PRE FEASIBILITY REPORT

Size: px
Start display at page:

Download "PRE FEASIBILITY REPORT"

Transcription

1 PIRAMAL ENTERPRISES LIMITED SY. NO. 71, 77, 78, 79A to 80A, 81A & 82A, DIGWAL VILLAGE, KOHIR MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Piramal Enterprises Limited Digwal (V), Kohir (M), Medak (Dist.) Phone: / Fax: E mail ID: ashok.podishetty@piramal.com alok.mishra@piramal.com SUBMITTED TO MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA PARYAVARAN BHAVAN, LODHI ROAD, NEW DELHI

2 Pre Feasibility Report Piramal Enterprises Limited at Sy. No. 71, 77, 78, 79A to 80A, 81A & 82A, Digwal Village, Kohir Mandal, Medak District, Andhra Pradesh DISCLAIMER The purpose and scope of this information memorandum is to introduce the subject matter and provide a general idea and information on the said area. All the material included in this document is based on data/information gathered from various sources and is based on certain assumptions. Although, due care and diligence has been taken to compile this document, the contained information may vary due to any change in any of the concerned factors, and the actual results may differ substantially from the presented information. M/s. Piramal Enterprises Limited, does not assume any liability for any financial or other loss resulting from this memorandum in consequence of undertaking this activity. Therefore, the content of this memorandum should not be relied upon for making any decision, investment or otherwise. The prospective user of this memorandum is encouraged to carry out his/her own due diligence and gather any information he/she considers necessary for making an informed decision. 1. Executive Summary M/s. Piramal Enterprises Limited, proposed to expand its Synthetic Organic Chemicals and intermediates manufacturing unit and Formulations in existing plant premises of an area 79 acres at Sy. No. 71, 77, 78, 79A to 80A, 81A & 82A, Digwal Village, Kohir Mandal, Medak District, Andhra Pradesh. The site is having a longitude (E) and latitude (N). The plant is surrounded by open land in north and east, National Highway No. 9 in south and road connecting Digwal village to Chillkeaplly village in west direction. The nearest human settlement from the site is Digwal from the site in southwest direction. There are no ecologically sensitive areas like national parks, sanctuaries within 10 km radius of the site. 1 P age

3 2. Introduction of the Project / Background Information: 2.1 Identification of Project and Project Proponent: The objective of this pre-feasibility study is to provide information for the expansion of Synthetic Organic Chemicals unit including formulations capacity from TPM to TPM at Sy. No. 71, 77, 78, 79A to 80A, 81A & 82A, Digwal Village, Kohir Mandal, Medak District, Andhra Pradesh, in an existing area of 79 acres. 2.2 Brief Description of Nature of the Project: The synthetic organic chemicals manufacturing will involve series of chemical reactions to get the final Product. The products of reaction are purified, filtered and dried before packing the final product. The Chemical reactions require various supporting services like Heating, Cooling and Agitation etc. 2.3 Need for the project and its importance to the country and or region: World population is growing at an alarming rate. In the Indian sub continent population growth is more than that of developed countries. To meet the needs and comforts of ever-growing population industrialization became inevitable. For the growing population the needs of health care substitutes are also increasing. 2.4 Demands-Supply Gap: The project is envisaged to meet the demand supply gap in both domestic market and export market, as API demand is increasing day by day. 2.5 Imports Vs. Indigenous Production: The project shall meet the reduce imports in some of the intermediate products and also enhance the foreign exchange reserves in view of the proposed exports of few products. 2.6 Domestic/export Markets: The products shall cater to both domestic and export markets. 2.7 Employment Generation (Direct and Indirect) due to the project: The present project for manufacturing of Synthetic Organic Chemicals requires substantial handling of raw materials, goods in process and finished goods. It is expected that no.s of employment will be generated by the proposed expansion project: 2 P age

4 3. Project Description 3.1 Type of Project including interlinked and interdependent projects, if any: M/s. Piramal Enterprises Limited, proposed to expand its Synthetic Organic Chemicals and intermediates manufacturing unit and Formulations in existing plant premises of an area 79 acres at Sy. No. 71, 77, 78, 79A to 80A, 81A & 82A, Digwal Village, Kohir Mandal, Medak District, Andhra Pradesh. 3.2 Size or magnitude of operation: List of products and manufacturing capacity Manufacturing Capacity After Expansion S.No Name of the Product Capacity (TPM) 1 Abacavir Sulfate 2 2 Diltiazem Hydrochloride 25 3 Cis Hydroxy Lactam 10 4 Ketoconazole Verapamil Hydrochloride Halothane Desflurane 25 8 Isoflurane Sevoflurane (Bottling ) Levobunolol Hydrochloride Brimonidine Tartrate Trazodone Hydrochloride FA (2,5-Bis (2,2,2-trifluoroethoxy)-2,2,2-trichloro acetophenone) Mebeverine Hydrochloride FC-4010 (hydroxsulphane) Paroxetine Oxybutynin Hydrochloride Iodoaniline Methyltriazole Immiquimod Flecainide Acetate Vitamin A Palmitate Vitamin E Alcohol Vitamin A Alcohol Dry Vitamin A Acetate Chloropurine Sevoflurane Amiodarone Hydrochloride Sertraline Hydrochloride 1 29 Quetiapine Hemifumarate Tolcapone P age

5 31 Methyl-2-(2-methyl-1H-pyrrolo [2,3-b] Pyridin-3yl) acetate (FCI-1641 ) Sodium Carboxymethyl Cellulose SSPP (4aS, 7aS)-Octahydro-1H-Pyrrolo[3,4-b] Pyridine Droxidopa Tramadol Hydrochloride Acyclovir Tafenoquine Succinate Spirapril Hydrochloride Dihydrate Clozapine Halofuginone Hydrobromide Donepezil Hydrochloride Irbesartan Telmisartan Sulindac Ziprasidone Hydrochloride Valacyclovir Hydro chloride 2 47 Metaxalone Lisnopril Dihydrate Loratadine Netaglinide Hydrochloride Imipramine Hydro chloride Opipramol Dihydrochloride Clomipramie Hydrochloride Memantine Hydrochloride Itra Itra Aprepitant Candesartan Cilexetil 3 59 Perindopril Erbumine Bittermelon Tinefcon Allopurinal 0.01 Total Process Description with process details (a schematic diagram/flow chart) 3.4 Raw material required along with estimated quantity likely source, marketing area of final product/s, mode of transport of raw material and finished product. All the raw materials required for manufacturing mostly available in India or from abroad. There are no banned chemicals or products which are proposed to be used. It is proposed to enter into long term arrangements with some of the raw material suppliers both in India and overseas to avoid shortages at any time. 4 P age

6 3.5 Availability of water its source, energy/power requirement and source should be given The total water requirement shall increased from KLD to KLD after expansion out of which 1295 KLD shall be drawn from ground water and balance shall be recycled water. The total water balance is presented table below. Total Water requirement After Expansion (Tentative) Purpose INPUT (KLD) OUTPUT (KLD) Fresh Water Recycled Water Loss Effluent Process Washings Scrubber Boiler Feed Cooling Tower RO/DM Plant Domestic Gardening Gross Total Total Electricity: The requirement of power will be 5685 KVA. Further, due to the nature of the reactions and requirement of continuous power. Therefore no delay or difficulty is foreseen on the power front. 5 P age

7 3.6 Quantity of wastes to be generated (liquid and solid) and Scheme for their Management/disposal Quantity of Effluent Generated and Mode of Treatment After Expansion (Tentative) Description of Effluent Quantity (KLD) Mode of Final Disposal Permitted After Expansion HTDS Effluents Process Treated in effluent treatment plant consist DM Rejects Boiler Blow Down Scrubbers 2 of Stripper, MEE, ATFD and Biological treatment followed by RO. RO Permeate reused for cooling tower makeup and RO rejects sent to MEE. Total HTDS - I LTDS Effluents Process Biological treatment followed by RO. RO Washings & Scrubber Lab Washings 29 Cooling Tower Blow Down Softner Rejetcs 15 DM Rejects 25 MEE Condensate Domestic Effluent Total LTDS - II Grand Total (I+II) Permeate reused for cooling tower makeup and RO rejects sent to MEE. 6 P age

8 Solid Wastes and Disposal After Expansion (Tentative) S.No Description Units Quantity Mode of Permitted After Expansion Treatment/Disposal 1 Organic residue (Process + Solvent residue) TPD Sent to TDSF/Cement Plants for Coincineration 2 Stripper Distillate KLD Sent to Cement Industries for Coincineration/ Authorized reprocessors/recyclers 3 Spent Carbon & Hyflow Kg/day Sent to TDSF/Cement Plants for Coincineration 4 Spent HCl KLD Sent to Authorized reprocessors/recyclers 5 Chromic Acid KLD Sent to Authorized reprocessors/recyclers 6 Spent Mixed Solvents KLD 8 10 Sent to authorized recovery units/cement plants for coincineration 7 Inorganic residue TPD 0.6 Sent to TSDF 8 Catalyst Kg/day Sent to Authorized Recyclers 9 Spent Silica TPD Sent to TSDF 10 Raney Nickel Kg/day Sent to TSDF 11 Evaporation salts TPD Sent to TSDF 12 ETP Sludge TPD Sent to TSDF 13 Ash from Boiler TPD 27 Sold to Brick manufactures 14 Detoxified containers & liners No.s/month Sold to authorized vendors 15 Off-Seperation & Kg/day Sent to TSDF discarded product 16 Discarded waste Kg/day Sent to TSDF mineral from dust collector, Vacuum system & floor sweeping 17 Iron Powder Kg/day Sent to TSDF 18 Waste oil KLD Sent to Authorized Recyclers 20 Used batteries No.s/Yr Sent to Authorized Recyclers 7 P age

9 4. Site Analysis 4.1 Plant Location M/s. Piramal Enterprises Limited, proposed to expand its Synthetic Organic Chemicals and intermediates manufacturing unit and formulations in existing plant premises of an area 79 acres at Sy. No. 71, 77, 78, 79A to 80A, 81A & 82A, Digwal Village, Kohir Mandal, Medak District, Andhra Pradesh. The site is having a longitude (E) and latitude (N). The plant is surrounded by open land in north and east, National Highway No. 9 in south and road connecting Digwal village to Chillkeaplly village in west direction. The nearest human settlement from the site is Digwal from the site in southwest direction. There are no ecologically sensitive areas like national parks, sanctuaries within 10 km radius of the site. 5. Planning Brief: The project is envisages to be completed by December 2015, and the production shall be initiated thereon. Consultants are identified for preparing the detailed project report. 6. Proposed Infrastructure: 6.1 Power Requirement and Supply/Source The total power requirement is 5685 KVA. 6.2 Utilities List of Utilities S.No Utility Permitted Proposed Total after expansion 1 Coal Fired Boiler 2x 4TPH* 3x6TPH * 16TPH 16TPH 4TPH 2x6TPH 2 Oil Fired Boilers 1x6TPH 1x6TPH 2x6TPH 3 DG Set* 2x1000KVA 3x500KVA 2x380KVA 2x250KVA 1x225KVA *One 4TPH 6TPH boiler will be removed 2x750 KVA 1x725KVA 2x1000KVA 3x500KVA 2x380KVA 2x250KVA 1x225KVA 2x750 KVA 1x725KVA 8 P age

10 Equipments The basic technology involved in the manufacturing of Bulk drugs is the process Kettles, Heat Exchangers, Centrifuges, and Storage Tanks. To support the process equipment Boilers, Chilling plants, Cooling Towers Etc. are required. All the above equipment can be sourced indigenously and the lead time to supply the equipment will not exceed 20 weeks. 6.3 Waste management Liquid Effluents The main sources of effluent generation from the plant are process, washings, Scrubber, blow downs from utilities like cooling tower, boiler & domestic effluents. These effluents are segregated on the basis on TDS and COD loads and treated in Effluent treatment system and treated effluent reused for cooling towers, boilers, scrubbers and washings. Air Pollution The sources of air pollution from the plant are from Coal fired boilers of 6TPH Oil fired existing, proposed 16 TPH coal fired boilers which will be in operation and 4TPH coal fired, 2x6TPH coal fired and 6TPH Oil fired (changed from existing coal to oil) will be standby mode and Backup DG sets of 2x1000, 3x500, 2x380KVA, 2x250 and 1x225 existing and 2x750KVA, 1x725KVA proposed. The proposed air pollution control equipment for coal fired boiler is bag filter and multi-cone cyclone separators. DG sets shall be provided with stack heights based on the CPCB formula for effective stack height. Solid waste Solid wastes are generated from the process, solvent distillation, distillate from stripper, salts from ATFD, sledges from ETP (primary & secondary), waste oil from DG sets, used batteries from DG sets. The stripper distillate, process residue and solvent residue are sent to TSDF/cement plants for co-incineration. The evaporation salts are sent to TSDF. Filter media like spent carbon, catalyst and hyflow are sent to TSDF/authorized recyclers. Waste oil and used batteries from the DG sets are sent to authorized recyclers. The sludge from effluent treatment plant is considered hazardous and the same is sent to TSDF. The ash from boiler is sold to brick manufacturers. The other solid wastes expected from the unit are containers, empty drums which are returned to the product seller or sold to authorize buyers after detoxification. 9 P age

11 7. Rehabilitation and Resettlement (R&R) Plan Not applicable as the land area is only 79 acres already acquired. 8. Project Schedule & Cost Estimates 8.1 Likely date of start of construction and likely date of completion (Time schedule for the project to be given) December Estimated project cost along with analysis in terms of economic viability of the project The estimated cost of the project is approximately Rs. 250 Crores. Project Cost Breakup Rs. In Crores Plant& machinery 120 Civil buildings 20 Structures 20 Total - I 160 Pipe lines & insulation 10% on plant & machinery 16 Electricals & instrumentation 10% on plant & machinery 16 Erection & commissioning & painting 8% on plant & machinery and structures 13 Pollution treatment Structural & equipment 20 Pollution treatment civil 10 Land & development 5 Material handling equipment charges 5 Laboratory equipment 2 Safety Equipment 2 Furniture, fixtures, computers, lighting etc 1 Total - II 90 Contingencies & pre-operative 5% on the above 4.5 expenses Project Cost (Total I+II) P age

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL PARK, ATTIVARAM VILLAGE, OZILI MANDAL, SPSR NELLORE DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ASTRIX LABORATORIES LIMITED SY. NO. 10 & 42, IDA, GADDAPOTHARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Sy. No. 10 & 42, IDA, Gaddapotharam (V), Jinnaram (M), Medak

More information

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA M/s. ARTEMIS BIO TECH LTD., (A Division of Themis Medicare Ltd.,) PLOT NO. 1 & 5, Phase I, IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA PRE FEASIBILITY REPORT Artemis Bio tech Ltd.,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ESHWAR PHARMACEUTICALS (P) LTD. (Formerly known as Konar Organics Ltd.,) SY. NO. 180/2, IDA KHAZIPALLY, KHAZIPALLY VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Eshwar

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT GENSYNTH FINE CHEMICALS PVT. LTD. PLOT NO. 220, 239 & 248, PHASE II, IDA, PASHAMAILARAM VILLAGE, PATANCHERU MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Gensynth Fine Chemicals Pvt. Ltd.,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ASTRICA LABORATORIES PRIVATE LIMITED SY. NO. Part of 46,50,51,52,53, 54,55&56, ANANTHSAGAR VILLAGE, CHEGUNTA MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT ASTRICA LABORATORIES PRIVATE LIMITED

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS III PLOT NO.116, 116A, 116B & 126C, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS I PLOT NO.137, 138, 145 & 146, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT AGRSOL (NDA) PVT. LTD SY. NO. 163, 164 & 165, UDUMULAPADU VLLAGE, DHONE MANDAL, KURNOOL DSTRCT, ANDHRA PRADESH PRE FEASBLTY REPORT AGRSOL (NDA) PVT. LTD H.No. 10 2 289/87, 101 Fortune Heights, Shantinagar,

More information

PIRAMAL ENTERPRISES LIMITED SY. NO. 71, 77, 78, 79A to 80A, 81A & 82A, DIGWAL VILLAGE, KOHIR MANDAL, MEDAK DISTRICT, ANDHRA PRADESH FORM I

PIRAMAL ENTERPRISES LIMITED SY. NO. 71, 77, 78, 79A to 80A, 81A & 82A, DIGWAL VILLAGE, KOHIR MANDAL, MEDAK DISTRICT, ANDHRA PRADESH FORM I PIRAMAL ENTERPRISES LIMITED SY. NO. 71, 77, 78, 79A to 80A, 81A & 82A, DIGWAL VILLAGE, KOHIR MANDAL, MEDAK DISTRICT, ANDHRA PRADESH FORM I Project No. 0514 21 01 May 2014 Piramal Enterprises Limited Digwal

More information

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT LG Polymers India Pvt. Ltd. Sy. No.s

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS II PLOT NO.75A, 75B, 1, 110,111 & 112, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DASAMI LAB PVT.LTD. (Formerly Known as Medchem Organics Pvt. Ltd.) SY.NO. 404, 405, 407, 408, 409 & 410, VELIMINEDU VILLAGE, CHITYAL MANDAL, NALGONDA DISTRICT, TELANGANA PRE FEASIBILITY REPORT M/s. Hazelo

More information

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations. 1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad

More information

S.V.LABS PVT.LTD. SY.NO. 501,506 & 507, KOYYALAGUDEM VILLAGE, CHOUTUPPAL MANDAL, NALGONDA DISTRICT, TELANGANA

S.V.LABS PVT.LTD. SY.NO. 501,506 & 507, KOYYALAGUDEM VILLAGE, CHOUTUPPAL MANDAL, NALGONDA DISTRICT, TELANGANA S.V.LABS PVT.LTD. SY.NO. 501,506 & 507, KOYYALAGUDEM VILLAGE, CHOUTUPPAL MANDAL, NALGONDA DISTRICT, TELANGANA PRE FEASIBILITY REPORT S.V. Labs Pvt. Ltd. Plot No: 3,4&5, First Cross, Anrich Industrial Estate,

More information

BALAJI AMINES LIMITED

BALAJI AMINES LIMITED FOR EXPANSION OF EXISTING SYNTHETIC ORGANIC CHEMICALS MANUFACTURING UNIT BALAJI AMINES LIMITED At Plot No: 4 & 5, Beside Sub-Station-II, I.D.A, Bollaram, Jinnaram (M), Medak District, Telangana State -

More information

SRI KUSUMA HARANADHA AGRO FURAL LIMITED (UNIT II) SY. NO

SRI KUSUMA HARANADHA AGRO FURAL LIMITED (UNIT II) SY. NO SRI KUSUMA HARANADHA AGRO FURAL LIMITED (UNIT II) SY. NO. 116/1, 119/3, 120/7, 118/2, 119/3, 98/4, 117/2, 119/6,120/2 AND 120/5 ALLIVEDU REVENUE VILLAGE, PEDAVEGI MANDAL, WEST GODAVARI DISTRICT, ANDHRA

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUGS INTERMEDIATES MANUFACTURING UNIT at SY. NO: PARTS OF 318, 319 AND 321 LOCATED AT PALLEPAHAD VILLAGE, THURKAPALLY MANDAL, YADADRI - BHONGIR DISTRICT, TELANGANA

More information

SVL LIFE SCIENCE PVT. LTD. SY.NO

SVL LIFE SCIENCE PVT. LTD. SY.NO SVL LIFE SCIENCE PVT. LTD. SY.NO. 45/1 TO 45/54 AND 46/1 TO 46/22, KOVVADA AGRAHARAM VILLAGE, PUSAPATIREGA MANDAL, VIZIANAGARAM DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED TO ANDHRA PRADESH STATE

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

FORM-1 FOR PROPOSED API PLANT AT MADURAI, TAMIL NADU. Name of Products. Products. 1 Metformin Hydrochloride Paracetamol Bronopol 25

FORM-1 FOR PROPOSED API PLANT AT MADURAI, TAMIL NADU. Name of Products. Products. 1 Metformin Hydrochloride Paracetamol Bronopol 25 3 ANNEXURES Annexure 1: Production Details Name of Products Products Production Capacity in MT/Month 1 Metformin Hydrochloride 1000 2 Paracetamol 1200 3 Bronopol 25 By-Products Total 2225 1 Acetic acid

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management ANNEXURES Annexure No. Description 1 Google image showing proposed project site 2 Plant Lay-Out 3 Manufacturing process details 4 Details of hazardous waste management 5 Details of Effluent Treatment Plant

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Apotex Pharmachem India Pvt Ltd, PLOT NO 1 A, 4 th PHASE, BOMMASANDRA INDUSTRIAL AREA, JIGINI LINK ROAD, ANEKAL TALUK, BANGALORE DISTRICT, KARNATAKA STATE PRE FEASIBILITY REPORT M/s Apotex Pharmachem India

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report Essentials Pharma 1 1. Introduction M/s. Essentials Pharma is an new unit to be located at Plot 19, Survey 10/1, Rajkot-Ahmedabad National Highway 8-B, Village: Hirasar, Tal: Rajkot,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

GRANULES INDIA LIMITED SY. NO. 533, 535 & 536, BONTHAPALLY VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA FORM I

GRANULES INDIA LIMITED SY. NO. 533, 535 & 536, BONTHAPALLY VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA FORM I GRANULES INDIA LIMITED SY. NO. 533, 535 & 536, BONTHAPALLY VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA FORM I Project No. 0515 21 01 May 2015 Granules India Limited Plot No. 15A/1, Phase III, IDA,

More information

M/S. HETERO INFRASTRUCTURE SEZ LIMITED

M/S. HETERO INFRASTRUCTURE SEZ LIMITED ENVIRONMENTAL STATEMENT (FORM - V) FOR THE FINANCIAL YEAR ENDING MARCH-2016. M/S. HETERO INFRASTRUCTURE SEZ LIMITED N.NARASAPURAM(V),NAKKAPALLI(M) VISAKHAPATNAM DISTRICT. SUBMITTED TO : ANDHRA PRADESH

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

ENVIRONMENTAL STATEMENT-FORM-V

ENVIRONMENTAL STATEMENT-FORM-V ENVIRONMENTAL STATEMENT (FORM V) FOR THE FINANCIAL YEAR ENDING MARCH 2017 M/S. (Formerly CIREX PHARMACEUTICALS LTD) GUNDLAMACHNOOR- VILLAGE, HATHNORA - MANDAL, SANGAREDDY -DISTRICT TELANGANA - 502296 SUBMITTED

More information

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar March 18, 2019 BY HAND DELIVERY/RPAD To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar 382 010 SUB.: APPLICATION FOR SUBMISSION OF ESSENTIAL DETAIL SOUGHT

More information

UNSATURATED POLYESTER RESIN

UNSATURATED POLYESTER RESIN PROJECT REPORT ON UNSATURATED POLYESTER RESIN BY AQUA CHEM INDUSTRIES Survey No. 50/2, Jodhpar (Nadi), Morbi - 363641, Gujarat. I N D E X Sr. No. Contents Page No. 1 Introduction 3 2 Project Description

More information

: Industrial Projects - 2. : 26th October, 2016

: Industrial Projects - 2. : 26th October, 2016 1. Proposal No. : IA/AP/IND/26243/2014, 2. MoEFCC File No. : J-11011/408/2014-IA II (I) 3. Category of the Proposal : Industrial Projects - 2 4. Name of the proposal : M/s Divis laboratories limited, Unit

More information

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II)

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II) BRIEF SUMMARY OF THE PROJECT for PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT of M/s. BASF INDIA LTD. (UNIT-II) PLOT NO. 8001 & 8001A, PHASE-VI, G.I.D.C., ANKLESHWAR, DIST: BHARUCH-393002,

More information

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600

Product Profile. Annexure A. Annexures to Form - I & PFR. MT/ M Consented Ultimate. Crude OBA AND/ OR Standardized OBA liquid/ powder 190 AND/ OR 2600 Annexure A Product Profile Sr. No. 1 Product Crude OBA AND/ OR Standardized OBA liquid/ powder MT/ M Consented Ultimate 525 190 AND/ OR 2600-23 - Annexure - B Details of Raw Materials Qty (Kg/ Kg) Qty/

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report M/s. Veer Poly Chem 0 1. Introduction M/s. Veer Polychem is an existing unit located at Plot 119 & 120, Ranpur road, GIDC Dhandhuka, Dist: Ahmedabad, Gujarat. Currently, unit is

More information

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh EXECUTIVE SUMMARY SUBMITTED BY M/s. Lakshmanan Cements Pvt Ltd No. 58-A, 25

More information

M/s. RAPID INTERMEDIATES

M/s. RAPID INTERMEDIATES BRIEF SUMMARY OF THE PROJECT for PROPOSED PESTICIDE SPECIFIC INTERMEDIATES AND SPECIALTY CHEMICALS PLANT of M/s. RAPID INTERMEDIATES PLOT NO. 2325, GIDC ESTATE-PANOLI, TALUKA: ANKLESHWAR, DIST: BHARUCH,

More information

M/S. Dain Colour Chem

M/S. Dain Colour Chem PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS

More information

ANNEXURE A DETAILS OF PRODUCTS

ANNEXURE A DETAILS OF PRODUCTS Annexures to Form 1 & Pre Feasibility Report Proposed Project for manufacturing of Dyes Intermediates of M/s Jay Dyechem, Narol-Vatva Road,Ta : City, District : Ahmedabad, Gujarat. ANNEXURE A DETAILS OF

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

NO. 276, PHASE II, IDA, PASHAMAILARAM VILLAGE, PATANCHERU MANDAL, MEDAK DISTRICT, ANDHRA PRADESH FORM I

NO. 276, PHASE II, IDA, PASHAMAILARAM VILLAGE, PATANCHERU MANDAL, MEDAK DISTRICT, ANDHRA PRADESH FORM I LAKSHMI SARAS CHEM TECH PVT. LTD., (Formerly known as Saras Chem Tech) PLOT.. 276, PHASE II, IDA, PASHAMAILARAM VILLAGE, PATANCHERU MANDAL, MEDAK DISTRICT, ANDHRA PRADESH FORM I Project No. 0114 21 01

More information

List of Annexures S. No Description Page No. Other Annexures

List of Annexures S. No Description Page No. Other Annexures List of Annexures S. No Description Page No. I Plant Layout 12 II Manufacturing Description & Flow Chart Details 13-25 III Effluent Treatment Plant Flow Chart & Solid Waste Handling Details 26 IV Water

More information

LIST OF ANNEXURE. Details of products and raw materials and storage facility for the same. Details of water consumption and wastewater generation

LIST OF ANNEXURE. Details of products and raw materials and storage facility for the same. Details of water consumption and wastewater generation LIST OF ANNEXURE Annexure-1 Location of the project site Annexure-2 Layout plan Annexure-3 Break up of land area requirement Annexure-4 Details of products and raw materials and storage facility for the

More information

AGRISOL (INDIA) PVT. LTD SY. NO. 163, 164 & 165, UDUMULAPADU VILLAGE, DHONE MANDAL, KURNOOL DISTRICT, ANDHRA PRADESH FORM I

AGRISOL (INDIA) PVT. LTD SY. NO. 163, 164 & 165, UDUMULAPADU VILLAGE, DHONE MANDAL, KURNOOL DISTRICT, ANDHRA PRADESH FORM I AGRISOL (INDIA) PVT. LTD SY.. 163, 164 & 165, UDUMULAPADU VILLAGE, DHONE MANDAL, KUROL DISTRICT, ANDHRA PRADESH FORM I Project No. 3001 21 01 January 2015 AGRISOL (INDIA) PVT. LTD H.No. 10 2 289/87, 101

More information

PRE FEASIBILTY REPORT

PRE FEASIBILTY REPORT PRE FEASIBILTY REPORT FOR ENVIRONMENT CLEARANCE OF PROPOSED NEW PROJECT S. O. CHEMICALS (5 f Category) Proposed By: COREL PHARMA CHEM PVT. LTD. SURVEY NO. 473 & 481, BORISANA, KADI THOL ROAD, KADI, DIST

More information

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI M/s. JANANY CEMENT INDUSTRIES PRIVATE LIMITED SURVEY NO 462, INDUSTRIAL PARK, GUNTAKINDAPALLI VILLAGE, SRIKALAHASTI MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY M/s.Janany Cement

More information

SREE RAYALASEEMA ALKALIES AND ALLIED CHEMICALS LIMITED SY. NO

SREE RAYALASEEMA ALKALIES AND ALLIED CHEMICALS LIMITED SY. NO SREE RAYALASEEMA ALKALIES AND ALLIED CHEMICALS LIMITED SY. NO. 51/1, 2A, 2B, 2C1, 2C2, 2C3, 56/1, 58/1, 59/1, 60, 62/3/2D2, 2C1/A2, 2C1/A3, 2C2/C, 2G/1, 2E, 2F, 1A, 1B, 62A, 62 B, 63, 64, 70/C2, 72/P,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For EXPANSION IN EXISTING MANUFACTURING PLANT Of M/s. SHIVA DYE STUFF PVT. LTD Plot no. A2-11/6104,G.I.D.C. Industrial Estate, Ankleshwar-393002, Gujarat. 1 CONTENTS Sr. No. Description

More information

Ramans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR

Ramans Enviro Services Pvt. Ltd. Ahmedabad. Annexure A. Product Profile. Crude OBA AND/OR Crude OBA-CBS-X. Standardized OBA Solid AND/OR Annexure A Product Profile Sr. No. 1 2 Product Crude OBA AND/OR Crude OBA-CBS-X Standardized OBA Solid AND/OR Standardized OBA Liquid Proposed Qty (MT/ M) 400 400 1600 Note : For making Standardized OBA

More information

Annexure-I List of Products

Annexure-I List of Products Annexure-I List of Products Sr. No. Name of Products Quantity (MT/Month) 1. Mono Chloro Acetic Acid (MCA) 300 2. Chloro Acetyl Chloride (CAC) 150 3. Tri Chloro Acetyl Chloride (TCAC) 150 4. Aluminum Chloroide

More information

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State.

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State. ON Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District 561 205, Karnataka State. Table of Contents 1. EXECUTIVE SUMMARY 2. INTRODUCTION OF THE PROJECT/

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

BRIEF DESCRIPTION OF THE PROJECT

BRIEF DESCRIPTION OF THE PROJECT BRIEF DESCRIPTION OF THE PROJECT. Introduction M/s Indorama Industries Limited is proposing to expand their project known as Indorama Spandex for manufacture of manmade textile fibre using petro chemical

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

Table of Contents. Paint production process Raw material storage details Hazardous waste quantity and proposed details

Table of Contents. Paint production process Raw material storage details Hazardous waste quantity and proposed details Table of Contents Annexure No Annexure 1 Annexure 2 Annexure 3A Annexure 3B Annexure 3C Annexure 4 Annexure 5 Annexure 6 Annexure 7A Annexure 7B Annexure 7C Annexure 7D Annexure 8 Annexure 9 Annexure 10A

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF CARBON BLACK (10950 TPM TO 15750 TPM ) AND CO-GENERATION POWER PLANT (22 MW TO 32 MW) IN EXISTING PREMISES of M/s. PHILLIPS CARBON BLACK LTD. Survey No.

More information

Kana Aroma Industries. Pre-Feasibility Report

Kana Aroma Industries. Pre-Feasibility Report Pre-Feasibility Report 1. INTRODUCTION M/s. is a proposed unit to be located at Shed no. C1-41/B/1 & 2, GIDC Industrial Estate, Nandesari, Vadodara, Gujarat and proposes to manufacture Allyl Iso Thiocynate,

More information

Amendment required in the existing EC

Amendment required in the existing EC Amendment required in the existing EC Change/Addition in Phase I; 250 KLPD Grain based Distillery with 20 MW Co-gen Power Plant / Molasses 160 KLPD based distillery with 12 MW Co-gen Power Plant in Environmental

More information

M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN:

M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN: Pre-feasibility Study Report For M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN: 401506 Prepared By: M/s SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited

More information

FORM-V (See Rule - 14) Part-A

FORM-V (See Rule - 14) Part-A FORM-V (See Rule - 14) Environmental Statement for the financial year ending 31 st March, 2016 Part-A Name and address of the owner / occupier : K. Rahul Raju of the Industry Managing Director Nagarjuna

More information

SUSTAINABLE WASTE MANAGEMENT

SUSTAINABLE WASTE MANAGEMENT SUSTAINABLE WASTE MANAGEMENT,Nemam An ISO 9001:2008, ISO 14001:2004, OHSAS 18001:2007 and FSSC 22000:2011 Certified Unit PLANT PROFILE Started with one 600 BPM CSD RGB Line in March 1997. Added one more

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Synthetic Organic Chemicals 5(f)

Synthetic Organic Chemicals 5(f) SEAC, Gujarat Page 1 of 14 Synthetic Organic Chemicals 5(f) For Terms of Reference [ToR] New Project 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD.

Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Summary For Ria Organics Private Limited, D-26/2, Kurkumbh - MIDC, Taluka - Daund Dist. Pune, Maharashtra, India. Consultant: M/s. SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited by QCI NABET Lab. Recognized

More information

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

For TOR New Projects. Mo. no. : Contact no. and  ID of the Applicant SEAC, Gujarat : Page 1 of 6 For TOR New Projects 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot /Survey, Landmark etc. ) M/s. Perstorp Industries

More information

ELITE PHARMACEUTICALS PVT. LTD., SY. NO. 286 (Part) & 297 (Part), JAGDEVPUR VILLAGE & MANDAL, MEDAK DISTRICT

ELITE PHARMACEUTICALS PVT. LTD., SY. NO. 286 (Part) & 297 (Part), JAGDEVPUR VILLAGE & MANDAL, MEDAK DISTRICT ELITE PHARMACEUTICALS PVT. LTD., SY. NO. 286 (Part) & 297 (Part), JAGDEVPUR VILLAGE & MANDAL, MEDAK DISTRICT 2. PUBLIC CONSULTATION Project No. 0214 21 01 February 2014 ELITE Pharmaceuticals Pvt. Ltd.,

More information

Mars Power & Steel Ltd.

Mars Power & Steel Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Mars Power & Steel Ltd. Village : Baihamura Tehsil : Ghargoda District : Raigarh Submitted to: Page 1 CHHATTISGARH ENVIRONMENT CONSERVATION BOARD Executive

More information

DESI S LABS SY.NO. 221(PART), RAMANNAPALEM VILLAGE, TIRUVURU MANDAL, KRISHNA DISTRICT, ANDHRA PRADESH FORM I

DESI S LABS SY.NO. 221(PART), RAMANNAPALEM VILLAGE, TIRUVURU MANDAL, KRISHNA DISTRICT, ANDHRA PRADESH FORM I DESI S LABS SY.NO. 221(PART), RAMANNAPALEM VILLAGE, TIRUVURU MANDAL, KRISHNA DISTRICT, ANDHRA PRADESH FORM I Project No. 0218-21-03 February 2018 M/s. Desi s Labs Flat No. 204, Satya Sai Residency, Plot

More information

M/S PARAS INDUSTRIES E-67, RIICO, PHASE-II, MAVAL,ABU ROAD, DIST: SIROHI, RAJASTHAN FORM 1 ANNEXURES

M/S PARAS INDUSTRIES E-67, RIICO, PHASE-II, MAVAL,ABU ROAD, DIST: SIROHI, RAJASTHAN FORM 1 ANNEXURES M/S PARAS INDUSTRIES E-67, RIICO, PHASE-II, MAVAL,A FORM 1 ANNEXURES ANNEXURE NAME OF THE ANNEXURE PAGE NO. ANNEXURE I Detail of product 2 ANNEXURE II Detail of Raw Materials 3 ANNEXURE III ANNEXURE IV

More information

SARACA LABORATORIES LIMITED ENVIRONMENT CLEARANCE CONDITION WISE COMPLIANCE REPORT. No.: SEIAA/TS/MDK-38/ , dated: 20:05:2016.

SARACA LABORATORIES LIMITED ENVIRONMENT CLEARANCE CONDITION WISE COMPLIANCE REPORT. No.: SEIAA/TS/MDK-38/ , dated: 20:05:2016. SARACA LABORATORIES LIMITED ENIRONMENT CLEARANCE CONDITION WISE COMPLIANCE REPORT No.: SEIAA/TS/MDK-38/2015-501, dated: 20:05:2016. ( November-2017 - April-2018) S.NO CONDITION Status of Compliance A SPECIFIC

More information

PRE- FEASIBILITY REPORT

PRE- FEASIBILITY REPORT PRE- FEASIBILITY REPORT PREPARED FOR SHIV SHANTHI CEMENT PRIVATE LIMITED Sy. Nos. 92, 93 & 94, Tatiguda Village, Garividi Mandal, Vizianagaram District, Andhra Pradesh. PREPARED BY ISO 9001: 2008 Certified

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

LIST OF PRODUCTS (PROPOSED) Existing Quantity (MT/Month)

LIST OF PRODUCTS (PROPOSED) Existing Quantity (MT/Month) LIST OF PRODUCTS (PROPOSED) Sr.No. Name of Product Existing Total after expansion 1 Benzyl Acetate 20 50 2 Benzyl Benzoate 20 50 3 Benzyl Alcohol 20 50 4 Benzyl Cyanide 20 50 5 Phenyl Acetic Acid 20 50

More information

Accord Energy Corporation India Pvt. Ltd.

Accord Energy Corporation India Pvt. Ltd. Accord Energy Corporation India Pvt. Ltd. PRE-FEASIBILITY REPORT ON ENVIRONMENTAL ASPECTS OF PROPOSED INCREASE IN CAPACITY 2 x 150 MW to 2 x 180 MW OF EXISTING ENVIRONMENTAL CLEARANCE ( J-13012/107/ 2009-IA-II

More information

TAGOOR CHEMICALS PRIVATE LIMITED (Formerly known as Vensar Laboratories Pvt Ltd)

TAGOOR CHEMICALS PRIVATE LIMITED (Formerly known as Vensar Laboratories Pvt Ltd) PRE - FEASIBILITY REPORT For EXPANSION OF EXISTING BULK DRUG & INTERMEDIATES MANUFACTURING UNIT at Survey No: 32, Tupakulagudem (Village), Tallapudi (Mandal), West Godavari (Dist.), Andhra Pradesh By TAGOOR

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT OF M/S. TEJASHRRI INTERMEDIATES PRIVATE LIMITED. #FLAT No 303, Varnica Arcade, B-88, Madhuranagar, Hyderabad - 500038 BULK DRUGS & INTERMEDIATES MANUFACTURING UNIT At PLOT NO.133

More information

B. Additional TOR. No ground water to be drawn for the proposed project.

B. Additional TOR. No ground water to be drawn for the proposed project. 10. Action plan to control ground water pollution. 11. Details of solid waste management including management of boiler ash, yeast, etc. Details of incinerated spent wash ash generation and its disposal.

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project Of MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS of 850 MT/Month By PASHUPATI INDUSTRIES 169/1/A2, Phase 1, Opposite Telephone Exchange, GIDC Naroda, Ahmedabad-382330

More information

PROJECT REPORT FOR MANUFACTURING THINQ PHARMA CRO LTD PITHAMPUR -3 BADGAON MADHYA PRADESH

PROJECT REPORT FOR MANUFACTURING THINQ PHARMA CRO LTD PITHAMPUR -3 BADGAON MADHYA PRADESH PROJECT REPORT FOR MANUFACTURING THINQ PHARMA CRO LTD PITHAMPUR -3 BADGAON MADHYA PRADESH CONTENTS 1. INTRODUCTION 2. GENERAL SECTION 3. PARTICULARS OF PROJECT 4. COST OF PROJECT AND MEANS OF FINANCING

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

Prasol Chemicals Ltd., Add. Mahad MIDC BRIEF SUMMARY

Prasol Chemicals Ltd., Add. Mahad MIDC BRIEF SUMMARY 1. INTRODUCTION BRIEF SUMMARY Prasol Chemicals Limited (Prasol), form an integral part of the global chemical industry. Prasol is an ISO 9001: 2008, ISO 14001: 2004 and an OHSAS 18001:2007 certified company

More information