure 3: Site Layout Map & Area breakup for Terminal ANNEXURE Annexure 1: Production Details Annexure 2: Site Location Map Annexure 3: Site Layout Map & Area breakup for Terminal Annexure 4: Operation Philosophy Annexure 5: Copy of Consent to Operate Annexure

More information

Pre-Feasibility Report for Construction of Additional Tankage at POL Terminal Partapur, Meerut, M/s IOCL PRE-FEASIBILITY REPORT

Pre-Feasibility Report for Construction of Additional Tankage at POL Terminal Partapur, Meerut, M/s IOCL PRE-FEASIBILITY REPORT PREAMBLE Pre-Feasibility Report for Construction of Additional PRE-FEASIBILITY REPORT Indian Oil Corporation Limited (IOCL) is India's largest commercial enterprise, with a sales turnover of Rs. 4,38,710

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

PROJECT REPORT FOR AMMENDMENT IN ENVIRONMENT CLEARANCE

PROJECT REPORT FOR AMMENDMENT IN ENVIRONMENT CLEARANCE 1.1 TYPE OF PROJECT The project of IOTL is a green field POL terminal with storage capacity 1,90,570 KL. 1.2 NEED FOR THE PROJECT Chhattisgarh was carved out of Madhya Pradesh on the 1 st November, 2000.

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure

More information

A. INTRODUCTION PREFEASIBILITY REPORT

A. INTRODUCTION PREFEASIBILITY REPORT A. INTRODUCTION a. BRIEF DESCRIPTION OF PROJECT M/s Bharat Petroleum Corporation Limited has set up the Haldia Coastal Installation at HAL-733, Patikhali, Durgachak, Haldia 721602, West Bengal. The Depot

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For DEVELOPMENT OF LPG BOTTLING PLANT AT RASAYANI, DISTRICT-RAIGAD, MAHARASTRA Proposed By M/s. BHARAT PETROLEUM CORPORATION LTD. ******************************************** Prepared

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT For EC FOR INCREASING STORAGE CAPACITY OF ETHANOL BY 6000 KL At Indian Oil Corporation Limited (IOCL), Panipat marketing Complex, Village-Baholi, P.O.-Panipat Refinery, Tehsil Panipat,

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT M/S INDIAN OIL CORPORATION LIMITED PREFEASIBILITY REPORT FOR THE PROPOSED CAPACITY EXPANSION OF MADURAI TERMINAL AT SURVEY NOS. 159 & 160, SIDCO INDUSTRIAL ESTATE, KAPPALUR VILLAGE, TIRUMANGALAM TALUK

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR Conversion of Existing Product Storage Tanks TK-16(HSD) of 6000 KL to MS and TK-6(MS) of 1000 KL to Ethanol AT HPCL Bulk POL Depot, Mansa Road, Phoos Mandi, Bhatinda-151001.

More information

PRE-FEASIBILITY REPORT FOR PROPOSED IOCL LPG BOTTLING PLANT KHORDHA

PRE-FEASIBILITY REPORT FOR PROPOSED IOCL LPG BOTTLING PLANT KHORDHA PRE-FEASIBILITY REPORT FOR PROPOSED IOCL LPG BOTTLING PLANT KHORDHA AT KHORDHA, ODISHA PREPARED BY INDIAN OIL CORPORATION LTD. & M/s ULTRA-TECH (ENVIRONMENT CONSULTANCY & LABORATORY) TABLE OF CONTENTS

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVE SUMMARY 1.1 Introduction Road Metal of M/s. Lakshmi Stone Crusher covering an extent of 2.10 Ac is located at Sy. No. 379/1 of Perecherla Village, Medikonduru Mandal, Guntur District, Andhra

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

TABLE OF CONTENTS. Para No. Contents Page No

TABLE OF CONTENTS. Para No. Contents Page No TABLE OF CONTENTS Para No. Contents Page No Chapter-1 Introduction 1.0 Preamble 1 1.1 Location of the project 1 1.2 Objectives of the EIA study 3 1.3 Methodology of study 3 1.4 Structure of EIA report

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,

More information

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance]

Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Pre-Feasibility Report [Application submitted for obtaining Terms of Reference for Prior Environment Clearance] Project Proposal: Expansion of Cement Plant capacity from 1.5 to 2.20 MTPA of Clinker and

More information

MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.

MODIFIED QUARRYING PLAN FOR SHINGATALOOR SAND MINING BLOCK-2 EXTENT Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY. MODIFIED QUARRYING PLAN FOR "SHINGATALOOR SAND MINING BLOCK-2" EXTENT -12.00 Acres (4.86 Ha) IN TUNGABHADRA RIVER BED ADJ ACENT TO SY.NO - 129 & 131OF SHINGATALOOR - VILLAGE MUNDARGI - TALUK GADAG - DISTRICT

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT EXECUTIVE SUMMARY 1.0 Executive Summary The Mining lease was granted in favour of Shri Mukesh Kumar S/o Shri Harish Chandra, R/o Tatol vaya Bagra, Tehsil - Bhinmal, Dist.-Jalore

More information

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha

Table 1.1: The Salient Features of the Project. Proposed Quartz Mine Of Sri. Syed Masthan Basha 1. EXECUTIVE SUMMARY 1.1 Introduction The Eknampuram Quartz mine of 89.80 Acres/ 36.34 ha is located in Sy. No. 60, Eknampuram Village, C.S. Puram Mandal, Prakasam District, Andhra Pradesh has been allotted

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report NAME OF THE PROJECT- Construction of 4/6 lane Access Control National Highway No. 754K from Dhadhaniya Sasan ( Jodhpur district) to Rajasthan-Gujarat Border near Sanchore (District-Jalore)

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS

SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS Annexure No - 13 SEIAA KARNATAKA CHECK LIST FOR BUILDING & CONSTRUCTION PROJECTS File No : Name of the Project: Proposed Commercial project called Bagmane Tech Park RIO Campus of M/s. Bagmane Developers

More information

DEVELOPMENT of. LPG Storage & Bottling Plant. Haldia. Project Feasibility Report

DEVELOPMENT of. LPG Storage & Bottling Plant. Haldia. Project Feasibility Report Hindustan Aegis LPG Limited DEVELOPMENT of LPG Storage & Bottling Plant Haldia Project Feasibility Report August 2017 1 Amendment Record: Amendment Inserted by (Name printed) Date Signature Remarks 2 Table

More information

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant PRE FEASIBILITY REPORT FOR Silica Sand Beneficiation Plant BY Shree Silicaam Minerals LLP VILLAGE : CHOKI TALUKA : JAGADIA DIST : BHARUCH GUJARAT (INDIA) PRE-FEASIBILITY REPORT: SILICA SAND BENIFICIATION

More information

1.1 SALIENT FEATURES OF THE PROJECT Pipeline extension from VVSPL Vijayawada to the proposed Dharmapuri Storage Terminal

1.1 SALIENT FEATURES OF THE PROJECT Pipeline extension from VVSPL Vijayawada to the proposed Dharmapuri Storage Terminal 1.0 EXECUTIVE SUMMARY Hindustan Petroleum Corporation Limited (HPCL) is one of the major Public Sector Navratna Oil Company engaged in refining, marketing and distribution of Petroleum Products in India.

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

Tehsil: Bap, District: Jodhpur, Rajasthan by RIICO Limited

Tehsil: Bap, District: Jodhpur, Rajasthan by RIICO Limited 1.0 Executive Summary PRE-FEASIBILITY REPORT Rajasthan State Industrial Development and Investment Corporation, known as RIICO, is a premier agency of Government of Rajasthan that has played an important

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT Page 0 of 14 EXECUTIVE SUMMARY The proposed project of 24.0 Ha or 59.28 Acre area is of stream bed sand mining and falls under Category- B1 as per EIA Notification 2006 amended till

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Sri D. Ujjinappa has applied for quarry lease for extracting of Building stone in Sy No. 19/2, Chatnihalli Village, Harpanahalli Taluk, Davangere District,

More information

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA 1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath Pre-Feasibility Report for Educational Institute Allen Career Institute-Supath at Plot No. 1, Educational Scheme, Naya Nohra & Hanuwantkhera, Kota, Rajasthan-324001 By M/s. Allen Career Institute Registered

More information

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh.

Table 1.1 : Salient features of the project. Sy. No. 379/1, Perecherla Village, Medikonduru Mandal, Guntur District, Andhra Pradesh. 1.0 EXECUTIVESUMMARY 1.1 Introduction Road Metal of M/s. Venkata Ramana Stone Crusher covering an extent of 0.89 Ac is located at Sy.No.379/1 of Perecherla Village, Medikonduru Mandal, Guntur District,

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

FORM I & PREFEASIBILITY REPORT FOR THE

FORM I & PREFEASIBILITY REPORT FOR THE BHARAT PETROLEUM CORPORATION LIMITED FORM I & PREFEASIBILITY REPORT FOR THE PROPOSED TO SET UP A LPG BOTTLING PLANT AT PLOT NO :12, KHATA NO :109 & 111, REV PLOT NO: 93(P), 902(P) AT IDCO GROWTH CENTRE

More information

PREFEASIBILITY REPORT FOR BRICK EARTH MINE

PREFEASIBILITY REPORT FOR BRICK EARTH MINE Page 1 PREFEASIBILITY REPORT FOR BRICK EARTH MINE Developed By- Village-Chandauhan, Tehsil-Phulpur, District-Allhabaad, Uttar Pradesh. RAI ENVIROMENTAL SERVICES PVT. LTD. Website: www.raienviro.com Email

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies Proposed Terms of Reference for EIA studies M/s Maithan Steel and Power Ltd. is located at: At/PO- Bonra, PS- Neturia in Purulia district of WB with latitude:23 0 37 53.85 Nand longitude 86 0 50 08.10

More information

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT FOR ORDINARY SAND PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

EIA-EMP REPORT GRAVEL QUARRY (Category-B2)

EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EIA-EMP REPORT GRAVEL QUARRY (Category-B2) EXTENT : 4.00.0 Hectares S. F. No : 436/1A (P) VILLAGE TALUK DISTRICT STATE : IYANPAPPAKKUDI : MADURAI : MADURAI : TAMIL NADU PROJECT PROPONENT Thiru P. Ayyanar

More information

PRE-FEASIBILITY REPORT OF SAND QUARRY

PRE-FEASIBILITY REPORT OF SAND QUARRY PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL

More information

Details of the proposed project as presented before the committee are tabulated below:

Details of the proposed project as presented before the committee are tabulated below: Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS

More information

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT EXCUTIVE SUMMARY Project : Mining Lease of Iron Ore (Ari Dongri Iron Ore Mine) Name of Company / Mine Owner : Godawari Power and Ispat Limited Location Village : Tehsil : District

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

M/s.NEERAJ KUMAR JAIN

M/s.NEERAJ KUMAR JAIN EXECUTIVE SUMMARY OF DARSHANI LATERITE AND RED OCHRE DEPOSIT Area : 15.00 Ha. Village Budhanwara, Tahsil Bohriband, Dist. Katni MADHYA PRADESH For M/s.NEERAJ KUMAR JAIN KATNI 1 BUDHANWARA LATERITE AND

More information

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A

FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) PART A (I) FORM V ENVIRONMENTAL STATEMENT REPORT FOR THE FINANCIAL YEAR 2013-14 M/s Halki Lime Stone Mine (Unit: J. K. Cement Limited) Name & Address of the Owner / Occupier of the Industry Operation or Process

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

2. PRE-FEASIBILITY REPORT

2. PRE-FEASIBILITY REPORT 2. PRE-FEASIBILITY REPORT 2.1 Executive Summary Smt. J N Rukmini, has applied for extracting of Building stone in Sy No. 40, Kuroda Bore Kavala village, Hassan Taluk & District, Karnataka over an extent

More information

5. ENVIRONMENT MANAGEMENT PLAN

5. ENVIRONMENT MANAGEMENT PLAN 5. ENVIRONMENT MANAGEMENT PLAN The environmental management plan consist of the set of mitigation measures, management and, monitoring measures to be taken during construction and operation phase to eliminate

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT GRANITE BUILDING STONE QUARRY MINING PROJECT STATE : KERALA DISTRICT : KANNUR THALUK : THALASSERY VILLAGE : THRIPPANGOTTUR BLOCK NO. : NIL SURVEY NO. : 275/1A MINERAL : GRANITE BUILDING

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT 2016 Expansion of POL Terminal In Magalia, Indore, Madhya Pradesh PRE FEASIBILITY REPORT 1 P a g e Prefeasibility Report 1 EXECUTIVE SUMMARY... 4 1.1 INDUSTRIAL AREA (PROCESSING AREA)... 5 1.2 RESIDENTIAL

More information

M/s. SHREE SHYAMJEE METALLICS

M/s. SHREE SHYAMJEE METALLICS PRE-FEASIBILITY REPORT FOR PRPOSED UNIT OF Manufacturing Of Manganese Dioxide, Manganese Oxide, Ferro Alloy Unit (By Thermite Process) And Manganese /Iron Ore Beneficiation From ROM At Survey No. 165 &

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

1. PRE-FEASIBILITY REPORT

1. PRE-FEASIBILITY REPORT 1. PRE-FEASIBILITY REPORT 1.1 Executive Summary Sri. T. Thimmegowda, has applies quarry lisence for extracting of Building Stone Quarry in Sy No. 33/2, Kurodbore Kaval village, Hassan Taluk, Hassan District,

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

SHRI.LAKSHMAN NAMDEV KOLI

SHRI.LAKSHMAN NAMDEV KOLI PRE-FEASIBILITY REPORT (PFR) FOR PROPOSED STONE QUARRY BY SHRI.LAKSHMAN NAMDEV KOLI AREA. 1.00 HA., GAT. NO. 811/2 PART, VILLAGE BASTAWADE, TAL.: TASGAON, DIST.: SANGLI PREPARED BY EQUINOX ENVIRONMENTS

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT OCTOBER 2017 Page 1 of 29 INDEX 1.1 EXECUTIVE SUMMARY...5 1.2 SALIENT FEATURES OF THE PROJECT...6 1.3 PROPOSED PLANNING...8 2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION...8

More information

ENVIRONMENTAL IMPACT ASSESSMENT REPORT AUGMENTATION AND REVAMPING OF LPG BOTTLING PLANT SALEM, TN

ENVIRONMENTAL IMPACT ASSESSMENT REPORT AUGMENTATION AND REVAMPING OF LPG BOTTLING PLANT SALEM, TN ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR AUGMENTATION AND REVAMPING OF LPG BOTTLING PLANT SALEM, TN SUBMITTED TO M/s INDIAN OIL CORPORATION LIMITED PREPARED BY M/s. ULTRA-TECH ENVIRONMENTAL LABORATORY

More information

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND

PRE FEASIBILITY REPORT OF KUMHARI STONE MINE, LESSEE M/s VINOD KUMAR JAIN VILLAGE KUMHARI, P.O. BASIA, P.S. BASIA, DIST. - GUMLA, JHARKHAND EXECUTIVE SUMMARY Kumhari Stone Mine is situated in Village - Kumhari, P.O. Basia, P.S. - Basia, District : Gumla, Jharkhand over an area of 2.02 Hectares or 5.00 Acres [ Plot no. 2085(P)]. Kumhari Stone

More information

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT EXECUTIVE SUMMARY NAGERCOIL MUNICIPALITY, KANYAKUMARI DISTRICT TWAD BOARD,SEWERAGE DIVISION,NAGERCOIL

More information

Environmental Impact Assessment report Public Hearing Certified EC compliance report

Environmental Impact Assessment report Public Hearing Certified EC compliance report We, Indian Oil company Ltd. have facilities of 12000 MT/month of LPG refilling bottle and 1000 MT of LPG storage at Indane Bottling plant, NH- 8 B, Navagam, Rajkot 360 003. We propose the expansion of

More information

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan Report on 1. PROJECT LOCATION & LAND USE The Ganesh Park 3 is a residential building project constructed on plot 608 to 613/5 Vil: GIDC Ankleshwar in Bharuch district of Gujarat state. The project land

More information

Check list for construction Project of EC [Category 8(a)]:

Check list for construction Project of EC [Category 8(a)]: Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist

More information

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell) ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation

More information

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD.

RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. FOR THE PROPOSED EXPANSION PROJECT FOR THE MANUFACTURING OF KETONIC RESINS Category: 5(f) OF RESINS & ALLIED CHEMICALS INDUSTRIES (BOMBAY) PVT. LTD. Located at: Plot No. C-1/46, 100 SHED AREA, GIDC, Vapi,

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information