1 Pre-Feasibility Study Report Of to be set-up at Survey No.: 1905/1, Village: Gangad, Taluka: Bavla District: Ahmedabad , Gujarat

2 INDEX S.N. 1. Executive Summary 2. Introduction of Project (ii) (iii) (iv) (v) (vi) (vii) (viii) Identification of project and project proponent Brief description of nature of Project Need for the project and its importance to country and or region Demand supply gap Importance vs. Indigenous production Export Possibility Domestic/export market Employment Generation 3. Project (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) Type of the project Location of project Details of alternative site considered Size or magnitude of project Project description with process details Raw Material requirement Raw Material sources Market area of finished products Mode of transportation of raw material and products Recycle/reuse options Quantity of waste to be generated alongwith mode of disposal 4. Site Analysis (ii) (iii) (iv) Connectivity Land use pattern Land ownership Existing infrastructure Pre Feasibility Report Page 1 of 14

3 (v) (vi) (vii) Soil classification Climatic data from secondary sources Social infrastructure available 5. Planning Concept (ii) (iii) (iv) Population projection Land use planning Assessment of infrastructure demand (Physical & Social) Amenities/ facilities 6. Proposed Infrastructure (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) Industrial area (processing area) Residential area (non processing area) Green belt Social infrastructure Connectivity (traffic & transportation road/rail metro/water ways) Drinking water management (source and supply of water) Sewerage system Industrial waste management Power requirement and supply/source 7. Rehabilitation and Resettle (R& R) Plan Policy to be adopted ( Central /State) in respect of the project affected persons including home oustees, land oustess and landless laborers a brief outline to be given) 8. Project Schedule & Cost Estimation (ii) Likely date to start construction and likely date of completion (Time schedule for the project to be given). Estimated project cost along with analysis in terms of economic of the project. 9. Analysis of Proposal (final recommendations) Financial and social benefits with special emphasis on the benefits to the local people including tribal population, if any, in the area. Pre Feasibility Report Page 2 of 14

4 1. Executive Summary Name of the unit : M/s. Rheomax Gums LLP Location of the factory : Survey No.: 1905/1 Village: Gangad, Taluka: BavlaDistrict: Ahmedabad, State: Gujarat, PinCode: Promoter of the unit : Mr. Kadam Chudgar B.E.(ChemEngg.), M.S.(ChemEngg., USA) Telephone number : +91(79) Fax number : +91(79) / kadamchudgar@gmail.com Contact information : Mr. Kadam Chudgar (Partner) Office Address 505 Kaivanna Building, Besides Ahmedabad Central Mall, PanchvatiAmbawadi Road, Ahmedabad Home Address 11F Sentosa Park, Chudgar Farm, Behind HiraRupa Hall, AmliBopal Road, Ahmedabad Mob. No kadamchudgar@gmail.com Category of industry : It may be noted that our project fall under activity 5(f) of category A as stated in the EIA Notification, 2006 and hence Environmental Clearance is obligatory. Location : M/s. Rheomax Gums LLP Site Address: Survey No.: 1905/1 Village: Gangad, Taluka: Bavla, District: Ahmedabad, State: Gujarat, Pin Code: Office Address 505 Kaivanna Building, Besides Ahmedabad Central Mall, Panchvati Ambawadi Road, Ahmedabad Mob. No Production details : Bulk drugs & pharma intermediates manufacturing unit Cost of the project : Rs 7.60 crores Land area : 17199m² Source of water : Tanker/ Bore well Source of power : GEB (Gujarat Electricity Board) Pre Feasibility Report Page 3 of 14

5 2. Introduction of Project Identification of project and Project Proponent Rheomax Gums LLP is an innovation led company planning to develop a wide range of pharmaceutical APIs and intermediates.we would place high emphasis on environment, health & safety as well as compliance of necessary legislations. The promoter, Mr. Kadam Chudgar as done B.E. - Chemical Engg.(DDIT, Nadiad, Gujarat) and M.S.- Chemical Engg.(Illinois Institute of Technology, Chicago, USA)and has vast experience in this field.in a career spanning more than 10 years, Mr. Chudgar has been associated with many multinational companies like Bayer, GE, Genentech and Dupont both as a consultant and a full time employee managing technical projects and general management in the pharmaceuticals and chemicals industries both in India as well as in USA. (ii) Brief description of nature of Project The project is being set up for producing pharmaceutical products/ bulk drugs. The technology is totally proven and safe in all aspects. The project will help industrial development in the region. It will increase employment opportunities in the region and will earn foreign exchange for the country. (iii) Need for the project and its importance to country and or region The Active Pharmaceutical Ingredient (API) forms the most vital part of any finished dosage product. Global generic markets are witnessing a period of unprecedented growth as blockbuster drug patents expire and the need for managing healthcare costs drives generic substitution globally. Strength in API is an integral part of capitalizing on this opportunity. As players globally come under pressure owing to weak regulatory compliance, quality or inefficient cost-base issues, India remains one of most favored API destinations globally. Bulk drugs manufacturing sector in India is well established and has recorded a steady growth in the overall Indian industrial scenario. The bulk drugs and allied industries have been amongst the fastest growing segments of the Indian industry. India's pharmaceutical industry is the third largest in the world in terms of volume. India is also one of the top five active pharmaceutical ingredients (API) producers in the world. The advantage of having low cost manufacturing capability and the key skills to develop quality products has captured international attention. Pre Feasibility Report Page 4 of 14

6 The state of Gujarat has become a land of opportunities for several industries in last few decades. Supportive role of Gujarat government in providing necessary infrastructure and amenities along with minimum legal hurdles has contributed to Gujarat becoming one of the most sought after investment destination. Further, Gujarat has a strong and diversified chemical industry base which meets the demands for a continuous supply of APIs and drug intermediates. The project is expected to bring the following benefits: Country will save valuable foreign exchange as import of these drugs will reduce by corresponding amount. These drugs also have export potential and hence possibility of earning foreign exchange. The proposed project will provide quality product at lower cost to the users. There should be positive impact on the socio-economic condition of the area in terms of direct and indirect employment due to the proposed project. There will be employment opportunity for local people during construction and operation phase of the proposed expansion. (iv) Demand supply gap The bulk drug and bulk drug intermediates industries have always played a major role in the economic development of the country. The growing demand of bulk drug and bulk drug intermediates in the domestic as well as international markets has provided a strong base for Rheomax Gums to set up its manufacturing facility at Gangad. With the emphasis on health care for all citizens the demand for drugs is expanding fast and the proposed project will fill the gap between supply and demand. (v) Imports vs. Indigenous production The products which will be manufactured in said premises will be of international standards, which will have acceptability in the export as well as domestic markets.the project proposal does not envisage import of any of the listed products as demand for them will be met through indigenous production only. Some of the raw materials may however be imported as and when required. (vi) Export possibility There is a huge export market for the proposed APIs and intermediates which include the developed western markets (USA & Europe) as well as the developing markets of Asia and Africa. Rheomax Gums LLP will focus more on the domestic market while steadily growing the export market. Pre Feasibility Report Page 5 of 14

7 (vii) Employment generation The company will provide approximately more than 30 numbers of contract as well as permanent employment to the local or surrounding people as well female employee. Estimated details are as stated in following table: Nos. of employees (approx.) Total worker in all shifts (round o clock) Project Type of the project: API (Bulk Drugs) & intermediates manufacturing unit. (ii) Location of project: Survey No.: 1905/1, Village: Gangad, Taluka: Bavla, District: Ahmedabad, State: Gujarat, Pin Code: The geographical information of the proposed project is as given below: Latitude : 22 39'52.24"N Longitude: 72 16'56.28"E Salient features were considered while finalizing the proposed project site location are: Proximity to Mundra/Kandla port makes it an attractive destination for exports. The project site is well connected by road & rail to major cities of Gujarat and the rest of India. Trained and qualified manpower is easily available in this area. (iii) Details of alternative site considered: No alternative site is examined because the proposed project is to be set up where there is easy availability of power, transportation, infrastructure and other required facilities. Pre Feasibility Report Page 6 of 14

8 (iv) Size or magnitude of project: The production capacity of the proposed project is given below: S.N. Product Quantity (MT/month) 1. Chloro Compound (2-chloromethyl-3,4-dimethoxy pyridine hydrochloride) Pantaprazole sodium 5 3. Phenylephrine HCl 2 4. Pregabalin 2 5. Telmisartan 2 6. Montekulast sodium 2 7. Ondansetron HCl 2 (v) Project description with process details For Manufacturing process of above stated products please refer attached Annexure - 4 of Form-1. (vi) Raw material requirement For details of raw material require to manufacturing the above stated products please refer attached Annexure 3 of Form-1. (vii) Raw Material sources: The company will be purchase raw materials from local and/or import depends on availability and market value. (viii) Market area of finished products: API (Bulk Drugs) and its intermediates are the active ingredient or chemical in a pharmaceutical product (medicine) in any dosage form (tablet, syrup, etc). They are widely used to treat a variety of diseases in the healthcare industry. (ix) Mode of transportation of raw material and products: The required raw materials for the manufacturing of proposed products would be transported by either sea or road. Similarly in case of products they would also be transported by either sea or road/air-ways depending on need and location of customers. Pre Feasibility Report Page 7 of 14

9 (x) Recycle/Reuse options: Industry will recover most of the spent solvent to be sent back for regeneration/ reactivation for further use in the process and also explore the maximum possibilities of reuse/recycle of water. (xi) Quantity of waste to be generated along with its mode of disposal: The type, quantity and mode of disposal of solid/ hazardous wastes generated from the proposed plant are given below: Details of Solid/Hazardous Waste Sr. no. Type of waste Hazardous waste category* Quantity per month Mode of storage & disposal 1. ETP sludge MT 2. MEE residue kg Will be collected, stored and disposed to an authorized TSDF site. Will be collected, stored and sent to a Common Hazardous Incineration Facility (CHWIF). 3. Sludge from wet scrubber kg Will be collected, stored and disposed to an authorized TSDF site. 4. Process waste/ residue MT Will be collected, stored and sent to a Common Hazardous Incineration Facility (CHWIF). 5. Spent carbon/ spent catalyst kg Will be sent back for regeneration/ reactivation. 6. Used oil kl Will be collected, stored reused as low grade lubrication and left over quantity (if any) sold to an authorized dealer or re-processor. 7. Discarded drum/ containers/carboys Plastic bags/ liners Nos. Will be collected, stored and sold to an authorized/ registered recyclers. 8. Fly ash # # 10 MT Will be collected stored and given to nearest brick/cement manufacturing unit. NOTE: * Hazardous waste category as per the Hazardous Waste (Management, Handling & Transboundary Movement) Rules, # Fly ash EXCLUDED from the category of Hazardous Waste (Management, Handling & Transboundary Movement) Rules, Pre Feasibility Report Page 8 of 14

10 4. Site Analysis Point Connectivity The proposed plant is to be set up within around 60 km away from Ahmedabad city. Existing roads and rails will be used for the proposed project. No new roads or rails are envisaged outside the boundary of the plant. Nearest Airport - Ahmedabad Airportabout 60 km (ii) Land use pattern The proposed plant will be set up in open Non Agriculture (NA) land. The said land falls in the Ahmedabad District. The land classification according to the different uses for the rural areas of the district is given below on the basis of information collected for the Village Directory. S. N. Classification Area (in Hectares) 1 Forest Irrigated Un-Irrigated Cultivated waste (Including Gaucher & Groves) Area not available for cultivation Total Source: Village& Town Directory, Census of India 2001 (iii) Land ownership Owned by company (iv) Existing infrastructure Land: sq.m. For more details please refer Annexure- 2 of Form- 1 Utilities: Power requirement of for the proposed plant will be met by GEB. o Water: Source of water is Tanker/ Borewell. o Fuel: Coal o Power: Gujarat Electricity Board (GEB). However in case of power failure, D.G. set will be used as source for power back-up. Pre Feasibility Report Page 9 of 14

11 Point (v) Transport: o Rail: The nearest broad gauge railhead is Ahmedabad. o Road: The proposed plant is connected to Ahmedabad by road routes. The distance from the plant to Ahmedabad is about 60km. o Air: The nearest domestic/ international airport is Ahmedabad approx. 60km. Communication: o All facilities are available i.e. Telephone, Fax, Internet etc. (vi) Soil classification The characteristic of soil if this area can broadly classified as black, medium black, goradu, kyari and rocky. (vii) Climatic data from secondary sources Temperature: o Average(annual) Maximum: 44.9 C o Average (annual) Minimum : 6.4 C o Maximum in month May : 44.7 C o Minimum in month January : 7.3 C Rainfall: o Average (annual) : 803 mm o Maximum rainfall in 24 hours: mm (September) o Minimum rainfall in 24 hours : 15.7 mm (March) Relative Humidity (%): o Maximum in month- August : 88 % o Minimum in month- March : 18% Wind Speed: o Avg. wind speed: 6.7kmph. (viii) Social infrastructure available Education: o Ahmedabad district (rural) has a literacy rate of 62.3% and Ahmedabad district (urban) has a literacy rate of 83.6%. Pre Feasibility Report Page 10 of 14

12 Point o There are total 2.6 primary, 1.2 secondary, 0.7 higher secondary and 0.1 college educational institutions/per populations in the district. o There are 39 beds in medical institutions per Health: populations in Bavalataluka of the district. The district has a presence of private specialized hospitals to provide a comprehensive range of tertiary and secondary care services backed by state-of- the- art technology and trained medicos. o The company is having separate OHC and providing first aid facility and appointed a qualified part time Doctor of medical inspection. Also company is conducting the six month medical checkup of all employees and the records are maintained. The company has also providing the Antidote Kits. In case of Emergency or major accident the company is having its own transport facility to shift the injured employees to outside Hospital for further treatment. o There are 39 beds in medical institutions per populations in Bavla town of the district is exists. o The district has a presence of private specialized hospitals to provide a comprehensive range of tertiary and secondary care services backed by state-of- the- art technology and trained medicos. o General details and availability of different amenities in Ahmedabad district is given under; S.N. General Information details 1 Total Population Rural Population Urban Population Total Villages Literacy rate 79.5 % Amenities 6 Education 99.3 % 7 Medical 78.4 % 8 Drinking Water 96.9 % 9 Post & Telegraph 79.1 % 10 Transport Communication 98.7 % 11 Approach by tar road 98.9 % 12 Power supply 100 % Source: District Census of India 2001 Pre Feasibility Report Page 11 of 14

13 5. Planning Concept Point Planning concept (ii) Population projection It is a pharmaceutical manufacturing industry where all types of facilities are easily available around site. Transportation services are nearest to the plant. Population of Ahmedabad district (including Rural Population Urban Population as per District Census of India (iii) Land use planning As per Annexure- 2 of Form 1 (iv) Assessment of infrastructure demand (physical & social) (v) Amenities / facilities There is no competitive demand from other industries at present, whereas details study w.r.t. physical & social would be incorporated in EIA study of the study area. All type of requisite facilities like water, hospitals, schools, transportation etc. are within arm s reach. 6. Proposed Infrastructure: Point Land area (ii) Residential area Total land area is 17199m².For more details please refer Annexure- 2 of Form 1 Not applicable (iii) Green belt area Green belt area is 6074m² (iv) Social infrastructure (v) Connectivity (traffic & transportation road/ rail metro/ water ways) (vi) Drinking water management (source and supply of water) (vii) Sewerage system Not applicable, whereas details study w.r.t. physical & social would be incorporated in EIA study of the study area. No new road, rail, air/ waterborne or other transport infrastructure including new or altered routes and stations are envisaged for the proposed plant. Existing transportation facilities available are enough to take care of the increasing traffic. Source of water supply is tanker/bore-well. Sewerage will be treated & discharged into the Septic tank/ Soak pit system. Pre Feasibility Report Page 12 of 14

14 Point (viii) Industrial management waste Water Pollution : o Effluent generated from the proposed unit will be treated in proposed effluent treatment plant (ETP). Air Pollution : o Process gas/ flue gas /fugitive emissions: adequate pollution control measures would be provided to control the process gas/ flue gas /fugitive emissions. Solid & Hazardous waste : (ix) Power requirement & supply/source o Quantity of generated solid/ hazardous wastes will be properly managed and disposed. o Estimated quantity of power requirement is 125 KVA and would be sourced out from Gujarat Electricity Board (GEB). 7. Rehabilitation and Resettle (R& R) Plan o Not applicable 8. Project Schedule & Cost Estimation o Likely date of start of construction and likely date of completion (Time schedule for the project to be given). o Proposed date of start of construction and machine erection/ installation: After getting Environment Clearance from EAC and No Objection Certificate from the GPCB. o Proposed date of start production: After getting the statutory required Consent & Authorization from the GPCB. o Estimated project cost along with analysis in terms of economic viability of the project. o Estimated project cost: total estimated cost of the project would be Rs Crores, details are as summarized under: Sr.No. Particulars Amount (Rupees in Crore) 1). Land & Land Development ). Building ). Plant and Machinery ). Utilities 0.50 Pre Feasibility Report Page 13 of 14

15 Sr.No. Particulars Amount (Rupees in Crore) 5). Piping, Valves, Electrification and fittings ). Lab and R&D equipments ). ETP ). Technical know-how ). Preliminary expenses 0.25 Total Project Cost 7.60 o Economic viability / Payback period calculation: expected payback period/ turnover is 5 years, details are as summarized under:- Year Expected turnover (Rupees in Crore) Analysis of Proposal (final recommendations) o Financial and social benefits with special emphasis on the benefit to the local people including tribal population (if any, in the area) are summarized under: (Proposed budget for activities under Corporate Social Responsibility) S.N. Activities 1. Education of poor children: Implementation Schedule Budgetary Cost (Rupees in lakhs) Give scholarships to meritorious students and distribute school 5 books, bags and other school supplies to the needy children. 2. Tree Plantation 5 years (2016 to 2020) 2 3. Medical camp for local villages 3 4. Drinking water facility 3 5. Vocational and skill development training for youth Total 5 years 16 3 Pre Feasibility Report Page 14 of 14

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat.

M/s. SAL STEEL LTD Survey no.245/p, Village:-Bharapar, Taluka:- Gandhidham, District:-Kutch, Gujarat. Pre-Feasibility Study Report For Proposed Fly Ash Co-processing clinker grinding cement Unit of 40,000 MT/month Production capacity within our Existing Premises for M/s. SAL STEEL LTD Survey no.245/p,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Polyurethane Foam Manufacturing Facility Of M/s. KRISHNA MARUTI LTD. At Plot No-13, SMG JV Park, Block No- 334,335 Vill- Hansalpur, Tal - Mandal Dist.: Ahmedabad, Gujarat INDEX

More information

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad

Proposed Project of Halcyon Labs Pvt Ltd D-2/CH : 335,336,337, GIDC-Dahej-2, DIst: Bharuch, Gujarat Ramans Enviro Services Pvt Ltd Ahmedabad 1. EXECUTIVE SUMMARY OF THE PROJECT BRIEF SUMMARY OF THE PROJECT : TYPE OF PROJECT : Proposed Project for manufacturing of pharma intermediates by Halcyon Labs Pvt.Ltd. LOCATION : Proposed Project of Halcyon

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED PROJECT FOR DYES, PIGMENTS AND DYE INTERMEDIATES MANUFACTURING PLANT IN GIDC, DAHEJ-II Of M/s. SHREEJI INDUSTRIES Plot No. D2/CH/24, Dahej-II, GIDC Industrial Estate,

More information

Pre-Feasibility Report For

Pre-Feasibility Report For Pre-Feasibility Report For Proposed New Project for manufacturing of Intermediates of Agro Chemicals & Synthetic Organic Chemicals. By M/s. MANBRO POLYMERS LIMITED, Plot No. D-2/CH-275, INDUSTRIAL ESTATE,

More information

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT

PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUG & BULK DRUG INTERMEDIATES MANUFACTURING UNIT Of M/s. SHREE RAM INDUSTRIES PLOT NO.5117, GIDC-ANKLESHWAR, PIN-393002 TAL: ANKLESHWAR, DIST: BHARUCH, GUJARAT

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF BAKELITE POWDER MANUFACTURING UNIT of M/S. HINDUSTAN BAKELITE COMPANY PLOT NO. J-3436, GIDC ESTATE, ANKLESHWAR, DISTRICT: BHARUCH-393002, GUJARAT 0 CONTENTS

More information

Pre-feasibility Report

Pre-feasibility Report Pre-feasibility Report for expansion of production capacity of Fluoropolymers including Poly Tetrafluoro Ethylene (PTFE), manufacturing of new age refrigerant gas Difluoromethane (HFC 32) and related products,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 0.0 EXECUTIVE SUMMARY Shri Ashok Patel Partner of M/s. Patel Polymers is planning to manufacture organic chemical Different Types of Resins, for proposed expansion project at Plot

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANICCHEMICALS (RESINS) (5 f B IND II) By M/s M R INDUSTRIES SURVEY NO. 58/1 & 58/3 OPPOSITE WHOLESOME FOOD PVT. LTD.,

More information

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3" N to 20 44' 20.7"N Longitude " E to 85 35'27.5 "E

EXECUTIVE SUMMARY. Kumardeipur Sand Quarry Cum ' 13.3 N to 20 44' 20.7N Longitude  E to 85 35'27.5 E EXECUTIVE SUMMARY 1.0 INTRODUCTION Sri Mahesh Prasad Mishra proposes to mine Sand Quarry from an approved Mining Lease over an area of 14.85 Ac or 6.01 hectares (Non-Forest Land) which is located in at

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report 1. Executive Summary Residential, Commercial, Retail and Hotel projects and an IT/ITES. The Project has already obtained an Environmental Clearance from Ministry of Environment &

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY M/s Arti Chemical Industries is a project located at Plot No. E-22, Vilayat G.I.D.C. Tal: Vagra area of Bharuch district in Gujarat. M/s Arti Chemical Industries

More information

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF

(B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF (B) PREFEASIBILITY REPORT OF EXISTING BLACK TRAP PROJECT OF Makwana Dineshbhai Khimjibhai AT VILLAGE:- Tithava, TALUKA:- Wankaner, DIST.:- Morbi 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXCUTIVE SUMMARY

More information

PRE-FEASIBILITY REPORT. for

PRE-FEASIBILITY REPORT. for PRE-FEASIBILITY REPORT for PROPOSED COMMON EFFLUENT TREATMETN PLANT (CETP) of M/s. VIKASHTEX ENVIROTECH CETP PVT. LTD. Block No. 523, Village: Hathoda, Taluka: Mangrol, Dist: Surat - 394 405 (Guj.) Prepared

More information

PROJECT FEASIBILITY REPORT

PROJECT FEASIBILITY REPORT PROJECT FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For PROPOSED CHEMICAL MANUFACTURING UNIT From M/s. MORADIA BROTHERS CHEM PVT LTD LOCATED AT: Block No.: 45, JalBhumi Industrial Estate,

More information

PRE FEASIBILTY REPORT

PRE FEASIBILTY REPORT PRE FEASIBILTY REPORT FOR ENVIRONMENT CLEARANCE OF PROPOSED NEW PROJECT S. O. CHEMICALS (5 f Category) Proposed By: COREL PHARMA CHEM PVT. LTD. SURVEY NO. 473 & 481, BORISANA, KADI THOL ROAD, KADI, DIST

More information

M/S. Dain Colour Chem

M/S. Dain Colour Chem PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of M/S. Dain Colour Chem Plot No.: 5, Nilkanth Estate, Village: Dhanot, Ta.: Kalol, Dist.: Gandhinagar-382729, Gujarat 1 CONTENTS

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT (B) PREFEASIBILITY REPORT OF EXISTING SAND MINING PROJECT OF RAJESHBHAI BHAGUBHAI PATEL AT VILLAGE:- Panchlai, TALUKA:- Pardi, DIST.:-Valdad. 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

EXISTING PROJECT FOR ORDINARY SAND MINING

EXISTING PROJECT FOR ORDINARY SAND MINING (C) PROJECT REPORT OF EXISTING PROJECT FOR ORDINARY SAND MINING OF JASHUBEN CHHAGANBHAI OAD AT VILLAGE:-TIMBA, TALUKA:- KAMREJ, DIST.:- SURAT 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE SUMMARY

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For EXPANSION IN EXISTING MANUFACTURING PLANT Of M/s. SHIVA DYE STUFF PVT. LTD Plot no. A2-11/6104,G.I.D.C. Industrial Estate, Ankleshwar-393002, Gujarat. 1 CONTENTS Sr. No. Description

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For NEW PROJECT (PIGMENT MANUFACTURING PLANT) Of M/s. SHREY INDUSTRIES Survey No. 111 & 112, Plot No. 7 & 8, Village: Dhanot, Ta: Kalol, Dist: Gandhinagar (Gujarat) CONTENTS Sr.

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report Essentials Pharma 1 1. Introduction M/s. Essentials Pharma is an new unit to be located at Plot 19, Survey 10/1, Rajkot-Ahmedabad National Highway 8-B, Village: Hirasar, Tal: Rajkot,

More information

For TOR New Projects. Mo. no. : Contact no. and ID of the Applicant

For TOR New Projects. Mo. no. : Contact no. and  ID of the Applicant SEAC, Gujarat : Page 1 of 6 For TOR New Projects 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot /Survey, Landmark etc. ) M/s. Perstorp Industries

More information

PREFEASIBILITY REPORT

PREFEASIBILITY REPORT PREFEASIBILITY REPORT For ToR Application of Expansion Project For MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS (Dyes Intermediates) Proposed By: M/s. Plot No. C/1/B-145-3 Phase-II, GIDC Estate, Naroda,

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED SY. NO. 29, TUPAKULAGUDEM VILLAGE, TALLAPUDI MANDAL, WEST GODAVARI DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT VENSUB LABORATORIES PRIVATE LIMITED Duplex No. 12,

More information

For TOR New. 1. Basic Information of the Project:

For TOR New. 1. Basic Information of the Project: SEAC, Gujarat: Page 1 of 12 For TOR New. 1. Basic Information of the Project: i Name & Address of the Project site M/s. Shreenathji Dye Chem (Complete details with plot no./survey no., Landmark etc. )

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE FOR MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS OF M/s. MAYUR COLOUR AND CHEMICALS LOCATED AT Plot No. 5148, GIDC Industrial Estate, Ankleshwar

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT Page1 PRE FEASIBILITY REPORT KALDA FLAG STONE QUARRY AREA OF -1.55 HACTARE STRICTLY AS PER MOEF GUIDELINE DATE 30/12/2006 IN TERMS OF PROVISIONS OF EIA NOTIFICATION 2006 VILLAGE KALDA TEHSIL PAWAI DISTRICT

More information

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant

PRE FEASIBILITY REPORT FOR. Silica Sand Beneficiation Plant PRE FEASIBILITY REPORT FOR Silica Sand Beneficiation Plant BY Shree Silicaam Minerals LLP VILLAGE : CHOKI TALUKA : JAGADIA DIST : BHARUCH GUJARAT (INDIA) PRE-FEASIBILITY REPORT: SILICA SAND BENIFICIATION

More information

1.0 EXECUTIVE SUMMARY

1.0 EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY M/s Merino Industries Limited has proposed for manufacturing Phenol Formaldehyde Resin, Melamine Formaldehyde Resin at Plot No D2 CH 36, Dahej Phase II, Dist. Bharuch, Gujarat. The

More information

M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN:

M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN: Pre-feasibility Study Report For M/s. NGL Fine-Chem Limited Plot no. S 18/3, Tarapur MIDC, Boisar, District Palghar, Maharashtra. PIN: 401506 Prepared By: M/s SADEKAR ENVIRO ENGINEERS PVT. LTD. Accredited

More information

PRE-FEASIBILITY REPORT FOR ORDINARY SAND

PRE-FEASIBILITY REPORT FOR ORDINARY SAND PRE-FEASIBILITY REPORT FOR ORDINARY SAND Proponent NISANT TRADERS At- Opp. Survey No.- 3 Panam River Area-2.50.00 Hectare Village-Ramji-ni-Nal, Taluka- Shahera Dist.- Panchmahal Mob.- +91924040782 CONTENTS

More information

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha)

STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Pre Feasibility Report On STONE QUARRY Survey No. : 57/5, Village : Dhadhade, Tehsil: Vikramgad, District Thane, Maharashtra Area (2.0 Ha) Submitted to MINISTRY OF ENVIRONMENT & FOREST STATE LEVEL ENVIRONMENTAL

More information

PRE FEASIBILITY REPORT. M/s. Riddhi Dyechem Industries

PRE FEASIBILITY REPORT. M/s. Riddhi Dyechem Industries PRE FEASIBILITY REPORT FOR OBTAINING ENVIRONMENTAL CLEARANCE For the Proposed Dye Manufacturing Unit of M/s. Riddhi Dyechem Industries Block No.: 680/p, 681/p, 682/p Village: Pariej, Taluka: Matar, District:

More information

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad

Shri Hari Dyes & Chemicals Plot No.: 439/1,417, Phase No. II, GIDC Estate, Vatva , Ahmedabad Annexure Prefeasibility Report (PFR) File PRE FEASIBILITY REPORT For PROPOSED EXPANSION IN EXISTING MANUFACTURING PLANT Of Shri Hari Dyes & Chemicals Work & Regd. Office: CONTENTS Sr. No. Description 1.

More information

M/s. RAPID INTERMEDIATES

M/s. RAPID INTERMEDIATES BRIEF SUMMARY OF THE PROJECT for PROPOSED PESTICIDE SPECIFIC INTERMEDIATES AND SPECIALTY CHEMICALS PLANT of M/s. RAPID INTERMEDIATES PLOT NO. 2325, GIDC ESTATE-PANOLI, TALUKA: ANKLESHWAR, DIST: BHARUCH,

More information

PRE-FEASIBILITY REPORT OF SAND QUARRY

PRE-FEASIBILITY REPORT OF SAND QUARRY PRE-FEASIBILITY REPORT OF SAND QUARRY Survey No Village Taluka District Lease area : 1 Paiki : Marigana : Anjar, : Kutch, Gujarat, : 2.00 Ha. Submitted to MINISTRY OF ENVIRONMENT & FORESTS STATE LEVEL

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL PARK, ATTIVARAM VILLAGE, OZILI MANDAL, SPSR NELLORE DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT ANVITHA LIFE CARE PLOT NO. 6, ATTIVARAM INDUSTRIAL

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT For PROPOSED EXPANSION OF CARBON BLACK (10950 TPM TO 15750 TPM ) AND CO-GENERATION POWER PLANT (22 MW TO 32 MW) IN EXISTING PREMISES of M/s. PHILLIPS CARBON BLACK LTD. Survey No.

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For ToR of Proposed Project Of MANUFACTURING OF SYNTHETIC ORGANIC CHEMICALS of 850 MT/Month By PASHUPATI INDUSTRIES 169/1/A2, Phase 1, Opposite Telephone Exchange, GIDC Naroda, Ahmedabad-382330

More information

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR

PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR PREFEASIBILITY REPORT OF EXISTING SILICA SAND MINING PROJECT OF MANGUBEN KANTILAL THAKKAR AT VILLAGE:- BRAHMPURI, TALUKA:- Sayla, DIST.:-Surendranagar 1 CONTENTS 1.0 INTRODUCTION 1.1 PREAMBLE 2.0 EXECUTIVE

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ASTRIX LABORATORIES LIMITED SY. NO. 10 & 42, IDA, GADDAPOTHARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Sy. No. 10 & 42, IDA, Gaddapotharam (V), Jinnaram (M), Medak

More information

INSPIRE INDUSTRIES PVT. LTD.

INSPIRE INDUSTRIES PVT. LTD. For Proposed 0.999 MTPA Coal Washery At Village: Bhelai, Tehsil: Baloda, District: Janjgir-Champa, Chhattisgarh Envirotech East (P) Limited An ISO 9001:2008, 14001:2004 & OHSAS:18001:2007 Company Laboratory

More information

UNSATURATED POLYESTER RESIN

UNSATURATED POLYESTER RESIN PROJECT REPORT ON UNSATURATED POLYESTER RESIN BY AQUA CHEM INDUSTRIES Survey No. 50/2, Jodhpar (Nadi), Morbi - 363641, Gujarat. I N D E X Sr. No. Contents Page No. 1 Introduction 3 2 Project Description

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ESHWAR PHARMACEUTICALS (P) LTD. (Formerly known as Konar Organics Ltd.,) SY. NO. 180/2, IDA KHAZIPALLY, KHAZIPALLY VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Eshwar

More information

vii Total cost of Proposed Project Existing : 0.16 Cr Proposed: 0.25 Cr Total : 0.41 Cr viii Total Plot area ( sq. meter)

vii Total cost of Proposed Project Existing : 0.16 Cr Proposed: 0.25 Cr Total : 0.41 Cr viii Total Plot area ( sq. meter) SEAC, Gujarat: Page 1 of 28 For TOR Expansion Case. 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot no./survey no., Landmark etc. ) M/s. Om Interchem

More information

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH

LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH LG POLYMERS INDIA PVT. LTD. SY. NO.S 29 TO 45, 83/1 AND 83/3, RR VENKATAPURAM VILLAGE, PENDURTI MANDAL, VISAKHAPATNAM DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT LG Polymers India Pvt. Ltd. Sy. No.s

More information

BALAJI AMINES LIMITED

BALAJI AMINES LIMITED FOR EXPANSION OF EXISTING SYNTHETIC ORGANIC CHEMICALS MANUFACTURING UNIT BALAJI AMINES LIMITED At Plot No: 4 & 5, Beside Sub-Station-II, I.D.A, Bollaram, Jinnaram (M), Medak District, Telangana State -

More information

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others

Table 1.1: The Salient Features of the Project Proposed Quartz Mine Of M/s. Viswanadha Stone Crusher & 16 others 1. EXECUTIVE SUMMARY 1.1 Introduction The Road Metal Quarries was granted in Guntur District, Andhra Pradesh has been allotted to M/s. Viswanadha Stone Crusher & 16 others by Assistant Director of Mines

More information

Synthetic Organic Chemicals 5(f)

Synthetic Organic Chemicals 5(f) SEAC, Gujarat Page 1 of 14 Synthetic Organic Chemicals 5(f) For Terms of Reference [ToR] New Project 1. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot

More information

PROJECT PRE-FEASIBILITY REPORT. For

PROJECT PRE-FEASIBILITY REPORT. For PROJECT PRE-FEASIBILITY REPORT For THE PROPOSED ORGANIC CHEMICALS MANUFACTURING IN EXISTING IN FORMULATION OF PESTICIDE, AGROCHEMICAL AND BIO FERTILIZERS MANUFACTURING UNIT AT M/S. SULPHUR MILLS LTD. PLOT

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1. Introduction 1. Identification of project and project proponent The Pahanbarri Sand Quarry area is located in the Tawa River at Village- Pahanbarri, Tehsil- Itarsi & District-

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT For Excavation of Brick Earth (Total Mining Area 1.112Ha.) (For Manufacturing of Bricks) Submitted By M/s New Kaptan Brick Field Shri Krishna Kr. Singh S/o Shri Brahma DevSingh Pure

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT ASTRICA LABORATORIES PRIVATE LIMITED SY. NO. Part of 46,50,51,52,53, 54,55&56, ANANTHSAGAR VILLAGE, CHEGUNTA MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT ASTRICA LABORATORIES PRIVATE LIMITED

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

PRE - FEASIBILITY REPORT

PRE - FEASIBILITY REPORT PRE - FEASIBILITY REPORT For PROPOSED BULK DRUGS INTERMEDIATES MANUFACTURING UNIT at SY. NO: PARTS OF 318, 319 AND 321 LOCATED AT PALLEPAHAD VILLAGE, THURKAPALLY MANDAL, YADADRI - BHONGIR DISTRICT, TELANGANA

More information

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar

To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar March 18, 2019 BY HAND DELIVERY/RPAD To The Member Secretary State Expert Appraisal Committee Paryavaran Bhavan Sector 10 A Gandhinagar 382 010 SUB.: APPLICATION FOR SUBMISSION OF ESSENTIAL DETAIL SOUGHT

More information

Check list for construction Project of EC [Category 8(a)]:

Check list for construction Project of EC [Category 8(a)]: Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist

More information

ANNEXURE A DETAILS OF PRODUCTS

ANNEXURE A DETAILS OF PRODUCTS Annexures to Form 1 & Pre Feasibility Report Proposed Project for manufacturing of Dyes Intermediates of M/s Jay Dyechem, Narol-Vatva Road,Ta : City, District : Ahmedabad, Gujarat. ANNEXURE A DETAILS OF

More information

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2

PRE-FEASIBILITY REPORT. 1. SUMMARY Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 PRE-FEASIBILITY REPORT 1. SUMMARY Project Kudeli Brick Earth Quarry Name of Company / Mine Owner Smt. Premawati Location 744, 760/1, 760/4, 750/1, 750/2 Village Kudeli Taluka Baikunthpur District Koriya

More information

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA

IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA M/s. ARTEMIS BIO TECH LTD., (A Division of Themis Medicare Ltd.,) PLOT NO. 1 & 5, Phase I, IDA, JEEDIMETLA, QUTUBULLAPUR MANDAL, RANGAREDDY DISTRICT, TELANGANA PRE FEASIBILITY REPORT Artemis Bio tech Ltd.,

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT M/S. VANAS INFRA PROJECTS PVT. LTD SURVEY NO. 598, CHINTALAPALLY VILLAGE, KOLLAPUR MANDAL, NAGARKURNOOL DISTRICT, TELANGANA PRE-FEASIBILITY REPORT SUBMITTED BY M/s. Sri Soma Jitendra H. No. 7-1-397/150,

More information

Pre-Feasibility Report

Pre-Feasibility Report Pre-Feasibility Report M/s. Veer Poly Chem 0 1. Introduction M/s. Veer Polychem is an existing unit located at Plot 119 & 120, Ranpur road, GIDC Dhandhuka, Dist: Ahmedabad, Gujarat. Currently, unit is

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT GENSYNTH FINE CHEMICALS PVT. LTD. PLOT NO. 220, 239 & 248, PHASE II, IDA, PASHAMAILARAM VILLAGE, PATANCHERU MANDAL, MEDAK DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT Gensynth Fine Chemicals Pvt. Ltd.,

More information

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location

PRE-FEASIBILITY REPORT. Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location 1. SUMMARY PRE-FEASIBILITY REPORT Project Stone Quarry Name of Company / Mine Owner Shri Jayant Kumar Choudhary Location Village Taluka District State Rupapali Basna Mahasamund Chhattisgarh 1 Mining Lease

More information

Environment Consultant:

Environment Consultant: MODERNIZATION CUM EXPANSION OF INDUCTION FURNACE PRODUCTION(2,05,000 TPA TO 6,00,000 TPA) AND ROLLING MILL PRODUCTION (3, 69,000 TPA TO 6,00,000 TPA) at Sy. No. 158 (part) 159 (part), 166 170, village

More information

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II)

PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT. M/s. BASF INDIA LTD. (UNIT-II) BRIEF SUMMARY OF THE PROJECT for PROPOSED EXPANSION OF DEVELOPER AND AZOCOLORANTS DYES IN EXISTING UNIT of M/s. BASF INDIA LTD. (UNIT-II) PLOT NO. 8001 & 8001A, PHASE-VI, G.I.D.C., ANKLESHWAR, DIST: BHARUCH-393002,

More information

CHAPTER REHABILITATION AND RESETTLEMENT (R&R) PLAN (I) POLICY TO BE ADOPTED (CENTRAL / STATE)... 32

CHAPTER REHABILITATION AND RESETTLEMENT (R&R) PLAN (I) POLICY TO BE ADOPTED (CENTRAL / STATE)... 32 CONTENTS CHAPTER 1... 1 1.0 PROJECT SUMMARY... 1 CHAPTER 2... 2 2.0 INTRODUCTION... 2 (I) IDENTIFICATION OF PROJECT AND PROJECT PROPONENT... 2 (II) BRIEF DESCRIPTION OF NATURE OF THE PROJECT... 2 (III)

More information

FORM-1 FOR PROPOSED API PLANT AT MADURAI, TAMIL NADU. Name of Products. Products. 1 Metformin Hydrochloride Paracetamol Bronopol 25

FORM-1 FOR PROPOSED API PLANT AT MADURAI, TAMIL NADU. Name of Products. Products. 1 Metformin Hydrochloride Paracetamol Bronopol 25 3 ANNEXURES Annexure 1: Production Details Name of Products Products Production Capacity in MT/Month 1 Metformin Hydrochloride 1000 2 Paracetamol 1200 3 Bronopol 25 By-Products Total 2225 1 Acetic acid

More information

PRE FEASIBILTY REPORT MANUFACTURING OF ORGANIC PIGMENT M/S PRINCE CHEMICALS

PRE FEASIBILTY REPORT MANUFACTURING OF ORGANIC PIGMENT M/S PRINCE CHEMICALS PRE FEASIBILTY REPORT ON PROPOSED PROJECT FOR MANUFACTURING OF ORGANIC PIGMENT OF M/S PRINCE CHEMICALS AT PLOT NO: 9111/3,9111/2/1 GIDC ESTATE, ANKLESHWAR, DIST: BHARUCH, STATE: GUJARAT 1 Index Sr no.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT Of Shri Upendra Suryawanshi At Khasra No. 413/1, 413/3 Vill.-Ambada, Tehsil-Amla, District-Betul (M.P.) Production Capacity: Max 6,320 Cu.mt/year Area 1.00Hectare Proponent Name

More information

PRE-FEASIBILTY REPORT

PRE-FEASIBILTY REPORT Aug 2018 PRE-FEASIBILTY REPORT OF M/S. J.M.R.MINES (MINING OF FELDSPAR, QUARTZ & MICA MINE) Lease Area : 5.78 Hectares(14.29 Acres) Sy.No.941,942,943 &947 Giddalur (V), Sydapuram (M), SPSR Nellore District

More information

Format for Appraisal-New:5

Format for Appraisal-New:5 SEAC Gujarat: Pageof5 Format for Appraisal-New:5. Basic Information of the Project: i Name & Address of the Project site (Complete details with plot no./survey no., Landmark etc. ) M/S. DHARMANANDAN FINE

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT The Proposed Th Proposed Food Colours and Lake Colours Manufacturing Unit will be established on Plot 22/1 - B, Dhatav, MIDC

More information

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State.

Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District , Karnataka State. ON Plot No. 2-D1, Obadenahalli, 3 rd Phase KIADB Industrial Area, Doddaballapur taluk, Bangalore Rural District 561 205, Karnataka State. Table of Contents 1. EXECUTIVE SUMMARY 2. INTRODUCTION OF THE PROJECT/

More information

Pre- FEASIBILITY REPORT

Pre- FEASIBILITY REPORT Pre- FEASIBILITY REPORT In Respect Of KATIKELA RIVER SAND BED OVER 15.00 ACRES OR 6.070 HA IN VILLAGE KATIKELA, JHARSUGUDA TAHASIL OF JHARSUGUDA DISTRICT, ODISHA (For the Financial Year-2015-16 to 2019-20)

More information

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management

ANNEXURES. 1 Google image showing proposed project site. 3 Manufacturing process details. 4 Details of hazardous waste management ANNEXURES Annexure No. Description 1 Google image showing proposed project site 2 Plant Lay-Out 3 Manufacturing process details 4 Details of hazardous waste management 5 Details of Effluent Treatment Plant

More information

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath

Pre-Feasibility Report. for. Educational Institute Allen Career Institute-Supath Pre-Feasibility Report for Educational Institute Allen Career Institute-Supath at Plot No. 1, Educational Scheme, Naya Nohra & Hanuwantkhera, Kota, Rajasthan-324001 By M/s. Allen Career Institute Registered

More information

Pre- Feasibility RepoRt

Pre- Feasibility RepoRt Pre- Feasibility RepoRt AREA- 59.28 ACRE (24.0 HA) FOR KEN RIVER SAND/MORRUM MINING AT BLOCK NO-09 KHAND NO-03 GATA NO-337 VILLAGE- KANWARA TEHSIL-BANDA, DISTRICT- BANDA(U.P) SHRI RAVINDRA NATH SINGH JULY

More information

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations.

The unit obtained NOC (CFE) of A.P. Pollution control Board in the year 1988 and started operations. 1. Introduction M/s. Sri Krishna Pharmaceuticals Limited, Unit-III (Formerly Sri Krishna Drugs Limited) was established in the year 1988. It is located at Sy. No. 57, Golkonda kalan, Raikunta (V), shamshabad

More information

Kana Aroma Industries. Pre-Feasibility Report

Kana Aroma Industries. Pre-Feasibility Report Pre-Feasibility Report 1. INTRODUCTION M/s. is a proposed unit to be located at Shed no. C1-41/B/1 & 2, GIDC Industrial Estate, Nandesari, Vadodara, Gujarat and proposes to manufacture Allyl Iso Thiocynate,

More information

M/s. Lakeland Chemicals (India) Ltd.

M/s. Lakeland Chemicals (India) Ltd. FOR THE PROPOSED EXPANSION PROJECT FOR MANUFACTURING OF SPECALITY CHEMICALS Category: 5(f) A OF Located at: Plot no 63,6A,6B, Rasayani Road, Vill. Madap, Tq. Khalapur, Dist. Raigad.( Maharashtra) 1 Project

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT FOR Conversion of Existing Product Storage Tanks TK-16(HSD) of 6000 KL to MS and TK-6(MS) of 1000 KL to Ethanol AT HPCL Bulk POL Depot, Mansa Road, Phoos Mandi, Bhatinda-151001.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT DR. REDDY S LABORATORIES LTD. CHEMICAL TECHOPS III PLOT NO.116, 116A, 116B & 126C, S.V. CO OP. IND. ESTATE, BOLLARAM VILLAGE, JINNARAM MANDAL, MEDAK DISTRICT, TELANGANA PRE FEASIBILITY REPORT DR. REDDY

More information

PRE-FEASIBILITY REPORT PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES. OF M/s. UMIYA CHEM INTERMEDIATES

PRE-FEASIBILITY REPORT PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES. OF M/s. UMIYA CHEM INTERMEDIATES PRE-FEASIBILITY REPORT ON PROPOSED PROJECT FOR MANUFACTURING OF DYES INTERMEDIATES OF M/s. UMIYA CHEM INTERMEDIATES AT PLOT NO: 4705/1/1, GIDC ESTATE,ANKLESHWAR, DIST:BHARUCH STATE:-GUJARAT 1 1.0 EXECUTIVE

More information

M/S PARAS INDUSTRIES E-67, RIICO, PHASE-II, MAVAL,ABU ROAD, DIST: SIROHI, RAJASTHAN FORM 1 ANNEXURES

M/S PARAS INDUSTRIES E-67, RIICO, PHASE-II, MAVAL,ABU ROAD, DIST: SIROHI, RAJASTHAN FORM 1 ANNEXURES M/S PARAS INDUSTRIES E-67, RIICO, PHASE-II, MAVAL,A FORM 1 ANNEXURES ANNEXURE NAME OF THE ANNEXURE PAGE NO. ANNEXURE I Detail of product 2 ANNEXURE II Detail of Raw Materials 3 ANNEXURE III ANNEXURE IV

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

M/S. Ever Shine Décor P. Ltd.

M/S. Ever Shine Décor P. Ltd. PRE FEASIBILITY REPORT OF M/S. Ever Shine Décor P. Ltd. Survey No. : 40, Village Indrad, Taluka Kadi, District Mehsana, Gujarat. Mob No.: 09898186603 Email: bhupeshgopani@gmail.com Prepared By: T. R. ASSOCIATES

More information

PRE-FEASIBILITY REPORT ON RICHMOND RESEARCH & PHARMACEUTICALS LLP. July 2018

PRE-FEASIBILITY REPORT ON RICHMOND RESEARCH & PHARMACEUTICALS LLP. July 2018 PRE-FEASIBILITY REPORT ON RICHMOND RESEARCH & PHARMACEUTICALS LLP July 2018 Prepared by B-401, Angel Complex, Near Hotel Oasis, Sardar Patel Stadium Circle, Navarangpura, Ahmedabad 380014 State Gujarat

More information

PRE-FEASIBILITY REPORT

PRE-FEASIBILITY REPORT PRE-FEASIBILITY REPORT ON PROPOSED PROJECT OF MANUFACTURING OF ORGANIC CHEMICALS OF AARTI INDUSTRIES LIMITED (UNIT-V) LOCATED AT Plot 41/1, GIDC Estate, Jhagadia, Bharuch-393110 1.0 EXECUTIVE SUMMARY M/s.

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT for PROPOSED EXPANSION OF BULK DRUGS IN EXISTING UNIT IN GIDC, ANKLESHWAR of M/s. RUSAN PHARMA LTD. PLOT NO. 6406, NEAR HOECHEST CHOWKADI, G.I.D.C., ANKLESHWAR, DIST.: BHARUCH, GUJARAT

More information

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH

SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH SRI K. RAVI SHANKAR SURVEY NO.100, ODULAPALLI VILLAGE, TALPULA MANDAL, ANANTHAPURAMU DISTRICT, ANDHRA PRADESH PRE FEASIBILITY REPORT (OPENCAST QUARTZ MINE 40.313 ha) SUBMITTED BY Sri Door No. 39/49/39,

More information

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report

Limestone Mining Project (Area: ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar (Gujarat) Pre-feasibility Report Limestone Mining Project (Area: 16.18 ha) at Near Village: Bhod, Taluka Ranavav, District Porbandar PRE - FEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENT CLEARANCE For MINING ACTIVITY CATEGORY B2 UNDER

More information

10 PF Resin (liquid) PF Resin (powder) Silver refining Hexamine Hardener Hexamine Tablet

10 PF Resin (liquid) PF Resin (powder) Silver refining Hexamine Hardener Hexamine Tablet PREFEASBILITY REPORT: 1.0 INTRODUCTION : M/s.Simalin Chemicals Pvt. Ltd.. is an existing unit located at plot no. 13, GIDC, Nandesari, Dist. Vadodara which is a chemical notified zone. The unit is involved

More information

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION Jaypee Group is a leading Business House of the country with its presence in Core industries and Service Sectors like Cement, Infrastructure development,

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT BANDOL CRUSHER STONE QUARRY OF SHRI TULSIRAM SAHU AT Khasra No. 15/2,23/2 Village Bandol Tehsil District State Madhya Pradesh Production Capacity 45030 M3/Year Area 3.150 Hectare

More information

PRE FEASIBILITY REPORT

PRE FEASIBILITY REPORT PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY AND INTRODUCTION OF THE PROJECT Shivneri Sugars Ltd., A/p. - Ganesh tekadi, Nhavi (Bk.), Tal.: Koregaon, Dist.: Satara, Maharashtra State was registered vide